CURRENT CONTRACTS
Construction Contracts
This category includes all construction trades and some construction related professional services as defined by Texas Government Code, Chapter 2254, Professional Services Procurement, such as architects, engineers and surveyors.
Construction Contracts
CONTRACT/DESCRIPTION | EXPIRES | AUTHORIZED | ORDERED | SPENT |
---|---|---|---|---|
MA - 6100 - PA210000086
2021 BROWNFIELDS ENVIRONMENTAL SERVICES ROTATION LIST |
06/24/2025
Expires: 1 days |
$3,500,000.00 | $1,508,173.40 | $1,043,131.82 |
MA - 6100 - CA240000005
MCKALLA RAIL STATION - CITY PROJECT ELEMENTS |
06/26/2025
Expires: 3 days |
$750,337.00 | $750,337.00 | $750,337.00 |
MA - 6100 - SA180000006
GREATER WALNUT AREA CENTRALIZED ODOR CONTROL FACILITY |
06/26/2025
Expires: 3 days |
$830,618.62 | $830,618.62 | $756,396.50 |
MA - 6100 - SA180000011
2018 RESERVOIR IMPROVEMENTS PROGRAM |
06/26/2025
Expires: 3 days |
$7,084,217.00 | $6,548,938.28 | $5,420,620.42 |
MA - 6100 - SA230000006
REIMBURSEMENT AGREEMENT-UPRR- SLAUGHTER LN PRELIMINARY ENG |
06/26/2025
Expires: 3 days |
$31,718.00 | $31,555.13 | $31,555.13 |
MA - 6100 - SA160000005
ABIA PARKING GARAGE AND ADMINISTRATION OFFICES |
06/29/2025
Expires: 6 days |
$15,021,225.25 | $15,021,225.25 | $15,021,225.25 |
MA - 6100 - SA150000005
ABIA TERMINAL EXPANSION AND IMPROVEMENTS |
06/30/2025
Expires: 7 days |
$41,137,426.04 | $41,013,342.26 | $41,013,342.26 |
MA - 6100 - SA150000014
DOWNTOWN DISTRICT COOLING PLANT # 3 |
06/30/2025
Expires: 7 days |
$5,064,337.55 | $5,060,658.99 | $5,052,639.66 |
MA - 6100 - SA210000004
PSA FOR MEXICAN AMERICAN CULTURAL CENTER PHASE 2 |
06/30/2025
Expires: 7 days |
$5,090,531.14 | $5,090,531.14 | $4,568,360.88 |
MA - 6100 - SA220000008
CMR SERVICES FOR ASIAN AMERICAN RESOURCE CENTER RENOVATIONS |
06/30/2025
Expires: 7 days |
$4,800,000.00 | $123,894.00 | $69,470.00 |
MA - 6100 - PA180000033
2018 STREAM RESTORATION AND STORMWATER TREATMENT ENG SVS RL |
07/15/2025
Expires: 22 days |
$15,059,000.00 | $10,564,407.50 | $9,375,604.74 |
MA - 6100 - CA220000014
2021 FACILITIES - LARGE FACILITIES IDIQ |
07/17/2025
Expires: 24 days |
$18,750,000.00 | $15,593,713.19 | $8,074,235.03 |
MA - 6100 - SA220000019
LAKELINE BOULEVARD IMPROVEMENTS |
07/18/2025
Expires: 25 days |
$2,737,374.33 | $2,737,374.33 | $1,850,314.49 |
MA - 6100 - CA220000013
WASTEWATER LINE RENEWAL AND SPOT REHAB SERVICE CONTRACT IDIQ |
07/28/2025
Expires: 35 days |
$9,600,000.00 | $8,641,418.07 | $8,055,626.64 |
MA - 6100 - PA200000050
2020 STORMWATER MAPPING & MODELING RL |
07/28/2025
Expires: 35 days |
$17,500,000.00 | $16,350,139.24 | $10,575,377.99 |
MA - 6100 - PA220000120
2022 INSPECTION & ANALYSIS OF POWER GENERATION FACILITIES RL |
08/09/2025
Expires: 47 days |
$6,000,000.00 | $54,529.56 | $47,402.99 |
MA - 6100 - CA240000006
IDIQ STORMWATER INFRASTRUCTURE IMPROVEMENTS-CLOSED SYST 2023 |
08/13/2025
Expires: 51 days |
$1,875,000.00 | $94,245.13 | $82,452.66 |
MA - 6100 - CA200000020
EMS FACILITY RENOVATIONS, CM@R |
08/29/2025
Expires: 67 days |
$32,302,439.10 | $32,302,439.10 | $29,751,687.37 |
MA - 6100 - SA220000007
MONTOPOLIS AND NORTHWEST DISTRICT PARK POOL REPLACEMENTS |
08/31/2025
Expires: 69 days |
$1,526,000.00 | $1,526,000.00 | $1,245,643.56 |
MA - 6100 - SA160000019
PEER REVIEW OF BARTON SPRINGS ROAD BRIDGE OVER BARTON CREEK |
09/09/2025
Expires: 78 days |
$39,165.47 | $39,165.47 | $21,726.72 |
MA - 6100 - CA230000003
WASTEWATER RENEWAL PROGRAM - MANHOLES IDIQ (2023-2027) |
09/10/2025
Expires: 79 days |
$1,500,000.00 | $1,119,204.76 | $700,118.49 |
MA - 6100 - PA190000058
2019 LANDSCAPE ARCHITECTURE ROTATION LIST |
09/24/2025
Expires: 93 days |
$10,500,000.00 | $3,871,152.22 | $2,885,732.11 |
MA - 6100 - PA200000115
2020 JOB ORDER CONTRACTING PROFESSIONAL SERVICES SUPPORT RL |
09/29/2025
Expires: 98 days |
$6,000,000.00 | $1,186,524.17 | $698,629.57 |
MA - 6100 - SA180000001
WILLIAM CANNON RAILROAD OVERPASS |
10/08/2025
Expires: 107 days |
$1,168,350.11 | $1,168,350.11 | $1,109,146.22 |
MA - 6100 - CA230000005
2020 BOND TRAFFIC & PEDESTRIAN SIGNALS-INSTALLATION & MAINT |
10/10/2025
Expires: 109 days |
$5,000,000.00 | $4,480,002.45 | $3,661,973.99 |
MA - 6100 - CA240000001
2024 MISCELLANEOUS RESIDENTIAL STREETS FOG SEAL IDIQ |
10/11/2025
Expires: 110 days |
$4,000,000.00 | $3,926,073.28 | $2,900,256.80 |
MA - 6100 - CA240000007
STORMWATER INFRASTRUCTURE MAINTENANCE-OPEN SYSTEMS |
10/13/2025
Expires: 112 days |
$3,000,000.00 | $1,203,504.18 | $481,957.02 |
MA - 6100 - CA200000013
2021 AW ASPHALT AND CONCRETE RESTORATION IDIQ |
10/20/2025
Expires: 119 days |
$20,000,000.00 | $10,832,207.05 | $9,542,076.19 |
MA - 6100 - PA210000001
2020 LOCAL MOBILITY FIELD ENG. FOR PED, BIKE, & TRAIL RL |
10/22/2025
Expires: 121 days |
$9,000,000.00 | $8,121,042.40 | $8,066,794.14 |
MA - 6100 - CA150000003
ABIA TERMINAL / APRON EXPANSION AND IMP (CM@R) |
10/23/2025
Expires: 122 days |
$295,181,618.05 | $295,053,393.05 | $295,053,393.05 |
MA - 6100 - SA220000012
CMR FOR MONTOPOLIS & NORTHWEST POOL REPLACEMENT |
10/23/2025
Expires: 122 days |
$17,483,367.00 | $17,483,367.00 | $5,584,990.55 |
MA - 6100 - SA190000016
2019 ABIA ENVIRONMENTAL & ENGINEERING SERVICES |
10/24/2025
Expires: 123 days |
$2,000,000.00 | $1,999,983.47 | $1,695,459.09 |
MA - 6100 - SA210000013
AUSTIN HISTORY CENTER/FAULK LIBRARY CMR |
10/31/2025
Expires: 130 days |
$15,094,327.72 | $15,094,327.72 | $15,094,327.72 |
MA - 6100 - SA200000009
BRANCH LIBRARY INTERIOR RENOVATIONS |
11/15/2025
Expires: 145 days |
$657,792.04 | $657,792.04 | $478,660.28 |
MA - 6100 - 23092100039
LOCAL MOBILITY ADA SIDEWALK AND RMP. IMPNTS GRP. 29-IDIQ |
12/04/2025
Expires: 164 days |
$5,000,000.00 | $4,495,178.08 | $4,494,310.26 |
MA - 6100 - CA240000002
WILD HORSE RANCH WWTP EXPANSION - EMERGENCY CONTRACT |
12/12/2025
Expires: 172 days |
$2,236,225.00 | $1,841,700.66 | $1,841,700.66 |
MA - 6100 - PA170000023
2017 STRUCTURAL ENGINEERING SERVICES ROTATION LIST |
12/12/2025
Expires: 172 days |
$1,250,000.00 | $1,179,753.83 | $1,084,324.44 |
MA - 6100 - PA200000012
2020 LARGE SCALE GENERAL CIVIL ENGINEERING SERVICES RL |
12/15/2025
Expires: 175 days |
$31,600,000.00 | $23,978,306.32 | $16,815,948.51 |
MA - 6100 - PA220000024
2021 ENGINEERING SERVICES FOR POWER PRODUCTION RL |
12/16/2025
Expires: 176 days |
$3,000,000.00 | $2,067,373.54 | $1,674,669.45 |
MA - 6100 - SA190000005
ENGINEERING SERVICES FOR ELECTRIC SERVICE DELIVERY |
12/17/2025
Expires: 177 days |
$9,500,000.00 | $9,343,426.74 | $7,949,929.36 |
MA - 6100 - SA180000007
ZILKER METRO-BARTON SPRINGS BATHHOUSE REHABILITATION |
12/25/2025 | $1,110,840.66 | $1,110,840.66 | $1,048,125.50 |
MA - 6100 - PA100000043
ENVIRONMENTAL SERVICES ROTATION LIST 2010-2012 FOR PWD |
12/31/2025 | $7,200,000.00 | $6,834,431.22 | $6,580,549.18 |
MA - 6100 - PA110000004
WATER AND WASTEWATER PIPELINE ENGINEERING ROTATION LIST |
12/31/2025 | $7,500,000.00 | $6,869,443.36 | $6,797,314.66 |
MA - 6100 - PA110000043
SMALL DIAMETER WATER AND WASTEWATER PIPELINE ENGINEERING |
12/31/2025 | $5,000,000.00 | $4,697,637.66 | $4,697,637.66 |
MA - 6100 - PA110000062
2011 SMALL SCALE CIVIL ENGINEERING ROTATION LIST |
12/31/2025 | $6,400,000.00 | $6,066,745.99 | $5,819,602.14 |
MA - 6100 - PA130000012
2012 SUBSURFACE UTILITY ENGINEERING SERVICES ROTATION LIST |
12/31/2025 | $3,000,000.00 | $2,237,528.32 | $2,225,572.13 |
MA - 6100 - PA150000002
2014 ENVIRONMENTAL SERVICES ROTATION LIST |
12/31/2025 | $4,800,000.00 | $4,406,241.49 | $4,284,801.82 |
MA - 6100 - PA150000019
2015 SPACE PLANNING SERVICES ROTATION LIST |
12/31/2025 | $3,000,000.00 | $531,882.21 | $523,403.55 |
MA - 6100 - PA160000003
2015 WATERSHED ENGINEERING FLOOD HAZARD MITIGATION RL |
12/31/2025 | $15,000,000.00 | $14,685,113.90 | $13,565,976.25 |
MA - 6100 - PA160000040
(CLMP187) 2016 SMALL W&WW FACILITIES ENGINEERING SERVICES RL |
12/31/2025 | $4,000,000.00 | $3,906,307.75 | $3,692,314.21 |
MA - 6100 - PA160000042
2016 LARGE W&WW FACILITIES ENGINEERING SERVICES RL |
12/31/2025 | $20,000,000.00 | $19,546,988.41 | $18,672,606.01 |
MA - 6100 - PA170000027
2017 CONSTRUCT MATL'S, GEOTECH & FORENSIC ENG ROTATION LIST |
12/31/2025 | $9,999,999.96 | $8,510,295.81 | $8,217,397.80 |
MA - 6100 - PA170000033
2017 SMALL DIAMETER W&WW PIPELINE ENGINEERING ROTATION LIST |
12/31/2025 | $5,000,000.00 | $4,746,629.18 | $4,699,069.75 |
MA - 6100 - PA170000034
2017 LARGE DIAMETER WATER & WASTE WATER PIPELINE ENG RL |
12/31/2025 | $9,999,999.90 | $9,799,534.02 | $9,250,316.07 |
MA - 6100 - PA170000053
2017 GENERAL ARCHITECTURAL SERVICES ROTATION LIST |
12/31/2025 | $4,252,409.68 | $4,050,246.73 | $3,847,876.22 |
MA - 6100 - PA190000065
(CLMP255) 2019 SMALL SCALE W&WW FACILITIES ENG SERVICES RL |
12/31/2025 | $10,500,000.00 | $5,390,158.90 | $4,307,422.07 |
MA - 6100 - PA190000066
2019 LARGE SCALE W&WW FACILITIES ENGINEERING SERVICES RL |
12/31/2025 | $33,000,000.00 | $29,137,580.76 | $24,280,088.81 |
MA - 6100 - PA190000067
WATERSHED PROTECTION FLOOD RISK REDUCTION RL |
12/31/2025 | $45,030,000.00 | $28,497,094.37 | $21,298,224.78 |
MA - 6100 - PA200000010
(CLMP262) 2019 LARGE DIA. WATER & WASTEWATER PIPELINE ENG RL |
12/31/2025 | $12,321,000.00 | $12,122,490.24 | $10,222,760.95 |
MA - 6100 - PA200000011
2020 ENVIRONMENTAL SERVICES ROTATION LIST |
12/31/2025 | $5,435,000.00 | $5,172,562.44 | $4,173,114.94 |
MA - 6100 - PA200000014
2019 SMALL DIAMETER W & WW PIPELINE ENGINEERING RL |
12/31/2025 | $8,476,000.00 | $7,696,778.89 | $5,955,223.32 |
MA - 6100 - PA210000069
2021 ATD TRANSPORTATION ENGINEERING SERVICES RL |
12/31/2025 | $8,800,000.00 | $7,791,576.55 | $7,090,007.06 |
MA - 6100 - PA220000067
2022 LARGE DIAMETER W&WW PIPELINE ENG SERVICES ROTATION LIST |
12/31/2025 | $24,000,000.00 | $12,763,157.61 | $6,486,859.53 |
MA - 6100 - PA220000097
2022 SMALL DIAMETER WATER AND WASTEWATER PIPELINE ENG. RL |
12/31/2025 | $11,050,000.00 | $6,649,754.71 | $5,086,233.77 |
MA - 6100 - PA230000026
2022 BUILDING COMMISSION (CX) SERVICES ROTATION LIST |
12/31/2025 | $10,000,000.00 | $1,059,614.07 | $417,226.78 |
MA - 6100 - SA170000007
CORRIDOR IMPROVEMENT PROGRAM CONSULTANT |
12/31/2025 | $77,500,000.00 | $76,775,144.20 | $75,135,549.46 |
MA - 6100 - SA170000010
WALNUT CREEK WWTP CONTROL SYSTEMS UPGRADE |
12/31/2025 | $5,327,552.30 | $5,327,552.30 | $4,087,806.27 |
MA - 6100 - SA190000002
NEW INFORMATION TECHNOLOGY BUILDING |
12/31/2025 | $2,695,078.27 | $2,677,920.14 | $2,677,920.14 |
MA - 6100 - SA190000003
ABIA TERMINAL CENTRALIZED BAGGAGE HANDLING SYSTEM DCM REISSU |
12/31/2025 | $13,837,408.87 | $13,837,408.87 | $3,612,416.11 |
MA - 6100 - SA190000008
SOUTH AREA AND NORTHWEST AREA LIFT STATION IMPROVEMENTS |
12/31/2025 | $12,325,402.33 | $7,925,085.23 | $6,098,113.43 |
MA - 6100 - SA200000006
WALNUT CREEK WASTEWATER TREATMENT PLANT HEADWORKS IMPROVEMEN |
12/31/2025 | $13,025,736.51 | $13,025,736.51 | $5,586,106.42 |
MA - 6100 - SA200000008
BOGGY CREEK LIFT STATION FORCE MAIN EXTENSION |
12/31/2025 | $1,557,860.63 | $1,557,860.63 | $1,525,824.51 |
MA - 6100 - SA210000006
WALNUT CREEK WWTP EXPANSION TO 100 MILLION GALLONS PER DAY |
12/31/2025 | $64,880,150.49 | $64,879,667.05 | $48,670,540.15 |
MA - 6100 - SA210000009
ZILKER METROPOLITAN PARK MASTER PLAN REISSUE |
12/31/2025 | $619,003.38 | $592,006.04 | $592,006.04 |
MA - 6100 - SA220000010
WATERLOO GREENWAY PROJECT |
12/31/2025 | $10,000,000.00 | $9,952,474.05 | $4,883,847.88 |
MA - 6100 - PA200000021
2020 SMALL SCALE GENERAL CIVIL ENGINEERING SERVICES |
01/02/2026 | $6,400,000.00 | $3,642,505.57 | $2,745,988.61 |
MA - 6100 - CA200000021
2020 JOB ORDER CONTRACTING FOR CITY FACILITY IMPROVEMENTS |
01/05/2026 | $48,000,000.00 | $26,512,574.84 | $19,226,511.71 |
MA - 6100 - PA190000022
2018 SURVEYING SERVICES ROTATION LIST |
01/09/2026 | $6,326,000.00 | $4,540,753.35 | $4,041,671.05 |
MA - 6100 - PA200000013
2020 ABIA ARCHITECTURAL & ENGINEERING SERVICES ROTATION LIST |
01/10/2026 | $30,000,000.00 | $21,002,775.92 | $16,645,522.67 |
MA - 6100 - SA220000006
2020 BOND SUBSTANDARD STREETS ROSS ROAD NORTH |
01/26/2026 | $3,181,951.58 | $3,181,951.58 | $2,862,246.59 |
MA - 6100 - PA210000037
2021 STREAM RESTORATION AND STORMWATER TREATMENT ENGINEER RL |
01/31/2026 | $19,600,000.00 | $11,629,690.16 | $5,393,890.26 |
MA - 6100 - SA200000004
UPPER HARRIS BRANCH INTERCEPTOR SA#2 $90,570.07 |
01/31/2026 | $3,065,377.63 | $3,065,377.63 | $2,761,674.41 |
MA - 6100 - 25020500029
2025 MISCELLANEOUS STREETS OVERLAY IDIQ |
02/06/2026 | $8,500,000.00 | $1,787,723.94 | $0.00 |
MA - 6100 - PA160000014
2016 LARGE SCALE GENERAL CIVIL ENGINEERING ROTATION LIST |
02/09/2026 | $17,450,000.00 | $16,924,259.29 | $15,923,383.30 |
MA - 6100 - CA240000003
LOCAL MOBILITY ADA SIDEWALK & RAMP IMPS GRP 32 CITYWIDE IDIQ |
02/12/2026 | $24,000,000.00 | $17,368,692.05 | $6,022,782.20 |
MA - 6100 - CA250000001
IN SITU WASTEWATER LINE RENEWAL PROGRAM IDIQ (2025 TO 2027) |
02/12/2026 | $1,250,000.00 | $1,053,965.48 | $0.00 |
MA - 6100 - CA220000004
2021-2025 BRIDGE MAINTENANCE IDIQ REBID |
02/13/2026 | $3,400,000.00 | $2,013,477.39 | $1,421,560.44 |
MA - 6100 - PA100000084
WATERSHED FLOOD HAZARD MITIGATION ENG SRVS RL 2011-2014 |
02/18/2026 | $7,500,000.00 | $7,490,978.83 | $7,191,715.86 |
MA - 6100 - PA150000015
2015 STORMWATER MODELING AND MAPPING ENGINEERING SERVICES RL |
02/28/2026 | $3,000,000.00 | $2,999,998.56 | $2,174,211.72 |
MA - 6100 - SA210000008
LADYBIRD LAKE-CANTERBURY AT MILDRED STREET & UTILITY IMPROVE |
03/01/2026 | $949,249.05 | $855,766.06 | $855,766.06 |
MA - 6100 - PA150000027
2015 ROOFING & WATERPROOFING CONSULTANT SERVICES RL |
03/12/2026 | $1,400,000.00 | $1,067,814.85 | $970,535.55 |
MA - 6100 - CA220000005
TRAFFIC SIGN & PAVEMENT MARKING SERVICES IDIQ - A |
03/23/2026 | $13,198,000.00 | $8,741,690.13 | $7,571,161.15 |
MA - 6100 - SA160000004
DESIGN OF REDBUD TRAIL BRIDGE OVER LADY BIRD LAKE |
03/25/2026 | $15,586,242.56 | $15,586,152.42 | $14,919,258.06 |
MA - 6100 - CA250000004
SAFE STREETS AND ROADS FOR ALL (SS4A) CONSTRUCTION IDIQ |
03/26/2026 | $2,000,000.00 | $0.00 | $0.00 |
MA - 6100 - PA180000016
ABIA CONSTR. MATL., GEOTECHN. & FORENSIC ENG SRVCS R.L. |
03/28/2026 | $15,000,000.00 | $7,168,179.42 | $3,439,223.38 |
MA - 6100 - CA220000007
TRAFFIC SIGN & PAVEMENT MARKING SERVICES IDIQ - B |
04/06/2026 | $13,198,000.00 | $3,323,198.98 | $1,923,087.29 |
MA - 6100 - CA250000003
SAFE STREETS AND ROADS FOR ALL CONCRETE CONSTRUCTION IDIQ |
04/06/2026 | $4,000,000.00 | $394,317.29 | $0.00 |
MA - 6100 - SA220000011
CLMP322-I35 CAP AND STITCH IMPROVEMENTS CONSULTANT |
04/11/2026 | $3,000,000.00 | $3,000,000.00 | $3,000,000.00 |
MA - 6100 - SA230000005
UPPER TANNEHILL STORMWATER IMPROVEMENTS AND WASTEWATER INTER |
04/13/2026 | $2,885,847.17 | $2,885,847.17 | $2,108,811.64 |
MA - 6100 - CA240000004
LOCAL MOBILITY ADA SIDEWALK & RAMP IMPS GRP 33 CITYWIDE IDIQ |
04/14/2026 | $20,000,000.00 | $12,338,198.36 | $3,451,698.23 |
MA - 6100 - CA230000002
2024 WATERLINE ON-CALL SERVICES IDIQ |
04/17/2026 | $9,000,000.00 | $4,135,417.90 | $3,553,914.60 |
MA - 6100 - SA200000005
EXISTING TERMINAL CENTRALIZED BHS UPGRADES |
04/19/2026 | $231,464,573.88 | $231,464,573.88 | $170,529,780.06 |
MA - 6100 - CA220000002
UNDERGROUND ELECTRICAL CIVIL CONSTRUCTION |
04/20/2026 | $72,000,000.00 | $60,381,913.70 | $59,912,156.32 |
MA - 6100 - PA180000027
2018 CORRIDOR PROGRAM ENGINEERING SERVICES ROTATION LIST |
04/26/2026 | $130,000,000.00 | $116,111,622.90 | $107,634,755.08 |
MA - 6100 - PA230000075
2023 TRANSPORTATION ENGINEERING SERVICES ROTATION LIST |
04/30/2026 | $30,000,000.00 | $11,901,630.52 | $4,560,231.94 |
MA - 6100 - SA200000011
DAVIS WATER TREATMENT PLANT SCADA SYSTEM IMPROVEMENTS |
04/30/2026 | $4,075,380.69 | $4,075,380.69 | $1,229,788.46 |
MA - 6100 - PA210000056
AE STAFF AUGMENTATION, ENG. AND REL. ENG SERVICES RL |
05/02/2026 | $70,875,000.00 | $52,831,419.32 | $36,251,880.93 |
MA - 6100 - PA200000052
2020 ENGINEERING SERVICES FOR AUSTIN ENERGY PLANTS |
05/11/2026 | $10,000,000.00 | $5,867,741.46 | $3,801,083.95 |
MA - 6100 - 25051300035
2024 FACILITIES - EMERGENCY AND LIFT STATION - IDIQ |
05/13/2026 | $7,000,000.00 | $0.00 | $0.00 |
MA - 6100 - SA240000010
BARBARA JORDAN TERMINAL (BJT) OPTIMIZATION - PHASE 2 |
05/25/2026 | $150,000,000.00 | $30,394,036.00 | $1,033,257.23 |
MA - 6100 - SA210000020
COLONY PARK AND GIVENS DISTRICT PARK AQUATIC FACILITIES CMR |
05/31/2026 | $20,712,344.35 | $20,712,344.35 | $19,157,189.40 |
MA - 6100 - SA230000003
CMR FOR AEDP AIRFIELD INFRASTRUCTURE |
06/01/2026 | $259,617,630.80 | $259,617,630.80 | $12,067,675.70 |
MA - 6100 - PA200000058
2020 BUILDING COMMISSIONING (CX)SERVICES ROTATION LIST |
06/17/2026 | $3,750,000.00 | $3,295,573.10 | $2,394,824.72 |
MA - 6100 - SA140000004
ABIA STORMWATER DRAINAGE IMPROVEMENTS |
06/17/2026 | $2,018,869.13 | $1,994,716.22 | $1,754,766.87 |
MA - 6100 - SA210000018
RELAY & PROTECTION ENGINEERING SERVICES FOR ELECTRIC SYSTEM. |
06/26/2026 | $2,935,000.00 | $2,365,857.82 | $2,202,122.44 |
MA - 6100 - SA220000014
ATD TRANSPORTATION ENGINEERING STAFF AUGMENTATION |
07/11/2026 | $21,500,000.00 | $19,214,203.33 | $14,004,624.62 |
MA - 6100 - SA220000015
CIVIL ENGINEERING SERVICES, STREET REHABILITATION PROGRAM |
07/14/2026 | $1,249,530.32 | $0.00 | $0.00 |
MA - 6100 - CA250000009
SHOAL CREEK - MOPAC/STECK WATER QUALITY PONDS RETROFIT |
07/21/2026 | $3,331,271.00 | $0.00 | $0.00 |
MA - 1100 - GA210000058
ELECTRICAL SUPPLIES |
07/28/2026 | $1,247,134.83 | $1,241,583.13 | $1,214,952.04 |
MA - 6100 - SA220000022
PROFESSIONAL SERVICES FOR ADEP AIRFIELD CONSTRUCTION |
07/31/2026 | $24,110,751.11 | $24,110,751.11 | $12,361,272.80 |
MA - 6100 - SA180000002
FALLWELL LANE CAPITAL RENEWAL |
08/03/2026 | $7,691,094.61 | $7,691,094.61 | $3,189,853.71 |
MA - 6100 - SA230000007
CENTER STREET PUMP STATION REPLACEMENT & ELECTRICAL IMPROV |
08/31/2026 | $2,247,900.74 | $2,247,900.74 | $2,023,238.69 |
MA - 6100 - PA190000057
2019 M.E.P. ENGINEERING ROTATION LIST |
09/10/2026 | $4,800,000.00 | $3,374,029.51 | $2,768,923.89 |
MA - 6100 - PA150000003
2015 ABIA ARCHITECTURAL AND ENGINEERING SERVICES RL |
09/25/2026 | $12,500,000.00 | $10,835,002.38 | $10,686,917.37 |
MA - 6100 - PA190000071
2019 GENERAL ARCHITECTURAL SERVICES ROTATION LIST |
09/29/2026 | $13,000,000.00 | $9,415,733.41 | $7,652,685.24 |
MA - 6100 - PA190000072
2019 STRUCTURAL ENGINEERING ROTATION LIST |
09/29/2026 | $4,015,000.00 | $2,343,300.11 | $2,030,910.61 |
MA - 6100 - SA190000015
OLTORF STREET RECLAIMED WATER MAIN PHASES 1 & 2 |
09/29/2026 | $1,679,162.24 | $1,679,162.23 | $1,544,869.88 |
MA - 6100 - PA220000085
2022 ASBESTOS, LEAD PAINT, & MOLD CONSULTANT SERVICES RL |
09/30/2026 | $6,000,000.00 | $2,093,853.82 | $1,485,622.79 |
MA - 6100 - PA220000102
2022 AUSTIN WATER SCADA SERVICES ROTATION LIST |
09/30/2026 | $10,000,000.00 | $1,593,452.96 | $413,881.23 |
MA - 6100 - SA230000013
CURB & GUTTERS - DATA COLLECTION AND ASSESSMENT 2023 |
09/30/2026 | $449,953.02 | $449,953.02 | $449,953.02 |
MA - 6100 - PA160000015
2016 SMALL SCALE GENERAL CIVIL ENGINEERING SERVICES RL |
10/03/2026 | $6,400,000.00 | $5,877,068.56 | $5,638,181.92 |
MA - 6100 - SA180000014
ATD TRANSPORTATION ENGINEERING STAFF AUGMENTATION |
10/31/2026 | $12,200,000.00 | $11,886,213.83 | $11,770,452.49 |
MA - 6100 - SA170000001
WILLIAMSON CREEK WW INTERCEPTOR |
11/01/2026 | $7,046,716.50 | $7,046,716.50 | $6,622,853.90 |
MA - 6100 - PA170000045
2017 WATER AND WASTEWATER SCADA SERVICES ROTATION LIST |
12/31/2026 | $5,000,000.00 | $4,829,490.82 | $4,470,683.95 |
MA - 6100 - PA180000034
2018 ABIA SURVEYING SERVICES ROTATION LIST |
12/31/2026 | $1,500,000.00 | $552,492.88 | $510,954.24 |
MA - 6100 - PA200000100
2020 CIP CONST. MAT'L. TESTING, GEO & FORENSIC ENG SRVCS. RL |
12/31/2026 | $25,000,000.00 | $14,378,108.52 | $6,850,995.81 |
MA - 6100 - PA210000039
2021 ROOFING & WATERPROOFING CONSULTANT SERVICES RL |
12/31/2026 | $1,400,000.00 | $655,032.75 | $487,473.73 |
MA - 6100 - PA220000017
2021 ATD FIELD ENGINEERING SERVICES ROTATION LIST |
12/31/2026 | $10,000,000.00 | $5,865,053.94 | $3,181,395.16 |
MA - 6100 - PA240000013
2024 ENVIRONMENTAL SERVICES ROTATION LIST |
12/31/2026 | $9,000,000.00 | $1,747,211.21 | $571,228.70 |
MA - 6100 - SA160000007
DESIGN OF BARTON SPRINGS ROAD BRIDGE OVER BARTON CREEK |
12/31/2026 | $14,098,960.64 | $11,364,645.16 | $4,125,783.96 |
MA - 6100 - SA160000017
CITY STREET IMPACT FEE |
12/31/2026 | $1,921,560.23 | $1,552,280.17 | $1,552,267.69 |
MA - 6100 - SA210000012
AQUIFER STORAGE AND RECOVERY PILOT PROJECT AND ASR PM |
12/31/2026 | $3,049,583.14 | $3,049,583.14 | $2,609,022.48 |
MA - 6100 - SA220000009
CONGRESS AVENUE URBAN DESIGN INITIATIVE |
12/31/2026 | $5,166,597.99 | $5,166,597.99 | $4,403,418.27 |
MA - 6100 - SA230000012
BRACKENRIDGE GAS INSULATED SWITCHGEAR SUBSTATION REISSUE |
12/31/2026 | $32,851,188.72 | $32,851,188.72 | $8,834,178.96 |
MA - 6100 - PA230000057
2023 SUBSURFACE UTILITY ENGINEERING (SUE) SERVICES RL |
02/28/2027 | $4,800,000.00 | $365,962.42 | $219,632.47 |
MA - 6100 - SA250000004
AEDP UICW CONSTRUCTION |
02/28/2027 | $2,894,390.90 | $2,894,390.90 | $0.00 |
MA - 6100 - CA250000006
AUS PARKING LOT CONSTRUCTION, REHABILITATION & REPAIR IDIQ |
03/23/2027 | $18,900,000.00 | $4,857,526.70 | $0.00 |
MA - 6100 - SA220000021
CMR SERVICES FOR BARBARA JORDAN TERMINAL (BJT) OPTIMIZATION |
03/31/2027 | $129,597,528.00 | $129,597,528.00 | $69,461,670.00 |
MA - 6100 - SA240000005
DAVIS MEDIUM SERVICE WATER TRANSMISSION MAIN PIPELINE |
04/09/2027 | $4,430,674.04 | $4,430,674.04 | $2,994,498.38 |
MA - 6100 - SA240000009
IH35 CAP & STITCH -CONNECTING AUSTIN EQUITABLY M |
08/07/2027 | $1,398,893.66 | $1,398,893.66 | $284,792.85 |
MA - 6100 - SA230000014
ABIA ENVIRONMENTAL AND ENGINEERING SERVICES |
09/30/2027 | $5,000,000.00 | $282,992.98 | $4,266.01 |
MA - 6100 - PA200000049
2020 DSD CONSTRUCTION MATERIALS ENGINEERING SERVICES RL |
12/31/2027 | $5,000,000.00 | $4,423,036.85 | $3,750,634.60 |
MA - 6100 - SA240000008
SUNKEN GARDENS - HABITAT ENHANCEMENT AND HISTORIC WALL REPAI |
12/31/2027 | $431,978.38 | $431,978.38 | $249,903.43 |
MA - 6100 - PA250000009
2024 LARGE SCALE GENERAL CIVIL ENGINEERING SERVICES RL |
03/02/2028 | $39,000,000.00 | $0.00 | $0.00 |
MA - 6100 - SA250000003
AUS CENTRAL UTILITY PLANT RELOCATION |
03/31/2028 | $6,511,481.62 | $6,511,481.62 | $2,688,255.32 |
MA - 6100 - SA220000001
WALNUT CREEK TRAIL - IH35 TO SOUTHERN WALNUT CREEK TRAIL |
04/10/2028 | $11,802,721.63 | $11,802,721.63 | $3,590,727.15 |
MA - 6100 - SA230000004
WALNUT CREEK PRIMARY CLARIFIER-FLOW EQUALIZATION BASIN REHAB |
06/16/2028 | $148,515,982.41 | $148,515,982.41 | $16,686,203.05 |
MA - 6100 - PA230000098
2023 LOCAL MOBILITY SIDEWALK, BIKEWAY AND URBAN TRAILS FIELD |
08/03/2028 | $24,000,000.00 | $6,492,832.97 | $3,675,476.49 |
MA - 6100 - PA240000095
2024 GENERAL ARCHITECTURAL ROTATION LIST |
09/08/2028 | $11,000,000.00 | $58,000.00 | $0.00 |
MA - 6100 - SA200000007
PROFESSIONAL ARCHITECTURAL AND HISTORIC PRESERVATION SERVICE |
09/15/2028 | $405,745.34 | $405,745.34 | $320,514.75 |
MA - 6100 - SA240000018
WALLER CREEK RESTACK PLAN |
11/03/2028 | $710,800.28 | $710,800.28 | $172,622.20 |
MA - 6100 - SA240000020
SOUTHWEST PRESSURE ZONES PUMP STATION/RESERVOIR STUDY |
11/06/2028 | $2,538,367.23 | $2,538,367.23 | $153,095.35 |
MA - 6100 - SA250000002
HANDCOX WATER TREATMENT PLANT RESILIENCY IMPROVEMENT |
11/20/2028 | $7,391,405.98 | $7,391,405.98 | $0.00 |
MA - 6100 - SA240000013
WEST GARAGE - LOT B CMR |
11/30/2028 | $242,632,668.07 | $242,632,668.07 | $9,977,860.81 |
MA - 6100 - SA240000014
WEST GARAGE - LOT B PSA PRELIMINARY AND DESIGN PHASE |
11/30/2028 | $9,694,338.85 | $9,694,338.85 | $7,319,514.81 |
MA - 6100 - SA180000005
NORTHEAST WATER TREATMENT PLANT EXPANSION TO 1.5 MGD |
12/01/2028 | $11,662,792.26 | $11,662,792.26 | $7,565,087.78 |
MA - 6100 - PA240000062
2024 CONSTRUCTION INSPECTION ROTATION LIST |
12/31/2028 | $7,200,000.00 | $1,924,877.64 | $372,301.69 |
MA - 6100 - SA230000002
ATD STREET DESIGN STAFF AUGMENTATION |
12/31/2028 | $22,000,000.00 | $6,879,529.12 | $5,505,772.44 |
MA - 6100 - SA250000006
CONCOURSE B AND TUNNEL |
02/25/2029 | $8,819,891.00 | $8,819,891.00 | $911,087.92 |
MA - 6100 - SA240000003
AUSTIN CONVENTION CENTER REDEVELOPMENT |
03/29/2029 | $259,156,735.95 | $259,156,735.95 | $34,025,257.08 |
MA - 6100 - SA240000001
EXPERT PROJECT MANAGER & TECHNICAL SERVICES FOR REDEV OF ACC |
03/30/2029 | $26,002,925.65 | $26,002,925.65 | $9,676,943.76 |
MA - 6100 - SA240000002
AUSTIN CONVENTION CENTER REDEVELOPMENT |
03/30/2029 | $103,973,829.72 | $103,973,829.62 | $38,718,837.79 |
MA - 6100 - PA240000069
2023 WATERSHED PROTECTION FLOOD RISK REDUCTION ROTATION LIST |
08/15/2029 | $45,000,000.00 | $0.00 | $0.00 |
MA - 6100 - SA240000019
AUS BUILDING COMMISSIONING (CX) SERVICES |
09/09/2029 | $24,000,000.00 | $1,636,779.25 | $0.00 |
MA - 6100 - PA250000003
2023 SURVEYING SERVICES ROTATION LIST |
10/08/2029 | $7,000,000.00 | $0.00 | $0.00 |
MA - 6100 - PA250000007
2024 LARGE SCALE W&WW FACILITIES ENGINEERING SERVI |
10/28/2029 | $35,000,000.00 | $5,242,661.07 | $949,204.21 |
MA - 6100 - SA240000017
UTILITY INFRASTRUCTURE CAMPUS WIDE |
11/30/2029 | $9,999,876.52 | $9,999,876.52 | $2,996,309.31 |
MA - 6100 - PA250000008
(CLMP372) 2024 AUS ARCHITECTURAL & ENGINEERING SERVICES RL |
12/10/2029 | $60,000,000.00 | $0.00 | $0.00 |
MA - 6100 - SA200000022
HORNSBY BEND BMP HEADWORKS |
01/01/1930 | $2,740,782.49 | $2,740,782.49 | $2,363,351.47 |
MA - 6100 - SA250000005
ARRIVALS AND DEPARTURES HALL CMAR |
01/31/1930 | $4,211,270.06 | $4,211,270.06 | $233,959.45 |
MA - 6100 - SA250000007
ARRIVALS AND DEPARTURES HALL (AEDP) DESIGN SERVICES |
01/31/1930 | $10,180,331.68 | $10,180,331.68 | $4,555,634.93 |
MA - 6100 - CA160000003
REPUBLIC SQUARE PARK MASTER PLAN RE-IMPROVEMENTS (PARD) |
02/10/1930 | $2,381,144.95 | $2,239,716.85 | $2,239,716.85 |
MA - 6100 - SA220000004
ABIA AIRPORT PRINCIPAL ARCHITECT/ENGINEER |
03/07/1930 | $52,000,000.00 | $42,984,875.47 | $34,724,981.66 |
MA - 6100 - PA250000068
CLMP375-2024 LOCALIZED FLOOD ANALYSIS ROTATION LIST |
05/07/1930 | $36,000,000.00 | $0.00 | $0.00 |
CT - 6100 - 09051901445
DAVIS WATER TREATMENT PLANT POWER DISTRIBUTION UPGRADE |
Open | $6,994,382.15 | $6,994,382.15 | $6,410,538.11 |
CT - 6100 - 09060501513
WATER DISTRIBUTION CONTROL SYSTEM& LIFT STATION TELEMETRY |
Open | $2,100,902.63 | $2,100,902.63 | $2,068,742.69 |
CT - 6100 - 09120800381A
DAVIS WTP TREATED WATER DISCHARGE SYSTEM |
Open | $6,757,987.46 | $6,757,987.46 | $6,424,866.55 |
CT - 6100 - 11110300120A
WEST RUNDBERG LANE EXTENSION PROJECT |
Open | $297,778.73 | $297,778.73 | $233,805.67 |
CT - 6100 - 11110300120A
WEST RUNDBERG LANE EXTENSION PROJECT |
Open | $297,778.73 | $297,778.73 | $233,805.67 |
CT - 6100 - 11110300120A
WEST RUNDBERG LANE EXTENSION PROJECT |
Open | $297,778.73 | $297,778.73 | $233,805.67 |
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM |
Open | $45,786,686.58 | $45,786,686.58 | $42,838,262.02 |
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM |
Open | $45,786,686.58 | $45,786,686.58 | $42,838,262.02 |
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM |
Open | $45,786,686.58 | $45,786,686.58 | $42,838,262.02 |
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM |
Open | $45,786,686.58 | $45,786,686.58 | $42,838,262.02 |
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM |
Open | $45,786,686.58 | $45,786,686.58 | $42,838,262.02 |
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM |
Open | $45,786,686.58 | $45,786,686.58 | $42,838,262.02 |
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM |
Open | $45,786,686.58 | $45,786,686.58 | $42,838,262.02 |
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM |
Open | $45,786,686.58 | $45,786,686.58 | $42,838,262.02 |
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM |
Open | $45,786,686.58 | $45,786,686.58 | $42,838,262.02 |
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM |
Open | $45,786,686.58 | $45,786,686.58 | $42,838,262.02 |
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE |
Open | $26,672,943.53 | $26,672,943.53 | $25,740,274.76 |
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE |
Open | $26,672,943.53 | $26,672,943.53 | $25,740,274.76 |
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE |
Open | $26,672,943.53 | $26,672,943.53 | $25,740,274.76 |
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE |
Open | $26,672,943.53 | $26,672,943.53 | $25,740,274.76 |
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE |
Open | $26,672,943.53 | $26,672,943.53 | $25,740,274.76 |
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE |
Open | $26,672,943.53 | $26,672,943.53 | $25,740,274.76 |
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE |
Open | $26,672,943.53 | $26,672,943.53 | $25,740,274.76 |
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE |
Open | $26,672,943.53 | $26,672,943.53 | $25,740,274.76 |
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE |
Open | $26,672,943.53 | $26,672,943.53 | $25,740,274.76 |
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE |
Open | $26,672,943.53 | $26,672,943.53 | $25,740,274.76 |
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP) |
Open | $4,952,044.83 | $4,952,044.83 | $4,918,121.01 |
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP) |
Open | $4,952,044.83 | $4,952,044.83 | $4,918,121.01 |
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP) |
Open | $4,952,044.83 | $4,952,044.83 | $4,918,121.01 |
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP) |
Open | $4,952,044.83 | $4,952,044.83 | $4,918,121.01 |
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP) |
Open | $4,952,044.83 | $4,952,044.83 | $4,918,121.01 |
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP) |
Open | $4,952,044.83 | $4,952,044.83 | $4,918,121.01 |
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP) |
Open | $4,952,044.83 | $4,952,044.83 | $4,918,121.01 |
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP) |
Open | $4,952,044.83 | $4,952,044.83 | $4,918,121.01 |
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP) |
Open | $4,952,044.83 | $4,952,044.83 | $4,918,121.01 |
CT - 6100 - 18102400031A
FOREST RIDGE GROUND STORAGE RESERVOIR IMPROVEMENTS |
Open | $47,000.00 | $47,000.00 | $46,243.78 |
CT - 6100 - 18102400031A
FOREST RIDGE GROUND STORAGE RESERVOIR IMPROVEMENTS |
Open | $47,000.00 | $47,000.00 | $46,243.78 |
CT - 6100 - 18102400031A
FOREST RIDGE GROUND STORAGE RESERVOIR IMPROVEMENTS |
Open | $47,000.00 | $47,000.00 | $46,243.78 |
CT - 6100 - 18102400031A
FOREST RIDGE GROUND STORAGE RESERVOIR IMPROVEMENTS |
Open | $47,000.00 | $47,000.00 | $46,243.78 |
CT - 6100 - 18102400031A
FOREST RIDGE GROUND STORAGE RESERVOIR IMPROVEMENTS |
Open | $47,000.00 | $47,000.00 | $46,243.78 |
CT - 6100 - 18111400070A
LEUTHAN LANE GROUND STORAGE RESERVOIR IMPROVEMENTS |
Open | $40,162.41 | $40,162.41 | $39,220.40 |
CT - 6100 - 18111400070A
LEUTHAN LANE GROUND STORAGE RESERVOIR IMPROVEMENTS |
Open | $40,162.41 | $40,162.41 | $39,220.40 |
CT - 6100 - 18111400070A
LEUTHAN LANE GROUND STORAGE RESERVOIR IMPROVEMENTS |
Open | $40,162.41 | $40,162.41 | $39,220.40 |
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST |
Open | $10,458,303.00 | $10,458,303.00 | $10,395,318.06 |
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST |
Open | $10,458,303.00 | $10,458,303.00 | $10,395,318.06 |
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST |
Open | $10,458,303.00 | $10,458,303.00 | $10,395,318.06 |
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST |
Open | $10,458,303.00 | $10,458,303.00 | $10,395,318.06 |
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST |
Open | $10,458,303.00 | $10,458,303.00 | $10,395,318.06 |
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST |
Open | $10,458,303.00 | $10,458,303.00 | $10,395,318.06 |
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST |
Open | $10,458,303.00 | $10,458,303.00 | $10,395,318.06 |
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST |
Open | $10,458,303.00 | $10,458,303.00 | $10,395,318.06 |
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST |
Open | $10,458,303.00 | $10,458,303.00 | $10,395,318.06 |
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST |
Open | $10,458,303.00 | $10,458,303.00 | $10,395,318.06 |
CT - 6100 - 19082200757
ACC HIGHLAND CHILLED WATER PLANT |
Open | $25,633,791.67 | $25,633,791.67 | $25,255,263.52 |
CT - 6100 - 19082200757
ACC HIGHLAND CHILLED WATER PLANT |
Open | $25,633,791.67 | $25,633,791.67 | $25,255,263.52 |
CT - 6100 - 19082200757
ACC HIGHLAND CHILLED WATER PLANT |
Open | $25,633,791.67 | $25,633,791.67 | $25,255,263.52 |
CT - 6100 - 19082200757
ACC HIGHLAND CHILLED WATER PLANT |
Open | $25,633,791.67 | $25,633,791.67 | $25,255,263.52 |
CT - 6100 - 19082200757
ACC HIGHLAND CHILLED WATER PLANT |
Open | $25,633,791.67 | $25,633,791.67 | $25,255,263.52 |
CT - 6100 - 19110100074
DAVIS LANE # 1 RESERVOIR IMPROVEMENTS |
Open | $5,095,366.53 | $5,095,366.53 | $5,068,385.66 |
CT - 6100 - 19110100074
DAVIS LANE # 1 RESERVOIR IMPROVEMENTS |
Open | $5,095,366.53 | $5,095,366.53 | $5,068,385.66 |
CT - 6100 - 19110100074
DAVIS LANE # 1 RESERVOIR IMPROVEMENTS |
Open | $5,095,366.53 | $5,095,366.53 | $5,068,385.66 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1 |
Open | $3,913,079.50 | $3,913,079.50 | $3,906,673.25 |
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS |
Open | $43,401,870.66 | $43,401,870.66 | $41,219,693.48 |
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS |
Open | $43,401,870.66 | $43,401,870.66 | $41,219,693.48 |
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS |
Open | $43,401,870.66 | $43,401,870.66 | $41,219,693.48 |
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS |
Open | $43,401,870.66 | $43,401,870.66 | $41,219,693.48 |
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS |
Open | $43,401,870.66 | $43,401,870.66 | $41,219,693.48 |
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS |
Open | $43,401,870.66 | $43,401,870.66 | $41,219,693.48 |
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS |
Open | $43,401,870.66 | $43,401,870.66 | $41,219,693.48 |
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS |
Open | $43,401,870.66 | $43,401,870.66 | $41,219,693.48 |
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS |
Open | $43,401,870.66 | $43,401,870.66 | $41,219,693.48 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC |
Open | $31,206,079.43 | $31,206,079.43 | $29,107,312.19 |
CT - 6100 - 20080700966
BRUSH SQUARE - O. HENRY MUSEUM RESTORATION |
Open | $850,321.45 | $850,321.45 | $611,954.51 |
CT - 6100 - 20080700966
BRUSH SQUARE - O. HENRY MUSEUM RESTORATION |
Open | $850,321.45 | $850,321.45 | $611,954.51 |
CT - 6100 - 20080700966
BRUSH SQUARE - O. HENRY MUSEUM RESTORATION |
Open | $850,321.45 | $850,321.45 | $611,954.51 |
CT - 6100 - 20081701011
HARMOND AVENUE AREA WATER AND WASTEWATER SYSTEM RENEWAL |
Open | $3,153,641.80 | $3,153,641.80 | $2,989,635.32 |
CT - 6100 - 20081701011
HARMOND AVENUE AREA WATER AND WASTEWATER SYSTEM RENEWAL |
Open | $3,153,641.80 | $3,153,641.80 | $2,989,635.32 |
CT - 6100 - 20081701011
HARMOND AVENUE AREA WATER AND WASTEWATER SYSTEM RENEWAL |
Open | $3,153,641.80 | $3,153,641.80 | $2,989,635.32 |
CT - 6100 - 20102900051
SAN ANTONIO STREET CHILLED WATER DISTRIBUTION EXTENSION |
Open | $4,322,891.00 | $4,322,891.00 | $4,167,980.60 |
CT - 6100 - 20102900051
SAN ANTONIO STREET CHILLED WATER DISTRIBUTION EXTENSION |
Open | $4,322,891.00 | $4,322,891.00 | $4,167,980.60 |
CT - 6100 - 20102900051
SAN ANTONIO STREET CHILLED WATER DISTRIBUTION EXTENSION |
Open | $4,322,891.00 | $4,322,891.00 | $4,167,980.60 |
CT - 6100 - 20120100122
SLAUGHTER LANE AND CAPITAL OF TEXAS RESERVOIR IMPROVEMENTS |
Open | $3,469,435.64 | $3,469,435.64 | $3,469,360.64 |
CT - 6100 - 20120100122
SLAUGHTER LANE AND CAPITAL OF TEXAS RESERVOIR IMPROVEMENTS |
Open | $3,469,435.64 | $3,469,435.64 | $3,469,360.64 |
CT - 6100 - 20120100122
SLAUGHTER LANE AND CAPITAL OF TEXAS RESERVOIR IMPROVEMENTS |
Open | $3,469,435.64 | $3,469,435.64 | $3,469,360.64 |
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP |
Open | $16,226,149.13 | $16,226,149.13 | $15,932,635.33 |
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP |
Open | $16,226,149.13 | $16,226,149.13 | $15,932,635.33 |
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP |
Open | $16,226,149.13 | $16,226,149.13 | $15,932,635.33 |
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP |
Open | $16,226,149.13 | $16,226,149.13 | $15,932,635.33 |
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP |
Open | $16,226,149.13 | $16,226,149.13 | $15,932,635.33 |
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP |
Open | $16,226,149.13 | $16,226,149.13 | $15,932,635.33 |
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP |
Open | $16,226,149.13 | $16,226,149.13 | $15,932,635.33 |
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP |
Open | $16,226,149.13 | $16,226,149.13 | $15,932,635.33 |
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP |
Open | $16,226,149.13 | $16,226,149.13 | $15,932,635.33 |
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP |
Open | $16,226,149.13 | $16,226,149.13 | $15,932,635.33 |
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP |
Open | $16,226,149.13 | $16,226,149.13 | $15,932,635.33 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL |
Open | $23,464,878.78 | $23,464,878.78 | $18,488,635.25 |
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2 |
Open | $6,434,176.40 | $6,434,176.40 | $6,402,276.40 |
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2 |
Open | $6,434,176.40 | $6,434,176.40 | $6,402,276.40 |
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2 |
Open | $6,434,176.40 | $6,434,176.40 | $6,402,276.40 |
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2 |
Open | $6,434,176.40 | $6,434,176.40 | $6,402,276.40 |
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2 |
Open | $6,434,176.40 | $6,434,176.40 | $6,402,276.40 |
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2 |
Open | $6,434,176.40 | $6,434,176.40 | $6,402,276.40 |
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2 |
Open | $6,434,176.40 | $6,434,176.40 | $6,402,276.40 |
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2 |
Open | $6,434,176.40 | $6,434,176.40 | $6,402,276.40 |
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2 |
Open | $6,434,176.40 | $6,434,176.40 | $6,402,276.40 |
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2 |
Open | $6,434,176.40 | $6,434,176.40 | $6,402,276.40 |
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2 |
Open | $3,177,853.20 | $3,177,853.20 | $3,018,960.53 |
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2 |
Open | $3,177,853.20 | $3,177,853.20 | $3,018,960.53 |
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2 |
Open | $3,177,853.20 | $3,177,853.20 | $3,018,960.53 |
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2 |
Open | $3,177,853.20 | $3,177,853.20 | $3,018,960.53 |
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2 |
Open | $3,177,853.20 | $3,177,853.20 | $3,018,960.53 |
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2 |
Open | $3,177,853.20 | $3,177,853.20 | $3,018,960.53 |
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2 |
Open | $3,177,853.20 | $3,177,853.20 | $3,018,960.53 |
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2 |
Open | $3,177,853.20 | $3,177,853.20 | $3,018,960.53 |
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2 |
Open | $3,177,853.20 | $3,177,853.20 | $3,018,960.53 |
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2 |
Open | $3,177,853.20 | $3,177,853.20 | $3,018,960.53 |
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2 |
Open | $3,177,853.20 | $3,177,853.20 | $3,018,960.53 |
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2 |
Open | $3,177,853.20 | $3,177,853.20 | $3,018,960.53 |
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2 |
Open | $3,177,853.20 | $3,177,853.20 | $3,018,960.53 |
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS |
Open | $966,200.55 | $966,200.55 | $840,648.00 |
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS |
Open | $966,200.55 | $966,200.55 | $840,648.00 |
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS |
Open | $966,200.55 | $966,200.55 | $840,648.00 |
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS |
Open | $966,200.55 | $966,200.55 | $840,648.00 |
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS |
Open | $966,200.55 | $966,200.55 | $840,648.00 |
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS |
Open | $966,200.55 | $966,200.55 | $840,648.00 |
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS |
Open | $966,200.55 | $966,200.55 | $840,648.00 |
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS |
Open | $6,855,135.60 | $6,855,135.60 | $6,833,980.20 |
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS |
Open | $6,855,135.60 | $6,855,135.60 | $6,833,980.20 |
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS |
Open | $6,855,135.60 | $6,855,135.60 | $6,833,980.20 |
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS |
Open | $6,855,135.60 | $6,855,135.60 | $6,833,980.20 |
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS |
Open | $6,855,135.60 | $6,855,135.60 | $6,833,980.20 |
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS |
Open | $6,855,135.60 | $6,855,135.60 | $6,833,980.20 |
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS |
Open | $6,855,135.60 | $6,855,135.60 | $6,833,980.20 |
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST |
Open | $18,242,298.25 | $18,242,298.25 | $18,242,298.24 |
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST |
Open | $18,242,298.25 | $18,242,298.25 | $18,242,298.24 |
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST |
Open | $18,242,298.25 | $18,242,298.25 | $18,242,298.24 |
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST |
Open | $18,242,298.25 | $18,242,298.25 | $18,242,298.24 |
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST |
Open | $18,242,298.25 | $18,242,298.25 | $18,242,298.24 |
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST |
Open | $18,242,298.25 | $18,242,298.25 | $18,242,298.24 |
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST |
Open | $18,242,298.25 | $18,242,298.25 | $18,242,298.24 |
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK |
Open | $6,342,467.10 | $6,342,467.10 | $5,837,593.25 |
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK |
Open | $6,342,467.10 | $6,342,467.10 | $5,837,593.25 |
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK |
Open | $6,342,467.10 | $6,342,467.10 | $5,837,593.25 |
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK |
Open | $6,342,467.10 | $6,342,467.10 | $5,837,593.25 |
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK |
Open | $6,342,467.10 | $6,342,467.10 | $5,837,593.25 |
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK |
Open | $6,342,467.10 | $6,342,467.10 | $5,837,593.25 |
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK |
Open | $6,342,467.10 | $6,342,467.10 | $5,837,593.25 |
CT - 6100 - 21121400224
HYDE PARK WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $8,479,167.50 | $8,479,167.50 | $7,801,001.47 |
CT - 6100 - 21121400224
HYDE PARK WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $8,479,167.50 | $8,479,167.50 | $7,801,001.47 |
CT - 6100 - 21121400224
HYDE PARK WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $8,479,167.50 | $8,479,167.50 | $7,801,001.47 |
CT - 6100 - 21121400224
HYDE PARK WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $8,479,167.50 | $8,479,167.50 | $7,801,001.47 |
CT - 6100 - 21121400224
HYDE PARK WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $8,479,167.50 | $8,479,167.50 | $7,801,001.47 |
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM |
Open | $9,402,835.88 | $9,402,835.88 | $8,774,758.65 |
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM |
Open | $9,402,835.88 | $9,402,835.88 | $8,774,758.65 |
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM |
Open | $9,402,835.88 | $9,402,835.88 | $8,774,758.65 |
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM |
Open | $9,402,835.88 | $9,402,835.88 | $8,774,758.65 |
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM |
Open | $9,402,835.88 | $9,402,835.88 | $8,774,758.65 |
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM |
Open | $9,402,835.88 | $9,402,835.88 | $8,774,758.65 |
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM |
Open | $9,402,835.88 | $9,402,835.88 | $8,774,758.65 |
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM |
Open | $9,402,835.88 | $9,402,835.88 | $8,774,758.65 |
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM |
Open | $9,402,835.88 | $9,402,835.88 | $8,774,758.65 |
CT - 6100 - 22020500342
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT CENTRIFUGES |
Open | $10,841,914.37 | $10,841,914.37 | $10,603,722.50 |
CT - 6100 - 22020500342
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT CENTRIFUGES |
Open | $10,841,914.37 | $10,841,914.37 | $10,603,722.50 |
CT - 6100 - 22020500342
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT CENTRIFUGES |
Open | $10,841,914.37 | $10,841,914.37 | $10,603,722.50 |
CT - 6100 - 22020500342
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT CENTRIFUGES |
Open | $10,841,914.37 | $10,841,914.37 | $10,603,722.50 |
CT - 6100 - 22021700368
SL OAKS LS WET WELL CONV. & HOB CREEK LS JIB CRANE INSTALL |
Open | $712,395.55 | $712,395.55 | $466,600.10 |
CT - 6100 - 22021700368
SL OAKS LS WET WELL CONV. & HOB CREEK LS JIB CRANE INSTALL |
Open | $712,395.55 | $712,395.55 | $466,600.10 |
CT - 6100 - 22021700368
SL OAKS LS WET WELL CONV. & HOB CREEK LS JIB CRANE INSTALL |
Open | $712,395.55 | $712,395.55 | $466,600.10 |
CT - 6100 - 22021700368
SL OAKS LS WET WELL CONV. & HOB CREEK LS JIB CRANE INSTALL |
Open | $712,395.55 | $712,395.55 | $466,600.10 |
CT - 6100 - 22021700368
SL OAKS LS WET WELL CONV. & HOB CREEK LS JIB CRANE INSTALL |
Open | $712,395.55 | $712,395.55 | $466,600.10 |
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT) |
Open | $8,584,169.00 | $8,584,169.00 | $8,168,529.52 |
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT) |
Open | $8,584,169.00 | $8,584,169.00 | $8,168,529.52 |
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT) |
Open | $8,584,169.00 | $8,584,169.00 | $8,168,529.52 |
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT) |
Open | $8,584,169.00 | $8,584,169.00 | $8,168,529.52 |
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT) |
Open | $8,584,169.00 | $8,584,169.00 | $8,168,529.52 |
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT) |
Open | $8,584,169.00 | $8,584,169.00 | $8,168,529.52 |
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT) |
Open | $8,584,169.00 | $8,584,169.00 | $8,168,529.52 |
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT) |
Open | $8,584,169.00 | $8,584,169.00 | $8,168,529.52 |
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT) |
Open | $8,584,169.00 | $8,584,169.00 | $8,168,529.52 |
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT) |
Open | $8,584,169.00 | $8,584,169.00 | $8,168,529.52 |
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT) |
Open | $8,584,169.00 | $8,584,169.00 | $8,168,529.52 |
CT - 6100 - 22050300543
CTECC SECURITY GATE & FENCING IMPROVEMENTS - REBID |
Open | $1,741,460.80 | $1,741,460.80 | $1,415,203.21 |
CT - 6100 - 22050300543
CTECC SECURITY GATE & FENCING IMPROVEMENTS - REBID |
Open | $1,741,460.80 | $1,741,460.80 | $1,415,203.21 |
CT - 6100 - 22050300543
CTECC SECURITY GATE & FENCING IMPROVEMENTS - REBID |
Open | $1,741,460.80 | $1,741,460.80 | $1,415,203.21 |
CT - 6100 - 22050300543
CTECC SECURITY GATE & FENCING IMPROVEMENTS - REBID |
Open | $1,741,460.80 | $1,741,460.80 | $1,415,203.21 |
CT - 6100 - 22050300543
CTECC SECURITY GATE & FENCING IMPROVEMENTS - REBID |
Open | $1,741,460.80 | $1,741,460.80 | $1,415,203.21 |
CT - 6100 - 22050300543
CTECC SECURITY GATE & FENCING IMPROVEMENTS - REBID |
Open | $1,741,460.80 | $1,741,460.80 | $1,415,203.21 |
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET |
Open | $13,855,717.41 | $13,855,717.41 | $13,827,217.41 |
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET |
Open | $13,855,717.41 | $13,855,717.41 | $13,827,217.41 |
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET |
Open | $13,855,717.41 | $13,855,717.41 | $13,827,217.41 |
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET |
Open | $13,855,717.41 | $13,855,717.41 | $13,827,217.41 |
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET |
Open | $13,855,717.41 | $13,855,717.41 | $13,827,217.41 |
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET |
Open | $13,855,717.41 | $13,855,717.41 | $13,827,217.41 |
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET |
Open | $13,855,717.41 | $13,855,717.41 | $13,827,217.41 |
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET |
Open | $13,855,717.41 | $13,855,717.41 | $13,827,217.41 |
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET |
Open | $13,855,717.41 | $13,855,717.41 | $13,827,217.41 |
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET |
Open | $13,855,717.41 | $13,855,717.41 | $13,827,217.41 |
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET |
Open | $13,855,717.41 | $13,855,717.41 | $13,827,217.41 |
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET |
Open | $13,855,717.41 | $13,855,717.41 | $13,827,217.41 |
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS |
Open | $14,151,013.81 | $14,151,013.81 | $7,963,589.22 |
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS |
Open | $14,151,013.81 | $14,151,013.81 | $7,963,589.22 |
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS |
Open | $14,151,013.81 | $14,151,013.81 | $7,963,589.22 |
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS |
Open | $14,151,013.81 | $14,151,013.81 | $7,963,589.22 |
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS |
Open | $14,151,013.81 | $14,151,013.81 | $7,963,589.22 |
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS |
Open | $14,151,013.81 | $14,151,013.81 | $7,963,589.22 |
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS |
Open | $14,151,013.81 | $14,151,013.81 | $7,963,589.22 |
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS |
Open | $14,151,013.81 | $14,151,013.81 | $7,963,589.22 |
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS |
Open | $14,151,013.81 | $14,151,013.81 | $7,963,589.22 |
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS |
Open | $14,151,013.81 | $14,151,013.81 | $7,963,589.22 |
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS |
Open | $14,151,013.81 | $14,151,013.81 | $7,963,589.22 |
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS |
Open | $14,151,013.81 | $14,151,013.81 | $7,963,589.22 |
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION |
Open | $4,886,800.00 | $4,886,800.00 | $2,818,074.73 |
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION |
Open | $4,886,800.00 | $4,886,800.00 | $2,818,074.73 |
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION |
Open | $4,886,800.00 | $4,886,800.00 | $2,818,074.73 |
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION |
Open | $4,886,800.00 | $4,886,800.00 | $2,818,074.73 |
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION |
Open | $4,886,800.00 | $4,886,800.00 | $2,818,074.73 |
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION |
Open | $4,886,800.00 | $4,886,800.00 | $2,818,074.73 |
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION |
Open | $4,886,800.00 | $4,886,800.00 | $2,818,074.73 |
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION |
Open | $4,886,800.00 | $4,886,800.00 | $2,818,074.73 |
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION |
Open | $4,886,800.00 | $4,886,800.00 | $2,818,074.73 |
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION |
Open | $4,886,800.00 | $4,886,800.00 | $2,818,074.73 |
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION |
Open | $4,886,800.00 | $4,886,800.00 | $2,818,074.73 |
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI |
Open | $21,925,619.39 | $21,925,619.39 | $19,380,800.68 |
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI |
Open | $21,925,619.39 | $21,925,619.39 | $19,380,800.68 |
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI |
Open | $21,925,619.39 | $21,925,619.39 | $19,380,800.68 |
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI |
Open | $21,925,619.39 | $21,925,619.39 | $19,380,800.68 |
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI |
Open | $21,925,619.39 | $21,925,619.39 | $19,380,800.68 |
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI |
Open | $21,925,619.39 | $21,925,619.39 | $19,380,800.68 |
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI |
Open | $21,925,619.39 | $21,925,619.39 | $19,380,800.68 |
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI |
Open | $21,925,619.39 | $21,925,619.39 | $19,380,800.68 |
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI |
Open | $21,925,619.39 | $21,925,619.39 | $19,380,800.68 |
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI |
Open | $21,925,619.39 | $21,925,619.39 | $19,380,800.68 |
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI |
Open | $21,925,619.39 | $21,925,619.39 | $19,380,800.68 |
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID |
Open | $4,962,478.72 | $4,962,478.72 | $4,900,331.02 |
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID |
Open | $4,962,478.72 | $4,962,478.72 | $4,900,331.02 |
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID |
Open | $4,962,478.72 | $4,962,478.72 | $4,900,331.02 |
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID |
Open | $4,962,478.72 | $4,962,478.72 | $4,900,331.02 |
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID |
Open | $4,962,478.72 | $4,962,478.72 | $4,900,331.02 |
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID |
Open | $4,962,478.72 | $4,962,478.72 | $4,900,331.02 |
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID |
Open | $4,962,478.72 | $4,962,478.72 | $4,900,331.02 |
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID |
Open | $4,962,478.72 | $4,962,478.72 | $4,900,331.02 |
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID |
Open | $4,962,478.72 | $4,962,478.72 | $4,900,331.02 |
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID |
Open | $4,962,478.72 | $4,962,478.72 | $4,900,331.02 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
Open | $6,608,293.00 | $6,608,293.00 | $6,542,210.07 |
CT - 6100 - 22082600851
ONION CREEK RECLAIMED WATER MAIN PHASE 1 |
Open | $8,252,332.00 | $8,252,332.00 | $7,325,139.40 |
CT - 6100 - 22090800881
GOVALLE SITE DOMESTIC WASTEWATER SERVICE IMPROVEMENTS |
Open | $1,180,745.30 | $1,180,745.30 | $957,246.68 |
CT - 6100 - 22090800881
GOVALLE SITE DOMESTIC WASTEWATER SERVICE IMPROVEMENTS |
Open | $1,180,745.30 | $1,180,745.30 | $957,246.68 |
CT - 6100 - 22090800881
GOVALLE SITE DOMESTIC WASTEWATER SERVICE IMPROVEMENTS |
Open | $1,180,745.30 | $1,180,745.30 | $957,246.68 |
CT - 6100 - 22090800881
GOVALLE SITE DOMESTIC WASTEWATER SERVICE IMPROVEMENTS |
Open | $1,180,745.30 | $1,180,745.30 | $957,246.68 |
CT - 6100 - 22090800881
GOVALLE SITE DOMESTIC WASTEWATER SERVICE IMPROVEMENTS |
Open | $1,180,745.30 | $1,180,745.30 | $957,246.68 |
CT - 6100 - 22090800882
DOWNTOWN WAYFINDING IMPLEMENTATION 2.0 |
Open | $536,300.73 | $536,300.73 | $501,809.22 |
CT - 6100 - 22090800882
DOWNTOWN WAYFINDING IMPLEMENTATION 2.0 |
Open | $536,300.73 | $536,300.73 | $501,809.22 |
CT - 6100 - 22090800882
DOWNTOWN WAYFINDING IMPLEMENTATION 2.0 |
Open | $536,300.73 | $536,300.73 | $501,809.22 |
CT - 6100 - 22090800882
DOWNTOWN WAYFINDING IMPLEMENTATION 2.0 |
Open | $536,300.73 | $536,300.73 | $501,809.22 |
CT - 6100 - 22102400032
HIGHLAND AND BROWNIE NEIGHBORHOOD PARKS |
Open | $4,060,555.04 | $4,060,555.04 | $3,786,304.70 |
CT - 6100 - 22102400032
HIGHLAND AND BROWNIE NEIGHBORHOOD PARKS |
Open | $4,060,555.04 | $4,060,555.04 | $3,786,304.70 |
CT - 6100 - 22102400032
HIGHLAND AND BROWNIE NEIGHBORHOOD PARKS |
Open | $4,060,555.04 | $4,060,555.04 | $3,786,304.70 |
CT - 6100 - 22102400032
HIGHLAND AND BROWNIE NEIGHBORHOOD PARKS |
Open | $4,060,555.04 | $4,060,555.04 | $3,786,304.70 |
CT - 6100 - 22102400032
HIGHLAND AND BROWNIE NEIGHBORHOOD PARKS |
Open | $4,060,555.04 | $4,060,555.04 | $3,786,304.70 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID |
Open | $2,465,528.07 | $2,465,528.07 | $2,209,140.64 |
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $9,579,841.58 | $9,579,841.58 | $6,694,948.13 |
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $9,579,841.58 | $9,579,841.58 | $6,694,948.13 |
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $9,579,841.58 | $9,579,841.58 | $6,694,948.13 |
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $9,579,841.58 | $9,579,841.58 | $6,694,948.13 |
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $9,579,841.58 | $9,579,841.58 | $6,694,948.13 |
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $9,579,841.58 | $9,579,841.58 | $6,694,948.13 |
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $9,579,841.58 | $9,579,841.58 | $6,694,948.13 |
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $9,579,841.58 | $9,579,841.58 | $6,694,948.13 |
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $9,579,841.58 | $9,579,841.58 | $6,694,948.13 |
CT - 6100 - 22110700063
SOUTH AUSTIN REGIONAL WWTP TRAINS A & B IMPROVEMENTS |
Open | $122,133,817.66 | $122,133,817.66 | $24,630,471.90 |
CT - 6100 - 22110700063
SOUTH AUSTIN REGIONAL WWTP TRAINS A & B IMPROVEMENTS |
Open | $122,133,817.66 | $122,133,817.66 | $24,630,471.90 |
CT - 6100 - 22110700063
SOUTH AUSTIN REGIONAL WWTP TRAINS A & B IMPROVEMENTS |
Open | $122,133,817.66 | $122,133,817.66 | $24,630,471.90 |
CT - 6100 - 22110700063
SOUTH AUSTIN REGIONAL WWTP TRAINS A & B IMPROVEMENTS |
Open | $122,133,817.66 | $122,133,817.66 | $24,630,471.90 |
CT - 6100 - 22110700063
SOUTH AUSTIN REGIONAL WWTP TRAINS A & B IMPROVEMENTS |
Open | $122,133,817.66 | $122,133,817.66 | $24,630,471.90 |
CT - 6100 - 22111400070
PECAN GARDENS EMERGENCY REPAIR |
Open | $78,627.97 | $78,627.97 | $76,337.17 |
CT - 6100 - 22111800089A
PUBLIC HEALTH CAPITAL REHABILITATION - ROOFS |
Open | $426,270.98 | $426,270.98 | $406,427.86 |
CT - 6100 - 22111800089A
PUBLIC HEALTH CAPITAL REHABILITATION - ROOFS |
Open | $426,270.98 | $426,270.98 | $406,427.86 |
CT - 6100 - 22111800089A
PUBLIC HEALTH CAPITAL REHABILITATION - ROOFS |
Open | $426,270.98 | $426,270.98 | $406,427.86 |
CT - 6100 - 22120200114
WILD HORSE RANCH WWTP EXPANSION |
Open | $70,862,006.32 | $70,862,006.32 | $46,947,919.65 |
CT - 6100 - 22120200114
WILD HORSE RANCH WWTP EXPANSION |
Open | $70,862,006.32 | $70,862,006.32 | $46,947,919.65 |
CT - 6100 - 22120200114
WILD HORSE RANCH WWTP EXPANSION |
Open | $70,862,006.32 | $70,862,006.32 | $46,947,919.65 |
CT - 6100 - 22120200114
WILD HORSE RANCH WWTP EXPANSION |
Open | $70,862,006.32 | $70,862,006.32 | $46,947,919.65 |
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL |
Open | $7,922,347.47 | $7,922,347.47 | $7,830,277.24 |
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL |
Open | $7,922,347.47 | $7,922,347.47 | $7,830,277.24 |
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL |
Open | $7,922,347.47 | $7,922,347.47 | $7,830,277.24 |
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL |
Open | $7,922,347.47 | $7,922,347.47 | $7,830,277.24 |
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL |
Open | $7,922,347.47 | $7,922,347.47 | $7,830,277.24 |
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL |
Open | $7,922,347.47 | $7,922,347.47 | $7,830,277.24 |
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL |
Open | $7,922,347.47 | $7,922,347.47 | $7,830,277.24 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION |
Open | $68,219,359.46 | $68,219,359.46 | $53,399,722.23 |
CT - 6100 - 23013000192
WM CANNON DR CORRIDOR - RUNNING WATER DR - MCKINNEY FALLS PW |
Open | $21,090,366.04 | $21,090,366.04 | $11,646,967.12 |
CT - 6100 - 23013000192
WM CANNON DR CORRIDOR - RUNNING WATER DR - MCKINNEY FALLS PW |
Open | $21,090,366.04 | $21,090,366.04 | $11,646,967.12 |
CT - 6100 - 23013000192
WM CANNON DR CORRIDOR - RUNNING WATER DR - MCKINNEY FALLS PW |
Open | $21,090,366.04 | $21,090,366.04 | $11,646,967.12 |
CT - 6100 - 23013000192
WM CANNON DR CORRIDOR - RUNNING WATER DR - MCKINNEY FALLS PW |
Open | $21,090,366.04 | $21,090,366.04 | $11,646,967.12 |
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION |
Open | $3,827,795.80 | $3,827,795.80 | $3,636,406.01 |
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION |
Open | $3,827,795.80 | $3,827,795.80 | $3,636,406.01 |
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION |
Open | $3,827,795.80 | $3,827,795.80 | $3,636,406.01 |
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION |
Open | $3,827,795.80 | $3,827,795.80 | $3,636,406.01 |
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION |
Open | $3,827,795.80 | $3,827,795.80 | $3,636,406.01 |
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION |
Open | $3,827,795.80 | $3,827,795.80 | $3,636,406.01 |
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION |
Open | $3,827,795.80 | $3,827,795.80 | $3,636,406.01 |
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION |
Open | $3,827,795.80 | $3,827,795.80 | $3,636,406.01 |
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION |
Open | $3,827,795.80 | $3,827,795.80 | $3,636,406.01 |
CT - 6100 - 23022400242
NORTHBRIDGE SHELTER EMERGENCY REPAIR (11/12/2022) |
Open | $131,557.55 | $131,557.55 | $111,944.91 |
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1 |
Open | $7,078,455.16 | $7,078,455.16 | $6,539,465.75 |
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1 |
Open | $7,078,455.16 | $7,078,455.16 | $6,539,465.75 |
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1 |
Open | $7,078,455.16 | $7,078,455.16 | $6,539,465.75 |
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1 |
Open | $7,078,455.16 | $7,078,455.16 | $6,539,465.75 |
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1 |
Open | $7,078,455.16 | $7,078,455.16 | $6,539,465.75 |
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1 |
Open | $7,078,455.16 | $7,078,455.16 | $6,539,465.75 |
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1 |
Open | $7,078,455.16 | $7,078,455.16 | $6,539,465.75 |
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1 |
Open | $7,078,455.16 | $7,078,455.16 | $6,539,465.75 |
CT - 6100 - 23031300282
AFS LEAD REMEDIATION |
Open | $169,659.20 | $169,659.20 | $80,221.80 |
CT - 6100 - 23031300282
AFS LEAD REMEDIATION |
Open | $169,659.20 | $169,659.20 | $80,221.80 |
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE |
Open | $13,972,052.51 | $13,972,052.51 | $13,682,115.15 |
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE |
Open | $13,972,052.51 | $13,972,052.51 | $13,682,115.15 |
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE |
Open | $13,972,052.51 | $13,972,052.51 | $13,682,115.15 |
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE |
Open | $13,972,052.51 | $13,972,052.51 | $13,682,115.15 |
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE |
Open | $13,972,052.51 | $13,972,052.51 | $13,682,115.15 |
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE |
Open | $13,972,052.51 | $13,972,052.51 | $13,682,115.15 |
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE |
Open | $13,972,052.51 | $13,972,052.51 | $13,682,115.15 |
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID |
Open | $1,095,848.21 | $1,095,848.21 | $1,049,570.19 |
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID |
Open | $1,095,848.21 | $1,095,848.21 | $1,049,570.19 |
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID |
Open | $1,095,848.21 | $1,095,848.21 | $1,049,570.19 |
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID |
Open | $1,095,848.21 | $1,095,848.21 | $1,049,570.19 |
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID |
Open | $1,095,848.21 | $1,095,848.21 | $1,049,570.19 |
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID |
Open | $1,095,848.21 | $1,095,848.21 | $1,049,570.19 |
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID |
Open | $1,095,848.21 | $1,095,848.21 | $1,049,570.19 |
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM |
Open | $28,857,615.25 | $28,857,615.25 | $21,056,329.37 |
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM |
Open | $28,857,615.25 | $28,857,615.25 | $21,056,329.37 |
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM |
Open | $28,857,615.25 | $28,857,615.25 | $21,056,329.37 |
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM |
Open | $28,857,615.25 | $28,857,615.25 | $21,056,329.37 |
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM |
Open | $28,857,615.25 | $28,857,615.25 | $21,056,329.37 |
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM |
Open | $28,857,615.25 | $28,857,615.25 | $21,056,329.37 |
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM |
Open | $28,857,615.25 | $28,857,615.25 | $21,056,329.37 |
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM |
Open | $28,857,615.25 | $28,857,615.25 | $21,056,329.37 |
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM |
Open | $28,857,615.25 | $28,857,615.25 | $21,056,329.37 |
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM |
Open | $28,857,615.25 | $28,857,615.25 | $21,056,329.37 |
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM |
Open | $28,857,615.25 | $28,857,615.25 | $21,056,329.37 |
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM |
Open | $28,857,615.25 | $28,857,615.25 | $21,056,329.37 |
CT - 6100 - 23073100584
GEORGE WASHINGTON CARVER MUSEUM - THEATER AND ACCESS IMPVMTS |
Open | $3,098,972.02 | $3,098,972.02 | $2,894,383.77 |
CT - 6100 - 23073100584
GEORGE WASHINGTON CARVER MUSEUM - THEATER AND ACCESS IMPVMTS |
Open | $3,098,972.02 | $3,098,972.02 | $2,894,383.77 |
CT - 6100 - 23073100584
GEORGE WASHINGTON CARVER MUSEUM - THEATER AND ACCESS IMPVMTS |
Open | $3,098,972.02 | $3,098,972.02 | $2,894,383.77 |
CT - 6100 - 23073100584
GEORGE WASHINGTON CARVER MUSEUM - THEATER AND ACCESS IMPVMTS |
Open | $3,098,972.02 | $3,098,972.02 | $2,894,383.77 |
CT - 6100 - 23073100584
GEORGE WASHINGTON CARVER MUSEUM - THEATER AND ACCESS IMPVMTS |
Open | $3,098,972.02 | $3,098,972.02 | $2,894,383.77 |
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL |
Open | $9,170,270.29 | $9,170,270.29 | $6,076,410.98 |
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL |
Open | $9,170,270.29 | $9,170,270.29 | $6,076,410.98 |
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL |
Open | $9,170,270.29 | $9,170,270.29 | $6,076,410.98 |
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL |
Open | $9,170,270.29 | $9,170,270.29 | $6,076,410.98 |
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL |
Open | $9,170,270.29 | $9,170,270.29 | $6,076,410.98 |
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL |
Open | $9,170,270.29 | $9,170,270.29 | $6,076,410.98 |
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL |
Open | $9,170,270.29 | $9,170,270.29 | $6,076,410.98 |
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL |
Open | $9,170,270.29 | $9,170,270.29 | $6,076,410.98 |
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL |
Open | $9,170,270.29 | $9,170,270.29 | $6,076,410.98 |
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL |
Open | $9,170,270.29 | $9,170,270.29 | $6,076,410.98 |
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL |
Open | $9,170,270.29 | $9,170,270.29 | $6,076,410.98 |
CT - 6100 - 23090100693
WALLER CREEK - INLET FACILITY WET WELL MECHANICAL SCREENING |
Open | $2,686,273.00 | $2,686,273.00 | $2,589,866.17 |
CT - 6100 - 23090100693
WALLER CREEK - INLET FACILITY WET WELL MECHANICAL SCREENING |
Open | $2,686,273.00 | $2,686,273.00 | $2,589,866.17 |
CT - 6100 - 23090100693
WALLER CREEK - INLET FACILITY WET WELL MECHANICAL SCREENING |
Open | $2,686,273.00 | $2,686,273.00 | $2,589,866.17 |
CT - 6100 - 23090100693
WALLER CREEK - INLET FACILITY WET WELL MECHANICAL SCREENING |
Open | $2,686,273.00 | $2,686,273.00 | $2,589,866.17 |
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK |
Open | $2,336,297.75 | $2,336,297.75 | $2,219,464.76 |
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK |
Open | $2,336,297.75 | $2,336,297.75 | $2,219,464.76 |
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK |
Open | $2,336,297.75 | $2,336,297.75 | $2,219,464.76 |
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK |
Open | $2,336,297.75 | $2,336,297.75 | $2,219,464.76 |
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK |
Open | $2,336,297.75 | $2,336,297.75 | $2,219,464.76 |
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK |
Open | $2,336,297.75 | $2,336,297.75 | $2,219,464.76 |
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK |
Open | $2,336,297.75 | $2,336,297.75 | $2,219,464.76 |
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK |
Open | $2,336,297.75 | $2,336,297.75 | $2,219,464.76 |
CT - 6100 - 23092100764
WALNUT CREEK WWTP EFFLUENT SAMPLE PUMP MODIFICATIONS REBID |
Open | $1,910,540.02 | $1,910,540.02 | $1,815,013.02 |
CT - 6100 - 23092100764
WALNUT CREEK WWTP EFFLUENT SAMPLE PUMP MODIFICATIONS REBID |
Open | $1,910,540.02 | $1,910,540.02 | $1,815,013.02 |
CT - 6100 - 23092100764
WALNUT CREEK WWTP EFFLUENT SAMPLE PUMP MODIFICATIONS REBID |
Open | $1,910,540.02 | $1,910,540.02 | $1,815,013.02 |
CT - 6100 - 23092200767
STARLINE DRIVE AND LAWNDALE DRIVE PRESSURE ZONE CONVERSION |
Open | $1,522,789.16 | $1,522,789.16 | $1,359,909.95 |
CT - 6100 - 23092200767
STARLINE DRIVE AND LAWNDALE DRIVE PRESSURE ZONE CONVERSION |
Open | $1,522,789.16 | $1,522,789.16 | $1,359,909.95 |
CT - 6100 - 23092200767
STARLINE DRIVE AND LAWNDALE DRIVE PRESSURE ZONE CONVERSION |
Open | $1,522,789.16 | $1,522,789.16 | $1,359,909.95 |
CT - 6100 - 23092200767
STARLINE DRIVE AND LAWNDALE DRIVE PRESSURE ZONE CONVERSION |
Open | $1,522,789.16 | $1,522,789.16 | $1,359,909.95 |
CT - 6100 - 23092200767
STARLINE DRIVE AND LAWNDALE DRIVE PRESSURE ZONE CONVERSION |
Open | $1,522,789.16 | $1,522,789.16 | $1,359,909.95 |
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
Open | $33,143,528.65 | $33,143,528.65 | $18,150,956.02 |
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
Open | $33,143,528.65 | $33,143,528.65 | $18,150,956.02 |
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
Open | $33,143,528.65 | $33,143,528.65 | $18,150,956.02 |
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
Open | $33,143,528.65 | $33,143,528.65 | $18,150,956.02 |
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
Open | $33,143,528.65 | $33,143,528.65 | $18,150,956.02 |
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
Open | $33,143,528.65 | $33,143,528.65 | $18,150,956.02 |
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
Open | $33,143,528.65 | $33,143,528.65 | $18,150,956.02 |
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
Open | $33,143,528.65 | $33,143,528.65 | $18,150,956.02 |
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
Open | $33,143,528.65 | $33,143,528.65 | $18,150,956.02 |
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
Open | $33,143,528.65 | $33,143,528.65 | $18,150,956.02 |
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
Open | $33,143,528.65 | $33,143,528.65 | $18,150,956.02 |
CT - 6100 - 23101600017
BULL CREEK WASTEWATER PIPELINES RENEWAL |
Open | $3,233,821.48 | $3,233,821.48 | $3,072,130.41 |
CT - 6100 - 23101600017
BULL CREEK WASTEWATER PIPELINES RENEWAL |
Open | $3,233,821.48 | $3,233,821.48 | $3,072,130.41 |
CT - 6100 - 23101600017
BULL CREEK WASTEWATER PIPELINES RENEWAL |
Open | $3,233,821.48 | $3,233,821.48 | $3,072,130.41 |
CT - 6100 - 23101600017
BULL CREEK WASTEWATER PIPELINES RENEWAL |
Open | $3,233,821.48 | $3,233,821.48 | $3,072,130.41 |
CT - 6100 - 23102400031
OLTORF STREET RECLAIMED WATER MAIN PHASE 2 |
Open | $10,338,105.64 | $10,338,105.64 | $5,199,399.48 |
CT - 6100 - 23102400031
OLTORF STREET RECLAIMED WATER MAIN PHASE 2 |
Open | $10,338,105.64 | $10,338,105.64 | $5,199,399.48 |
CT - 6100 - 23110600054
TERI RD AND PLEASANT VALLEY RD ROUNDABOUT |
Open | $1,966,076.77 | $1,966,076.77 | $1,715,864.38 |
CT - 6100 - 23110600054
TERI RD AND PLEASANT VALLEY RD ROUNDABOUT |
Open | $1,966,076.77 | $1,966,076.77 | $1,715,864.38 |
CT - 6100 - 23110600054
TERI RD AND PLEASANT VALLEY RD ROUNDABOUT |
Open | $1,966,076.77 | $1,966,076.77 | $1,715,864.38 |
CT - 6100 - 23110600054
TERI RD AND PLEASANT VALLEY RD ROUNDABOUT |
Open | $1,966,076.77 | $1,966,076.77 | $1,715,864.38 |
CT - 6100 - 23110600054
TERI RD AND PLEASANT VALLEY RD ROUNDABOUT |
Open | $1,966,076.77 | $1,966,076.77 | $1,715,864.38 |
CT - 6100 - 23110600054
TERI RD AND PLEASANT VALLEY RD ROUNDABOUT |
Open | $1,966,076.77 | $1,966,076.77 | $1,715,864.38 |
CT - 6100 - 23121100103
BRAKER LANE FROM SAMSUNG BLVD TO DAWES PLACE |
Open | $22,599,765.00 | $22,599,765.00 | $14,891,853.00 |
CT - 6100 - 23121100103
BRAKER LANE FROM SAMSUNG BLVD TO DAWES PLACE |
Open | $22,599,765.00 | $22,599,765.00 | $14,891,853.00 |
CT - 6100 - 23121100103
BRAKER LANE FROM SAMSUNG BLVD TO DAWES PLACE |
Open | $22,599,765.00 | $22,599,765.00 | $14,891,853.00 |
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION |
Open | $17,090,003.48 | $17,090,003.48 | $10,830,897.84 |
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION |
Open | $17,090,003.48 | $17,090,003.48 | $10,830,897.84 |
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION |
Open | $17,090,003.48 | $17,090,003.48 | $10,830,897.84 |
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION |
Open | $17,090,003.48 | $17,090,003.48 | $10,830,897.84 |
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION |
Open | $17,090,003.48 | $17,090,003.48 | $10,830,897.84 |
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION |
Open | $17,090,003.48 | $17,090,003.48 | $10,830,897.84 |
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION |
Open | $17,090,003.48 | $17,090,003.48 | $10,830,897.84 |
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION |
Open | $17,090,003.48 | $17,090,003.48 | $10,830,897.84 |
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION |
Open | $17,090,003.48 | $17,090,003.48 | $10,830,897.84 |
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION |
Open | $17,090,003.48 | $17,090,003.48 | $10,830,897.84 |
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION |
Open | $2,237,467.89 | $2,237,467.89 | $1,994,103.33 |
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION |
Open | $2,237,467.89 | $2,237,467.89 | $1,994,103.33 |
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION |
Open | $2,237,467.89 | $2,237,467.89 | $1,994,103.33 |
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION |
Open | $2,237,467.89 | $2,237,467.89 | $1,994,103.33 |
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION |
Open | $2,237,467.89 | $2,237,467.89 | $1,994,103.33 |
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION |
Open | $2,237,467.89 | $2,237,467.89 | $1,994,103.33 |
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION |
Open | $2,237,467.89 | $2,237,467.89 | $1,994,103.33 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID |
Open | $1,381,448.49 | $1,381,448.49 | $1,288,989.44 |
CT - 6100 - 24012200199
EAST VILLAGE SUBSTATION |
Open | $10,063,320.98 | $10,063,320.98 | $9,456,875.67 |
CT - 6100 - 24012200199
EAST VILLAGE SUBSTATION |
Open | $10,063,320.98 | $10,063,320.98 | $9,456,875.67 |
CT - 6100 - 24012200199
EAST VILLAGE SUBSTATION |
Open | $10,063,320.98 | $10,063,320.98 | $9,456,875.67 |
CT - 6100 - 24012200199
EAST VILLAGE SUBSTATION |
Open | $10,063,320.98 | $10,063,320.98 | $9,456,875.67 |
CT - 6100 - 24012200199
EAST VILLAGE SUBSTATION |
Open | $10,063,320.98 | $10,063,320.98 | $9,456,875.67 |
CT - 6100 - 24020500245
ST. ELMO SERVICE CENTER NEW AUSTIN ENERGY POLE YARD |
Open | $366,703.37 | $366,703.37 | $348,368.20 |
CT - 6100 - 24020500245
ST. ELMO SERVICE CENTER NEW AUSTIN ENERGY POLE YARD |
Open | $366,703.37 | $366,703.37 | $348,368.20 |
CT - 6100 - 24020500245
ST. ELMO SERVICE CENTER NEW AUSTIN ENERGY POLE YARD |
Open | $366,703.37 | $366,703.37 | $348,368.20 |
CT - 6100 - 24022900296
KRAMER LANE SUBSTATION REBID (CLMC989A) |
Open | $12,341,761.45 | $12,341,761.45 | $11,093,620.58 |
CT - 6100 - 24022900296
KRAMER LANE SUBSTATION REBID (CLMC989A) |
Open | $12,341,761.45 | $12,341,761.45 | $11,093,620.58 |
CT - 6100 - 24030400303
WALNUT CREEK - OAK KNOLL FLOOD RISK REDUCTION PROJECT |
Open | $8,232,469.24 | $8,232,469.24 | $72,633.96 |
CT - 6100 - 24031200321
38TH AND 40TH STREETS WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $4,983,757.00 | $4,983,757.00 | $3,541,916.35 |
CT - 6100 - 24031200321
38TH AND 40TH STREETS WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $4,983,757.00 | $4,983,757.00 | $3,541,916.35 |
CT - 6100 - 24031200321
38TH AND 40TH STREETS WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $4,983,757.00 | $4,983,757.00 | $3,541,916.35 |
CT - 6100 - 24031200321
38TH AND 40TH STREETS WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $4,983,757.00 | $4,983,757.00 | $3,541,916.35 |
CT - 6100 - 24031200321
38TH AND 40TH STREETS WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $4,983,757.00 | $4,983,757.00 | $3,541,916.35 |
CT - 6100 - 24031200321
38TH AND 40TH STREETS WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $4,983,757.00 | $4,983,757.00 | $3,541,916.35 |
CT - 6100 - 24031800331
LONGHORN DAM MULITMODAL IMPROVEMENTS |
Open | $21,101,355.10 | $21,101,355.10 | $15,100,441.22 |
CT - 6100 - 24031800331
LONGHORN DAM MULITMODAL IMPROVEMENTS |
Open | $21,101,355.10 | $21,101,355.10 | $15,100,441.22 |
CT - 6100 - 24031800331
LONGHORN DAM MULITMODAL IMPROVEMENTS |
Open | $21,101,355.10 | $21,101,355.10 | $15,100,441.22 |
CT - 6100 - 24031800331
LONGHORN DAM MULITMODAL IMPROVEMENTS |
Open | $21,101,355.10 | $21,101,355.10 | $15,100,441.22 |
CT - 6100 - 24031800331
LONGHORN DAM MULITMODAL IMPROVEMENTS |
Open | $21,101,355.10 | $21,101,355.10 | $15,100,441.22 |
CT - 6100 - 24031800331
LONGHORN DAM MULITMODAL IMPROVEMENTS |
Open | $21,101,355.10 | $21,101,355.10 | $15,100,441.22 |
CT - 6100 - 24040200359
BRAZOS ST DUCT BANK CIVIL WORK |
Open | $2,137,427.89 | $2,137,427.89 | $1,719,898.47 |
CT - 6100 - 24040200359
BRAZOS ST DUCT BANK CIVIL WORK |
Open | $2,137,427.89 | $2,137,427.89 | $1,719,898.47 |
CT - 6100 - 24040200359
BRAZOS ST DUCT BANK CIVIL WORK |
Open | $2,137,427.89 | $2,137,427.89 | $1,719,898.47 |
CT - 6100 - 24040200359
BRAZOS ST DUCT BANK CIVIL WORK |
Open | $2,137,427.89 | $2,137,427.89 | $1,719,898.47 |
CT - 6100 - 24042200392
CLMC910B PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE |
Open | $6,873,427.04 | $6,873,427.04 | $5,744,105.05 |
CT - 6100 - 24042200392
CLMC910B PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE |
Open | $6,873,427.04 | $6,873,427.04 | $5,744,105.05 |
CT - 6100 - 24042200392
CLMC910B PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE |
Open | $6,873,427.04 | $6,873,427.04 | $5,744,105.05 |
CT - 6100 - 24042500399
LOOP 360 AT RM 2222 AND COURTYARD ROADWAY PROJECT |
Open | $9,758,411.52 | $9,758,411.52 | $8,871,283.20 |
CT - 6100 - 24051500434
HAROLD COURT SERVICE CENTER WPD CAMPUS IMPROVEMENTS |
Open | $1,016,794.12 | $1,016,794.12 | $907,692.93 |
CT - 6100 - 24051500434
HAROLD COURT SERVICE CENTER WPD CAMPUS IMPROVEMENTS |
Open | $1,016,794.12 | $1,016,794.12 | $907,692.93 |
CT - 6100 - 24051500434
HAROLD COURT SERVICE CENTER WPD CAMPUS IMPROVEMENTS |
Open | $1,016,794.12 | $1,016,794.12 | $907,692.93 |
CT - 6100 - 24051500434
HAROLD COURT SERVICE CENTER WPD CAMPUS IMPROVEMENTS |
Open | $1,016,794.12 | $1,016,794.12 | $907,692.93 |
CT - 6100 - 24053100454
NORTHWEST AUSTIN BOOSTER STATIONS IMPROVEMENTS REBID |
Open | $9,031,387.59 | $9,031,387.59 | $2,929,659.34 |
CT - 6100 - 24053100454
NORTHWEST AUSTIN BOOSTER STATIONS IMPROVEMENTS REBID |
Open | $9,031,387.59 | $9,031,387.59 | $2,929,659.34 |
CT - 6100 - 24053100454
NORTHWEST AUSTIN BOOSTER STATIONS IMPROVEMENTS REBID |
Open | $9,031,387.59 | $9,031,387.59 | $2,929,659.34 |
CT - 6100 - 24053100454
NORTHWEST AUSTIN BOOSTER STATIONS IMPROVEMENTS REBID |
Open | $9,031,387.59 | $9,031,387.59 | $2,929,659.34 |
CT - 6100 - 24053100454
NORTHWEST AUSTIN BOOSTER STATIONS IMPROVEMENTS REBID |
Open | $9,031,387.59 | $9,031,387.59 | $2,929,659.34 |
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION |
Open | $8,915,396.00 | $8,915,396.00 | $7,908,721.07 |
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION |
Open | $8,915,396.00 | $8,915,396.00 | $7,908,721.07 |
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION |
Open | $8,915,396.00 | $8,915,396.00 | $7,908,721.07 |
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION |
Open | $8,915,396.00 | $8,915,396.00 | $7,908,721.07 |
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION |
Open | $8,915,396.00 | $8,915,396.00 | $7,908,721.07 |
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION |
Open | $8,915,396.00 | $8,915,396.00 | $7,908,721.07 |
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION |
Open | $8,915,396.00 | $8,915,396.00 | $7,908,721.07 |
CT - 6100 - 24062000481
LONGHORN DAM SAFETY IMPROVEMENTS |
Open | $3,769,553.19 | $3,769,553.19 | $2,006,204.01 |
CT - 6100 - 24062000481
LONGHORN DAM SAFETY IMPROVEMENTS |
Open | $3,769,553.19 | $3,769,553.19 | $2,006,204.01 |
CT - 6100 - 24062000481
LONGHORN DAM SAFETY IMPROVEMENTS |
Open | $3,769,553.19 | $3,769,553.19 | $2,006,204.01 |
CT - 6100 - 24062000481
LONGHORN DAM SAFETY IMPROVEMENTS |
Open | $3,769,553.19 | $3,769,553.19 | $2,006,204.01 |
CT - 6100 - 24062000481
LONGHORN DAM SAFETY IMPROVEMENTS |
Open | $3,769,553.19 | $3,769,553.19 | $2,006,204.01 |
CT - 6100 - 24062000485
WESTGATE NEIGHBORHOOD WASTEWATER PIPELINE RENEWAL |
Open | $6,862,803.00 | $6,862,803.00 | $1,374,571.62 |
CT - 6100 - 24070100501
WILLIAMSON CREEK PHASE 1- BRASSIEWOOD DRIVE AND CREEKWOOD |
Open | $2,275,561.68 | $2,275,561.68 | $518,770.95 |
CT - 6100 - 24070100501
WILLIAMSON CREEK PHASE 1- BRASSIEWOOD DRIVE AND CREEKWOOD |
Open | $2,275,561.68 | $2,275,561.68 | $518,770.95 |
CT - 6100 - 24070900515
WALLER CREEK CENTER PARKING GARAGE RENEWAL |
Open | $1,356,527.83 | $1,356,527.83 | $1,287,769.01 |
CT - 6100 - 24071500530
BULL CREEK OLD LAMPASAS NO. 3 DAM MODERNIZATION |
Open | $15,350,085.42 | $15,350,085.42 | $3,778,393.52 |
CT - 6100 - 24071500530
BULL CREEK OLD LAMPASAS NO. 3 DAM MODERNIZATION |
Open | $15,350,085.42 | $15,350,085.42 | $3,778,393.52 |
CT - 6100 - 24071500530
BULL CREEK OLD LAMPASAS NO. 3 DAM MODERNIZATION |
Open | $15,350,085.42 | $15,350,085.42 | $3,778,393.52 |
CT - 6100 - 24072400543
FOUR POINTS DUCT BANK- WO 440397 |
Open | $4,895,221.04 | $4,895,221.04 | $2,352,770.04 |
CT - 6100 - 24072400543
FOUR POINTS DUCT BANK- WO 440397 |
Open | $4,895,221.04 | $4,895,221.04 | $2,352,770.04 |
CT - 6100 - 24072500545
KELLAM ROAD WATER PIPELINE RENEWAL |
Open | $1,269,816.65 | $1,269,816.65 | $608,561.23 |
CT - 6100 - 24072500545
KELLAM ROAD WATER PIPELINE RENEWAL |
Open | $1,269,816.65 | $1,269,816.65 | $608,561.23 |
CT - 6100 - 24072500545
KELLAM ROAD WATER PIPELINE RENEWAL |
Open | $1,269,816.65 | $1,269,816.65 | $608,561.23 |
CT - 6100 - 24072500545
KELLAM ROAD WATER PIPELINE RENEWAL |
Open | $1,269,816.65 | $1,269,816.65 | $608,561.23 |
CT - 6100 - 24072600552
JOHNNY MORRIS/HWY 290 AREA WATER LINE EXTENSIONS |
Open | $1,985,503.71 | $1,985,503.71 | $1,760,919.69 |
CT - 6100 - 24072600552
JOHNNY MORRIS/HWY 290 AREA WATER LINE EXTENSIONS |
Open | $1,985,503.71 | $1,985,503.71 | $1,760,919.69 |
CT - 6100 - 24072600552
JOHNNY MORRIS/HWY 290 AREA WATER LINE EXTENSIONS |
Open | $1,985,503.71 | $1,985,503.71 | $1,760,919.69 |
CT - 6100 - 24072600552
JOHNNY MORRIS/HWY 290 AREA WATER LINE EXTENSIONS |
Open | $1,985,503.71 | $1,985,503.71 | $1,760,919.69 |
CT - 6100 - 24072600552
JOHNNY MORRIS/HWY 290 AREA WATER LINE EXTENSIONS |
Open | $1,985,503.71 | $1,985,503.71 | $1,760,919.69 |
CT - 6100 - 24073000556
BULL CREEK BASIN WASTEWATER PIPELINES RENEWAL - CIPP |
Open | $6,874,319.00 | $6,874,319.00 | $5,001,145.89 |
CT - 6100 - 24073000556
BULL CREEK BASIN WASTEWATER PIPELINES RENEWAL - CIPP |
Open | $6,874,319.00 | $6,874,319.00 | $5,001,145.89 |
CT - 6100 - 24073000557
LITTLE BEAR CREEK RECHARGE ENHANCEMENT FACILITY |
Open | $2,501,051.78 | $2,501,051.78 | $2,375,999.19 |
CT - 6100 - 24073000557
LITTLE BEAR CREEK RECHARGE ENHANCEMENT FACILITY |
Open | $2,501,051.78 | $2,501,051.78 | $2,375,999.19 |
CT - 6100 - 24073100560
BURRELL DRIVE WASTEWATER IMPROVEMENTS |
Open | $2,461,690.00 | $2,461,690.00 | $2,040,190.55 |
CT - 6100 - 24073100560
BURRELL DRIVE WASTEWATER IMPROVEMENTS |
Open | $2,461,690.00 | $2,461,690.00 | $2,040,190.55 |
CT - 6100 - 24073100560
BURRELL DRIVE WASTEWATER IMPROVEMENTS |
Open | $2,461,690.00 | $2,461,690.00 | $2,040,190.55 |
CT - 6100 - 24073100560
BURRELL DRIVE WASTEWATER IMPROVEMENTS |
Open | $2,461,690.00 | $2,461,690.00 | $2,040,190.55 |
CT - 6100 - 24073100560
BURRELL DRIVE WASTEWATER IMPROVEMENTS |
Open | $2,461,690.00 | $2,461,690.00 | $2,040,190.55 |
CT - 6100 - 24082700602
COLONY PARK SUSTAINABLE COMMUNITY INFRASTRUCTURE |
Open | $2,728,819.00 | $2,728,819.00 | $551,137.28 |
CT - 6100 - 24082700602
COLONY PARK SUSTAINABLE COMMUNITY INFRASTRUCTURE |
Open | $2,728,819.00 | $2,728,819.00 | $551,137.28 |
CT - 6100 - 24082800606
NORTHWEST AREA LIFT STATION IMPROVEMENTS GREAT HILLS LIFT ST |
Open | $8,383,439.00 | $8,383,439.00 | $4,689,134.93 |
CT - 6100 - 24082800606
NORTHWEST AREA LIFT STATION IMPROVEMENTS GREAT HILLS LIFT ST |
Open | $8,383,439.00 | $8,383,439.00 | $4,689,134.93 |
CT - 6100 - 24082800606
NORTHWEST AREA LIFT STATION IMPROVEMENTS GREAT HILLS LIFT ST |
Open | $8,383,439.00 | $8,383,439.00 | $4,689,134.93 |
CT - 6100 - 24082900611
STREET LIGHTING CONSTRUCTION: BLUFF SPR, MCNEIL DR CORRIDORS |
Open | $1,441,759.26 | $1,441,759.26 | $1,211,281.46 |
CT - 6100 - 24082900611
STREET LIGHTING CONSTRUCTION: BLUFF SPR, MCNEIL DR CORRIDORS |
Open | $1,441,759.26 | $1,441,759.26 | $1,211,281.46 |
CT - 6100 - 24082900611
STREET LIGHTING CONSTRUCTION: BLUFF SPR, MCNEIL DR CORRIDORS |
Open | $1,441,759.26 | $1,441,759.26 | $1,211,281.46 |
CT - 6100 - 24082900611
STREET LIGHTING CONSTRUCTION: BLUFF SPR, MCNEIL DR CORRIDORS |
Open | $1,441,759.26 | $1,441,759.26 | $1,211,281.46 |
CT - 6100 - 24090500623
COUNTRY CLUB CREEK TRAIL - ELMONT DR TO E OLTORF ST |
Open | $5,288,590.50 | $5,288,590.50 | $106,607.74 |
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB |
Open | $1,281,755.05 | $1,281,755.05 | $721,618.58 |
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB |
Open | $1,281,755.05 | $1,281,755.05 | $721,618.58 |
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB |
Open | $1,281,755.05 | $1,281,755.05 | $721,618.58 |
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB |
Open | $1,281,755.05 | $1,281,755.05 | $721,618.58 |
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB |
Open | $1,281,755.05 | $1,281,755.05 | $721,618.58 |
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB |
Open | $1,281,755.05 | $1,281,755.05 | $721,618.58 |
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB |
Open | $1,281,755.05 | $1,281,755.05 | $721,618.58 |
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB |
Open | $1,281,755.05 | $1,281,755.05 | $721,618.58 |
CT - 6100 - 24091000633
BARTON CREEK - BANK EROSION RESTORATION AT 1732 TOOMEY RD |
Open | $5,197,958.82 | $5,197,958.82 | $2,067,108.63 |
CT - 6100 - 24091000633
BARTON CREEK - BANK EROSION RESTORATION AT 1732 TOOMEY RD |
Open | $5,197,958.82 | $5,197,958.82 | $2,067,108.63 |
CT - 6100 - 24091000633
BARTON CREEK - BANK EROSION RESTORATION AT 1732 TOOMEY RD |
Open | $5,197,958.82 | $5,197,958.82 | $2,067,108.63 |
CT - 6100 - 24091000633
BARTON CREEK - BANK EROSION RESTORATION AT 1732 TOOMEY RD |
Open | $5,197,958.82 | $5,197,958.82 | $2,067,108.63 |
CT - 6100 - 24092500650
GILLIS STREET WATER AND WASTEWATER PIPELINES RENEWAL |
Open | $1,724,595.03 | $1,724,595.03 | $765,594.01 |
CT - 6100 - 24092500650
GILLIS STREET WATER AND WASTEWATER PIPELINES RENEWAL |
Open | $1,724,595.03 | $1,724,595.03 | $765,594.01 |
CT - 6100 - 24092500650
GILLIS STREET WATER AND WASTEWATER PIPELINES RENEWAL |
Open | $1,724,595.03 | $1,724,595.03 | $765,594.01 |
CT - 6100 - 24101000024
SAR ELEVATED TANK REHAB & IMPROVEMENTS - PACKAGE 2 |
Open | $2,419,804.84 | $2,419,804.84 | $1,280,499.15 |
CT - 6100 - 24101000024
SAR ELEVATED TANK REHAB & IMPROVEMENTS - PACKAGE 2 |
Open | $2,419,804.84 | $2,419,804.84 | $1,280,499.15 |
CT - 6100 - 24101000024
SAR ELEVATED TANK REHAB & IMPROVEMENTS - PACKAGE 2 |
Open | $2,419,804.84 | $2,419,804.84 | $1,280,499.15 |
CT - 6100 - 24102400043
TIMBER CREEK SUBSTATION |
Open | $9,752,169.00 | $9,752,169.00 | $0.00 |
CT - 6100 - 24110700065
SH71 @ US183 INTERCHANGE TXDOT RELOCATION AW & WW TRANSMISSI |
Open | $5,833,210.00 | $5,833,210.00 | $3,129,583.02 |
CT - 6100 - 24110700065
SH71 @ US183 INTERCHANGE TXDOT RELOCATION AW & WW TRANSMISSI |
Open | $5,833,210.00 | $5,833,210.00 | $3,129,583.02 |
CT - 6100 - 24110700065
SH71 @ US183 INTERCHANGE TXDOT RELOCATION AW & WW TRANSMISSI |
Open | $5,833,210.00 | $5,833,210.00 | $3,129,583.02 |
CT - 6100 - 24112600086
HILLSPRING AND SCOTTSDALE WATER AND WASTEWATER SYSTEM RENEWA |
Open | $1,337,580.00 | $1,337,580.00 | $462,798.20 |
CT - 6100 - 24120400096
TOWN LAKE CENTER MAJOR RENOVATIONS AND REMODELING |
Open | $15,384,620.00 | $15,384,620.00 | $3,180,284.80 |
CT - 6100 - 24121100104
OLD ENFIELD WATER & WASTEWATER PIPELINE RENEWAL |
Open | $6,157,650.00 | $6,157,650.00 | $0.00 |
CT - 6100 - 24121100104
OLD ENFIELD WATER & WASTEWATER PIPELINE RENEWAL |
Open | $6,157,650.00 | $6,157,650.00 | $0.00 |
CT - 6100 - 24121100104
OLD ENFIELD WATER & WASTEWATER PIPELINE RENEWAL |
Open | $6,157,650.00 | $6,157,650.00 | $0.00 |
CT - 6100 - 24121100104
OLD ENFIELD WATER & WASTEWATER PIPELINE RENEWAL |
Open | $6,157,650.00 | $6,157,650.00 | $0.00 |
CT - 6100 - 24121100104
OLD ENFIELD WATER & WASTEWATER PIPELINE RENEWAL |
Open | $6,157,650.00 | $6,157,650.00 | $0.00 |
CT - 6100 - 24121800123
STREET LIGHTING CONST: PEARCE LN & VARIOUS CITY INTERSECTION |
Open | $1,541,342.00 | $1,541,342.00 | $287,833.18 |
CT - 6100 - 24121800123
STREET LIGHTING CONST: PEARCE LN & VARIOUS CITY INTERSECTION |
Open | $1,541,342.00 | $1,541,342.00 | $287,833.18 |
CT - 6100 - 24121800123
STREET LIGHTING CONST: PEARCE LN & VARIOUS CITY INTERSECTION |
Open | $1,541,342.00 | $1,541,342.00 | $287,833.18 |
CT - 6100 - 24122000127
DECKER POWER PLANT - DAM UPGRADES REISSUE |
Open | $12,198,059.00 | $12,198,059.00 | $0.00 |
CT - 6100 - 24122000129
ELISABET NEY MUSEUM BLDG RESTORATION & SITE IMPROV REISSUE |
Open | $4,855,500.00 | $4,855,500.00 | $1,394,850.44 |
CT - 6100 - 24122000129
ELISABET NEY MUSEUM BLDG RESTORATION & SITE IMPROV REISSUE |
Open | $4,855,500.00 | $4,855,500.00 | $1,394,850.44 |
CT - 6100 - 24122300130
6TH STREET CHILLED WATER TRANSMISSION LINE EXTENSION |
Open | $22,593,601.00 | $22,593,601.00 | $0.00 |
CT - 6100 - 25010300140
GIVENS DISTRICT PARK -- RECREATION CENTER RENOVATION |
Open | $2,808,252.29 | $2,808,252.29 | $400,579.30 |
CT - 6100 - 25010300140
GIVENS DISTRICT PARK -- RECREATION CENTER RENOVATION |
Open | $2,808,252.29 | $2,808,252.29 | $400,579.30 |
CT - 6100 - 25010300140
GIVENS DISTRICT PARK -- RECREATION CENTER RENOVATION |
Open | $2,808,252.29 | $2,808,252.29 | $400,579.30 |
CT - 6100 - 25010800144
NW AREA LIFT STATION IMPRMTS: BOULDER LANE LIFT STATION |
Open | $6,881,000.00 | $6,881,000.00 | $0.00 |
CT - 6100 - 25010900151
IVANHOE TRAIL WATER AND WASTEWATER PIPELINE RENEWAL |
Open | $2,977,416.00 | $2,977,416.00 | $0.00 |
CT - 6100 - 25020500186
HYDE PARK (E 38TH ST/GROOMS ST/AVENUE F) WW PIPELINE RENEWAL |
Open | $1,345,149.00 | $1,345,149.00 | $0.00 |
CT - 6100 - 25021100194
WALNUT CREEK - JANUARY DR FLOOD RISK REDUCTION PROJECT |
Open | $1,936,072.00 | $1,936,072.00 | $0.00 |
CT - 6100 - 25021100194
WALNUT CREEK - JANUARY DR FLOOD RISK REDUCTION PROJECT |
Open | $1,936,072.00 | $1,936,072.00 | $0.00 |
CT - 6100 - 25021200198
SOUTH AREA LIFT STATION IMPROVEMENTS: SPRINGFIELD LIFT STATI |
Open | $7,837,942.54 | $7,837,942.54 | $0.00 |
CT - 6100 - 25021200198
SOUTH AREA LIFT STATION IMPROVEMENTS: SPRINGFIELD LIFT STATI |
Open | $7,837,942.54 | $7,837,942.54 | $0.00 |
CT - 6100 - 25022400215
NWLS IMPROVEMENTS: ROCK HARBOR FORCE MAIN AND FOUR POINTS #2 |
Open | $4,224,497.00 | $4,224,497.00 | $0.00 |
CT - 6100 - 25030400228
2020 BOND SUBSTANDARD STREETS ROSS ROAD NORTH |
Open | $29,650,594.00 | $29,650,594.00 | $0.00 |
CT - 6100 - 25031100242
MLK/HEFLIN/SPRINGDALE INTERSECTION IMPROVEMENTS |
Open | $2,598,716.00 | $2,598,716.00 | $0.00 |
CT - 6100 - 25031700257
GARDEN VILLA LANE WATER & WASTEWATER PIPELINE RENEWAL |
Open | $8,426,181.00 | $8,426,181.00 | $0.00 |
CT - 6100 - 25032000267
RIDGELINE NEIGHBORHOOD PARK - PHASE I DEVELOPMENT |
Open | $1,117,589.00 | $1,117,589.00 | $0.00 |
CT - 6100 - 25032800287
DISTRICT COOLING VALVE RISER REPAIRS |
Open | $31,159.25 | $31,159.25 | $0.00 |
CT - 6100 - 25040300302
BOGGY CREEK LIFT STATION FORCE MAIN EXTENSION |
Open | $15,063,376.00 | $15,063,376.00 | $0.00 |
CT - 6100 - 25041600322
DAVIS WTP SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) I |
Open | $8,989,951.00 | $8,989,951.00 | $0.00 |
CT - 6100 - 25041700326
SLAUGHTER LANE- LOOP 1 TO BRODIE LANE- CAMPO |
Open | $12,978,416.55 | $12,978,416.55 | $0.00 |
CT - 6100 - 25051500351
F&I FLEXI-PAVE - SOLE SOURCE |
Open | $46,994.73 | $46,994.73 | $0.00 |
CT - 6100 - 25060400378
NORTH AUSTIN CIPP WASTEWATER RENEWAL |
Open | $2,772,892.00 | $2,772,892.00 | $0.00 |
CT - 6100 - 25060500381
E. ALLANDALE WHITE ROCK NEIGHBRHD W&WW SYSTEM RENEWAL REBID |
Open | $4,799,250.00 | $4,799,250.00 | $0.00 |
CT - 6100 - 25061200385
APD MOUNTED PATROL DRAINAGE/ASPHALT PROJECT |
Open | $967,000.00 | $967,000.00 | $0.00 |
CT - 6100 - 25061700391
MCNEIL DRIVE WATER TRANSMISSION MAIN |
Open | $50,734,011.00 | $50,734,011.00 | $0.00 |
CT - 6100 - 607Q0001461B
NE INTERIM WWTP INFRASTRUCTURE IMPRV. |
Open | $402,317.06 | $402,317.06 | $401,985.08 |
CT - 6100 - 607Q0001461B
NE INTERIM WWTP INFRASTRUCTURE IMPRV. |
Open | $402,317.06 | $402,317.06 | $401,985.08 |
CT - 6100 - CLMA044V
AUSTIN CONVENTION CENTER REDEVELOPMENT CLMA044V |
Open | $72,480.00 | $72,480.00 | $0.00 |
CT - 6100 - CLMP354PV
AUSTIN CONVENTION CENTER REDEVELOPMENT CT V |
Open | $73,746.03 | $73,746.03 | $67,269.26 |
CT - 6100 - CLMP356E
EXPERT PM AND TECH SERVICES FOR REDEV OF ACC |
Open | $73,500.00 | $73,500.00 | $0.00 |
CT - 6100 - PC607QPQ00827-A
WALLER CREEK TUNNEL |
Open | $17,501,494.43 | $17,501,494.43 | $17,378,187.83 |
CT - 8600 - 24022700292
JIMMY CLAY MAINT BARN - ENCLOSED CARPORT TO REPLACE CARPORT |
Open | $33,253.61 | $33,253.61 | $33,253.59 |
Search Contract Catalog