CONTRACT/DESCRIPTION EXPIRES AUTHORIZED ORDERED SPENT
MA - 6100 - PA210000086
2021 BROWNFIELDS ENVIRONMENTAL SERVICES ROTATION LIST
06/24/2025
Expires:
1 days
$3,500,000.00 $1,508,173.40 $1,043,131.82
MA - 6100 - CA240000005
MCKALLA RAIL STATION - CITY PROJECT ELEMENTS
06/26/2025
Expires:
3 days
$750,337.00 $750,337.00 $750,337.00
MA - 6100 - SA180000006
GREATER WALNUT AREA CENTRALIZED ODOR CONTROL FACILITY
06/26/2025
Expires:
3 days
$830,618.62 $830,618.62 $756,396.50
MA - 6100 - SA180000011
2018 RESERVOIR IMPROVEMENTS PROGRAM
06/26/2025
Expires:
3 days
$7,084,217.00 $6,548,938.28 $5,420,620.42
MA - 6100 - SA230000006
REIMBURSEMENT AGREEMENT-UPRR- SLAUGHTER LN PRELIMINARY ENG
06/26/2025
Expires:
3 days
$31,718.00 $31,555.13 $31,555.13
MA - 6100 - SA160000005
ABIA PARKING GARAGE AND ADMINISTRATION OFFICES
06/29/2025
Expires:
6 days
$15,021,225.25 $15,021,225.25 $15,021,225.25
MA - 6100 - SA150000005
ABIA TERMINAL EXPANSION AND IMPROVEMENTS
06/30/2025
Expires:
7 days
$41,137,426.04 $41,013,342.26 $41,013,342.26
MA - 6100 - SA150000014
DOWNTOWN DISTRICT COOLING PLANT # 3
06/30/2025
Expires:
7 days
$5,064,337.55 $5,060,658.99 $5,052,639.66
MA - 6100 - SA210000004
PSA FOR MEXICAN AMERICAN CULTURAL CENTER PHASE 2
06/30/2025
Expires:
7 days
$5,090,531.14 $5,090,531.14 $4,568,360.88
MA - 6100 - SA220000008
CMR SERVICES FOR ASIAN AMERICAN RESOURCE CENTER RENOVATIONS
06/30/2025
Expires:
7 days
$4,800,000.00 $123,894.00 $69,470.00
MA - 6100 - PA180000033
2018 STREAM RESTORATION AND STORMWATER TREATMENT ENG SVS RL
07/15/2025
Expires:
22 days
$15,059,000.00 $10,564,407.50 $9,375,604.74
MA - 6100 - CA220000014
2021 FACILITIES - LARGE FACILITIES IDIQ
07/17/2025
Expires:
24 days
$18,750,000.00 $15,593,713.19 $8,074,235.03
MA - 6100 - SA220000019
LAKELINE BOULEVARD IMPROVEMENTS
07/18/2025
Expires:
25 days
$2,737,374.33 $2,737,374.33 $1,850,314.49
MA - 6100 - CA220000013
WASTEWATER LINE RENEWAL AND SPOT REHAB SERVICE CONTRACT IDIQ
07/28/2025
Expires:
35 days
$9,600,000.00 $8,641,418.07 $8,055,626.64
MA - 6100 - PA200000050
2020 STORMWATER MAPPING & MODELING RL
07/28/2025
Expires:
35 days
$17,500,000.00 $16,350,139.24 $10,575,377.99
MA - 6100 - PA220000120
2022 INSPECTION & ANALYSIS OF POWER GENERATION FACILITIES RL
08/09/2025
Expires:
47 days
$6,000,000.00 $54,529.56 $47,402.99
MA - 6100 - CA240000006
IDIQ STORMWATER INFRASTRUCTURE IMPROVEMENTS-CLOSED SYST 2023
08/13/2025
Expires:
51 days
$1,875,000.00 $94,245.13 $82,452.66
MA - 6100 - CA200000020
EMS FACILITY RENOVATIONS, CM@R
08/29/2025
Expires:
67 days
$32,302,439.10 $32,302,439.10 $29,751,687.37
MA - 6100 - SA220000007
MONTOPOLIS AND NORTHWEST DISTRICT PARK POOL REPLACEMENTS
08/31/2025
Expires:
69 days
$1,526,000.00 $1,526,000.00 $1,245,643.56
MA - 6100 - SA160000019
PEER REVIEW OF BARTON SPRINGS ROAD BRIDGE OVER BARTON CREEK
09/09/2025
Expires:
78 days
$39,165.47 $39,165.47 $21,726.72
MA - 6100 - CA230000003
WASTEWATER RENEWAL PROGRAM - MANHOLES IDIQ (2023-2027)
09/10/2025
Expires:
79 days
$1,500,000.00 $1,119,204.76 $700,118.49
MA - 6100 - PA190000058
2019 LANDSCAPE ARCHITECTURE ROTATION LIST
09/24/2025
Expires:
93 days
$10,500,000.00 $3,871,152.22 $2,885,732.11
MA - 6100 - PA200000115
2020 JOB ORDER CONTRACTING PROFESSIONAL SERVICES SUPPORT RL
09/29/2025
Expires:
98 days
$6,000,000.00 $1,186,524.17 $698,629.57
MA - 6100 - SA180000001
WILLIAM CANNON RAILROAD OVERPASS
10/08/2025
Expires:
107 days
$1,168,350.11 $1,168,350.11 $1,109,146.22
MA - 6100 - CA230000005
2020 BOND TRAFFIC & PEDESTRIAN SIGNALS-INSTALLATION & MAINT
10/10/2025
Expires:
109 days
$5,000,000.00 $4,480,002.45 $3,661,973.99
MA - 6100 - CA240000001
2024 MISCELLANEOUS RESIDENTIAL STREETS FOG SEAL IDIQ
10/11/2025
Expires:
110 days
$4,000,000.00 $3,926,073.28 $2,900,256.80
MA - 6100 - CA240000007
STORMWATER INFRASTRUCTURE MAINTENANCE-OPEN SYSTEMS
10/13/2025
Expires:
112 days
$3,000,000.00 $1,203,504.18 $481,957.02
MA - 6100 - CA200000013
2021 AW ASPHALT AND CONCRETE RESTORATION IDIQ
10/20/2025
Expires:
119 days
$20,000,000.00 $10,832,207.05 $9,542,076.19
MA - 6100 - PA210000001
2020 LOCAL MOBILITY FIELD ENG. FOR PED, BIKE, & TRAIL RL
10/22/2025
Expires:
121 days
$9,000,000.00 $8,121,042.40 $8,066,794.14
MA - 6100 - CA150000003
ABIA TERMINAL / APRON EXPANSION AND IMP (CM@R)
10/23/2025
Expires:
122 days
$295,181,618.05 $295,053,393.05 $295,053,393.05
MA - 6100 - SA220000012
CMR FOR MONTOPOLIS & NORTHWEST POOL REPLACEMENT
10/23/2025
Expires:
122 days
$17,483,367.00 $17,483,367.00 $5,584,990.55
MA - 6100 - SA190000016
2019 ABIA ENVIRONMENTAL & ENGINEERING SERVICES
10/24/2025
Expires:
123 days
$2,000,000.00 $1,999,983.47 $1,695,459.09
MA - 6100 - SA210000013
AUSTIN HISTORY CENTER/FAULK LIBRARY CMR
10/31/2025
Expires:
130 days
$15,094,327.72 $15,094,327.72 $15,094,327.72
MA - 6100 - SA200000009
BRANCH LIBRARY INTERIOR RENOVATIONS
11/15/2025
Expires:
145 days
$657,792.04 $657,792.04 $478,660.28
MA - 6100 - 23092100039
LOCAL MOBILITY ADA SIDEWALK AND RMP. IMPNTS GRP. 29-IDIQ
12/04/2025
Expires:
164 days
$5,000,000.00 $4,495,178.08 $4,494,310.26
MA - 6100 - CA240000002
WILD HORSE RANCH WWTP EXPANSION - EMERGENCY CONTRACT
12/12/2025
Expires:
172 days
$2,236,225.00 $1,841,700.66 $1,841,700.66
MA - 6100 - PA170000023
2017 STRUCTURAL ENGINEERING SERVICES ROTATION LIST
12/12/2025
Expires:
172 days
$1,250,000.00 $1,179,753.83 $1,084,324.44
MA - 6100 - PA200000012
2020 LARGE SCALE GENERAL CIVIL ENGINEERING SERVICES RL
12/15/2025
Expires:
175 days
$31,600,000.00 $23,978,306.32 $16,815,948.51
MA - 6100 - PA220000024
2021 ENGINEERING SERVICES FOR POWER PRODUCTION RL
12/16/2025
Expires:
176 days
$3,000,000.00 $2,067,373.54 $1,674,669.45
MA - 6100 - SA190000005
ENGINEERING SERVICES FOR ELECTRIC SERVICE DELIVERY
12/17/2025
Expires:
177 days
$9,500,000.00 $9,343,426.74 $7,949,929.36
MA - 6100 - SA180000007
ZILKER METRO-BARTON SPRINGS BATHHOUSE REHABILITATION
12/25/2025 $1,110,840.66 $1,110,840.66 $1,048,125.50
MA - 6100 - PA100000043
ENVIRONMENTAL SERVICES ROTATION LIST 2010-2012 FOR PWD
12/31/2025 $7,200,000.00 $6,834,431.22 $6,580,549.18
MA - 6100 - PA110000004
WATER AND WASTEWATER PIPELINE ENGINEERING ROTATION LIST
12/31/2025 $7,500,000.00 $6,869,443.36 $6,797,314.66
MA - 6100 - PA110000043
SMALL DIAMETER WATER AND WASTEWATER PIPELINE ENGINEERING
12/31/2025 $5,000,000.00 $4,697,637.66 $4,697,637.66
MA - 6100 - PA110000062
2011 SMALL SCALE CIVIL ENGINEERING ROTATION LIST
12/31/2025 $6,400,000.00 $6,066,745.99 $5,819,602.14
MA - 6100 - PA130000012
2012 SUBSURFACE UTILITY ENGINEERING SERVICES ROTATION LIST
12/31/2025 $3,000,000.00 $2,237,528.32 $2,225,572.13
MA - 6100 - PA150000002
2014 ENVIRONMENTAL SERVICES ROTATION LIST
12/31/2025 $4,800,000.00 $4,406,241.49 $4,284,801.82
MA - 6100 - PA150000019
2015 SPACE PLANNING SERVICES ROTATION LIST
12/31/2025 $3,000,000.00 $531,882.21 $523,403.55
MA - 6100 - PA160000003
2015 WATERSHED ENGINEERING FLOOD HAZARD MITIGATION RL
12/31/2025 $15,000,000.00 $14,685,113.90 $13,565,976.25
MA - 6100 - PA160000040
(CLMP187) 2016 SMALL W&WW FACILITIES ENGINEERING SERVICES RL
12/31/2025 $4,000,000.00 $3,906,307.75 $3,692,314.21
MA - 6100 - PA160000042
2016 LARGE W&WW FACILITIES ENGINEERING SERVICES RL
12/31/2025 $20,000,000.00 $19,546,988.41 $18,672,606.01
MA - 6100 - PA170000027
2017 CONSTRUCT MATL'S, GEOTECH & FORENSIC ENG ROTATION LIST
12/31/2025 $9,999,999.96 $8,510,295.81 $8,217,397.80
MA - 6100 - PA170000033
2017 SMALL DIAMETER W&WW PIPELINE ENGINEERING ROTATION LIST
12/31/2025 $5,000,000.00 $4,746,629.18 $4,699,069.75
MA - 6100 - PA170000034
2017 LARGE DIAMETER WATER & WASTE WATER PIPELINE ENG RL
12/31/2025 $9,999,999.90 $9,799,534.02 $9,250,316.07
MA - 6100 - PA170000053
2017 GENERAL ARCHITECTURAL SERVICES ROTATION LIST
12/31/2025 $4,252,409.68 $4,050,246.73 $3,847,876.22
MA - 6100 - PA190000065
(CLMP255) 2019 SMALL SCALE W&WW FACILITIES ENG SERVICES RL
12/31/2025 $10,500,000.00 $5,390,158.90 $4,307,422.07
MA - 6100 - PA190000066
2019 LARGE SCALE W&WW FACILITIES ENGINEERING SERVICES RL
12/31/2025 $33,000,000.00 $29,137,580.76 $24,280,088.81
MA - 6100 - PA190000067
WATERSHED PROTECTION FLOOD RISK REDUCTION RL
12/31/2025 $45,030,000.00 $28,497,094.37 $21,298,224.78
MA - 6100 - PA200000010
(CLMP262) 2019 LARGE DIA. WATER & WASTEWATER PIPELINE ENG RL
12/31/2025 $12,321,000.00 $12,122,490.24 $10,222,760.95
MA - 6100 - PA200000011
2020 ENVIRONMENTAL SERVICES ROTATION LIST
12/31/2025 $5,435,000.00 $5,172,562.44 $4,173,114.94
MA - 6100 - PA200000014
2019 SMALL DIAMETER W & WW PIPELINE ENGINEERING RL
12/31/2025 $8,476,000.00 $7,696,778.89 $5,955,223.32
MA - 6100 - PA210000069
2021 ATD TRANSPORTATION ENGINEERING SERVICES RL
12/31/2025 $8,800,000.00 $7,791,576.55 $7,090,007.06
MA - 6100 - PA220000067
2022 LARGE DIAMETER W&WW PIPELINE ENG SERVICES ROTATION LIST
12/31/2025 $24,000,000.00 $12,763,157.61 $6,486,859.53
MA - 6100 - PA220000097
2022 SMALL DIAMETER WATER AND WASTEWATER PIPELINE ENG. RL
12/31/2025 $11,050,000.00 $6,649,754.71 $5,086,233.77
MA - 6100 - PA230000026
2022 BUILDING COMMISSION (CX) SERVICES ROTATION LIST
12/31/2025 $10,000,000.00 $1,059,614.07 $417,226.78
MA - 6100 - SA170000007
CORRIDOR IMPROVEMENT PROGRAM CONSULTANT
12/31/2025 $77,500,000.00 $76,775,144.20 $75,135,549.46
MA - 6100 - SA170000010
WALNUT CREEK WWTP CONTROL SYSTEMS UPGRADE
12/31/2025 $5,327,552.30 $5,327,552.30 $4,087,806.27
MA - 6100 - SA190000002
NEW INFORMATION TECHNOLOGY BUILDING
12/31/2025 $2,695,078.27 $2,677,920.14 $2,677,920.14
MA - 6100 - SA190000003
ABIA TERMINAL CENTRALIZED BAGGAGE HANDLING SYSTEM DCM REISSU
12/31/2025 $13,837,408.87 $13,837,408.87 $3,612,416.11
MA - 6100 - SA190000008
SOUTH AREA AND NORTHWEST AREA LIFT STATION IMPROVEMENTS
12/31/2025 $12,325,402.33 $7,925,085.23 $6,098,113.43
MA - 6100 - SA200000006
WALNUT CREEK WASTEWATER TREATMENT PLANT HEADWORKS IMPROVEMEN
12/31/2025 $13,025,736.51 $13,025,736.51 $5,586,106.42
MA - 6100 - SA200000008
BOGGY CREEK LIFT STATION FORCE MAIN EXTENSION
12/31/2025 $1,557,860.63 $1,557,860.63 $1,525,824.51
MA - 6100 - SA210000006
WALNUT CREEK WWTP EXPANSION TO 100 MILLION GALLONS PER DAY
12/31/2025 $64,880,150.49 $64,879,667.05 $48,670,540.15
MA - 6100 - SA210000009
ZILKER METROPOLITAN PARK MASTER PLAN REISSUE
12/31/2025 $619,003.38 $592,006.04 $592,006.04
MA - 6100 - SA220000010
WATERLOO GREENWAY PROJECT
12/31/2025 $10,000,000.00 $9,952,474.05 $4,883,847.88
MA - 6100 - PA200000021
2020 SMALL SCALE GENERAL CIVIL ENGINEERING SERVICES
01/02/2026 $6,400,000.00 $3,642,505.57 $2,745,988.61
MA - 6100 - CA200000021
2020 JOB ORDER CONTRACTING FOR CITY FACILITY IMPROVEMENTS
01/05/2026 $48,000,000.00 $26,512,574.84 $19,226,511.71
MA - 6100 - PA190000022
2018 SURVEYING SERVICES ROTATION LIST
01/09/2026 $6,326,000.00 $4,540,753.35 $4,041,671.05
MA - 6100 - PA200000013
2020 ABIA ARCHITECTURAL & ENGINEERING SERVICES ROTATION LIST
01/10/2026 $30,000,000.00 $21,002,775.92 $16,645,522.67
MA - 6100 - SA220000006
2020 BOND SUBSTANDARD STREETS ROSS ROAD NORTH
01/26/2026 $3,181,951.58 $3,181,951.58 $2,862,246.59
MA - 6100 - PA210000037
2021 STREAM RESTORATION AND STORMWATER TREATMENT ENGINEER RL
01/31/2026 $19,600,000.00 $11,629,690.16 $5,393,890.26
MA - 6100 - SA200000004
UPPER HARRIS BRANCH INTERCEPTOR SA#2 $90,570.07
01/31/2026 $3,065,377.63 $3,065,377.63 $2,761,674.41
MA - 6100 - 25020500029
2025 MISCELLANEOUS STREETS OVERLAY IDIQ
02/06/2026 $8,500,000.00 $1,787,723.94 $0.00
MA - 6100 - PA160000014
2016 LARGE SCALE GENERAL CIVIL ENGINEERING ROTATION LIST
02/09/2026 $17,450,000.00 $16,924,259.29 $15,923,383.30
MA - 6100 - CA240000003
LOCAL MOBILITY ADA SIDEWALK & RAMP IMPS GRP 32 CITYWIDE IDIQ
02/12/2026 $24,000,000.00 $17,368,692.05 $6,022,782.20
MA - 6100 - CA250000001
IN SITU WASTEWATER LINE RENEWAL PROGRAM IDIQ (2025 TO 2027)
02/12/2026 $1,250,000.00 $1,053,965.48 $0.00
MA - 6100 - CA220000004
2021-2025 BRIDGE MAINTENANCE IDIQ REBID
02/13/2026 $3,400,000.00 $2,013,477.39 $1,421,560.44
MA - 6100 - PA100000084
WATERSHED FLOOD HAZARD MITIGATION ENG SRVS RL 2011-2014
02/18/2026 $7,500,000.00 $7,490,978.83 $7,191,715.86
MA - 6100 - PA150000015
2015 STORMWATER MODELING AND MAPPING ENGINEERING SERVICES RL
02/28/2026 $3,000,000.00 $2,999,998.56 $2,174,211.72
MA - 6100 - SA210000008
LADYBIRD LAKE-CANTERBURY AT MILDRED STREET & UTILITY IMPROVE
03/01/2026 $949,249.05 $855,766.06 $855,766.06
MA - 6100 - PA150000027
2015 ROOFING & WATERPROOFING CONSULTANT SERVICES RL
03/12/2026 $1,400,000.00 $1,067,814.85 $970,535.55
MA - 6100 - CA220000005
TRAFFIC SIGN & PAVEMENT MARKING SERVICES IDIQ - A
03/23/2026 $13,198,000.00 $8,741,690.13 $7,571,161.15
MA - 6100 - SA160000004
DESIGN OF REDBUD TRAIL BRIDGE OVER LADY BIRD LAKE
03/25/2026 $15,586,242.56 $15,586,152.42 $14,919,258.06
MA - 6100 - CA250000004
SAFE STREETS AND ROADS FOR ALL (SS4A) CONSTRUCTION IDIQ
03/26/2026 $2,000,000.00 $0.00 $0.00
MA - 6100 - PA180000016
ABIA CONSTR. MATL., GEOTECHN. & FORENSIC ENG SRVCS R.L.
03/28/2026 $15,000,000.00 $7,168,179.42 $3,439,223.38
MA - 6100 - CA220000007
TRAFFIC SIGN & PAVEMENT MARKING SERVICES IDIQ - B
04/06/2026 $13,198,000.00 $3,323,198.98 $1,923,087.29
MA - 6100 - CA250000003
SAFE STREETS AND ROADS FOR ALL CONCRETE CONSTRUCTION IDIQ
04/06/2026 $4,000,000.00 $394,317.29 $0.00
MA - 6100 - SA220000011
CLMP322-I35 CAP AND STITCH IMPROVEMENTS CONSULTANT
04/11/2026 $3,000,000.00 $3,000,000.00 $3,000,000.00
MA - 6100 - SA230000005
UPPER TANNEHILL STORMWATER IMPROVEMENTS AND WASTEWATER INTER
04/13/2026 $2,885,847.17 $2,885,847.17 $2,108,811.64
MA - 6100 - CA240000004
LOCAL MOBILITY ADA SIDEWALK & RAMP IMPS GRP 33 CITYWIDE IDIQ
04/14/2026 $20,000,000.00 $12,338,198.36 $3,451,698.23
MA - 6100 - CA230000002
2024 WATERLINE ON-CALL SERVICES IDIQ
04/17/2026 $9,000,000.00 $4,135,417.90 $3,553,914.60
MA - 6100 - SA200000005
EXISTING TERMINAL CENTRALIZED BHS UPGRADES
04/19/2026 $231,464,573.88 $231,464,573.88 $170,529,780.06
MA - 6100 - CA220000002
UNDERGROUND ELECTRICAL CIVIL CONSTRUCTION
04/20/2026 $72,000,000.00 $60,381,913.70 $59,912,156.32
MA - 6100 - PA180000027
2018 CORRIDOR PROGRAM ENGINEERING SERVICES ROTATION LIST
04/26/2026 $130,000,000.00 $116,111,622.90 $107,634,755.08
MA - 6100 - PA230000075
2023 TRANSPORTATION ENGINEERING SERVICES ROTATION LIST
04/30/2026 $30,000,000.00 $11,901,630.52 $4,560,231.94
MA - 6100 - SA200000011
DAVIS WATER TREATMENT PLANT SCADA SYSTEM IMPROVEMENTS
04/30/2026 $4,075,380.69 $4,075,380.69 $1,229,788.46
MA - 6100 - PA210000056
AE STAFF AUGMENTATION, ENG. AND REL. ENG SERVICES RL
05/02/2026 $70,875,000.00 $52,831,419.32 $36,251,880.93
MA - 6100 - PA200000052
2020 ENGINEERING SERVICES FOR AUSTIN ENERGY PLANTS
05/11/2026 $10,000,000.00 $5,867,741.46 $3,801,083.95
MA - 6100 - 25051300035
2024 FACILITIES - EMERGENCY AND LIFT STATION - IDIQ
05/13/2026 $7,000,000.00 $0.00 $0.00
MA - 6100 - SA240000010
BARBARA JORDAN TERMINAL (BJT) OPTIMIZATION - PHASE 2
05/25/2026 $150,000,000.00 $30,394,036.00 $1,033,257.23
MA - 6100 - SA210000020
COLONY PARK AND GIVENS DISTRICT PARK AQUATIC FACILITIES CMR
05/31/2026 $20,712,344.35 $20,712,344.35 $19,157,189.40
MA - 6100 - SA230000003
CMR FOR AEDP AIRFIELD INFRASTRUCTURE
06/01/2026 $259,617,630.80 $259,617,630.80 $12,067,675.70
MA - 6100 - PA200000058
2020 BUILDING COMMISSIONING (CX)SERVICES ROTATION LIST
06/17/2026 $3,750,000.00 $3,295,573.10 $2,394,824.72
MA - 6100 - SA140000004
ABIA STORMWATER DRAINAGE IMPROVEMENTS
06/17/2026 $2,018,869.13 $1,994,716.22 $1,754,766.87
MA - 6100 - SA210000018
RELAY & PROTECTION ENGINEERING SERVICES FOR ELECTRIC SYSTEM.
06/26/2026 $2,935,000.00 $2,365,857.82 $2,202,122.44
MA - 6100 - SA220000014
ATD TRANSPORTATION ENGINEERING STAFF AUGMENTATION
07/11/2026 $21,500,000.00 $19,214,203.33 $14,004,624.62
MA - 6100 - SA220000015
CIVIL ENGINEERING SERVICES, STREET REHABILITATION PROGRAM
07/14/2026 $1,249,530.32 $0.00 $0.00
MA - 6100 - CA250000009
SHOAL CREEK - MOPAC/STECK WATER QUALITY PONDS RETROFIT
07/21/2026 $3,331,271.00 $0.00 $0.00
MA - 1100 - GA210000058
ELECTRICAL SUPPLIES
07/28/2026 $1,247,134.83 $1,241,583.13 $1,214,952.04
MA - 6100 - SA220000022
PROFESSIONAL SERVICES FOR ADEP AIRFIELD CONSTRUCTION
07/31/2026 $24,110,751.11 $24,110,751.11 $12,361,272.80
MA - 6100 - SA180000002
FALLWELL LANE CAPITAL RENEWAL
08/03/2026 $7,691,094.61 $7,691,094.61 $3,189,853.71
MA - 6100 - SA230000007
CENTER STREET PUMP STATION REPLACEMENT & ELECTRICAL IMPROV
08/31/2026 $2,247,900.74 $2,247,900.74 $2,023,238.69
MA - 6100 - PA190000057
2019 M.E.P. ENGINEERING ROTATION LIST
09/10/2026 $4,800,000.00 $3,374,029.51 $2,768,923.89
MA - 6100 - PA150000003
2015 ABIA ARCHITECTURAL AND ENGINEERING SERVICES RL
09/25/2026 $12,500,000.00 $10,835,002.38 $10,686,917.37
MA - 6100 - PA190000071
2019 GENERAL ARCHITECTURAL SERVICES ROTATION LIST
09/29/2026 $13,000,000.00 $9,415,733.41 $7,652,685.24
MA - 6100 - PA190000072
2019 STRUCTURAL ENGINEERING ROTATION LIST
09/29/2026 $4,015,000.00 $2,343,300.11 $2,030,910.61
MA - 6100 - SA190000015
OLTORF STREET RECLAIMED WATER MAIN PHASES 1 & 2
09/29/2026 $1,679,162.24 $1,679,162.23 $1,544,869.88
MA - 6100 - PA220000085
2022 ASBESTOS, LEAD PAINT, & MOLD CONSULTANT SERVICES RL
09/30/2026 $6,000,000.00 $2,093,853.82 $1,485,622.79
MA - 6100 - PA220000102
2022 AUSTIN WATER SCADA SERVICES ROTATION LIST
09/30/2026 $10,000,000.00 $1,593,452.96 $413,881.23
MA - 6100 - SA230000013
CURB & GUTTERS - DATA COLLECTION AND ASSESSMENT 2023
09/30/2026 $449,953.02 $449,953.02 $449,953.02
MA - 6100 - PA160000015
2016 SMALL SCALE GENERAL CIVIL ENGINEERING SERVICES RL
10/03/2026 $6,400,000.00 $5,877,068.56 $5,638,181.92
MA - 6100 - SA180000014
ATD TRANSPORTATION ENGINEERING STAFF AUGMENTATION
10/31/2026 $12,200,000.00 $11,886,213.83 $11,770,452.49
MA - 6100 - SA170000001
WILLIAMSON CREEK WW INTERCEPTOR
11/01/2026 $7,046,716.50 $7,046,716.50 $6,622,853.90
MA - 6100 - PA170000045
2017 WATER AND WASTEWATER SCADA SERVICES ROTATION LIST
12/31/2026 $5,000,000.00 $4,829,490.82 $4,470,683.95
MA - 6100 - PA180000034
2018 ABIA SURVEYING SERVICES ROTATION LIST
12/31/2026 $1,500,000.00 $552,492.88 $510,954.24
MA - 6100 - PA200000100
2020 CIP CONST. MAT'L. TESTING, GEO & FORENSIC ENG SRVCS. RL
12/31/2026 $25,000,000.00 $14,378,108.52 $6,850,995.81
MA - 6100 - PA210000039
2021 ROOFING & WATERPROOFING CONSULTANT SERVICES RL
12/31/2026 $1,400,000.00 $655,032.75 $487,473.73
MA - 6100 - PA220000017
2021 ATD FIELD ENGINEERING SERVICES ROTATION LIST
12/31/2026 $10,000,000.00 $5,865,053.94 $3,181,395.16
MA - 6100 - PA240000013
2024 ENVIRONMENTAL SERVICES ROTATION LIST
12/31/2026 $9,000,000.00 $1,747,211.21 $571,228.70
MA - 6100 - SA160000007
DESIGN OF BARTON SPRINGS ROAD BRIDGE OVER BARTON CREEK
12/31/2026 $14,098,960.64 $11,364,645.16 $4,125,783.96
MA - 6100 - SA160000017
CITY STREET IMPACT FEE
12/31/2026 $1,921,560.23 $1,552,280.17 $1,552,267.69
MA - 6100 - SA210000012
AQUIFER STORAGE AND RECOVERY PILOT PROJECT AND ASR PM
12/31/2026 $3,049,583.14 $3,049,583.14 $2,609,022.48
MA - 6100 - SA220000009
CONGRESS AVENUE URBAN DESIGN INITIATIVE
12/31/2026 $5,166,597.99 $5,166,597.99 $4,403,418.27
MA - 6100 - SA230000012
BRACKENRIDGE GAS INSULATED SWITCHGEAR SUBSTATION REISSUE
12/31/2026 $32,851,188.72 $32,851,188.72 $8,834,178.96
MA - 6100 - PA230000057
2023 SUBSURFACE UTILITY ENGINEERING (SUE) SERVICES RL
02/28/2027 $4,800,000.00 $365,962.42 $219,632.47
MA - 6100 - SA250000004
AEDP UICW CONSTRUCTION
02/28/2027 $2,894,390.90 $2,894,390.90 $0.00
MA - 6100 - CA250000006
AUS PARKING LOT CONSTRUCTION, REHABILITATION & REPAIR IDIQ
03/23/2027 $18,900,000.00 $4,857,526.70 $0.00
MA - 6100 - SA220000021
CMR SERVICES FOR BARBARA JORDAN TERMINAL (BJT) OPTIMIZATION
03/31/2027 $129,597,528.00 $129,597,528.00 $69,461,670.00
MA - 6100 - SA240000005
DAVIS MEDIUM SERVICE WATER TRANSMISSION MAIN PIPELINE
04/09/2027 $4,430,674.04 $4,430,674.04 $2,994,498.38
MA - 6100 - SA240000009
IH35 CAP & STITCH -CONNECTING AUSTIN EQUITABLY M
08/07/2027 $1,398,893.66 $1,398,893.66 $284,792.85
MA - 6100 - SA230000014
ABIA ENVIRONMENTAL AND ENGINEERING SERVICES
09/30/2027 $5,000,000.00 $282,992.98 $4,266.01
MA - 6100 - PA200000049
2020 DSD CONSTRUCTION MATERIALS ENGINEERING SERVICES RL
12/31/2027 $5,000,000.00 $4,423,036.85 $3,750,634.60
MA - 6100 - SA240000008
SUNKEN GARDENS - HABITAT ENHANCEMENT AND HISTORIC WALL REPAI
12/31/2027 $431,978.38 $431,978.38 $249,903.43
MA - 6100 - PA250000009
2024 LARGE SCALE GENERAL CIVIL ENGINEERING SERVICES RL
03/02/2028 $39,000,000.00 $0.00 $0.00
MA - 6100 - SA250000003
AUS CENTRAL UTILITY PLANT RELOCATION
03/31/2028 $6,511,481.62 $6,511,481.62 $2,688,255.32
MA - 6100 - SA220000001
WALNUT CREEK TRAIL - IH35 TO SOUTHERN WALNUT CREEK TRAIL
04/10/2028 $11,802,721.63 $11,802,721.63 $3,590,727.15
MA - 6100 - SA230000004
WALNUT CREEK PRIMARY CLARIFIER-FLOW EQUALIZATION BASIN REHAB
06/16/2028 $148,515,982.41 $148,515,982.41 $16,686,203.05
MA - 6100 - PA230000098
2023 LOCAL MOBILITY SIDEWALK, BIKEWAY AND URBAN TRAILS FIELD
08/03/2028 $24,000,000.00 $6,492,832.97 $3,675,476.49
MA - 6100 - PA240000095
2024 GENERAL ARCHITECTURAL ROTATION LIST
09/08/2028 $11,000,000.00 $58,000.00 $0.00
MA - 6100 - SA200000007
PROFESSIONAL ARCHITECTURAL AND HISTORIC PRESERVATION SERVICE
09/15/2028 $405,745.34 $405,745.34 $320,514.75
MA - 6100 - SA240000018
WALLER CREEK RESTACK PLAN
11/03/2028 $710,800.28 $710,800.28 $172,622.20
MA - 6100 - SA240000020
SOUTHWEST PRESSURE ZONES PUMP STATION/RESERVOIR STUDY
11/06/2028 $2,538,367.23 $2,538,367.23 $153,095.35
MA - 6100 - SA250000002
HANDCOX WATER TREATMENT PLANT RESILIENCY IMPROVEMENT
11/20/2028 $7,391,405.98 $7,391,405.98 $0.00
MA - 6100 - SA240000013
WEST GARAGE - LOT B CMR
11/30/2028 $242,632,668.07 $242,632,668.07 $9,977,860.81
MA - 6100 - SA240000014
WEST GARAGE - LOT B PSA PRELIMINARY AND DESIGN PHASE
11/30/2028 $9,694,338.85 $9,694,338.85 $7,319,514.81
MA - 6100 - SA180000005
NORTHEAST WATER TREATMENT PLANT EXPANSION TO 1.5 MGD
12/01/2028 $11,662,792.26 $11,662,792.26 $7,565,087.78
MA - 6100 - PA240000062
2024 CONSTRUCTION INSPECTION ROTATION LIST
12/31/2028 $7,200,000.00 $1,924,877.64 $372,301.69
MA - 6100 - SA230000002
ATD STREET DESIGN STAFF AUGMENTATION
12/31/2028 $22,000,000.00 $6,879,529.12 $5,505,772.44
MA - 6100 - SA250000006
CONCOURSE B AND TUNNEL
02/25/2029 $8,819,891.00 $8,819,891.00 $911,087.92
MA - 6100 - SA240000003
AUSTIN CONVENTION CENTER REDEVELOPMENT
03/29/2029 $259,156,735.95 $259,156,735.95 $34,025,257.08
MA - 6100 - SA240000001
EXPERT PROJECT MANAGER & TECHNICAL SERVICES FOR REDEV OF ACC
03/30/2029 $26,002,925.65 $26,002,925.65 $9,676,943.76
MA - 6100 - SA240000002
AUSTIN CONVENTION CENTER REDEVELOPMENT
03/30/2029 $103,973,829.72 $103,973,829.62 $38,718,837.79
MA - 6100 - PA240000069
2023 WATERSHED PROTECTION FLOOD RISK REDUCTION ROTATION LIST
08/15/2029 $45,000,000.00 $0.00 $0.00
MA - 6100 - SA240000019
AUS BUILDING COMMISSIONING (CX) SERVICES
09/09/2029 $24,000,000.00 $1,636,779.25 $0.00
MA - 6100 - PA250000003
2023 SURVEYING SERVICES ROTATION LIST
10/08/2029 $7,000,000.00 $0.00 $0.00
MA - 6100 - PA250000007
2024 LARGE SCALE W&WW FACILITIES ENGINEERING SERVI
10/28/2029 $35,000,000.00 $5,242,661.07 $949,204.21
MA - 6100 - SA240000017
UTILITY INFRASTRUCTURE CAMPUS WIDE
11/30/2029 $9,999,876.52 $9,999,876.52 $2,996,309.31
MA - 6100 - PA250000008
(CLMP372) 2024 AUS ARCHITECTURAL & ENGINEERING SERVICES RL
12/10/2029 $60,000,000.00 $0.00 $0.00
MA - 6100 - SA200000022
HORNSBY BEND BMP HEADWORKS
01/01/1930 $2,740,782.49 $2,740,782.49 $2,363,351.47
MA - 6100 - SA250000005
ARRIVALS AND DEPARTURES HALL CMAR
01/31/1930 $4,211,270.06 $4,211,270.06 $233,959.45
MA - 6100 - SA250000007
ARRIVALS AND DEPARTURES HALL (AEDP) DESIGN SERVICES
01/31/1930 $10,180,331.68 $10,180,331.68 $4,555,634.93
MA - 6100 - CA160000003
REPUBLIC SQUARE PARK MASTER PLAN RE-IMPROVEMENTS (PARD)
02/10/1930 $2,381,144.95 $2,239,716.85 $2,239,716.85
MA - 6100 - SA220000004
ABIA AIRPORT PRINCIPAL ARCHITECT/ENGINEER
03/07/1930 $52,000,000.00 $42,984,875.47 $34,724,981.66
MA - 6100 - PA250000068
CLMP375-2024 LOCALIZED FLOOD ANALYSIS ROTATION LIST
05/07/1930 $36,000,000.00 $0.00 $0.00
CT - 6100 - 09051901445
DAVIS WATER TREATMENT PLANT POWER DISTRIBUTION UPGRADE
Open $6,994,382.15 $6,994,382.15 $6,410,538.11
CT - 6100 - 09060501513
WATER DISTRIBUTION CONTROL SYSTEM& LIFT STATION TELEMETRY
Open $2,100,902.63 $2,100,902.63 $2,068,742.69
CT - 6100 - 09120800381A
DAVIS WTP TREATED WATER DISCHARGE SYSTEM
Open $6,757,987.46 $6,757,987.46 $6,424,866.55
CT - 6100 - 11110300120A
WEST RUNDBERG LANE EXTENSION PROJECT
Open $297,778.73 $297,778.73 $233,805.67
CT - 6100 - 11110300120A
WEST RUNDBERG LANE EXTENSION PROJECT
Open $297,778.73 $297,778.73 $233,805.67
CT - 6100 - 11110300120A
WEST RUNDBERG LANE EXTENSION PROJECT
Open $297,778.73 $297,778.73 $233,805.67
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM
Open $45,786,686.58 $45,786,686.58 $42,838,262.02
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM
Open $45,786,686.58 $45,786,686.58 $42,838,262.02
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM
Open $45,786,686.58 $45,786,686.58 $42,838,262.02
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM
Open $45,786,686.58 $45,786,686.58 $42,838,262.02
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM
Open $45,786,686.58 $45,786,686.58 $42,838,262.02
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM
Open $45,786,686.58 $45,786,686.58 $42,838,262.02
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM
Open $45,786,686.58 $45,786,686.58 $42,838,262.02
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM
Open $45,786,686.58 $45,786,686.58 $42,838,262.02
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM
Open $45,786,686.58 $45,786,686.58 $42,838,262.02
CT - 6100 - 16040500516
DAVIS WATER TREATMENT PLANT TREATED WATER DISCHARGE SYSTEM
Open $45,786,686.58 $45,786,686.58 $42,838,262.02
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE
Open $26,672,943.53 $26,672,943.53 $25,740,274.76
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE
Open $26,672,943.53 $26,672,943.53 $25,740,274.76
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE
Open $26,672,943.53 $26,672,943.53 $25,740,274.76
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE
Open $26,672,943.53 $26,672,943.53 $25,740,274.76
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE
Open $26,672,943.53 $26,672,943.53 $25,740,274.76
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE
Open $26,672,943.53 $26,672,943.53 $25,740,274.76
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE
Open $26,672,943.53 $26,672,943.53 $25,740,274.76
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE
Open $26,672,943.53 $26,672,943.53 $25,740,274.76
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE
Open $26,672,943.53 $26,672,943.53 $25,740,274.76
CT - 6100 - 16080400825
DAVIS WTP POWER DISTRIBUTION UPGRADE
Open $26,672,943.53 $26,672,943.53 $25,740,274.76
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP)
Open $4,952,044.83 $4,952,044.83 $4,918,121.01
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP)
Open $4,952,044.83 $4,952,044.83 $4,918,121.01
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP)
Open $4,952,044.83 $4,952,044.83 $4,918,121.01
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP)
Open $4,952,044.83 $4,952,044.83 $4,918,121.01
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP)
Open $4,952,044.83 $4,952,044.83 $4,918,121.01
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP)
Open $4,952,044.83 $4,952,044.83 $4,918,121.01
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP)
Open $4,952,044.83 $4,952,044.83 $4,918,121.01
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP)
Open $4,952,044.83 $4,952,044.83 $4,918,121.01
CT - 6100 - 17052600559
ONION CREEK FIRE / EMS STATION REISSUE (CSP)
Open $4,952,044.83 $4,952,044.83 $4,918,121.01
CT - 6100 - 18102400031A
FOREST RIDGE GROUND STORAGE RESERVOIR IMPROVEMENTS
Open $47,000.00 $47,000.00 $46,243.78
CT - 6100 - 18102400031A
FOREST RIDGE GROUND STORAGE RESERVOIR IMPROVEMENTS
Open $47,000.00 $47,000.00 $46,243.78
CT - 6100 - 18102400031A
FOREST RIDGE GROUND STORAGE RESERVOIR IMPROVEMENTS
Open $47,000.00 $47,000.00 $46,243.78
CT - 6100 - 18102400031A
FOREST RIDGE GROUND STORAGE RESERVOIR IMPROVEMENTS
Open $47,000.00 $47,000.00 $46,243.78
CT - 6100 - 18102400031A
FOREST RIDGE GROUND STORAGE RESERVOIR IMPROVEMENTS
Open $47,000.00 $47,000.00 $46,243.78
CT - 6100 - 18111400070A
LEUTHAN LANE GROUND STORAGE RESERVOIR IMPROVEMENTS
Open $40,162.41 $40,162.41 $39,220.40
CT - 6100 - 18111400070A
LEUTHAN LANE GROUND STORAGE RESERVOIR IMPROVEMENTS
Open $40,162.41 $40,162.41 $39,220.40
CT - 6100 - 18111400070A
LEUTHAN LANE GROUND STORAGE RESERVOIR IMPROVEMENTS
Open $40,162.41 $40,162.41 $39,220.40
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST
Open $10,458,303.00 $10,458,303.00 $10,395,318.06
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST
Open $10,458,303.00 $10,458,303.00 $10,395,318.06
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST
Open $10,458,303.00 $10,458,303.00 $10,395,318.06
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST
Open $10,458,303.00 $10,458,303.00 $10,395,318.06
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST
Open $10,458,303.00 $10,458,303.00 $10,395,318.06
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST
Open $10,458,303.00 $10,458,303.00 $10,395,318.06
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST
Open $10,458,303.00 $10,458,303.00 $10,395,318.06
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST
Open $10,458,303.00 $10,458,303.00 $10,395,318.06
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST
Open $10,458,303.00 $10,458,303.00 $10,395,318.06
CT - 6100 - 19080800698C
CLMB329 ABIA CONSOLIDATED MAINT.- AUS CARGO DEVELOPMENT EAST
Open $10,458,303.00 $10,458,303.00 $10,395,318.06
CT - 6100 - 19082200757
ACC HIGHLAND CHILLED WATER PLANT
Open $25,633,791.67 $25,633,791.67 $25,255,263.52
CT - 6100 - 19082200757
ACC HIGHLAND CHILLED WATER PLANT
Open $25,633,791.67 $25,633,791.67 $25,255,263.52
CT - 6100 - 19082200757
ACC HIGHLAND CHILLED WATER PLANT
Open $25,633,791.67 $25,633,791.67 $25,255,263.52
CT - 6100 - 19082200757
ACC HIGHLAND CHILLED WATER PLANT
Open $25,633,791.67 $25,633,791.67 $25,255,263.52
CT - 6100 - 19082200757
ACC HIGHLAND CHILLED WATER PLANT
Open $25,633,791.67 $25,633,791.67 $25,255,263.52
CT - 6100 - 19110100074
DAVIS LANE # 1 RESERVOIR IMPROVEMENTS
Open $5,095,366.53 $5,095,366.53 $5,068,385.66
CT - 6100 - 19110100074
DAVIS LANE # 1 RESERVOIR IMPROVEMENTS
Open $5,095,366.53 $5,095,366.53 $5,068,385.66
CT - 6100 - 19110100074
DAVIS LANE # 1 RESERVOIR IMPROVEMENTS
Open $5,095,366.53 $5,095,366.53 $5,068,385.66
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20030900458
BOGGY CREEK - MLK TOD STORMWATER CONVEYANCE IMP PHASE 1
Open $3,913,079.50 $3,913,079.50 $3,906,673.25
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS
Open $43,401,870.66 $43,401,870.66 $41,219,693.48
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS
Open $43,401,870.66 $43,401,870.66 $41,219,693.48
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS
Open $43,401,870.66 $43,401,870.66 $41,219,693.48
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS
Open $43,401,870.66 $43,401,870.66 $41,219,693.48
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS
Open $43,401,870.66 $43,401,870.66 $41,219,693.48
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS
Open $43,401,870.66 $43,401,870.66 $41,219,693.48
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS
Open $43,401,870.66 $43,401,870.66 $41,219,693.48
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS
Open $43,401,870.66 $43,401,870.66 $41,219,693.48
CT - 6100 - 20042000587
NORTH AUSTIN RESERVOIR AND PUMP STATION IMPROVEMENTS
Open $43,401,870.66 $43,401,870.66 $41,219,693.48
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20042700606
SOUTH AUSTIN REGIONAL WWTP ELECTRICAL SUBSTATION NO.1 REPLAC
Open $31,206,079.43 $31,206,079.43 $29,107,312.19
CT - 6100 - 20080700966
BRUSH SQUARE - O. HENRY MUSEUM RESTORATION
Open $850,321.45 $850,321.45 $611,954.51
CT - 6100 - 20080700966
BRUSH SQUARE - O. HENRY MUSEUM RESTORATION
Open $850,321.45 $850,321.45 $611,954.51
CT - 6100 - 20080700966
BRUSH SQUARE - O. HENRY MUSEUM RESTORATION
Open $850,321.45 $850,321.45 $611,954.51
CT - 6100 - 20081701011
HARMOND AVENUE AREA WATER AND WASTEWATER SYSTEM RENEWAL
Open $3,153,641.80 $3,153,641.80 $2,989,635.32
CT - 6100 - 20081701011
HARMOND AVENUE AREA WATER AND WASTEWATER SYSTEM RENEWAL
Open $3,153,641.80 $3,153,641.80 $2,989,635.32
CT - 6100 - 20081701011
HARMOND AVENUE AREA WATER AND WASTEWATER SYSTEM RENEWAL
Open $3,153,641.80 $3,153,641.80 $2,989,635.32
CT - 6100 - 20102900051
SAN ANTONIO STREET CHILLED WATER DISTRIBUTION EXTENSION
Open $4,322,891.00 $4,322,891.00 $4,167,980.60
CT - 6100 - 20102900051
SAN ANTONIO STREET CHILLED WATER DISTRIBUTION EXTENSION
Open $4,322,891.00 $4,322,891.00 $4,167,980.60
CT - 6100 - 20102900051
SAN ANTONIO STREET CHILLED WATER DISTRIBUTION EXTENSION
Open $4,322,891.00 $4,322,891.00 $4,167,980.60
CT - 6100 - 20120100122
SLAUGHTER LANE AND CAPITAL OF TEXAS RESERVOIR IMPROVEMENTS
Open $3,469,435.64 $3,469,435.64 $3,469,360.64
CT - 6100 - 20120100122
SLAUGHTER LANE AND CAPITAL OF TEXAS RESERVOIR IMPROVEMENTS
Open $3,469,435.64 $3,469,435.64 $3,469,360.64
CT - 6100 - 20120100122
SLAUGHTER LANE AND CAPITAL OF TEXAS RESERVOIR IMPROVEMENTS
Open $3,469,435.64 $3,469,435.64 $3,469,360.64
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP
Open $16,226,149.13 $16,226,149.13 $15,932,635.33
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP
Open $16,226,149.13 $16,226,149.13 $15,932,635.33
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP
Open $16,226,149.13 $16,226,149.13 $15,932,635.33
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP
Open $16,226,149.13 $16,226,149.13 $15,932,635.33
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP
Open $16,226,149.13 $16,226,149.13 $15,932,635.33
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP
Open $16,226,149.13 $16,226,149.13 $15,932,635.33
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP
Open $16,226,149.13 $16,226,149.13 $15,932,635.33
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP
Open $16,226,149.13 $16,226,149.13 $15,932,635.33
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP
Open $16,226,149.13 $16,226,149.13 $15,932,635.33
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP
Open $16,226,149.13 $16,226,149.13 $15,932,635.33
CT - 6100 - 20121600156
HORNSBY BEND TRANSFER PUMP STATION AND IRRIGATION SYSTEM IMP
Open $16,226,149.13 $16,226,149.13 $15,932,635.33
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21012800275
ULLRICH WTP LOW SERVICE PUMP STATION ELECTRICAL FEED RENEWAL
Open $23,464,878.78 $23,464,878.78 $18,488,635.25
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2
Open $6,434,176.40 $6,434,176.40 $6,402,276.40
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2
Open $6,434,176.40 $6,434,176.40 $6,402,276.40
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2
Open $6,434,176.40 $6,434,176.40 $6,402,276.40
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2
Open $6,434,176.40 $6,434,176.40 $6,402,276.40
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2
Open $6,434,176.40 $6,434,176.40 $6,402,276.40
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2
Open $6,434,176.40 $6,434,176.40 $6,402,276.40
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2
Open $6,434,176.40 $6,434,176.40 $6,402,276.40
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2
Open $6,434,176.40 $6,434,176.40 $6,402,276.40
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2
Open $6,434,176.40 $6,434,176.40 $6,402,276.40
CT - 6100 - 21020400293
HIGHLAND PARK WATER AND WASTEWATER IMPROVEMENTS - PHASE 2
Open $6,434,176.40 $6,434,176.40 $6,402,276.40
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2
Open $3,177,853.20 $3,177,853.20 $3,018,960.53
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2
Open $3,177,853.20 $3,177,853.20 $3,018,960.53
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2
Open $3,177,853.20 $3,177,853.20 $3,018,960.53
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2
Open $3,177,853.20 $3,177,853.20 $3,018,960.53
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2
Open $3,177,853.20 $3,177,853.20 $3,018,960.53
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2
Open $3,177,853.20 $3,177,853.20 $3,018,960.53
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2
Open $3,177,853.20 $3,177,853.20 $3,018,960.53
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2
Open $3,177,853.20 $3,177,853.20 $3,018,960.53
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2
Open $3,177,853.20 $3,177,853.20 $3,018,960.53
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2
Open $3,177,853.20 $3,177,853.20 $3,018,960.53
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2
Open $3,177,853.20 $3,177,853.20 $3,018,960.53
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2
Open $3,177,853.20 $3,177,853.20 $3,018,960.53
CT - 6100 - 21061500672
ROSEDALE NORTH WATER AND WASTEWATER PIPELINE RENEWAL PHASE 2
Open $3,177,853.20 $3,177,853.20 $3,018,960.53
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS
Open $966,200.55 $966,200.55 $840,648.00
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS
Open $966,200.55 $966,200.55 $840,648.00
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS
Open $966,200.55 $966,200.55 $840,648.00
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS
Open $966,200.55 $966,200.55 $840,648.00
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS
Open $966,200.55 $966,200.55 $840,648.00
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS
Open $966,200.55 $966,200.55 $840,648.00
CT - 6100 - 21081200843
ST. ELMO SERVICE CENTER 8 RENOVATIONS
Open $966,200.55 $966,200.55 $840,648.00
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS
Open $6,855,135.60 $6,855,135.60 $6,833,980.20
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS
Open $6,855,135.60 $6,855,135.60 $6,833,980.20
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS
Open $6,855,135.60 $6,855,135.60 $6,833,980.20
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS
Open $6,855,135.60 $6,855,135.60 $6,833,980.20
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS
Open $6,855,135.60 $6,855,135.60 $6,833,980.20
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS
Open $6,855,135.60 $6,855,135.60 $6,833,980.20
CT - 6100 - 21092401032
SPRINGDALE AND 290 WATER LINE IMPROVEMENTS
Open $6,855,135.60 $6,855,135.60 $6,833,980.20
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST
Open $18,242,298.25 $18,242,298.25 $18,242,298.24
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST
Open $18,242,298.25 $18,242,298.25 $18,242,298.24
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST
Open $18,242,298.25 $18,242,298.25 $18,242,298.24
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST
Open $18,242,298.25 $18,242,298.25 $18,242,298.24
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST
Open $18,242,298.25 $18,242,298.25 $18,242,298.24
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST
Open $18,242,298.25 $18,242,298.25 $18,242,298.24
CT - 6100 - 21110300084
AUS CARGO DEVELOPMENT EAST
Open $18,242,298.25 $18,242,298.25 $18,242,298.24
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK
Open $6,342,467.10 $6,342,467.10 $5,837,593.25
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK
Open $6,342,467.10 $6,342,467.10 $5,837,593.25
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK
Open $6,342,467.10 $6,342,467.10 $5,837,593.25
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK
Open $6,342,467.10 $6,342,467.10 $5,837,593.25
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK
Open $6,342,467.10 $6,342,467.10 $5,837,593.25
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK
Open $6,342,467.10 $6,342,467.10 $5,837,593.25
CT - 6100 - 21121400222
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK
Open $6,342,467.10 $6,342,467.10 $5,837,593.25
CT - 6100 - 21121400224
HYDE PARK WATER AND WASTEWATER PIPELINE RENEWAL
Open $8,479,167.50 $8,479,167.50 $7,801,001.47
CT - 6100 - 21121400224
HYDE PARK WATER AND WASTEWATER PIPELINE RENEWAL
Open $8,479,167.50 $8,479,167.50 $7,801,001.47
CT - 6100 - 21121400224
HYDE PARK WATER AND WASTEWATER PIPELINE RENEWAL
Open $8,479,167.50 $8,479,167.50 $7,801,001.47
CT - 6100 - 21121400224
HYDE PARK WATER AND WASTEWATER PIPELINE RENEWAL
Open $8,479,167.50 $8,479,167.50 $7,801,001.47
CT - 6100 - 21121400224
HYDE PARK WATER AND WASTEWATER PIPELINE RENEWAL
Open $8,479,167.50 $8,479,167.50 $7,801,001.47
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM
Open $9,402,835.88 $9,402,835.88 $8,774,758.65
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM
Open $9,402,835.88 $9,402,835.88 $8,774,758.65
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM
Open $9,402,835.88 $9,402,835.88 $8,774,758.65
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM
Open $9,402,835.88 $9,402,835.88 $8,774,758.65
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM
Open $9,402,835.88 $9,402,835.88 $8,774,758.65
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM
Open $9,402,835.88 $9,402,835.88 $8,774,758.65
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM
Open $9,402,835.88 $9,402,835.88 $8,774,758.65
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM
Open $9,402,835.88 $9,402,835.88 $8,774,758.65
CT - 6100 - 21121400227
POLYBUTYLENE WATER SERVICES REPLACEMENT PROGRAM
Open $9,402,835.88 $9,402,835.88 $8,774,758.65
CT - 6100 - 22020500342
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT CENTRIFUGES
Open $10,841,914.37 $10,841,914.37 $10,603,722.50
CT - 6100 - 22020500342
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT CENTRIFUGES
Open $10,841,914.37 $10,841,914.37 $10,603,722.50
CT - 6100 - 22020500342
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT CENTRIFUGES
Open $10,841,914.37 $10,841,914.37 $10,603,722.50
CT - 6100 - 22020500342
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT CENTRIFUGES
Open $10,841,914.37 $10,841,914.37 $10,603,722.50
CT - 6100 - 22021700368
SL OAKS LS WET WELL CONV. & HOB CREEK LS JIB CRANE INSTALL
Open $712,395.55 $712,395.55 $466,600.10
CT - 6100 - 22021700368
SL OAKS LS WET WELL CONV. & HOB CREEK LS JIB CRANE INSTALL
Open $712,395.55 $712,395.55 $466,600.10
CT - 6100 - 22021700368
SL OAKS LS WET WELL CONV. & HOB CREEK LS JIB CRANE INSTALL
Open $712,395.55 $712,395.55 $466,600.10
CT - 6100 - 22021700368
SL OAKS LS WET WELL CONV. & HOB CREEK LS JIB CRANE INSTALL
Open $712,395.55 $712,395.55 $466,600.10
CT - 6100 - 22021700368
SL OAKS LS WET WELL CONV. & HOB CREEK LS JIB CRANE INSTALL
Open $712,395.55 $712,395.55 $466,600.10
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT)
Open $8,584,169.00 $8,584,169.00 $8,168,529.52
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT)
Open $8,584,169.00 $8,584,169.00 $8,168,529.52
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT)
Open $8,584,169.00 $8,584,169.00 $8,168,529.52
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT)
Open $8,584,169.00 $8,584,169.00 $8,168,529.52
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT)
Open $8,584,169.00 $8,584,169.00 $8,168,529.52
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT)
Open $8,584,169.00 $8,584,169.00 $8,168,529.52
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT)
Open $8,584,169.00 $8,584,169.00 $8,168,529.52
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT)
Open $8,584,169.00 $8,584,169.00 $8,168,529.52
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT)
Open $8,584,169.00 $8,584,169.00 $8,168,529.52
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT)
Open $8,584,169.00 $8,584,169.00 $8,168,529.52
CT - 6100 - 22030700402
DAVIS & HANDCOX WTP POLYMER FEED SYS (2018 FLOOD RES. IMPMT)
Open $8,584,169.00 $8,584,169.00 $8,168,529.52
CT - 6100 - 22050300543
CTECC SECURITY GATE & FENCING IMPROVEMENTS - REBID
Open $1,741,460.80 $1,741,460.80 $1,415,203.21
CT - 6100 - 22050300543
CTECC SECURITY GATE & FENCING IMPROVEMENTS - REBID
Open $1,741,460.80 $1,741,460.80 $1,415,203.21
CT - 6100 - 22050300543
CTECC SECURITY GATE & FENCING IMPROVEMENTS - REBID
Open $1,741,460.80 $1,741,460.80 $1,415,203.21
CT - 6100 - 22050300543
CTECC SECURITY GATE & FENCING IMPROVEMENTS - REBID
Open $1,741,460.80 $1,741,460.80 $1,415,203.21
CT - 6100 - 22050300543
CTECC SECURITY GATE & FENCING IMPROVEMENTS - REBID
Open $1,741,460.80 $1,741,460.80 $1,415,203.21
CT - 6100 - 22050300543
CTECC SECURITY GATE & FENCING IMPROVEMENTS - REBID
Open $1,741,460.80 $1,741,460.80 $1,415,203.21
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET
Open $13,855,717.41 $13,855,717.41 $13,827,217.41
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET
Open $13,855,717.41 $13,855,717.41 $13,827,217.41
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET
Open $13,855,717.41 $13,855,717.41 $13,827,217.41
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET
Open $13,855,717.41 $13,855,717.41 $13,827,217.41
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET
Open $13,855,717.41 $13,855,717.41 $13,827,217.41
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET
Open $13,855,717.41 $13,855,717.41 $13,827,217.41
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET
Open $13,855,717.41 $13,855,717.41 $13,827,217.41
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET
Open $13,855,717.41 $13,855,717.41 $13,827,217.41
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET
Open $13,855,717.41 $13,855,717.41 $13,827,217.41
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET
Open $13,855,717.41 $13,855,717.41 $13,827,217.41
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET
Open $13,855,717.41 $13,855,717.41 $13,827,217.41
CT - 6100 - 22051700575
AIRPORT BOULEVARD - N. LAMAR BLVD TO 55TH STREET
Open $13,855,717.41 $13,855,717.41 $13,827,217.41
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS
Open $14,151,013.81 $14,151,013.81 $7,963,589.22
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS
Open $14,151,013.81 $14,151,013.81 $7,963,589.22
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS
Open $14,151,013.81 $14,151,013.81 $7,963,589.22
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS
Open $14,151,013.81 $14,151,013.81 $7,963,589.22
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS
Open $14,151,013.81 $14,151,013.81 $7,963,589.22
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS
Open $14,151,013.81 $14,151,013.81 $7,963,589.22
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS
Open $14,151,013.81 $14,151,013.81 $7,963,589.22
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS
Open $14,151,013.81 $14,151,013.81 $7,963,589.22
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS
Open $14,151,013.81 $14,151,013.81 $7,963,589.22
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS
Open $14,151,013.81 $14,151,013.81 $7,963,589.22
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS
Open $14,151,013.81 $14,151,013.81 $7,963,589.22
CT - 6100 - 22061300635
ULLRICH WTP PROCESS DRAIN & SUPPORT SYSTEMS IMPROVEMENTS
Open $14,151,013.81 $14,151,013.81 $7,963,589.22
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION
Open $4,886,800.00 $4,886,800.00 $2,818,074.73
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION
Open $4,886,800.00 $4,886,800.00 $2,818,074.73
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION
Open $4,886,800.00 $4,886,800.00 $2,818,074.73
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION
Open $4,886,800.00 $4,886,800.00 $2,818,074.73
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION
Open $4,886,800.00 $4,886,800.00 $2,818,074.73
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION
Open $4,886,800.00 $4,886,800.00 $2,818,074.73
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION
Open $4,886,800.00 $4,886,800.00 $2,818,074.73
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION
Open $4,886,800.00 $4,886,800.00 $2,818,074.73
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION
Open $4,886,800.00 $4,886,800.00 $2,818,074.73
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION
Open $4,886,800.00 $4,886,800.00 $2,818,074.73
CT - 6100 - 22062900680
ZEBRA MUSSEL MITIGATION
Open $4,886,800.00 $4,886,800.00 $2,818,074.73
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI
Open $21,925,619.39 $21,925,619.39 $19,380,800.68
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI
Open $21,925,619.39 $21,925,619.39 $19,380,800.68
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI
Open $21,925,619.39 $21,925,619.39 $19,380,800.68
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI
Open $21,925,619.39 $21,925,619.39 $19,380,800.68
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI
Open $21,925,619.39 $21,925,619.39 $19,380,800.68
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI
Open $21,925,619.39 $21,925,619.39 $19,380,800.68
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI
Open $21,925,619.39 $21,925,619.39 $19,380,800.68
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI
Open $21,925,619.39 $21,925,619.39 $19,380,800.68
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI
Open $21,925,619.39 $21,925,619.39 $19,380,800.68
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI
Open $21,925,619.39 $21,925,619.39 $19,380,800.68
CT - 6100 - 22062900682
COUNTRY CLUB WEST - ROY G. GUERRERO PARK CHANNEL STABILIZATI
Open $21,925,619.39 $21,925,619.39 $19,380,800.68
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID
Open $4,962,478.72 $4,962,478.72 $4,900,331.02
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID
Open $4,962,478.72 $4,962,478.72 $4,900,331.02
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID
Open $4,962,478.72 $4,962,478.72 $4,900,331.02
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID
Open $4,962,478.72 $4,962,478.72 $4,900,331.02
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID
Open $4,962,478.72 $4,962,478.72 $4,900,331.02
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID
Open $4,962,478.72 $4,962,478.72 $4,900,331.02
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID
Open $4,962,478.72 $4,962,478.72 $4,900,331.02
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID
Open $4,962,478.72 $4,962,478.72 $4,900,331.02
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID
Open $4,962,478.72 $4,962,478.72 $4,900,331.02
CT - 6100 - 22070500692
TENNIS FACILITIES - PHARR TENNIS CENTER RENOVATIONS - REBID
Open $4,962,478.72 $4,962,478.72 $4,900,331.02
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22071800725
ROCK HARBOUR LIFT STATION IMPROVEMENTS
Open $6,608,293.00 $6,608,293.00 $6,542,210.07
CT - 6100 - 22082600851
ONION CREEK RECLAIMED WATER MAIN PHASE 1
Open $8,252,332.00 $8,252,332.00 $7,325,139.40
CT - 6100 - 22090800881
GOVALLE SITE DOMESTIC WASTEWATER SERVICE IMPROVEMENTS
Open $1,180,745.30 $1,180,745.30 $957,246.68
CT - 6100 - 22090800881
GOVALLE SITE DOMESTIC WASTEWATER SERVICE IMPROVEMENTS
Open $1,180,745.30 $1,180,745.30 $957,246.68
CT - 6100 - 22090800881
GOVALLE SITE DOMESTIC WASTEWATER SERVICE IMPROVEMENTS
Open $1,180,745.30 $1,180,745.30 $957,246.68
CT - 6100 - 22090800881
GOVALLE SITE DOMESTIC WASTEWATER SERVICE IMPROVEMENTS
Open $1,180,745.30 $1,180,745.30 $957,246.68
CT - 6100 - 22090800881
GOVALLE SITE DOMESTIC WASTEWATER SERVICE IMPROVEMENTS
Open $1,180,745.30 $1,180,745.30 $957,246.68
CT - 6100 - 22090800882
DOWNTOWN WAYFINDING IMPLEMENTATION 2.0
Open $536,300.73 $536,300.73 $501,809.22
CT - 6100 - 22090800882
DOWNTOWN WAYFINDING IMPLEMENTATION 2.0
Open $536,300.73 $536,300.73 $501,809.22
CT - 6100 - 22090800882
DOWNTOWN WAYFINDING IMPLEMENTATION 2.0
Open $536,300.73 $536,300.73 $501,809.22
CT - 6100 - 22090800882
DOWNTOWN WAYFINDING IMPLEMENTATION 2.0
Open $536,300.73 $536,300.73 $501,809.22
CT - 6100 - 22102400032
HIGHLAND AND BROWNIE NEIGHBORHOOD PARKS
Open $4,060,555.04 $4,060,555.04 $3,786,304.70
CT - 6100 - 22102400032
HIGHLAND AND BROWNIE NEIGHBORHOOD PARKS
Open $4,060,555.04 $4,060,555.04 $3,786,304.70
CT - 6100 - 22102400032
HIGHLAND AND BROWNIE NEIGHBORHOOD PARKS
Open $4,060,555.04 $4,060,555.04 $3,786,304.70
CT - 6100 - 22102400032
HIGHLAND AND BROWNIE NEIGHBORHOOD PARKS
Open $4,060,555.04 $4,060,555.04 $3,786,304.70
CT - 6100 - 22102400032
HIGHLAND AND BROWNIE NEIGHBORHOOD PARKS
Open $4,060,555.04 $4,060,555.04 $3,786,304.70
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110200046
PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE - RE-BID
Open $2,465,528.07 $2,465,528.07 $2,209,140.64
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL
Open $9,579,841.58 $9,579,841.58 $6,694,948.13
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL
Open $9,579,841.58 $9,579,841.58 $6,694,948.13
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL
Open $9,579,841.58 $9,579,841.58 $6,694,948.13
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL
Open $9,579,841.58 $9,579,841.58 $6,694,948.13
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL
Open $9,579,841.58 $9,579,841.58 $6,694,948.13
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL
Open $9,579,841.58 $9,579,841.58 $6,694,948.13
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL
Open $9,579,841.58 $9,579,841.58 $6,694,948.13
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL
Open $9,579,841.58 $9,579,841.58 $6,694,948.13
CT - 6100 - 22110300053
ZILKER WATER AND WASTEWATER PIPELINE RENEWAL
Open $9,579,841.58 $9,579,841.58 $6,694,948.13
CT - 6100 - 22110700063
SOUTH AUSTIN REGIONAL WWTP TRAINS A & B IMPROVEMENTS
Open $122,133,817.66 $122,133,817.66 $24,630,471.90
CT - 6100 - 22110700063
SOUTH AUSTIN REGIONAL WWTP TRAINS A & B IMPROVEMENTS
Open $122,133,817.66 $122,133,817.66 $24,630,471.90
CT - 6100 - 22110700063
SOUTH AUSTIN REGIONAL WWTP TRAINS A & B IMPROVEMENTS
Open $122,133,817.66 $122,133,817.66 $24,630,471.90
CT - 6100 - 22110700063
SOUTH AUSTIN REGIONAL WWTP TRAINS A & B IMPROVEMENTS
Open $122,133,817.66 $122,133,817.66 $24,630,471.90
CT - 6100 - 22110700063
SOUTH AUSTIN REGIONAL WWTP TRAINS A & B IMPROVEMENTS
Open $122,133,817.66 $122,133,817.66 $24,630,471.90
CT - 6100 - 22111400070
PECAN GARDENS EMERGENCY REPAIR
Open $78,627.97 $78,627.97 $76,337.17
CT - 6100 - 22111800089A
PUBLIC HEALTH CAPITAL REHABILITATION - ROOFS
Open $426,270.98 $426,270.98 $406,427.86
CT - 6100 - 22111800089A
PUBLIC HEALTH CAPITAL REHABILITATION - ROOFS
Open $426,270.98 $426,270.98 $406,427.86
CT - 6100 - 22111800089A
PUBLIC HEALTH CAPITAL REHABILITATION - ROOFS
Open $426,270.98 $426,270.98 $406,427.86
CT - 6100 - 22120200114
WILD HORSE RANCH WWTP EXPANSION
Open $70,862,006.32 $70,862,006.32 $46,947,919.65
CT - 6100 - 22120200114
WILD HORSE RANCH WWTP EXPANSION
Open $70,862,006.32 $70,862,006.32 $46,947,919.65
CT - 6100 - 22120200114
WILD HORSE RANCH WWTP EXPANSION
Open $70,862,006.32 $70,862,006.32 $46,947,919.65
CT - 6100 - 22120200114
WILD HORSE RANCH WWTP EXPANSION
Open $70,862,006.32 $70,862,006.32 $46,947,919.65
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL
Open $7,922,347.47 $7,922,347.47 $7,830,277.24
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL
Open $7,922,347.47 $7,922,347.47 $7,830,277.24
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL
Open $7,922,347.47 $7,922,347.47 $7,830,277.24
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL
Open $7,922,347.47 $7,922,347.47 $7,830,277.24
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL
Open $7,922,347.47 $7,922,347.47 $7,830,277.24
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL
Open $7,922,347.47 $7,922,347.47 $7,830,277.24
CT - 6100 - 22121300129
AUSTIN TO MANOR PHASE 2 - TRAIL
Open $7,922,347.47 $7,922,347.47 $7,830,277.24
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23012400188
WALLER CREEK DELTA CONSTRUCTION
Open $68,219,359.46 $68,219,359.46 $53,399,722.23
CT - 6100 - 23013000192
WM CANNON DR CORRIDOR - RUNNING WATER DR - MCKINNEY FALLS PW
Open $21,090,366.04 $21,090,366.04 $11,646,967.12
CT - 6100 - 23013000192
WM CANNON DR CORRIDOR - RUNNING WATER DR - MCKINNEY FALLS PW
Open $21,090,366.04 $21,090,366.04 $11,646,967.12
CT - 6100 - 23013000192
WM CANNON DR CORRIDOR - RUNNING WATER DR - MCKINNEY FALLS PW
Open $21,090,366.04 $21,090,366.04 $11,646,967.12
CT - 6100 - 23013000192
WM CANNON DR CORRIDOR - RUNNING WATER DR - MCKINNEY FALLS PW
Open $21,090,366.04 $21,090,366.04 $11,646,967.12
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION
Open $3,827,795.80 $3,827,795.80 $3,636,406.01
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION
Open $3,827,795.80 $3,827,795.80 $3,636,406.01
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION
Open $3,827,795.80 $3,827,795.80 $3,636,406.01
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION
Open $3,827,795.80 $3,827,795.80 $3,636,406.01
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION
Open $3,827,795.80 $3,827,795.80 $3,636,406.01
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION
Open $3,827,795.80 $3,827,795.80 $3,636,406.01
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION
Open $3,827,795.80 $3,827,795.80 $3,636,406.01
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION
Open $3,827,795.80 $3,827,795.80 $3,636,406.01
CT - 6100 - 23022400240
STASSNEY LN AT CONGRESS AVE INTERSECTION
Open $3,827,795.80 $3,827,795.80 $3,636,406.01
CT - 6100 - 23022400242
NORTHBRIDGE SHELTER EMERGENCY REPAIR (11/12/2022)
Open $131,557.55 $131,557.55 $111,944.91
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1
Open $7,078,455.16 $7,078,455.16 $6,539,465.75
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1
Open $7,078,455.16 $7,078,455.16 $6,539,465.75
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1
Open $7,078,455.16 $7,078,455.16 $6,539,465.75
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1
Open $7,078,455.16 $7,078,455.16 $6,539,465.75
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1
Open $7,078,455.16 $7,078,455.16 $6,539,465.75
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1
Open $7,078,455.16 $7,078,455.16 $6,539,465.75
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1
Open $7,078,455.16 $7,078,455.16 $6,539,465.75
CT - 6100 - 23030300260
OLTORF STREET RECLAIMED WATER MAIN PHASE 1
Open $7,078,455.16 $7,078,455.16 $6,539,465.75
CT - 6100 - 23031300282
AFS LEAD REMEDIATION
Open $169,659.20 $169,659.20 $80,221.80
CT - 6100 - 23031300282
AFS LEAD REMEDIATION
Open $169,659.20 $169,659.20 $80,221.80
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE
Open $13,972,052.51 $13,972,052.51 $13,682,115.15
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE
Open $13,972,052.51 $13,972,052.51 $13,682,115.15
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE
Open $13,972,052.51 $13,972,052.51 $13,682,115.15
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE
Open $13,972,052.51 $13,972,052.51 $13,682,115.15
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE
Open $13,972,052.51 $13,972,052.51 $13,682,115.15
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE
Open $13,972,052.51 $13,972,052.51 $13,682,115.15
CT - 6100 - 23032800315
BURNET ROAD CORRIDOR - AE KRAMER SITE DRAINAGE
Open $13,972,052.51 $13,972,052.51 $13,682,115.15
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID
Open $1,095,848.21 $1,095,848.21 $1,049,570.19
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID
Open $1,095,848.21 $1,095,848.21 $1,049,570.19
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID
Open $1,095,848.21 $1,095,848.21 $1,049,570.19
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID
Open $1,095,848.21 $1,095,848.21 $1,049,570.19
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID
Open $1,095,848.21 $1,095,848.21 $1,049,570.19
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID
Open $1,095,848.21 $1,095,848.21 $1,049,570.19
CT - 6100 - 23061200480
PED. SAFETY & TRANSIT CONNECTIONS- CAMPO-PHB REBID
Open $1,095,848.21 $1,095,848.21 $1,049,570.19
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM
Open $28,857,615.25 $28,857,615.25 $21,056,329.37
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM
Open $28,857,615.25 $28,857,615.25 $21,056,329.37
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM
Open $28,857,615.25 $28,857,615.25 $21,056,329.37
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM
Open $28,857,615.25 $28,857,615.25 $21,056,329.37
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM
Open $28,857,615.25 $28,857,615.25 $21,056,329.37
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM
Open $28,857,615.25 $28,857,615.25 $21,056,329.37
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM
Open $28,857,615.25 $28,857,615.25 $21,056,329.37
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM
Open $28,857,615.25 $28,857,615.25 $21,056,329.37
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM
Open $28,857,615.25 $28,857,615.25 $21,056,329.37
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM
Open $28,857,615.25 $28,857,615.25 $21,056,329.37
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM
Open $28,857,615.25 $28,857,615.25 $21,056,329.37
CT - 6100 - 23063000532
LITTLE WALNUT CREEK FLOOD RISK REDUCTION IMPROVEMENTS, FROM
Open $28,857,615.25 $28,857,615.25 $21,056,329.37
CT - 6100 - 23073100584
GEORGE WASHINGTON CARVER MUSEUM - THEATER AND ACCESS IMPVMTS
Open $3,098,972.02 $3,098,972.02 $2,894,383.77
CT - 6100 - 23073100584
GEORGE WASHINGTON CARVER MUSEUM - THEATER AND ACCESS IMPVMTS
Open $3,098,972.02 $3,098,972.02 $2,894,383.77
CT - 6100 - 23073100584
GEORGE WASHINGTON CARVER MUSEUM - THEATER AND ACCESS IMPVMTS
Open $3,098,972.02 $3,098,972.02 $2,894,383.77
CT - 6100 - 23073100584
GEORGE WASHINGTON CARVER MUSEUM - THEATER AND ACCESS IMPVMTS
Open $3,098,972.02 $3,098,972.02 $2,894,383.77
CT - 6100 - 23073100584
GEORGE WASHINGTON CARVER MUSEUM - THEATER AND ACCESS IMPVMTS
Open $3,098,972.02 $3,098,972.02 $2,894,383.77
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL
Open $9,170,270.29 $9,170,270.29 $6,076,410.98
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL
Open $9,170,270.29 $9,170,270.29 $6,076,410.98
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL
Open $9,170,270.29 $9,170,270.29 $6,076,410.98
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL
Open $9,170,270.29 $9,170,270.29 $6,076,410.98
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL
Open $9,170,270.29 $9,170,270.29 $6,076,410.98
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL
Open $9,170,270.29 $9,170,270.29 $6,076,410.98
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL
Open $9,170,270.29 $9,170,270.29 $6,076,410.98
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL
Open $9,170,270.29 $9,170,270.29 $6,076,410.98
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL
Open $9,170,270.29 $9,170,270.29 $6,076,410.98
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL
Open $9,170,270.29 $9,170,270.29 $6,076,410.98
CT - 6100 - 23080300599
SOUTH TARRYTOWN WATER & WASTEWATER PIPELINE RENEWAL
Open $9,170,270.29 $9,170,270.29 $6,076,410.98
CT - 6100 - 23090100693
WALLER CREEK - INLET FACILITY WET WELL MECHANICAL SCREENING
Open $2,686,273.00 $2,686,273.00 $2,589,866.17
CT - 6100 - 23090100693
WALLER CREEK - INLET FACILITY WET WELL MECHANICAL SCREENING
Open $2,686,273.00 $2,686,273.00 $2,589,866.17
CT - 6100 - 23090100693
WALLER CREEK - INLET FACILITY WET WELL MECHANICAL SCREENING
Open $2,686,273.00 $2,686,273.00 $2,589,866.17
CT - 6100 - 23090100693
WALLER CREEK - INLET FACILITY WET WELL MECHANICAL SCREENING
Open $2,686,273.00 $2,686,273.00 $2,589,866.17
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK
Open $2,336,297.75 $2,336,297.75 $2,219,464.76
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK
Open $2,336,297.75 $2,336,297.75 $2,219,464.76
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK
Open $2,336,297.75 $2,336,297.75 $2,219,464.76
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK
Open $2,336,297.75 $2,336,297.75 $2,219,464.76
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK
Open $2,336,297.75 $2,336,297.75 $2,219,464.76
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK
Open $2,336,297.75 $2,336,297.75 $2,219,464.76
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK
Open $2,336,297.75 $2,336,297.75 $2,219,464.76
CT - 6100 - 23092100763
SAR ELEVATED TANK REHAB & IMPROVEMENTS - CIVIL WORK
Open $2,336,297.75 $2,336,297.75 $2,219,464.76
CT - 6100 - 23092100764
WALNUT CREEK WWTP EFFLUENT SAMPLE PUMP MODIFICATIONS REBID
Open $1,910,540.02 $1,910,540.02 $1,815,013.02
CT - 6100 - 23092100764
WALNUT CREEK WWTP EFFLUENT SAMPLE PUMP MODIFICATIONS REBID
Open $1,910,540.02 $1,910,540.02 $1,815,013.02
CT - 6100 - 23092100764
WALNUT CREEK WWTP EFFLUENT SAMPLE PUMP MODIFICATIONS REBID
Open $1,910,540.02 $1,910,540.02 $1,815,013.02
CT - 6100 - 23092200767
STARLINE DRIVE AND LAWNDALE DRIVE PRESSURE ZONE CONVERSION
Open $1,522,789.16 $1,522,789.16 $1,359,909.95
CT - 6100 - 23092200767
STARLINE DRIVE AND LAWNDALE DRIVE PRESSURE ZONE CONVERSION
Open $1,522,789.16 $1,522,789.16 $1,359,909.95
CT - 6100 - 23092200767
STARLINE DRIVE AND LAWNDALE DRIVE PRESSURE ZONE CONVERSION
Open $1,522,789.16 $1,522,789.16 $1,359,909.95
CT - 6100 - 23092200767
STARLINE DRIVE AND LAWNDALE DRIVE PRESSURE ZONE CONVERSION
Open $1,522,789.16 $1,522,789.16 $1,359,909.95
CT - 6100 - 23092200767
STARLINE DRIVE AND LAWNDALE DRIVE PRESSURE ZONE CONVERSION
Open $1,522,789.16 $1,522,789.16 $1,359,909.95
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS
Open $33,143,528.65 $33,143,528.65 $18,150,956.02
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS
Open $33,143,528.65 $33,143,528.65 $18,150,956.02
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS
Open $33,143,528.65 $33,143,528.65 $18,150,956.02
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS
Open $33,143,528.65 $33,143,528.65 $18,150,956.02
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS
Open $33,143,528.65 $33,143,528.65 $18,150,956.02
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS
Open $33,143,528.65 $33,143,528.65 $18,150,956.02
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS
Open $33,143,528.65 $33,143,528.65 $18,150,956.02
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS
Open $33,143,528.65 $33,143,528.65 $18,150,956.02
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS
Open $33,143,528.65 $33,143,528.65 $18,150,956.02
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS
Open $33,143,528.65 $33,143,528.65 $18,150,956.02
CT - 6100 - 23092600771
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS
Open $33,143,528.65 $33,143,528.65 $18,150,956.02
CT - 6100 - 23101600017
BULL CREEK WASTEWATER PIPELINES RENEWAL
Open $3,233,821.48 $3,233,821.48 $3,072,130.41
CT - 6100 - 23101600017
BULL CREEK WASTEWATER PIPELINES RENEWAL
Open $3,233,821.48 $3,233,821.48 $3,072,130.41
CT - 6100 - 23101600017
BULL CREEK WASTEWATER PIPELINES RENEWAL
Open $3,233,821.48 $3,233,821.48 $3,072,130.41
CT - 6100 - 23101600017
BULL CREEK WASTEWATER PIPELINES RENEWAL
Open $3,233,821.48 $3,233,821.48 $3,072,130.41
CT - 6100 - 23102400031
OLTORF STREET RECLAIMED WATER MAIN PHASE 2
Open $10,338,105.64 $10,338,105.64 $5,199,399.48
CT - 6100 - 23102400031
OLTORF STREET RECLAIMED WATER MAIN PHASE 2
Open $10,338,105.64 $10,338,105.64 $5,199,399.48
CT - 6100 - 23110600054
TERI RD AND PLEASANT VALLEY RD ROUNDABOUT
Open $1,966,076.77 $1,966,076.77 $1,715,864.38
CT - 6100 - 23110600054
TERI RD AND PLEASANT VALLEY RD ROUNDABOUT
Open $1,966,076.77 $1,966,076.77 $1,715,864.38
CT - 6100 - 23110600054
TERI RD AND PLEASANT VALLEY RD ROUNDABOUT
Open $1,966,076.77 $1,966,076.77 $1,715,864.38
CT - 6100 - 23110600054
TERI RD AND PLEASANT VALLEY RD ROUNDABOUT
Open $1,966,076.77 $1,966,076.77 $1,715,864.38
CT - 6100 - 23110600054
TERI RD AND PLEASANT VALLEY RD ROUNDABOUT
Open $1,966,076.77 $1,966,076.77 $1,715,864.38
CT - 6100 - 23110600054
TERI RD AND PLEASANT VALLEY RD ROUNDABOUT
Open $1,966,076.77 $1,966,076.77 $1,715,864.38
CT - 6100 - 23121100103
BRAKER LANE FROM SAMSUNG BLVD TO DAWES PLACE
Open $22,599,765.00 $22,599,765.00 $14,891,853.00
CT - 6100 - 23121100103
BRAKER LANE FROM SAMSUNG BLVD TO DAWES PLACE
Open $22,599,765.00 $22,599,765.00 $14,891,853.00
CT - 6100 - 23121100103
BRAKER LANE FROM SAMSUNG BLVD TO DAWES PLACE
Open $22,599,765.00 $22,599,765.00 $14,891,853.00
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION
Open $17,090,003.48 $17,090,003.48 $10,830,897.84
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION
Open $17,090,003.48 $17,090,003.48 $10,830,897.84
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION
Open $17,090,003.48 $17,090,003.48 $10,830,897.84
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION
Open $17,090,003.48 $17,090,003.48 $10,830,897.84
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION
Open $17,090,003.48 $17,090,003.48 $10,830,897.84
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION
Open $17,090,003.48 $17,090,003.48 $10,830,897.84
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION
Open $17,090,003.48 $17,090,003.48 $10,830,897.84
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION
Open $17,090,003.48 $17,090,003.48 $10,830,897.84
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION
Open $17,090,003.48 $17,090,003.48 $10,830,897.84
CT - 6100 - 23121400126
ZILKER METRO PARK - BARTON SPRINGS BATHHOUSE REHABILITATION
Open $17,090,003.48 $17,090,003.48 $10,830,897.84
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION
Open $2,237,467.89 $2,237,467.89 $1,994,103.33
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION
Open $2,237,467.89 $2,237,467.89 $1,994,103.33
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION
Open $2,237,467.89 $2,237,467.89 $1,994,103.33
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION
Open $2,237,467.89 $2,237,467.89 $1,994,103.33
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION
Open $2,237,467.89 $2,237,467.89 $1,994,103.33
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION
Open $2,237,467.89 $2,237,467.89 $1,994,103.33
CT - 6100 - 23121900143
LITTLE WALNUT CREEK-PARK PLAZA STREAM STABILIZATION
Open $2,237,467.89 $2,237,467.89 $1,994,103.33
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24010800171
PARQUE ZARAGOZA NEIGHBORHOOD PARK BATHHOUSE REHAB-REBID
Open $1,381,448.49 $1,381,448.49 $1,288,989.44
CT - 6100 - 24012200199
EAST VILLAGE SUBSTATION
Open $10,063,320.98 $10,063,320.98 $9,456,875.67
CT - 6100 - 24012200199
EAST VILLAGE SUBSTATION
Open $10,063,320.98 $10,063,320.98 $9,456,875.67
CT - 6100 - 24012200199
EAST VILLAGE SUBSTATION
Open $10,063,320.98 $10,063,320.98 $9,456,875.67
CT - 6100 - 24012200199
EAST VILLAGE SUBSTATION
Open $10,063,320.98 $10,063,320.98 $9,456,875.67
CT - 6100 - 24012200199
EAST VILLAGE SUBSTATION
Open $10,063,320.98 $10,063,320.98 $9,456,875.67
CT - 6100 - 24020500245
ST. ELMO SERVICE CENTER NEW AUSTIN ENERGY POLE YARD
Open $366,703.37 $366,703.37 $348,368.20
CT - 6100 - 24020500245
ST. ELMO SERVICE CENTER NEW AUSTIN ENERGY POLE YARD
Open $366,703.37 $366,703.37 $348,368.20
CT - 6100 - 24020500245
ST. ELMO SERVICE CENTER NEW AUSTIN ENERGY POLE YARD
Open $366,703.37 $366,703.37 $348,368.20
CT - 6100 - 24022900296
KRAMER LANE SUBSTATION REBID (CLMC989A)
Open $12,341,761.45 $12,341,761.45 $11,093,620.58
CT - 6100 - 24022900296
KRAMER LANE SUBSTATION REBID (CLMC989A)
Open $12,341,761.45 $12,341,761.45 $11,093,620.58
CT - 6100 - 24030400303
WALNUT CREEK - OAK KNOLL FLOOD RISK REDUCTION PROJECT
Open $8,232,469.24 $8,232,469.24 $72,633.96
CT - 6100 - 24031200321
38TH AND 40TH STREETS WATER AND WASTEWATER PIPELINE RENEWAL
Open $4,983,757.00 $4,983,757.00 $3,541,916.35
CT - 6100 - 24031200321
38TH AND 40TH STREETS WATER AND WASTEWATER PIPELINE RENEWAL
Open $4,983,757.00 $4,983,757.00 $3,541,916.35
CT - 6100 - 24031200321
38TH AND 40TH STREETS WATER AND WASTEWATER PIPELINE RENEWAL
Open $4,983,757.00 $4,983,757.00 $3,541,916.35
CT - 6100 - 24031200321
38TH AND 40TH STREETS WATER AND WASTEWATER PIPELINE RENEWAL
Open $4,983,757.00 $4,983,757.00 $3,541,916.35
CT - 6100 - 24031200321
38TH AND 40TH STREETS WATER AND WASTEWATER PIPELINE RENEWAL
Open $4,983,757.00 $4,983,757.00 $3,541,916.35
CT - 6100 - 24031200321
38TH AND 40TH STREETS WATER AND WASTEWATER PIPELINE RENEWAL
Open $4,983,757.00 $4,983,757.00 $3,541,916.35
CT - 6100 - 24031800331
LONGHORN DAM MULITMODAL IMPROVEMENTS
Open $21,101,355.10 $21,101,355.10 $15,100,441.22
CT - 6100 - 24031800331
LONGHORN DAM MULITMODAL IMPROVEMENTS
Open $21,101,355.10 $21,101,355.10 $15,100,441.22
CT - 6100 - 24031800331
LONGHORN DAM MULITMODAL IMPROVEMENTS
Open $21,101,355.10 $21,101,355.10 $15,100,441.22
CT - 6100 - 24031800331
LONGHORN DAM MULITMODAL IMPROVEMENTS
Open $21,101,355.10 $21,101,355.10 $15,100,441.22
CT - 6100 - 24031800331
LONGHORN DAM MULITMODAL IMPROVEMENTS
Open $21,101,355.10 $21,101,355.10 $15,100,441.22
CT - 6100 - 24031800331
LONGHORN DAM MULITMODAL IMPROVEMENTS
Open $21,101,355.10 $21,101,355.10 $15,100,441.22
CT - 6100 - 24040200359
BRAZOS ST DUCT BANK CIVIL WORK
Open $2,137,427.89 $2,137,427.89 $1,719,898.47
CT - 6100 - 24040200359
BRAZOS ST DUCT BANK CIVIL WORK
Open $2,137,427.89 $2,137,427.89 $1,719,898.47
CT - 6100 - 24040200359
BRAZOS ST DUCT BANK CIVIL WORK
Open $2,137,427.89 $2,137,427.89 $1,719,898.47
CT - 6100 - 24040200359
BRAZOS ST DUCT BANK CIVIL WORK
Open $2,137,427.89 $2,137,427.89 $1,719,898.47
CT - 6100 - 24042200392
CLMC910B PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE
Open $6,873,427.04 $6,873,427.04 $5,744,105.05
CT - 6100 - 24042200392
CLMC910B PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE
Open $6,873,427.04 $6,873,427.04 $5,744,105.05
CT - 6100 - 24042200392
CLMC910B PALMER EVENTS CENTER PLUMBING AND RESTROOM UPGRADE
Open $6,873,427.04 $6,873,427.04 $5,744,105.05
CT - 6100 - 24042500399
LOOP 360 AT RM 2222 AND COURTYARD ROADWAY PROJECT
Open $9,758,411.52 $9,758,411.52 $8,871,283.20
CT - 6100 - 24051500434
HAROLD COURT SERVICE CENTER WPD CAMPUS IMPROVEMENTS
Open $1,016,794.12 $1,016,794.12 $907,692.93
CT - 6100 - 24051500434
HAROLD COURT SERVICE CENTER WPD CAMPUS IMPROVEMENTS
Open $1,016,794.12 $1,016,794.12 $907,692.93
CT - 6100 - 24051500434
HAROLD COURT SERVICE CENTER WPD CAMPUS IMPROVEMENTS
Open $1,016,794.12 $1,016,794.12 $907,692.93
CT - 6100 - 24051500434
HAROLD COURT SERVICE CENTER WPD CAMPUS IMPROVEMENTS
Open $1,016,794.12 $1,016,794.12 $907,692.93
CT - 6100 - 24053100454
NORTHWEST AUSTIN BOOSTER STATIONS IMPROVEMENTS REBID
Open $9,031,387.59 $9,031,387.59 $2,929,659.34
CT - 6100 - 24053100454
NORTHWEST AUSTIN BOOSTER STATIONS IMPROVEMENTS REBID
Open $9,031,387.59 $9,031,387.59 $2,929,659.34
CT - 6100 - 24053100454
NORTHWEST AUSTIN BOOSTER STATIONS IMPROVEMENTS REBID
Open $9,031,387.59 $9,031,387.59 $2,929,659.34
CT - 6100 - 24053100454
NORTHWEST AUSTIN BOOSTER STATIONS IMPROVEMENTS REBID
Open $9,031,387.59 $9,031,387.59 $2,929,659.34
CT - 6100 - 24053100454
NORTHWEST AUSTIN BOOSTER STATIONS IMPROVEMENTS REBID
Open $9,031,387.59 $9,031,387.59 $2,929,659.34
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION
Open $8,915,396.00 $8,915,396.00 $7,908,721.07
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION
Open $8,915,396.00 $8,915,396.00 $7,908,721.07
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION
Open $8,915,396.00 $8,915,396.00 $7,908,721.07
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION
Open $8,915,396.00 $8,915,396.00 $7,908,721.07
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION
Open $8,915,396.00 $8,915,396.00 $7,908,721.07
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION
Open $8,915,396.00 $8,915,396.00 $7,908,721.07
CT - 6100 - 24060400459
FAMILY VIOLENCE SHELTER AND PROTECTION
Open $8,915,396.00 $8,915,396.00 $7,908,721.07
CT - 6100 - 24062000481
LONGHORN DAM SAFETY IMPROVEMENTS
Open $3,769,553.19 $3,769,553.19 $2,006,204.01
CT - 6100 - 24062000481
LONGHORN DAM SAFETY IMPROVEMENTS
Open $3,769,553.19 $3,769,553.19 $2,006,204.01
CT - 6100 - 24062000481
LONGHORN DAM SAFETY IMPROVEMENTS
Open $3,769,553.19 $3,769,553.19 $2,006,204.01
CT - 6100 - 24062000481
LONGHORN DAM SAFETY IMPROVEMENTS
Open $3,769,553.19 $3,769,553.19 $2,006,204.01
CT - 6100 - 24062000481
LONGHORN DAM SAFETY IMPROVEMENTS
Open $3,769,553.19 $3,769,553.19 $2,006,204.01
CT - 6100 - 24062000485
WESTGATE NEIGHBORHOOD WASTEWATER PIPELINE RENEWAL
Open $6,862,803.00 $6,862,803.00 $1,374,571.62
CT - 6100 - 24070100501
WILLIAMSON CREEK PHASE 1- BRASSIEWOOD DRIVE AND CREEKWOOD
Open $2,275,561.68 $2,275,561.68 $518,770.95
CT - 6100 - 24070100501
WILLIAMSON CREEK PHASE 1- BRASSIEWOOD DRIVE AND CREEKWOOD
Open $2,275,561.68 $2,275,561.68 $518,770.95
CT - 6100 - 24070900515
WALLER CREEK CENTER PARKING GARAGE RENEWAL
Open $1,356,527.83 $1,356,527.83 $1,287,769.01
CT - 6100 - 24071500530
BULL CREEK OLD LAMPASAS NO. 3 DAM MODERNIZATION
Open $15,350,085.42 $15,350,085.42 $3,778,393.52
CT - 6100 - 24071500530
BULL CREEK OLD LAMPASAS NO. 3 DAM MODERNIZATION
Open $15,350,085.42 $15,350,085.42 $3,778,393.52
CT - 6100 - 24071500530
BULL CREEK OLD LAMPASAS NO. 3 DAM MODERNIZATION
Open $15,350,085.42 $15,350,085.42 $3,778,393.52
CT - 6100 - 24072400543
FOUR POINTS DUCT BANK- WO 440397
Open $4,895,221.04 $4,895,221.04 $2,352,770.04
CT - 6100 - 24072400543
FOUR POINTS DUCT BANK- WO 440397
Open $4,895,221.04 $4,895,221.04 $2,352,770.04
CT - 6100 - 24072500545
KELLAM ROAD WATER PIPELINE RENEWAL
Open $1,269,816.65 $1,269,816.65 $608,561.23
CT - 6100 - 24072500545
KELLAM ROAD WATER PIPELINE RENEWAL
Open $1,269,816.65 $1,269,816.65 $608,561.23
CT - 6100 - 24072500545
KELLAM ROAD WATER PIPELINE RENEWAL
Open $1,269,816.65 $1,269,816.65 $608,561.23
CT - 6100 - 24072500545
KELLAM ROAD WATER PIPELINE RENEWAL
Open $1,269,816.65 $1,269,816.65 $608,561.23
CT - 6100 - 24072600552
JOHNNY MORRIS/HWY 290 AREA WATER LINE EXTENSIONS
Open $1,985,503.71 $1,985,503.71 $1,760,919.69
CT - 6100 - 24072600552
JOHNNY MORRIS/HWY 290 AREA WATER LINE EXTENSIONS
Open $1,985,503.71 $1,985,503.71 $1,760,919.69
CT - 6100 - 24072600552
JOHNNY MORRIS/HWY 290 AREA WATER LINE EXTENSIONS
Open $1,985,503.71 $1,985,503.71 $1,760,919.69
CT - 6100 - 24072600552
JOHNNY MORRIS/HWY 290 AREA WATER LINE EXTENSIONS
Open $1,985,503.71 $1,985,503.71 $1,760,919.69
CT - 6100 - 24072600552
JOHNNY MORRIS/HWY 290 AREA WATER LINE EXTENSIONS
Open $1,985,503.71 $1,985,503.71 $1,760,919.69
CT - 6100 - 24073000556
BULL CREEK BASIN WASTEWATER PIPELINES RENEWAL - CIPP
Open $6,874,319.00 $6,874,319.00 $5,001,145.89
CT - 6100 - 24073000556
BULL CREEK BASIN WASTEWATER PIPELINES RENEWAL - CIPP
Open $6,874,319.00 $6,874,319.00 $5,001,145.89
CT - 6100 - 24073000557
LITTLE BEAR CREEK RECHARGE ENHANCEMENT FACILITY
Open $2,501,051.78 $2,501,051.78 $2,375,999.19
CT - 6100 - 24073000557
LITTLE BEAR CREEK RECHARGE ENHANCEMENT FACILITY
Open $2,501,051.78 $2,501,051.78 $2,375,999.19
CT - 6100 - 24073100560
BURRELL DRIVE WASTEWATER IMPROVEMENTS
Open $2,461,690.00 $2,461,690.00 $2,040,190.55
CT - 6100 - 24073100560
BURRELL DRIVE WASTEWATER IMPROVEMENTS
Open $2,461,690.00 $2,461,690.00 $2,040,190.55
CT - 6100 - 24073100560
BURRELL DRIVE WASTEWATER IMPROVEMENTS
Open $2,461,690.00 $2,461,690.00 $2,040,190.55
CT - 6100 - 24073100560
BURRELL DRIVE WASTEWATER IMPROVEMENTS
Open $2,461,690.00 $2,461,690.00 $2,040,190.55
CT - 6100 - 24073100560
BURRELL DRIVE WASTEWATER IMPROVEMENTS
Open $2,461,690.00 $2,461,690.00 $2,040,190.55
CT - 6100 - 24082700602
COLONY PARK SUSTAINABLE COMMUNITY INFRASTRUCTURE
Open $2,728,819.00 $2,728,819.00 $551,137.28
CT - 6100 - 24082700602
COLONY PARK SUSTAINABLE COMMUNITY INFRASTRUCTURE
Open $2,728,819.00 $2,728,819.00 $551,137.28
CT - 6100 - 24082800606
NORTHWEST AREA LIFT STATION IMPROVEMENTS GREAT HILLS LIFT ST
Open $8,383,439.00 $8,383,439.00 $4,689,134.93
CT - 6100 - 24082800606
NORTHWEST AREA LIFT STATION IMPROVEMENTS GREAT HILLS LIFT ST
Open $8,383,439.00 $8,383,439.00 $4,689,134.93
CT - 6100 - 24082800606
NORTHWEST AREA LIFT STATION IMPROVEMENTS GREAT HILLS LIFT ST
Open $8,383,439.00 $8,383,439.00 $4,689,134.93
CT - 6100 - 24082900611
STREET LIGHTING CONSTRUCTION: BLUFF SPR, MCNEIL DR CORRIDORS
Open $1,441,759.26 $1,441,759.26 $1,211,281.46
CT - 6100 - 24082900611
STREET LIGHTING CONSTRUCTION: BLUFF SPR, MCNEIL DR CORRIDORS
Open $1,441,759.26 $1,441,759.26 $1,211,281.46
CT - 6100 - 24082900611
STREET LIGHTING CONSTRUCTION: BLUFF SPR, MCNEIL DR CORRIDORS
Open $1,441,759.26 $1,441,759.26 $1,211,281.46
CT - 6100 - 24082900611
STREET LIGHTING CONSTRUCTION: BLUFF SPR, MCNEIL DR CORRIDORS
Open $1,441,759.26 $1,441,759.26 $1,211,281.46
CT - 6100 - 24090500623
COUNTRY CLUB CREEK TRAIL - ELMONT DR TO E OLTORF ST
Open $5,288,590.50 $5,288,590.50 $106,607.74
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB
Open $1,281,755.05 $1,281,755.05 $721,618.58
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB
Open $1,281,755.05 $1,281,755.05 $721,618.58
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB
Open $1,281,755.05 $1,281,755.05 $721,618.58
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB
Open $1,281,755.05 $1,281,755.05 $721,618.58
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB
Open $1,281,755.05 $1,281,755.05 $721,618.58
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB
Open $1,281,755.05 $1,281,755.05 $721,618.58
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB
Open $1,281,755.05 $1,281,755.05 $721,618.58
CT - 6100 - 24090900630
WILLIAMSON CREEK - DICK NICHOLS / BECKETT MEADOWS POND REHAB
Open $1,281,755.05 $1,281,755.05 $721,618.58
CT - 6100 - 24091000633
BARTON CREEK - BANK EROSION RESTORATION AT 1732 TOOMEY RD
Open $5,197,958.82 $5,197,958.82 $2,067,108.63
CT - 6100 - 24091000633
BARTON CREEK - BANK EROSION RESTORATION AT 1732 TOOMEY RD
Open $5,197,958.82 $5,197,958.82 $2,067,108.63
CT - 6100 - 24091000633
BARTON CREEK - BANK EROSION RESTORATION AT 1732 TOOMEY RD
Open $5,197,958.82 $5,197,958.82 $2,067,108.63
CT - 6100 - 24091000633
BARTON CREEK - BANK EROSION RESTORATION AT 1732 TOOMEY RD
Open $5,197,958.82 $5,197,958.82 $2,067,108.63
CT - 6100 - 24092500650
GILLIS STREET WATER AND WASTEWATER PIPELINES RENEWAL
Open $1,724,595.03 $1,724,595.03 $765,594.01
CT - 6100 - 24092500650
GILLIS STREET WATER AND WASTEWATER PIPELINES RENEWAL
Open $1,724,595.03 $1,724,595.03 $765,594.01
CT - 6100 - 24092500650
GILLIS STREET WATER AND WASTEWATER PIPELINES RENEWAL
Open $1,724,595.03 $1,724,595.03 $765,594.01
CT - 6100 - 24101000024
SAR ELEVATED TANK REHAB & IMPROVEMENTS - PACKAGE 2
Open $2,419,804.84 $2,419,804.84 $1,280,499.15
CT - 6100 - 24101000024
SAR ELEVATED TANK REHAB & IMPROVEMENTS - PACKAGE 2
Open $2,419,804.84 $2,419,804.84 $1,280,499.15
CT - 6100 - 24101000024
SAR ELEVATED TANK REHAB & IMPROVEMENTS - PACKAGE 2
Open $2,419,804.84 $2,419,804.84 $1,280,499.15
CT - 6100 - 24102400043
TIMBER CREEK SUBSTATION
Open $9,752,169.00 $9,752,169.00 $0.00
CT - 6100 - 24110700065
SH71 @ US183 INTERCHANGE TXDOT RELOCATION AW & WW TRANSMISSI
Open $5,833,210.00 $5,833,210.00 $3,129,583.02
CT - 6100 - 24110700065
SH71 @ US183 INTERCHANGE TXDOT RELOCATION AW & WW TRANSMISSI
Open $5,833,210.00 $5,833,210.00 $3,129,583.02
CT - 6100 - 24110700065
SH71 @ US183 INTERCHANGE TXDOT RELOCATION AW & WW TRANSMISSI
Open $5,833,210.00 $5,833,210.00 $3,129,583.02
CT - 6100 - 24112600086
HILLSPRING AND SCOTTSDALE WATER AND WASTEWATER SYSTEM RENEWA
Open $1,337,580.00 $1,337,580.00 $462,798.20
CT - 6100 - 24120400096
TOWN LAKE CENTER MAJOR RENOVATIONS AND REMODELING
Open $15,384,620.00 $15,384,620.00 $3,180,284.80
CT - 6100 - 24121100104
OLD ENFIELD WATER & WASTEWATER PIPELINE RENEWAL
Open $6,157,650.00 $6,157,650.00 $0.00
CT - 6100 - 24121100104
OLD ENFIELD WATER & WASTEWATER PIPELINE RENEWAL
Open $6,157,650.00 $6,157,650.00 $0.00
CT - 6100 - 24121100104
OLD ENFIELD WATER & WASTEWATER PIPELINE RENEWAL
Open $6,157,650.00 $6,157,650.00 $0.00
CT - 6100 - 24121100104
OLD ENFIELD WATER & WASTEWATER PIPELINE RENEWAL
Open $6,157,650.00 $6,157,650.00 $0.00
CT - 6100 - 24121100104
OLD ENFIELD WATER & WASTEWATER PIPELINE RENEWAL
Open $6,157,650.00 $6,157,650.00 $0.00
CT - 6100 - 24121800123
STREET LIGHTING CONST: PEARCE LN & VARIOUS CITY INTERSECTION
Open $1,541,342.00 $1,541,342.00 $287,833.18
CT - 6100 - 24121800123
STREET LIGHTING CONST: PEARCE LN & VARIOUS CITY INTERSECTION
Open $1,541,342.00 $1,541,342.00 $287,833.18
CT - 6100 - 24121800123
STREET LIGHTING CONST: PEARCE LN & VARIOUS CITY INTERSECTION
Open $1,541,342.00 $1,541,342.00 $287,833.18
CT - 6100 - 24122000127
DECKER POWER PLANT - DAM UPGRADES REISSUE
Open $12,198,059.00 $12,198,059.00 $0.00
CT - 6100 - 24122000129
ELISABET NEY MUSEUM BLDG RESTORATION & SITE IMPROV REISSUE
Open $4,855,500.00 $4,855,500.00 $1,394,850.44
CT - 6100 - 24122000129
ELISABET NEY MUSEUM BLDG RESTORATION & SITE IMPROV REISSUE
Open $4,855,500.00 $4,855,500.00 $1,394,850.44
CT - 6100 - 24122300130
6TH STREET CHILLED WATER TRANSMISSION LINE EXTENSION
Open $22,593,601.00 $22,593,601.00 $0.00
CT - 6100 - 25010300140
GIVENS DISTRICT PARK -- RECREATION CENTER RENOVATION
Open $2,808,252.29 $2,808,252.29 $400,579.30
CT - 6100 - 25010300140
GIVENS DISTRICT PARK -- RECREATION CENTER RENOVATION
Open $2,808,252.29 $2,808,252.29 $400,579.30
CT - 6100 - 25010300140
GIVENS DISTRICT PARK -- RECREATION CENTER RENOVATION
Open $2,808,252.29 $2,808,252.29 $400,579.30
CT - 6100 - 25010800144
NW AREA LIFT STATION IMPRMTS: BOULDER LANE LIFT STATION
Open $6,881,000.00 $6,881,000.00 $0.00
CT - 6100 - 25010900151
IVANHOE TRAIL WATER AND WASTEWATER PIPELINE RENEWAL
Open $2,977,416.00 $2,977,416.00 $0.00
CT - 6100 - 25020500186
HYDE PARK (E 38TH ST/GROOMS ST/AVENUE F) WW PIPELINE RENEWAL
Open $1,345,149.00 $1,345,149.00 $0.00
CT - 6100 - 25021100194
WALNUT CREEK - JANUARY DR FLOOD RISK REDUCTION PROJECT
Open $1,936,072.00 $1,936,072.00 $0.00
CT - 6100 - 25021100194
WALNUT CREEK - JANUARY DR FLOOD RISK REDUCTION PROJECT
Open $1,936,072.00 $1,936,072.00 $0.00
CT - 6100 - 25021200198
SOUTH AREA LIFT STATION IMPROVEMENTS: SPRINGFIELD LIFT STATI
Open $7,837,942.54 $7,837,942.54 $0.00
CT - 6100 - 25021200198
SOUTH AREA LIFT STATION IMPROVEMENTS: SPRINGFIELD LIFT STATI
Open $7,837,942.54 $7,837,942.54 $0.00
CT - 6100 - 25022400215
NWLS IMPROVEMENTS: ROCK HARBOR FORCE MAIN AND FOUR POINTS #2
Open $4,224,497.00 $4,224,497.00 $0.00
CT - 6100 - 25030400228
2020 BOND SUBSTANDARD STREETS ROSS ROAD NORTH
Open $29,650,594.00 $29,650,594.00 $0.00
CT - 6100 - 25031100242
MLK/HEFLIN/SPRINGDALE INTERSECTION IMPROVEMENTS
Open $2,598,716.00 $2,598,716.00 $0.00
CT - 6100 - 25031700257
GARDEN VILLA LANE WATER & WASTEWATER PIPELINE RENEWAL
Open $8,426,181.00 $8,426,181.00 $0.00
CT - 6100 - 25032000267
RIDGELINE NEIGHBORHOOD PARK - PHASE I DEVELOPMENT
Open $1,117,589.00 $1,117,589.00 $0.00
CT - 6100 - 25032800287
DISTRICT COOLING VALVE RISER REPAIRS
Open $31,159.25 $31,159.25 $0.00
CT - 6100 - 25040300302
BOGGY CREEK LIFT STATION FORCE MAIN EXTENSION
Open $15,063,376.00 $15,063,376.00 $0.00
CT - 6100 - 25041600322
DAVIS WTP SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) I
Open $8,989,951.00 $8,989,951.00 $0.00
CT - 6100 - 25041700326
SLAUGHTER LANE- LOOP 1 TO BRODIE LANE- CAMPO
Open $12,978,416.55 $12,978,416.55 $0.00
CT - 6100 - 25051500351
F&I FLEXI-PAVE - SOLE SOURCE
Open $46,994.73 $46,994.73 $0.00
CT - 6100 - 25060400378
NORTH AUSTIN CIPP WASTEWATER RENEWAL
Open $2,772,892.00 $2,772,892.00 $0.00
CT - 6100 - 25060500381
E. ALLANDALE WHITE ROCK NEIGHBRHD W&WW SYSTEM RENEWAL REBID
Open $4,799,250.00 $4,799,250.00 $0.00
CT - 6100 - 25061200385
APD MOUNTED PATROL DRAINAGE/ASPHALT PROJECT
Open $967,000.00 $967,000.00 $0.00
CT - 6100 - 25061700391
MCNEIL DRIVE WATER TRANSMISSION MAIN
Open $50,734,011.00 $50,734,011.00 $0.00
CT - 6100 - 607Q0001461B
NE INTERIM WWTP INFRASTRUCTURE IMPRV.
Open $402,317.06 $402,317.06 $401,985.08
CT - 6100 - 607Q0001461B
NE INTERIM WWTP INFRASTRUCTURE IMPRV.
Open $402,317.06 $402,317.06 $401,985.08
CT - 6100 - CLMA044V
AUSTIN CONVENTION CENTER REDEVELOPMENT CLMA044V
Open $72,480.00 $72,480.00 $0.00
CT - 6100 - CLMP354PV
AUSTIN CONVENTION CENTER REDEVELOPMENT CT V
Open $73,746.03 $73,746.03 $67,269.26
CT - 6100 - CLMP356E
EXPERT PM AND TECH SERVICES FOR REDEV OF ACC
Open $73,500.00 $73,500.00 $0.00
CT - 6100 - PC607QPQ00827-A
WALLER CREEK TUNNEL
Open $17,501,494.43 $17,501,494.43 $17,378,187.83
CT - 8600 - 24022700292
JIMMY CLAY MAINT BARN - ENCLOSED CARPORT TO REPLACE CARPORT
Open $33,253.61 $33,253.61 $33,253.59