PRM 6100 24103003762 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/01/2024 |
Outstanding |
$191,734.73 |
PRM 6100 24102803407 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/30/2024 |
Outstanding |
$43,795.86 |
PRM 6100 24102803491 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/30/2024 |
Outstanding |
$116,851.10 |
PRM 6100 24102503259 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/29/2024 |
Outstanding |
$44,782.24 |
PRM 6100 24102403064 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/28/2024 |
Outstanding |
$458,504.66 |
PRM 6100 24102403085 |
Paving/Resurfacing, Alley and Parking Lot |
10/28/2024 |
Outstanding |
$234,056.11 |
PRM 6100 24102102555 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/23/2024 |
Outstanding |
$12,709.07 |
PRM 6100 24102102648 |
Construction, Street (Major and Residential)(Incl Reconstruc |
10/23/2024 |
Outstanding |
$26,382.11 |
PRM 6100 24101702321 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/21/2024 |
Outstanding |
$13,690.85 |
PRM 6100 24101602196 |
Paving/Resurfacing, Street (Major and Residential) |
10/18/2024 |
Outstanding |
$917,160.64 |
PRM 6100 24101502063 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/17/2024 |
Outstanding |
$494,404.00 |
PRM 6100 24100801223 |
Paving/Resurfacing, Alley and Parking Lot |
10/10/2024 |
Outstanding |
$29,592.15 |
PRM 6100 24100801228 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/10/2024 |
Outstanding |
$48,983.25 |
PRM 6100 24100700963 |
Paving/Resurfacing, Alley and Parking Lot |
10/09/2024 |
Outstanding |
$47,847.68 |
PRM 6100 24100200394 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/04/2024 |
Outstanding |
$205,560.35 |
PRM 6100 24100200414 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/04/2024 |
Outstanding |
$211,504.68 |
PRM 6100 24100200416 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/04/2024 |
Outstanding |
$103,460.90 |
PRM 6100 24092743602 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/01/2024 |
Paid |
$177,718.56 |
PRM 6100 24092543009 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/27/2024 |
Paid |
$636,371.89 |
PRM 6100 24092442771 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/26/2024 |
Paid |
$5,647.39 |
PRM 6100 24092442773 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/26/2024 |
Paid |
$19,242.87 |
PRM 6100 24091942208 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/23/2024 |
Paid |
$5,578.49 |
PRM 6100 24091942211 |
Paving/Resurfacing, Street (Major and Residential) |
09/23/2024 |
Paid |
$474,241.72 |
PRM 6100 24091942213 |
Paving/Resurfacing, Street (Major and Residential) |
09/23/2024 |
Paid |
$1,045,886.65 |
PRM 6100 24091942221 |
Paving/Resurfacing, Street (Major and Residential) |
09/23/2024 |
Paid |
$266,273.31 |
PRM 6100 24091741798 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/19/2024 |
Paid |
$10.00 |
PRM 6100 24091741832 |
Paving/Resurfacing, Street (Major and Residential) |
09/19/2024 |
Paid |
$433,817.45 |
PRM 6100 24091341383 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/17/2024 |
Paid |
$134,237.05 |
PRM 6100 24091341383 |
Paving/Resurfacing, Street (Major and Residential) |
09/17/2024 |
Paid |
$378,903.17 |
PRM 6100 24091341385 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/17/2024 |
Paid |
$462,810.76 |
PRM 6100 24091341385 |
Paving/Resurfacing, Street (Major and Residential) |
09/17/2024 |
Paid |
$470,397.46 |
PRM 6100 24091241209 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/16/2024 |
Paid |
$27,193.63 |
PRM 6100 24091241214 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/16/2024 |
Paid |
$3,763.68 |
PRM 6100 24090540452 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/09/2024 |
Paid |
$85,604.44 |
PRM 6100 24082939743 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/03/2024 |
Paid |
$230,736.45 |
PRM 6100 24082839514 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/30/2024 |
Paid |
$164,184.44 |
PRM 6100 24082839516 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/30/2024 |
Paid |
$7,445.72 |
PRM 6100 24082739374 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/29/2024 |
Paid |
$522,565.73 |
PRM 6100 24082639179 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/28/2024 |
Paid |
$20,074.47 |
PRM 6100 24082639183 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/28/2024 |
Paid |
$37,597.38 |
PRM 6100 24082639185 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/28/2024 |
Paid |
$22,685.83 |
PRM 6100 24082639190 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/28/2024 |
Paid |
$386,334.88 |
PRM 6100 24082639265 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/28/2024 |
Paid |
$24,217.54 |
PRM 6100 24082339030 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/27/2024 |
Paid |
$1,717.65 |
PRM 6100 24082138638 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/23/2024 |
Paid |
$260,126.09 |
PRM 6100 24082138643 |
Construction, Street (Major and Residential)(Incl Reconstruc |
08/23/2024 |
Paid |
$44,726.46 |
PRM 6100 24082138649 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/23/2024 |
Paid |
$29,174.78 |
PRM 6100 24082138665 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/23/2024 |
Paid |
$105,991.34 |
PRM 6100 24082038412 |
Paving/Resurfacing, Alley and Parking Lot |
08/22/2024 |
Paid |
$5,533.23 |
PRM 6100 24081938176 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/21/2024 |
Paid |
$92,072.50 |
PRC 1100 MAX132161 |
Paving/Resurfacing, Alley and Parking Lot |
08/19/2024 |
Paid |
$12,188.80 |
PRM 6100 24081337404 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/15/2024 |
Paid |
$44,653.82 |
PRM 6100 24080536448 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/07/2024 |
Paid |
$201,126.46 |
PRM 6100 24080536517 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/07/2024 |
Paid |
$259,530.30 |
PRM 6100 24080536517 |
Paving/Resurfacing, Street (Major and Residential) |
08/07/2024 |
Paid |
$367,714.60 |
PRM 6100 24080236271 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/06/2024 |
Paid |
$643,230.92 |
PRM 6100 24080236271 |
Paving/Resurfacing, Alley and Parking Lot |
08/06/2024 |
Paid |
$68,714.08 |
PRM 6100 24080236277 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/06/2024 |
Paid |
$239,797.79 |
PRM 6100 24073135875 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/02/2024 |
Paid |
$2,736.24 |
PRM 6100 24073135880 |
Paving/Resurfacing, Street (Major and Residential) |
08/02/2024 |
Paid |
$2,661.51 |
PRM 6100 24073035564 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/01/2024 |
Paid |
$148,360.48 |
PRM 6100 24072534998 |
Paving/Resurfacing, Alley and Parking Lot |
07/29/2024 |
Paid |
$69,189.22 |
PRM 6100 24072534998 |
Paving/Resurfacing, Street (Major and Residential) |
07/29/2024 |
Paid |
$3,102.55 |
PRM 6100 24072434791 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/26/2024 |
Paid |
$7,765.37 |
PRM 6100 24072334588 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/25/2024 |
Paid |
$57,533.23 |
PRM 6100 24072234380 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/24/2024 |
Paid |
$236,427.38 |
PRM 6100 24071533480 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/17/2024 |
Paid |
$320,627.81 |
PRM 6100 24071533533 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/17/2024 |
Paid |
$64,600.22 |
PRM 6100 24071133219 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/15/2024 |
Paid |
$271,168.69 |
PRM 6100 24070832683 |
Construction, Street (Major and Residential)(Incl Reconstruc |
07/10/2024 |
Paid |
$38,623.96 |
PRM 6100 24070832686 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/10/2024 |
Paid |
$201,892.31 |
PRM 6100 24070832686 |
Paving/Resurfacing, Alley and Parking Lot |
07/10/2024 |
Paid |
$12,272.44 |
PRM 6100 24070832686 |
Paving/Resurfacing, Street (Major and Residential) |
07/10/2024 |
Paid |
$30,377.87 |
PRM 6100 24070532611 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/09/2024 |
Paid |
$24,748.84 |
PRM 6100 24070232101 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/05/2024 |
Paid |
$7,859.28 |
PRM 6100 24070232106 |
Construction, Parking Lot and Alley |
07/05/2024 |
Paid |
$348,368.20 |
PRM 6100 24070131842 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/03/2024 |
Paid |
$15,052.46 |
PRM 6100 24070131858 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/03/2024 |
Paid |
$169,499.07 |
PRM 6100 24070131988 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/03/2024 |
Paid |
$21,289.16 |
PRM 6100 24062831693 |
Paving/Resurfacing, Alley and Parking Lot |
07/02/2024 |
Paid |
$5,550.90 |
PRM 6100 24062731573 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/01/2024 |
Paid |
$56,544.98 |
PRM 6100 24062731575 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/01/2024 |
Paid |
$14,708.14 |
PRM 6100 24062731578 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/01/2024 |
Paid |
$26,525.21 |
PRM 6100 24061730230 |
Paving/Resurfacing, Alley and Parking Lot |
06/20/2024 |
Paid |
$6,319.93 |
PRM 6100 24061730324 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/20/2024 |
Paid |
$148,599.18 |
PRM 6100 24061129638 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/13/2024 |
Paid |
$110,771.98 |
PRM 6100 24060729175 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/11/2024 |
Paid |
$163,441.57 |
PRM 6100 24060628998 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/10/2024 |
Paid |
$104,244.02 |
PRM 6100 24060428498 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/06/2024 |
Paid |
$350,724.10 |
PRM 6100 24060428500 |
Paving/Resurfacing, Street (Major and Residential) |
06/06/2024 |
Paid |
$94,765.27 |
PRM 6100 24060428502 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/06/2024 |
Paid |
$136,343.10 |
PRM 6100 24060428507 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/06/2024 |
Paid |
$60,514.34 |
PRM 6100 24052827731 |
Construction, Street (Major and Residential)(Incl Reconstruc |
05/30/2024 |
Paid |
$51,329.69 |
PRM 6100 24052427605 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/29/2024 |
Paid |
$206,081.46 |
PRM 6100 24052427610 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/29/2024 |
Paid |
$163,632.98 |
PRM 6100 24052427632 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/29/2024 |
Paid |
$164,128.86 |
PRM 6100 24052327453 |
Paving/Resurfacing, Street (Major and Residential) |
05/28/2024 |
Paid |
$309,117.75 |
PRM 6100 24052127020 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/23/2024 |
Paid |
$369,042.23 |
PRM 6100 24052127031 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/23/2024 |
Paid |
$147,844.74 |
PRM 6100 24050925719 |
Paving/Resurfacing, Street (Major and Residential) |
05/13/2024 |
Paid |
$58,948.45 |
PRM 6100 24050224839 |
Paving/Resurfacing, Alley and Parking Lot |
05/06/2024 |
Paid |
$19,002.90 |
PRM 6100 24042523944 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/29/2024 |
Paid |
$184,059.58 |
PRM 6100 24042523952 |
Paving/Resurfacing, Alley and Parking Lot |
04/29/2024 |
Paid |
$117,478.88 |
PRM 6100 24042523961 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/29/2024 |
Paid |
$381,528.24 |
PRM 6100 24042523982 |
Paving/Resurfacing, Street (Major and Residential) |
04/29/2024 |
Paid |
$24,610.00 |
PRM 6100 24042423753 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/26/2024 |
Paid |
$497,090.91 |
PRM 6100 24042423755 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/26/2024 |
Paid |
$102,909.01 |
PRM 6100 24041522443 |
Paving/Resurfacing, Street (Major and Residential) |
04/17/2024 |
Paid |
$24,558.75 |
PRM 6100 24041522445 |
Paving/Resurfacing, Street (Major and Residential) |
04/17/2024 |
Paid |
$49,960.00 |
PRM 6100 24041522530 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/17/2024 |
Paid |
$285,996.69 |
PRM 6100 24041522532 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/17/2024 |
Paid |
$276,894.39 |
PRM 6100 24041522539 |
Paving/Resurfacing, Street (Major and Residential) |
04/17/2024 |
Paid |
$30,713.75 |
PRM 6100 24041522543 |
Paving/Resurfacing, Street (Major and Residential) |
04/17/2024 |
Paid |
$24,160.00 |
PRM 6100 24041222319 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/16/2024 |
Paid |
$32,635.35 |
PRM 6100 24040921799 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/11/2024 |
Paid |
$154,648.10 |
PRM 6100 24040521600 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/09/2024 |
Paid |
$385,013.67 |
PRM 6100 24032920690 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/02/2024 |
Paid |
$18,959.17 |
PRM 6100 24032920690 |
Construction, Street (Major and Residential)(Incl Reconstruc |
04/02/2024 |
Paid |
$759,849.21 |
PRM 6100 24032720215 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/29/2024 |
Paid |
$29,190.02 |
PRM 6100 24032619973 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/28/2024 |
Paid |
$263,615.77 |
PRM 6100 24032619985 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/28/2024 |
Paid |
$53,291.82 |
PRM 6100 24032619985 |
Paving/Resurfacing, Street (Major and Residential) |
03/28/2024 |
Paid |
$268,061.74 |
PRM 6100 24032619989 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/28/2024 |
Paid |
$264,936.69 |
PRM 6100 24032619991 |
Paving/Resurfacing, Street (Major and Residential) |
03/28/2024 |
Paid |
$17,711.06 |
PRM 6100 24032619993 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/28/2024 |
Paid |
$23,437.70 |
PRM 6100 24031818792 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/20/2024 |
Paid |
$122,754.46 |
PRM 6100 24031818795 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/20/2024 |
Paid |
$110,051.19 |
PRM 6100 24031818804 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/20/2024 |
Paid |
$147,542.06 |
PRM 6100 24031518605 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/19/2024 |
Paid |
$109,409.31 |
PRM 6100 24031418499 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/18/2024 |
Paid |
$209,084.37 |
PRM 6100 24030517419 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/07/2024 |
Paid |
$141,658.66 |
PRM 6100 24030417162 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/06/2024 |
Paid |
$285,279.21 |
PRM 6100 24030116987 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/05/2024 |
Paid |
$13,419.54 |
PRM 6100 24030116987 |
Paving/Resurfacing, Street (Major and Residential) |
03/05/2024 |
Paid |
$206,656.19 |
PRM 6100 24030117003 |
Paving/Resurfacing, Street (Major and Residential) |
03/05/2024 |
Paid |
$15,070.00 |
PRM 6100 24022716497 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/29/2024 |
Paid |
$20,271.20 |
PRM 6100 24022115840 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/23/2024 |
Paid |
$241,492.01 |
PRM 6100 24021615356 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/21/2024 |
Paid |
$22,884.80 |
PRM 6100 24021615387 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/21/2024 |
Paid |
$24,999.75 |
PRM 6100 24021314902 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/15/2024 |
Paid |
$21,922.55 |
PRM 6100 24021314909 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/15/2024 |
Paid |
$6,519.12 |
PRM 6100 24021314922 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/15/2024 |
Paid |
$4,122.05 |
PRM 6100 24021214736 |
Paving/Resurfacing, Street (Major and Residential) |
02/14/2024 |
Paid |
$19,120.29 |
PRM 6100 24021214741 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/14/2024 |
Paid |
$24,980.31 |
PRM 6100 24021214741 |
Paving/Resurfacing, Street (Major and Residential) |
02/14/2024 |
Paid |
$35,400.93 |
PRM 6100 24021214836 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/14/2024 |
Paid |
$17,742.50 |
PRM 6100 24020814488 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/12/2024 |
Paid |
$216,377.60 |
PRM 6100 24020814492 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/12/2024 |
Paid |
$17,815.22 |
PRM 6100 24020614151 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/08/2024 |
Paid |
$119,644.54 |
PRM 6100 24020513856 |
Paving/Resurfacing, Street (Major and Residential) |
02/07/2024 |
Paid |
$286,330.00 |
PRM 6100 24020513864 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/07/2024 |
Paid |
$59,015.30 |
PRM 6100 24020113572 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/05/2024 |
Paid |
$22,217.53 |
PRM 6100 24012512730 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
01/29/2024 |
Paid |
$51,988.50 |
PRM 6100 24012512732 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
01/29/2024 |
Paid |
$256,737.81 |
PRM 6100 24012512736 |
Paving/Resurfacing, Street (Major and Residential) |
01/29/2024 |
Paid |
$50,568.63 |
PRM 6100 24012512741 |
Paving/Resurfacing, Street (Major and Residential) |
01/29/2024 |
Paid |
$198,550.00 |
PRM 6100 24012512757 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
01/29/2024 |
Paid |
$229,591.18 |
PRM 6100 24012512759 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
01/29/2024 |
Paid |
$131,254.66 |
PRM 6100 24011611564 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
01/18/2024 |
Paid |
$25,474.66 |
PRM 6100 24011611567 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
01/18/2024 |
Paid |
$314,368.09 |
PRM 6100 24011011048 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
01/12/2024 |
Paid |
$8,117.80 |
PRM 6100 24011011050 |
Paving/Resurfacing, Street (Major and Residential) |
01/12/2024 |
Paid |
$24,867.70 |
PRM 6100 24011011052 |
Paving/Resurfacing, Street (Major and Residential) |
01/12/2024 |
Paid |
$24,957.13 |
PRM 6100 24011011054 |
Paving/Resurfacing, Street (Major and Residential) |
01/12/2024 |
Paid |
$39,055.13 |
PRM 6100 24010510664 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
01/09/2024 |
Paid |
$4,167.53 |
PRM 6100 24010410390 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
01/08/2024 |
Paid |
$8,614.10 |
PRM 6100 24010310153 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
01/05/2024 |
Paid |
$83,629.58 |
PRM 6100 24010209963 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
01/04/2024 |
Paid |
$436,914.08 |
PRM 6100 23122909829 |
Paving/Resurfacing, Street (Major and Residential) |
01/03/2024 |
Paid |
$9,415.90 |
PRM 6100 23122909831 |
Paving/Resurfacing, Street (Major and Residential) |
01/03/2024 |
Paid |
$603,921.54 |
PRM 6100 23122209423 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/28/2023 |
Paid |
$128,847.33 |
PRM 6100 23122209427 |
Paving/Resurfacing, Street (Major and Residential) |
12/28/2023 |
Paid |
$122,086.40 |
PRM 6100 23122109279 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/27/2023 |
Paid |
$161,603.87 |
PRM 6100 23122009074 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/22/2023 |
Paid |
$188,462.87 |
PRM 6100 23121808591 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/20/2023 |
Paid |
$336,575.09 |
PRM 6100 23121808604 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/20/2023 |
Paid |
$76,263.52 |
PRM 6100 23121808606 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/20/2023 |
Paid |
$235,938.60 |
PRM 6100 23121808618 |
Paving/Resurfacing, Street (Major and Residential) |
12/20/2023 |
Paid |
$45,244.50 |
PRM 6100 23121808727 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/20/2023 |
Paid |
$263,212.11 |
PRM 6100 23121408290 |
Paving/Resurfacing, Street (Major and Residential) |
12/18/2023 |
Paid |
$178,902.10 |
PRM 6100 23121408293 |
Paving/Resurfacing, Alley and Parking Lot |
12/18/2023 |
Paid |
$92,935.54 |
PRM 6100 23121408325 |
Paving/Resurfacing, Alley and Parking Lot |
12/18/2023 |
Paid |
$4,990.79 |
PRM 6100 23121308058 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/15/2023 |
Paid |
$106,946.52 |
PRM 6100 23120506915 |
Paving/Resurfacing, Alley and Parking Lot |
12/07/2023 |
Paid |
$3,484.55 |
PRM 6100 23120506915 |
Paving/Resurfacing, Street (Major and Residential) |
12/07/2023 |
Paid |
$25,092.80 |
PRM 6100 23120506917 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/07/2023 |
Paid |
$242,850.87 |
PRM 6100 23120506920 |
Paving/Resurfacing, Street (Major and Residential) |
12/07/2023 |
Paid |
$1,432,610.96 |
PRM 6100 23120506922 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/07/2023 |
Paid |
$134,756.68 |
PRM 6100 23120506924 |
Paving/Resurfacing, Street (Major and Residential) |
12/07/2023 |
Paid |
$19,141.34 |
PRM 6100 23120506927 |
Paving/Resurfacing, Street (Major and Residential) |
12/07/2023 |
Paid |
$1,425,071.25 |
PRM 6100 23120506934 |
Paving/Resurfacing, Street (Major and Residential) |
12/07/2023 |
Paid |
$54,017.81 |
PRM 6100 23120406783 |
Paving/Resurfacing, Street (Major and Residential) |
12/06/2023 |
Paid |
$23,827.62 |
PRM 6100 23112205785 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/29/2023 |
Paid |
$153,087.27 |
PRM 6100 23112205788 |
Paving/Resurfacing, Street (Major and Residential) |
11/29/2023 |
Paid |
$1,157,735.31 |
PRM 6100 23112205794 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/29/2023 |
Paid |
$447,299.40 |
PRM 6100 23112205802 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/29/2023 |
Paid |
$18,475.44 |
PRM 6100 23112705932 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/29/2023 |
Paid |
$270,542.50 |
PRM 6100 23112105641 |
Paving/Resurfacing, Street (Major and Residential) |
11/27/2023 |
Paid |
$474,240.00 |
PRM 6100 23112105727 |
Paving/Resurfacing, Street (Major and Residential) |
11/27/2023 |
Paid |
$475,000.00 |
PRM 6100 23112105732 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/27/2023 |
Paid |
$3,676.71 |
PRM 6100 23112105736 |
Paving/Resurfacing, Alley and Parking Lot |
11/27/2023 |
Paid |
$15,798.17 |
PRM 6100 23111304636 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/15/2023 |
Paid |
$102,075.75 |
PRM 6100 23111304636 |
Paving/Resurfacing, Street (Major and Residential) |
11/15/2023 |
Paid |
$746,003.19 |
PRM 6100 23110704236 |
Paving/Resurfacing, Alley and Parking Lot |
11/09/2023 |
Paid |
$949.30 |
PRM 6100 23110704238 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/09/2023 |
Paid |
$127,039.09 |
PRM 6100 23110604100 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/08/2023 |
Paid |
$37,286.08 |
PRM 6100 23110604158 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/08/2023 |
Paid |
$8,200.78 |
PRM 6100 23110604158 |
Construction, Street (Major and Residential)(Incl Reconstruc |
11/08/2023 |
Paid |
$8,708.24 |
PRM 6100 23110604164 |
Paving/Resurfacing, Alley and Parking Lot |
11/08/2023 |
Paid |
$1,130.85 |
PRM 6100 23110303936 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/07/2023 |
Paid |
$78,318.95 |
PRM 6100 23103103507 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/02/2023 |
Paid |
$17,399.44 |
PRM 6100 23103003309 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/01/2023 |
Paid |
$177,801.31 |
PRM 6100 23103003314 |
Paving/Resurfacing, Street (Major and Residential) |
11/01/2023 |
Paid |
$275,401.20 |
PRM 6100 23102603094 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/30/2023 |
Paid |
$13,177.60 |
PRM 6100 23102603096 |
Paving/Resurfacing, Alley and Parking Lot |
10/30/2023 |
Paid |
$5,400.00 |
PRM 6100 23102402741 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/26/2023 |
Paid |
$28,552.73 |
PRM 6100 23102402744 |
Paving/Resurfacing, Street (Major and Residential) |
10/26/2023 |
Paid |
$34,566.08 |
PRM 6100 23102002566 |
Paving/Resurfacing, Street (Major and Residential) |
10/24/2023 |
Paid |
$476,763.20 |
PRM 6100 23101802121 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/20/2023 |
Paid |
$109,975.13 |
PRM 6100 23101802121 |
Paving/Resurfacing, Street (Major and Residential) |
10/20/2023 |
Paid |
$366,569.38 |
PRM 6100 23101701983 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/19/2023 |
Paid |
$312,508.99 |
PRM 6100 23101601809 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/18/2023 |
Paid |
$23,437.90 |
PRM 6100 23101601873 |
Paving/Resurfacing, Street (Major and Residential) |
10/18/2023 |
Paid |
$418,158.68 |
PRM 6100 23101301674 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/17/2023 |
Paid |
$149,214.12 |
PRM 6100 23101101136 |
Paving/Resurfacing, Street (Major and Residential) |
10/13/2023 |
Paid |
$561,470.28 |
PRM 6100 23100600766 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/10/2023 |
Paid |
$175,556.15 |
PRM 6100 23100400446 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/06/2023 |
Paid |
$24,545.30 |
PRM 6100 23100400546 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/06/2023 |
Paid |
$24,303.05 |
PRM 6100 23100300248 |
Paving/Resurfacing, Street (Major and Residential) |
10/05/2023 |
Paid |
$363,685.37 |
PRM 6100 23092937065 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/03/2023 |
Paid |
$20,012.59 |
PRM 6100 23092636470 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/28/2023 |
Paid |
$93,197.73 |
PRM 6100 23092636475 |
Paving/Resurfacing, Street (Major and Residential) |
09/28/2023 |
Paid |
$10,790.21 |
PRM 6100 23092636494 |
Paving/Resurfacing, Street (Major and Residential) |
09/28/2023 |
Paid |
$22,362.61 |
PRM 6100 23092136001 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/25/2023 |
Paid |
$12,097.39 |
PRM 6100 23092035772 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/22/2023 |
Paid |
$76,247.81 |
PRM 6100 23092035779 |
Paving/Resurfacing, Alley and Parking Lot |
09/22/2023 |
Paid |
$78,715.28 |
PRM 6100 23091935562 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/21/2023 |
Paid |
$191,378.34 |
PRM 6100 23091935567 |
Paving/Resurfacing, Street (Major and Residential) |
09/21/2023 |
Paid |
$10,204.41 |
PRM 6100 23091935569 |
Paving/Resurfacing, Street (Major and Residential) |
09/21/2023 |
Paid |
$13,222.53 |
PRM 6100 23091935585 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/21/2023 |
Paid |
$40,637.27 |
PRM 6100 23091935588 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/21/2023 |
Paid |
$191,657.21 |
PRM 6100 23091935591 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/21/2023 |
Paid |
$110,987.94 |
PRM 6100 23091935593 |
Paving/Resurfacing, Street (Major and Residential) |
09/21/2023 |
Paid |
$23,555.40 |
PRM 6100 23091935595 |
Paving/Resurfacing, Street (Major and Residential) |
09/21/2023 |
Paid |
$23,625.00 |
PRM 6100 23091835382 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/20/2023 |
Paid |
$37,924.89 |
PRM 6100 23091835458 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/20/2023 |
Paid |
$264,630.81 |
PRM 6100 23090734228 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/11/2023 |
Paid |
$262,507.26 |
PRM 6100 23090734228 |
Paving/Resurfacing, Alley and Parking Lot |
09/11/2023 |
Paid |
$1,142.85 |
PRM 6100 23090734234 |
Paving/Resurfacing, Alley and Parking Lot |
09/11/2023 |
Paid |
$59,282.05 |
PRM 6100 23090734240 |
Construction, Street (Major and Residential)(Incl Reconstruc |
09/11/2023 |
Paid |
$165,456.65 |
PRM 6100 23090734242 |
Paving/Resurfacing, Alley and Parking Lot |
09/11/2023 |
Paid |
$35,027.36 |
PRM 6100 23090734244 |
Paving/Resurfacing, Street (Major and Residential) |
09/11/2023 |
Paid |
$21,271.25 |
PRM 6100 23090633977 |
Paving/Resurfacing, Street (Major and Residential) |
09/08/2023 |
Paid |
$5,367.37 |
PRM 6100 23090633982 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/08/2023 |
Paid |
$109,695.09 |
PRM 6100 23090633985 |
Paving/Resurfacing, Alley and Parking Lot |
09/08/2023 |
Paid |
$14,747.50 |
PRM 6100 23090633988 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/08/2023 |
Paid |
$20,919.60 |
PRM 6100 23083133417 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/05/2023 |
Paid |
$102,783.20 |
PRM 6100 23083033257 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/01/2023 |
Paid |
$200,237.12 |
PRM 6100 23083033263 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/01/2023 |
Paid |
$99,696.25 |
PRM 6100 23082332419 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/25/2023 |
Paid |
$101,402.94 |
PRM 6100 23082332421 |
Paving/Resurfacing, Alley and Parking Lot |
08/25/2023 |
Paid |
$21,714.13 |
PRM 6100 23082332479 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/25/2023 |
Paid |
$22,064.36 |
PRM 6100 23081731905 |
Paving/Resurfacing, Alley and Parking Lot |
08/21/2023 |
Paid |
$7,912.75 |
PRM 6100 23081631595 |
Paving/Resurfacing, Street (Major and Residential) |
08/18/2023 |
Paid |
$30,614.69 |
PRM 6100 23081631713 |
Paving/Resurfacing, Street (Major and Residential) |
08/18/2023 |
Paid |
$60,867.85 |
PRM 6100 23081631715 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/18/2023 |
Paid |
$95,262.60 |
PRM 6100 23081631715 |
Paving/Resurfacing, Street (Major and Residential) |
08/18/2023 |
Paid |
$12,975.49 |
PRM 6100 23081431268 |
Paving/Resurfacing, Street (Major and Residential) |
08/16/2023 |
Paid |
$9,790.45 |
PRM 6100 23080930798 |
Paving/Resurfacing, Street (Major and Residential) |
08/11/2023 |
Paid |
$49,031.99 |
PRM 6100 23080830683 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/10/2023 |
Paid |
$7,440.87 |
PRM 6100 23080830686 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/10/2023 |
Paid |
$224,396.07 |
PRM 6100 23080830686 |
Paving/Resurfacing, Street (Major and Residential) |
08/10/2023 |
Paid |
$181,645.01 |
PRM 6100 23080830688 |
Paving/Resurfacing, Street (Major and Residential) |
08/10/2023 |
Paid |
$134,021.26 |
PRM 6100 23080830693 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/10/2023 |
Paid |
$122,402.97 |
PRM 6100 23080830693 |
Paving/Resurfacing, Street (Major and Residential) |
08/10/2023 |
Paid |
$2,355.37 |
PRM 6100 23080830696 |
Paving/Resurfacing, Street (Major and Residential) |
08/10/2023 |
Paid |
$397,107.40 |
PRM 6100 23080330270 |
Paving/Resurfacing, Street (Major and Residential) |
08/07/2023 |
Paid |
$230,564.86 |
PRM 6100 23080330272 |
Paving/Resurfacing, Street (Major and Residential) |
08/07/2023 |
Paid |
$193,883.85 |
PRM 6100 23080330279 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/07/2023 |
Paid |
$69,857.46 |
PRM 6100 23080330289 |
Paving/Resurfacing, Alley and Parking Lot |
08/07/2023 |
Paid |
$105,131.44 |
PRM 6100 23080330289 |
Paving/Resurfacing, Street (Major and Residential) |
08/07/2023 |
Paid |
$101,979.93 |
PRM 6100 23080330299 |
Paving/Resurfacing, Street (Major and Residential) |
08/07/2023 |
Paid |
$24,340.00 |
PRM 6100 23072128895 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/25/2023 |
Paid |
$77,469.95 |
PRM 6100 23071828520 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/20/2023 |
Paid |
$28,415.83 |
PRM 6100 23071828546 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/20/2023 |
Paid |
$140,450.28 |
PRM 6100 23071728371 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/19/2023 |
Paid |
$56,298.73 |
PRM 6100 23071728371 |
Paving/Resurfacing, Street (Major and Residential) |
07/19/2023 |
Paid |
$350,342.06 |
PRM 6100 23071728374 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/19/2023 |
Paid |
$132,629.39 |
PRM 6100 23071728374 |
Paving/Resurfacing, Street (Major and Residential) |
07/19/2023 |
Paid |
$870,646.94 |
PRM 6100 23071428225 |
Paving/Resurfacing, Street (Major and Residential) |
07/18/2023 |
Paid |
$328,684.32 |
PRM 6100 23071428230 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/18/2023 |
Paid |
$175,715.89 |
PRM 6100 23070727294 |
Construction, Street (Major and Residential)(Incl Reconstruc |
07/11/2023 |
Paid |
$102,263.04 |
PRM 6100 23070627119 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/10/2023 |
Paid |
$242,933.53 |
PRM 6100 23070627123 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/10/2023 |
Paid |
$215,459.63 |
PRM 6100 23070627130 |
Paving/Resurfacing, Street (Major and Residential) |
07/10/2023 |
Paid |
$16,594.31 |
PRM 6100 23070627134 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/10/2023 |
Paid |
$53,911.24 |
PRM 6100 23070627138 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/10/2023 |
Paid |
$47,522.87 |
PRM 6100 23070627165 |
Paving/Resurfacing, Street (Major and Residential) |
07/10/2023 |
Paid |
$24,850.00 |
PRM 6100 23070426892 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/06/2023 |
Paid |
$113,205.60 |
PRM 6100 23062726114 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/29/2023 |
Paid |
$58,280.45 |
PRM 6100 23062625953 |
Construction, Street (Major and Residential)(Incl Reconstruc |
06/28/2023 |
Paid |
$15,791.00 |
PRM 6100 23062325824 |
Paving/Resurfacing, Street (Major and Residential) |
06/27/2023 |
Paid |
$20,699.40 |
PRM 6100 23062325889 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/27/2023 |
Paid |
$364,362.33 |
PRM 6100 23062225686 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/26/2023 |
Paid |
$302,127.79 |
PRM 6100 23062125435 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/23/2023 |
Paid |
$233,848.24 |
PRM 6100 23062125550 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/23/2023 |
Paid |
$100,526.31 |
PRM 6100 23061525024 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/20/2023 |
Paid |
$81,155.65 |
PRM 6100 23061324849 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/15/2023 |
Paid |
$232,266.41 |
PRM 6100 23061324851 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/15/2023 |
Paid |
$69,302.40 |
PRM 6100 23061224804 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/14/2023 |
Paid |
$243,409.06 |
PRM 6100 23060924558 |
Paving/Resurfacing, Alley and Parking Lot |
06/13/2023 |
Paid |
$9,967.08 |
PRM 6100 23060924560 |
Paving/Resurfacing, Alley and Parking Lot |
06/13/2023 |
Paid |
$760.30 |
PRM 6100 23060624197 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/08/2023 |
Paid |
$31,290.71 |
PRM 6100 23060624216 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/08/2023 |
Paid |
$34,476.07 |
PRM 6100 23060123764 |
Paving/Resurfacing, Street (Major and Residential) |
06/05/2023 |
Paid |
$38,630.56 |
PRM 6100 23051722368 |
Paving/Resurfacing, Street (Major and Residential) |
05/19/2023 |
Paid |
$44,752.13 |
PRM 6100 23051722373 |
Paving/Resurfacing, Alley and Parking Lot |
05/19/2023 |
Paid |
$70,887.50 |
PRM 6100 23051622251 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/18/2023 |
Paid |
$168,188.97 |
PRM 6100 23051622262 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/18/2023 |
Paid |
$112,817.22 |
PRM 6100 23051021634 |
Construction, Street (Major and Residential)(Incl Reconstruc |
05/12/2023 |
Paid |
$3,490.06 |
PRM 6100 23050921505 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/11/2023 |
Paid |
$147,532.81 |
PRM 6100 23050921507 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/11/2023 |
Paid |
$82,378.69 |
PRM 6100 23050421069 |
Paving/Resurfacing, Street (Major and Residential) |
05/08/2023 |
Paid |
$12,491.32 |
PRM 6100 23050321001 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/05/2023 |
Paid |
$54,134.53 |
PRM 6100 23050220829 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/04/2023 |
Paid |
$84,213.74 |
PRM 6100 23050120650 |
Construction, Street (Major and Residential)(Incl Reconstruc |
05/03/2023 |
Paid |
$141,568.31 |
PRM 6100 23042720385 |
Paving/Resurfacing, Street (Major and Residential) |
05/01/2023 |
Paid |
$73,090.00 |
PRM 6100 23042720387 |
Paving/Resurfacing, Street (Major and Residential) |
05/01/2023 |
Paid |
$198,020.98 |
PRM 6100 23042620245 |
Paving/Resurfacing, Street (Major and Residential) |
04/28/2023 |
Paid |
$24,805.00 |
PRM 6100 23042620247 |
Paving/Resurfacing, Street (Major and Residential) |
04/28/2023 |
Paid |
$24,987.50 |
PRM 6100 23042520115 |
Paving/Resurfacing, Street (Major and Residential) |
04/27/2023 |
Paid |
$49,352.75 |
PRM 6100 23041719297 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/19/2023 |
Paid |
$109,661.91 |
PRM 6100 23041719311 |
Paving/Resurfacing, Alley and Parking Lot |
04/19/2023 |
Paid |
$361,055.10 |
PRM 6100 23041719314 |
Paving/Resurfacing, Alley and Parking Lot |
04/19/2023 |
Paid |
$214,560.50 |
PRM 6100 23032917424 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/03/2023 |
Paid |
$62,036.66 |
PRM 6100 23033117623 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/03/2023 |
Paid |
$144,227.58 |
PRM 6100 23032416956 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/27/2023 |
Paid |
$24,887.15 |
PRM 6100 23032116542 |
Construction, Street (Major and Residential)(Incl Reconstruc |
03/23/2023 |
Paid |
$79,711.65 |
PRM 6100 23032216699 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/23/2023 |
Paid |
$37,531.65 |
PRM 6100 23031716161 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/21/2023 |
Paid |
$89,590.70 |
PRM 6100 23030314593 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/07/2023 |
Paid |
$74,105.87 |
PRM 6100 23022113429 |
Paving/Resurfacing, Alley and Parking Lot |
02/23/2023 |
Paid |
$330,296.38 |
PRM 6100 23021412974 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/15/2023 |
Paid |
$85,263.96 |
PRM 6100 23021012560 |
Construction, Street (Major and Residential)(Incl Reconstruc |
02/14/2023 |
Paid |
$89,540.35 |
PRM 6100 23012611331 |
Paving/Resurfacing, Alley and Parking Lot |
01/30/2023 |
Paid |
$58,766.65 |
PRM 8600 23011810222 |
PAVEMENT MARKING LINES, LETTERS AND SYMBOLS |
01/19/2023 |
Paid |
$400.00 |
PRM 6100 22121907734 |
Paving/Resurfacing, Alley and Parking Lot |
12/21/2022 |
Paid |
$41,153.05 |
PRM 6100 22121507513 |
Paving/Resurfacing, Alley and Parking Lot |
12/19/2022 |
Paid |
$122,869.04 |
PRM 6100 22120806780 |
Paving/Resurfacing, Street (Major and Residential) |
12/12/2022 |
Paid |
$237,334.92 |
PRM 6100 22120606481 |
Paving/Resurfacing, Street (Major and Residential) |
12/08/2022 |
Paid |
$453,625.00 |
PRM 6100 22120506323 |
Paving/Resurfacing, Street (Major and Residential) |
12/07/2022 |
Paid |
$939,851.63 |
PRM 6100 22120206234 |
Paving/Resurfacing, Street (Major and Residential) |
12/06/2022 |
Paid |
$816,047.42 |
PRM 6100 22112505526 |
Paving/Resurfacing, Street (Major and Residential) |
11/29/2022 |
Paid |
$80,033.94 |
PRM 6100 22111504601 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/17/2022 |
Paid |
$47,662.45 |
PRM 6100 22110703832 |
Paving/Resurfacing, Alley and Parking Lot |
11/09/2022 |
Paid |
$22,886.45 |
PRM 6100 22110703862 |
Construction, Street (Major and Residential)(Incl Reconstruc |
11/09/2022 |
Paid |
$328.88 |
PRM 6100 22110303663 |
Paving/Resurfacing, Alley and Parking Lot |
11/07/2022 |
Paid |
$13,529.33 |
PRM 6100 22110303671 |
Paving/Resurfacing, Alley and Parking Lot |
11/07/2022 |
Paid |
$6,486.98 |
PRM 6100 22110203525 |
Paving/Resurfacing, Alley and Parking Lot |
11/04/2022 |
Paid |
$6,306.96 |
PRM 6100 22101802237 |
Paving/Resurfacing, Street (Major and Residential) |
10/20/2022 |
Paid |
$473,515.63 |
PRM 6100 22101701992 |
Paving/Resurfacing, Street (Major and Residential) |
10/19/2022 |
Paid |
$945,475.63 |
PRM 6100 22101701994 |
Paving/Resurfacing, Street (Major and Residential) |
10/19/2022 |
Paid |
$123,070.33 |
PRM 6100 22101401845 |
Paving/Resurfacing, Street (Major and Residential) |
10/18/2022 |
Paid |
$2,820,823.13 |
PRM 6100 22101701979 |
Paving/Resurfacing, Street (Major and Residential) |
10/18/2022 |
Paid |
$462,460.00 |
PRM 6100 22101201543 |
Paving/Resurfacing, Street (Major and Residential) |
10/13/2022 |
Paid |
$194,100.03 |
PRM 6100 22092232572 |
Paving/Resurfacing, Alley and Parking Lot |
09/26/2022 |
Paid |
$14,155.00 |
PRM 6100 22092232575 |
Construction, Street (Major and Residential)(Incl Reconstruc |
09/26/2022 |
Paid |
$66,311.10 |
PRM 6100 22092132412 |
Paving/Resurfacing, Alley and Parking Lot |
09/23/2022 |
Paid |
$33,720.25 |
PRM 6100 22090731175 |
Paving/Resurfacing, Alley and Parking Lot |
09/09/2022 |
Paid |
$150,342.25 |
PRM 6100 22090130703 |
Paving/Resurfacing, Alley and Parking Lot |
09/06/2022 |
Paid |
$189,374.43 |
PRM 6100 22090130712 |
Paving/Resurfacing, Alley and Parking Lot |
09/06/2022 |
Paid |
$1,001.15 |
PRM 6100 22081028499 |
Paving/Resurfacing, Street (Major and Residential) |
08/11/2022 |
Paid |
$291,261.45 |
PRM 6100 22080127735 |
Paving/Resurfacing, Street (Major and Residential) |
08/04/2022 |
Paid |
$448,875.00 |
PRM 6100 22072527006 |
Paving/Resurfacing, Street (Major and Residential) |
07/28/2022 |
Paid |
$927,176.25 |
PRM 6100 22072527009 |
Paving/Resurfacing, Street (Major and Residential) |
07/28/2022 |
Paid |
$466,925.00 |
PRM 6100 22072026627 |
Paving/Resurfacing, Street (Major and Residential) |
07/25/2022 |
Paid |
$361,202.99 |
PRM 6100 22072126706 |
Paving/Resurfacing, Street (Major and Residential) |
07/25/2022 |
Paid |
$470,582.50 |
PRM 6100 22072026607 |
Paving/Resurfacing, Street (Major and Residential) |
07/22/2022 |
Paid |
$2,529.48 |
PRM 6100 22061623511 |
Paving/Resurfacing, Street (Major and Residential) |
06/17/2022 |
Paid |
$123,186.97 |
PRM 6100 22061623513 |
Paving/Resurfacing, Street (Major and Residential) |
06/17/2022 |
Paid |
$265,060.57 |
PRM 6100 22060822801 |
Paving/Resurfacing, Alley and Parking Lot |
06/10/2022 |
Paid |
$20,536.88 |
PRM 6100 22060622557 |
Paving/Resurfacing, Alley and Parking Lot |
06/08/2022 |
Paid |
$15,704.24 |
PRM 6100 22051220526 |
Paving/Resurfacing, Street (Major and Residential) |
05/16/2022 |
Paid |
$70,993.03 |
PRM 6100 22051320658 |
Paving/Resurfacing, Street (Major and Residential) |
05/16/2022 |
Paid |
$125,661.73 |
PRM 6100 22051120373 |
Paving/Resurfacing, Street (Major and Residential) |
05/12/2022 |
Paid |
$304,398.77 |
PRM 6100 22050319669 |
Construction, Street (Major and Residential)(Incl Reconstruc |
05/05/2022 |
Paid |
$113,162.22 |
PRM 6100 22042819304 |
Construction, Street (Major and Residential)(Incl Reconstruc |
05/02/2022 |
Paid |
$153,342.49 |
PRM 6100 22042618995 |
Paving/Resurfacing, Alley and Parking Lot |
04/28/2022 |
Paid |
$1,074.25 |
PRM 6100 22041217837 |
Paving/Resurfacing, Street (Major and Residential) |
04/14/2022 |
Paid |
$48,060.03 |
PRM 6100 22040417054 |
Construction, Street (Major and Residential)(Incl Reconstruc |
04/06/2022 |
Paid |
$272,824.58 |
PRM 6100 22030714321 |
Construction, Street (Major and Residential)(Incl Reconstruc |
03/09/2022 |
Paid |
$179,530.62 |
PRM 6100 22030414140 |
Paving/Resurfacing, Street (Major and Residential) |
03/08/2022 |
Paid |
$386,684.75 |
PRM 6100 22030414142 |
Paving/Resurfacing, Alley and Parking Lot |
03/08/2022 |
Paid |
$13,626.70 |
PRM 6100 22030314000 |
Paving/Resurfacing, Street (Major and Residential) |
03/07/2022 |
Paid |
$96,400.98 |
PRM 6100 22022313143 |
Paving/Resurfacing, Street (Major and Residential) |
02/24/2022 |
Paid |
$132,107.00 |
PRM 6100 22021112098 |
Construction, Street (Major and Residential)(Incl Reconstruc |
02/15/2022 |
Paid |
$174,739.30 |
PRM 6100 22011809809 |
Paving/Resurfacing, Street (Major and Residential) |
01/20/2022 |
Paid |
$111,782.93 |
PRM 6100 22011409613 |
Paving/Resurfacing, Street (Major and Residential) |
01/18/2022 |
Paid |
$212,894.53 |
PRM 6100 21122107681 |
Construction, Street (Major and Residential)(Incl Reconstruc |
12/28/2021 |
Paid |
$173,506.04 |
PRM 6100 21120306106 |
Paving/Resurfacing, Street (Major and Residential) |
12/07/2021 |
Paid |
$102,444.51 |
PRM 6100 21120306119 |
Paving/Resurfacing, Street (Major and Residential) |
12/07/2021 |
Paid |
$74,235.63 |
PRM 6100 21120205934 |
Paving/Resurfacing, Street (Major and Residential) |
12/06/2021 |
Paid |
$272,980.03 |
PRM 6100 21111604400 |
Construction, Street (Major and Residential)(Incl Reconstruc |
11/18/2021 |
Paid |
$6,248.72 |
PRM 6100 21101401350 |
Construction, Street (Major and Residential)(Incl Reconstruc |
10/18/2021 |
Paid |
$92,425.47 |
PRM 6100 21100400282 |
Paving/Resurfacing, Alley and Parking Lot |
10/06/2021 |
Paid |
$392,405.10 |
PRM 6100 21092032572 |
Construction, Street (Major and Residential)(Incl Reconstruc |
09/21/2021 |
Paid |
$306,972.72 |
PRM 6100 21091532113 |
Paving/Resurfacing, Street (Major and Residential) |
09/17/2021 |
Paid |
$1,171,040.50 |
PRM 6100 21091431898 |
Construction, Street (Major and Residential)(Incl Reconstruc |
09/16/2021 |
Paid |
$107,939.00 |
PRM 6100 21091031541 |
Paving/Resurfacing, Street (Major and Residential) |
09/14/2021 |
Paid |
$307,752.77 |
PRM 6100 21091031592 |
Paving/Resurfacing, Street (Major and Residential) |
09/14/2021 |
Paid |
$365,817.61 |
PRM 6100 21080227960 |
Paving/Resurfacing, Alley and Parking Lot |
08/03/2021 |
Paid |
$262,106.62 |
PRM 6100 21071626363 |
Construction, Street (Major and Residential)(Incl Reconstruc |
07/20/2021 |
Paid |
$38,783.75 |
PRM 6100 21071526207 |
Construction, Street (Major and Residential)(Incl Reconstruc |
07/19/2021 |
Paid |
$197,755.46 |
PRM 6100 21062324108 |
Paving/Resurfacing, Alley and Parking Lot |
06/25/2021 |
Paid |
$63,474.77 |
PRM 6100 21061623274 |
Construction, Street (Major and Residential)(Incl Reconstruc |
06/21/2021 |
Paid |
$56,102.25 |
PRM 6100 21061122771 |
Construction, Street (Major and Residential)(Incl Reconstruc |
06/15/2021 |
Paid |
$1,411.08 |
PRM 6100 21061122773 |
Construction, Street (Major and Residential)(Incl Reconstruc |
06/15/2021 |
Paid |
$50,715.75 |
PRM 6100 21051820591 |
Paving/Resurfacing, Alley and Parking Lot |
05/20/2021 |
Paid |
$62,266.09 |
PRM 6100 21050319130 |
Paving/Resurfacing, Street (Major and Residential) |
05/05/2021 |
Paid |
$231,336.88 |
PRM 6100 21050319141 |
Construction, Street (Major and Residential)(Incl Reconstruc |
05/05/2021 |
Paid |
$236,211.76 |
PRM 6100 21042618443 |
Paving/Resurfacing, Alley and Parking Lot |
04/28/2021 |
Paid |
$172,639.67 |
PRM 6100 21041917645 |
Paving/Resurfacing, Alley and Parking Lot |
04/21/2021 |
Paid |
$104,513.73 |
PRM 6100 21041617538 |
Construction, Street (Major and Residential)(Incl Reconstruc |
04/20/2021 |
Paid |
$30,521.81 |
PRM 6100 21041617577 |
Construction, Street (Major and Residential)(Incl Reconstruc |
04/20/2021 |
Paid |
$80,013.83 |
PRM 6100 21041217104 |
Paving/Resurfacing, Street (Major and Residential) |
04/14/2021 |
Paid |
$246,534.31 |
PRM 6100 21032515529 |
Paving/Resurfacing, Alley and Parking Lot |
03/29/2021 |
Paid |
$110,626.60 |
PRM 6100 21030913714 |
Construction, Street (Major and Residential)(Incl Reconstruc |
03/11/2021 |
Paid |
$189,675.10 |
PRM 6100 21030813551 |
Paving/Resurfacing, Alley and Parking Lot |
03/10/2021 |
Paid |
$125,085.55 |
PRM 6100 21020911617 |
Paving/Resurfacing, Street (Major and Residential) |
02/11/2021 |
Paid |
$12,825.00 |
PRM 6100 21011108852 |
Paving/Resurfacing, Street (Major and Residential) |
01/13/2021 |
Paid |
$472,150.00 |
PRM 6100 21011108854 |
Paving/Resurfacing, Alley and Parking Lot |
01/13/2021 |
Paid |
$20,410.75 |
PRM 6100 21011108854 |
Paving/Resurfacing, Street (Major and Residential) |
01/13/2021 |
Paid |
$435,222.25 |
PRM 6100 21010808783 |
Paving/Resurfacing, Street (Major and Residential) |
01/12/2021 |
Paid |
$2,271,187.80 |
PRM 6100 21010808709 |
Paving/Resurfacing, Street (Major and Residential) |
01/11/2021 |
Paid |
$707,417.50 |
PRM 6100 21010508320 |
Paving/Resurfacing, Alley and Parking Lot |
01/07/2021 |
Paid |
$51,874.75 |
PRM 6100 20122207375 |
Construction, Street (Major and Residential)(Incl Reconstruc |
12/28/2020 |
Paid |
$73,392.25 |
PRM 6100 20121406627 |
Paving/Resurfacing, Street (Major and Residential) |
12/16/2020 |
Paid |
$1,625,260.00 |
PRM 6100 20091734205 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/21/2020 |
Paid |
$6,853.47 |
PRM 6100 20071427754 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/17/2020 |
Paid |
$111,872.57 |
PRM 6100 20071327591 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/15/2020 |
Paid |
$37,500.00 |
PRM 6100 20050121692 |
Construction, Street (Major and Residential)(Incl Reconstruc |
05/05/2020 |
Paid |
$107,249.99 |
PRM 6100 20031817186 |
Construction, Street (Major and Residential)(Incl Reconstruc |
03/20/2020 |
Paid |
$135,644.80 |
PRM 6100 20030515985 |
Construction, Street (Major and Residential)(Incl Reconstruc |
03/10/2020 |
Paid |
$398,730.20 |
PRM 6100 20022715103 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/28/2020 |
Paid |
$270,850.27 |
PRM 6100 20021813932 |
Construction, Street (Major and Residential)(Incl Reconstruc |
02/20/2020 |
Paid |
$268,729.35 |
PRM 6100 20021813935 |
Construction, Street (Major and Residential)(Incl Reconstruc |
02/20/2020 |
Paid |
$11,500.00 |
PRM 6100 19123108400 |
Construction, Street (Major and Residential)(Incl Reconstruc |
01/03/2020 |
Paid |
$264,697.08 |
PRM 6100 19120406095 |
Construction, Street (Major and Residential)(Incl Reconstruc |
12/06/2019 |
Paid |
$282,326.70 |
PRM 6100 19112105357 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/25/2019 |
Paid |
$229,207.42 |
PRM 6100 19110603815 |
Construction, Street (Major and Residential)(Incl Reconstruc |
11/08/2019 |
Paid |
$301,435.00 |
PRM 6100 19102903076 |
Construction, Street (Major and Residential)(Incl Reconstruc |
10/31/2019 |
Paid |
$386,186.88 |
PRM 6100 19100300339 |
Construction, Street (Major and Residential)(Incl Reconstruc |
10/07/2019 |
Paid |
$383,022.60 |
PRM 6100 19092734204 |
Construction, Street (Major and Residential)(Incl Reconstruc |
10/02/2019 |
Paid |
$366,977.40 |
PRM 6100 19092734208 |
Construction, Street (Major and Residential)(Incl Reconstruc |
10/02/2019 |
Paid |
$218,500.00 |
PRM 6100 19092734210 |
Construction, Street (Major and Residential)(Incl Reconstruc |
10/02/2019 |
Paid |
$12,500.00 |
PRM 6100 19091032170 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/11/2019 |
Paid |
$45,744.35 |
PRM 6100 19090431681 |
Construction, Street (Major and Residential)(Incl Reconstruc |
09/09/2019 |
Paid |
$237,500.00 |
PRM 6100 19081630094 |
Construction, Street (Major and Residential)(Incl Reconstruc |
08/20/2019 |
Paid |
$20,000.00 |
PRM 6100 19080829310 |
Construction, Street (Major and Residential)(Incl Reconstruc |
08/13/2019 |
Paid |
$17,500.00 |
PRM 6100 19070926114 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/12/2019 |
Paid |
$195,179.43 |
PRM 6100 19061123457 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/13/2019 |
Paid |
$101,734.49 |
PRM 6100 19051521134 |
Construction, Street (Major and Residential)(Incl Reconstruc |
05/17/2019 |
Paid |
$332,500.00 |
PRM 6100 19042919327 |
Construction, Street (Major and Residential)(Incl Reconstruc |
05/01/2019 |
Paid |
$37,500.00 |
PRM 6100 19041517908 |
Construction, Street (Major and Residential)(Incl Reconstruc |
04/16/2019 |
Paid |
$380,000.00 |
PRM 6100 19041017473 |
Construction, Street (Major and Residential)(Incl Reconstruc |
04/12/2019 |
Paid |
$37,500.00 |
PRM 6100 19030613900 |
Construction, Street (Major and Residential)(Incl Reconstruc |
03/08/2019 |
Paid |
$397,310.90 |
PRM 6100 19020410343 |
Construction, Street (Major and Residential)(Incl Reconstruc |
02/05/2019 |
Paid |
$213,750.00 |
PRM 6100 18122107172 |
Construction, Street (Major and Residential)(Incl Reconstruc |
12/27/2018 |
Paid |
$342,714.87 |
PRM 6100 18103002967 |
Construction, Street (Major and Residential)(Incl Reconstruc |
11/01/2018 |
Paid |
$213,750.00 |
PRM 6100 18100100055 |
Construction, Highway and Road |
10/03/2018 |
Paid |
$31,030.40 |
PRM 6100 18080127401 |
Construction, Street (Major and Residential)(Incl Reconstruc |
08/03/2018 |
Paid |
$257,474.23 |
PRM 6100 18061122670 |
Construction, Highway and Road |
06/13/2018 |
Paid |
$414,051.60 |
PRM 6100 18052120897 |
Construction, Highway and Road |
05/23/2018 |
Paid |
$175,526.03 |
PRM 6100 18052120899 |
Construction, Highway and Road |
05/23/2018 |
Paid |
$122,922.36 |
PRM 6100 18052120917 |
Construction, Highway and Road |
05/23/2018 |
Paid |
$179,584.35 |
PRM 6100 18050419607 |
Construction, Highway and Road |
05/07/2018 |
Paid |
$120,520.30 |
PRM 6100 18050219411 |
Construction, Highway and Road |
05/03/2018 |
Paid |
$134,252.03 |
PRM 6100 18042318379 |
Construction, Highway and Road |
04/25/2018 |
Paid |
$356,430.88 |
PRM 6100 18040917204 |
Construction, Highway and Road |
04/10/2018 |
Paid |
$145,270.01 |
PRM 6100 17120405679 |
Construction, Highway and Road |
12/05/2017 |
Paid |
$105,520.30 |
PRM 6100 17112104766 |
Construction, Highway and Road |
11/22/2017 |
Paid |
$272,667.67 |
PRM 6100 17080729816 |
Construction, Highway and Road |
08/08/2017 |
Paid |
$179,479.70 |
PRM 6100 17010409039 |
Construction, Highway and Road |
01/06/2017 |
Paid |
$202,093.96 |
PRM 6100 17010409042 |
Construction, Highway and Road |
01/06/2017 |
Paid |
$192,807.93 |
PRM 6100 16112104863 |
Construction, Highway and Road |
11/23/2016 |
Paid |
$187,317.58 |
PRM 6100 16112104868 |
Construction, Highway and Road |
11/23/2016 |
Paid |
$259,580.09 |
PRM 7500 16011311057 |
Maintenance and Repair, Parking Lot and Alley |
01/14/2016 |
Paid |
$22,856.97 |
PRM 6100 14120506796 |
CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING |
12/08/2014 |
Paid |
$20,371.04 |
PRM 6100 14102302947 |
CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING |
10/24/2014 |
Paid |
$79,388.37 |
PRM 6100 14090235502 |
CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING |
09/03/2014 |
Paid |
$307,661.43 |
PRM 6100 14021813918 |
CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING |
02/19/2014 |
Paid |
$24,390.92 |
PRM 6100 13082833543 |
CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING |
08/29/2013 |
Paid |
$44,504.97 |
PRM 6100 13080831848 |
CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING |
08/09/2013 |
Paid |
$279,363.75 |
PRM 6100 13070227151 |
CRACK SEALING. THIS WORK SHALL CONSIST OF SEALING |
07/03/2013 |
Paid |
$139,558.70 |