Data Drill Down for All Months & All Years

PAYMENT REQUEST
CATEGORY CONTRACTUALS
EXPENSE CATEGORY SERVICES-CONSTRUCTION CONTR
PAYEE ALPHA PAVING INDUSTRIES LLC
PAYMENT REQUEST Select a payment request.
Payment Requests | Select from Below
PAYMENT REQUEST DESCRIPTION CHECK DATE CHECK STATUS 
Checks cleared as of 01/31/2015 have been reflected as paid on the reports
AMOUNT
PRM 6100 24103003762 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/01/2024 Outstanding $191,734.73
PRM 6100 24102803407 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/30/2024 Outstanding $43,795.86
PRM 6100 24102803491 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/30/2024 Outstanding $116,851.10
PRM 6100 24102503259 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/29/2024 Outstanding $44,782.24
PRM 6100 24102403064 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/28/2024 Outstanding $458,504.66
PRM 6100 24102403085 Paving/Resurfacing, Alley and Parking Lot 10/28/2024 Outstanding $234,056.11
PRM 6100 24102102555 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/23/2024 Outstanding $12,709.07
PRM 6100 24102102648 Construction, Street (Major and Residential)(Incl Reconstruc 10/23/2024 Outstanding $26,382.11
PRM 6100 24101702321 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/21/2024 Outstanding $13,690.85
PRM 6100 24101602196 Paving/Resurfacing, Street (Major and Residential) 10/18/2024 Outstanding $917,160.64
PRM 6100 24101502063 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/17/2024 Outstanding $494,404.00
PRM 6100 24100801223 Paving/Resurfacing, Alley and Parking Lot 10/10/2024 Outstanding $29,592.15
PRM 6100 24100801228 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/10/2024 Outstanding $48,983.25
PRM 6100 24100700963 Paving/Resurfacing, Alley and Parking Lot 10/09/2024 Outstanding $47,847.68
PRM 6100 24100200394 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/04/2024 Outstanding $205,560.35
PRM 6100 24100200414 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/04/2024 Outstanding $211,504.68
PRM 6100 24100200416 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/04/2024 Outstanding $103,460.90
PRM 6100 24092743602 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/01/2024 Paid $177,718.56
PRM 6100 24092543009 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/27/2024 Paid $636,371.89
PRM 6100 24092442771 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/26/2024 Paid $5,647.39
PRM 6100 24092442773 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/26/2024 Paid $19,242.87
PRM 6100 24091942208 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/23/2024 Paid $5,578.49
PRM 6100 24091942211 Paving/Resurfacing, Street (Major and Residential) 09/23/2024 Paid $474,241.72
PRM 6100 24091942213 Paving/Resurfacing, Street (Major and Residential) 09/23/2024 Paid $1,045,886.65
PRM 6100 24091942221 Paving/Resurfacing, Street (Major and Residential) 09/23/2024 Paid $266,273.31
PRM 6100 24091741798 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/19/2024 Paid $10.00
PRM 6100 24091741832 Paving/Resurfacing, Street (Major and Residential) 09/19/2024 Paid $433,817.45
PRM 6100 24091341383 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/17/2024 Paid $134,237.05
PRM 6100 24091341383 Paving/Resurfacing, Street (Major and Residential) 09/17/2024 Paid $378,903.17
PRM 6100 24091341385 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/17/2024 Paid $462,810.76
PRM 6100 24091341385 Paving/Resurfacing, Street (Major and Residential) 09/17/2024 Paid $470,397.46
PRM 6100 24091241209 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/16/2024 Paid $27,193.63
PRM 6100 24091241214 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/16/2024 Paid $3,763.68
PRM 6100 24090540452 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/09/2024 Paid $85,604.44
PRM 6100 24082939743 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/03/2024 Paid $230,736.45
PRM 6100 24082839514 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/30/2024 Paid $164,184.44
PRM 6100 24082839516 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/30/2024 Paid $7,445.72
PRM 6100 24082739374 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/29/2024 Paid $522,565.73
PRM 6100 24082639179 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/28/2024 Paid $20,074.47
PRM 6100 24082639183 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/28/2024 Paid $37,597.38
PRM 6100 24082639185 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/28/2024 Paid $22,685.83
PRM 6100 24082639190 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/28/2024 Paid $386,334.88
PRM 6100 24082639265 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/28/2024 Paid $24,217.54
PRM 6100 24082339030 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/27/2024 Paid $1,717.65
PRM 6100 24082138638 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/23/2024 Paid $260,126.09
PRM 6100 24082138643 Construction, Street (Major and Residential)(Incl Reconstruc 08/23/2024 Paid $44,726.46
PRM 6100 24082138649 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/23/2024 Paid $29,174.78
PRM 6100 24082138665 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/23/2024 Paid $105,991.34
PRM 6100 24082038412 Paving/Resurfacing, Alley and Parking Lot 08/22/2024 Paid $5,533.23
PRM 6100 24081938176 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/21/2024 Paid $92,072.50
PRC 1100 MAX132161 Paving/Resurfacing, Alley and Parking Lot 08/19/2024 Paid $12,188.80
PRM 6100 24081337404 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/15/2024 Paid $44,653.82
PRM 6100 24080536448 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/07/2024 Paid $201,126.46
PRM 6100 24080536517 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/07/2024 Paid $259,530.30
PRM 6100 24080536517 Paving/Resurfacing, Street (Major and Residential) 08/07/2024 Paid $367,714.60
PRM 6100 24080236271 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/06/2024 Paid $643,230.92
PRM 6100 24080236271 Paving/Resurfacing, Alley and Parking Lot 08/06/2024 Paid $68,714.08
PRM 6100 24080236277 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/06/2024 Paid $239,797.79
PRM 6100 24073135875 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/02/2024 Paid $2,736.24
PRM 6100 24073135880 Paving/Resurfacing, Street (Major and Residential) 08/02/2024 Paid $2,661.51
PRM 6100 24073035564 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/01/2024 Paid $148,360.48
PRM 6100 24072534998 Paving/Resurfacing, Alley and Parking Lot 07/29/2024 Paid $69,189.22
PRM 6100 24072534998 Paving/Resurfacing, Street (Major and Residential) 07/29/2024 Paid $3,102.55
PRM 6100 24072434791 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/26/2024 Paid $7,765.37
PRM 6100 24072334588 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/25/2024 Paid $57,533.23
PRM 6100 24072234380 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/24/2024 Paid $236,427.38
PRM 6100 24071533480 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/17/2024 Paid $320,627.81
PRM 6100 24071533533 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/17/2024 Paid $64,600.22
PRM 6100 24071133219 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/15/2024 Paid $271,168.69
PRM 6100 24070832683 Construction, Street (Major and Residential)(Incl Reconstruc 07/10/2024 Paid $38,623.96
PRM 6100 24070832686 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/10/2024 Paid $201,892.31
PRM 6100 24070832686 Paving/Resurfacing, Alley and Parking Lot 07/10/2024 Paid $12,272.44
PRM 6100 24070832686 Paving/Resurfacing, Street (Major and Residential) 07/10/2024 Paid $30,377.87
PRM 6100 24070532611 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/09/2024 Paid $24,748.84
PRM 6100 24070232101 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/05/2024 Paid $7,859.28
PRM 6100 24070232106 Construction, Parking Lot and Alley 07/05/2024 Paid $348,368.20
PRM 6100 24070131842 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/03/2024 Paid $15,052.46
PRM 6100 24070131858 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/03/2024 Paid $169,499.07
PRM 6100 24070131988 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/03/2024 Paid $21,289.16
PRM 6100 24062831693 Paving/Resurfacing, Alley and Parking Lot 07/02/2024 Paid $5,550.90
PRM 6100 24062731573 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/01/2024 Paid $56,544.98
PRM 6100 24062731575 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/01/2024 Paid $14,708.14
PRM 6100 24062731578 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/01/2024 Paid $26,525.21
PRM 6100 24061730230 Paving/Resurfacing, Alley and Parking Lot 06/20/2024 Paid $6,319.93
PRM 6100 24061730324 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/20/2024 Paid $148,599.18
PRM 6100 24061129638 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/13/2024 Paid $110,771.98
PRM 6100 24060729175 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/11/2024 Paid $163,441.57
PRM 6100 24060628998 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/10/2024 Paid $104,244.02
PRM 6100 24060428498 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/06/2024 Paid $350,724.10
PRM 6100 24060428500 Paving/Resurfacing, Street (Major and Residential) 06/06/2024 Paid $94,765.27
PRM 6100 24060428502 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/06/2024 Paid $136,343.10
PRM 6100 24060428507 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/06/2024 Paid $60,514.34
PRM 6100 24052827731 Construction, Street (Major and Residential)(Incl Reconstruc 05/30/2024 Paid $51,329.69
PRM 6100 24052427605 Construction, Sidewalk and Driveway (incl Handicapped ramps) 05/29/2024 Paid $206,081.46
PRM 6100 24052427610 Construction, Sidewalk and Driveway (incl Handicapped ramps) 05/29/2024 Paid $163,632.98
PRM 6100 24052427632 Construction, Sidewalk and Driveway (incl Handicapped ramps) 05/29/2024 Paid $164,128.86
PRM 6100 24052327453 Paving/Resurfacing, Street (Major and Residential) 05/28/2024 Paid $309,117.75
PRM 6100 24052127020 Construction, Sidewalk and Driveway (incl Handicapped ramps) 05/23/2024 Paid $369,042.23
PRM 6100 24052127031 Construction, Sidewalk and Driveway (incl Handicapped ramps) 05/23/2024 Paid $147,844.74
PRM 6100 24050925719 Paving/Resurfacing, Street (Major and Residential) 05/13/2024 Paid $58,948.45
PRM 6100 24050224839 Paving/Resurfacing, Alley and Parking Lot 05/06/2024 Paid $19,002.90
PRM 6100 24042523944 Construction, Sidewalk and Driveway (incl Handicapped ramps) 04/29/2024 Paid $184,059.58
PRM 6100 24042523952 Paving/Resurfacing, Alley and Parking Lot 04/29/2024 Paid $117,478.88
PRM 6100 24042523961 Construction, Sidewalk and Driveway (incl Handicapped ramps) 04/29/2024 Paid $381,528.24
PRM 6100 24042523982 Paving/Resurfacing, Street (Major and Residential) 04/29/2024 Paid $24,610.00
PRM 6100 24042423753 Construction, Sidewalk and Driveway (incl Handicapped ramps) 04/26/2024 Paid $497,090.91
PRM 6100 24042423755 Construction, Sidewalk and Driveway (incl Handicapped ramps) 04/26/2024 Paid $102,909.01
PRM 6100 24041522443 Paving/Resurfacing, Street (Major and Residential) 04/17/2024 Paid $24,558.75
PRM 6100 24041522445 Paving/Resurfacing, Street (Major and Residential) 04/17/2024 Paid $49,960.00
PRM 6100 24041522530 Construction, Sidewalk and Driveway (incl Handicapped ramps) 04/17/2024 Paid $285,996.69
PRM 6100 24041522532 Construction, Sidewalk and Driveway (incl Handicapped ramps) 04/17/2024 Paid $276,894.39
PRM 6100 24041522539 Paving/Resurfacing, Street (Major and Residential) 04/17/2024 Paid $30,713.75
PRM 6100 24041522543 Paving/Resurfacing, Street (Major and Residential) 04/17/2024 Paid $24,160.00
PRM 6100 24041222319 Construction, Sidewalk and Driveway (incl Handicapped ramps) 04/16/2024 Paid $32,635.35
PRM 6100 24040921799 Construction, Sidewalk and Driveway (incl Handicapped ramps) 04/11/2024 Paid $154,648.10
PRM 6100 24040521600 Construction, Sidewalk and Driveway (incl Handicapped ramps) 04/09/2024 Paid $385,013.67
PRM 6100 24032920690 Construction, Sidewalk and Driveway (incl Handicapped ramps) 04/02/2024 Paid $18,959.17
PRM 6100 24032920690 Construction, Street (Major and Residential)(Incl Reconstruc 04/02/2024 Paid $759,849.21
PRM 6100 24032720215 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/29/2024 Paid $29,190.02
PRM 6100 24032619973 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/28/2024 Paid $263,615.77
PRM 6100 24032619985 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/28/2024 Paid $53,291.82
PRM 6100 24032619985 Paving/Resurfacing, Street (Major and Residential) 03/28/2024 Paid $268,061.74
PRM 6100 24032619989 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/28/2024 Paid $264,936.69
PRM 6100 24032619991 Paving/Resurfacing, Street (Major and Residential) 03/28/2024 Paid $17,711.06
PRM 6100 24032619993 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/28/2024 Paid $23,437.70
PRM 6100 24031818792 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/20/2024 Paid $122,754.46
PRM 6100 24031818795 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/20/2024 Paid $110,051.19
PRM 6100 24031818804 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/20/2024 Paid $147,542.06
PRM 6100 24031518605 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/19/2024 Paid $109,409.31
PRM 6100 24031418499 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/18/2024 Paid $209,084.37
PRM 6100 24030517419 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/07/2024 Paid $141,658.66
PRM 6100 24030417162 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/06/2024 Paid $285,279.21
PRM 6100 24030116987 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/05/2024 Paid $13,419.54
PRM 6100 24030116987 Paving/Resurfacing, Street (Major and Residential) 03/05/2024 Paid $206,656.19
PRM 6100 24030117003 Paving/Resurfacing, Street (Major and Residential) 03/05/2024 Paid $15,070.00
PRM 6100 24022716497 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/29/2024 Paid $20,271.20
PRM 6100 24022115840 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/23/2024 Paid $241,492.01
PRM 6100 24021615356 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/21/2024 Paid $22,884.80
PRM 6100 24021615387 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/21/2024 Paid $24,999.75
PRM 6100 24021314902 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/15/2024 Paid $21,922.55
PRM 6100 24021314909 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/15/2024 Paid $6,519.12
PRM 6100 24021314922 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/15/2024 Paid $4,122.05
PRM 6100 24021214736 Paving/Resurfacing, Street (Major and Residential) 02/14/2024 Paid $19,120.29
PRM 6100 24021214741 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/14/2024 Paid $24,980.31
PRM 6100 24021214741 Paving/Resurfacing, Street (Major and Residential) 02/14/2024 Paid $35,400.93
PRM 6100 24021214836 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/14/2024 Paid $17,742.50
PRM 6100 24020814488 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/12/2024 Paid $216,377.60
PRM 6100 24020814492 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/12/2024 Paid $17,815.22
PRM 6100 24020614151 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/08/2024 Paid $119,644.54
PRM 6100 24020513856 Paving/Resurfacing, Street (Major and Residential) 02/07/2024 Paid $286,330.00
PRM 6100 24020513864 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/07/2024 Paid $59,015.30
PRM 6100 24020113572 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/05/2024 Paid $22,217.53
PRM 6100 24012512730 Construction, Sidewalk and Driveway (incl Handicapped ramps) 01/29/2024 Paid $51,988.50
PRM 6100 24012512732 Construction, Sidewalk and Driveway (incl Handicapped ramps) 01/29/2024 Paid $256,737.81
PRM 6100 24012512736 Paving/Resurfacing, Street (Major and Residential) 01/29/2024 Paid $50,568.63
PRM 6100 24012512741 Paving/Resurfacing, Street (Major and Residential) 01/29/2024 Paid $198,550.00
PRM 6100 24012512757 Construction, Sidewalk and Driveway (incl Handicapped ramps) 01/29/2024 Paid $229,591.18
PRM 6100 24012512759 Construction, Sidewalk and Driveway (incl Handicapped ramps) 01/29/2024 Paid $131,254.66
PRM 6100 24011611564 Construction, Sidewalk and Driveway (incl Handicapped ramps) 01/18/2024 Paid $25,474.66
PRM 6100 24011611567 Construction, Sidewalk and Driveway (incl Handicapped ramps) 01/18/2024 Paid $314,368.09
PRM 6100 24011011048 Construction, Sidewalk and Driveway (incl Handicapped ramps) 01/12/2024 Paid $8,117.80
PRM 6100 24011011050 Paving/Resurfacing, Street (Major and Residential) 01/12/2024 Paid $24,867.70
PRM 6100 24011011052 Paving/Resurfacing, Street (Major and Residential) 01/12/2024 Paid $24,957.13
PRM 6100 24011011054 Paving/Resurfacing, Street (Major and Residential) 01/12/2024 Paid $39,055.13
PRM 6100 24010510664 Construction, Sidewalk and Driveway (incl Handicapped ramps) 01/09/2024 Paid $4,167.53
PRM 6100 24010410390 Construction, Sidewalk and Driveway (incl Handicapped ramps) 01/08/2024 Paid $8,614.10
PRM 6100 24010310153 Construction, Sidewalk and Driveway (incl Handicapped ramps) 01/05/2024 Paid $83,629.58
PRM 6100 24010209963 Construction, Sidewalk and Driveway (incl Handicapped ramps) 01/04/2024 Paid $436,914.08
PRM 6100 23122909829 Paving/Resurfacing, Street (Major and Residential) 01/03/2024 Paid $9,415.90
PRM 6100 23122909831 Paving/Resurfacing, Street (Major and Residential) 01/03/2024 Paid $603,921.54
PRM 6100 23122209423 Construction, Sidewalk and Driveway (incl Handicapped ramps) 12/28/2023 Paid $128,847.33
PRM 6100 23122209427 Paving/Resurfacing, Street (Major and Residential) 12/28/2023 Paid $122,086.40
PRM 6100 23122109279 Construction, Sidewalk and Driveway (incl Handicapped ramps) 12/27/2023 Paid $161,603.87
PRM 6100 23122009074 Construction, Sidewalk and Driveway (incl Handicapped ramps) 12/22/2023 Paid $188,462.87
PRM 6100 23121808591 Construction, Sidewalk and Driveway (incl Handicapped ramps) 12/20/2023 Paid $336,575.09
PRM 6100 23121808604 Construction, Sidewalk and Driveway (incl Handicapped ramps) 12/20/2023 Paid $76,263.52
PRM 6100 23121808606 Construction, Sidewalk and Driveway (incl Handicapped ramps) 12/20/2023 Paid $235,938.60
PRM 6100 23121808618 Paving/Resurfacing, Street (Major and Residential) 12/20/2023 Paid $45,244.50
PRM 6100 23121808727 Construction, Sidewalk and Driveway (incl Handicapped ramps) 12/20/2023 Paid $263,212.11
PRM 6100 23121408290 Paving/Resurfacing, Street (Major and Residential) 12/18/2023 Paid $178,902.10
PRM 6100 23121408293 Paving/Resurfacing, Alley and Parking Lot 12/18/2023 Paid $92,935.54
PRM 6100 23121408325 Paving/Resurfacing, Alley and Parking Lot 12/18/2023 Paid $4,990.79
PRM 6100 23121308058 Construction, Sidewalk and Driveway (incl Handicapped ramps) 12/15/2023 Paid $106,946.52
PRM 6100 23120506915 Paving/Resurfacing, Alley and Parking Lot 12/07/2023 Paid $3,484.55
PRM 6100 23120506915 Paving/Resurfacing, Street (Major and Residential) 12/07/2023 Paid $25,092.80
PRM 6100 23120506917 Construction, Sidewalk and Driveway (incl Handicapped ramps) 12/07/2023 Paid $242,850.87
PRM 6100 23120506920 Paving/Resurfacing, Street (Major and Residential) 12/07/2023 Paid $1,432,610.96
PRM 6100 23120506922 Construction, Sidewalk and Driveway (incl Handicapped ramps) 12/07/2023 Paid $134,756.68
PRM 6100 23120506924 Paving/Resurfacing, Street (Major and Residential) 12/07/2023 Paid $19,141.34
PRM 6100 23120506927 Paving/Resurfacing, Street (Major and Residential) 12/07/2023 Paid $1,425,071.25
PRM 6100 23120506934 Paving/Resurfacing, Street (Major and Residential) 12/07/2023 Paid $54,017.81
PRM 6100 23120406783 Paving/Resurfacing, Street (Major and Residential) 12/06/2023 Paid $23,827.62
PRM 6100 23112205785 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/29/2023 Paid $153,087.27
PRM 6100 23112205788 Paving/Resurfacing, Street (Major and Residential) 11/29/2023 Paid $1,157,735.31
PRM 6100 23112205794 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/29/2023 Paid $447,299.40
PRM 6100 23112205802 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/29/2023 Paid $18,475.44
PRM 6100 23112705932 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/29/2023 Paid $270,542.50
PRM 6100 23112105641 Paving/Resurfacing, Street (Major and Residential) 11/27/2023 Paid $474,240.00
PRM 6100 23112105727 Paving/Resurfacing, Street (Major and Residential) 11/27/2023 Paid $475,000.00
PRM 6100 23112105732 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/27/2023 Paid $3,676.71
PRM 6100 23112105736 Paving/Resurfacing, Alley and Parking Lot 11/27/2023 Paid $15,798.17
PRM 6100 23111304636 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/15/2023 Paid $102,075.75
PRM 6100 23111304636 Paving/Resurfacing, Street (Major and Residential) 11/15/2023 Paid $746,003.19
PRM 6100 23110704236 Paving/Resurfacing, Alley and Parking Lot 11/09/2023 Paid $949.30
PRM 6100 23110704238 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/09/2023 Paid $127,039.09
PRM 6100 23110604100 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/08/2023 Paid $37,286.08
PRM 6100 23110604158 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/08/2023 Paid $8,200.78
PRM 6100 23110604158 Construction, Street (Major and Residential)(Incl Reconstruc 11/08/2023 Paid $8,708.24
PRM 6100 23110604164 Paving/Resurfacing, Alley and Parking Lot 11/08/2023 Paid $1,130.85
PRM 6100 23110303936 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/07/2023 Paid $78,318.95
PRM 6100 23103103507 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/02/2023 Paid $17,399.44
PRM 6100 23103003309 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/01/2023 Paid $177,801.31
PRM 6100 23103003314 Paving/Resurfacing, Street (Major and Residential) 11/01/2023 Paid $275,401.20
PRM 6100 23102603094 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/30/2023 Paid $13,177.60
PRM 6100 23102603096 Paving/Resurfacing, Alley and Parking Lot 10/30/2023 Paid $5,400.00
PRM 6100 23102402741 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/26/2023 Paid $28,552.73
PRM 6100 23102402744 Paving/Resurfacing, Street (Major and Residential) 10/26/2023 Paid $34,566.08
PRM 6100 23102002566 Paving/Resurfacing, Street (Major and Residential) 10/24/2023 Paid $476,763.20
PRM 6100 23101802121 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/20/2023 Paid $109,975.13
PRM 6100 23101802121 Paving/Resurfacing, Street (Major and Residential) 10/20/2023 Paid $366,569.38
PRM 6100 23101701983 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/19/2023 Paid $312,508.99
PRM 6100 23101601809 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/18/2023 Paid $23,437.90
PRM 6100 23101601873 Paving/Resurfacing, Street (Major and Residential) 10/18/2023 Paid $418,158.68
PRM 6100 23101301674 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/17/2023 Paid $149,214.12
PRM 6100 23101101136 Paving/Resurfacing, Street (Major and Residential) 10/13/2023 Paid $561,470.28
PRM 6100 23100600766 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/10/2023 Paid $175,556.15
PRM 6100 23100400446 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/06/2023 Paid $24,545.30
PRM 6100 23100400546 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/06/2023 Paid $24,303.05
PRM 6100 23100300248 Paving/Resurfacing, Street (Major and Residential) 10/05/2023 Paid $363,685.37
PRM 6100 23092937065 Construction, Sidewalk and Driveway (incl Handicapped ramps) 10/03/2023 Paid $20,012.59
PRM 6100 23092636470 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/28/2023 Paid $93,197.73
PRM 6100 23092636475 Paving/Resurfacing, Street (Major and Residential) 09/28/2023 Paid $10,790.21
PRM 6100 23092636494 Paving/Resurfacing, Street (Major and Residential) 09/28/2023 Paid $22,362.61
PRM 6100 23092136001 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/25/2023 Paid $12,097.39
PRM 6100 23092035772 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/22/2023 Paid $76,247.81
PRM 6100 23092035779 Paving/Resurfacing, Alley and Parking Lot 09/22/2023 Paid $78,715.28
PRM 6100 23091935562 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/21/2023 Paid $191,378.34
PRM 6100 23091935567 Paving/Resurfacing, Street (Major and Residential) 09/21/2023 Paid $10,204.41
PRM 6100 23091935569 Paving/Resurfacing, Street (Major and Residential) 09/21/2023 Paid $13,222.53
PRM 6100 23091935585 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/21/2023 Paid $40,637.27
PRM 6100 23091935588 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/21/2023 Paid $191,657.21
PRM 6100 23091935591 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/21/2023 Paid $110,987.94
PRM 6100 23091935593 Paving/Resurfacing, Street (Major and Residential) 09/21/2023 Paid $23,555.40
PRM 6100 23091935595 Paving/Resurfacing, Street (Major and Residential) 09/21/2023 Paid $23,625.00
PRM 6100 23091835382 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/20/2023 Paid $37,924.89
PRM 6100 23091835458 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/20/2023 Paid $264,630.81
PRM 6100 23090734228 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/11/2023 Paid $262,507.26
PRM 6100 23090734228 Paving/Resurfacing, Alley and Parking Lot 09/11/2023 Paid $1,142.85
PRM 6100 23090734234 Paving/Resurfacing, Alley and Parking Lot 09/11/2023 Paid $59,282.05
PRM 6100 23090734240 Construction, Street (Major and Residential)(Incl Reconstruc 09/11/2023 Paid $165,456.65
PRM 6100 23090734242 Paving/Resurfacing, Alley and Parking Lot 09/11/2023 Paid $35,027.36
PRM 6100 23090734244 Paving/Resurfacing, Street (Major and Residential) 09/11/2023 Paid $21,271.25
PRM 6100 23090633977 Paving/Resurfacing, Street (Major and Residential) 09/08/2023 Paid $5,367.37
PRM 6100 23090633982 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/08/2023 Paid $109,695.09
PRM 6100 23090633985 Paving/Resurfacing, Alley and Parking Lot 09/08/2023 Paid $14,747.50
PRM 6100 23090633988 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/08/2023 Paid $20,919.60
PRM 6100 23083133417 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/05/2023 Paid $102,783.20
PRM 6100 23083033257 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/01/2023 Paid $200,237.12
PRM 6100 23083033263 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/01/2023 Paid $99,696.25
PRM 6100 23082332419 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/25/2023 Paid $101,402.94
PRM 6100 23082332421 Paving/Resurfacing, Alley and Parking Lot 08/25/2023 Paid $21,714.13
PRM 6100 23082332479 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/25/2023 Paid $22,064.36
PRM 6100 23081731905 Paving/Resurfacing, Alley and Parking Lot 08/21/2023 Paid $7,912.75
PRM 6100 23081631595 Paving/Resurfacing, Street (Major and Residential) 08/18/2023 Paid $30,614.69
PRM 6100 23081631713 Paving/Resurfacing, Street (Major and Residential) 08/18/2023 Paid $60,867.85
PRM 6100 23081631715 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/18/2023 Paid $95,262.60
PRM 6100 23081631715 Paving/Resurfacing, Street (Major and Residential) 08/18/2023 Paid $12,975.49
PRM 6100 23081431268 Paving/Resurfacing, Street (Major and Residential) 08/16/2023 Paid $9,790.45
PRM 6100 23080930798 Paving/Resurfacing, Street (Major and Residential) 08/11/2023 Paid $49,031.99
PRM 6100 23080830683 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/10/2023 Paid $7,440.87
PRM 6100 23080830686 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/10/2023 Paid $224,396.07
PRM 6100 23080830686 Paving/Resurfacing, Street (Major and Residential) 08/10/2023 Paid $181,645.01
PRM 6100 23080830688 Paving/Resurfacing, Street (Major and Residential) 08/10/2023 Paid $134,021.26
PRM 6100 23080830693 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/10/2023 Paid $122,402.97
PRM 6100 23080830693 Paving/Resurfacing, Street (Major and Residential) 08/10/2023 Paid $2,355.37
PRM 6100 23080830696 Paving/Resurfacing, Street (Major and Residential) 08/10/2023 Paid $397,107.40
PRM 6100 23080330270 Paving/Resurfacing, Street (Major and Residential) 08/07/2023 Paid $230,564.86
PRM 6100 23080330272 Paving/Resurfacing, Street (Major and Residential) 08/07/2023 Paid $193,883.85
PRM 6100 23080330279 Construction, Sidewalk and Driveway (incl Handicapped ramps) 08/07/2023 Paid $69,857.46
PRM 6100 23080330289 Paving/Resurfacing, Alley and Parking Lot 08/07/2023 Paid $105,131.44
PRM 6100 23080330289 Paving/Resurfacing, Street (Major and Residential) 08/07/2023 Paid $101,979.93
PRM 6100 23080330299 Paving/Resurfacing, Street (Major and Residential) 08/07/2023 Paid $24,340.00
PRM 6100 23072128895 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/25/2023 Paid $77,469.95
PRM 6100 23071828520 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/20/2023 Paid $28,415.83
PRM 6100 23071828546 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/20/2023 Paid $140,450.28
PRM 6100 23071728371 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/19/2023 Paid $56,298.73
PRM 6100 23071728371 Paving/Resurfacing, Street (Major and Residential) 07/19/2023 Paid $350,342.06
PRM 6100 23071728374 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/19/2023 Paid $132,629.39
PRM 6100 23071728374 Paving/Resurfacing, Street (Major and Residential) 07/19/2023 Paid $870,646.94
PRM 6100 23071428225 Paving/Resurfacing, Street (Major and Residential) 07/18/2023 Paid $328,684.32
PRM 6100 23071428230 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/18/2023 Paid $175,715.89
PRM 6100 23070727294 Construction, Street (Major and Residential)(Incl Reconstruc 07/11/2023 Paid $102,263.04
PRM 6100 23070627119 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/10/2023 Paid $242,933.53
PRM 6100 23070627123 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/10/2023 Paid $215,459.63
PRM 6100 23070627130 Paving/Resurfacing, Street (Major and Residential) 07/10/2023 Paid $16,594.31
PRM 6100 23070627134 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/10/2023 Paid $53,911.24
PRM 6100 23070627138 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/10/2023 Paid $47,522.87
PRM 6100 23070627165 Paving/Resurfacing, Street (Major and Residential) 07/10/2023 Paid $24,850.00
PRM 6100 23070426892 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/06/2023 Paid $113,205.60
PRM 6100 23062726114 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/29/2023 Paid $58,280.45
PRM 6100 23062625953 Construction, Street (Major and Residential)(Incl Reconstruc 06/28/2023 Paid $15,791.00
PRM 6100 23062325824 Paving/Resurfacing, Street (Major and Residential) 06/27/2023 Paid $20,699.40
PRM 6100 23062325889 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/27/2023 Paid $364,362.33
PRM 6100 23062225686 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/26/2023 Paid $302,127.79
PRM 6100 23062125435 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/23/2023 Paid $233,848.24
PRM 6100 23062125550 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/23/2023 Paid $100,526.31
PRM 6100 23061525024 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/20/2023 Paid $81,155.65
PRM 6100 23061324849 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/15/2023 Paid $232,266.41
PRM 6100 23061324851 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/15/2023 Paid $69,302.40
PRM 6100 23061224804 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/14/2023 Paid $243,409.06
PRM 6100 23060924558 Paving/Resurfacing, Alley and Parking Lot 06/13/2023 Paid $9,967.08
PRM 6100 23060924560 Paving/Resurfacing, Alley and Parking Lot 06/13/2023 Paid $760.30
PRM 6100 23060624197 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/08/2023 Paid $31,290.71
PRM 6100 23060624216 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/08/2023 Paid $34,476.07
PRM 6100 23060123764 Paving/Resurfacing, Street (Major and Residential) 06/05/2023 Paid $38,630.56
PRM 6100 23051722368 Paving/Resurfacing, Street (Major and Residential) 05/19/2023 Paid $44,752.13
PRM 6100 23051722373 Paving/Resurfacing, Alley and Parking Lot 05/19/2023 Paid $70,887.50
PRM 6100 23051622251 Construction, Sidewalk and Driveway (incl Handicapped ramps) 05/18/2023 Paid $168,188.97
PRM 6100 23051622262 Construction, Sidewalk and Driveway (incl Handicapped ramps) 05/18/2023 Paid $112,817.22
PRM 6100 23051021634 Construction, Street (Major and Residential)(Incl Reconstruc 05/12/2023 Paid $3,490.06
PRM 6100 23050921505 Construction, Sidewalk and Driveway (incl Handicapped ramps) 05/11/2023 Paid $147,532.81
PRM 6100 23050921507 Construction, Sidewalk and Driveway (incl Handicapped ramps) 05/11/2023 Paid $82,378.69
PRM 6100 23050421069 Paving/Resurfacing, Street (Major and Residential) 05/08/2023 Paid $12,491.32
PRM 6100 23050321001 Construction, Sidewalk and Driveway (incl Handicapped ramps) 05/05/2023 Paid $54,134.53
PRM 6100 23050220829 Construction, Sidewalk and Driveway (incl Handicapped ramps) 05/04/2023 Paid $84,213.74
PRM 6100 23050120650 Construction, Street (Major and Residential)(Incl Reconstruc 05/03/2023 Paid $141,568.31
PRM 6100 23042720385 Paving/Resurfacing, Street (Major and Residential) 05/01/2023 Paid $73,090.00
PRM 6100 23042720387 Paving/Resurfacing, Street (Major and Residential) 05/01/2023 Paid $198,020.98
PRM 6100 23042620245 Paving/Resurfacing, Street (Major and Residential) 04/28/2023 Paid $24,805.00
PRM 6100 23042620247 Paving/Resurfacing, Street (Major and Residential) 04/28/2023 Paid $24,987.50
PRM 6100 23042520115 Paving/Resurfacing, Street (Major and Residential) 04/27/2023 Paid $49,352.75
PRM 6100 23041719297 Construction, Sidewalk and Driveway (incl Handicapped ramps) 04/19/2023 Paid $109,661.91
PRM 6100 23041719311 Paving/Resurfacing, Alley and Parking Lot 04/19/2023 Paid $361,055.10
PRM 6100 23041719314 Paving/Resurfacing, Alley and Parking Lot 04/19/2023 Paid $214,560.50
PRM 6100 23032917424 Construction, Sidewalk and Driveway (incl Handicapped ramps) 04/03/2023 Paid $62,036.66
PRM 6100 23033117623 Construction, Sidewalk and Driveway (incl Handicapped ramps) 04/03/2023 Paid $144,227.58
PRM 6100 23032416956 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/27/2023 Paid $24,887.15
PRM 6100 23032116542 Construction, Street (Major and Residential)(Incl Reconstruc 03/23/2023 Paid $79,711.65
PRM 6100 23032216699 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/23/2023 Paid $37,531.65
PRM 6100 23031716161 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/21/2023 Paid $89,590.70
PRM 6100 23030314593 Construction, Sidewalk and Driveway (incl Handicapped ramps) 03/07/2023 Paid $74,105.87
PRM 6100 23022113429 Paving/Resurfacing, Alley and Parking Lot 02/23/2023 Paid $330,296.38
PRM 6100 23021412974 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/15/2023 Paid $85,263.96
PRM 6100 23021012560 Construction, Street (Major and Residential)(Incl Reconstruc 02/14/2023 Paid $89,540.35
PRM 6100 23012611331 Paving/Resurfacing, Alley and Parking Lot 01/30/2023 Paid $58,766.65
PRM 8600 23011810222 PAVEMENT MARKING LINES, LETTERS AND SYMBOLS 01/19/2023 Paid $400.00
PRM 6100 22121907734 Paving/Resurfacing, Alley and Parking Lot 12/21/2022 Paid $41,153.05
PRM 6100 22121507513 Paving/Resurfacing, Alley and Parking Lot 12/19/2022 Paid $122,869.04
PRM 6100 22120806780 Paving/Resurfacing, Street (Major and Residential) 12/12/2022 Paid $237,334.92
PRM 6100 22120606481 Paving/Resurfacing, Street (Major and Residential) 12/08/2022 Paid $453,625.00
PRM 6100 22120506323 Paving/Resurfacing, Street (Major and Residential) 12/07/2022 Paid $939,851.63
PRM 6100 22120206234 Paving/Resurfacing, Street (Major and Residential) 12/06/2022 Paid $816,047.42
PRM 6100 22112505526 Paving/Resurfacing, Street (Major and Residential) 11/29/2022 Paid $80,033.94
PRM 6100 22111504601 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/17/2022 Paid $47,662.45
PRM 6100 22110703832 Paving/Resurfacing, Alley and Parking Lot 11/09/2022 Paid $22,886.45
PRM 6100 22110703862 Construction, Street (Major and Residential)(Incl Reconstruc 11/09/2022 Paid $328.88
PRM 6100 22110303663 Paving/Resurfacing, Alley and Parking Lot 11/07/2022 Paid $13,529.33
PRM 6100 22110303671 Paving/Resurfacing, Alley and Parking Lot 11/07/2022 Paid $6,486.98
PRM 6100 22110203525 Paving/Resurfacing, Alley and Parking Lot 11/04/2022 Paid $6,306.96
PRM 6100 22101802237 Paving/Resurfacing, Street (Major and Residential) 10/20/2022 Paid $473,515.63
PRM 6100 22101701992 Paving/Resurfacing, Street (Major and Residential) 10/19/2022 Paid $945,475.63
PRM 6100 22101701994 Paving/Resurfacing, Street (Major and Residential) 10/19/2022 Paid $123,070.33
PRM 6100 22101401845 Paving/Resurfacing, Street (Major and Residential) 10/18/2022 Paid $2,820,823.13
PRM 6100 22101701979 Paving/Resurfacing, Street (Major and Residential) 10/18/2022 Paid $462,460.00
PRM 6100 22101201543 Paving/Resurfacing, Street (Major and Residential) 10/13/2022 Paid $194,100.03
PRM 6100 22092232572 Paving/Resurfacing, Alley and Parking Lot 09/26/2022 Paid $14,155.00
PRM 6100 22092232575 Construction, Street (Major and Residential)(Incl Reconstruc 09/26/2022 Paid $66,311.10
PRM 6100 22092132412 Paving/Resurfacing, Alley and Parking Lot 09/23/2022 Paid $33,720.25
PRM 6100 22090731175 Paving/Resurfacing, Alley and Parking Lot 09/09/2022 Paid $150,342.25
PRM 6100 22090130703 Paving/Resurfacing, Alley and Parking Lot 09/06/2022 Paid $189,374.43
PRM 6100 22090130712 Paving/Resurfacing, Alley and Parking Lot 09/06/2022 Paid $1,001.15
PRM 6100 22081028499 Paving/Resurfacing, Street (Major and Residential) 08/11/2022 Paid $291,261.45
PRM 6100 22080127735 Paving/Resurfacing, Street (Major and Residential) 08/04/2022 Paid $448,875.00
PRM 6100 22072527006 Paving/Resurfacing, Street (Major and Residential) 07/28/2022 Paid $927,176.25
PRM 6100 22072527009 Paving/Resurfacing, Street (Major and Residential) 07/28/2022 Paid $466,925.00
PRM 6100 22072026627 Paving/Resurfacing, Street (Major and Residential) 07/25/2022 Paid $361,202.99
PRM 6100 22072126706 Paving/Resurfacing, Street (Major and Residential) 07/25/2022 Paid $470,582.50
PRM 6100 22072026607 Paving/Resurfacing, Street (Major and Residential) 07/22/2022 Paid $2,529.48
PRM 6100 22061623511 Paving/Resurfacing, Street (Major and Residential) 06/17/2022 Paid $123,186.97
PRM 6100 22061623513 Paving/Resurfacing, Street (Major and Residential) 06/17/2022 Paid $265,060.57
PRM 6100 22060822801 Paving/Resurfacing, Alley and Parking Lot 06/10/2022 Paid $20,536.88
PRM 6100 22060622557 Paving/Resurfacing, Alley and Parking Lot 06/08/2022 Paid $15,704.24
PRM 6100 22051220526 Paving/Resurfacing, Street (Major and Residential) 05/16/2022 Paid $70,993.03
PRM 6100 22051320658 Paving/Resurfacing, Street (Major and Residential) 05/16/2022 Paid $125,661.73
PRM 6100 22051120373 Paving/Resurfacing, Street (Major and Residential) 05/12/2022 Paid $304,398.77
PRM 6100 22050319669 Construction, Street (Major and Residential)(Incl Reconstruc 05/05/2022 Paid $113,162.22
PRM 6100 22042819304 Construction, Street (Major and Residential)(Incl Reconstruc 05/02/2022 Paid $153,342.49
PRM 6100 22042618995 Paving/Resurfacing, Alley and Parking Lot 04/28/2022 Paid $1,074.25
PRM 6100 22041217837 Paving/Resurfacing, Street (Major and Residential) 04/14/2022 Paid $48,060.03
PRM 6100 22040417054 Construction, Street (Major and Residential)(Incl Reconstruc 04/06/2022 Paid $272,824.58
PRM 6100 22030714321 Construction, Street (Major and Residential)(Incl Reconstruc 03/09/2022 Paid $179,530.62
PRM 6100 22030414140 Paving/Resurfacing, Street (Major and Residential) 03/08/2022 Paid $386,684.75
PRM 6100 22030414142 Paving/Resurfacing, Alley and Parking Lot 03/08/2022 Paid $13,626.70
PRM 6100 22030314000 Paving/Resurfacing, Street (Major and Residential) 03/07/2022 Paid $96,400.98
PRM 6100 22022313143 Paving/Resurfacing, Street (Major and Residential) 02/24/2022 Paid $132,107.00
PRM 6100 22021112098 Construction, Street (Major and Residential)(Incl Reconstruc 02/15/2022 Paid $174,739.30
PRM 6100 22011809809 Paving/Resurfacing, Street (Major and Residential) 01/20/2022 Paid $111,782.93
PRM 6100 22011409613 Paving/Resurfacing, Street (Major and Residential) 01/18/2022 Paid $212,894.53
PRM 6100 21122107681 Construction, Street (Major and Residential)(Incl Reconstruc 12/28/2021 Paid $173,506.04
PRM 6100 21120306106 Paving/Resurfacing, Street (Major and Residential) 12/07/2021 Paid $102,444.51
PRM 6100 21120306119 Paving/Resurfacing, Street (Major and Residential) 12/07/2021 Paid $74,235.63
PRM 6100 21120205934 Paving/Resurfacing, Street (Major and Residential) 12/06/2021 Paid $272,980.03
PRM 6100 21111604400 Construction, Street (Major and Residential)(Incl Reconstruc 11/18/2021 Paid $6,248.72
PRM 6100 21101401350 Construction, Street (Major and Residential)(Incl Reconstruc 10/18/2021 Paid $92,425.47
PRM 6100 21100400282 Paving/Resurfacing, Alley and Parking Lot 10/06/2021 Paid $392,405.10
PRM 6100 21092032572 Construction, Street (Major and Residential)(Incl Reconstruc 09/21/2021 Paid $306,972.72
PRM 6100 21091532113 Paving/Resurfacing, Street (Major and Residential) 09/17/2021 Paid $1,171,040.50
PRM 6100 21091431898 Construction, Street (Major and Residential)(Incl Reconstruc 09/16/2021 Paid $107,939.00
PRM 6100 21091031541 Paving/Resurfacing, Street (Major and Residential) 09/14/2021 Paid $307,752.77
PRM 6100 21091031592 Paving/Resurfacing, Street (Major and Residential) 09/14/2021 Paid $365,817.61
PRM 6100 21080227960 Paving/Resurfacing, Alley and Parking Lot 08/03/2021 Paid $262,106.62
PRM 6100 21071626363 Construction, Street (Major and Residential)(Incl Reconstruc 07/20/2021 Paid $38,783.75
PRM 6100 21071526207 Construction, Street (Major and Residential)(Incl Reconstruc 07/19/2021 Paid $197,755.46
PRM 6100 21062324108 Paving/Resurfacing, Alley and Parking Lot 06/25/2021 Paid $63,474.77
PRM 6100 21061623274 Construction, Street (Major and Residential)(Incl Reconstruc 06/21/2021 Paid $56,102.25
PRM 6100 21061122771 Construction, Street (Major and Residential)(Incl Reconstruc 06/15/2021 Paid $1,411.08
PRM 6100 21061122773 Construction, Street (Major and Residential)(Incl Reconstruc 06/15/2021 Paid $50,715.75
PRM 6100 21051820591 Paving/Resurfacing, Alley and Parking Lot 05/20/2021 Paid $62,266.09
PRM 6100 21050319130 Paving/Resurfacing, Street (Major and Residential) 05/05/2021 Paid $231,336.88
PRM 6100 21050319141 Construction, Street (Major and Residential)(Incl Reconstruc 05/05/2021 Paid $236,211.76
PRM 6100 21042618443 Paving/Resurfacing, Alley and Parking Lot 04/28/2021 Paid $172,639.67
PRM 6100 21041917645 Paving/Resurfacing, Alley and Parking Lot 04/21/2021 Paid $104,513.73
PRM 6100 21041617538 Construction, Street (Major and Residential)(Incl Reconstruc 04/20/2021 Paid $30,521.81
PRM 6100 21041617577 Construction, Street (Major and Residential)(Incl Reconstruc 04/20/2021 Paid $80,013.83
PRM 6100 21041217104 Paving/Resurfacing, Street (Major and Residential) 04/14/2021 Paid $246,534.31
PRM 6100 21032515529 Paving/Resurfacing, Alley and Parking Lot 03/29/2021 Paid $110,626.60
PRM 6100 21030913714 Construction, Street (Major and Residential)(Incl Reconstruc 03/11/2021 Paid $189,675.10
PRM 6100 21030813551 Paving/Resurfacing, Alley and Parking Lot 03/10/2021 Paid $125,085.55
PRM 6100 21020911617 Paving/Resurfacing, Street (Major and Residential) 02/11/2021 Paid $12,825.00
PRM 6100 21011108852 Paving/Resurfacing, Street (Major and Residential) 01/13/2021 Paid $472,150.00
PRM 6100 21011108854 Paving/Resurfacing, Alley and Parking Lot 01/13/2021 Paid $20,410.75
PRM 6100 21011108854 Paving/Resurfacing, Street (Major and Residential) 01/13/2021 Paid $435,222.25
PRM 6100 21010808783 Paving/Resurfacing, Street (Major and Residential) 01/12/2021 Paid $2,271,187.80
PRM 6100 21010808709 Paving/Resurfacing, Street (Major and Residential) 01/11/2021 Paid $707,417.50
PRM 6100 21010508320 Paving/Resurfacing, Alley and Parking Lot 01/07/2021 Paid $51,874.75
PRM 6100 20122207375 Construction, Street (Major and Residential)(Incl Reconstruc 12/28/2020 Paid $73,392.25
PRM 6100 20121406627 Paving/Resurfacing, Street (Major and Residential) 12/16/2020 Paid $1,625,260.00
PRM 6100 20091734205 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/21/2020 Paid $6,853.47
PRM 6100 20071427754 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/17/2020 Paid $111,872.57
PRM 6100 20071327591 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/15/2020 Paid $37,500.00
PRM 6100 20050121692 Construction, Street (Major and Residential)(Incl Reconstruc 05/05/2020 Paid $107,249.99
PRM 6100 20031817186 Construction, Street (Major and Residential)(Incl Reconstruc 03/20/2020 Paid $135,644.80
PRM 6100 20030515985 Construction, Street (Major and Residential)(Incl Reconstruc 03/10/2020 Paid $398,730.20
PRM 6100 20022715103 Construction, Sidewalk and Driveway (incl Handicapped ramps) 02/28/2020 Paid $270,850.27
PRM 6100 20021813932 Construction, Street (Major and Residential)(Incl Reconstruc 02/20/2020 Paid $268,729.35
PRM 6100 20021813935 Construction, Street (Major and Residential)(Incl Reconstruc 02/20/2020 Paid $11,500.00
PRM 6100 19123108400 Construction, Street (Major and Residential)(Incl Reconstruc 01/03/2020 Paid $264,697.08
PRM 6100 19120406095 Construction, Street (Major and Residential)(Incl Reconstruc 12/06/2019 Paid $282,326.70
PRM 6100 19112105357 Construction, Sidewalk and Driveway (incl Handicapped ramps) 11/25/2019 Paid $229,207.42
PRM 6100 19110603815 Construction, Street (Major and Residential)(Incl Reconstruc 11/08/2019 Paid $301,435.00
PRM 6100 19102903076 Construction, Street (Major and Residential)(Incl Reconstruc 10/31/2019 Paid $386,186.88
PRM 6100 19100300339 Construction, Street (Major and Residential)(Incl Reconstruc 10/07/2019 Paid $383,022.60
PRM 6100 19092734204 Construction, Street (Major and Residential)(Incl Reconstruc 10/02/2019 Paid $366,977.40
PRM 6100 19092734208 Construction, Street (Major and Residential)(Incl Reconstruc 10/02/2019 Paid $218,500.00
PRM 6100 19092734210 Construction, Street (Major and Residential)(Incl Reconstruc 10/02/2019 Paid $12,500.00
PRM 6100 19091032170 Construction, Sidewalk and Driveway (incl Handicapped ramps) 09/11/2019 Paid $45,744.35
PRM 6100 19090431681 Construction, Street (Major and Residential)(Incl Reconstruc 09/09/2019 Paid $237,500.00
PRM 6100 19081630094 Construction, Street (Major and Residential)(Incl Reconstruc 08/20/2019 Paid $20,000.00
PRM 6100 19080829310 Construction, Street (Major and Residential)(Incl Reconstruc 08/13/2019 Paid $17,500.00
PRM 6100 19070926114 Construction, Sidewalk and Driveway (incl Handicapped ramps) 07/12/2019 Paid $195,179.43
PRM 6100 19061123457 Construction, Sidewalk and Driveway (incl Handicapped ramps) 06/13/2019 Paid $101,734.49
PRM 6100 19051521134 Construction, Street (Major and Residential)(Incl Reconstruc 05/17/2019 Paid $332,500.00
PRM 6100 19042919327 Construction, Street (Major and Residential)(Incl Reconstruc 05/01/2019 Paid $37,500.00
PRM 6100 19041517908 Construction, Street (Major and Residential)(Incl Reconstruc 04/16/2019 Paid $380,000.00
PRM 6100 19041017473 Construction, Street (Major and Residential)(Incl Reconstruc 04/12/2019 Paid $37,500.00
PRM 6100 19030613900 Construction, Street (Major and Residential)(Incl Reconstruc 03/08/2019 Paid $397,310.90
PRM 6100 19020410343 Construction, Street (Major and Residential)(Incl Reconstruc 02/05/2019 Paid $213,750.00
PRM 6100 18122107172 Construction, Street (Major and Residential)(Incl Reconstruc 12/27/2018 Paid $342,714.87
PRM 6100 18103002967 Construction, Street (Major and Residential)(Incl Reconstruc 11/01/2018 Paid $213,750.00
PRM 6100 18100100055 Construction, Highway and Road 10/03/2018 Paid $31,030.40
PRM 6100 18080127401 Construction, Street (Major and Residential)(Incl Reconstruc 08/03/2018 Paid $257,474.23
PRM 6100 18061122670 Construction, Highway and Road 06/13/2018 Paid $414,051.60
PRM 6100 18052120897 Construction, Highway and Road 05/23/2018 Paid $175,526.03
PRM 6100 18052120899 Construction, Highway and Road 05/23/2018 Paid $122,922.36
PRM 6100 18052120917 Construction, Highway and Road 05/23/2018 Paid $179,584.35
PRM 6100 18050419607 Construction, Highway and Road 05/07/2018 Paid $120,520.30
PRM 6100 18050219411 Construction, Highway and Road 05/03/2018 Paid $134,252.03
PRM 6100 18042318379 Construction, Highway and Road 04/25/2018 Paid $356,430.88
PRM 6100 18040917204 Construction, Highway and Road 04/10/2018 Paid $145,270.01
PRM 6100 17120405679 Construction, Highway and Road 12/05/2017 Paid $105,520.30
PRM 6100 17112104766 Construction, Highway and Road 11/22/2017 Paid $272,667.67
PRM 6100 17080729816 Construction, Highway and Road 08/08/2017 Paid $179,479.70
PRM 6100 17010409039 Construction, Highway and Road 01/06/2017 Paid $202,093.96
PRM 6100 17010409042 Construction, Highway and Road 01/06/2017 Paid $192,807.93
PRM 6100 16112104863 Construction, Highway and Road 11/23/2016 Paid $187,317.58
PRM 6100 16112104868 Construction, Highway and Road 11/23/2016 Paid $259,580.09
PRM 7500 16011311057 Maintenance and Repair, Parking Lot and Alley 01/14/2016 Paid $22,856.97
PRM 6100 14120506796 CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING 12/08/2014 Paid $20,371.04
PRM 6100 14102302947 CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING 10/24/2014 Paid $79,388.37
PRM 6100 14090235502 CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING 09/03/2014 Paid $307,661.43
PRM 6100 14021813918 CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING 02/19/2014 Paid $24,390.92
PRM 6100 13082833543 CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING 08/29/2013 Paid $44,504.97
PRM 6100 13080831848 CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING 08/09/2013 Paid $279,363.75
PRM 6100 13070227151 CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING 07/03/2013 Paid $139,558.70