Checks cleared as of 01/31/2015 have been reflected as paid on the reports
AMOUNT
PRM 2400 19091132311 Cable Construction, Installation and Maintenance ( 09/13/2019 Paid $4,961.34
PRM 5600 19030613871 Cable Construction, Installation and Maintenance ( 03/08/2019 Paid $3,685.39
PRM 5600 19011108499 Cable Construction, Installation and Maintenance ( 01/15/2019 Paid $1,946.84
PRM 5600 18112705016 Cable Construction, Installation and Maintenance ( 11/29/2018 Paid $1,349.94
PRM 5600 18091331128 Cable Construction, Installation and Maintenance ( 09/17/2018 Paid $7,283.17
PRM 5600 18080627652 Cable Construction, Installation and Maintenance ( 08/08/2018 Paid $3,375.00
PRM 5600 18072626830 Cable Construction, Installation and Maintenance ( 07/30/2018 Paid $40,761.50
PRM 5600 18072326333 Cable Construction, Installation and Maintenance ( 07/25/2018 Paid $105,196.71
PRM 5600 18071926179 Cable Construction, Installation and Maintenance ( 07/23/2018 Paid $2,585.50
PRM 5600 18053021805 Cable Construction, Installation and Maintenance ( 06/01/2018 Paid $2,424.55
PRM 5600 18040917198 Cable Construction, Installation and Maintenance ( 04/11/2018 Paid $4,956.00
PRM 5600 18032916463 Cable Construction, Installation and Maintenance ( 04/02/2018 Paid $9,860.83
PRM 5600 17101902132 Cable Construction, Installation and Maintenance ( 10/23/2017 Paid $25,922.45
PRM 5600 17091833829 Cable Construction, Installation and Maintenance ( 09/20/2017 Paid $16,399.75
PRM 5600 17080930098 Cable Construction, Installation and Maintenance ( 08/11/2017 Paid $3,098.92
PRM 5600 17031015820 Cable Construction, Installation and Maintenance ( 03/14/2017 Paid $221.54
PRM 5600 17020912772 Cable Construction, Installation and Maintenance ( 02/13/2017 Paid $1,114.50
PRM 5600 17020612248 Cable Construction, Installation and Maintenance ( 02/08/2017 Paid $2,282.34
PRM 5600 16123008692 Cable Construction, Installation and Maintenance ( 01/03/2017 Paid $15,715.37
PRM 5600 16101300938 Cable Construction, Installation and Maintenance ( 10/14/2016 Paid $18,950.00
PRM 5600 16091637839 Cable Construction, Installation and Maintenance ( 09/20/2016 Paid $575.00
PRM 5600 16090836906 Cable Construction, Installation and Maintenance ( 09/12/2016 Paid $1,992.17
PRM 5600 16090736680 Cable Construction, Installation and Maintenance ( 09/08/2016 Paid $2,126.00
PRM 5600 16090136091 Cable Construction, Installation and Maintenance ( 09/06/2016 Paid $16,128.00
PRM 5600 16081033645 Cable Construction, Installation and Maintenance ( 08/11/2016 Paid $1,500.54
PRM 5600 16072731931 Cable Construction, Installation and Maintenance ( 07/28/2016 Paid $5,530.43
PRM 5600 16070529850 Cable Construction, Installation and Maintenance ( 07/06/2016 Paid $634.75
PRM 5600 16062829025 Cable Construction, Installation and Maintenance ( 06/29/2016 Paid $1,221.75
PRM 5600 16062528708 Cable Construction, Installation and Maintenance ( 06/27/2016 Paid $14,301.35
PRM 5600 16050323789 Cable Construction, Installation and Maintenance ( 05/04/2016 Paid $1,665.61
PRM 5600 16040620894 Cable Construction, Installation and Maintenance ( 04/07/2016 Paid $22,573.50
PRM 5600 16031417995 Cable Construction, Installation and Maintenance ( 03/15/2016 Paid $12,227.50
PRM 5600 16031017651 Cable Construction, Installation and Maintenance ( 03/11/2016 Paid $996.88
PRM 1100 15120806977 Cable Construction, Installation and Maintenance ( 12/09/2015 Paid $6,603.84
PRM 5600 15120306606 Cable Construction, Installation and Maintenance ( 12/04/2015 Paid $756.00
PRM 5600 15111905188 Cable Construction, Installation and Maintenance ( 11/20/2015 Paid $806.45
PRM 5600 15111704960 Cable Construction, Installation and Maintenance ( 11/18/2015 Paid $667.00
PRM 5600 15111704962 Cable Construction, Installation and Maintenance ( 11/18/2015 Paid $2,971.06
PRM 5600 15090137098 Cable Construction, Installation and Maintenance ( 09/02/2015 Paid $788.00
GAX 5600 15072117327 07/28/2015 Paid ($505.70)
PRM 6000 15071431224 Cable Construction, Installation and Maintenance ( 07/15/2015 Paid $563.20
PRM 5600 15070630140 Cable Construction, Installation and Maintenance ( 07/07/2015 Paid $13,291.87
PRM 5600 15062428970 Cable Construction, Installation and Maintenance ( 06/25/2015 Paid $2,401.76
PRM 5600 15042222195 Cable Construction, Installation and Maintenance ( 04/23/2015 Paid $5,502.15
PRM 5600 15041521327 Cable Construction, Installation and Maintenance ( 04/16/2015 Paid $9,641.72
PRM 5600 15041320971 Cable Construction, Installation and Maintenance ( 04/14/2015 Paid $2,745.00
PRM 5600 15041320973 Cable Construction, Installation and Maintenance ( 04/14/2015 Paid $22,081.30
PRM 5600 15040720337 Cable Construction, Installation and Maintenance ( 04/08/2015 Paid $3,026.65
PRM 6000 15040720359 Cable Construction, Installation and Maintenance ( 04/08/2015 Paid $1,988.50
PRM 5600 15040219966 Cable Construction, Installation and Maintenance ( 04/03/2015 Paid $1,222.50
PRM 6000 15032118394 Cable Construction, Installation and Maintenance ( 03/23/2015 Paid $52,577.78
PRM 5600 15031817920 Cable Construction, Installation and Maintenance ( 03/19/2015 Paid $1,433.32
PRM 5600 15030916751 Cable Construction, Installation and Maintenance ( 03/10/2015 Paid $11,918.04
PRM 5600 15030916759 Cable Construction, Installation and Maintenance ( 03/10/2015 Paid $729.75
PRM 6000 15021814639 Cable Construction, Installation and Maintenance ( 02/19/2015 Paid $1,622.45
PRM 5600 15021214244 Cable Construction, Installation and Maintenance ( 02/13/2015 Paid $7,143.56
PRM 6000 15021114049 Cable Construction, Installation and Maintenance ( 02/12/2015 Paid $724.00
PRM 5600 15020613371 Cable Construction, Installation and Maintenance ( 02/09/2015 Paid $423.00
PRM 5600 15020513216 Cable Construction, Installation and Maintenance ( 02/06/2015 Paid $423.00
PRM 5600 15012712149 Cable Construction, Installation and Maintenance ( 01/28/2015 Paid $3,224.00
PRM 6000 15012712163 Cable Construction, Installation and Maintenance ( 01/28/2015 Paid $704.00
PRM 5600 15012211788 Cable Construction, Installation and Maintenance ( 01/23/2015 Paid $1,000.00
PRM 5600 15012211790 Cable Construction, Installation and Maintenance ( 01/23/2015 Paid $404.50
PRM 5600 15011310727 Cable Construction, Installation and Maintenance ( 01/14/2015 Paid $1,369.00
PRM 6000 15011210583 Cable Construction, Installation and Maintenance ( 01/13/2015 Paid $7,600.00
PRM 5600 15010910430 Cable Construction, Installation and Maintenance ( 01/12/2015 Paid $1,354.00
PRM 5600 14122208499 Cable Construction, Installation and Maintenance ( 12/23/2014 Paid $16,578.34
PRM 5600 14122208509 Cable Construction, Installation and Maintenance ( 12/23/2014 Paid $594.11
PRM 6000 14121908190 Cable Construction, Installation and Maintenance ( 12/22/2014 Paid $26,144.44
PRM 5600 14120506781 Cable Construction, Installation and Maintenance ( 12/12/2014 Paid $2,931.25
PRM 5600 14120907133 Cable Construction, Installation and Maintenance ( 12/10/2014 Paid $2,566.54
PRM 5600 14120907134 Cable Construction, Installation and Maintenance ( 12/10/2014 Paid $992.57
PRM 5600 14120907140 Cable Construction, Installation and Maintenance ( 12/10/2014 Paid $1,671.93
PRM 5600 14120907141 Cable Construction, Installation and Maintenance ( 12/10/2014 Paid $2,253.69
PRM 5600 14120206421 Cable Construction, Installation and Maintenance ( 12/03/2014 Paid $2,027.25
PRM 5600 14120206424 Cable Construction, Installation and Maintenance ( 12/03/2014 Paid $693.00
PRM 5600 14120206426 Cable Construction, Installation and Maintenance ( 12/03/2014 Paid $458.25
PRM 5600 14120206427 Cable Construction, Installation and Maintenance ( 12/03/2014 Paid $2,292.00
PRM 6000 14112506041 Cable Construction, Installation and Maintenance ( 11/26/2014 Paid $6,680.00
PRM 5600 14111305044 Cable Construction, Installation and Maintenance ( 11/14/2014 Paid $12,132.54
PRM 5600 14111204928 Cable Construction, Installation and Maintenance ( 11/13/2014 Paid $1,197.09
PRM 5600 14111204930 Cable Construction, Installation and Maintenance ( 11/13/2014 Paid $24,781.90
PRM 5600 14111204940 Cable Construction, Installation and Maintenance ( 11/13/2014 Paid $10,857.41
PRM 6000 14111004719 Cable Construction, Installation and Maintenance ( 11/12/2014 Paid $3,860.75
PRM 5600 14110604427 Cable Construction, Installation and Maintenance ( 11/07/2014 Paid $8,181.50
PRM 5600 14110404158 Cable Construction, Installation and Maintenance ( 11/05/2014 Paid $3,529.05
PRM 6000 14102903528 Cable Construction, Installation and Maintenance ( 10/30/2014 Paid $29,971.20
PRM 5600 14102703111 Cable Construction, Installation and Maintenance ( 10/28/2014 Paid $8,542.46
PRM 5600 14102703113 Cable Construction, Installation and Maintenance ( 10/28/2014 Paid $14,029.50
PRM 6000 14102703130 Cable Construction, Installation and Maintenance ( 10/28/2014 Paid $5,821.56
PRM 5600 14102302908 Cable Construction, Installation and Maintenance ( 10/24/2014 Paid $1,646.28
PRM 5600 14102002388 Cable Construction, Installation and Maintenance ( 10/21/2014 Paid $27,270.00
PRM 6000 14101501907 Cable Construction, Installation and Maintenance ( 10/16/2014 Paid $2,204.50
PRM 5600 14101301324 Cable Construction, Installation and Maintenance ( 10/14/2014 Paid $1,948.50
PRM 5600 14093038645 Cable Construction, Installation and Maintenance ( 10/01/2014 Paid $1,636.25
PRM 5600 14093038647 Cable Construction, Installation and Maintenance ( 10/01/2014 Paid $998.30
PRM 5600 14090235425 Cable Construction, Installation and Maintenance ( 09/03/2014 Paid $428.25
PRM 5600 14090235431 Cable Construction, Installation and Maintenance ( 09/03/2014 Paid $31,715.00
PRM 5600 14090235436 Cable Construction, Installation and Maintenance ( 09/03/2014 Paid $6,305.46
PRM 5600 14082234424 Cable Construction, Installation and Maintenance ( 08/25/2014 Paid $1,644.60
PRM 6000 14081333386 Cable Construction, Installation and Maintenance ( 08/14/2014 Paid $829.10
PRM 5600 14081133023 Cable Construction, Installation and Maintenance ( 08/12/2014 Paid $11,783.88
PRM 5600 14080532514 Cable Construction, Installation and Maintenance ( 08/06/2014 Paid $1,945.00
PRM 5600 14080132210 Cable Construction, Installation and Maintenance ( 08/04/2014 Paid $445.72
PRM 5600 14072331037 Cable Construction, Installation and Maintenance ( 07/24/2014 Paid $574.96
PRM 5600 14072331042 Cable Construction, Installation and Maintenance ( 07/24/2014 Paid $4,393.65
PRM 5600 14072130525 Cable Construction, Installation and Maintenance ( 07/22/2014 Paid $1,169.51
PRM 5600 14072130528 Cable Construction, Installation and Maintenance ( 07/22/2014 Paid $423.00
PRM 5600 14071730131 Cable Construction, Installation and Maintenance ( 07/18/2014 Paid $1,274.05
PRM 5600 14071429272 Cable Construction, Installation and Maintenance ( 07/15/2014 Paid $2,331.50
PRM 6000 14070828692 Cable Construction, Installation and Maintenance ( 07/09/2014 Paid $2,107.77
PRM 5600 14070128174 Cable Construction, Installation and Maintenance ( 07/02/2014 Paid $42,829.36
PRM 5600 14062427344 Cable Construction, Installation and Maintenance ( 06/25/2014 Paid $893.25
PRM 5600 14062026967 Cable Construction, Installation and Maintenance ( 06/23/2014 Paid $8,179.70
PRM 5600 14060325076 Cable Construction, Installation and Maintenance ( 06/04/2014 Paid $2,933.45
PRM 5600 14060325080 Cable Construction, Installation and Maintenance ( 06/04/2014 Paid $1,019.25
PRM 5600 14060325085 Cable Construction, Installation and Maintenance ( 06/04/2014 Paid $2,016.50
PRM 5600 14052824454 Cable Construction, Installation and Maintenance ( 05/29/2014 Paid $18,979.05
PRM 5600 14052824456 Cable Construction, Installation and Maintenance ( 05/29/2014 Paid $26,992.60
PRM 5600 14052724265 Cable Construction, Installation and Maintenance ( 05/28/2014 Paid $423.00
PRM 5600 14052724266 Cable Construction, Installation and Maintenance ( 05/28/2014 Paid $29,702.00
PRM 5600 14052023754 Cable Construction, Installation and Maintenance ( 05/21/2014 Paid $9,317.00
PRM 5600 14051623516 Cable Construction, Installation and Maintenance ( 05/19/2014 Paid $352.00
PRM 5600 14042421044 Cable Construction, Installation and Maintenance ( 04/25/2014 Paid $30,281.50
PRM 5600 14042320935 Cable Construction, Installation and Maintenance ( 04/24/2014 Paid $986.77
PRM 5600 14041620271 Cable Construction, Installation and Maintenance ( 04/17/2014 Paid $13,206.47
PRM 5600 14041419911 Cable Construction, Installation and Maintenance ( 04/15/2014 Paid $288.54
PRM 5600 14040519023 Cable Construction, Installation and Maintenance ( 04/07/2014 Paid $37,290.28
PRM 5600 14040318789 Cable Construction, Installation and Maintenance ( 04/04/2014 Paid $704.00
PRM 5600 14033118208 Cable Construction, Installation and Maintenance ( 04/01/2014 Paid $539.50
PRM 5600 14032517595 Cable Construction, Installation and Maintenance ( 03/26/2014 Paid $5,970.29
PRM 5600 14032517602 Cable Construction, Installation and Maintenance ( 03/26/2014 Paid $3,174.50
PRM 5600 14031316374 Cable Construction, Installation and Maintenance ( 03/14/2014 Paid $1,665.01
PRM 5600 14031316377 Cable Construction, Installation and Maintenance ( 03/14/2014 Paid $423.00
PRM 5600 14030715550 Cable Construction, Installation and Maintenance ( 03/10/2014 Paid $208.25
PRM 5600 14022714883 Cable Construction, Installation and Maintenance ( 02/28/2014 Paid $4,110.40
PRM 5600 14022114293 Cable Construction, Installation and Maintenance ( 02/24/2014 Paid $2,168.00
PRM 5600 14020412466 Cable Construction, Installation and Maintenance ( 02/05/2014 Paid $352.00
PRM 5600 14013012120 Cable Construction, Installation and Maintenance ( 01/31/2014 Paid $2,194.80
PRM 5600 14010910349 Cable Construction, Installation and Maintenance ( 01/10/2014 Paid $9,572.22
PRM 5600 14010709823 Cable Construction, Installation and Maintenance ( 01/08/2014 Paid $4,047.90
PRM 5600 14010709825 Cable Construction, Installation and Maintenance ( 01/08/2014 Paid $10,019.34
PRM 5600 14010709827 Cable Construction, Installation and Maintenance ( 01/08/2014 Paid $6,414.75
PRM 5600 14010709829 Cable Construction, Installation and Maintenance ( 01/08/2014 Paid $704.00
PRM 5600 14010609570 Cable Construction, Installation and Maintenance ( 01/07/2014 Paid $16,787.63
PRM 5600 13121808375 Cable Construction, Installation and Maintenance ( 12/19/2013 Paid $1,803.90
PRM 8500 13121608033 Cables: Printer, Disk, Network, etc. 12/17/2013 Paid $1,233.50
PRM 5600 13121207697 Cable Construction, Installation and Maintenance ( 12/13/2013 Paid $3,264.35
PRM 5600 13120907154 Cable Construction, Installation and Maintenance ( 12/10/2013 Paid $124,134.35
PRM 5600 13120506972 Cable Construction, Installation and Maintenance ( 12/06/2013 Paid $352.00
PRM 5600 13120206474 Cable Construction, Installation and Maintenance ( 12/03/2013 Paid $1,395.00
PRM 5600 13112005736 Cable Construction, Installation and Maintenance ( 11/21/2013 Paid $1,625.50
PRM 5600 13111905608 Cable Construction, Installation and Maintenance ( 11/20/2013 Paid $301.00
PRM 5600 13111305161 Cable Construction, Installation and Maintenance ( 11/14/2013 Paid $1,419.25
PRM 5600 13110704698 Cable Construction, Installation and Maintenance ( 11/08/2013 Paid $4,938.60
PRM 5600 13110504337 Cable Construction, Installation and Maintenance ( 11/06/2013 Paid $1,126.50
PRM 5600 13110504344 Cable Construction, Installation and Maintenance ( 11/06/2013 Paid $2,348.04
PRM 5600 13102803260 Cable Construction, Installation and Maintenance ( 10/29/2013 Paid $176.39
PRM 5600 13102102154 Cable Construction, Installation and Maintenance ( 10/22/2013 Paid $1,351.00
PRM 5600 13101701693 Cable Construction, Installation and Maintenance ( 10/18/2013 Paid $8,317.34
PRM 5600 13100800771 Cable Construction, Installation and Maintenance ( 10/09/2013 Paid $10,696.50
PRM 5600 13092035854 Cable Construction, Installation and Maintenance ( 09/23/2013 Paid $9,420.00
PRM 5600 13091735392 Cable Construction, Installation and Maintenance ( 09/18/2013 Paid $94,929.38
PRM 5600 13090433849 Cable Construction, Installation and Maintenance ( 09/05/2013 Paid $819.00
PRM 5600 13090433851 Cable Construction, Installation and Maintenance ( 09/05/2013 Paid $1,891.44
PRM 5600 13082333052 Cable Construction, Installation and Maintenance ( 08/26/2013 Paid $21,617.13
PRM 5600 13080931928 Cable Construction, Installation and Maintenance ( 08/12/2013 Paid $12,263.25
PRM 5600 13080231193 Cable Construction, Installation and Maintenance ( 08/05/2013 Paid $14,295.65
PRM 5600 13071628497 Cable Construction, Installation and Maintenance ( 07/17/2013 Paid $790.00
PRM 5600 13071628499 Cable Construction, Installation and Maintenance ( 07/17/2013 Paid $500.00
PRM 5600 13071528258 Cable Construction, Installation and Maintenance ( 07/16/2013 Paid $1,947.50
PRM 5600 13061125415 Cable Construction, Installation and Maintenance ( 06/12/2013 Paid $3,484.03
PRM 5600 13060625114 Cable Construction, Installation and Maintenance ( 06/07/2013 Paid $4,989.56
PRM 5600 13053124550 Cable Construction, Installation and Maintenance ( 06/03/2013 Paid $210.00
PRM 5600 13052924251 Cable Construction, Installation and Maintenance ( 05/30/2013 Paid $6,789.93
PRM 5600 13052823992 Cable Construction, Installation and Maintenance ( 05/29/2013 Paid $87,377.61
PRM 5600 13051522910 Cable Construction, Installation and Maintenance ( 05/16/2013 Paid $6,444.08
PRM 5600 13051322601 Cable Construction, Installation and Maintenance ( 05/14/2013 Paid $1,992.50
PRM 5600 13050221735 Cable Construction, Installation and Maintenance ( 05/03/2013 Paid $500.00
PRM 5600 13050221744 Cable Construction, Installation and Maintenance ( 05/03/2013 Paid $12,172.68
PRM 5600 13041219605 Cable Construction, Installation and Maintenance ( 04/15/2013 Paid $15,685.95
PRM 5600 13040218544 Cable Construction, Installation and Maintenance ( 04/03/2013 Paid $1,286.25
PRM 5600 13040218546 Cable Construction, Installation and Maintenance ( 04/03/2013 Paid $2,141.47
PRM 5600 13032017496 Cable Construction, Installation and Maintenance ( 03/21/2013 Paid $717.45
PRM 5600 13031817153 Cable Construction, Installation and Maintenance ( 03/19/2013 Paid $6,706.32
PRM 5600 13030716163 Cable Construction, Installation and Maintenance ( 03/08/2013 Paid $10,449.50
PRM 5600 13022514797 Cable Construction, Installation and Maintenance ( 02/26/2013 Paid $5,765.00
PRM 5600 13021914302 Cable Construction, Installation and Maintenance ( 02/20/2013 Paid $44,335.00
PRM 5600 13021113699 Cable Construction, Installation and Maintenance ( 02/12/2013 Paid $6,415.00
PRM 5600 13020713427 Cable Construction, Installation and Maintenance ( 02/08/2013 Paid $25,851.93
PRM 5600 13013012669 Cable Construction, Installation and Maintenance ( 01/31/2013 Paid $3,370.32
PRM 5600 13012812281 Cable Construction, Installation and Maintenance ( 01/29/2013 Paid $8,972.83
PRM 5600 13011811322 Cable Construction, Installation and Maintenance ( 01/22/2013 Paid $1,611.00
PRM 5600 13011811322 Teleconference Systems, Audio/Video 01/22/2013 Paid $12,989.20
PRM 5600 13011010299 Cable Construction, Installation and Maintenance ( 01/11/2013 Paid $325.00
PRM 5600 13010809903 Cable Construction, Installation and Maintenance ( 01/09/2013 Paid $52,112.35
PRM 5600 13010809906 Cable Construction, Installation and Maintenance ( 01/09/2013 Paid $1,781.15
PRM 5600 13010809908 Cable Construction, Installation and Maintenance ( 01/09/2013 Paid $9,006.15
PRM 5600 13010809911 Cable Construction, Installation and Maintenance ( 01/09/2013 Paid $197.50
PRM 5600 13010809921 Cable Construction, Installation and Maintenance ( 01/09/2013 Paid $1,376.30
PRM 5600 13010709643 Cable Construction, Installation and Maintenance ( 01/08/2013 Paid $3,611.12
PRM 5600 13010709645 Cable Construction, Installation and Maintenance ( 01/08/2013 Paid $1,055.00
PRM 5600 13010209195 Cable Construction, Installation and Maintenance ( 01/03/2013 Paid $8,777.60
PRM 5600 12122908917 Cable Construction, Installation and Maintenance ( 12/31/2012 Paid $1,165.00
PRM 5600 12122908919 Cable Construction, Installation and Maintenance ( 12/31/2012 Paid $71,549.15
PRM 5600 12122908919 Teleconference Systems, Audio/Video 12/31/2012 Paid $3,093.75
PRM 5600 12122908921 Teleconference Systems, Audio/Video 12/31/2012 Paid $230.00
PRM 5600 12122608479 Cable Construction, Installation and Maintenance ( 12/27/2012 Paid $56,250.91
PRM 5600 12122008313 Cable Construction, Installation and Maintenance ( 12/21/2012 Paid $1,205.00
PRM 5600 12121407705 Cable Construction, Installation and Maintenance ( 12/17/2012 Paid $11,679.00
PRM 5600 12121107188 Cable Construction, Installation and Maintenance ( 12/12/2012 Paid $9,577.53
PRM 5600 12120506628 Cable Construction, Installation and Maintenance ( 12/06/2012 Paid $5,132.66
PRM 5600 12120506633 Cable Construction, Installation and Maintenance ( 12/06/2012 Paid $9,709.13
PRM 5600 12112806066 Cable Construction, Installation and Maintenance ( 12/04/2012 Paid $759.50
PRM 5600 12112806068 Cable Construction, Installation and Maintenance ( 12/04/2012 Paid $325.00
PRM 5600 12112806070 Cable Construction, Installation and Maintenance ( 12/04/2012 Paid $29,453.40
PRM 5600 12112806073 Cable Construction, Installation and Maintenance ( 12/04/2012 Paid $7,740.00
PRM 5600 12113006345 Cable Construction, Installation and Maintenance ( 12/03/2012 Paid $14,884.60
PRM 5600 12112806065 Cable Construction, Installation and Maintenance ( 11/29/2012 Paid $52,525.13
PRM 5600 12111304839 Cable Construction, Installation and Maintenance ( 11/14/2012 Paid $23,589.80
PRM 5600 12102202604 Cable Construction, Installation and Maintenance ( 10/23/2012 Paid $1,131.00
PRM 5600 12101601645 Cable Construction, Installation and Maintenance ( 10/17/2012 Paid $725.00
PRM 5600 12092434799 Cable Construction, Installation and Maintenance ( 09/25/2012 Paid $5,914.95
PRM 5600 12091734057 Cable Construction, Installation and Maintenance ( 09/18/2012 Paid $325.00
PRM 5600 12091734059 Cable Construction, Installation and Maintenance ( 09/18/2012 Paid $5,263.33
PRM 5600 12090633049 Cable Construction, Installation and Maintenance ( 09/07/2012 Paid $15,556.38
PRM 5600 12082131201 Cable Construction, Installation and Maintenance ( 08/22/2012 Paid $6,474.00
PRM 5600 12082031063 Cable Construction, Installation and Maintenance ( 08/21/2012 Paid $52,083.17
PRM 5600 12081430448 Cable Construction, Installation and Maintenance ( 08/15/2012 Paid $3,953.25
PRM 5600 12081430450 Cable Construction, Installation and Maintenance ( 08/15/2012 Paid $395.00
PRM 5600 12081430453 Cable Construction, Installation and Maintenance ( 08/15/2012 Paid $49,099.00
PRM 5600 12081430455 Cable Construction, Installation and Maintenance ( 08/15/2012 Paid $59,691.50
PRM 5600 12080729675 Cable Construction, Installation and Maintenance ( 08/08/2012 Paid $24,149.10
PRM 5600 12080729679 Cable Construction, Installation and Maintenance ( 08/08/2012 Paid $28,474.87
PRM 5600 12073028855 Cable Construction, Installation and Maintenance ( 07/31/2012 Paid $111,676.05
PRM 5600 12072428278 Cable Construction, Installation and Maintenance ( 07/25/2012 Paid $3,332.50
PRM 5600 12071127213 Cable Construction, Installation and Maintenance ( 07/12/2012 Paid $76,011.67
PRM 5600 12071027011 Cable Construction, Installation and Maintenance ( 07/11/2012 Paid $14,480.00
PRM 5600 12070626726 Cable Construction, Installation and Maintenance ( 07/09/2012 Paid $34,582.58
PRM 5600 12062625483 Cable Construction, Installation and Maintenance ( 06/27/2012 Paid $8,030.00
PRM 5600 12062525267 Cable Construction, Installation and Maintenance ( 06/26/2012 Paid $1,025.50
PRM 5600 12062525271 Cable Construction, Installation and Maintenance ( 06/26/2012 Paid $5,398.02
PRM 5600 12053123068 Cable Construction, Installation and Maintenance ( 06/01/2012 Paid $4,175.57
PRM 5600 12052522520 Cable Construction, Installation and Maintenance ( 05/29/2012 Paid $9,623.75
PRM 5600 12052322248 Cable Construction, Installation and Maintenance ( 05/24/2012 Paid $33,119.58
PRM 5600 12052222129 Cable Construction, Installation and Maintenance ( 05/23/2012 Paid $28,276.19
PRM 5600 12042619822 Cable Construction, Installation and Maintenance ( 04/27/2012 Paid $13,628.68
PRM 5600 12042619823 Cable Construction, Installation and Maintenance ( 04/27/2012 Paid $6,067.22
PRM 5600 12041919063 Cable Construction, Installation and Maintenance ( 04/20/2012 Paid $3,001.00
PRM 5600 12040217301 Cable Construction, Installation and Maintenance ( 04/03/2012 Paid $12,596.18
PRM 5600 12032716736 Cable Construction, Installation and Maintenance ( 03/28/2012 Paid $1,650.90
PRM 5600 12032316494 Cable Construction, Installation and Maintenance ( 03/26/2012 Paid $26,494.40
PRM 5600 12031515663 Cable Construction, Installation and Maintenance ( 03/16/2012 Paid $858.10
PRM 5600 12030915055 Cable Construction, Installation and Maintenance ( 03/12/2012 Paid $6,254.08
PRM 5600 12030714732 Cable Construction, Installation and Maintenance ( 03/08/2012 Paid $32,475.42
PRM 5600 12022413544 Cable Construction, Installation and Maintenance ( 02/27/2012 Paid $8,053.95
PRM 5600 12020811938 Cable Construction, Installation and Maintenance ( 02/09/2012 Paid $24,160.31
PRM 5600 12020711743 Cable Construction, Installation and Maintenance ( 02/08/2012 Paid $24,143.75
PRM 5600 12020611594 Cable Construction, Installation and Maintenance ( 02/07/2012 Paid $68,113.07
PRM 5600 12020111262 Cable Construction, Installation and Maintenance ( 02/02/2012 Paid $33,825.98
PRM 5600 12012510647 Cable Construction, Installation and Maintenance ( 01/26/2012 Paid $20,037.13
PRM 5600 12011810024 Cable Construction, Installation and Maintenance ( 01/19/2012 Paid $4,155.88
PRM 5600 12011709847 Cable Construction, Installation and Maintenance ( 01/18/2012 Paid $10,018.19
PRM 5600 12011209554 Cable Construction, Installation and Maintenance ( 01/13/2012 Paid $281,519.10
PRM 5600 12010308541 Cable Construction, Installation and Maintenance ( 01/04/2012 Paid $79,717.69
PRM 5600 11122808151 Cable Construction, Installation and Maintenance ( 12/29/2011 Paid $490.40
PRM 5600 11121407055 Cable Construction, Installation and Maintenance ( 12/15/2011 Paid $13,800.83
PRM 5600 11120706451 Cable Construction, Installation and Maintenance ( 12/08/2011 Paid $10,335.40
PRM 5600 11120506180 Cable Construction, Installation and Maintenance ( 12/06/2011 Paid $36,716.98
PRM 5600 11111704881 Cable Construction, Installation and Maintenance ( 11/18/2011 Paid $539.50
PRM 5600 11111604742 Cable Construction, Installation and Maintenance ( 11/17/2011 Paid $1,410.52
PRM 5600 11110904207 Cable Construction, Installation and Maintenance ( 11/10/2011 Paid $26,916.08
PRM 5600 11110804050 Cable Construction, Installation and Maintenance ( 11/09/2011 Paid $6,665.90
PRM 5600 11110103266 Cable Construction, Installation and Maintenance ( 11/02/2011 Paid $2,109.50
PRM 5600 11102602697 Cable Construction, Installation and Maintenance ( 10/27/2011 Paid $14,786.45
PRM 5600 11102502460 Cable Construction, Installation and Maintenance ( 10/26/2011 Paid $7,733.06
PRM 5600 11101801812 Cable Construction, Installation and Maintenance ( 10/19/2011 Paid $722.00
PRM 5600 11101701654 Cable Construction, Installation and Maintenance ( 10/18/2011 Paid $24,143.75
PRM 5600 11100500420 Cable Construction, Installation and Maintenance ( 10/06/2011 Paid $777.50
PRM 5600 11100300080 Cable Construction, Installation and Maintenance ( 10/04/2011 Paid $2,545.77
PRM 5600 11092135005 Cable Construction, Installation and Maintenance ( 09/22/2011 Paid $13,366.32
PRM 5600 11091434470 Cable Construction, Installation and Maintenance ( 09/15/2011 Paid $3,904.09
PRM 5600 11090933992 Cable Construction, Installation and Maintenance ( 09/12/2011 Paid $3,203.78
PRM 5600 11090733703 Cable Construction, Installation and Maintenance ( 09/08/2011 Paid $6,420.50
PRM 5600 11090133358 Cable Construction, Installation and Maintenance ( 09/02/2011 Paid $5,402.11
PRM 5600 11082932888 Cable Construction, Installation and Maintenance ( 08/30/2011 Paid $15,408.01
PRM 5600 11082632748 Cable Construction, Installation and Maintenance ( 08/29/2011 Paid $19,240.65
PRM 5600 11082232129 Cable Construction, Installation and Maintenance ( 08/23/2011 Paid $18,825.98
PRM 5600 11081931968 Cable Construction, Installation and Maintenance ( 08/22/2011 Paid $26,243.75
PRM 5600 11081631441 Cable Construction, Installation and Maintenance ( 08/17/2011 Paid $1,433.55
PRM 5600 11072829571 Cable Construction, Installation and Maintenance ( 07/29/2011 Paid $2,783.50
PRM 5600 11072729450 Cable Construction, Installation and Maintenance ( 07/28/2011 Paid $1,007.63
PRM 5600 11071127805 Cable Construction, Installation and Maintenance ( 07/12/2011 Paid $19,711.10
PRM 5600 11063027105 Cable Construction, Installation and Maintenance ( 07/01/2011 Paid $53,771.31
PRM 5600 11062826778 Cable Construction, Installation and Maintenance ( 06/29/2011 Paid $5,130.50
PRM 5600 11062426521 Cable Construction, Installation and Maintenance ( 06/27/2011 Paid $7,684.78
PRM 5600 11061625760 Cable Construction, Installation and Maintenance ( 06/17/2011 Paid $3,959.59
PRM 5600 11060824872 Cable Construction, Installation and Maintenance ( 06/09/2011 Paid $2,517.74
PRM 5600 11051823104 Cable Construction, Installation and Maintenance ( 05/19/2011 Paid $4,861.00
PRM 5600 11051622800 Cable Construction, Installation and Maintenance ( 05/17/2011 Paid $462.50
PRM 5600 11051122490 Cable Construction, Installation and Maintenance ( 05/12/2011 Paid $3,015.11
PRM 5600 11042520659 Cable Construction, Installation and Maintenance ( 04/26/2011 Paid $4,404.88
PRM 5600 11042120500 Cable Construction, Installation and Maintenance ( 04/22/2011 Paid $3,092.97
PRM 5600 11042020404 Cable Construction, Installation and Maintenance ( 04/21/2011 Paid $1,910.45
PRM 5600 11040719169 Cable Construction, Installation and Maintenance ( 04/08/2011 Paid $19,631.36
PRM 5600 11040118514 Cable Construction, Installation and Maintenance ( 04/04/2011 Paid $2,603.82
PRM 5600 11033118278 Cable Construction, Installation and Maintenance ( 04/01/2011 Paid $2,155.28
PRM 5600 11031516640 Cable Construction, Installation and Maintenance ( 03/16/2011 Paid $881.01
PRM 5600 11030415508 Cable Construction, Installation and Maintenance ( 03/07/2011 Paid $7,477.83
PRM 5600 11022514680 Cable Construction, Installation and Maintenance ( 02/28/2011 Paid $22,847.50
PRM 5600 11022314242 Cable Construction, Installation and Maintenance ( 02/24/2011 Paid $22,820.89
PRM 5600 11021813933 Cable Construction, Installation and Maintenance ( 02/22/2011 Paid $366.70
PRM 5600 11021613676 Cable Construction, Installation and Maintenance ( 02/17/2011 Paid $19,129.82
PRM 5600 11020212661 Cable Construction, Installation and Maintenance ( 02/03/2011 Paid $11,792.83
PRM 5600 11020212662 Cable Construction, Installation and Maintenance ( 02/03/2011 Paid $15,820.86
PRM 5600 11012712021 Cable Construction, Installation and Maintenance ( 01/28/2011 Paid $14,974.24
PRM 5600 11012611892 Cable Construction, Installation and Maintenance ( 01/27/2011 Paid $23,375.50
PRM 5600 11012411420 Cable Construction, Installation and Maintenance ( 01/25/2011 Paid $18,503.53
PRM 5600 11011210345 Cable Construction, Installation and Maintenance ( 01/13/2011 Paid $15,966.15
PRM 5600 11010609782 Cable Construction, Installation and Maintenance ( 01/07/2011 Paid $370.00
PRM 5600 11010509543 Cable Construction, Installation and Maintenance ( 01/06/2011 Paid $19,090.54
PRM 5600 10122908810 Cable Construction, Installation and Maintenance ( 12/30/2010 Paid $8,133.50
PRM 5600 10122708533 Cable Construction, Installation and Maintenance ( 12/28/2010 Paid $1,217.50
PRM 5600 10120907491 Cable Construction, Installation and Maintenance ( 12/10/2010 Paid $6,971.20
PRM 5600 10120707174 Cable Construction, Installation and Maintenance ( 12/08/2010 Paid $8,050.00
PRM 5600 10120206714 Cable Construction, Installation and Maintenance ( 12/03/2010 Paid $22,436.00
PRM 5600 10113006290 Cable Construction, Installation and Maintenance ( 12/01/2010 Paid $395.00
PRM 5600 10113006291 Cable Construction, Installation and Maintenance ( 12/01/2010 Paid $4,958.34
PRM 5600 10112305951 Cable Construction, Installation and Maintenance ( 11/24/2010 Paid $3,934.94
PRM 5600 10111504987 Cable Construction, Installation and Maintenance ( 11/16/2010 Paid $7,607.39
PRM 5600 10111204838 Cable Construction, Installation and Maintenance ( 11/15/2010 Paid $6,806.50
PRM 5600 10110504255 Cable Construction, Installation and Maintenance ( 11/08/2010 Paid $5,096.30
PRM 5600 10110304002 Cable Construction, Installation and Maintenance ( 11/04/2010 Paid $24,810.91
PRM 5600 10110103708 Fiber Optics Cables, Interconnecting Components, a 11/02/2010 Paid $9,632.90
PRM 5600 10102703288 Cable Construction, Installation and Maintenance ( 10/28/2010 Paid $9,247.73
PRM 5600 10102603038 Cable Construction, Installation and Maintenance ( 10/27/2010 Paid $971.20
PRM 5600 10102202614 Cable Construction, Installation and Maintenance ( 10/25/2010 Paid $6,987.10
PRM 5600 10102002302 Cable Construction, Installation and Maintenance ( 10/21/2010 Paid $6,742.40
PRM 5600 10101301568 Cable Construction, Installation and Maintenance ( 10/14/2010 Paid $43,408.90
PRM 5600 10101101202 Cable Construction, Installation and Maintenance ( 10/12/2010 Paid $832.28
PRM 5600 10100600699 Cable Construction, Installation and Maintenance ( 10/07/2010 Paid $4,780.00
PRM 5600 10100500457 Cable Construction, Installation and Maintenance ( 10/06/2010 Paid $859.51
PRM 5600 10092438493 Cable Construction, Installation and Maintenance ( 09/27/2010 Paid $6,712.71
PRM 5600 10092037866 Cable Construction, Installation and Maintenance ( 09/21/2010 Paid $2,100.00
PRM 5600 10091537326 Cable Construction, Installation and Maintenance ( 09/16/2010 Paid $31,444.20
PRM 5600 10091036802 Cable Construction, Installation and Maintenance ( 09/13/2010 Paid $6,654.31
PRM 5600 10082635097 Cable Construction, Installation and Maintenance ( 08/27/2010 Paid $575.00
PRM 5600 10081734099 Cable Construction, Installation and Maintenance ( 08/18/2010 Paid $22,200.93
PRM 5600 10081633923 Cable Construction, Installation and Maintenance ( 08/17/2010 Paid $3,361.90
PRM 5600 10080933139 Cable Construction, Installation and Maintenance ( 08/10/2010 Paid $988.33
PRM 5600 10080232485 Cable Construction, Installation and Maintenance ( 08/03/2010 Paid $3,557.28
PRM 5600 10072832028 Cable Construction, Installation and Maintenance ( 07/29/2010 Paid $443.62
PRM 5600 10072231369 Cable Construction, Installation and Maintenance ( 07/23/2010 Paid $158.78
PRM 5600 10071530555 Cable Construction, Installation and Maintenance ( 07/16/2010 Paid $7,187.51
PRM 5600 10071430356 Cable Construction, Installation and Maintenance ( 07/15/2010 Paid $5,773.76
PRM 5600 10070229320 Cable Construction, Installation and Maintenance ( 07/06/2010 Paid $37,116.15
PRM 5600 10062428331 Cable Construction, Installation and Maintenance ( 06/25/2010 Paid $9,611.17
PRM 5600 10061527147 Cable Construction, Installation and Maintenance ( 06/16/2010 Paid $10,000.00
PRM 5600 10061527148 Cable Construction, Installation and Maintenance ( 06/16/2010 Paid $1,000.00
PRM 5600 10061126914 Cable Construction, Installation and Maintenance ( 06/14/2010 Paid $4,367.18
PRM 5600 10061026741 Cable Construction, Installation and Maintenance ( 06/11/2010 Paid $947.25
PRM 5600 10060125673 Cable Construction, Installation and Maintenance ( 06/02/2010 Paid $5,762.00
PRM 5600 10051424108 Cable Construction, Installation and Maintenance ( 05/17/2010 Paid $12,452.00
PRM 5600 10051123618 Cable Construction, Installation and Maintenance ( 05/12/2010 Paid $1,145.05
PRM 5600 10043022644 Cable Construction, Installation and Maintenance ( 05/03/2010 Paid $27,884.00
PRM 5600 10041321059 Cable Construction, Installation and Maintenance ( 04/14/2010 Paid $2,722.19
PRM 5600 10041220851 Cable Construction, Installation and Maintenance ( 04/13/2010 Paid $16,052.50
PRM 5600 10040620231 Cable Construction, Installation and Maintenance ( 04/07/2010 Paid $24,654.62
PRM 5600 10040520110 Cable Construction, Installation and Maintenance ( 04/06/2010 Paid $315.00
PRM 5600 10032619278 Cable Construction, Installation and Maintenance ( 03/29/2010 Paid $36,112.03
PRM 5600 10032218571 Cable Construction, Installation and Maintenance ( 03/23/2010 Paid $395.00
PRM 5600 10031017159 Cable Construction, Installation and Maintenance ( 03/11/2010 Paid $16,523.25
PRM 5600 10031017161 Cable Construction, Installation and Maintenance ( 03/11/2010 Paid $2,478.21
PRM 5600 10030316248 Cable Construction, Installation and Maintenance ( 03/04/2010 Paid $540.00
PRM 5600 10022315064 Cable Construction, Installation and Maintenance ( 02/24/2010 Paid $4,980.00
PRM 5600 10021114174 Cable Construction, Installation and Maintenance ( 02/12/2010 Paid $1,547.50
PRM 5600 10020913666 Cable Construction, Installation and Maintenance ( 02/10/2010 Paid $3,290.00
PRM 5600 10012912517 Cable Construction, Installation and Maintenance ( 02/01/2010 Paid $445.00
PRM 5600 10012712159 Cable Construction, Installation and Maintenance ( 01/28/2010 Paid $5,501.60
PRM 5600 10012111510 Cable Construction, Installation and Maintenance ( 01/22/2010 Paid $7,967.18
PRM 5600 10011511167 Cable Construction, Installation and Maintenance ( 01/19/2010 Paid $10,122.21
PRM 5600 10011511167 Fiber Optics Cables, Interconnecting Components, a 01/19/2010 Paid $4,526.50
PRM 5600 10010509841 Cable Construction, Installation and Maintenance ( 01/06/2010 Paid $19,400.87
PRM 5600 09121608047 Cable Construction, Installation and Maintenance ( 12/17/2009 Paid $13,642.06
PRM 5600 09120407077 Cable Construction, Installation and Maintenance ( 12/07/2009 Paid $1,716.00
PRM 5600 09120206735 Cable Construction, Installation and Maintenance ( 12/03/2009 Paid $336.00
PRM 5600 09112005729 Cable Construction, Installation and Maintenance ( 11/23/2009 Paid $6,443.00
PRM 5600 09111805498 Cable Construction, Installation and Maintenance ( 11/19/2009 Paid $4,162.40
PRM 5600 09110904518 Cable Construction, Installation and Maintenance ( 11/10/2009 Paid $64,581.04
PRM 5600 09110604369 Cable Construction, Installation and Maintenance ( 11/09/2009 Paid $37,860.05
PRM 5600 09102903216 Cable Construction, Installation and Maintenance ( 10/30/2009 Paid $11,731.50
PRM 5600 09102803087 Cable Construction, Installation and Maintenance ( 10/29/2009 Paid $5,258.43
PRM 5600 09102602738 Cable Construction, Installation and Maintenance ( 10/27/2009 Paid $192.84
PRM 5600 09102102346 Cable Construction, Installation and Maintenance ( 10/22/2009 Paid $11,786.52
PRM 5600 09101201311 Cable Construction, Installation and Maintenance ( 10/13/2009 Paid $2,307.36
PRM 5600 09101201312 Cable Construction, Installation and Maintenance ( 10/13/2009 Paid $5,661.00
PRM 5600 09101201313 Cable Construction, Installation and Maintenance ( 10/13/2009 Paid $4,447.40
PRM 5600 09092945517 Cable Construction, Installation and Maintenance ( 09/30/2009 Paid $340.00
PRM 5600 09091643890 Cable Construction, Installation and Maintenance ( 09/17/2009 Paid $16,034.96
PRM 5600 09090442863 Cable Construction, Installation and Maintenance ( 09/08/2009 Paid $15,463.42
PRM 5600 09082541574 Cable Construction, Installation and Maintenance ( 08/26/2009 Paid $835.00
PRM 5600 09082040997 Cable Construction, Installation and Maintenance ( 08/21/2009 Paid $6,823.90
PRM 5600 09081940868 Cable Construction, Installation and Maintenance ( 08/20/2009 Paid $1,623.61
PRM 5600 09081239977 Cable Construction, Installation and Maintenance ( 08/13/2009 Paid $3,801.76
PRM 5600 09080439120 Cable Construction, Installation and Maintenance ( 08/05/2009 Paid $3,661.05
PRM 5600 09072437685 Cable Construction, Installation and Maintenance ( 07/27/2009 Paid $4,654.00
PRM 5600 09072437688 Cable Construction, Installation and Maintenance ( 07/27/2009 Paid $1,329.40
PRM 5600 09072237265 Cable Construction, Installation and Maintenance ( 07/23/2009 Paid $180.00
PRM 5600 09071536398 Cable Construction, Installation and Maintenance ( 07/16/2009 Paid $2,016.06
PRM 5600 09070935686 Cable Construction, Installation and Maintenance ( 07/10/2009 Paid $11,190.00
PRM 5600 09070935687 Cable Construction, Installation and Maintenance ( 07/10/2009 Paid $3,059.39
PRM 5600 09070935689 Cable Construction, Installation and Maintenance ( 07/10/2009 Paid $12,572.38
PRM 5600 09063034854 Cable Construction, Installation and Maintenance ( 07/01/2009 Paid $13,840.73
PRM 5600 09062934696 Cable Construction, Installation and Maintenance ( 06/30/2009 Paid $315.00
PRM 5600 09062334095 Cable Construction, Installation and Maintenance ( 06/24/2009 Paid $556.60
PRM 5600 09061132767 Cable Construction, Installation and Maintenance ( 06/12/2009 Paid $977.50
PRM 5600 09060431927 Cable Construction, Installation and Maintenance ( 06/05/2009 Paid $4,873.74
PRM 5600 09060131419 Cable Construction, Installation and Maintenance ( 06/02/2009 Paid $1,036.09
PRM 5600 09060131421 Cable Construction, Installation and Maintenance ( 06/02/2009 Paid $367.50
PRM 5600 09060131422 Cable Construction, Installation and Maintenance ( 06/02/2009 Paid $22,123.71
PRM 5600 09052730931 Cable Construction, Installation and Maintenance ( 05/28/2009 Paid $37,670.67
PRM 5600 09052630748 Cable Construction, Installation and Maintenance ( 05/27/2009 Paid $11,492.39
PRM 5600 09051429577 Cable Construction, Installation and Maintenance ( 05/15/2009 Paid $4,058.25
PRM 5600 09051229246 Cable Construction, Installation and Maintenance ( 05/13/2009 Paid $8,151.65
PRM 5600 09050828955 Cable Construction, Installation and Maintenance ( 05/11/2009 Paid $83,858.26
PRM 5600 09050528443 Cable Construction, Installation and Maintenance ( 05/06/2009 Paid $16,494.15
PRM 5600 09050528444 Cable Construction, Installation and Maintenance ( 05/06/2009 Paid $11,688.83
PRM 5600 09042427201 Cable Construction, Installation and Maintenance ( 04/27/2009 Paid $1,844.97
PRM 5600 09041325647 Cable Construction, Installation and Maintenance ( 04/14/2009 Paid $51,035.00
PRM 5600 09040624605 Cable Construction, Installation and Maintenance ( 04/07/2009 Paid $5,964.20
PRM 5600 09040324392 Cable Construction, Installation and Maintenance ( 04/06/2009 Paid $31,829.79
PRM 5600 09040324393 Cable Construction, Installation and Maintenance ( 04/06/2009 Paid $4,606.20
PRM 5600 09032522886 Cable Construction, Installation and Maintenance ( 03/26/2009 Paid $1,188.00
PRM 5600 09031722022 Cable Construction, Installation and Maintenance ( 03/18/2009 Paid $217.52
PRM 5600 09030520358 Cable Construction, Installation and Maintenance ( 03/06/2009 Paid $14,255.00
PRM 5600 09030420170 Cable Construction, Installation and Maintenance ( 03/05/2009 Paid $500.13
PRM 5600 09022018816 Cable Construction, Installation and Maintenance ( 02/23/2009 Paid $315.00
PRM 5600 09021918543 Cable Construction, Installation and Maintenance ( 02/20/2009 Paid $1,344.00
PRM 5600 09021718159 Cable Construction, Installation and Maintenance ( 02/18/2009 Paid $10,237.39
PRM 5600 09020516742 Cable Construction, Installation and Maintenance ( 02/06/2009 Paid $45,153.11
PRM 5600 09012715283 Cable Construction, Installation and Maintenance ( 01/28/2009 Paid $8,174.00
PRM 5600 09012314872 Cable Construction, Installation and Maintenance ( 01/26/2009 Paid $3,459.00
PRM 5600 09012214652 Cable Construction, Installation and Maintenance ( 01/23/2009 Paid $49,905.56
PRM 5600 09011413801 Cable Construction, Installation and Maintenance ( 01/15/2009 Paid $1,368.00
PRM 5600 09010211990 Cable Construction, Installation and Maintenance ( 01/05/2009 Paid $24,217.30
PRM 5600 08123111895 Cable Construction, Installation and Maintenance ( 01/02/2009 Paid $612.66
PRM 5600 08121810984 Cable Construction, Installation and Maintenance ( 12/19/2008 Paid $57,665.00
PRM 5600 08121110210 Cable Construction, Installation and Maintenance ( 12/12/2008 Paid $1,768.00
PRM 5600 08120809551 Cable Construction, Installation and Maintenance ( 12/09/2008 Paid $3,264.12
PRM 5600 08112407712 Cable Construction, Installation and Maintenance ( 11/25/2008 Paid $930.00
PRM 5600 08111907069 Cable Construction, Installation and Maintenance ( 11/20/2008 Paid $1,285.00
PRM 5600 08111806863 Cable Construction, Installation and Maintenance ( 11/19/2008 Paid $9,030.51
PRM 5600 08111706600 Cable Construction, Installation and Maintenance ( 11/18/2008 Paid $1,463.05
PRM 5600 08111706602 Cable Construction, Installation and Maintenance ( 11/18/2008 Paid $5,436.41
PRM 5600 08111706603 Cable Construction, Installation and Maintenance ( 11/18/2008 Paid $1,997.72
PRM 5600 08111706604 Cable Construction, Installation and Maintenance ( 11/18/2008 Paid $4,638.64
PRM 5600 08111706605 Cable Construction, Installation and Maintenance ( 11/18/2008 Paid $373.40
PRM 5600 08111205817 Cable Construction, Installation and Maintenance ( 11/13/2008 Paid $6,552.39
PRM 5600 08110605358 Cable Construction, Installation and Maintenance ( 11/07/2008 Paid $12,887.44
PRM 5600 08110605359 Cable Construction, Installation and Maintenance ( 11/07/2008 Paid $26,084.23
PRM 5600 08103104611 Cable Construction, Installation and Maintenance ( 11/03/2008 Paid $3,040.52
PRM 5600 08102203194 Cable Construction, Installation and Maintenance ( 10/23/2008 Paid $3,006.86
PRM 5600 08102103016 Cable Construction, Installation and Maintenance ( 10/22/2008 Paid $8,930.84
PRM 5600 08102103017 Cable Construction, Installation and Maintenance ( 10/22/2008 Paid $1,997.72
PRM 5600 08102103018 Cable Construction, Installation and Maintenance ( 10/22/2008 Paid $2,196.11
PRM 5600 08102103019 Cable Construction, Installation and Maintenance ( 10/22/2008 Paid $1,997.72
PRM 5600 08102103020 Cable Construction, Installation and Maintenance ( 10/22/2008 Paid $2,008.16
PRM 5600 08102103021 Cable Construction, Installation and Maintenance ( 10/22/2008 Paid $3,517.28
PRM 5600 08101301749 Cable Construction, Installation and Maintenance ( 10/14/2008 Paid $23,777.83
PRM 5600 08100100053 Cable Construction, Installation and Maintenance ( 10/02/2008 Paid $3,730.94
PRM 5600 08100100054 Cable Construction, Installation and Maintenance ( 10/02/2008 Paid $8,663.36