Data Drill Down for All Months & All Years
PAYMENT REQUEST
CATEGORY | CONTRACTUALS |
---|---|
EXPENSE CATEGORY | SERVICES-CONSTRUCTION CONTR |
PAYEE | MUNIZ CONCRETE & CONTRACTING INC |
PAYMENT REQUEST | Select a payment request. |
Payment Requests | Select from Below
PAYMENT REQUEST | DESCRIPTION | CHECK DATE | CHECK STATUS ![]() Checks cleared as of 01/31/2015 have been reflected as paid on the reports |
AMOUNT |
---|---|---|---|---|
PRM 6100 25031219474 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/14/2025 | Outstanding | $17,174.47 |
PRM 6100 25030318192 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/05/2025 | Paid | $56,383.94 |
PRM 6100 25022617607 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/28/2025 | Paid | $13,068.95 |
PRM 6100 25022617612 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/28/2025 | Paid | $125,264.44 |
PRM 6100 25022617614 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/28/2025 | Paid | $242,327.30 |
PRM 6100 25022617636 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/28/2025 | Paid | $48,006.33 |
PRM 6100 25022117011 | CONSTRUCTION SERVICES, GENERAL | 02/25/2025 | Paid | $386,413.90 |
PRM 6100 25022117016 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/25/2025 | Paid | $237,010.96 |
PRM 6100 25021916606 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/21/2025 | Paid | $438,537.30 |
PRM 6100 25021916621 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/21/2025 | Paid | $235,810.14 |
PRM 6100 25021316056 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/18/2025 | Paid | $568,716.51 |
PRM 6100 25021015523 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/12/2025 | Paid | $154,157.43 |
PRM 6100 25021015526 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/12/2025 | Paid | $248,310.00 |
PRM 6100 25021015537 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/12/2025 | Paid | $234,757.91 |
PRM 6100 25013114525 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/04/2025 | Paid | $115,060.45 |
PRM 6100 25012713847 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/29/2025 | Paid | $2,787.87 |
PRM 6100 25012413697 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/28/2025 | Paid | $11,445.12 |
PRM 6100 25012113087 | CONSTRUCTION SERVICES, GENERAL | 01/23/2025 | Paid | $466,718.90 |
PRM 6100 25011712906 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/22/2025 | Paid | $21,101.54 |
PRM 6100 25011712927 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/22/2025 | Paid | $116,323.00 |
PRM 6100 25012012993 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/22/2025 | Paid | $621,681.26 |
PRM 6100 25012012995 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/22/2025 | Paid | $175,953.15 |
PRM 6100 25011412221 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/16/2025 | Paid | $210,407.11 |
PRM 6100 25011012009 | Site Work | 01/14/2025 | Paid | $88,846.46 |
PRM 6100 24123110823 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/03/2025 | Paid | $288,594.73 |
PRM 6100 24121709283 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/19/2024 | Paid | $183,018.32 |
PRM 6100 24121608959 | CONSTRUCTION SERVICES, GENERAL | 12/18/2024 | Paid | $513,449.67 |
PRM 6100 24121208658 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/16/2024 | Paid | $606,294.40 |
PRM 6100 24121008297 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/12/2024 | Paid | $421,354.05 |
PRM 6100 24120507710 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/09/2024 | Paid | $212,909.47 |
PRM 6000 24120407499 | CONSTRUCTION SERVICES, GENERAL | 12/06/2024 | Paid | $188,165.08 |
PRM 6100 24120407504 | CONSTRUCTION SERVICES, GENERAL | 12/06/2024 | Paid | $272,815.00 |
PRM 6100 24120307317 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/05/2024 | Paid | $84,303.82 |
PRM 6100 24112706995 | CONSTRUCTION SERVICES, GENERAL | 12/04/2024 | Paid | $326,165.76 |
PRM 6100 24120207105 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/04/2024 | Paid | $151,295.32 |
PRM 6100 24120207105 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/04/2024 | Paid | $400,929.49 |
PRM 6100 24120207108 | DRIVEWAY PAVEMENT, PORTLAND CEMENT CONCRETE. | 12/04/2024 | Paid | $182,843.06 |
PRM 6100 24111805726 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/20/2024 | Paid | $73,101.61 |
PRM 6100 24102403091 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/28/2024 | Paid | $39,674.42 |
PRM 6100 24102202773 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/24/2024 | Paid | $319,004.26 |
PRM 6100 24102202779 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/24/2024 | Paid | $192,965.11 |
PRM 6100 24102102577 | Construction, Parking Lot and Alley | 10/23/2024 | Paid | $14,087.56 |
PRM 6100 24101502061 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/17/2024 | Paid | $199,983.99 |
PRM 6100 24101502089 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/17/2024 | Paid | $199,984.31 |
PRM 6100 24101401863 | Concrete | 10/16/2024 | Paid | $303,269.61 |
PRM 6100 24100901430 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/11/2024 | Paid | $403,698.49 |
PRM 6100 24100200396 | CONSTRUCTION SERVICES, GENERAL | 10/04/2024 | Paid | $258,330.10 |
PRM 6100 24091341388 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/17/2024 | Paid | $156,106.40 |
PRM 6100 24091140989 | CONSTRUCTION SERVICES, GENERAL | 09/13/2024 | Paid | $209,750.91 |
PRM 6100 24090340081 | CONSTRUCTION SERVICES, GENERAL | 09/05/2024 | Paid | $315,188.89 |
PRM 6100 24090340091 | CONSTRUCTION SERVICES, GENERAL | 09/05/2024 | Paid | $348,118.26 |
PRM 6100 24082639181 | CONSTRUCTION SERVICES, GENERAL | 08/28/2024 | Paid | $151,120.87 |
PRM 6100 24082339028 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/27/2024 | Paid | $189,234.89 |
PRM 6100 24082038390 | CONSTRUCTION SERVICES, GENERAL | 08/22/2024 | Paid | $22,646.54 |
PRM 6100 24081638016 | CONSTRUCTION SERVICES, GENERAL | 08/20/2024 | Paid | $333,233.46 |
PRM 6100 24081537805 | DRIVEWAY PAVEMENT, PORTLAND CEMENT CONCRETE. | 08/19/2024 | Paid | $236,680.67 |
PRM 6100 24081237275 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/14/2024 | Paid | $199,984.31 |
PRM 6100 24080937086 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/13/2024 | Paid | $3,085.67 |
PRM 6100 24073035549 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/01/2024 | Paid | $267,225.01 |
PRM 6100 24073035562 | CONSTRUCTION SERVICES, GENERAL | 08/01/2024 | Paid | $521,276.71 |
PRM 6100 24073035582 | CONSTRUCTION SERVICES, GENERAL | 08/01/2024 | Paid | $196,898.13 |
PRM 6100 24073035596 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/01/2024 | Paid | $124,128.07 |
PRM 6100 24072534989 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/29/2024 | Paid | $217,806.74 |
PRM 6100 24072334604 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/25/2024 | Paid | $274,676.11 |
PRM 6100 24071533541 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/17/2024 | Paid | $449,040.38 |
PRM 6100 24071133217 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/15/2024 | Paid | $199,263.73 |
PRM 6100 24062831701 | CONSTRUCTION SERVICES, GENERAL | 07/02/2024 | Paid | $89,677.54 |
PRM 6100 24062531233 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/27/2024 | Paid | $321,187.81 |
PRM 6100 24062531242 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/27/2024 | Paid | $165,005.93 |
PRM 6100 24062130893 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/25/2024 | Paid | $7,385.31 |
PRM 6100 24061229948 | CONSTRUCTION SERVICES, GENERAL | 06/14/2024 | Paid | $76,010.48 |
PRM 6100 24061229953 | CONSTRUCTION SERVICES, GENERAL | 06/14/2024 | Paid | $253,396.33 |
PRM 6100 24061029563 | CONSTRUCTION SERVICES, GENERAL | 06/12/2024 | Paid | $643,087.95 |
PRM 6100 24061029565 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/12/2024 | Paid | $66,673.45 |
PRM 6100 24060729301 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/11/2024 | Paid | $112,858.51 |
PRM 6100 24060628982 | DRIVEWAY PAVEMENT, PORTLAND CEMENT CONCRETE. | 06/10/2024 | Paid | $318,116.44 |
PRM 6100 24060428487 | CONSTRUCTION SERVICES, GENERAL | 06/06/2024 | Paid | $30,224.74 |
PRM 6100 24060428506 | CONSTRUCTION SERVICES, GENERAL | 06/06/2024 | Paid | $316,125.70 |
PRM 6100 24053128172 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/04/2024 | Paid | $250,638.27 |
PRM 6100 24052427636 | CONSTRUCTION SERVICES, GENERAL | 05/29/2024 | Paid | $61,159.25 |
PRM 6100 24052026734 | CONSTRUCTION SERVICES, GENERAL | 05/22/2024 | Paid | $290,895.93 |
PRM 6100 24042523950 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/29/2024 | Paid | $368,660.37 |
PRM 6100 24042523954 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/29/2024 | Paid | $51,109.09 |
PRM 6100 24042523963 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/29/2024 | Paid | $119,295.98 |
PRM 6100 24042423868 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/26/2024 | Paid | $11,243.49 |
PRM 6100 24041923223 | DRIVEWAY PAVEMENT, PORTLAND CEMENT CONCRETE. | 04/23/2024 | Paid | $230,574.34 |
PRM 6100 24041823048 | Electrical | 04/22/2024 | Paid | $50,286.40 |
PRM 6100 24041622636 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/18/2024 | Paid | $352,952.28 |
PRM 6100 24041522431 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/17/2024 | Paid | $58,627.73 |
PRM 6100 24041522438 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/17/2024 | Paid | $394,493.11 |
PRM 6100 24041222333 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/16/2024 | Paid | $277,627.71 |
PRM 6100 24041022013 | CONSTRUCTION SERVICES, GENERAL | 04/12/2024 | Paid | $452,457.91 |
PRM 6100 24040521601 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/09/2024 | Paid | $100,512.02 |
PRM 6100 24040221002 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/04/2024 | Paid | $63,751.26 |
PRM 6100 24040120832 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/03/2024 | Paid | $115,215.30 |
PRM 6100 24032820515 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/01/2024 | Paid | $549,835.63 |
PRM 6100 24032619951 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/28/2024 | Paid | $184,134.63 |
PRM 6100 24031818806 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/20/2024 | Paid | $237,500.53 |
PRM 6100 24031818918 | CONSTRUCTION SERVICES, GENERAL | 03/20/2024 | Paid | $213,147.13 |
PRM 6100 24031818938 | DRIVEWAY PAVEMENT, PORTLAND CEMENT CONCRETE. | 03/20/2024 | Paid | $163,972.36 |
PRM 6100 24030417248 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/06/2024 | Paid | $115,297.90 |
PRM 6100 24030417260 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/06/2024 | Paid | $491,207.93 |
PRM 6100 24030116989 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/05/2024 | Paid | $97,357.29 |
PRM 6100 24030117097 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/05/2024 | Paid | $575,055.80 |
PRM 6100 24021314905 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/15/2024 | Paid | $225,692.58 |
PRM 6100 24020914615 | Site Work | 02/13/2024 | Paid | $23,915.25 |
PRM 6100 24020714275 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/09/2024 | Paid | $359,060.23 |
PRM 6100 24020614090 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/08/2024 | Paid | $274,142.93 |
PRM 6100 24020513860 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/07/2024 | Paid | $346,037.09 |
PRM 6100 24020113565 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/05/2024 | Paid | $19,557.75 |
PRM 6100 24012612913 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/30/2024 | Paid | $241,052.25 |
PRM 6100 24011011059 | Site Work | 01/12/2024 | Paid | $116,469.34 |
PRM 6100 24010810737 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/10/2024 | Paid | $256,599.71 |
PRM 6100 24010410379 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/08/2024 | Paid | $217,540.45 |
PRM 6100 23122909805 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/03/2024 | Paid | $309,002.15 |
PRM 6100 23121808722 | Site Work | 12/20/2023 | Paid | $170,378.28 |
PRM 6100 23121508438 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/19/2023 | Paid | $174,687.21 |
PRM 6100 23121408287 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/18/2023 | Paid | $353,176.43 |
PRM 6100 23121408294 | CONSTRUCTION SERVICES, GENERAL | 12/18/2023 | Paid | $86,798.24 |
PRM 6100 23121408322 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/18/2023 | Paid | $59,480.05 |
PRM 6100 23120506925 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/07/2023 | Paid | $182,995.79 |
PRM 6100 23120506933 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/07/2023 | Paid | $229,083.52 |
PRM 6100 23120406681 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/06/2023 | Paid | $239,453.95 |
PRM 6100 23112205804 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/29/2023 | Paid | $159,098.61 |
PRM 6100 23112105628 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/27/2023 | Paid | $258,482.73 |
PRM 6100 23112105722 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/27/2023 | Paid | $62,567.53 |
PRM 6100 23111705349 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/21/2023 | Paid | $988,687.84 |
PRM 6100 23111705351 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/21/2023 | Paid | $193,166.00 |
PRM 6100 23111605123 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/20/2023 | Paid | $112,047.66 |
PRM 6100 23111504939 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/17/2023 | Paid | $70,752.50 |
PRM 6100 23111404763 | Site Work | 11/16/2023 | Paid | $176,230.85 |
PRM 6100 23111304577 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/15/2023 | Paid | $123,975.50 |
PRM 6100 23110604159 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/08/2023 | Paid | $93,232.07 |
PRM 6100 23110604165 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/08/2023 | Paid | $79,061.46 |
PRM 6100 23101301672 | Site Work | 10/17/2023 | Paid | $193,889.63 |
PRM 6100 23100600765 | Concrete | 10/10/2023 | Paid | $929,296.90 |
PRM 6100 23100600799 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/10/2023 | Paid | $91,586.33 |
PRM 6100 23100600802 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/10/2023 | Paid | $158,398.13 |
PRM 6100 23100500652 | CONSTRUCTION SERVICES, GENERAL | 10/09/2023 | Paid | $316,747.48 |
PRM 6100 23100500664 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/09/2023 | Paid | $137,667.80 |
PRM 6100 23100400437 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/06/2023 | Paid | $43,403.96 |
PRM 6100 23100400537 | Construction, Parking Lot and Alley | 10/06/2023 | Paid | $121,491.64 |
PRM 6100 23100400537 | Masonry | 10/06/2023 | Paid | $26,131.72 |
PRM 6100 23100300218 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/05/2023 | Paid | $94,613.60 |
PRM 6100 23100300246 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/05/2023 | Paid | $43,385.42 |
PRM 6100 23092636474 | Site Work | 09/28/2023 | Paid | $101,507.24 |
PRM 6100 23092135995 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/25/2023 | Paid | $294,131.98 |
PRM 6100 23091935571 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/21/2023 | Paid | $200,618.81 |
PRM 6100 23091935587 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/21/2023 | Paid | $236,645.49 |
PRM 6100 23091835365 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/20/2023 | Paid | $97,619.55 |
PRM 6100 23091835373 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/20/2023 | Paid | $340,900.62 |
PRM 6100 23090734232 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/11/2023 | Paid | $184,862.47 |
PRM 6100 23090533784 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/07/2023 | Paid | $202,781.99 |
PRM 6100 23083133415 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/05/2023 | Paid | $167,013.95 |
PRM 6100 23083133440 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/05/2023 | Paid | $72,796.52 |
PRM 6100 23083033256 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/01/2023 | Paid | $123,789.40 |
PRM 6100 23083033258 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/01/2023 | Paid | $96,424.08 |
PRM 6100 23083033325 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/01/2023 | Paid | $114,976.24 |
PRM 6100 23082332418 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/25/2023 | Paid | $177,531.34 |
PRM 6100 23082332420 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/25/2023 | Paid | $208,241.02 |
PRM 6100 23082332428 | CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, | 08/25/2023 | Paid | $37,671.27 |
PRM 6100 23082332428 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/25/2023 | Paid | $200,848.48 |
PRM 6100 23082232268 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/24/2023 | Paid | $174,249.23 |
PRM 6100 23081631596 | Site Work | 08/18/2023 | Paid | $487,809.66 |
PRM 6100 23081631730 | CONSTRUCTION SERVICES, GENERAL | 08/18/2023 | Paid | $475,057.24 |
PRM 6100 23081030981 | Concrete, Precast | 08/14/2023 | Paid | $89,149.42 |
PRM 6100 23080830675 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/10/2023 | Paid | $298,745.44 |
PRM 6100 23080830684 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/10/2023 | Paid | $62,464.28 |
PRM 6100 23080430414 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/08/2023 | Paid | $259,844.61 |
PRM 6100 23080430428 | Concrete | 08/08/2023 | Paid | $681,207.40 |
PRM 6100 23080430435 | Demolition Services | 08/08/2023 | Paid | $84,551.82 |
PRM 6100 23080330278 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/07/2023 | Paid | $371,375.08 |
PRM 6100 23080330280 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/07/2023 | Paid | $34,664.08 |
PRM 6100 23080330284 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/07/2023 | Paid | $134,505.46 |
PRM 6100 23080330286 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/07/2023 | Paid | $146,441.72 |
PRM 6100 23072729572 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/31/2023 | Paid | $117,415.68 |
PRM 6100 23072429067 | CONSTRUCTION SERVICES, GENERAL | 07/26/2023 | Paid | $163,149.03 |
PRM 6100 23072128893 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/25/2023 | Paid | $350,807.45 |
PRM 6100 23071828521 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/20/2023 | Paid | $62,888.76 |
PRM 6100 23071728370 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/19/2023 | Paid | $182,446.01 |
PRM 6100 23071728373 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/19/2023 | Paid | $267,036.93 |
PRM 6100 23071728377 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/19/2023 | Paid | $147,069.19 |
PRM 6100 23071027508 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/12/2023 | Paid | $130,308.18 |
PRM 6100 23070627142 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/10/2023 | Paid | $94,374.67 |
PRM 6100 23070627164 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/10/2023 | Paid | $311,139.01 |
PRM 6100 23070627166 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/10/2023 | Paid | $221,732.67 |
PRM 6100 23062625954 | Demolition Services | 06/28/2023 | Paid | $6,918.82 |
PRM 6100 23062325818 | Electrical | 06/27/2023 | Paid | $379,200.16 |
PRM 6100 23062325821 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/27/2023 | Paid | $415,440.61 |
PRM 6100 23062325887 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/27/2023 | Paid | $235,004.47 |
PRM 6100 23062225661 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/26/2023 | Paid | $468,094.60 |
PRM 6100 23062225684 | CONSTRUCTION SERVICES, GENERAL | 06/26/2023 | Paid | $216,017.79 |
PRM 6100 23062225684 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/26/2023 | Paid | $41,419.09 |
PRM 6100 23062125566 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/23/2023 | Paid | $54,813.56 |
PRM 6100 23061324850 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/15/2023 | Paid | $38,077.13 |
PRM 6100 23061224716 | Construction, Parking Lot and Alley | 06/14/2023 | Paid | $7,663.13 |
PRM 6100 23061224716 | Masonry | 06/14/2023 | Paid | $25,480.14 |
PRM 6100 23061224805 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/14/2023 | Paid | $134,567.89 |
PRM 6100 23060824472 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/12/2023 | Paid | $169,170.59 |
PRM 6100 23060624201 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/08/2023 | Paid | $165,224.21 |
PRM 6100 23060624205 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/08/2023 | Paid | $68,791.34 |
PRM 6100 23060624213 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/08/2023 | Paid | $149,999.88 |
PRM 6100 23060524030 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/07/2023 | Paid | $53,842.08 |
PRM 6100 23060524034 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/07/2023 | Paid | $231,975.44 |
PRM 6100 23060524037 | Demolition Services | 06/07/2023 | Paid | $409,061.14 |
PRM 6100 23052523231 | Concrete | 05/30/2023 | Paid | $827,531.75 |
PRM 6100 23052322867 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/25/2023 | Paid | $41,506.57 |
PRM 6100 23052322867 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/25/2023 | Paid | $285,839.55 |
PRM 6100 23052322870 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/25/2023 | Paid | $325,753.66 |
PRM 6100 23052322881 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/25/2023 | Paid | $17,438.80 |
PRM 6100 23052222730 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/24/2023 | Paid | $72,460.30 |
PRM 6100 23051722370 | CONSTRUCTION SERVICES, GENERAL | 05/19/2023 | Paid | $276,535.63 |
PRM 6100 23051622250 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/18/2023 | Paid | $557,301.98 |
PRM 6100 23051622253 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/18/2023 | Paid | $190,994.54 |
PRM 6100 23050921502 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/11/2023 | Paid | $226,879.59 |
PRM 6100 23050921525 | Construction, Parking Lot and Alley | 05/11/2023 | Paid | $75,847.10 |
PRM 6100 23050921525 | Masonry | 05/11/2023 | Paid | $68,131.26 |
PRM 6100 23050821329 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/10/2023 | Paid | $277,810.91 |
PRM 6100 23050421074 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/08/2023 | Paid | $77,314.23 |
PRM 6100 23050320999 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/05/2023 | Paid | $51,923.21 |
PRM 6100 23050220830 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/04/2023 | Paid | $122,210.39 |
PRM 6100 23050120716 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/03/2023 | Paid | $33,457.27 |
PRM 6100 23042820474 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/02/2023 | Paid | $77,945.01 |
PRM 6100 23042720383 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/01/2023 | Paid | $128,003.74 |
PRM 6100 23042720386 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/01/2023 | Paid | $164,307.69 |
PRM 6100 23042620234 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/28/2023 | Paid | $471,454.44 |
PRM 6100 23042620240 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/28/2023 | Paid | $49,590.82 |
PRM 6100 23042620246 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/28/2023 | Paid | $290,000.00 |
PRM 6100 23042520106 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/27/2023 | Paid | $168,239.75 |
PRM 6100 23041819416 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/20/2023 | Paid | $33,824.06 |
PRM 6100 23041819432 | Electrical | 04/20/2023 | Paid | $64,555.64 |
PRM 6100 23041819454 | Construction, Parking Lot and Alley | 04/20/2023 | Paid | $69,666.86 |
PRM 6100 23041819454 | Masonry | 04/20/2023 | Paid | $66,928.13 |
PRM 6100 23041719294 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/19/2023 | Paid | $89,494.38 |
PRM 6100 23040417968 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/06/2023 | Paid | $76,352.00 |
PRM 6100 23040317801 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/05/2023 | Paid | $146,134.56 |
PRM 6100 23040317806 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/05/2023 | Paid | $463,719.23 |
PRM 6100 23040317808 | Demolition Services | 04/05/2023 | Paid | $295,682.27 |
PRM 6100 23033017489 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/03/2023 | Paid | $86,028.50 |
PRM 6100 23032717069 | Concrete | 03/29/2023 | Paid | $903,187.25 |
PRM 6100 23032216678 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/24/2023 | Paid | $223,424.58 |
PRM 6100 23032216690 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/24/2023 | Paid | $37,895.49 |
PRM 6100 23032216746 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/24/2023 | Paid | $97,414.23 |
PRM 6100 23032016284 | CONSTRUCTION SERVICES, GENERAL | 03/22/2023 | Paid | $175,341.92 |
PRM 6100 23032016284 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/22/2023 | Paid | $113,448.14 |
PRM 6100 23032016293 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/22/2023 | Paid | $28,765.56 |
PRM 6100 23030915320 | Demolition Services | 03/13/2023 | Paid | $241,588.66 |
PRM 6100 23030714996 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/09/2023 | Paid | $204,979.12 |
PRM 6100 23030614795 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/08/2023 | Paid | $58,987.32 |
PRM 6100 23030614799 | CONSTRUCTION SERVICES, GENERAL | 03/08/2023 | Paid | $377,301.90 |
PRM 6100 23030614804 | CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, | 03/08/2023 | Paid | $271,724.82 |
PRM 6100 23030614804 | Construction, Parking Lot and Alley | 03/08/2023 | Paid | $142,417.06 |
PRM 6100 23030214490 | Concrete | 03/06/2023 | Paid | $120,083.97 |
PRM 6100 23030114326 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/03/2023 | Paid | $116,379.40 |
PRM 6100 23022313821 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/27/2023 | Paid | $176,439.17 |
PRM 6100 23022213682 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/24/2023 | Paid | $22,309.72 |
PRM 6100 23022213687 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/24/2023 | Paid | $61,136.52 |
PRM 6100 23022113440 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/23/2023 | Paid | $16,990.06 |
PRM 6100 23021412978 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/15/2023 | Paid | $183,021.78 |
PRM 6100 23021012561 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/14/2023 | Paid | $181,836.89 |
PRM 6100 23020912446 | Construction, Parking Lot and Alley | 02/13/2023 | Paid | $161,916.78 |
PRM 6100 23020611997 | Electrical | 02/08/2023 | Paid | $82,629.09 |
PRM 6100 23020612018 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/08/2023 | Paid | $148,472.11 |
PRM 6100 23020311803 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/07/2023 | Paid | $194,054.69 |
PRM 6100 23012611328 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/30/2023 | Paid | $183,295.57 |
PRM 6100 23012611346 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/30/2023 | Paid | $299,602.36 |
PRM 6100 23012010553 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/24/2023 | Paid | $115,731.70 |
PRM 6100 23011810165 | Construction, Parking Lot and Alley | 01/20/2023 | Paid | $325,399.87 |
PRM 6100 23011810165 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/20/2023 | Paid | $56,693.18 |
PRM 6100 23011810165 | Masonry | 01/20/2023 | Paid | $5,610.97 |
PRM 6100 23011810256 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/20/2023 | Paid | $69,069.42 |
PRM 6100 23011710038 | Demolition Services | 01/19/2023 | Paid | $469,525.49 |
PRM 6100 23011109657 | CONSTRUCTION SERVICES, GENERAL | 01/17/2023 | Paid | $188,700.10 |
PRM 6100 23011209747 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/17/2023 | Paid | $52,939.42 |
PRM 6100 23010609122 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/10/2023 | Paid | $118,891.33 |
PRM 6100 22122908636 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/03/2023 | Paid | $137,116.29 |
PRM 6100 22122908636 | Electrical | 01/03/2023 | Paid | $317,357.04 |
PRM 6100 22122708393 | Concrete | 12/29/2022 | Paid | $158,300.38 |
PRM 6100 22122708393 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/29/2022 | Paid | $52,801.67 |
PRM 6100 22122208176 | Concrete, Precast | 12/28/2022 | Paid | $282,036.62 |
PRM 6100 22121507494 | CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, | 12/19/2022 | Paid | $16,536.84 |
PRM 6100 22121407331 | Demolition Services | 12/16/2022 | Paid | $183,708.12 |
PRM 6100 22121207028 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/14/2022 | Paid | $243,559.56 |
PRM 6100 22120606483 | Concrete | 12/08/2022 | Paid | $571,508.09 |
PRM 6100 22120606485 | Construction, Parking Lot and Alley | 12/08/2022 | Paid | $373,013.56 |
PRM 6100 22120606485 | Masonry | 12/08/2022 | Paid | $11,221.93 |
PRM 6100 22120506344 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/06/2022 | Paid | $90,237.30 |
PRM 6100 22120106129 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/05/2022 | Paid | $102,730.93 |
PRM 6100 22120106135 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/05/2022 | Paid | $86,144.36 |
PRM 6100 22113006023 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/02/2022 | Paid | $126,788.94 |
PRM 6100 22112905825 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/01/2022 | Paid | $90,446.80 |
PRM 6100 22113005958 | Concrete | 12/01/2022 | Paid | $405,945.67 |
PRM 6100 22112305432 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/29/2022 | Paid | $25,086.61 |
PRM 6100 22112505511 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/29/2022 | Paid | $101,298.89 |
PRM 6100 22112505514 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/29/2022 | Paid | $110,820.14 |
PRM 6100 22112505525 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/29/2022 | Paid | $66,247.31 |
PRM 6100 22111504611 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/17/2022 | Paid | $213,918.11 |
PRM 6100 22111504611 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/17/2022 | Paid | $149,197.67 |
PRM 6100 22111504623 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/17/2022 | Paid | $31,793.39 |
PRM 6100 22110803994 | Construction, Parking Lot and Alley | 11/10/2022 | Paid | $134,988.82 |
PRM 6100 22110803994 | Masonry | 11/10/2022 | Paid | $7,481.29 |
PRM 6100 22110703852 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/09/2022 | Paid | $107,209.84 |
PRM 6100 22110703856 | Electrical | 11/09/2022 | Paid | $294,583.46 |
PRM 6100 22110303667 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/07/2022 | Paid | $95,630.29 |
PRM 6100 22110203594 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/04/2022 | Paid | $49,167.32 |
PRM 6100 22110203496 | CONSTRUCTION SERVICES, GENERAL | 11/03/2022 | Paid | $186,921.77 |
PRM 6100 22102502883 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/27/2022 | Paid | $104,933.75 |
PRM 6100 22102602967 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/27/2022 | Paid | $65,549.77 |
PRM 6100 22102102598 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/25/2022 | Paid | $64,507.68 |
PRM 6100 22101701998 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/19/2022 | Paid | $88,714.21 |
PRM 6100 22101401841 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/18/2022 | Paid | $146,752.41 |
PRM 6100 22101101317 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/13/2022 | Paid | $34,685.99 |
PRM 6100 22101101322 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/13/2022 | Paid | $344,325.90 |
PRM 6100 22101101324 | Construction, Parking Lot and Alley | 10/13/2022 | Paid | $438,207.93 |
PRM 6100 22101101324 | Masonry | 10/13/2022 | Paid | $38,822.27 |
PRM 6100 22101101331 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/13/2022 | Paid | $132,220.80 |
PRM 6100 22101101355 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/13/2022 | Paid | $155,054.04 |
PRM 6100 22100400320 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/06/2022 | Paid | $167,277.77 |
PRM 6100 22100300086 | Electrical | 10/05/2022 | Paid | $61,637.59 |
PRM 6100 22093033294 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/04/2022 | Paid | $434,159.74 |
PRM 6100 22092032302 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/22/2022 | Paid | $50,033.75 |
PRM 6100 22092032305 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/22/2022 | Paid | $51,621.80 |
PRM 6100 22091632061 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/20/2022 | Paid | $197,335.17 |
PRM 6100 22091531863 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/19/2022 | Paid | $162,369.95 |
PRM 6100 22091531866 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/19/2022 | Paid | $295,994.84 |
PRM 6100 22091531886 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/19/2022 | Paid | $75,394.48 |
PRM 6100 22090931423 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/13/2022 | Paid | $4,882.69 |
PRM 6100 22090731176 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/09/2022 | Paid | $61,685.44 |
PRM 6100 22090230819 | Construction, Parking Lot and Alley | 09/07/2022 | Paid | $154,331.67 |
PRM 6100 22090230819 | Masonry | 09/07/2022 | Paid | $99,639.86 |
PRM 6100 22090230822 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/07/2022 | Paid | $214,947.56 |
PRM 6100 22090230833 | Electrical | 09/07/2022 | Paid | $126,478.47 |
PRM 6100 22090130706 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/06/2022 | Paid | $308,863.05 |
PRM 6100 22082329604 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/25/2022 | Paid | $2,577.53 |
PRM 6100 22082229388 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/24/2022 | Paid | $112,393.68 |
PRM 6100 22082229393 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/24/2022 | Paid | $187,413.98 |
PRM 6100 22082229471 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/24/2022 | Paid | $119,912.86 |
PRM 6100 22081929287 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/23/2022 | Paid | $125,537.62 |
PRM 6100 22080928435 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/11/2022 | Paid | $78,248.64 |
PRM 6100 22080528188 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/09/2022 | Paid | $357,423.77 |
PRM 6100 22080428071 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/08/2022 | Paid | $257,854.81 |
PRM 6100 22080227829 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/04/2022 | Paid | $119,005.33 |
PRM 6100 22080127737 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/03/2022 | Paid | $85,468.01 |
PRM 6100 22072927477 | Construction, Parking Lot and Alley | 08/02/2022 | Paid | $222,657.27 |
PRM 6100 22072927477 | Masonry | 08/02/2022 | Paid | $50,552.43 |
PRM 6100 22072827362 | Concrete, Precast | 08/01/2022 | Paid | $200,184.35 |
PRM 6100 22072627089 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/28/2022 | Paid | $77,228.83 |
PRM 6100 22072627125 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/28/2022 | Paid | $120,096.82 |
PRM 6100 22072126705 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/26/2022 | Paid | $505,011.39 |
PRM 6100 22071225804 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/14/2022 | Paid | $123,548.08 |
PRM 6100 22071225813 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/14/2022 | Paid | $157,739.68 |
PRM 6100 22071225815 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/14/2022 | Paid | $64,958.69 |
PRM 6100 22071125642 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/13/2022 | Paid | $61,881.40 |
PRM 6100 22071125644 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/13/2022 | Paid | $148,041.79 |
PRM 6100 22070825494 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/12/2022 | Paid | $71,085.21 |
PRM 6100 22070725395 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/11/2022 | Paid | $112,741.66 |
PRM 6100 22070525143 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/07/2022 | Paid | $245,810.82 |
PRM 6100 22062924757 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/01/2022 | Paid | $111,496.48 |
PRM 6100 22062324059 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/27/2022 | Paid | $122,148.68 |
PRM 6100 22062324158 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/27/2022 | Paid | $199,521.99 |
PRM 6100 22062324173 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/27/2022 | Paid | $9,789.12 |
PRM 6100 22061623503 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/21/2022 | Paid | $188,936.20 |
PRM 6100 22060922976 | Concrete, Precast | 06/13/2022 | Paid | $79,998.82 |
PRM 6100 22060622558 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/08/2022 | Paid | $132,870.76 |
PRM 6100 22052721901 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/01/2022 | Paid | $4,928.75 |
PRM 6100 22052621762 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/31/2022 | Paid | $116,076.15 |
PRM 6100 22052521564 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/27/2022 | Paid | $111,103.63 |
PRM 6100 22052521566 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/27/2022 | Paid | $128,376.19 |
PRM 6100 22052521570 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/27/2022 | Paid | $178,104.01 |
PRM 6100 22052521665 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/27/2022 | Paid | $115,247.00 |
PRM 6100 22052421408 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/26/2022 | Paid | $55,631.41 |
PRM 6100 22051720844 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/19/2022 | Paid | $61,020.40 |
PRM 6100 22051720852 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/19/2022 | Paid | $26,716.35 |
PRM 6100 22051620772 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/18/2022 | Paid | $188,189.81 |
PRM 6100 22051320677 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/17/2022 | Paid | $158,692.59 |
PRM 6100 22050920119 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/11/2022 | Paid | $65,527.72 |
PRM 6100 22050920123 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/11/2022 | Paid | $51,047.04 |
PRM 6100 22050519877 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/09/2022 | Paid | $48,675.20 |
PRM 6100 22042719205 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/02/2022 | Paid | $84,673.69 |
PRM 6100 22042819269 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/02/2022 | Paid | $26,475.77 |
PRM 6100 22042819300 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/02/2022 | Paid | $135,576.39 |
PRM 6100 22042618989 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/28/2022 | Paid | $188,267.24 |
PRM 6100 22042618991 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/28/2022 | Paid | $99,418.28 |
PRM 6100 22042618996 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/28/2022 | Paid | $121,796.07 |
PRM 6100 22042618999 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/28/2022 | Paid | $181,144.99 |
PRM 6100 22042518868 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/27/2022 | Paid | $44,554.80 |
PRM 6100 22042218754 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/26/2022 | Paid | $90,529.25 |
PRM 6100 22041518208 | Concrete, Precast | 04/19/2022 | Paid | $401,503.55 |
PRM 6100 22041518208 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/19/2022 | Paid | $62,321.46 |
PRM 6100 22041217824 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/14/2022 | Paid | $180,837.92 |
PRM 6100 22041117677 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/13/2022 | Paid | $143,839.52 |
PRM 6100 22041117677 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/13/2022 | Paid | $91,016.95 |
PRM 6100 22041117689 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/13/2022 | Paid | $535.50 |
PRM 6100 22041117694 | Concrete | 04/13/2022 | Paid | $30,762.90 |
PRM 6100 22040517155 | CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, | 04/07/2022 | Paid | $32,779.75 |
PRM 6100 22032816441 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/30/2022 | Paid | $36,391.46 |
PRM 6100 22032416192 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/28/2022 | Paid | $16,254.50 |
PRM 6100 22032416193 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/28/2022 | Paid | $6,175.00 |
PRM 6100 22032316043 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/25/2022 | Paid | $70,354.96 |
PRM 6100 22032215911 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/24/2022 | Paid | $44,202.39 |
PRM 6100 22032115693 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/23/2022 | Paid | $79,116.13 |
PRM 6100 22032115700 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/23/2022 | Paid | $90,290.00 |
PRM 6100 22031815565 | Concrete, Precast | 03/21/2022 | Paid | $619,766.31 |
PRM 6100 22031615299 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/18/2022 | Paid | $106,335.42 |
PRM 6100 22031615351 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/18/2022 | Paid | $156,433.41 |
PRM 6100 22031014814 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/14/2022 | Paid | $39,359.82 |
PRM 6100 22030714320 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/09/2022 | Paid | $106,148.64 |
PRM 6100 22030113764 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/03/2022 | Paid | $33,661.26 |
PRM 6100 22030113764 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/03/2022 | Paid | $164,427.66 |
PRM 6100 22022813665 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/02/2022 | Paid | $74,319.48 |
PRM 6100 22022413279 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/28/2022 | Paid | $34,003.51 |
PRM 6100 22022212949 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/24/2022 | Paid | $48,735.90 |
PRM 6100 22022212954 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/24/2022 | Paid | $84,057.64 |
PRM 6100 22021512431 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/17/2022 | Paid | $110,660.10 |
PRM 6100 22021412242 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/16/2022 | Paid | $208,064.63 |
PRM 6100 22021112092 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/15/2022 | Paid | $186,003.76 |
PRM 6100 22021011950 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/14/2022 | Paid | $155,652.80 |
PRM 6100 22021112087 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/14/2022 | Paid | $44,745.67 |
PRM 6100 22020911795 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/11/2022 | Paid | $64,930.02 |
PRM 6100 22020911795 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/11/2022 | Paid | $141,898.30 |
PRM 6100 22020911861 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/11/2022 | Paid | $133,377.55 |
PRM 6100 22020711487 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/09/2022 | Paid | $386,692.11 |
PRM 6100 22013111042 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/02/2022 | Paid | $268,901.71 |
PRM 6100 22013111047 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/02/2022 | Paid | $51,644.35 |
PRM 6100 22013111049 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/02/2022 | Paid | $97,762.17 |
PRM 6100 22013111063 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/02/2022 | Paid | $119,175.51 |
PRM 6100 22012710797 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/31/2022 | Paid | $38,054.97 |
PRM 6100 22012710808 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/31/2022 | Paid | $186,274.78 |
PRM 6100 22012810957 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/31/2022 | Paid | $162,128.22 |
PRM 6100 22012610687 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/28/2022 | Paid | $9,128.12 |
PRM 6100 22011909902 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/21/2022 | Paid | $309,061.00 |
PRM 6100 22011809715 | Concrete | 01/20/2022 | Paid | $84,942.52 |
PRM 6100 22011809720 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/20/2022 | Paid | $87,407.07 |
PRM 6100 22011109276 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/13/2022 | Paid | $75,759.21 |
PRM 6100 22011009208 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/12/2022 | Paid | $52,409.00 |
PRM 6100 22010709096 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/11/2022 | Paid | $89,559.07 |
PRM 6100 22010608914 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/10/2022 | Paid | $82,289.64 |
PRM 6100 22010408679 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/06/2022 | Paid | $116,523.53 |
PRM 6100 22010308535 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/05/2022 | Paid | $84,779.20 |
PRM 6100 21122708037 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/29/2021 | Paid | $3,661.28 |
PRM 6100 21122107684 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/28/2021 | Paid | $200,927.73 |
PRM 6100 21121607343 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/20/2021 | Paid | $41,758.33 |
PRM 6100 21121607350 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/20/2021 | Paid | $150,460.28 |
PRM 6100 21121306997 | Concrete | 12/15/2021 | Paid | $54,431.88 |
PRM 6100 21120906663 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/13/2021 | Paid | $212,168.09 |
PRM 6100 21120706344 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/09/2021 | Paid | $103,882.71 |
PRM 6100 21120606247 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/08/2021 | Paid | $136,921.35 |
PRM 6100 21120205930 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/06/2021 | Paid | $151,854.59 |
PRM 6100 21120105781 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/03/2021 | Paid | $8,895.84 |
PRM 6100 21112905553 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/01/2021 | Paid | $8,739.22 |
PRM 6100 21111904867 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/23/2021 | Paid | $51,526.30 |
PRM 6100 21111504308 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/17/2021 | Paid | $148,020.99 |
PRM 6100 21111504310 | Concrete | 11/17/2021 | Paid | $69,451.86 |
PRM 6100 21111504312 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/17/2021 | Paid | $136,656.51 |
PRM 6100 21111104084 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/16/2021 | Paid | $178,330.73 |
PRM 6100 21111204138 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/16/2021 | Paid | $104,543.06 |
PRM 6100 21110803745 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/10/2021 | Paid | $110,400.02 |
PRM 6100 21110803852 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/10/2021 | Paid | $98,131.06 |
PRM 6100 21110303336 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/05/2021 | Paid | $105,432.07 |
PRM 6100 21110103078 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/03/2021 | Paid | $126,578.40 |
PRM 6100 21102802779 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/01/2021 | Paid | $104,371.02 |
PRM 6100 21102802779 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/01/2021 | Paid | $81,758.13 |
PRM 6100 21102802801 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/01/2021 | Paid | $161,197.48 |
PRM 6100 21101801714 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/20/2021 | Paid | $14,332.78 |
PRM 6100 21101801721 | Concrete | 10/20/2021 | Paid | $68,039.84 |
PRM 6100 21101801721 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/20/2021 | Paid | $83,060.98 |
PRM 6100 21101301271 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/18/2021 | Paid | $80,577.34 |
PRM 6100 21101301262 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/15/2021 | Paid | $505,402.90 |
PRM 6100 21100600480 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/08/2021 | Paid | $166,343.31 |
PRM 6100 21093033822 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/04/2021 | Paid | $38,139.60 |
PRM 6100 21092833458 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/30/2021 | Paid | $34,289.89 |
PRM 6100 21092933654 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/30/2021 | Paid | $101,517.58 |
PRM 6100 21092232913 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/24/2021 | Paid | $195,096.91 |
PRM 6100 21092032671 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/22/2021 | Paid | $160,684.99 |
PRM 6100 21092032671 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/22/2021 | Paid | $19,377.59 |
PRM 6100 21092032674 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/22/2021 | Paid | $114,785.11 |
PRM 6100 21091632292 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/20/2021 | Paid | $171,502.93 |
PRM 6100 21091632292 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/20/2021 | Paid | $80,151.36 |
PRM 6100 21091632305 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/20/2021 | Paid | $19,826.79 |
PRM 6100 21091031597 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/14/2021 | Paid | $191,746.93 |
PRM 6100 21090831295 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/10/2021 | Paid | $60,557.13 |
PRM 6100 21090731208 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/09/2021 | Paid | $61,792.05 |
PRM 6100 21083130566 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/02/2021 | Paid | $320,923.35 |
PRM 6100 21083130604 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/02/2021 | Paid | $56,483.96 |
PRM 6100 21082530084 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/27/2021 | Paid | $296,993.62 |
PRM 6100 21082029768 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/24/2021 | Paid | $11,618.03 |
PRM 6100 21082029771 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/24/2021 | Paid | $144,490.44 |
PRM 6100 21081629260 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/18/2021 | Paid | $19,334.72 |
PRM 6100 21081629260 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/18/2021 | Paid | $6,832.74 |
PRM 6100 21081629262 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/18/2021 | Paid | $178,366.42 |
PRM 6100 21081629325 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/18/2021 | Paid | $94,974.24 |
PRM 6100 21080928706 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/11/2021 | Paid | $188,902.30 |
PRM 6100 21080928717 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/11/2021 | Paid | $31,760.48 |
PRM 6100 21080928721 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/11/2021 | Paid | $23,252.94 |
PRM 6100 21080328121 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/05/2021 | Paid | $12,427.12 |
PRM 6100 21080328123 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/05/2021 | Paid | $184,287.95 |
PRM 6100 21080328123 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/05/2021 | Paid | $382,335.65 |
PRM 6100 21080227959 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/04/2021 | Paid | $100,150.94 |
PRM 6100 21080227962 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/04/2021 | Paid | $100,533.67 |
PRM 6100 21072927657 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/02/2021 | Paid | $308,645.29 |
PRM 6100 21072927663 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/02/2021 | Paid | $94,855.94 |
PRM 6100 21072327084 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/27/2021 | Paid | $166,818.76 |
PRM 6100 21072226951 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/26/2021 | Paid | $246,624.50 |
PRM 6100 21072226953 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/26/2021 | Paid | $196,070.71 |
PRM 6100 21071626465 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/20/2021 | Paid | $56,780.48 |
PRM 6100 21071325935 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/15/2021 | Paid | $117,544.06 |
PRM 6100 21071325949 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/15/2021 | Paid | $220,573.00 |
PRM 6100 21070825492 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/12/2021 | Paid | $139,786.39 |
PRM 6100 21070825504 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/12/2021 | Paid | $541,269.61 |
PRM 6100 21070625232 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/08/2021 | Paid | $82,500.47 |
PRM 6100 21063024884 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/02/2021 | Paid | $102,476.54 |
PRM 6100 21062323931 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/25/2021 | Paid | $139,685.51 |
PRM 6100 21062123454 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/23/2021 | Paid | $219,329.33 |
PRM 6100 21061623271 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/21/2021 | Paid | $8,080.37 |
PRM 6100 21061523020 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/17/2021 | Paid | $93,912.22 |
PRM 6100 21061422935 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/16/2021 | Paid | $87,932.53 |
PRM 6100 21061122772 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/15/2021 | Paid | $6,967.70 |
PRM 6100 21060922420 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/11/2021 | Paid | $116,487.45 |
PRM 6100 21060922420 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/11/2021 | Paid | $11,853.24 |
PRM 6100 21060422032 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/08/2021 | Paid | $295,188.48 |
PRM 6100 21060121672 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/03/2021 | Paid | $38,289.50 |
PRM 6100 21060121692 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/03/2021 | Paid | $148,990.68 |
PRM 6100 21052521284 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/27/2021 | Paid | $64,654.00 |
PRM 6100 21052421220 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/26/2021 | Paid | $48,268.71 |
PRM 6100 21052020917 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/24/2021 | Paid | $184,530.14 |
PRM 6100 21051820600 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/20/2021 | Paid | $30,492.43 |
PRM 6100 21051420280 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/18/2021 | Paid | $1,392.02 |
PRM 6100 21051320167 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/17/2021 | Paid | $73,546.36 |
PRM 6100 21051019780 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/12/2021 | Paid | $152,209.53 |
PRM 6100 21050719687 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/11/2021 | Paid | $138,733.41 |
PRM 6100 21050319126 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/05/2021 | Paid | $155,139.29 |
PRM 6100 21050319142 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/05/2021 | Paid | $102,483.00 |
PRM 6100 21050319142 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/05/2021 | Paid | $126,877.75 |
PRM 6100 21042918839 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/03/2021 | Paid | $79,715.39 |
PRM 6100 21042618438 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/28/2021 | Paid | $166,566.73 |
PRM 6100 21042117934 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/23/2021 | Paid | $185,250.31 |
PRM 6100 21041617513 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/20/2021 | Paid | $36,586.00 |
PRM 6100 21041617578 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/20/2021 | Paid | $6,598.06 |
PRM 6100 21041517394 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/19/2021 | Paid | $47,985.44 |
PRM 6100 21041317173 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/15/2021 | Paid | $191,457.51 |
PRM 6100 21041217110 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/14/2021 | Paid | $49,012.77 |
PRM 6100 21040616415 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/08/2021 | Paid | $22,145.40 |
PRM 6100 21040616417 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/08/2021 | Paid | $106,631.07 |
PRM 6100 21033116104 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/02/2021 | Paid | $16,484.00 |
PRM 6100 21033015944 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/01/2021 | Paid | $130,952.01 |
PRM 6100 21032915824 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/31/2021 | Paid | $55,929.28 |
PRM 6100 21032515518 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/29/2021 | Paid | $134,302.09 |
PRM 6100 21032515528 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/29/2021 | Paid | $196,050.57 |
PRM 6100 21032215025 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/24/2021 | Paid | $171,578.87 |
PRM 6100 21031914970 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/23/2021 | Paid | $123,424.00 |
PRM 6100 21031714698 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/19/2021 | Paid | $68,830.97 |
PRM 6100 21031714706 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/19/2021 | Paid | $55,125.74 |
PRM 6100 21031514279 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/17/2021 | Paid | $122,083.16 |
PRM 6100 21031514279 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/17/2021 | Paid | $46,217.41 |
PRM 6100 21031514353 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/17/2021 | Paid | $130,017.95 |
PRM 6100 21031514353 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/17/2021 | Paid | $26,391.42 |
PRM 6100 21030913720 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/11/2021 | Paid | $112,454.68 |
PRM 6100 21030913733 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/11/2021 | Paid | $110,189.09 |
PRM 6100 21030813550 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/10/2021 | Paid | $212,412.87 |
PRM 6100 21030313126 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/05/2021 | Paid | $12,962.30 |
PRM 6100 21030212937 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/04/2021 | Paid | $4,984.52 |
PRM 6100 21030212944 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/04/2021 | Paid | $28,317.82 |
PRM 6100 21022212209 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/24/2021 | Paid | $11,647.72 |
PRM 6100 21022212212 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/24/2021 | Paid | $237,296.57 |
PRM 6100 21021212075 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/17/2021 | Paid | $7,616.72 |
PRM 6100 21020911623 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/11/2021 | Paid | $75,090.69 |
PRM 6100 21020511365 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/09/2021 | Paid | $138,823.11 |
PRM 6100 21020511367 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/09/2021 | Paid | $125,363.10 |
PRM 6100 21020411194 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/08/2021 | Paid | $407,633.97 |
PRM 6100 21020311064 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/05/2021 | Paid | $133,807.60 |
PRM 6100 21020110855 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/03/2021 | Paid | $275,981.54 |
PRM 6100 21020110855 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/03/2021 | Paid | $47,935.90 |
PRM 6100 21012009599 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/22/2021 | Paid | $77,784.05 |
PRM 6100 21011409226 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/19/2021 | Paid | $155,497.05 |
PRM 6100 21010408117 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/06/2021 | Paid | $32,854.88 |
PRM 6100 21010408187 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/06/2021 | Paid | $35,023.33 |
PRM 6100 21010107959 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/05/2021 | Paid | $246,853.57 |
PRM 6100 20122807585 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/30/2020 | Paid | $151,829.00 |
PRM 6100 20122807640 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/30/2020 | Paid | $221,655.26 |
PRM 6100 20121707057 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/21/2020 | Paid | $122,382.53 |
PRM 6100 20121606845 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/18/2020 | Paid | $398,297.16 |
PRM 6100 20121406626 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/16/2020 | Paid | $209,539.42 |
PRM 6100 20120705959 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/09/2020 | Paid | $618.77 |
PRM 6100 20120705961 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/09/2020 | Paid | $34,755.94 |
PRM 6100 20120405782 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/08/2020 | Paid | $19,851.98 |
PRM 6100 20120205365 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/04/2020 | Paid | $130,407.38 |
PRM 6100 20120205373 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/04/2020 | Paid | $18,842.88 |
PRM 6100 20120205437 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/04/2020 | Paid | $621.23 |
PRM 6100 20120205450 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/04/2020 | Paid | $433.40 |
PRM 6100 20120205452 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/04/2020 | Paid | $200,686.69 |
PRM 6100 20120205455 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/04/2020 | Paid | $8,843.67 |
PRM 6100 20112404917 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/30/2020 | Paid | $144,439.17 |
PRM 6100 20112304785 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/25/2020 | Paid | $20,478.42 |
PRM 6100 20112004681 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/24/2020 | Paid | $66,986.61 |
PRM 6100 20111604082 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 11/18/2020 | Paid | $20,308.63 |
PRM 6100 20111203848 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 11/16/2020 | Paid | $5,413.65 |
PRM 6100 20110503359 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 11/09/2020 | Paid | $8,105.44 |
PRM 6100 20110403279 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/06/2020 | Paid | $80,316.20 |
PRM 6100 20110303112 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/05/2020 | Paid | $139,431.22 |
PRM 6100 20103002911 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/03/2020 | Paid | $85,778.55 |
PRM 6100 20102702486 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/29/2020 | Paid | $13,676.46 |
PRM 6100 20102602399 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/28/2020 | Paid | $28,126.61 |
PRM 6100 20102602399 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/28/2020 | Paid | $7,797.60 |
PRM 6100 20102302247 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/27/2020 | Paid | $4,801.96 |
PRM 6100 20102202108 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/26/2020 | Paid | $26,633.37 |
PRM 6100 20102102045 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/23/2020 | Paid | $258,520.57 |
PRM 6100 20102102052 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/23/2020 | Paid | $52,983.85 |
PRM 6100 20101901746 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/21/2020 | Paid | $207,215.24 |
PRM 6100 20101901830 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/21/2020 | Paid | $7,265.43 |
PRM 6100 20101601606 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/20/2020 | Paid | $108,875.32 |
PRM 6100 20101601653 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/20/2020 | Paid | $114,666.45 |
PRM 6100 20101301282 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/15/2020 | Paid | $79,427.59 |
PRM 6100 20100900953 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/13/2020 | Paid | $137,093.71 |
PRM 6100 20100900969 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/13/2020 | Paid | $20,566.40 |
PRM 6100 20100901046 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/13/2020 | Paid | $100,880.21 |
PRM 6100 20100901048 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/13/2020 | Paid | $181,237.67 |
PRM 6100 20100901048 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/13/2020 | Paid | $34,625.31 |
PRM 6100 20100100042 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/05/2020 | Paid | $287,444.06 |
PRM 6100 20100100052 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/05/2020 | Paid | $95,483.79 |
PRM 6100 20100100055 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/05/2020 | Paid | $305,309.40 |
PRM 6100 20093035409 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/02/2020 | Paid | $15,292.66 |
PRM 6100 20093035482 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/02/2020 | Paid | $11,160.90 |
PRM 6100 20092835187 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/30/2020 | Paid | $29,594.75 |
PRM 6100 20092835189 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/30/2020 | Paid | $16,284.98 |
PRM 6100 20092535044 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 09/29/2020 | Paid | $10,820.65 |
PRM 6100 20092535048 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/29/2020 | Paid | $34,450.29 |
PRM 6100 20092134490 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/23/2020 | Paid | $144,234.92 |
PRM 6100 20092134490 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/23/2020 | Paid | $66,117.09 |
PRM 6100 20091734179 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 09/21/2020 | Paid | $48,747.44 |
PRM 6100 20091634025 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/18/2020 | Paid | $281,316.51 |
PRM 6100 20091133611 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/15/2020 | Paid | $91,163.23 |
PRM 6100 20090833228 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 09/10/2020 | Paid | $1,209.55 |
PRM 6100 20090333008 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/08/2020 | Paid | $307,928.28 |
PRM 6100 20090232817 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/04/2020 | Paid | $119,559.92 |
PRM 6100 20083132611 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/02/2020 | Paid | $2,113.75 |
PRM 6100 20083132614 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/02/2020 | Paid | $407,668.61 |
PRM 6100 20083132622 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/02/2020 | Paid | $43,654.80 |
PRM 6100 20082531985 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/27/2020 | Paid | $126,737.01 |
PRM 6100 20082431832 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/26/2020 | Paid | $4,193.07 |
PRM 6100 20082431904 | CONSTRUCTION SERVICES, GENERAL | 08/26/2020 | Paid | $69,023.36 |
PRM 6100 20082131740 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/25/2020 | Paid | $168,148.39 |
PRM 6100 20081931502 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/21/2020 | Paid | $230,573.27 |
PRM 6100 20081931508 | CONSTRUCTION SERVICES, GENERAL | 08/21/2020 | Paid | $6,084.67 |
PRM 6100 20081831409 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/20/2020 | Paid | $56,595.91 |
PRM 6100 20081431161 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/18/2020 | Paid | $54,075.31 |
PRM 6100 20081130734 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/13/2020 | Paid | $164,901.48 |
PRM 6100 20080730440 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/11/2020 | Paid | $57,234.02 |
PRM 6100 20080430044 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/06/2020 | Paid | $64,567.66 |
PRM 6100 20080329970 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/05/2020 | Paid | $93,351.59 |
PRM 6100 20073129822 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/04/2020 | Paid | $106,903.60 |
PRM 6100 20072729203 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/29/2020 | Paid | $19,278.58 |
PRM 6100 20072128489 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/23/2020 | Paid | $480,690.39 |
PRM 6100 20072128502 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/23/2020 | Paid | $84,930.87 |
PRM 6100 20072028358 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/22/2020 | Paid | $61,800.79 |
PRM 6100 20072028361 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/22/2020 | Paid | $15,532.58 |
PRM 6100 20072028427 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/22/2020 | Paid | $3,500.00 |
PRM 6100 20071427775 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/17/2020 | Paid | $46,179.00 |
PRM 6100 20071027503 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/15/2020 | Paid | $272,325.74 |
PRM 6100 20070226892 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/08/2020 | Paid | $950.92 |
PRM 6100 20062926460 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/01/2020 | Paid | $112,451.88 |
PRM 6100 20062926471 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/01/2020 | Paid | $146,713.38 |
PRM 6100 20062626338 | Construction, Parking Lot and Alley | 06/30/2020 | Paid | $1,770.79 |
PRM 6100 20062926468 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/30/2020 | Paid | $160,032.00 |
PRM 6100 20061925901 | Construction, Parking Lot and Alley | 06/24/2020 | Paid | $18,138.61 |
PRM 6100 20061925906 | Construction, Parking Lot and Alley | 06/24/2020 | Paid | $72,827.96 |
PRM 6100 20062226010 | Construction, Parking Lot and Alley | 06/24/2020 | Paid | $2,892.69 |
PRM 6100 20062226011 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/24/2020 | Paid | $105,194.31 |
PRM 6100 20062226020 | Construction, Parking Lot and Alley | 06/24/2020 | Paid | $1,054.22 |
PRM 6100 20061725703 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/23/2020 | Paid | $79,332.73 |
PRM 6100 20061825772 | Construction, Parking Lot and Alley | 06/23/2020 | Paid | $2,510.04 |
PRM 6100 20060824874 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/10/2020 | Paid | $227,292.00 |
PRM 6100 20060824874 | Finishes: Flooring, Wall and Ceiling, etc. | 06/10/2020 | Paid | $24,512.91 |
PRM 6100 20060224366 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/04/2020 | Paid | $57,575.04 |
PRM 6100 20052123542 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/27/2020 | Paid | $74,109.44 |
PRM 6100 20052123559 | Finishes: Flooring, Wall and Ceiling, etc. | 05/27/2020 | Paid | $18,338.12 |
PRM 6100 20051523057 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/20/2020 | Paid | $71,668.75 |
PRM 6100 20051523068 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/20/2020 | Paid | $28,825.40 |
PRM 6100 20051523073 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/20/2020 | Paid | $9,500.00 |
PRM 6100 20051523082 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/20/2020 | Paid | $69,011.42 |
PRM 6100 20050622166 | CONSTRUCTION SERVICES, GENERAL | 05/12/2020 | Paid | $5,123.87 |
PRM 6100 20050822328 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/12/2020 | Paid | $50,283.45 |
PRM 6100 20050822330 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/12/2020 | Paid | $62,682.62 |
PRM 6100 20050121672 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/05/2020 | Paid | $22,871.13 |
PRM 6100 20050121675 | Finishes: Flooring, Wall and Ceiling, etc. | 05/05/2020 | Paid | $113,548.46 |
PRM 6100 20042921409 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/01/2020 | Paid | $121,897.77 |
PRM 6100 20042821314 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/30/2020 | Paid | $42,972.99 |
PRM 6100 20042320898 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/28/2020 | Paid | $41,074.10 |
PRM 6100 20042320905 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/28/2020 | Paid | $62,528.98 |
PRM 6100 20042020477 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/22/2020 | Paid | $50,245.56 |
PRM 6100 20041520091 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/17/2020 | Paid | $154,423.46 |
PRM 6100 20040719436 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/10/2020 | Paid | $33,013.60 |
PRM 6100 20040218987 | Finishes: Flooring, Wall and Ceiling, etc. | 04/07/2020 | Paid | $119,426.40 |
PRM 6100 20033118644 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/03/2020 | Paid | $161,828.22 |
PRM 6100 20032618179 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/31/2020 | Paid | $53,238.68 |
PRM 6100 20032417842 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/27/2020 | Paid | $45,350.00 |
PRM 6100 20032518009 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/27/2020 | Paid | $162,549.39 |
PRM 6100 20031216715 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/16/2020 | Paid | $211,739.81 |
PRM 6100 20030415822 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/09/2020 | Paid | $34,287.42 |
PRM 6100 20030315569 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/05/2020 | Paid | $42,101.60 |
PRM 6100 20022715104 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/02/2020 | Paid | $12,662.55 |
PRM 6100 20022715106 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/02/2020 | Paid | $212,141.16 |
PRM 6100 20022514711 | Finishes: Flooring, Wall and Ceiling, etc. | 02/27/2020 | Paid | $214,432.39 |
PRM 6100 20021813928 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/19/2020 | Paid | $110,812.05 |
PRM 6100 20021813933 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/19/2020 | Paid | $86,645.24 |
PRM 6100 20021213264 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/13/2020 | Paid | $41,694.70 |
PRM 6100 20020311880 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/05/2020 | Paid | $246,558.88 |
PRM 6100 20012811245 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/30/2020 | Paid | $50,035.18 |
PRM 6100 20012911323 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/30/2020 | Paid | $118,704.38 |
PRM 6100 20012711022 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/29/2020 | Paid | $111,843.49 |
PRM 6100 20012711033 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/29/2020 | Paid | $96,309.24 |
PRM 6100 20012310798 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/28/2020 | Paid | $7,780.95 |
PRM 6100 20012310799 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/28/2020 | Paid | $223,345.84 |
PRM 6100 20012310825 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/28/2020 | Paid | $148,849.00 |
PRM 6100 20012711032 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/28/2020 | Paid | $186,639.19 |
PRM 6100 20011510254 | Construction, Street (Major and Residential)(Incl Reconstruc | 01/21/2020 | Paid | $151,164.75 |
PRM 6100 20011309873 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/15/2020 | Paid | $35,929.41 |
PRM 6100 19123108515 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/06/2020 | Paid | $27,371.10 |
PRM 6100 19123108515 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/06/2020 | Paid | $13,507.15 |
PRM 6100 19123108517 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/06/2020 | Paid | $3,962.61 |
PRM 6100 19123008296 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/03/2020 | Paid | $69,931.49 |
PRM 6100 19122608019 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/30/2019 | Paid | $236,588.55 |
PRM 6100 19121807548 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/20/2019 | Paid | $20,074.46 |
PRM 6100 19121807469 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/19/2019 | Paid | $168,516.03 |
PRM 6100 19121607242 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/18/2019 | Paid | $20,704.90 |
PRM 6100 19121607242 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/18/2019 | Paid | $123,484.67 |
PRM 6100 19121106848 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/13/2019 | Paid | $33,720.18 |
PRM 6100 19120606460 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/11/2019 | Paid | $19,848.26 |
PRM 6100 19120406161 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/09/2019 | Paid | $105,204.52 |
PRM 6100 19120406160 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/06/2019 | Paid | $159,265.66 |
PRM 6100 19120205907 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/04/2019 | Paid | $204,959.85 |
PRM 6100 19120205919 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/04/2019 | Paid | $158,842.73 |
PRM 6100 19112605739 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/03/2019 | Paid | $177,220.20 |
PRM 6100 19112605684 | CONSTRUCTION SERVICES, GENERAL | 12/02/2019 | Paid | $1,764.62 |
PRM 6100 19111804835 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 11/21/2019 | Paid | $81,638.81 |
PRM 6100 19111904929 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/21/2019 | Paid | $239,442.69 |
PRM 6100 19110503576 | CONSTRUCTION SERVICES, GENERAL | 11/07/2019 | Paid | $18,572.56 |
PRM 6100 19103103400 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/05/2019 | Paid | $228,576.60 |
PRM 6100 19102903067 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/31/2019 | Paid | $3,395.94 |
PRM 6100 19102903067 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/31/2019 | Paid | $45,414.58 |
PRM 6100 19102903067 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/31/2019 | Paid | $79,817.35 |
PRM 6100 19102102112 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/24/2019 | Paid | $346,961.00 |
PRM 6100 19100800472 | CONSTRUCTION SERVICES, GENERAL | 10/09/2019 | Paid | $95,271.50 |
PRM 6100 19092433552 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/26/2019 | Paid | $106,191.23 |
PRM 6100 19092433554 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/26/2019 | Paid | $244,791.18 |
PRM 6100 19092433565 | Construction, Highway and Road | 09/26/2019 | Paid | $54,256.89 |
PRM 6100 19092433565 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/26/2019 | Paid | $90.00 |
PRM 6100 19091332600 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/17/2019 | Paid | $64,283.23 |
PRM 6100 19091632771 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/17/2019 | Paid | $57,034.57 |
PRM 6100 19091032172 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/11/2019 | Paid | $183,019.95 |
PRM 6100 19090431683 | Construction, Parking Lot and Alley | 09/09/2019 | Paid | $41,345.74 |
PRM 6100 19090431556 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 09/06/2019 | Paid | $29,288.17 |
PRM 6100 19090431556 | Construction, Parking Lot and Alley | 09/06/2019 | Paid | $12,512.01 |
PRM 6100 19090431556 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/06/2019 | Paid | $233,998.08 |
PRM 6100 19082730931 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 08/30/2019 | Paid | $15,516.19 |
PRM 6100 19082330648 | Construction, Parking Lot and Alley | 08/27/2019 | Paid | $20,550.40 |
PRM 6100 19082330648 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/27/2019 | Paid | $285,609.16 |
PRM 6100 19082330648 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/27/2019 | Paid | $143,872.71 |
PRM 6100 19081630068 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/20/2019 | Paid | $31,771.36 |
PRM 6100 19081529965 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/19/2019 | Paid | $114,767.75 |
PRM 6100 19072427542 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/26/2019 | Paid | $6,844.60 |
PRM 6100 19071927174 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/22/2019 | Paid | $121,187.98 |
PRM 6100 19071927175 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/22/2019 | Paid | $73,242.39 |
PRM 6100 19071927176 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/22/2019 | Paid | $137,895.33 |
PRM 6100 19071927177 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/22/2019 | Paid | $148,201.85 |
PRM 6100 19071927178 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/22/2019 | Paid | $250,993.45 |
PRM 6100 19071626792 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/19/2019 | Paid | $70,688.50 |
PRM 6100 19062524892 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/27/2019 | Paid | $132,611.85 |
PRM 6100 19062424767 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/26/2019 | Paid | $264,918.40 |
PRM 6100 19062024500 | CONSTRUCTION SERVICES, GENERAL | 06/24/2019 | Paid | $33,658.75 |
PRM 6100 19062024500 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/24/2019 | Paid | $147,369.16 |
PRM 6100 19061723984 | CONSTRUCTION SERVICES, GENERAL | 06/19/2019 | Paid | $11,690.94 |
PRM 6100 19060623165 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/11/2019 | Paid | $55,088.47 |
PRM 6100 19052021463 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/22/2019 | Paid | $138,056.83 |
PRM 6100 19051521143 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/17/2019 | Paid | $36,838.00 |
PRM 6100 19051320872 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/15/2019 | Paid | $150,185.82 |
PRM 6100 19043019489 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/02/2019 | Paid | $7,181.24 |
PRM 6100 19042919318 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 05/01/2019 | Paid | $3,399.48 |
PRM 6100 19042318759 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/25/2019 | Paid | $64,167.01 |
PRM 6100 19041618056 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/17/2019 | Paid | $258,559.41 |
PRM 6100 19041017475 | Construction, Street Lighting | 04/12/2019 | Paid | $9,355.26 |
PRM 6100 19040216525 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/04/2019 | Paid | $6,663.82 |
PRM 6100 19040116280 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 04/03/2019 | Paid | $126,012.48 |
PRM 6100 19040116326 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/02/2019 | Paid | $212,761.11 |
PRM 6100 19032816133 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/01/2019 | Paid | $11,247.88 |
PRM 6100 19031915191 | Construction, Highway and Road | 03/21/2019 | Paid | $142,057.72 |
PRM 6100 19031915194 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/21/2019 | Paid | $3,101.77 |
PRM 6100 19031815027 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/19/2019 | Paid | $444,746.42 |
PRM 6100 19031815027 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/19/2019 | Paid | $300,445.87 |
PRM 6100 19022512849 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/27/2019 | Paid | $58,933.56 |
PRM 6100 19021912321 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/20/2019 | Paid | $89,243.79 |
PRM 6100 19021412040 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/19/2019 | Paid | $132,910.42 |
PRM 6100 19021412043 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/19/2019 | Paid | $7,075.11 |
PRM 6100 19021211594 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/13/2019 | Paid | $213,364.48 |
PRM 6100 19021111433 | Construction, Street (Major and Residential)(Incl Reconstruc | 02/12/2019 | Paid | $374,546.58 |
PRM 6100 19020711102 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/11/2019 | Paid | $7,434.20 |
PRM 6100 19020711104 | Construction, Highway and Road | 02/11/2019 | Paid | $133,205.92 |
PRM 6100 19020610883 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/07/2019 | Paid | $272,317.53 |
PRM 6100 19020610887 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/07/2019 | Paid | $144,461.60 |
PRM 6100 19012209172 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 01/24/2019 | Paid | $54,167.16 |
PRM 6100 19011809040 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/22/2019 | Paid | $365,694.73 |
PRM 6100 19010808115 | Construction, Highway and Road | 01/09/2019 | Paid | $123,933.57 |
PRM 6100 19010808115 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/09/2019 | Paid | $4,195.16 |
PRM 6100 18122107173 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/24/2018 | Paid | $143,740.77 |
PRM 6100 18122107174 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/24/2018 | Paid | $140,207.38 |
PRM 6100 18122107175 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/24/2018 | Paid | $102,859.43 |
PRM 6100 18122107176 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/24/2018 | Paid | $82,118.35 |
PRM 6100 18122107177 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/24/2018 | Paid | $69,112.33 |
PRM 6100 18122107178 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/24/2018 | Paid | $61,906.43 |
PRM 6100 18122107179 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/24/2018 | Paid | $35,667.16 |
PRM 6100 18122107180 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/24/2018 | Paid | $35,305.31 |
PRM 6100 18122107181 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/24/2018 | Paid | $24,352.48 |
PRM 6100 18122107182 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/24/2018 | Paid | $8,274.89 |
PRM 6100 18122107183 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/24/2018 | Paid | $7,979.90 |
PRM 6100 18122107184 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/24/2018 | Paid | $4,493.39 |
PRM 6100 18122107185 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/24/2018 | Paid | $1,985.35 |
PRM 6100 18121806862 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/20/2018 | Paid | $179,416.27 |
PRM 6100 18121806875 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/20/2018 | Paid | $13,545.50 |
PRM 6100 18120305593 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/05/2018 | Paid | $22,106.51 |
PRM 6100 18120305600 | Construction, Highway and Road | 12/05/2018 | Paid | $23,858.26 |
PRM 6100 18120305600 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/05/2018 | Paid | $150,000.00 |
PRM 6100 18120305621 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/05/2018 | Paid | $35,910.92 |
PRM 6100 18120305625 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 12/05/2018 | Paid | $8,428.24 |
PRM 6100 18112604923 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 11/28/2018 | Paid | $266,589.08 |
PRM 6100 18111904459 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 11/21/2018 | Paid | $7,235.09 |
PRM 6100 18110903921 | Construction, Street Lighting | 11/14/2018 | Paid | $35,979.68 |
PRM 6100 18103002963 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 11/01/2018 | Paid | $2,218.13 |
PRM 6100 18103002976 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/01/2018 | Paid | $147,946.58 |
PRM 6100 18103002976 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 11/01/2018 | Paid | $306,761.30 |
PRM 6100 18102902880 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/31/2018 | Paid | $160,136.66 |
PRM 6100 18102902880 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/31/2018 | Paid | $112,363.43 |
PRM 6100 18102902880 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/31/2018 | Paid | $292,344.05 |
PRM 6100 18102602805 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/30/2018 | Paid | $69,156.44 |
PRM 6100 18102602807 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/30/2018 | Paid | $10,476.19 |
PRM 6100 18102602809 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/30/2018 | Paid | $160,899.88 |
PRM 6100 18101601767 | Paving/Resurfacing, Street (Major and Residential) | 10/17/2018 | Paid | $17,045.52 |
PRM 6100 18101000906 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/12/2018 | Paid | $19,981.00 |
PRM 6100 18100800767 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/10/2018 | Paid | $7,457.32 |
PRM 6100 18100500679 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/09/2018 | Paid | $146,209.14 |
PRM 6100 18100300478 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/05/2018 | Paid | $136,506.01 |
PRM 6100 18100100059 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/03/2018 | Paid | $1,016.28 |
PRM 6100 18100100061 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 10/03/2018 | Paid | $6,649.28 |
PRM 6100 18091831408 | Construction, Bridge and Drawbridge (Includes Reconstruction | 09/20/2018 | Paid | $3,026.10 |
PRM 6100 18091831417 | Construction, Bridge and Drawbridge (Includes Reconstruction | 09/20/2018 | Paid | $3,065.69 |
PRM 6100 18091831405 | Paving/Resurfacing, Street (Major and Residential) | 09/19/2018 | Paid | $189,177.56 |
PRM 6100 18090530112 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 09/07/2018 | Paid | $628,660.65 |
PRM 6100 18090429934 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/06/2018 | Paid | $10,687.51 |
PRM 6100 18090429936 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/06/2018 | Paid | $168,013.78 |
PRM 6100 18090429936 | Construction, Street Lighting | 09/06/2018 | Paid | $76,587.67 |
PRM 6100 18082128878 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/22/2018 | Paid | $4,700.13 |
PRM 6100 18082028717 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/21/2018 | Paid | $213,069.20 |
PRM 6100 18082028717 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/21/2018 | Paid | $38,869.85 |
PRM 6100 18080627671 | Construction, Street (Major and Residential)(Incl Reconstruc | 08/08/2018 | Paid | $225,157.10 |
PRM 6100 18080327570 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/07/2018 | Paid | $342,020.53 |
PRM 6100 18080327583 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 08/07/2018 | Paid | $151,827.38 |
PRM 6100 18072326346 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/25/2018 | Paid | $113,647.97 |
PRM 6100 18071725962 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/19/2018 | Paid | $464,983.13 |
PRM 6100 18070324768 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/06/2018 | Paid | $151,563.26 |
PRM 6100 18070324773 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 07/06/2018 | Paid | $21,621.71 |
PRM 6100 18070324775 | Construction, Street Lighting | 07/06/2018 | Paid | $106,941.16 |
PRM 6100 18062123656 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/25/2018 | Paid | $95,578.07 |
PRM 6100 18062023503 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/22/2018 | Paid | $90,009.89 |
PRM 6100 18061923378 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/21/2018 | Paid | $301,779.46 |
PRM 6100 18061923381 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/21/2018 | Paid | $127,364.41 |
PRM 6100 18061823256 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/20/2018 | Paid | $4,961.03 |
PRM 6100 18061523098 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/18/2018 | Paid | $112,706.00 |
PRM 6100 18061523099 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/18/2018 | Paid | $215,003.46 |
PRM 6100 18061523100 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/18/2018 | Paid | $77,288.32 |
PRM 6100 18061523102 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/18/2018 | Paid | $1,665.95 |
PRM 6100 18060722551 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 06/11/2018 | Paid | $22,400.70 |
PRM 6100 18053121945 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 06/04/2018 | Paid | $145,645.69 |
PRM 6100 18052120898 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 05/23/2018 | Paid | $116,577.64 |
PRM 6100 18052120914 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/23/2018 | Paid | $236,502.87 |
PRM 6100 18050819915 | Construction, Street Lighting | 05/10/2018 | Paid | $120,453.43 |
PRM 6100 18050319538 | Paving/Resurfacing, Street (Major and Residential) | 05/07/2018 | Paid | $16,380.00 |
PRM 6100 18050219404 | Construction, Parking Lot and Alley | 05/04/2018 | Paid | $23,376.89 |
PRM 6100 18050219404 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/04/2018 | Paid | $93,454.25 |
PRM 6100 18050219404 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/04/2018 | Paid | $475,078.49 |
PRM 6100 18041617773 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/18/2018 | Paid | $153,167.68 |
PRM 6100 18041617773 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 04/18/2018 | Paid | $134,876.89 |
PRM 6100 18040416937 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/06/2018 | Paid | $166,601.97 |
PRM 6100 18032315874 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/27/2018 | Paid | $141,774.42 |
PRM 6100 18032215748 | Construction, Bridge and Drawbridge (Includes Reconstruction | 03/26/2018 | Paid | $195.62 |
PRM 6100 18032215748 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/26/2018 | Paid | $63,604.59 |
PRM 6100 18032115559 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/23/2018 | Paid | $293,215.62 |
PRM 6100 18032015407 | Construction, Bridge and Drawbridge (Includes Reconstruction | 03/22/2018 | Paid | $46,241.07 |
PRM 6100 18032015421 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/22/2018 | Paid | $125,141.09 |
PRM 6100 18031915293 | Construction, Bridge and Drawbridge (Includes Reconstruction | 03/21/2018 | Paid | $57,495.80 |
PRM 6100 18030714236 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/09/2018 | Paid | $494,962.44 |
PRM 6100 18030614027 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 03/08/2018 | Paid | $193,535.19 |
PRM 6100 18030614027 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 03/08/2018 | Paid | $130,220.47 |
PRM 6100 18022112745 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/23/2018 | Paid | $115,377.39 |
PRM 6100 18022112752 | Construction, Bridge and Drawbridge (Includes Reconstruction | 02/23/2018 | Paid | $12,544.91 |
PRM 6100 18022112754 | Construction, Bridge and Drawbridge (Includes Reconstruction | 02/23/2018 | Paid | $2,522.02 |
PRM 6100 18022112756 | Construction, Bridge and Drawbridge (Includes Reconstruction | 02/23/2018 | Paid | $9,429.76 |
PRM 6100 18021512357 | Construction, Curb and Gutter (Maintenance, Repair, Removal) | 02/20/2018 | Paid | $211,589.77 |
PRM 6100 18021512357 | Construction, Street Lighting | 02/20/2018 | Paid | $24,895.80 |
PRM 6100 18021612467 | Construction, Parking Lot and Alley | 02/20/2018 | Paid | $38,779.43 |
PRM 6100 18021011843 | Construction, Parking Lot and Alley | 02/13/2018 | Paid | $8,020.04 |
PRM 6100 18021011843 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/13/2018 | Paid | $308,086.74 |
PRM 6100 18020911786 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/12/2018 | Paid | $27,759.46 |
PRM 6100 18020911786 | Construction, Street (Major and Residential)(Incl Reconstruc | 02/12/2018 | Paid | $113,945.28 |
PRM 6100 18020611503 | Construction, Bridge and Drawbridge (Includes Reconstruction | 02/08/2018 | Paid | $3,716.68 |
PRM 6100 18020611506 | Construction, Bridge and Drawbridge (Includes Reconstruction | 02/08/2018 | Paid | $6,164.45 |
PRM 6100 18012610453 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 01/30/2018 | Paid | $82,837.79 |
PRM 6100 18011909913 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/23/2018 | Paid | $95,557.51 |
PRM 6100 18011909915 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/23/2018 | Paid | $194,548.03 |
PRM 6100 18010909044 | CONSTRUCTION SERVICES, GENERAL | 01/11/2018 | Paid | $19,560.42 |
PRM 6100 18010408615 | CONTRACTOR, GENERAL, CONSTRUCTION | 01/08/2018 | Paid | $36,806.08 |
PRM 6100 17122707810 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/29/2017 | Paid | $731,275.49 |
PRM 6100 17121907213 | CONTRACTOR, GENERAL, CONSTRUCTION | 12/21/2017 | Paid | $20,299.93 |
PRM 6100 17121907217 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 12/21/2017 | Paid | $78,847.61 |
PRM 6100 17121907247 | Construction, Bridge and Drawbridge (Includes Reconstruction | 12/21/2017 | Paid | $126,823.32 |
PRM 6100 17121907247 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/21/2017 | Paid | $264,164.70 |
PRM 6100 17120505829 | Construction, Bridge and Drawbridge (Includes Reconstruction | 12/07/2017 | Paid | $31,799.82 |
PRM 6100 17120505831 | Construction, Bridge and Drawbridge (Includes Reconstruction | 12/07/2017 | Paid | $44,056.62 |
PRM 6100 17120505839 | Construction, Bridge and Drawbridge (Includes Reconstruction | 12/07/2017 | Paid | $13,270.90 |
PRM 6100 17112104750 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 11/27/2017 | Paid | $130,588.57 |
PRM 6100 17112104752 | CONTRACTOR, GENERAL, CONSTRUCTION | 11/27/2017 | Paid | $79,645.43 |
PRM 6100 17112104752 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/27/2017 | Paid | $88,506.27 |
PRM 6100 17112104754 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/27/2017 | Paid | $66,948.75 |
PRM 6100 17112104757 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 11/27/2017 | Paid | $121,784.94 |
PRM 6100 17111003792 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 11/13/2017 | Paid | $237,223.84 |
PRM 6100 17110303248 | Construction, Parking Lot and Alley | 11/06/2017 | Paid | $75,198.20 |
PRM 6100 17103102944 | Construction, Bridge and Drawbridge (Includes Reconstruction | 11/02/2017 | Paid | $10,996.48 |
PRM 6100 17103102944 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/02/2017 | Paid | $401,079.77 |
PRM 6100 17101802046 | Construction, Parking Lot and Alley | 10/20/2017 | Paid | $138,764.84 |
PRM 6100 17101802048 | Construction, Parking Lot and Alley | 10/20/2017 | Paid | $20,252.34 |
PRC 6100 17101900178 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/19/2017 | Paid | $0.40 |
PRM 6100 17101301424 | CONTRACTOR, GENERAL, CONSTRUCTION | 10/17/2017 | Paid | $31,058.74 |
PRM 6100 17101301424 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 10/17/2017 | Paid | $114,247.48 |
PRM 6100 17101000761 | Construction, Street (Major and Residential)(Incl Reconstruc | 10/12/2017 | Paid | $62,111.78 |
PRM 6100 17101000765 | CONSTRUCTION SERVICES, GENERAL | 10/12/2017 | Paid | $190,010.13 |
PRM 6100 17101100964 | Construction, Parking Lot and Alley | 10/12/2017 | Paid | $44,200.83 |
PRM 6100 17101100964 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/12/2017 | Paid | $15,918.03 |
PRM 6100 17100600515 | Paving/Resurfacing, Street (Major and Residential) | 10/10/2017 | Paid | $18,089.85 |
PRM 6100 17100500405 | Site Work | 10/09/2017 | Paid | $55,359.72 |
PRM 6100 17100300108 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/05/2017 | Paid | $169,684.80 |
PRM 6100 17100300110 | Construction, Street (Major and Residential)(Incl Reconstruc | 10/05/2017 | Paid | $528,960.47 |
PRM 6100 17100400250 | Construction, Parking Lot and Alley | 10/05/2017 | Paid | $4,419.81 |
PRM 6100 17100300128 | Construction, Parking Lot and Alley | 10/04/2017 | Paid | $5,490.58 |
PRM 6100 17100300132 | Construction, Parking Lot and Alley | 10/04/2017 | Paid | $32,407.13 |
PRM 6100 17100300134 | Construction, Parking Lot and Alley | 10/04/2017 | Paid | $5,467.45 |
PRM 6100 17100300136 | Construction, Parking Lot and Alley | 10/04/2017 | Paid | $165.28 |
PRM 6100 17100300138 | Construction, Parking Lot and Alley | 10/04/2017 | Paid | $366.86 |
PRM 6100 17100300140 | Construction, Parking Lot and Alley | 10/04/2017 | Paid | $42,064.98 |
PRM 6100 17100300140 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/04/2017 | Paid | $191,452.12 |
PRM 6100 17100300142 | Construction, Parking Lot and Alley | 10/04/2017 | Paid | $41,460.05 |
PRM 6100 17091934008 | CONTRACTOR, GENERAL, CONSTRUCTION | 09/21/2017 | Paid | $53,778.55 |
PRM 6100 17091934008 | Construction, Parking Lot and Alley | 09/21/2017 | Paid | $225,442.88 |
PRM 6100 17091934008 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 09/21/2017 | Paid | $93,375.63 |
PRM 6100 17091233324 | Construction, Parking Lot and Alley | 09/14/2017 | Paid | $85,381.15 |
PRM 6100 17090833030 | CONSTRUCTION SERVICES, GENERAL | 09/12/2017 | Paid | $36,910.22 |
PRM 6100 17082931970 | Construction, Bridge and Drawbridge (Includes Reconstruction | 08/31/2017 | Paid | $107,389.39 |
PRM 6100 17082931973 | Construction, Bridge and Drawbridge (Includes Reconstruction | 08/31/2017 | Paid | $6,698.83 |
PRM 6100 17082131199 | Construction, Parking Lot and Alley | 08/23/2017 | Paid | $99,689.48 |
PRM 6100 17082131201 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 08/23/2017 | Paid | $141,425.40 |
PRM 6100 17081731023 | CONTRACTOR, GENERAL, CONSTRUCTION | 08/21/2017 | Paid | $86,571.65 |
PRM 6100 17081030274 | Construction, Bridge and Drawbridge (Includes Reconstruction | 08/14/2017 | Paid | $6,259.22 |
PRM 6100 17080429727 | Construction, Parking Lot and Alley | 08/07/2017 | Paid | $12,129.13 |
PRM 6100 17080329620 | Construction, Street (Major and Residential)(Incl Reconstruc | 08/04/2017 | Paid | $491,105.36 |
PRM 6100 17080129283 | Construction, Parking Lot and Alley | 08/03/2017 | Paid | $60,048.84 |
PRM 6100 17080229485 | Construction, Parking Lot and Alley | 08/03/2017 | Paid | $22,168.36 |
PRM 6100 17073129123 | CONSTRUCTION SERVICES, GENERAL | 08/02/2017 | Paid | $225,806.27 |
PRM 6100 17073129129 | Construction, Parking Lot and Alley | 08/02/2017 | Paid | $85,381.15 |
PRM 6100 17073129129 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/02/2017 | Paid | $34,904.00 |
PRM 6100 17080129282 | Construction, Parking Lot and Alley | 08/02/2017 | Paid | $99,369.05 |
PRM 6100 17080129284 | Construction, Parking Lot and Alley | 08/02/2017 | Paid | $48,690.25 |
PRM 6100 17071928071 | Construction, Bridge and Drawbridge (Includes Reconstruction | 07/21/2017 | Paid | $70,515.79 |
PRM 6100 17071928071 | Construction, Parking Lot and Alley | 07/21/2017 | Paid | $137,645.27 |
PRM 6100 17071727863 | Construction, Bridge and Drawbridge (Includes Reconstruction | 07/19/2017 | Paid | $49,394.76 |
PRM 6100 17071727863 | Construction, Parking Lot and Alley | 07/19/2017 | Paid | $82,102.13 |
PRM 6100 17071727863 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 07/19/2017 | Paid | $73,294.44 |
PRM 6100 17071727870 | Construction, Bridge and Drawbridge (Includes Reconstruction | 07/19/2017 | Paid | $16,414.76 |
PRM 6100 17070326667 | Construction, Street (Major and Residential)(Incl Reconstruc | 07/06/2017 | Paid | $145,961.19 |
PRM 6100 17062726017 | CONSTRUCTION SERVICES, GENERAL | 06/29/2017 | Paid | $168,489.73 |
PRM 6100 17061925263 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 06/21/2017 | Paid | $223,943.96 |
PRM 6100 17061525062 | Construction, Street (Major and Residential)(Incl Reconstruc | 06/19/2017 | Paid | $390,981.61 |
PRM 6100 17061525062 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 06/19/2017 | Paid | $146,899.77 |
PRM 6100 17061224675 | Construction, Parking Lot and Alley | 06/14/2017 | Paid | $286,376.21 |
PRM 6100 17060924568 | CONSTRUCTION SERVICES, GENERAL | 06/13/2017 | Paid | $114,868.17 |
PRM 6100 17060523939 | CONTRACTOR, GENERAL, CONSTRUCTION | 06/07/2017 | Paid | $85,939.85 |
PRM 6100 17060523939 | Construction, Parking Lot and Alley | 06/07/2017 | Paid | $85,381.15 |
PRM 6100 17052422993 | Construction, Bridge and Drawbridge (Includes Reconstruction | 05/26/2017 | Paid | $1,250.00 |
PRM 6100 17051622189 | Construction, Bridge and Drawbridge (Includes Reconstruction | 05/18/2017 | Paid | $19,924.94 |
PRM 6100 17051622204 | Construction, Parking Lot and Alley | 05/18/2017 | Paid | $301,220.18 |
PRM 6100 17051622209 | Construction, Parking Lot and Alley | 05/18/2017 | Paid | $42,300.55 |
PRM 6100 17051622211 | Construction, Parking Lot and Alley | 05/18/2017 | Paid | $101,850.45 |
PRM 6100 17051622215 | Construction, Bridge and Drawbridge (Includes Reconstruction | 05/18/2017 | Paid | $2,844.74 |
PRM 6100 17051622215 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/18/2017 | Paid | $8,663.43 |
PRM 6100 17051221952 | CONSTRUCTION SERVICES, GENERAL | 05/16/2017 | Paid | $326,936.22 |
PRM 6100 17050320977 | Paving/Resurfacing, Street (Major and Residential) | 05/05/2017 | Paid | $19,329.12 |
PRM 6100 17050320979 | CONSTRUCTION SERVICES, GENERAL | 05/05/2017 | Paid | $176,135.08 |
PRM 6100 17050120686 | Construction, Street (Major and Residential)(Incl Reconstruc | 05/03/2017 | Paid | $497,090.24 |
PRM 6100 17041819507 | CONTRACTOR, GENERAL, CONSTRUCTION | 04/20/2017 | Paid | $105,590.73 |
PRM 6100 17041819507 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/20/2017 | Paid | $6,355.38 |
PRM 6100 17041819509 | Construction, Parking Lot and Alley | 04/20/2017 | Paid | $33,646.86 |
PRM 6100 17041819511 | Construction, Parking Lot and Alley | 04/20/2017 | Paid | $162,040.44 |
PRM 6100 17040518370 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/07/2017 | Paid | $90,731.37 |
PRM 6100 17040518370 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 04/07/2017 | Paid | $39,550.75 |
PRM 6100 17032417206 | CONTRACTOR, GENERAL, CONSTRUCTION | 03/28/2017 | Paid | $137,355.75 |
PRM 6100 17032417208 | Construction, Street (Major and Residential)(Incl Reconstruc | 03/28/2017 | Paid | $263,405.61 |
PRM 6100 17032016635 | Construction, Bridge and Drawbridge (Includes Reconstruction | 03/22/2017 | Paid | $99,000.18 |
PRM 6100 17032016635 | Construction, Street (Major and Residential)(Incl Reconstruc | 03/22/2017 | Paid | $121,560.89 |
PRM 6100 17031315935 | Construction, Parking Lot and Alley | 03/15/2017 | Paid | $6,734.95 |
PRM 6100 17031015836 | Construction, Parking Lot and Alley | 03/14/2017 | Paid | $118,733.99 |
PRM 6100 17030715425 | Construction, Bridge and Drawbridge (Includes Reconstruction | 03/09/2017 | Paid | $20,155.36 |
PRM 6100 17030615183 | Construction, Parking Lot and Alley | 03/08/2017 | Paid | $199,766.56 |
PRM 6100 17030615183 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/08/2017 | Paid | $127,085.48 |
PRM 6100 17030615190 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 03/07/2017 | Paid | $173,691.13 |
PRM 6100 17030315037 | Construction, Street (Major and Residential)(Incl Reconstruc | 03/06/2017 | Paid | $236,378.17 |
PRM 6100 17030114688 | Construction, Parking Lot and Alley | 03/03/2017 | Paid | $147,312.31 |
PRM 6100 17030114699 | Construction, Parking Lot and Alley | 03/03/2017 | Paid | $70,000.00 |
PRM 6100 17022214049 | CONSTRUCTION SERVICES, GENERAL | 02/24/2017 | Paid | $292,948.25 |
PRM 6100 17022214049 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 02/24/2017 | Paid | $181,550.38 |
PRM 6100 17022214054 | Construction, Parking Lot and Alley | 02/24/2017 | Paid | $28,101.60 |
PRM 6100 17021313014 | CONTRACTOR, GENERAL, CONSTRUCTION | 02/15/2017 | Paid | $33,754.93 |
PRM 6100 17020912785 | Construction, Bridge and Drawbridge (Includes Reconstruction | 02/13/2017 | Paid | $32,012.23 |
PRM 6100 17020912790 | Construction, Street (Major and Residential)(Incl Reconstruc | 02/13/2017 | Paid | $115,914.64 |
PRM 6100 17013011447 | Construction, Street (Major and Residential)(Incl Reconstruc | 01/31/2017 | Paid | $461,277.01 |
PRM 6100 17013011447 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 01/31/2017 | Paid | $122,749.94 |
PRM 6100 17012310506 | Construction, Parking Lot and Alley | 01/25/2017 | Paid | $38,901.55 |
PRM 6100 17012310518 | Concrete | 01/25/2017 | Paid | $14,277.34 |
PRM 6100 17011810282 | CONTRACTOR, GENERAL, CONSTRUCTION | 01/20/2017 | Paid | $146,586.33 |
PRM 6100 17011810282 | Construction, Street (Major and Residential)(Incl Reconstruc | 01/20/2017 | Paid | $194,186.89 |
PRM 6100 17011810284 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 01/20/2017 | Paid | $93,013.84 |
PRM 6100 16121907529 | Construction, Bridge and Drawbridge (Includes Reconstruction | 01/12/2017 | Paid | $73,235.22 |
PRM 6100 16121907531 | Construction, Bridge and Drawbridge (Includes Reconstruction | 01/12/2017 | Paid | $16,015.35 |
PRM 6100 16121907533 | Construction, Bridge and Drawbridge (Includes Reconstruction | 01/12/2017 | Paid | $47,670.86 |
PRM 6100 16121907543 | Construction, Bridge and Drawbridge (Includes Reconstruction | 01/12/2017 | Paid | $29,772.73 |
PRM 6100 16121907550 | Construction, Bridge and Drawbridge (Includes Reconstruction | 01/12/2017 | Paid | $888.35 |
PRM 6100 17010308832 | Construction, Parking Lot and Alley | 01/05/2017 | Paid | $94,439.67 |
PRM 6100 16122908532 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/03/2017 | Paid | $53,208.61 |
PRM 6100 16123008703 | Construction, Street (Major and Residential)(Incl Reconstruc | 01/03/2017 | Paid | $277,273.10 |
PRM 6100 16122808390 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 12/30/2016 | Paid | $198,768.90 |
PRM 6100 16121406927 | Construction, Street (Major and Residential)(Incl Reconstruc | 12/16/2016 | Paid | $59,159.16 |
PRM 6100 16120205744 | Construction, Street (Major and Residential)(Incl Reconstruc | 12/05/2016 | Paid | $231,459.11 |
PRM 6100 16112905416 | Construction, Parking Lot and Alley | 12/01/2016 | Paid | $42,013.27 |
PRM 6100 16112905416 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/01/2016 | Paid | $96,236.60 |
PRM 6100 16112905419 | Construction, Parking Lot and Alley | 12/01/2016 | Paid | $14,900.04 |
PRM 6100 16112905421 | Construction, Parking Lot and Alley | 12/01/2016 | Paid | $33,001.10 |
PRM 6100 16112805273 | CONTRACTOR, GENERAL, CONSTRUCTION | 11/30/2016 | Paid | $24,775.14 |
PRM 6100 16112205061 | CONSTRUCTION SERVICES, GENERAL | 11/28/2016 | Paid | $62,806.01 |
PRM 6100 16110803933 | Construction, Parking Lot and Alley | 11/10/2016 | Paid | $112,343.78 |
PRM 6100 16110703830 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 11/09/2016 | Paid | $179,650.06 |
PRM 6100 16110203441 | Construction, Parking Lot and Alley | 11/04/2016 | Paid | $98,327.47 |
PRM 6100 16110203441 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/04/2016 | Paid | $111,464.51 |
PRM 6100 16110303608 | Site Work | 11/04/2016 | Paid | $34,451.61 |
PRM 6100 16101701259 | Construction, Parking Lot and Alley | 10/19/2016 | Paid | $210,985.13 |
PRM 6100 16101701259 | Construction, Street (Major and Residential)(Incl Reconstruc | 10/19/2016 | Paid | $117,876.62 |
PRM 6100 16100500415 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 10/07/2016 | Paid | $92,987.23 |
PRM 6100 16100400289 | Construction, Parking Lot and Alley | 10/06/2016 | Paid | $10,492.75 |
PRM 6100 16100400295 | Construction, Street (Major and Residential)(Incl Reconstruc | 10/05/2016 | Paid | $315,358.81 |
PRM 6100 16100300088 | Construction, Bridge and Drawbridge (Includes Reconstruction | 10/04/2016 | Paid | $17,754.71 |
PRM 6100 16100300090 | Construction, Bridge and Drawbridge (Includes Reconstruction | 10/04/2016 | Paid | $1,692.90 |
PRM 6100 16092038169 | Construction, Street (Major and Residential)(Incl Reconstruc | 09/22/2016 | Paid | $98,444.20 |
PRM 6100 16092038172 | Construction, Parking Lot and Alley | 09/22/2016 | Paid | $129,775.46 |
PRM 6100 16091937991 | Construction, Bridge and Drawbridge (Includes Reconstruction | 09/20/2016 | Paid | $29,001.08 |
PRM 6100 16091937992 | Construction, Bridge and Drawbridge (Includes Reconstruction | 09/20/2016 | Paid | $3,907.53 |
PRM 6100 16091937995 | Construction, Bridge and Drawbridge (Includes Reconstruction | 09/20/2016 | Paid | $6,006.71 |
PRM 6100 16091937996 | Construction, Bridge and Drawbridge (Includes Reconstruction | 09/20/2016 | Paid | $851.79 |
PRM 6100 16091937999 | Construction, Bridge and Drawbridge (Includes Reconstruction | 09/20/2016 | Paid | $3,839.83 |
PRM 6100 16091337382 | Paving/Resurfacing, Street (Major and Residential) | 09/15/2016 | Paid | $101,835.12 |
PRM 6100 16090736699 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 09/09/2016 | Paid | $232,135.35 |
PRM 6100 16090636511 | Construction, Bridge and Drawbridge (Includes Reconstruction | 09/07/2016 | Paid | $36,606.58 |
PRM 6100 16090636513 | Construction, Bridge and Drawbridge (Includes Reconstruction | 09/07/2016 | Paid | $34,669.64 |
PRM 6100 16090636516 | Construction, Bridge and Drawbridge (Includes Reconstruction | 09/07/2016 | Paid | $28,001.94 |
PRM 6100 16090636516 | Construction, Street (Major and Residential)(Incl Reconstruc | 09/07/2016 | Paid | $393,234.66 |
PRM 6100 16090136101 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/06/2016 | Paid | $64,899.71 |
PRM 6100 16082234752 | Site Work | 08/24/2016 | Paid | $59,431.83 |
PRM 6100 16081634170 | Construction, Parking Lot and Alley | 08/18/2016 | Paid | $113,683.59 |
PRM 6100 16081533996 | Concrete | 08/17/2016 | Paid | $156,684.15 |
PRM 6100 16081533996 | Construction, Street (Major and Residential)(Incl Reconstruc | 08/17/2016 | Paid | $59,779.82 |
PRM 6100 16081033669 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 08/11/2016 | Paid | $288,099.83 |
PRM 6100 16080533061 | Construction, Parking Lot and Alley | 08/08/2016 | Paid | $70,784.40 |
PRM 6100 16080432943 | Construction, Parking Lot and Alley | 08/05/2016 | Paid | $130,401.35 |
PRM 6100 16080232476 | Construction, Parking Lot and Alley | 08/03/2016 | Paid | $209,578.37 |
PRM 6100 16080132315 | Construction, Street (Major and Residential)(Incl Reconstruc | 08/02/2016 | Paid | $323,355.25 |
PRM 6100 16080132325 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/02/2016 | Paid | $8,060.90 |
PRM 6100 16080132334 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/02/2016 | Paid | $35,811.74 |
PRM 6100 16072832043 | Site Work | 07/29/2016 | Paid | $53,786.34 |
PRM 6100 16072131565 | Construction, Parking Lot and Alley | 07/22/2016 | Paid | $58,799.97 |
PRM 6100 16072131565 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/22/2016 | Paid | $99,809.63 |
PRM 6100 16070830336 | CONSTRUCTION SERVICES, GENERAL | 07/11/2016 | Paid | $10,238.37 |
PRM 6100 16070830336 | Concrete | 07/11/2016 | Paid | $114,585.32 |
PRM 6100 16070830336 | Construction, Street (Major and Residential)(Incl Reconstruc | 07/11/2016 | Paid | $243,317.42 |
PRM 6100 16070630143 | Site Work | 07/07/2016 | Paid | $52,139.31 |
PRM 6100 16070529868 | Construction, Parking Lot and Alley | 07/06/2016 | Paid | $213,494.60 |
PRM 6100 16070529874 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/06/2016 | Paid | $14,297.56 |
PRM 6100 16070529876 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/06/2016 | Paid | $23,070.83 |
PRM 6100 16070529878 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/06/2016 | Paid | $11,569.49 |
PRM 6100 16070529878 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/06/2016 | Paid | $11,381.61 |
PRM 6100 16062228282 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 06/23/2016 | Paid | $137,625.22 |
PRM 6100 16062128080 | Construction, Street (Major and Residential)(Incl Reconstruc | 06/22/2016 | Paid | $131,044.33 |
PRM 6100 16062027956 | Construction, Bridge and Drawbridge (Includes Reconstruction | 06/21/2016 | Paid | $13,405.72 |
PRM 6100 16062027963 | Construction, Bridge and Drawbridge (Includes Reconstruction | 06/21/2016 | Paid | $139,848.02 |
PRM 6100 16062027966 | Construction, Bridge and Drawbridge (Includes Reconstruction | 06/21/2016 | Paid | $49,210.10 |
PRM 6100 16061327089 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/14/2016 | Paid | $23,453.33 |
PRM 6100 16061327098 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/14/2016 | Paid | $13,214.77 |
PRM 6100 16060626360 | Construction, Bridge and Drawbridge (Includes Reconstruction | 06/07/2016 | Paid | $234,916.39 |
PRM 6100 16053125984 | Site Work | 06/01/2016 | Paid | $94,539.99 |
PRM 6100 16052425412 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/25/2016 | Paid | $76,373.17 |
PRM 6100 16051624772 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 05/17/2016 | Paid | $146,495.75 |
PRM 6100 16051324651 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/16/2016 | Paid | $80,945.58 |
PRM 6100 16042522649 | Construction, Parking Lot and Alley | 04/27/2016 | Paid | $82,456.74 |
PRM 6100 16042522650 | Construction, Parking Lot and Alley | 04/27/2016 | Paid | $40,988.57 |
PRM 6100 16042522651 | Construction, Parking Lot and Alley | 04/27/2016 | Paid | $111,526.67 |
PRM 6100 16042522652 | Construction, Parking Lot and Alley | 04/27/2016 | Paid | $91,111.36 |
PRM 6100 16042522653 | Construction, Street (Major and Residential)(Incl Reconstruc | 04/27/2016 | Paid | $34,068.18 |
PRM 6100 16042522661 | Construction, Parking Lot and Alley | 04/27/2016 | Paid | $26,145.14 |
PRM 6100 16042522662 | Construction, Parking Lot and Alley | 04/27/2016 | Paid | $50,849.48 |
PRM 6100 16042522663 | Construction, Parking Lot and Alley | 04/27/2016 | Paid | $97,538.40 |
PRM 6100 16042522668 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/27/2016 | Paid | $6,513.51 |
PRM 6100 16042522669 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/27/2016 | Paid | $3,860.53 |
PRM 6100 16041421714 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/20/2016 | Paid | $70,824.03 |
PRM 6100 16041821931 | Site Work | 04/19/2016 | Paid | $33,658.76 |
PRM 6100 16041421711 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 04/15/2016 | Paid | $69,855.01 |
PRM 6100 16040620905 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/07/2016 | Paid | $3,315.95 |
PRM 6100 16033120257 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/06/2016 | Paid | $71,640.15 |
PRM 6100 16033120258 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/06/2016 | Paid | $5,791.94 |
PRM 6100 16033120259 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/06/2016 | Paid | $150,983.45 |
PRM 6100 16033120260 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/06/2016 | Paid | $30,688.46 |
PRM 6100 16033120261 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/06/2016 | Paid | $4,463.15 |
PRM 6100 16033120262 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/06/2016 | Paid | $15,209.79 |
PRM 6100 16032819563 | Construction, Parking Lot and Alley | 03/30/2016 | Paid | $105,501.46 |
PRM 6100 16032819564 | Construction, Parking Lot and Alley | 03/30/2016 | Paid | $594.58 |
PRM 6100 16032118823 | Site Work | 03/22/2016 | Paid | $106,452.56 |
PRM 6100 16032118827 | Construction, Street (Major and Residential)(Incl Reconstruc | 03/22/2016 | Paid | $218,173.04 |
PRM 6100 16030817161 | Construction, Parking Lot and Alley | 03/14/2016 | Paid | $55,422.86 |
PRM 6100 16030817162 | Construction, Parking Lot and Alley | 03/14/2016 | Paid | $712.50 |
PRM 6100 16030817163 | Construction, Parking Lot and Alley | 03/14/2016 | Paid | $72,541.19 |
PRM 6100 16030817164 | Construction, Parking Lot and Alley | 03/14/2016 | Paid | $16,329.93 |
PRM 6100 16030817165 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/14/2016 | Paid | $14,566.36 |
PRM 6100 16030817166 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/14/2016 | Paid | $12,112.61 |
PRM 6100 16030817167 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/14/2016 | Paid | $4,905.87 |
PRM 6100 16030817168 | Construction, Parking Lot and Alley | 03/14/2016 | Paid | $293,611.75 |
PRM 6100 16030817169 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/14/2016 | Paid | $15,043.59 |
PRM 6100 16030817173 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/14/2016 | Paid | $29,104.96 |
PRM 6100 16031017700 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 03/11/2016 | Paid | $95,536.11 |
PRM 6100 16022615811 | Construction, Parking Lot and Alley | 03/03/2016 | Paid | $92,993.05 |
PRM 6100 16022615812 | Construction, Parking Lot and Alley | 03/03/2016 | Paid | $71,783.32 |
PRM 6100 16030216345 | Construction, Parking Lot and Alley | 03/03/2016 | Paid | $141,535.13 |
PRM 6100 16021914919 | Construction, Street (Major and Residential)(Incl Reconstruc | 02/22/2016 | Paid | $204,102.22 |
PRM 6100 16021814713 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 02/19/2016 | Paid | $364,252.38 |
PRM 6100 16021114135 | Construction, Parking Lot and Alley | 02/17/2016 | Paid | $143,395.37 |
PRM 6100 16020913829 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/10/2016 | Paid | $47,927.19 |
PRM 6100 16020313160 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/09/2016 | Paid | $33,890.33 |
PRM 6100 16020313161 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/09/2016 | Paid | $125,089.60 |
PRM 6100 16020112917 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/04/2016 | Paid | $1,763.03 |
PRM 6100 16020112918 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/04/2016 | Paid | $8,244.26 |
PRM 6100 16020112919 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/04/2016 | Paid | $61,570.69 |
PRM 6100 16020112920 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/04/2016 | Paid | $11,479.93 |
PRM 6100 16020112921 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/04/2016 | Paid | $5,335.89 |
PRM 6100 16020112922 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/04/2016 | Paid | $226.58 |
PRM 6100 16020112911 | Site Work | 02/02/2016 | Paid | $85,436.35 |
PRM 6100 16020112913 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 02/02/2016 | Paid | $58,223.27 |
PRM 6100 16012912847 | Construction, Parking Lot and Alley | 02/01/2016 | Paid | $310,867.41 |
PRM 6100 16011511380 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/22/2016 | Paid | $11,961.67 |
PRM 6100 16011911678 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/22/2016 | Paid | $446.98 |
PRM 6100 16011911680 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/22/2016 | Paid | $4,405.22 |
PRM 6100 16011411267 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/21/2016 | Paid | $20,395.11 |
PRM 6100 16011311013 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/19/2016 | Paid | $2,793.03 |
PRM 6100 16011311015 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/19/2016 | Paid | $3,217.25 |
PRM 6100 16011311016 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/19/2016 | Paid | $340.00 |
PRM 6100 16011311017 | Site Work | 01/19/2016 | Paid | $78,996.77 |
PRM 6100 16010609935 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 01/07/2016 | Paid | $135,114.94 |
PRM 6100 16010609937 | Construction, Parking Lot and Alley | 01/07/2016 | Paid | $230,828.57 |
PRM 6100 15123009388 | Paving/Resurfacing, Street (Major and Residential) | 01/06/2016 | Paid | $54,974.17 |
PRM 6100 16010409626 | Construction, Street (Major and Residential)(Incl Reconstruc | 01/05/2016 | Paid | $177,102.01 |
PRM 6100 15122809036 | CONSTRUCTION SERVICES, GENERAL | 12/31/2015 | Paid | $53,101.97 |
PRM 6100 15122809037 | CONSTRUCTION SERVICES, GENERAL | 12/31/2015 | Paid | $46,537.96 |
PRM 6100 15122809038 | CONSTRUCTION SERVICES, GENERAL | 12/31/2015 | Paid | $24,764.49 |
PRM 6100 15122208768 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/29/2015 | Paid | $94,724.89 |
PRM 6100 15121708320 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/22/2015 | Paid | $6,920.00 |
PRM 6100 15121708321 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/22/2015 | Paid | $1,176.00 |
PRM 6100 15121608183 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 12/17/2015 | Paid | $220,802.05 |
PRM 6100 15121007424 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/16/2015 | Paid | $5,594.32 |
PRM 6100 15121007425 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/16/2015 | Paid | $1,447.02 |
PRM 6100 15121508023 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/16/2015 | Paid | $23,180.22 |
PRM 6100 15120706839 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/11/2015 | Paid | $3,460.20 |
PRM 6100 15120706840 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/11/2015 | Paid | $1,202.28 |
PRM 6100 15120706841 | Construction, Parking Lot and Alley | 12/11/2015 | Paid | $38,398.29 |
PRM 6100 15120706842 | Construction, Parking Lot and Alley | 12/11/2015 | Paid | $56,242.40 |
PRM 6100 15120706843 | Construction, Parking Lot and Alley | 12/11/2015 | Paid | $25,354.55 |
PRM 6100 15120706844 | Construction, Parking Lot and Alley | 12/11/2015 | Paid | $16,565.98 |
PRM 6100 15120706845 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 12/11/2015 | Paid | $119,017.38 |
PRM 6100 15121007404 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/11/2015 | Paid | $13,269.29 |
PRM 6100 15121007405 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/11/2015 | Paid | $37,516.91 |
PRM 6100 15120907247 | Site Work | 12/10/2015 | Paid | $46,193.17 |
PRM 6100 15111905204 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/25/2015 | Paid | $107,990.94 |
PRM 6100 15111905205 | Construction, Parking Lot and Alley | 11/25/2015 | Paid | $208,985.04 |
PRM 6100 15110504084 | Construction, Parking Lot and Alley | 11/10/2015 | Paid | $108,081.56 |
PRM 6100 15110504085 | Construction, Parking Lot and Alley | 11/10/2015 | Paid | $52,005.74 |
PRM 6100 15102102451 | Construction, Parking Lot and Alley | 10/27/2015 | Paid | $163,535.09 |
PRM 6100 15102102452 | Construction, Parking Lot and Alley | 10/27/2015 | Paid | $40,296.10 |
PRM 6100 15102002206 | Construction, Parking Lot and Alley | 10/26/2015 | Paid | $47,931.01 |
PRM 6100 15101601776 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/22/2015 | Paid | $106,749.83 |
PRM 6100 15101601777 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/22/2015 | Paid | $31,125.71 |
PRM 6100 15101901981 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/22/2015 | Paid | $34,056.37 |
PRM 6100 15101901983 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/22/2015 | Paid | $76,222.49 |
PRM 6100 15102102477 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/22/2015 | Paid | $9,423.25 |
PRM 6100 15101901963 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 10/20/2015 | Paid | $132,665.79 |
PRM 6100 15101301036 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/14/2015 | Paid | $18,495.92 |
PRM 6100 15100600554 | Construction, Parking Lot and Alley | 10/09/2015 | Paid | $3,925.40 |
PRM 6100 15100600555 | Construction, Parking Lot and Alley | 10/09/2015 | Paid | $111,857.27 |
PRM 6100 15100600556 | Construction, Parking Lot and Alley | 10/09/2015 | Paid | $129,851.94 |
PRM 6100 15100600557 | Construction, Parking Lot and Alley | 10/09/2015 | Paid | $48,952.03 |
PRM 6100 15100600558 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/09/2015 | Paid | $3,173.79 |
PRM 6100 15100600559 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/09/2015 | Paid | $744.25 |
PRM 6100 15100600560 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 10/09/2015 | Paid | $160,882.45 |
PRM 6100 15100500329 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 10/06/2015 | Paid | $282,834.90 |
PRM 6100 15092339624 | Construction, Parking Lot and Alley | 09/29/2015 | Paid | $1,045.00 |
PRM 6100 15092339626 | Construction, Parking Lot and Alley | 09/29/2015 | Paid | $118,159.81 |
PRM 6100 15092339627 | Construction, Parking Lot and Alley | 09/29/2015 | Paid | $201,832.18 |
PRM 6100 15092339628 | Construction, Parking Lot and Alley | 09/29/2015 | Paid | $22,647.76 |
PRM 6100 15092339629 | Construction, Parking Lot and Alley | 09/29/2015 | Paid | $103,563.30 |
PRM 6100 15092139195 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/25/2015 | Paid | $16,549.07 |
PRM 6100 15092139196 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/25/2015 | Paid | $43,991.35 |
PRM 6100 15092139197 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/25/2015 | Paid | $808.92 |
PRM 6100 15092139198 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/25/2015 | Paid | $5,011.13 |
PRM 6100 15092139199 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/25/2015 | Paid | $3,453.46 |
PRM 6100 15092139200 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/25/2015 | Paid | $5,626.60 |
PRM 6100 15092139201 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/25/2015 | Paid | $3,331.62 |
PRM 6100 15092139202 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/25/2015 | Paid | $5,259.46 |
PRM 6100 15092139203 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/25/2015 | Paid | $12,490.34 |
PRM 6100 15092139204 | CONSTRUCTION SERVICES, GENERAL | 09/25/2015 | Paid | $36,674.79 |
PRM 6100 15091738974 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/24/2015 | Paid | $99,114.43 |
PRM 6100 15091738960 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 09/18/2015 | Paid | $49,876.16 |
PRM 6100 15090237338 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 09/09/2015 | Paid | $17,611.75 |
PRM 6100 15090837821 | Construction, Parking Lot and Alley | 09/09/2015 | Paid | $71,890.34 |
PRM 6100 15090437635 | Construction, Parking Lot and Alley | 09/08/2015 | Paid | $44,955.95 |
PRM 6100 15090237330 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/03/2015 | Paid | $86,830.14 |
PRM 6100 15083136928 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 09/01/2015 | Paid | $98,582.69 |
PRM 6100 15081835367 | Construction, Parking Lot and Alley | 08/24/2015 | Paid | $41,342.51 |
PRM 6100 15081835368 | Construction, Parking Lot and Alley | 08/24/2015 | Paid | $279,382.60 |
PRM 6100 15081835369 | Construction, Parking Lot and Alley | 08/24/2015 | Paid | $90,836.29 |
PRM 6100 15081835370 | Construction, Parking Lot and Alley | 08/24/2015 | Paid | $78,413.70 |
PRM 6100 15081835371 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/24/2015 | Paid | $751.05 |
PRM 6100 15081835361 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 08/19/2015 | Paid | $332,072.64 |
PRM 6100 15080333549 | Construction, Parking Lot and Alley | 08/07/2015 | Paid | $51,588.80 |
PRM 6100 15080333550 | Construction, Parking Lot and Alley | 08/07/2015 | Paid | $71,573.20 |
PRM 6100 15080333551 | Construction, Parking Lot and Alley | 08/07/2015 | Paid | $8,712.92 |
PRM 6100 15080333552 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/07/2015 | Paid | $119,225.14 |
PRM 6100 15080333553 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/07/2015 | Paid | $10,868.48 |
PRM 6100 15080333554 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/07/2015 | Paid | $22,930.69 |
PRM 6100 15080333555 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/07/2015 | Paid | $51,893.40 |
PRM 6100 15080333556 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/07/2015 | Paid | $117,717.63 |
PRM 6100 15080333558 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/07/2015 | Paid | $3,947.25 |
PRM 6100 15080333559 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/07/2015 | Paid | $101,381.86 |
PRM 6100 15080333560 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/07/2015 | Paid | $8,492.55 |
PRM 6100 15080333561 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/07/2015 | Paid | $4,305.11 |
PRM 6100 15080333562 | Construction, Parking Lot and Alley | 08/07/2015 | Paid | $28,731.56 |
PRM 6100 15080333563 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/07/2015 | Paid | $16,747.52 |
PRM 6100 15080333564 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/07/2015 | Paid | $31,653.05 |
PRM 6100 15072332569 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/29/2015 | Paid | $9,663.94 |
PRM 6100 15072332570 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/29/2015 | Paid | $6,212.78 |
PRM 6100 15072332571 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/29/2015 | Paid | $951.09 |
PRM 6100 15072332575 | Construction, Parking Lot and Alley | 07/29/2015 | Paid | $13,952.17 |
PRM 6100 15072332578 | Construction, Parking Lot and Alley | 07/29/2015 | Paid | $14,391.79 |
PRM 6100 15072332579 | Construction, Parking Lot and Alley | 07/29/2015 | Paid | $122,776.43 |
PRM 6100 15072332580 | Construction, Parking Lot and Alley | 07/29/2015 | Paid | $159,080.38 |
PRM 6100 15072332582 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/29/2015 | Paid | $23,286.50 |
PRM 6100 15071030843 | Construction, Parking Lot and Alley | 07/15/2015 | Paid | $50,445.62 |
PRM 6100 15071030844 | Construction, Parking Lot and Alley | 07/15/2015 | Paid | $89,377.04 |
PRM 6100 15070930715 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 07/14/2015 | Paid | $471,811.16 |
PRM 6100 15070730337 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/10/2015 | Paid | $31,490.90 |
PRM 6100 15070730338 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/10/2015 | Paid | $14,486.63 |
PRM 6100 15070730339 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/10/2015 | Paid | $21,450.21 |
PRM 6100 15062929460 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/02/2015 | Paid | $48,047.90 |
PRM 6100 15062529120 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/30/2015 | Paid | $68,962.70 |
PRM 6100 15062529121 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/30/2015 | Paid | $24,743.01 |
PRM 6100 15062529123 | Construction, Parking Lot and Alley | 06/30/2015 | Paid | $11,571.24 |
PRM 6100 15062529124 | Construction, Parking Lot and Alley | 06/30/2015 | Paid | $317,184.71 |
PRM 6100 15061527873 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/16/2015 | Paid | $42,852.55 |
PRM 6100 15061527875 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 06/16/2015 | Paid | $534,453.61 |
PRM 6100 15060827049 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/11/2015 | Paid | $126,284.17 |
PRM 6100 15060827050 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/11/2015 | Paid | $34,560.90 |
PRM 6100 15051925281 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/22/2015 | Paid | $63,003.05 |
PRM 6100 15051424879 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/18/2015 | Paid | $83,699.28 |
PRM 6100 15051424880 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/18/2015 | Paid | $33,497.47 |
PRM 6100 15051424881 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/18/2015 | Paid | $121,432.79 |
PRM 6100 15050423513 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 05/05/2015 | Paid | $197,141.28 |
PRM 6100 15041621572 | CONSTRUCTION SERVICES, GENERAL | 04/23/2015 | Paid | $71,180.04 |
PRM 6100 15041521369 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/16/2015 | Paid | $314,432.26 |
PRM 6100 15041521370 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/16/2015 | Paid | $86,033.61 |
PRM 6100 15041521371 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/16/2015 | Paid | $65,114.38 |
PRM 6100 15041521372 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/16/2015 | Paid | $46,024.16 |
PRM 6100 15041521373 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/16/2015 | Paid | $237,316.50 |
PRM 6100 15041521374 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/16/2015 | Paid | $2,267.65 |
PRM 6100 15041521375 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/16/2015 | Paid | $60,421.37 |
PRM 6100 15041521376 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/16/2015 | Paid | $121,892.39 |
PRM 6100 15041521377 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/16/2015 | Paid | $103,358.91 |
PRM 6100 15040820574 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/09/2015 | Paid | $140,598.75 |
PRM 6100 15040820575 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/09/2015 | Paid | $60,631.42 |
PRM 6100 15040820576 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/09/2015 | Paid | $22,344.01 |
PRM 6100 15040820577 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/09/2015 | Paid | $51,101.69 |
PRM 6100 15040820578 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/09/2015 | Paid | $73,458.75 |
PRM 6100 15040820579 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/09/2015 | Paid | $241,980.84 |
PRM 6100 15040820580 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/09/2015 | Paid | $30,049.58 |
PRM 6100 15040620162 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/07/2015 | Paid | $88,552.97 |
PRM 6100 15031617648 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/17/2015 | Paid | $25,128.98 |
PRM 6100 15030416346 | CONSTRUCTION SERVICES, GENERAL | 03/06/2015 | Paid | $67,608.22 |
PRM 6100 15030216026 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 03/04/2015 | Paid | $82,170.27 |
PRM 6100 15022715881 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 03/02/2015 | Paid | $171,892.60 |
PRM 6100 15021814642 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/19/2015 | Paid | $124,732.27 |
PRM 6100 15021814678 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/19/2015 | Paid | $360,244.78 |
PRM 6100 15021714420 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/18/2015 | Paid | $9,299.82 |
PRM 6100 15021714421 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/18/2015 | Paid | $22,520.20 |
PRM 6100 15021714423 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/18/2015 | Paid | $11,702.75 |
PRM 6100 15021714425 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/18/2015 | Paid | $11,268.45 |
PRM 6100 15021714426 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/18/2015 | Paid | $3,620.71 |
PRM 6100 15021714429 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/18/2015 | Paid | $59,791.62 |
PRM 6100 15021714430 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/18/2015 | Paid | $22,032.30 |
PRM 6100 15021714431 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/18/2015 | Paid | $3,153.12 |
PRM 6100 15021214258 | CONSTRUCTION SERVICES, GENERAL | 02/17/2015 | Paid | $46,277.57 |
PRM 6100 15012812264 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/29/2015 | Paid | $237,433.17 |
PRM 6100 15012612048 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/28/2015 | Paid | $98,826.02 |
PRM 6100 15012111609 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 01/22/2015 | Paid | $411,143.42 |
PRM 6100 15010810358 | CONSTRUCTION SERVICES, GENERAL | 01/12/2015 | Paid | $153,729.32 |
PRM 6100 15010509869 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/07/2015 | Paid | $68,473.34 |
PRM 6100 15010509871 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/07/2015 | Paid | $83,273.68 |
PRM 6100 15010509867 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/06/2015 | Paid | $14,499.09 |
PRM 6100 15010509870 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/06/2015 | Paid | $9,317.71 |
PRM 6100 15010509872 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/06/2015 | Paid | $4,640.43 |
PRM 6100 15010509875 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/06/2015 | Paid | $3,397.61 |
PRM 6100 15010509877 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/06/2015 | Paid | $3,555.73 |
PRM 6100 14121908203 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/23/2014 | Paid | $101,928.25 |
PRM 6100 14121908204 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/23/2014 | Paid | $131,780.63 |
PRM 6100 14121908205 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/23/2014 | Paid | $23,955.39 |
PRM 6100 14121607796 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/17/2014 | Paid | $51,229.02 |
PRM 6100 14121607798 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/17/2014 | Paid | $33,999.64 |
PRM 6100 14121607801 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/17/2014 | Paid | $100,236.87 |
PRM 6100 14120206338 | CONSTRUCTION SERVICES, GENERAL | 12/03/2014 | Paid | $53,316.13 |
PRM 6100 14112506047 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/02/2014 | Paid | $79,203.57 |
PRM 6100 14111705273 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/20/2014 | Paid | $38,806.89 |
PRM 6100 14111705267 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/18/2014 | Paid | $180,077.82 |
PRM 6100 14102803407 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/29/2014 | Paid | $314,879.86 |
PRM 6100 14102403030 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/28/2014 | Paid | $110,943.71 |
PRM 6100 14102703140 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/28/2014 | Paid | $305,103.42 |
PRM 6100 14102002418 | CONSTRUCTION SERVICES, GENERAL | 10/22/2014 | Paid | $93,174.44 |
PRM 6100 14101702240 | CONSTRUCTION SERVICES, GENERAL | 10/20/2014 | Paid | $61,862.11 |
PRM 6100 14100600490 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/07/2014 | Paid | $95,211.42 |
PRM 6100 14100600492 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/07/2014 | Paid | $65,615.69 |
PRM 6100 14100600497 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/07/2014 | Paid | $75,753.19 |
PRM 6100 14100600499 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 10/07/2014 | Paid | $109,427.66 |
PRM 6100 14092438014 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/25/2014 | Paid | $15,369.38 |
PRM 6100 14092438015 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/25/2014 | Paid | $127,978.73 |
PRM 6100 14092438016 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/25/2014 | Paid | $34,831.18 |
PRM 6100 14091937376 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 09/23/2014 | Paid | $42,145.94 |
PRM 6100 14091536838 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/17/2014 | Paid | $238,133.83 |
PRM 6100 14091536838 | Paving/Resurfacing, Street (Major and Residential) | 09/17/2014 | Paid | $56,647.04 |
PRM 6100 14090535920 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/08/2014 | Paid | $114,778.24 |
PRM 6100 14090235490 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/03/2014 | Paid | $19,883.34 |
PRM 6100 14082935302 | CONSTRUCTION SERVICES, GENERAL | 09/02/2014 | Paid | $169,597.36 |
PRM 6100 14082734985 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/28/2014 | Paid | $9,419.25 |
PRM 6100 14082734985 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/28/2014 | Paid | $56,997.44 |
PRM 6100 14082734999 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/28/2014 | Paid | $34,540.48 |
PRM 6100 14082034081 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 08/21/2014 | Paid | $162,957.70 |
PRM 6100 14081833711 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/19/2014 | Paid | $62,465.82 |
PRM 6100 14080532552 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/06/2014 | Paid | $114,587.43 |
PRM 6100 14080532554 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/06/2014 | Paid | $75,864.43 |
PRM 6100 14080432376 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/05/2014 | Paid | $34,631.20 |
PRM 6100 14072130553 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 07/22/2014 | Paid | $190,280.56 |
PRM 6100 14070728573 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/10/2014 | Paid | $119,565.38 |
PRM 6100 14070328447 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/08/2014 | Paid | $163,735.73 |
PRM 6100 14061726574 | Paving/Resurfacing, Street (Major and Residential) | 06/19/2014 | Paid | $54,200.45 |
PRM 6100 14061726569 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/18/2014 | Paid | $121,108.17 |
PRM 6100 14060625474 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 06/09/2014 | Paid | $204,301.86 |
PRM 6100 14052924685 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/02/2014 | Paid | $564,397.18 |
PRM 6100 14052023792 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/21/2014 | Paid | $295,943.90 |
PRM 6100 14050622230 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 05/07/2014 | Paid | $230,860.44 |
PRM 6100 14050521985 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/06/2014 | Paid | $84,038.52 |
PRM 6100 14050521987 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/06/2014 | Paid | $286,704.50 |
PRM 6100 14050521989 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/06/2014 | Paid | $271,438.47 |
PRM 6100 14050521991 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/06/2014 | Paid | $64,554.67 |
PRM 6100 14042220794 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/23/2014 | Paid | $67,558.87 |
PRM 6100 14041419931 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 04/15/2014 | Paid | $166,945.27 |
PRM 6100 14040719238 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 04/08/2014 | Paid | $31,099.50 |
PRM 6100 14032417481 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/26/2014 | Paid | $52,075.29 |
PRM 6100 14032017012 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/24/2014 | Paid | $123,614.65 |
PRM 6100 14032017012 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/24/2014 | Paid | $66,435.30 |
PRM 6100 14031216241 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/14/2014 | Paid | $49,230.21 |
PRM 6100 14031216241 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 03/14/2014 | Paid | $347,470.26 |
PRM 6100 14031015866 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 03/12/2014 | Paid | $98,477.51 |
PRM 6100 14020612813 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/07/2014 | Paid | $75,531.89 |
PRM 6100 14020612815 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/07/2014 | Paid | $42,908.18 |
PRM 6100 14020612817 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/07/2014 | Paid | $16,160.35 |
PRM 6100 14020612819 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/07/2014 | Paid | $60,302.01 |
PRM 6100 14020612821 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/07/2014 | Paid | $16,537.60 |
PRM 6100 14012111351 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 01/22/2014 | Paid | $141,134.28 |
PRM 6100 14011310682 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/14/2014 | Paid | $181,986.56 |
PRM 6100 14010609618 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/07/2014 | Paid | $7,647.84 |
PRM 6100 13122708945 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/30/2013 | Paid | $26,932.50 |
PRM 6100 13122008634 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 12/26/2013 | Paid | $193,658.77 |
PRM 6100 13121607978 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/17/2013 | Paid | $28,380.63 |
PRM 6100 13121607980 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/17/2013 | Paid | $188,897.54 |
PRM 6100 13121607993 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/17/2013 | Paid | $84,217.54 |
PRM 6100 13112506057 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/26/2013 | Paid | $50,464.63 |
PRM 6100 13112506057 | Paving/Resurfacing, Street (Major and Residential) | 11/26/2013 | Paid | $120,484.28 |
PRM 6100 13112506057 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 11/26/2013 | Paid | $110,763.61 |
PRM 6100 13111805487 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 11/19/2013 | Paid | $191,745.75 |
PRM 6100 13110504390 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/06/2013 | Paid | $4,657.11 |
PRM 6100 13110504398 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/06/2013 | Paid | $256,301.23 |
PRM 6100 13110504402 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/06/2013 | Paid | $345,421.94 |
PRM 6100 13110504409 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/06/2013 | Paid | $25,470.69 |
PRM 6100 13102202464 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/23/2013 | Paid | $168,273.19 |
PRM 6100 13101801857 | Paving/Resurfacing, Street (Major and Residential) | 10/21/2013 | Paid | $210,743.51 |
PRM 6100 13101601605 | Paving/Resurfacing, Street (Major and Residential) | 10/17/2013 | Paid | $287,181.75 |
PRM 6100 13100700657 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/08/2013 | Paid | $136,009.91 |
PRM 6100 13100700662 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/08/2013 | Paid | $230,139.54 |
PRM 6100 13100700664 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/08/2013 | Paid | $37,127.64 |
PRM 6100 13100700664 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 10/08/2013 | Paid | $282,568.36 |
PRM 6100 13100700667 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/08/2013 | Paid | $104,971.83 |
PRM 6100 13092636472 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 09/27/2013 | Paid | $351,422.58 |
PRM 6100 13092536319 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/26/2013 | Paid | $117,749.18 |
PRM 6100 13091335121 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 09/16/2013 | Paid | $284,121.27 |
PRM 6100 13083033683 | Site Work | 09/04/2013 | Paid | $48,015.42 |
PRM 6100 13082633193 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 08/27/2013 | Paid | $68,555.51 |
PRM 6100 13082032638 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/21/2013 | Paid | $130,953.92 |
PRM 6100 13081632376 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/19/2013 | Paid | $228,832.56 |
PRM 6100 13072630395 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/29/2013 | Paid | $298,956.07 |
PRM 6100 13071628530 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/17/2013 | Paid | $103,926.67 |
PRM 6100 13071528287 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 07/16/2013 | Paid | $153,542.50 |
PRM 6100 13071528288 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/16/2013 | Paid | $227,581.77 |
PRM 6100 13071528294 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/16/2013 | Paid | $80,336.04 |
PRM 6100 13071528297 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/16/2013 | Paid | $19,829.85 |
PRM 6100 13071528298 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/16/2013 | Paid | $116,062.67 |
PRM 6100 13062626856 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/27/2013 | Paid | $141,267.65 |
PRM 6100 13053024456 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/31/2013 | Paid | $11,855.19 |
PRM 6100 13053024461 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/31/2013 | Paid | $56,232.45 |
PRM 6100 13053024462 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/31/2013 | Paid | $7,908.00 |
PRM 6100 13053024463 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/31/2013 | Paid | $57,363.28 |
PRM 6100 13053024466 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/31/2013 | Paid | $61,108.59 |
PRM 6100 13053024468 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/31/2013 | Paid | $2,132.75 |
PRM 6100 13053024469 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/31/2013 | Paid | $119,937.41 |
PRM 6100 13053024470 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/31/2013 | Paid | $30,939.14 |
PRM 6100 13053024471 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/31/2013 | Paid | $162,842.98 |
PRM 6100 13053024472 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/31/2013 | Paid | $44,546.21 |
PRM 6100 13053024473 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/31/2013 | Paid | $53,804.67 |
PRM 6100 13053024474 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/31/2013 | Paid | $36,222.31 |
PRM 6100 13053024475 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/31/2013 | Paid | $161,160.85 |
PRM 6100 13053024476 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/31/2013 | Paid | $142,368.52 |
PRM 6100 13053024477 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/31/2013 | Paid | $3,844.65 |
PRM 6100 13053024479 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/31/2013 | Paid | $17,526.86 |
PRM 6100 13053024480 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/31/2013 | Paid | $2,789.86 |
PRM 6100 13052423854 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/28/2013 | Paid | $210,713.72 |
PRM 6100 13042921402 | Paving/Resurfacing, Street (Major and Residential) | 04/30/2013 | Paid | $74,364.91 |
PRM 6100 13042621175 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/29/2013 | Paid | $48,043.78 |
PRM 6100 13042621176 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/29/2013 | Paid | $23,691.84 |
PRM 6100 13042220404 | Site Work | 04/23/2013 | Paid | $16,039.83 |
PRM 6100 13041920291 | Dam and Levee Construction, Maintenance and Repair | 04/22/2013 | Paid | $26,320.93 |
PRM 6100 13041820148 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/19/2013 | Paid | $43,322.85 |
PRM 6100 13041820149 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/19/2013 | Paid | $260,657.34 |
PRM 6100 13041720012 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/18/2013 | Paid | $7,618.99 |
PRM 6100 13041720014 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/18/2013 | Paid | $4,246.50 |
PRM 6100 13041519773 | Construction, Sewer and Storm Drain | 04/16/2013 | Paid | $57,228.52 |
PRM 6100 13032818166 | Site Work | 03/29/2013 | Paid | $112,126.13 |
PRM 6100 13032217652 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/25/2013 | Paid | $190,618.77 |
PRM 6100 13032217653 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/25/2013 | Paid | $163,821.85 |
PRM 6100 13030816385 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/11/2013 | Paid | $477,450.59 |
PRM 6100 13022715240 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/28/2013 | Paid | $122,952.56 |
PRM 6100 13022715241 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/28/2013 | Paid | $36,928.97 |
PRM 6100 13022715242 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/28/2013 | Paid | $33,698.93 |
PRM 6100 13022715243 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/28/2013 | Paid | $27,493.33 |
PRM 6100 13022715244 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/28/2013 | Paid | $45,662.70 |
PRM 6100 13022715245 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/28/2013 | Paid | $65,540.06 |
PRM 6100 13022715246 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/28/2013 | Paid | $6,840.00 |
PRM 6100 13022715247 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/28/2013 | Paid | $43,470.22 |
PRM 6100 13022715248 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/28/2013 | Paid | $112,938.94 |
PRM 6100 13021113717 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 02/12/2013 | Paid | $47,154.65 |
PRM 6100 13020713447 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/08/2013 | Paid | $116,206.95 |
PRM 6100 13012912541 | Site Work | 01/30/2013 | Paid | $126,052.56 |
PRM 6100 13011510827 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/16/2013 | Paid | $107,965.20 |
PRM 6100 12121307546 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/14/2012 | Paid | $86,749.67 |
PRM 6100 12112906262 | CONSTRUCTION SERVICES, HEAVY | 11/30/2012 | Paid | $58,727.82 |
PRM 6100 12112605713 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/27/2012 | Paid | $308,214.31 |
PRM 6100 12111905435 | Construction, Sewer and Storm Drain | 11/20/2012 | Paid | $47,560.02 |
PRM 6100 12111905436 | Construction, Bridge and Drawbridge (Includes Reconstruction | 11/20/2012 | Paid | $43,335.88 |
PRM 6100 12111905437 | Construction, Bridge and Drawbridge (Includes Reconstruction | 11/20/2012 | Paid | $1,912.00 |
PRM 6100 12111304857 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/14/2012 | Paid | $71,601.67 |
PRM 6100 12110904721 | Construction, Highway and Road | 11/13/2012 | Paid | $15,000.00 |
PRM 6100 12100800915 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/09/2012 | Paid | $8,286.48 |
PRM 6100 12100300474 | Construction, Bridge and Drawbridge (Includes Reconstruction | 10/04/2012 | Paid | $143,981.78 |
PRM 6100 12100300475 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/04/2012 | Paid | $129,981.59 |
PRM 6100 12100300476 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/04/2012 | Paid | $258,527.82 |
PRM 6100 12100300477 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/04/2012 | Paid | $77,833.28 |
PRM 6100 12100300478 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/04/2012 | Paid | $566,083.06 |
PRM 6100 12100300479 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/04/2012 | Paid | $91,075.77 |
PRM 6100 12090633068 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 09/07/2012 | Paid | $126,193.45 |
PRM 6100 12090633069 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 09/07/2012 | Paid | $25,446.89 |
PRM 6100 12090432702 | Construction, Bridge and Drawbridge (Includes Reconstruction | 09/05/2012 | Paid | $94,580.65 |
PRM 6100 12082331500 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/24/2012 | Paid | $135,845.66 |
PRM 6100 12082331501 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/24/2012 | Paid | $254,137.58 |
PRM 6100 12082331502 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/24/2012 | Paid | $100,253.43 |
PRM 6100 12082031098 | Construction, Sewer and Storm Drain | 08/21/2012 | Paid | $23,412.37 |
PRM 6100 12081030194 | Construction, Highway and Road | 08/13/2012 | Paid | $89,824.02 |
PRM 6100 12080629553 | Construction, Bridge and Drawbridge (Includes Reconstruction | 08/07/2012 | Paid | $151,460.55 |
PRM 6100 12071727719 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/18/2012 | Paid | $310,183.72 |
PRM 6100 12071727720 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/18/2012 | Paid | $187,699.64 |
PRM 6100 12061924783 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/20/2012 | Paid | $24,504.78 |
PRM 6100 12061924784 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/20/2012 | Paid | $318,554.35 |
PRM 6100 12061924785 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/20/2012 | Paid | $63,402.76 |
PRM 6100 12061824665 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/19/2012 | Paid | $176,696.54 |
PRM 6100 12060423402 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/05/2012 | Paid | $336,808.08 |
PRM 6100 12060123248 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/04/2012 | Paid | $142,908.03 |
PRM 6100 12060123249 | Construction, Sewer and Storm Drain | 06/04/2012 | Paid | $56,447.66 |
PRM 6100 12060123250 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/04/2012 | Paid | $100,932.47 |
PRM 6100 12050820910 | Dam and Levee Construction, Maintenance and Repair | 05/09/2012 | Paid | $32,506.92 |
PRM 6100 12050820911 | Construction, Sewer and Storm Drain | 05/09/2012 | Paid | $132,760.50 |
PRM 6100 12050820913 | Construction, Highway and Road | 05/09/2012 | Paid | $49,755.56 |
PRM 6100 12050320693 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/04/2012 | Paid | $24,627.40 |
PRM 6100 12050320694 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/04/2012 | Paid | $14,791.52 |
PRM 6100 12050220415 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/03/2012 | Paid | $76,018.43 |
PRM 6100 12042719955 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/30/2012 | Paid | $64,065.15 |
PRM 6100 12042519680 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/26/2012 | Paid | $888.25 |
PRM 6100 12042519681 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/26/2012 | Paid | $5,560.44 |
PRM 6100 12042519682 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/26/2012 | Paid | $26,600.00 |
PRM 6100 12041318441 | CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, | 04/16/2012 | Paid | $29,436.98 |
PRM 6100 12041018015 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/11/2012 | Paid | $118,480.20 |
PRM 6100 12040217324 | Construction, Highway and Road | 04/03/2012 | Paid | $23,403.82 |
PRM 6100 12040217325 | Construction, Sewer and Storm Drain | 04/03/2012 | Paid | $145,532.88 |
PRM 6100 12032216396 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/23/2012 | Paid | $14,701.38 |
PRM 6100 12032216397 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/23/2012 | Paid | $10,560.15 |
PRM 6100 12032216398 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/23/2012 | Paid | $9,043.85 |
PRM 6100 12032216399 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/23/2012 | Paid | $8,047.82 |
PRM 6100 12032216400 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/23/2012 | Paid | $12,440.94 |
PRM 6100 12032216401 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/23/2012 | Paid | $7,679.19 |
PRM 6100 12032216402 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/23/2012 | Paid | $2,826.36 |
PRM 6100 12032216403 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/23/2012 | Paid | $3,005.50 |
PRM 6100 12032016134 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/21/2012 | Paid | $149,052.53 |
PRM 6100 12032016135 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/21/2012 | Paid | $18,857.50 |
PRM 6100 12032016136 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/21/2012 | Paid | $83,120.96 |
PRM 6100 12032016137 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/21/2012 | Paid | $125,293.17 |
PRM 6100 12031915940 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/20/2012 | Paid | $85,788.51 |
PRM 6100 12031915941 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/20/2012 | Paid | $24,334.25 |
PRM 6100 12031915942 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/20/2012 | Paid | $139,785.50 |
PRM 6100 12031915943 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/20/2012 | Paid | $16,508.63 |
PRM 6100 12031915944 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/20/2012 | Paid | $10,716.00 |
PRM 6100 12031915945 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/20/2012 | Paid | $50,308.49 |
PRM 6100 12030514428 | Construction, Sewer and Storm Drain | 03/06/2012 | Paid | $120,613.35 |
PRM 6100 12030514429 | Construction, Highway and Road | 03/06/2012 | Paid | $49,792.28 |
PRM 6100 12030214319 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/05/2012 | Paid | $493,903.76 |
PRM 6100 12022313419 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/24/2012 | Paid | $110,349.68 |
PRM 6100 12021312344 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/14/2012 | Paid | $18,070.66 |
PRM 6100 12021312345 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 02/14/2012 | Paid | $82,649.12 |
PRM 6100 12020611626 | Construction, Highway and Road | 02/07/2012 | Paid | $23,979.28 |
PRM 6100 12020611627 | Construction, Sewer and Storm Drain | 02/07/2012 | Paid | $166,100.50 |
PRM 6100 12012710904 | CONSTRUCTION SERVICES, GENERAL | 01/30/2012 | Paid | $20,845.39 |
PRM 6100 12012610791 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/27/2012 | Paid | $144,642.77 |
PRM 6100 12012610792 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/27/2012 | Paid | $27,321.53 |
PRM 6100 12012610793 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/27/2012 | Paid | $67,719.13 |
PRM 6100 12012610794 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 01/27/2012 | Paid | $37,062.35 |
PRM 6100 12010508822 | CONSTRUCTION SERVICES, HEAVY | 01/06/2012 | Paid | $8,484.69 |
PRM 6100 11122708051 | Construction, Sewer and Storm Drain | 12/28/2011 | Paid | $106,667.67 |
PRM 6100 11121907518 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/20/2011 | Paid | $146,772.91 |
PRM 6100 11121907519 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/20/2011 | Paid | $98,409.74 |
PRM 6100 11120906736 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/12/2011 | Paid | $143,967.08 |
PRM 6100 11120906737 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 12/12/2011 | Paid | $205,636.43 |
PRM 6100 11120706474 | CONSTRUCTION SERVICES, HEAVY | 12/08/2011 | Paid | $44,436.10 |
PRM 6100 11120506207 | Construction, Sewer and Storm Drain | 12/06/2011 | Paid | $104,463.90 |
PRM 6100 11112205289 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 11/23/2011 | Paid | $61,127.75 |
PRM 6100 11112205290 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 11/23/2011 | Paid | $84,475.71 |
PRM 6100 11112205291 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 11/23/2011 | Paid | $156,648.34 |
PRM 6100 11110904226 | CONSTRUCTION SERVICES, HEAVY | 11/10/2011 | Paid | $8,881.58 |
PRM 6100 11110403751 | Construction, Sewer and Storm Drain | 11/07/2011 | Paid | $27,501.45 |
PRM 6100 11101201204 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/13/2011 | Paid | $359,085.84 |
PRM 6100 11101201205 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/13/2011 | Paid | $106,786.13 |
PRM 6100 11101201206 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 10/13/2011 | Paid | $81,932.61 |
PRM 6100 11101000921 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/11/2011 | Paid | $12,964.42 |
PRM 6100 11100500456 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 10/06/2011 | Paid | $64,226.83 |
PRM 6100 11100500457 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 10/06/2011 | Paid | $8,397.24 |
PRM 6100 11100500458 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 10/06/2011 | Paid | $237,845.35 |
PRM 6100 11100400273 | CONSTRUCTION SERVICES, HEAVY | 10/05/2011 | Paid | $51,100.03 |
PRM 6100 11093036069 | Construction, Sewer and Storm Drain | 10/03/2011 | Paid | $143,220.90 |
PRM 6100 11092635410 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $4,476.20 |
PRM 6100 11092635411 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $2,376.21 |
PRM 6100 11092635412 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $11,086.80 |
PRM 6100 11092635413 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $200.00 |
PRM 6100 11092635414 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $1,836.44 |
PRM 6100 11092635415 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $1,271.12 |
PRM 6100 11092635416 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $834.68 |
PRM 6100 11092635417 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $3,577.16 |
PRM 6100 11092635418 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $309.83 |
PRM 6100 11092635419 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $309.83 |
PRM 6100 11092635420 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $2,223.15 |
PRM 6100 11092635421 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $3,050.67 |
PRM 6100 11092635422 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $1,539.32 |
PRM 6100 11092635423 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $5,693.74 |
PRM 6100 11092635424 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $795.76 |
PRM 6100 11092635426 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $5,241.49 |
PRM 6100 11092635427 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $11,219.25 |
PRM 6100 11092635428 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $11,580.35 |
PRM 6100 11092635429 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $14,175.45 |
PRM 6100 11092635430 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 09/27/2011 | Paid | $12,630.95 |
PRM 6100 11091934740 | CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, | 09/20/2011 | Paid | $17,521.48 |
PRM 6100 11090733727 | Dam and Levee Construction, Maintenance and Repair | 09/08/2011 | Paid | $9,515.46 |
PRM 6100 11090633597 | CONSTRUCTION SERVICES, GENERAL | 09/07/2011 | Paid | $21,188.70 |
PRM 6100 11090633597 | CONSTRUCTION SERVICES, HEAVY | 09/07/2011 | Paid | $186,512.07 |
PRM 6100 11081931984 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/22/2011 | Paid | $179,251.37 |
PRM 6100 11081931985 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/22/2011 | Paid | $59,600.43 |
PRM 6100 11081931986 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/22/2011 | Paid | $82,161.89 |
PRM 6100 11081631476 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 08/17/2011 | Paid | $22,945.15 |
PRM 6100 11081631477 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/17/2011 | Paid | $65,869.64 |
PRM 6100 11080930754 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 08/10/2011 | Paid | $106,925.35 |
PRM 6100 11080229965 | CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, | 08/03/2011 | Paid | $29,061.66 |
PRM 6100 11080129802 | CONSTRUCTION SERVICES, HEAVY | 08/02/2011 | Paid | $82,015.40 |
PRM 6100 11080129803 | CONSTRUCTION SERVICES, GENERAL | 08/02/2011 | Paid | $22,723.07 |
PRM 6100 11072829598 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/29/2011 | Paid | $65,743.80 |
PRM 6100 11072729462 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/28/2011 | Paid | $53,067.56 |
PRM 6100 11071227954 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/13/2011 | Paid | $65,927.24 |
PRM 6100 11071227955 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/13/2011 | Paid | $37,104.68 |
PRM 6100 11071227956 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/13/2011 | Paid | $6,387.51 |
PRM 6100 11071227957 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 07/13/2011 | Paid | $119,454.09 |
PRM 6100 11071127815 | CONSTRUCTION SERVICES, HEAVY | 07/12/2011 | Paid | $115,807.87 |
PRM 6100 11070627481 | CONSTRUCTION SERVICES, GENERAL | 07/07/2011 | Paid | $28,078.87 |
PRM 6100 11062826797 | CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, | 06/29/2011 | Paid | $63,764.53 |
PRM 6100 11062026061 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/21/2011 | Paid | $26,893.84 |
PRM 6100 11062026062 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/21/2011 | Paid | $135,175.97 |
PRM 6100 11062026063 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/21/2011 | Paid | $6,460.00 |
PRM 6100 11062026064 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/21/2011 | Paid | $25,199.42 |
PRM 6100 11062026065 | PAVEMENT, PORTLAND CEMENT CONCRETE. THIS WORK SHA | 06/21/2011 | Paid | $25,099.44 |
PRM 6100 11060824906 | CONSTRUCTION SERVICES, GENERAL | 06/09/2011 | Paid | $15,059.46 |
PRM 6100 11060724726 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/08/2011 | Paid | $88,244.79 |
PRM 6100 11060724727 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 06/08/2011 | Paid | $60,541.89 |
PRM 6100 11060624634 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/07/2011 | Paid | $3,695.50 |
PRM 6100 11060624635 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/07/2011 | Paid | $40,087.58 |
PRM 6100 11060624636 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/07/2011 | Paid | $17,016.87 |
PRM 6100 11060324500 | Dam and Levee Construction, Maintenance and Repair | 06/06/2011 | Paid | $9,493.96 |
PRM 6100 11060324501 | CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, | 06/06/2011 | Paid | $134,911.88 |
PRM 6100 11052724025 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/31/2011 | Paid | $104,586.16 |
PRM 6100 11052724026 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/31/2011 | Paid | $45,924.81 |
PRM 6100 11050922202 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/10/2011 | Paid | $19,380.00 |
PRM 6100 11050922202 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/10/2011 | Paid | $49,651.27 |
PRM 6100 11050922203 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/10/2011 | Paid | $9,600.79 |
PRM 6100 11050922204 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 05/10/2011 | Paid | $13,242.66 |
PRM 6100 11050922205 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/10/2011 | Paid | $1,881.00 |
PRM 6100 11050922206 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/10/2011 | Paid | $77,206.03 |
PRM 6100 11050922207 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/10/2011 | Paid | $23,268.35 |
PRM 6100 11050922208 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/10/2011 | Paid | $8,529.15 |
PRM 6100 11050922209 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/10/2011 | Paid | $23,583.80 |
PRM 6100 11050922210 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/10/2011 | Paid | $10,268.41 |
PRM 6100 11050922211 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/10/2011 | Paid | $31,284.83 |
PRM 6100 11050922212 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/10/2011 | Paid | $24,602.62 |
PRM 6100 11050922213 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/10/2011 | Paid | $4,987.50 |
PRM 6100 11050221370 | CONSTRUCTION SERVICES, GENERAL | 05/03/2011 | Paid | $32,286.60 |
PRM 6100 11042921254 | CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, | 05/02/2011 | Paid | $83,280.31 |
PRM 6100 11041519961 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 04/18/2011 | Paid | $2,403.75 |
PRM 6100 11041519962 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 04/18/2011 | Paid | $24,257.39 |
PRM 6100 11041519963 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 04/18/2011 | Paid | $6,710.62 |
PRM 6100 11041519964 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 04/18/2011 | Paid | $7,366.28 |
PRM 6100 11041419853 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 04/15/2011 | Paid | $65,545.87 |
PRM 6100 11040418729 | CONSTRUCTION SERVICES, GENERAL | 04/05/2011 | Paid | $48,787.25 |
PRM 6100 11040118548 | CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, | 04/04/2011 | Paid | $22,398.50 |
PRM 6100 11032918003 | Demolition Services | 03/30/2011 | Paid | $37,968.16 |
PRM 6100 11032117154 | CONSTRUCTION SERVICES, HEAVY | 03/22/2011 | Paid | $16,871.51 |
PRM 6100 11032117154 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/22/2011 | Paid | $19,508.67 |
PRM 6100 11032117154 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 03/22/2011 | Paid | $87,072.85 |
PRM 6100 11030715672 | CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, | 03/08/2011 | Paid | $57,227.15 |
PRM 6100 11022214022 | CONSTRUCTION SERVICES, GENERAL | 02/23/2011 | Paid | $19,482.36 |
PRM 6100 11020312779 | Dam and Levee Construction, Maintenance and Repair | 02/04/2011 | Paid | $12,764.11 |
PRM 6100 11012611912 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/27/2011 | Paid | $22,269.19 |
PRM 6100 11012611913 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/27/2011 | Paid | $11,770.45 |
PRM 6100 11012611914 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/27/2011 | Paid | $2,645.75 |
PRM 6100 11012611915 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/27/2011 | Paid | $23,965.36 |
PRM 6100 11012611916 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/27/2011 | Paid | $136,524.08 |
PRM 6100 11012611917 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 01/27/2011 | Paid | $53,700.94 |
PRM 6100 11012011133 | CONSTRUCTION SERVICES, HEAVY | 01/21/2011 | Paid | $39,079.93 |
PRM 6100 11011910983 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 01/20/2011 | Paid | $20,003.09 |
PRM 6100 11011910984 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 01/20/2011 | Paid | $43,519.96 |
PRM 6100 10122108381 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 12/22/2010 | Paid | $18,068.07 |
PRM 6100 10120707188 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/08/2010 | Paid | $1,710.00 |
PRM 6100 10120607017 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/07/2010 | Paid | $97,972.71 |
PRM 6100 10120607018 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/07/2010 | Paid | $91,430.85 |
PRM 6100 10120607019 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/07/2010 | Paid | $78,692.30 |
PRM 6100 10120306860 | Demolition Services | 12/06/2010 | Paid | $41,775.77 |
PRM 6100 10120106545 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 12/02/2010 | Paid | $18,229.00 |
PRM 6100 10111204850 | Dam and Levee Construction, Maintenance and Repair | 11/15/2010 | Paid | $15,980.25 |
PRM 6100 10110304011 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/04/2010 | Paid | $119,100.46 |
PRM 6100 10110304012 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/04/2010 | Paid | $33,808.15 |
PRM 6100 10110203854 | Demolition Services | 11/03/2010 | Paid | $53,655.13 |
PRM 6100 10110203855 | PAVEMENT, PORTLAND CEMENT CONCRETE. THIS WORK SHA | 11/03/2010 | Paid | $29,625.37 |
PRM 6100 10110103732 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/02/2010 | Paid | $7,980.00 |
PRM 6100 10110103733 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 11/02/2010 | Paid | $202,120.10 |
PRM 6100 10100400238 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/05/2010 | Paid | $55,042.53 |
PRM 6100 10100400239 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/05/2010 | Paid | $106,370.55 |
PRM 6100 10100400240 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/05/2010 | Paid | $15,119.46 |
PRM 6100 10100400241 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/05/2010 | Paid | $200,642.76 |
PRM 6100 10100400242 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 10/05/2010 | Paid | $47,139.00 |
PRM 6100 10100100046 | Demolition Services | 10/04/2010 | Paid | $85,453.83 |
PRM 6100 10090336076 | Demolition Services | 09/07/2010 | Paid | $77,402.37 |
PRM 6100 10082334694 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/24/2010 | Paid | $85,047.80 |
PRM 6100 10082334695 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/24/2010 | Paid | $8,512.00 |
PRM 6100 10082334696 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/24/2010 | Paid | $113,656.10 |
PRM 6100 10082334697 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/24/2010 | Paid | $214,291.02 |
PRM 6100 10080332649 | Dam and Levee Construction, Maintenance and Repair | 08/04/2010 | Paid | $0.10 |
PRM 6100 10080232500 | Dam and Levee Construction, Maintenance and Repair | 08/03/2010 | Paid | $10,739.21 |
PRM 6100 10080232501 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/03/2010 | Paid | $17,978.09 |
PRM 6100 10080232502 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/03/2010 | Paid | $30,129.25 |
PRM 6100 10080232503 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/03/2010 | Paid | $10,867.62 |
PRM 6100 10080232504 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 08/03/2010 | Paid | $43,873.85 |
PRM 6100 10080232505 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 08/03/2010 | Paid | $8,712.00 |
PRM 6100 10073032351 | Demolition Services | 08/02/2010 | Paid | $83,426.33 |
PRM 6100 10073032352 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 08/02/2010 | Paid | $63,282.45 |
PRM 6100 10072731854 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/28/2010 | Paid | $108,181.01 |
PRM 6100 10072731855 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/28/2010 | Paid | $149,534.75 |
PRM 6100 10072731856 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/28/2010 | Paid | $22,772.83 |
PRM 6100 10072131192 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/22/2010 | Paid | $30,689.75 |
PRM 6100 10072131193 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/22/2010 | Paid | $25,621.50 |
PRM 6100 10072131194 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/22/2010 | Paid | $13,983.29 |
PRM 6100 10070229353 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 07/06/2010 | Paid | $53,322.04 |
PRM 6100 10062227923 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/23/2010 | Paid | $72,341.78 |
PRM 6100 10062127789 | Dam and Levee Construction, Maintenance and Repair | 06/22/2010 | Paid | $15,237.30 |
PRM 6100 10060826535 | PAVEMENT, PORTLAND CEMENT CONCRETE. THIS WORK SHA | 06/09/2010 | Paid | $324,809.47 |
PRM 6100 10060426254 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/07/2010 | Paid | $29,247.01 |
PRM 6100 10060426255 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 06/07/2010 | Paid | $57,962.71 |
PRM 6100 10051724240 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/18/2010 | Paid | $126,644.36 |
PRM 6100 10051724241 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 05/18/2010 | Paid | $24,151.25 |
PRM 6100 10042622077 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/27/2010 | Paid | $3,800.00 |
PRM 6100 10042622078 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/27/2010 | Paid | $67,965.98 |
PRM 6100 10042622079 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/27/2010 | Paid | $45,147.89 |
PRM 6100 10042622080 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 04/27/2010 | Paid | $34,892.31 |
PRM 6100 10032218596 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. | 03/23/2010 | Paid | $17,168.77 |
PRM 6100 10031918438 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/22/2010 | Paid | $46,540.67 |
PRM 6100 10031117357 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/12/2010 | Paid | $42,239.79 |
PRM 6100 10031117358 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/12/2010 | Paid | $99,588.36 |
PRM 6100 10031117359 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/12/2010 | Paid | $15,858.83 |
PRM 6100 10031117360 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/12/2010 | Paid | $5,886.79 |
PRM 6100 10031117361 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/12/2010 | Paid | $5,886.79 |
PRM 6100 10031117362 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/12/2010 | Paid | $210,649.20 |
PRM 6100 10031117363 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 03/12/2010 | Paid | $42,222.19 |
PRM 6100 10021714522 | SIDEWALK, PORTLAND CEMENT CONCRETE. | 02/18/2010 | Paid | $14,140.17 |
PRM 6100 10021214344 | Construction, Bridge and Drawbridge (Includes Reconstruction | 02/16/2010 | Paid | $12,716.68 |
PRM 6100 10021214344 | Dam and Levee Construction, Maintenance and Repair | 02/16/2010 | Paid | $36,354.24 |
PRM 6100 10021214344 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 02/16/2010 | Paid | $32,041.53 |
PRM 6100 10020112715 | Construction, Sidewalk and Driveway (incl Handicapped ramps) | 02/02/2010 | Paid | $127,776.38 |
PRM 6100 10011911278 | Dam and Levee Construction, Maintenance and Repair | 01/20/2010 | Paid | $160,764.63 |
PRM 6100 09121708249 | Construction, Sidewalk and Driveway (Includes Pede | 12/18/2009 | Paid | $204,101.89 |
PRM 6100 09121708250 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. THIS WORK SH | 12/18/2009 | Paid | $100,411.36 |
PRM 6100 09121708251 | Construction, Sidewalk and Driveway (Includes Pede | 12/18/2009 | Paid | $70,647.36 |
PRM 6100 09120807293 | Construction, Bridge (Includes Reconstruction/Reha | 12/09/2009 | Paid | $13,731.12 |
PRM 6100 09120807293 | PAVEMENT MARKING LINES, LETTERS AND SYMBOLS. | 12/09/2009 | Paid | $37,565.66 |
PRM 6100 09120106533 | Dam and Levee Construction, Maintenance and Repair | 12/02/2009 | Paid | $104,079.91 |
PRM 6100 09111605205 | Construction, Bridge (Includes Reconstruction/Reha | 11/17/2009 | Paid | $56,125.05 |
PRM 6100 09111605205 | Dam and Levee Construction, Maintenance and Repair | 11/17/2009 | Paid | $123,607.90 |
PRM 6100 09111605205 | SIDEWALK, PORTLAND CEMENT CONCRETE. THIS WORK SHAL | 11/17/2009 | Paid | $55,301.26 |
PRM 6100 09110203591 | Construction, Sidewalk and Driveway (Includes Pede | 11/03/2009 | Paid | $59,411.66 |
PRM 6100 09100500343 | PAVEMENT, PORTLAND CEMENT CONCRETE. THIS WORK SHA | 10/06/2009 | Paid | $36,043.69 |
PRM 6100 09100200234 | Dam and Levee Construction, Maintenance and Repair | 10/05/2009 | Paid | $66,315.40 |
PRM 6100 09100200234 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. THIS WORK SH | 10/05/2009 | Paid | $65,509.63 |
PRM 6100 09092344770 | Construction, Bridge (Includes Reconstruction/Reha | 09/24/2009 | Paid | $32,683.95 |
PRM 6100 09092344770 | SIDEWALK, PORTLAND CEMENT CONCRETE. THIS WORK SHAL | 09/24/2009 | Paid | $12,197.99 |
PRM 6100 09082842032 | Dam and Levee Construction, Maintenance and Repair | 08/31/2009 | Paid | $102,800.25 |
PRM 6100 09081240000 | Construction, Sidewalk and Driveway (Includes Pede | 08/13/2009 | Paid | $34,257.82 |
PRM 6100 09080439126 | Dam and Levee Construction, Maintenance and Repair | 08/05/2009 | Paid | $190,293.15 |
PRM 6100 09080439126 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. THIS WORK SH | 08/05/2009 | Paid | $273,361.67 |
PRM 6100 09080338911 | PAVEMENT, PORTLAND CEMENT CONCRETE. THIS WORK SHA | 08/04/2009 | Paid | $29,837.20 |
PRM 6100 09080338911 | SIDEWALK, PORTLAND CEMENT CONCRETE. THIS WORK SHAL | 08/04/2009 | Paid | $80,026.78 |
PRM 6100 09071636664 | Construction, Sidewalk and Driveway (Includes Pede | 07/17/2009 | Paid | $54,339.99 |
PRM 6100 09070635311 | Dam and Levee Construction, Maintenance and Repair | 07/07/2009 | Paid | $207,159.89 |
PRM 6100 09070635312 | Construction, Sidewalk and Driveway (Includes Pede | 07/07/2009 | Paid | $79,343.75 |
PRM 6100 09070235162 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. THIS WORK SH | 07/06/2009 | Paid | $171,451.02 |
PRM 6100 09061633246 | BARRICADES, TRAFFIC, PORTABLE | 06/17/2009 | Paid | $4,924.07 |
PRM 6100 09061633246 | PAVEMENT, PORTLAND CEMENT CONCRETE. THIS WORK SHA | 06/17/2009 | Paid | $49,448.45 |
PRM 6100 09052931265 | Dam and Levee Construction, Maintenance and Repair | 06/01/2009 | Paid | $196,196.49 |
PRM 6100 09040925255 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. THIS WORK SH | 04/10/2009 | Paid | $107,638.14 |
PRM 6100 09030420182 | SIDEWALK, PORTLAND CEMENT CONCRETE. THIS WORK SHAL | 03/05/2009 | Paid | $179,196.45 |
PRM 6100 09013015945 | SIDEWALK W/RAMPS FOR THE HANDICAPPED. THIS WORK SH | 02/02/2009 | Paid | $216,076.93 |
PRM 6100 09012715323 | Construction, Sidewalk and Driveway (Includes Pede | 01/28/2009 | Paid | $55,226.83 |
PRM 6100 08121610757 | Construction, Sidewalk and Driveway (Includes Pede | 12/17/2008 | Paid | $316,572.76 |