ACTIVE SOLICITATIONS
Update to Offer Submission
All offers for City of Austin solicitations must be submitted electronically via eResponse.
List of Active Solicitations
eResponse Instructions |
IFB 1100 DPL1008REBID
View Details
Purchase of fencing and fencing-related products & services to include installation of new fencing, repair services, and custom projects for substations and facilities.
Due Date: 07/15/2025 at 2PM
Security Fencing Services
Purchase of fencing and fencing-related products & services to include installation of new fencing, repair services, and custom projects for substations and facilities.
RFP 7200 SLW3026
View Details
The selected vendor will develop a displacement mitigation strategy and implementation plan that can successfully support existing Colony Park residents to stay in their community.
Due Date: 07/15/2025 at 2PM
Colony Park Displacement Mitigation Strategy
The selected vendor will develop a displacement mitigation strategy and implementation plan that can successfully support existing Colony Park residents to stay in their community.
IFB 1100 MMH1025
View Details
The Contract is with the City of Austin, acting through Austin-Bergstrom International Airport (AUS) and Austin Energy (AE), for the installation, repair, testing, and related services of electrical gear within multiple City facilities. These include eleven AUS facilities and six AE district cooling plants. The scope encompasses electrical gear with equipment ratings for both low voltage (up to 600 volts) and medium voltage (up to 15,000 volts). The Contractor shall be responsible for the installation, testing, start-up, maintenance, repair, troubleshooting, calibration, documentation, and improvement of Electrical Systems. This includes, but is not limited to, power distribution systems, rotating equipment and associated controls, and on-site power generation.
Due Date: 07/17/2025 at 2PM
Electrical Switchgear Preventative Maintenance & Installatio
The Contract is with the City of Austin, acting through Austin-Bergstrom International Airport (AUS) and Austin Energy (AE), for the installation, repair, testing, and related services of electrical gear within multiple City facilities. These include eleven AUS facilities and six AE district cooling plants. The scope encompasses electrical gear with equipment ratings for both low voltage (up to 600 volts) and medium voltage (up to 15,000 volts). The Contractor shall be responsible for the installation, testing, start-up, maintenance, repair, troubleshooting, calibration, documentation, and improvement of Electrical Systems. This includes, but is not limited to, power distribution systems, rotating equipment and associated controls, and on-site power generation.
IFB 6100 CLMC1075
View Details
Construct improvements identified for the Four Points Center (#3) Lift Station in the Northwest Area Lift Station Study. Increase effective wet well volume capacity for Hancox WTP sludge/solids discharge.
Due Date: 07/17/2025 at 2PM
Northwest Area Lift Station Improvements: Four Points Center
Construct improvements identified for the Four Points Center (#3) Lift Station in the Northwest Area Lift Station Study. Increase effective wet well volume capacity for Hancox WTP sludge/solids discharge.
IFB 6100 CLMC1079
View Details
Construction of a new vehicle Checkpoint C at the Austin-Bergstrom International Airport. Construction will include installation of prefabricated guard shack, concrete slab foundation, asphalt paving, roadway striping airport security fencing with automatic gates, and new utility connections for water, wastewater and telecommunications.
Due Date: 07/17/2025 at 2PM
Vehicle Checkpoint C
Construction of a new vehicle Checkpoint C at the Austin-Bergstrom International Airport. Construction will include installation of prefabricated guard shack, concrete slab foundation, asphalt paving, roadway striping airport security fencing with automatic gates, and new utility connections for water, wastewater and telecommunications.
IFB 6100 CLMC1107A
View Details
Design and construction of a bike and pedestrian concrete trail and bridge over Boggy Creek from Gunter Street/Sellers Street intersection to Lyons Road. Construction will utilize federal funds, CSJ: 0914-04-344.
Due Date: 07/17/2025 at 2PM
MoKan Trail Phase 5: Boggy Creek Bridge Rebid
Design and construction of a bike and pedestrian concrete trail and bridge over Boggy Creek from Gunter Street/Sellers Street intersection to Lyons Road. Construction will utilize federal funds, CSJ: 0914-04-344.
IFB 7800 MRO1025
View Details
Due Date: 07/17/2025 at 2PM
Automotive After-market & Custom Air Conditioning Parts
RFP 5000 GTG3000REBID
View Details
The purpose of this contract is to provide Qualtrax software licenses and hosting services.
Due Date: 07/17/2025 at 2PM
Qualtrax Software for Quality, Compliance, and Risk Mgmt.
The purpose of this contract is to provide Qualtrax software licenses and hosting services.
IFB 7800 MLJ1033
View Details
OEM PARTS and REPAIR SERVICES for FORD LIGHT DUTY VEHICLES
Due Date: 07/22/2025 at 2PM
OEM PARTS and REPAIR SERVICES
for FORD LIGHT DUTY VEHICLES
OEM PARTS and REPAIR SERVICES for FORD LIGHT DUTY VEHICLES
IFB 8600 CSH1045REBID
View Details
Purchase of concrete liner boxes for graves and other burial supplies.
Due Date: 07/22/2025 at 2PM
Cemetery equipment and Burial supplies
Purchase of concrete liner boxes for graves and other burial supplies.
IFB 6100 CLMC1056
View Details
The Work consists of an approximate 1400 linear foot horizontal directional bore under Lady Bird Lake for the installation of a 36 inch outside diameter high density polyethylene casing pipe with 12 – 3 inch HDPE carrier pipe, including 2 electrical manholes, electrical duct bank and other incidental construction. Electrical conductors will be provided and installed by Austin Energy.
Due Date: 07/24/2025 at 2PM
LADY BIRD LAKE BORE FOR PEDERNALES RECONDUCTOR
The Work consists of an approximate 1400 linear foot horizontal directional bore under Lady Bird Lake for the installation of a 36 inch outside diameter high density polyethylene casing pipe with 12 – 3 inch HDPE carrier pipe, including 2 electrical manholes, electrical duct bank and other incidental construction. Electrical conductors will be provided and installed by Austin Energy.
IFB 6100 CLMC1127
View Details
As needed and required, this contract is for the repair and replacement of deteriorated wastewater mains throughout the city including performing emergency repairs on wastewater mains and the wastewater collection system. In general, projects are larger or more complex than AWU crews can complete, but too small, isolated, or time sensitive to competitively bid as individual construction contracts.
Due Date: 07/24/2025 at 2PM
WW Line Renewal and Spot Rehab Service IDIQ (2026-2028)
As needed and required, this contract is for the repair and replacement of deteriorated wastewater mains throughout the city including performing emergency repairs on wastewater mains and the wastewater collection system. In general, projects are larger or more complex than AWU crews can complete, but too small, isolated, or time sensitive to competitively bid as individual construction contracts.
IFB 9000 AAM1014
View Details
To establish a new master agreement for required maintenance of equipment for Drug Chemistry, Toxicology, Crime Scene & Firearm/Toolmark Sections.
Due Date: 07/24/2025 at 2PM
Calibration Services
To establish a new master agreement for required maintenance of equipment for Drug Chemistry, Toxicology, Crime Scene & Firearm/Toolmark Sections.
RFQS 6100 CLMP385
View Details
Capital Delivery Services (CDS) seeks a qualified consultant (“Consultant”) with skilled and experienced water and wastewater and general civil engineering project management staff to augment the existing CDS workforce in project management duties within the CDS Utility Project Management Division (UPMD) and Civil Project Management Division (CPMD), currently located at 6800 Burleson Road and 505 Barton Springs Road. The Consultant shall provide design and construction project management services under the supervision of a CDS Project Management Supervisor. The Consultants will be selected based on the two categories below: 1) Project Management for Water and Wastewater Projects 2) Project Management for General Civil Engineering Projects
Due Date: 07/24/2025 at 2PM
Project Management Staff Augmentation Serv for WWW & Gen Civ
Capital Delivery Services (CDS) seeks a qualified consultant (“Consultant”) with skilled and experienced water and wastewater and general civil engineering project management staff to augment the existing CDS workforce in project management duties within the CDS Utility Project Management Division (UPMD) and Civil Project Management Division (CPMD), currently located at 6800 Burleson Road and 505 Barton Springs Road. The Consultant shall provide design and construction project management services under the supervision of a CDS Project Management Supervisor. The Consultants will be selected based on the two categories below: 1) Project Management for Water and Wastewater Projects 2) Project Management for General Civil Engineering Projects
IFB 1100 CPG1002
View Details
The City of Austin, dba Austin Energy, seeks a Contractor to provide insecticide supplies.
Due Date: 07/29/2025 at 2PM
Insecticide Supplies
The City of Austin, dba Austin Energy, seeks a Contractor to provide insecticide supplies.
IFB 8600 KMF1033
View Details
Provide pesticides, fertilizers, and other related goods to City of Austin Parks and Recreation Department Golf Division. The Golf Division currently operates five of seven City owned golf facilities.
Due Date: 07/29/2025 at 2PM
Pesticides, Fertilizers and Related Goods
Provide pesticides, fertilizers, and other related goods to City of Austin Parks and Recreation Department Golf Division. The Golf Division currently operates five of seven City owned golf facilities.
RFP 5300 BPS3016
View Details
The automated web-bases system will allow Austin citizens and property owners to apply for, pay for, and acquire, a short-term rental license within the City’s jurisdiction, and the ability to remit all required
Due Date: 07/29/2025 at 2PM
SW_SV-Short-Term Rental Licensing
The automated web-bases system will allow Austin citizens and property owners to apply for, pay for, and acquire, a short-term rental license within the City’s jurisdiction, and the ability to remit all required
IFB 1100 MMH1026
View Details
The City of Austin, Austin Energy, (Decker Creek Power Station), seeks a qualified Contractor to perform off-site chemical regeneration of mixed bed ion exchange resin.
Due Date: 07/31/2025 at 2PM
Mixed Bed Resin and Reverse Osmosis Filter Services
The City of Austin, Austin Energy, (Decker Creek Power Station), seeks a qualified Contractor to perform off-site chemical regeneration of mixed bed ion exchange resin.
IFB 6100 CLMC1113
View Details
This project will stabilize approximately 800' of a small tributary to Walnut Creek. On going channel incision has created steep and unstable stream banks between single-family homes.
Due Date: 07/31/2025 at 2PM
Walnut Creek - Thompkins Tributary at Lavinia Lane Stream St
This project will stabilize approximately 800' of a small tributary to Walnut Creek. On going channel incision has created steep and unstable stream banks between single-family homes.
RFP 1100 DCM3040
View Details
The purpose of this contract is to provide Austin Energy crane and heavy equipment operations training in addition to providing training specific to preparing individuals for the National Commission of the Certification of Crane Operators (NCCCO) Certification
Due Date: 07/31/2025 at 2PM
Austin Energy Crane & Heavy Equipment Operations Training
The purpose of this contract is to provide Austin Energy crane and heavy equipment operations training in addition to providing training specific to preparing individuals for the National Commission of the Certification of Crane Operators (NCCCO) Certification
RFP 5800 SLW3028
View Details
This contract will provide a Broker of Record to provide consultation, implementation, and administration for the City’s latest Rolling Owner Controlled Insurance Program (“ROCIP”) efforts expected to begin in winter 2025. This phase of ROCIP will be specifically used to cover construction projects that are part of the Austin-Bergstrom International Airport's (AUS) Expansion and Redevelopment Program. The Administrator shall place all insurance coverages with insurance carriers licensed to do business in the State of Texas and have an A.M. Best rating of A- VIII or better.
Due Date: 07/31/2025 at 2PM
ROCIP AUS Insurance Broker of Record and Admin. Services
This contract will provide a Broker of Record to provide consultation, implementation, and administration for the City’s latest Rolling Owner Controlled Insurance Program (“ROCIP”) efforts expected to begin in winter 2025. This phase of ROCIP will be specifically used to cover construction projects that are part of the Austin-Bergstrom International Airport's (AUS) Expansion and Redevelopment Program. The Administrator shall place all insurance coverages with insurance carriers licensed to do business in the State of Texas and have an A.M. Best rating of A- VIII or better.
IFB 6200 MAS1004
View Details
The City of Austin (City) seeks to establish a contract with a contractor for the purchase of various sized traffic signal cables, loop lead-in cables and CAT 5E cables. Initial term of 36 months with two 12-month extension options. $575,000 over 5ys ($115,000 per yr)
Due Date: 08/05/2025 at 2PM
Traffic Signal Cable
The City of Austin (City) seeks to establish a contract with a contractor for the purchase of various sized traffic signal cables, loop lead-in cables and CAT 5E cables. Initial term of 36 months with two 12-month extension options. $575,000 over 5ys ($115,000 per yr)
RFP 1100 DCM3039
View Details
Provide a qualified and experienced Injury Prevention Provider who will provide meta-analysis of historical injury data and development of onsite education, intervention and training program services for Austin Energy employees.
Due Date: 08/05/2025 at 2PM
Injury Prevention Services - Training & Program Development
Provide a qualified and experienced Injury Prevention Provider who will provide meta-analysis of historical injury data and development of onsite education, intervention and training program services for Austin Energy employees.
RFQS 6100 CLMP387
View Details
Evaluate the sustainability of Austin Water’s water treatment process and conduct a feasibility study for potential alternatives.
Due Date: 08/06/2025 at 2PM
Lime Sustainability & Water Treatment Process Evaluation
Evaluate the sustainability of Austin Water’s water treatment process and conduct a feasibility study for potential alternatives.
CSP 6100 CLMB342
View Details
This project will construct approximately 18,000 linear feet of new 72-inch diameter gravity interceptor tunneled along Williamson Creek. Flow will be diverted from the existing interceptor into the new interceptor to abandon as much of the existing interceptor as possible. The project also includes up to 22 cutover lines that will replace the existing interceptor connections and divert the localized flows to the new interceptor.
Due Date: 08/12/2025 at 2PM
Williamson Creek Wastewater Interceptor
This project will construct approximately 18,000 linear feet of new 72-inch diameter gravity interceptor tunneled along Williamson Creek. Flow will be diverted from the existing interceptor into the new interceptor to abandon as much of the existing interceptor as possible. The project also includes up to 22 cutover lines that will replace the existing interceptor connections and divert the localized flows to the new interceptor.
IFB 6100 CLMC1109
View Details
The Work generally consists of providing the following services, including but not limited to the construction of district energy (chilled water) piping and associated infrastructure in the COA Right of Way. More specifically, the work consists of connecting new customers of Austin Energy to the existing underground chilled water distribution system to service the new customer’s building. Work consists of provision of above and below ground pipe, piping hot taps, pipe supports, flexible connections; excavation, tunneling, or boring as required for pipe installation, along with all required casing spacers, tunnel supports, tunnel safety provisions, tunnel dewatering, traffic control provisions including barricades, signage, and safety fencing, valve boxes with traffic rated lids, valve operator stem extensions; butterfly valves and gear operators; air elimination assemblies to include buried traffic-rated enclosure and lid, 2” riser piping, concrete base, shutoff ball valves, automatic air release devices, and associated piping tees and fittings; sediment containment, tree protection, CLSM, pea gravel and grouting, pipe wall penetration and seals; assisting Owner’s chemical testing company; flushing and testing; soil compaction; street, curb, and sidewalk repair, communications manholes, with inner duct, raceways, and hooks for communications fiber optic cabling, installation of fiber optic cabling, removal of excavated materials and spoils; along with associated appurtenances and services.
Due Date: 08/21/2025 at 2PM
2024 IDIQ Chilled Water Construction in the ROW
The Work generally consists of providing the following services, including but not limited to the construction of district energy (chilled water) piping and associated infrastructure in the COA Right of Way. More specifically, the work consists of connecting new customers of Austin Energy to the existing underground chilled water distribution system to service the new customer’s building. Work consists of provision of above and below ground pipe, piping hot taps, pipe supports, flexible connections; excavation, tunneling, or boring as required for pipe installation, along with all required casing spacers, tunnel supports, tunnel safety provisions, tunnel dewatering, traffic control provisions including barricades, signage, and safety fencing, valve boxes with traffic rated lids, valve operator stem extensions; butterfly valves and gear operators; air elimination assemblies to include buried traffic-rated enclosure and lid, 2” riser piping, concrete base, shutoff ball valves, automatic air release devices, and associated piping tees and fittings; sediment containment, tree protection, CLSM, pea gravel and grouting, pipe wall penetration and seals; assisting Owner’s chemical testing company; flushing and testing; soil compaction; street, curb, and sidewalk repair, communications manholes, with inner duct, raceways, and hooks for communications fiber optic cabling, installation of fiber optic cabling, removal of excavated materials and spoils; along with associated appurtenances and services.
Important Notices
The No Lobbying List contains solicitations issued by Central Procurement and all other delegated authorities. | |
All Vendors must now register with the City of Austin before they submit a bid or proposal. Please take the time to read the information in the Conflict of Interest Disclosure: http://www.austintexas.gov/department/conflict-interest-questionnaire. | |
City of Austin employees may not accept any gifts from vendors. Please do not offer or provide gifts or favors to City employees or to City offices. This includes paying for meals. | |
ALL BIDS AND COMPLIANCE PLANS NOT RECEIVED PRIOR TO THE DATE AND TIME SET FORTH WILL BE RETURNED TO THE BIDDER UNOPENED. |