Data Drill Down for All Months & All Years
PAYMENT REQUEST
CATEGORY | CONTRACTUALS |
---|---|
EXPENSE CATEGORY | SERVICES-CONSTRUCTION CONTR |
PAYEE | S J LOUIS CONSTRUCTION OF TEXAS LTD |
PAYMENT REQUEST | Select a payment request. |
Payment Requests | Select from Below
PAYMENT REQUEST | DESCRIPTION | CHECK DATE | CHECK STATUS ![]() Checks cleared as of 01/31/2015 have been reflected as paid on the reports |
AMOUNT |
---|---|---|---|---|
PRM 6100 22011809729 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 01/20/2022 | Paid | $695,971.08 |
PRM 6100 21100500368 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 10/07/2021 | Paid | $13,553.81 |
PRM 6100 21083130619 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 09/02/2021 | Paid | $877,642.40 |
PRM 6100 21081028814 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 08/12/2021 | Paid | $289,939.40 |
PRM 6100 21071325964 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 07/15/2021 | Paid | $362,965.35 |
PRM 6100 21060922426 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 06/11/2021 | Paid | $384,197.41 |
PRM 6100 21052121015 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 05/25/2021 | Paid | $249,574.06 |
PRM 6100 21041917641 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 04/21/2021 | Paid | $323,284.74 |
PRM 6100 21031614462 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 03/18/2021 | Paid | $230,710.04 |
PRM 6100 21030212923 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 03/04/2021 | Paid | $344,877.43 |
PRM 6100 21012710338 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 01/29/2021 | Paid | $359,834.07 |
PRM 6100 20121707045 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 12/21/2020 | Paid | $432,126.33 |
PRM 6100 20113005177 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 12/02/2020 | Paid | $643,673.27 |
PRM 6100 20101901726 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 10/21/2020 | Paid | $1,166,021.63 |
PRM 6100 20091133626 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 09/15/2020 | Paid | $616,628.90 |
PRM 6100 20081831402 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 08/20/2020 | Paid | $1,039,574.55 |
PRM 6100 20072328918 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 07/27/2020 | Paid | $241,547.00 |
PRM 6100 20070126753 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 07/06/2020 | Paid | $495,416.25 |
PRM 6100 20052123548 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 05/27/2020 | Paid | $443,287.71 |
PRM 6100 20041319845 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 04/15/2020 | Paid | $422,783.25 |
PRM 6100 20032518005 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 03/27/2020 | Paid | $341,876.92 |
PRM 6100 20030215382 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 03/04/2020 | Paid | $1,215,291.30 |
PRM 6100 20012110432 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 01/23/2020 | Paid | $59,141.30 |
PRM 6100 19123008289 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 01/03/2020 | Paid | $249,572.49 |
PRM 6100 19120205908 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 12/04/2019 | Paid | $147,229.99 |
PRM 6100 19102903075 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 10/31/2019 | Paid | $152,509.99 |
PRM 6100 19100900658 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 10/11/2019 | Paid | $345,689.13 |
PRM 6100 19082130440 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 08/23/2019 | Paid | $121,592.82 |
PRM 6100 19072927907 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 08/01/2019 | Paid | $232,634.17 |
PRM 6100 19062524891 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 06/27/2019 | Paid | $299,316.48 |
PRM 6100 19052822174 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 05/31/2019 | Paid | $345,183.59 |
PRM 6100 19050119745 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 05/03/2019 | Paid | $518,173.70 |
PRM 6100 19031815014 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 03/20/2019 | Paid | $682,644.35 |
PRM 6100 19021912332 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 02/21/2019 | Paid | $1,083,663.10 |
PRM 6100 19013110019 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 02/04/2019 | Paid | $751,467.10 |
PRM 6100 19010908306 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 01/11/2019 | Paid | $1,026,365.76 |
PRM 6100 18112004619 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 11/26/2018 | Paid | $896,542.58 |
PRM 6100 18101601763 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 10/18/2018 | Paid | $1,045,584.25 |
PRM 6100 18091230982 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 09/14/2018 | Paid | $1,046,885.41 |
PRM 6100 18082028712 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 08/22/2018 | Paid | $831,728.80 |
PRM 6100 18071725958 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 07/19/2018 | Paid | $537,214.55 |
PRM 6100 18062023510 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 06/22/2018 | Paid | $363,146.05 |
PRM 6100 18052120906 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 05/23/2018 | Paid | $366,368.45 |
PRM 6100 18041617770 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 04/18/2018 | Paid | $713,818.60 |
PRM 6100 18032015415 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 03/22/2018 | Paid | $90,036.25 |
PRM 6100 18030614033 | Construction, Tunnel | 03/08/2018 | Paid | $292,337.96 |
PRM 6100 18021512352 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 02/20/2018 | Paid | $205,462.07 |
PRM 6100 18012610455 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 01/30/2018 | Paid | $1,124,653.54 |
PRM 6100 17122007390 | Construction, Tunnel | 12/22/2017 | Paid | $74,252.09 |
PRM 6100 17122007393 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 12/22/2017 | Paid | $819,123.63 |
PRM 6100 17121206636 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 12/14/2017 | Paid | $700,185.26 |
PRM 6100 17111604231 | Construction, Tunnel | 11/20/2017 | Paid | $156,847.85 |
PRM 6100 17103002850 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 11/01/2017 | Paid | $242,130.10 |
PRM 6100 17102002192 | Construction, Tunnel | 10/24/2017 | Paid | $564,627.54 |
PRM 6100 17100300137 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 10/05/2017 | Paid | $53,526.70 |
PRM 6100 17091934003 | Construction, Tunnel | 09/21/2017 | Paid | $53,057.23 |
PRM 6100 17091833856 | Construction, Tunnel | 09/20/2017 | Paid | $6,251.00 |
PRM 6100 17082931967 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 08/31/2017 | Paid | $182,658.75 |
PRM 6100 17082331475 | Construction, Tunnel | 08/28/2017 | Paid | $47,238.99 |
PRM 6100 17082431616 | Construction, Tunnel | 08/28/2017 | Paid | $116,203.72 |
PRM 6100 17082131194 | Construction, Tunnel | 08/23/2017 | Paid | $118,812.18 |
PRM 6100 17081530654 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 08/17/2017 | Paid | $577,823.85 |
PRM 6100 17080229490 | Construction, Tunnel | 08/04/2017 | Paid | $375,112.95 |
PRM 6100 17061925260 | Construction, Tunnel | 06/21/2017 | Paid | $330,079.16 |
PRM 6100 17052422991 | Construction, Tunnel | 05/26/2017 | Paid | $518,525.00 |
PRM 6100 17052222692 | Construction, Tunnel | 05/24/2017 | Paid | $992,719.41 |
PRM 6100 17051121870 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 05/15/2017 | Paid | $21,582.10 |
PRM 6100 17042520236 | Construction, Tunnel | 04/27/2017 | Paid | $1,198,153.27 |
PRM 6100 17041118693 | EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS | 04/13/2017 | Paid | $814,411.25 |
PRM 6100 17032417203 | Construction, Tunnel | 03/28/2017 | Paid | $717,512.51 |
PRM 6100 17022714416 | Construction, Tunnel | 03/01/2017 | Paid | $127,311.14 |
PRM 6100 17020612274 | Construction, Tunnel | 02/08/2017 | Paid | $69,765.58 |
PRM 6100 17013011461 | Construction, Tunnel | 02/01/2017 | Paid | $131,848.61 |
PRM 6100 17011009571 | Construction, Tunnel | 01/12/2017 | Paid | $59,266.96 |
PRM 6100 16111004091 | Construction, Tunnel | 11/15/2016 | Paid | $140,837.95 |
PRM 6100 16100400300 | Construction, Tunnel | 10/06/2016 | Paid | $393,900.33 |
PRM 6100 16092739063 | Construction, Tunnel | 09/29/2016 | Paid | $130,127.27 |
PRM 6100 16082435203 | Construction, Tunnel | 08/26/2016 | Paid | $207,097.48 |
PRM 6100 16082334985 | Construction, Tunnel | 08/25/2016 | Paid | $121,143.49 |
PRM 6100 16071831192 | Construction, Tunnel | 07/19/2016 | Paid | $204,860.57 |
PRM 6100 16062829044 | Construction, Tunnel | 06/29/2016 | Paid | $170,756.59 |
PRM 6100 16062428599 | Construction, Tunnel | 06/27/2016 | Paid | $214,054.07 |
PRM 6100 16060726466 | Construction, Tunnel | 06/08/2016 | Paid | $79,591.47 |
PRM 6100 16051624777 | Construction, Tunnel | 05/17/2016 | Paid | $42,616.10 |
PRM 6100 16050223628 | Construction, Tunnel | 05/04/2016 | Paid | $215,638.42 |
PRM 6100 16040620909 | Construction, Tunnel | 04/11/2016 | Paid | $108,866.44 |
PRM 6100 16032218985 | Construction, Tunnel | 03/28/2016 | Paid | $611,016.82 |
PRM 6100 16020112915 | Construction, Pipeline | 02/04/2016 | Paid | $174,426.01 |
PRM 6100 15122809039 | Construction, Tunnel | 12/29/2015 | Paid | $418,604.18 |
PRM 6100 15111604879 | Construction, Tunnel | 11/20/2015 | Paid | $104,714.55 |
PRM 6100 15102703053 | Construction, Pipeline | 11/02/2015 | Paid | $140,886.90 |
PRM 6100 15101901979 | Construction, Tunnel | 10/22/2015 | Paid | $127,988.75 |
PRM 6100 15090237324 | Construction, Tunnel | 09/08/2015 | Paid | $223,877.00 |
PRM 6100 15081034356 | Construction, Tunnel | 08/17/2015 | Paid | $281,963.80 |
PRM 6100 15080333548 | Construction, Tunnel | 08/07/2015 | Paid | $7,980.00 |
PRM 6100 15061828367 | Construction, Tunnel | 06/24/2015 | Paid | $35,820.70 |
PRM 6100 15060126394 | Construction, Pipeline | 06/05/2015 | Paid | $162,399.75 |
PRM 6100 15051925280 | Construction, Tunnel | 05/22/2015 | Paid | $560,167.50 |
PRM 6100 15042021858 | Construction, Tunnel | 04/24/2015 | Paid | $303,424.96 |
PRM 6100 15042021859 | Construction, Tunnel | 04/24/2015 | Paid | $690,141.64 |
PRM 6100 15042021860 | Construction, Pipeline | 04/24/2015 | Paid | $67,403.45 |
PRM 6100 15031717767 | Construction, Pipeline | 03/18/2015 | Paid | $28,050.06 |
PRM 6100 15020212714 | Construction, Tunnel | 02/04/2015 | Paid | $298,894.06 |
PRM 6100 14111705276 | Construction, Pipeline | 11/20/2014 | Paid | $143,380.71 |
PRM 6100 14111004740 | Construction, Tunnel | 11/13/2014 | Paid | $259,826.99 |
PRM 6100 14102703137 | Construction, Pipeline | 10/28/2014 | Paid | $856,327.90 |
PRM 6100 14102002420 | Construction, Tunnel | 10/22/2014 | Paid | $335,160.04 |
PRM 6100 14092337735 | Construction, Pipeline | 09/25/2014 | Paid | $1,038,550.38 |
PRM 6100 14091536839 | Construction, Tunnel | 09/17/2014 | Paid | $481,982.57 |
PRM 6100 14080632663 | Construction, Pipeline | 08/07/2014 | Paid | $951,889.03 |
PRM 6100 14080532559 | Construction, Tunnel | 08/06/2014 | Paid | $359,931.29 |
PRM 6100 14072230797 | Construction, Pipeline | 07/24/2014 | Paid | $430,605.92 |
PRM 6100 14070928862 | Construction, Tunnel | 07/11/2014 | Paid | $450,282.53 |
PRM 6100 14070728571 | Construction, Tunnel | 07/09/2014 | Paid | $1,066,943.48 |
PRM 6100 14050622229 | Construction, Tunnel | 05/07/2014 | Paid | $1,273,399.00 |
PRM 6100 14040819390 | Construction, Tunnel | 04/10/2014 | Paid | $1,244,369.38 |
PRM 6100 14031015867 | Construction, Tunnel | 03/12/2014 | Paid | $479,149.12 |
PRM 6100 14021213330 | Construction, Tunnel | 02/14/2014 | Paid | $462,493.25 |
PRM 6100 14011010519 | Construction, Tunnel | 01/14/2014 | Paid | $703,261.25 |
PRM 6100 13121207731 | Construction, Tunnel | 12/16/2013 | Paid | $1,130,077.25 |
PRM 6100 13110804869 | Construction, Tunnel | 11/12/2013 | Paid | $1,140,631.79 |
PRM 6100 13101000998 | Construction, Tunnel | 10/11/2013 | Paid | $1,429,051.75 |
PRM 6100 13091735415 | Construction, Tunnel | 09/18/2013 | Paid | $1,095,821.87 |
PRM 6100 13082232963 | Construction, Tunnel | 08/26/2013 | Paid | $386,331.75 |
PRM 6100 13070227154 | Construction, Tunnel | 07/05/2013 | Paid | $7,006.34 |
PRM 6100 13060524977 | Construction, Tunnel | 06/06/2013 | Paid | $1,307,882.38 |
PRM 6100 13050722153 | Construction, Tunnel | 05/08/2013 | Paid | $1,264,711.25 |
PRM 6100 13040218570 | Construction, Tunnel | 04/03/2013 | Paid | $1,487,343.75 |
PRM 6100 13031917331 | Construction, Pipeline | 03/20/2013 | Paid | $50,111.26 |
PRM 6100 13030415690 | Construction, Tunnel | 03/06/2013 | Paid | $1,189,518.75 |
PRM 6100 13020513192 | Construction, Tunnel | 02/06/2013 | Paid | $1,354,904.25 |
PRM 6100 13010709660 | Construction, Tunnel | 01/09/2013 | Paid | $1,408,256.25 |
PRM 6100 12120306421 | Construction, Tunnel | 12/06/2012 | Paid | $1,255,662.50 |
PRM 6100 12110504091 | Construction, Tunnel | 11/06/2012 | Paid | $1,699,075.00 |
PRM 6100 12102202631 | Construction, Pipeline | 10/23/2012 | Paid | $50,219.19 |
PRM 6100 12100200265 | Construction, Tunnel | 10/04/2012 | Paid | $1,557,762.50 |
PRM 6100 12091033314 | Construction, Tunnel | 09/11/2012 | Paid | $954,037.50 |
PRM 6100 12080729707 | Construction, Tunnel | 08/08/2012 | Paid | $1,354,544.44 |
PRM 6100 12073129033 | Construction, Pipeline | 08/02/2012 | Paid | $25,053.65 |
PRM 6100 12070226259 | Construction, Tunnel | 07/03/2012 | Paid | $1,349,820.56 |
PRM 6100 12060423395 | Construction, Tunnel | 06/06/2012 | Paid | $998,901.25 |
PRM 6100 12052422412 | Construction, Pipeline | 05/29/2012 | Paid | $326,992.67 |
PRM 6100 12050921104 | Construction, Tunnel | 05/10/2012 | Paid | $1,350,425.00 |
PRM 6100 12041919098 | Construction, Pipeline | 04/23/2012 | Paid | $252,215.63 |
PRM 6100 12041218318 | Construction, Pipeline | 04/13/2012 | Paid | $95,415.13 |
PRM 6100 12040217330 | Construction, Tunnel | 04/04/2012 | Paid | $1,684,017.50 |
PRM 6100 12030514432 | Construction, Tunnel | 03/07/2012 | Paid | $925,567.19 |
PRM 6100 12022813802 | Construction, Pipeline | 03/01/2012 | Paid | $436,753.00 |
PRM 6100 12020611631 | Construction, Tunnel | 02/07/2012 | Paid | $2,100,331.25 |
PRM 6100 12012610798 | Construction, Pipeline | 01/30/2012 | Paid | $361,665.00 |
PRM 6100 12010909112 | Construction, Tunnel | 01/10/2012 | Paid | $1,169,871.56 |
PRM 6100 11122007676 | Construction, Tunnel | 12/22/2011 | Paid | $560,856.25 |
PRM 6100 11121907524 | Construction, Pipeline | 12/20/2011 | Paid | $597,388.50 |
PRM 6100 11121407069 | Construction, Pipeline | 12/15/2011 | Paid | $436,781.21 |
PRM 6100 11112205297 | Construction, Pipeline | 11/23/2011 | Paid | $185,187.31 |
PRM 6100 11110703895 | Construction, Tunnel | 11/08/2011 | Paid | $1,521,496.25 |
PRM 6100 11100300100 | Construction, Tunnel | 10/04/2011 | Paid | $588,120.32 |
PRM 6100 11092635433 | Construction, Pipeline | 09/28/2011 | Paid | $1,032,131.29 |
PRM 6100 11090733735 | Construction, Tunnel | 09/09/2011 | Paid | $2,371,840.80 |
PRM 6100 11081531341 | Construction, Pipeline | 08/16/2011 | Paid | $791,763.25 |
PRM 6100 11080430261 | Construction, Tunnel | 08/05/2011 | Paid | $75,760.60 |
PRM 6100 11072028780 | Construction, Pipeline | 07/22/2011 | Paid | $337,909.68 |
PRM 6100 11070627482 | Construction, Tunnel | 07/07/2011 | Paid | $38,161.50 |
PRM 6100 11062126196 | Construction, Pipeline | 06/23/2011 | Paid | $499,340.26 |
PRM 6100 11060824907 | Construction, Tunnel | 06/10/2011 | Paid | $411,551.87 |
PRM 6100 11051122513 | Construction, Pipeline | 05/13/2011 | Paid | $361,056.57 |
PRM 6100 11041820108 | Construction, Pipeline | 04/19/2011 | Paid | $266,996.46 |
PRM 6100 11031816990 | Construction, Pipeline | 03/21/2011 | Paid | $150,784.91 |
PRM 6100 11022414500 | Construction, Pipeline | 02/25/2011 | Paid | $243,267.27 |
PRM 6100 11011910985 | Construction, Pipeline | 01/20/2011 | Paid | $301,237.79 |
PRM 6100 10122808666 | Construction, Pipeline | 12/29/2010 | Paid | $689,110.57 |