PRM 6100 24041522439 |
Construction, Pipeline |
04/17/2024 |
Outstanding |
$753,682.50 |
PRM 6100 24041022008 |
Construction, Pipeline |
04/12/2024 |
Outstanding |
$93,146.69 |
PRM 6100 24041022012 |
Site Work |
04/12/2024 |
Outstanding |
$207,657.54 |
PRM 6100 24040921932 |
Construction, Pipeline |
04/11/2024 |
Outstanding |
$144,484.17 |
PRM 6100 24040521602 |
CONSTRUCTION SERVICES, HEAVY |
04/09/2024 |
Outstanding |
$329,685.38 |
PRM 6100 24040120831 |
Construction, Pipeline |
04/03/2024 |
Outstanding |
$604,588.86 |
PRM 6100 24031418473 |
Construction, Pipeline |
03/18/2024 |
Paid |
$56,081.86 |
PRM 6100 24031318364 |
Construction, Pipeline |
03/15/2024 |
Paid |
$40,835.18 |
PRM 6100 24030417159 |
Site Work |
03/06/2024 |
Paid |
$289,520.37 |
PRM 6100 24030116983 |
Site Work |
03/05/2024 |
Paid |
$4,950.00 |
PRM 6100 24013013177 |
Construction, Pipeline |
02/01/2024 |
Paid |
$306,470.85 |
PRM 6100 24012913030 |
Construction, Pipeline |
01/31/2024 |
Paid |
$15,151.40 |
PRM 6100 24012412534 |
Construction, Pipeline |
01/26/2024 |
Paid |
$117,384.98 |
PRM 6100 24011611551 |
Construction, Pipeline |
01/18/2024 |
Paid |
$208,919.83 |
PRM 6100 24011611553 |
CONSTRUCTION SERVICES, HEAVY |
01/18/2024 |
Paid |
$112,249.15 |
PRM 6100 24010210041 |
Site Work |
01/04/2024 |
Paid |
$153,840.75 |
PRM 6100 23122009095 |
Construction, Pipeline |
12/21/2023 |
Paid |
$223,157.54 |
PRM 6100 23121808589 |
Construction, Pipeline |
12/20/2023 |
Paid |
$450,396.49 |
PRM 6100 23121808595 |
Construction, Pipeline |
12/20/2023 |
Paid |
$212,984.10 |
PRM 6100 23121408292 |
Construction, Pipeline |
12/18/2023 |
Paid |
$94,440.66 |
PRM 6100 23120506923 |
Construction, Pipeline |
12/07/2023 |
Paid |
$141,292.81 |
PRM 6100 23120506930 |
Construction, Pipeline |
12/07/2023 |
Paid |
$310,608.12 |
PRM 6100 23112205784 |
Site Work |
11/29/2023 |
Paid |
$183,390.18 |
PRM 6100 23112705936 |
Site Work |
11/29/2023 |
Paid |
$5,049.00 |
PRM 6100 23112105643 |
Construction, Pipeline |
11/27/2023 |
Paid |
$274,084.48 |
PRM 6100 23110704237 |
Construction, Pipeline |
11/09/2023 |
Paid |
$190,659.54 |
PRM 6100 23110303938 |
Construction, Pipeline |
11/07/2023 |
Paid |
$451,969.25 |
PRM 6100 23100300243 |
Construction, Pipeline |
10/05/2023 |
Paid |
$350,641.03 |
PRM 6100 23100300249 |
Construction, Pipeline |
10/05/2023 |
Paid |
$369,930.54 |
PRM 6100 23092836884 |
CONSTRUCTION SERVICES, HEAVY |
10/02/2023 |
Paid |
$416,661.45 |
PRM 6100 23092035775 |
Site Work |
09/22/2023 |
Paid |
$259,948.54 |
PRM 6100 23091535246 |
Construction, Pipeline |
09/19/2023 |
Paid |
$470,797.00 |
PRM 6100 23090633987 |
Construction, Pipeline |
09/08/2023 |
Paid |
$184,616.47 |
PRM 6100 23090533786 |
CONSTRUCTION SERVICES, HEAVY |
09/06/2023 |
Paid |
$31,761.35 |
PRM 6100 23083133416 |
Site Work |
09/05/2023 |
Paid |
$5,148.00 |
PRM 6100 23082132137 |
Site Work |
08/23/2023 |
Paid |
$165,857.45 |
PRM 6100 23081731883 |
Construction, Pipeline |
08/21/2023 |
Paid |
$413,812.16 |
PRM 6100 23081431384 |
Construction, Pipeline |
08/16/2023 |
Paid |
$9,824.60 |
PRM 6100 23080830668 |
Construction, Pipeline |
08/10/2023 |
Paid |
$110,217.65 |
PRM 6100 23080830673 |
Construction, Pipeline |
08/10/2023 |
Paid |
$228,145.31 |
PRM 6100 23080430409 |
Site Work |
08/08/2023 |
Paid |
$81,953.62 |
PRM 6100 23080330287 |
Site Work |
08/07/2023 |
Paid |
$280,469.07 |
PRM 6100 23071828544 |
Construction, Pipeline |
07/20/2023 |
Paid |
$122,567.52 |
PRM 6100 23071428233 |
Construction, Pipeline |
07/18/2023 |
Paid |
$476,061.17 |
PRM 6100 23070526940 |
Construction, Pipeline |
07/07/2023 |
Paid |
$385,344.40 |
PRM 6100 23070526943 |
Construction, Pipeline |
07/07/2023 |
Paid |
$113,210.56 |
PRM 6100 23070526948 |
Construction, Pipeline |
07/07/2023 |
Paid |
$420,496.10 |
PRM 6100 23062626015 |
Site Work |
06/28/2023 |
Paid |
$24,257.43 |
PRM 6100 23061224715 |
Construction, Pipeline |
06/14/2023 |
Paid |
$324,869.03 |
PRM 6100 23061224732 |
Construction, Pipeline |
06/13/2023 |
Paid |
$57,000.00 |
PRM 6100 23060624183 |
Site Work |
06/08/2023 |
Paid |
$109,356.15 |
PRM 6100 23060624215 |
Construction, Pipeline |
06/08/2023 |
Paid |
$59,050.85 |
PRM 6100 23060624219 |
Construction, Pipeline |
06/08/2023 |
Paid |
$48,688.00 |
PRM 6100 23051622255 |
Construction, Pipeline |
05/18/2023 |
Paid |
$151,293.42 |
PRM 6100 23051622259 |
Site Work |
05/18/2023 |
Paid |
$100,005.32 |
PRM 6100 23050921503 |
Construction, Pipeline |
05/11/2023 |
Paid |
$350,591.41 |
PRM 6100 23050821330 |
Site Work |
05/10/2023 |
Paid |
$17,068.97 |
PRM 6100 23050421104 |
Construction, Pipeline |
05/08/2023 |
Paid |
$286,903.44 |
PRM 6100 23050120649 |
Construction, Pipeline |
05/03/2023 |
Paid |
$153,139.01 |
PRM 6100 23050120715 |
Construction, Pipeline |
05/03/2023 |
Paid |
$56,486.00 |
PRM 6100 23042019717 |
Construction, Pipeline |
04/24/2023 |
Paid |
$26,325.38 |
PRM 6100 23041819457 |
Construction, Pipeline |
04/20/2023 |
Paid |
$113,290.08 |
PRM 6100 23041819459 |
Construction, Pipeline |
04/20/2023 |
Paid |
$11,681.50 |
PRM 6100 23041819461 |
Construction, Pipeline |
04/20/2023 |
Paid |
$24,289.45 |
PRM 6100 23041719307 |
Construction, Pipeline |
04/19/2023 |
Paid |
$50,704.36 |
PRM 6100 23041719318 |
Site Work |
04/19/2023 |
Paid |
$163,121.97 |
PRM 6100 23040417969 |
Construction, Pipeline |
04/06/2023 |
Paid |
$544,809.42 |
PRM 6100 23032416955 |
Construction, Pipeline |
03/28/2023 |
Paid |
$51,959.49 |
PRM 6100 23032216747 |
Construction, Pipeline |
03/24/2023 |
Paid |
$23,750.10 |
PRM 6100 23032016267 |
Construction, Pipeline |
03/22/2023 |
Paid |
$354,771.88 |
PRM 6100 23032016269 |
Site Work |
03/22/2023 |
Paid |
$32,826.92 |
PRM 6100 23032016281 |
Site Work |
03/22/2023 |
Paid |
$445,341.00 |
PRM 6100 23032016283 |
Construction, Pipeline |
03/22/2023 |
Paid |
$917,595.11 |
PRM 6100 23031415722 |
Construction, Pipeline |
03/16/2023 |
Paid |
$53,367.67 |
PRM 6100 23030714994 |
Construction, Water System, Main and Service Line |
03/09/2023 |
Paid |
$93,089.55 |
PRM 6100 23022213670 |
Site Work |
02/24/2023 |
Paid |
$300,067.66 |
PRM 6100 23020812287 |
Construction, Pipeline |
02/10/2023 |
Paid |
$242,544.16 |
PRM 6100 23020611993 |
Site Work |
02/08/2023 |
Paid |
$97,770.84 |
PRM 6100 23020611995 |
Construction, Pipeline |
02/08/2023 |
Paid |
$144,337.30 |
PRM 6100 23020612016 |
Site Work |
02/08/2023 |
Paid |
$69,027.00 |
PRM 6100 23013011643 |
CONSTRUCTION SERVICES, GENERAL |
01/31/2023 |
Paid |
$71,865.22 |
PRM 6100 22122108028 |
Construction, Water System, Main and Service Line |
12/27/2022 |
Paid |
$716,732.63 |
PRM 6100 22121907740 |
Construction, Pipeline |
12/21/2022 |
Paid |
$743,208.89 |
PRM 6100 22121907742 |
Site Work |
12/21/2022 |
Paid |
$69,582.74 |
PRM 6100 22121907779 |
Construction, Pipeline |
12/21/2022 |
Paid |
$190,238.69 |
PRM 6100 22121507495 |
Construction, Pipeline |
12/19/2022 |
Paid |
$48,390.42 |
PRM 6100 22120506340 |
Site Work |
12/07/2022 |
Paid |
$343,137.72 |
PRM 6100 22112505523 |
Construction, Pipeline |
11/29/2022 |
Paid |
$312,888.48 |
PRM 6100 22111704878 |
Site Work |
11/21/2022 |
Paid |
$95,142.50 |
PRM 6100 22111504600 |
Construction, Pipeline |
11/17/2022 |
Paid |
$48,350.72 |
PRM 6100 22111504621 |
Site Work |
11/17/2022 |
Paid |
$68,151.11 |
PRM 6100 22110904120 |
Site Work |
11/14/2022 |
Paid |
$234,705.26 |
PRM 6100 22110703855 |
Construction, Water System, Main and Service Line |
11/09/2022 |
Paid |
$77,266.40 |
PRM 6100 22110703908 |
Site Work |
11/09/2022 |
Paid |
$78,755.76 |
PRM 6100 22102703116 |
Site Work |
10/31/2022 |
Paid |
$19,049.62 |
PRM 6100 22102102668 |
Construction, Pipeline |
10/25/2022 |
Paid |
$326,736.33 |
PRM 6100 22101802243 |
Construction, Water System, Main and Service Line |
10/20/2022 |
Paid |
$227,147.67 |
PRM 6100 22101401840 |
Site Work |
10/18/2022 |
Paid |
$121,090.38 |
PRM 6100 22101201552 |
Construction, Pipeline |
10/14/2022 |
Paid |
$427,637.26 |
PRM 6100 22101101325 |
Construction, Pipeline |
10/13/2022 |
Paid |
$102,253.21 |
PRM 6100 22092032308 |
CONSTRUCTION SERVICES, HEAVY |
09/22/2022 |
Paid |
$55,908.65 |
PRM 6100 22091431776 |
Construction, Pipeline |
09/19/2022 |
Paid |
$105,444.44 |
PRM 6100 22091531862 |
Site Work |
09/19/2022 |
Paid |
$53,306.76 |
PRM 6100 22090731177 |
Construction, Pipeline |
09/09/2022 |
Paid |
$1,220,775.40 |
PRM 6100 22090230825 |
Site Work |
09/07/2022 |
Paid |
$31,020.05 |
PRM 6100 22090130677 |
Construction, Pipeline |
09/06/2022 |
Paid |
$76,630.49 |
PRM 6100 22090130707 |
Site Work |
09/06/2022 |
Paid |
$190,204.16 |
PRM 6100 22082229469 |
CONSTRUCTION SERVICES, HEAVY |
08/24/2022 |
Paid |
$135,598.25 |
PRM 6100 22072927474 |
Site Work |
08/02/2022 |
Paid |
$64,833.30 |
PRM 6100 22072927476 |
Site Work |
08/02/2022 |
Paid |
$144,815.46 |
PRM 6100 22072927524 |
Construction, Pipeline |
08/02/2022 |
Paid |
$325,972.11 |
PRM 6100 22072827358 |
Construction, Water System, Main and Service Line |
08/01/2022 |
Paid |
$706,223.55 |
PRM 6100 22072126707 |
Construction, Pipeline |
07/26/2022 |
Paid |
$138,447.60 |
PRM 6100 22072026628 |
Site Work |
07/22/2022 |
Paid |
$314,734.23 |
PRM 6100 22070725394 |
Site Work |
07/11/2022 |
Paid |
$361,993.42 |
PRM 6100 22070625283 |
Site Work |
07/08/2022 |
Paid |
$25,649.61 |
PRM 6100 22070525147 |
Site Work |
07/07/2022 |
Paid |
$173,050.49 |
PRM 6100 22062424337 |
Construction, Pipeline |
06/28/2022 |
Paid |
$79,151.29 |
PRM 6100 22062324157 |
Construction, Pipeline |
06/27/2022 |
Paid |
$461,715.26 |
PRM 6100 22062324157 |
Site Work |
06/27/2022 |
Paid |
$257,782.86 |
PRM 6100 22052521551 |
Construction, Pipeline |
05/27/2022 |
Paid |
$83,820.97 |
PRM 6100 22051620773 |
Site Work |
05/18/2022 |
Paid |
$233,187.95 |
PRM 6100 22051320671 |
Site Work |
05/17/2022 |
Paid |
$289,954.19 |
PRM 6100 22051320681 |
Construction, Pipeline |
05/17/2022 |
Paid |
$211,372.48 |
PRM 6100 22051320684 |
Site Work |
05/17/2022 |
Paid |
$54,796.28 |
PRM 6100 22042218748 |
Construction, Pipeline |
04/26/2022 |
Paid |
$475,725.45 |
PRM 6100 22042118651 |
CONSTRUCTION SERVICES, HEAVY |
04/25/2022 |
Paid |
$430,439.90 |
PRM 6100 22041818343 |
Construction, Pipeline |
04/20/2022 |
Paid |
$381,285.88 |
PRM 6100 22041217817 |
Construction, Water System, Main and Service Line |
04/14/2022 |
Paid |
$489,334.41 |
PRM 6100 22040817609 |
CONSTRUCTION SERVICES, HEAVY |
04/12/2022 |
Paid |
$115,267.84 |
PRM 6100 22040417061 |
Site Work |
04/06/2022 |
Paid |
$50,827.46 |
PRM 6100 22040116961 |
Site Work |
04/05/2022 |
Paid |
$236,797.35 |
PRM 6100 22032115709 |
CONSTRUCTION SERVICES, HEAVY |
03/23/2022 |
Paid |
$782,669.14 |
PRM 6100 22030914646 |
Site Work |
03/11/2022 |
Paid |
$149,545.82 |
PRM 6100 22030814546 |
Construction, Pipeline |
03/10/2022 |
Paid |
$323,151.15 |
PRM 6100 22030414139 |
Construction, Pipeline |
03/08/2022 |
Paid |
$35,350.18 |
PRM 6100 22021412248 |
CONSTRUCTION SERVICES, HEAVY |
02/16/2022 |
Paid |
$110,580.74 |
PRM 6100 22021412253 |
Construction, Pipeline |
02/16/2022 |
Paid |
$439,070.90 |
PRM 6100 22020811649 |
Site Work |
02/10/2022 |
Paid |
$143,466.78 |
PRM 6100 22010408656 |
Construction, Water System, Main and Service Line |
01/06/2022 |
Paid |
$184,950.75 |
PRM 6100 22010308534 |
Construction, Pipeline |
01/05/2022 |
Paid |
$164,962.51 |
PRM 6100 22010308538 |
Construction, Water System, Main and Service Line |
01/05/2022 |
Paid |
$244,744.70 |
PRM 6100 21122707961 |
CONSTRUCTION SERVICES, HEAVY |
12/29/2021 |
Paid |
$182,767.17 |
PRM 6100 21122707980 |
CONSTRUCTION SERVICES, HEAVY |
12/29/2021 |
Paid |
$311,561.34 |
PRM 6100 21121607338 |
Construction, Water System, Main and Service Line |
12/20/2021 |
Paid |
$229,980.75 |
PRM 6100 21121607338 |
Site Work |
12/20/2021 |
Paid |
$340,452.45 |
PRM 6100 21120906615 |
Construction, Pipeline |
12/13/2021 |
Paid |
$405,604.30 |
PRM 6100 21120306108 |
Construction, Pipeline |
12/07/2021 |
Paid |
$239,547.26 |
PRM 6100 21120205923 |
Site Work |
12/06/2021 |
Paid |
$21,306.01 |
PRM 6100 21120105774 |
Site Work |
12/03/2021 |
Paid |
$1,500.00 |
PRM 6100 21120105776 |
Site Work |
12/03/2021 |
Paid |
$32,942.32 |
PRM 6100 21111504316 |
CONSTRUCTION SERVICES, HEAVY |
11/17/2021 |
Paid |
$130,324.11 |
PRM 6100 21111504316 |
Construction, Water System, Main and Service Line |
11/17/2021 |
Paid |
$627,202.67 |
PRM 6100 21110103077 |
Construction, Pipeline |
11/03/2021 |
Paid |
$721,700.84 |
PRM 6100 21110103077 |
Site Work |
11/03/2021 |
Paid |
$151,582.60 |
PRM 6100 21110103080 |
Site Work |
11/03/2021 |
Paid |
$4,180.18 |
PRM 6100 21110103084 |
Construction, Water System, Main and Service Line |
11/03/2021 |
Paid |
$320,296.24 |
PRM 6100 21101801613 |
CONSTRUCTION SERVICES, HEAVY |
10/20/2021 |
Paid |
$105,622.43 |
PRM 6100 21101801720 |
CONSTRUCTION SERVICES, HEAVY |
10/20/2021 |
Paid |
$186,168.64 |
PRM 6100 21100400285 |
Construction, Pipeline |
10/06/2021 |
Paid |
$923,248.85 |
PRM 6100 21100100059 |
Site Work |
10/05/2021 |
Paid |
$28,399.34 |
PRM 6100 21100100067 |
Site Work |
10/05/2021 |
Paid |
$284,338.10 |
PRM 6100 21100100069 |
Construction, Water System, Main and Service Line |
10/05/2021 |
Paid |
$540,152.43 |
PRM 6100 21092032668 |
CONSTRUCTION SERVICES, HEAVY |
09/22/2021 |
Paid |
$290,738.55 |
PRM 6100 21092032670 |
CONSTRUCTION SERVICES, HEAVY |
09/22/2021 |
Paid |
$193,874.86 |
PRM 6100 21092032670 |
Construction, Pipeline |
09/22/2021 |
Paid |
$25,672.36 |
PRM 6100 21090731209 |
Construction, Pipeline |
09/09/2021 |
Paid |
$255,565.19 |
PRM 6100 21083130575 |
Site Work |
09/02/2021 |
Paid |
$114,956.07 |
PRM 6100 21083130622 |
Site Work |
09/02/2021 |
Paid |
$9,040.70 |
PRM 6100 21081629258 |
CONSTRUCTION SERVICES, HEAVY |
08/18/2021 |
Paid |
$272,761.75 |
PRM 6100 21080928703 |
Construction, Water System, Main and Service Line |
08/11/2021 |
Paid |
$542,995.77 |
PRM 6100 21080227958 |
Site Work |
08/04/2021 |
Paid |
$18,022.40 |
PRM 6100 21073027878 |
Construction, Pipeline |
08/03/2021 |
Paid |
$217,768.66 |
PRM 6100 21072827521 |
Site Work |
07/30/2021 |
Paid |
$116,421.90 |
PRM 6100 21072026649 |
CONSTRUCTION SERVICES, HEAVY |
07/22/2021 |
Paid |
$318,292.55 |
PRM 6100 21070625223 |
Site Work |
07/08/2021 |
Paid |
$18,187.14 |
PRM 6100 21062123452 |
CONSTRUCTION SERVICES, HEAVY |
06/23/2021 |
Paid |
$434,652.27 |
PRM 6100 21062123456 |
CONSTRUCTION SERVICES, HEAVY |
06/23/2021 |
Paid |
$136,098.67 |
PRM 6100 21062123537 |
Construction, Pipeline |
06/23/2021 |
Paid |
$131,320.21 |
PRM 6100 21061623272 |
Site Work |
06/21/2021 |
Paid |
$215,738.73 |
PRM 6100 21061523030 |
Site Work |
06/17/2021 |
Paid |
$159,314.78 |
PRM 6100 21060121695 |
Construction, Water System, Main and Service Line |
06/03/2021 |
Paid |
$23,333.99 |
PRM 6100 21052521288 |
Construction, Water System, Main and Service Line |
05/27/2021 |
Paid |
$488,187.35 |
PRM 6100 21051420286 |
Construction, Pipeline |
05/18/2021 |
Paid |
$469,658.74 |
PRM 6100 21051320178 |
CONSTRUCTION SERVICES, HEAVY |
05/17/2021 |
Paid |
$267,701.45 |
PRM 6100 21051019779 |
CONSTRUCTION SERVICES, HEAVY |
05/12/2021 |
Paid |
$203,563.54 |
PRM 6100 21050319139 |
Site Work |
05/05/2021 |
Paid |
$9,255.82 |
PRM 6100 21042918840 |
Site Work |
05/03/2021 |
Paid |
$3,033.79 |
PRM 6100 21042818738 |
Site Work |
04/30/2021 |
Paid |
$142,299.83 |
PRM 6100 21042818740 |
Site Work |
04/30/2021 |
Paid |
$30,210.42 |
PRM 6100 21042818742 |
Site Work |
04/30/2021 |
Paid |
$11,860.88 |
PRM 6100 21042818744 |
Site Work |
04/30/2021 |
Paid |
$29,411.83 |
PRM 6100 21042017827 |
Site Work |
04/22/2021 |
Paid |
$57,642.06 |
PRM 6100 21041617515 |
Site Work |
04/20/2021 |
Paid |
$240,880.26 |
PRM 6100 21040516334 |
CONSTRUCTION SERVICES, HEAVY |
04/07/2021 |
Paid |
$138,314.87 |
PRM 6100 21033015954 |
Site Work |
04/01/2021 |
Paid |
$97,693.34 |
PRM 6100 21032915831 |
Construction, Pipeline |
03/31/2021 |
Paid |
$209,328.13 |
PRM 6100 21031914900 |
Construction, Water System, Main and Service Line |
03/23/2021 |
Paid |
$70,674.33 |
PRM 6100 21031714709 |
Construction, Water System, Main and Service Line |
03/19/2021 |
Paid |
$32,991.87 |
PRM 6100 21031514356 |
Construction, Pipeline |
03/17/2021 |
Paid |
$35,445.60 |
PRM 6100 21030212952 |
CONSTRUCTION SERVICES, HEAVY |
03/04/2021 |
Paid |
$139,339.22 |
PRM 6100 21030212952 |
Site Work |
03/04/2021 |
Paid |
$127,663.30 |
PRM 6100 21030112860 |
Site Work |
03/03/2021 |
Paid |
$50,273.97 |
PRM 6100 21020210953 |
Construction, Pipeline |
02/04/2021 |
Paid |
$177,885.61 |
PRM 6100 21020110858 |
CONSTRUCTION SERVICES, HEAVY |
02/03/2021 |
Paid |
$129,459.93 |
PRM 6100 21010508337 |
Construction, Water System, Main and Service Line |
01/07/2021 |
Paid |
$222,739.06 |
PRM 6100 21010408113 |
CONSTRUCTION SERVICES, HEAVY |
01/06/2021 |
Paid |
$75,076.00 |
PRM 6100 21010408194 |
Construction, Pipeline |
01/06/2021 |
Paid |
$330,329.25 |
PRM 6100 20122807642 |
Site Work |
12/30/2020 |
Paid |
$171,811.25 |
PRM 6100 20120806069 |
Construction, Pipeline |
12/10/2020 |
Paid |
$288,126.45 |
PRM 6100 20120806071 |
CONSTRUCTION SERVICES, HEAVY |
12/10/2020 |
Paid |
$384,504.90 |
PRM 6100 20120705870 |
Construction, Pipeline |
12/09/2020 |
Paid |
$50,761.80 |
PRM 6100 20120305560 |
Construction, Water System, Main and Service Line |
12/07/2020 |
Paid |
$886,939.03 |
PRM 6100 20120205375 |
Site Work |
12/04/2020 |
Paid |
$60,152.12 |
PRM 6100 20120205440 |
Site Work |
12/04/2020 |
Paid |
$119,914.63 |
PRM 6100 20110303106 |
CONSTRUCTION SERVICES, HEAVY |
11/05/2020 |
Paid |
$705,613.72 |
PRM 6100 20110303106 |
Site Work |
11/05/2020 |
Paid |
$98,998.10 |
PRM 6100 20110303108 |
Construction, Pipeline |
11/05/2020 |
Paid |
$720,147.71 |
PRM 6100 20101601652 |
Construction, Pipeline |
10/20/2020 |
Paid |
$268,248.60 |
PRM 6100 20100500278 |
CONSTRUCTION SERVICES, HEAVY |
10/07/2020 |
Paid |
$677,374.60 |
PRM 6100 20093035474 |
Construction, Pipeline |
10/02/2020 |
Paid |
$233,177.50 |
PRM 6100 20092535050 |
Site Work |
09/29/2020 |
Paid |
$77,746.80 |
PRM 6100 20090433148 |
CONSTRUCTION SERVICES, HEAVY |
09/09/2020 |
Paid |
$509,359.37 |
PRM 6100 20081831403 |
Construction, Water System, Main and Service Line |
08/20/2020 |
Paid |
$499,722.82 |
PRM 6100 20081130731 |
Site Work |
08/13/2020 |
Paid |
$335,688.95 |
PRM 6100 20081030615 |
Site Work |
08/12/2020 |
Paid |
$146,636.85 |
PRM 6100 20080329969 |
CONSTRUCTION SERVICES, HEAVY |
08/05/2020 |
Paid |
$366,452.05 |
PRM 6100 20071527897 |
Construction, Water System, Main and Service Line |
07/17/2020 |
Paid |
$439,182.18 |
PRM 6100 20071027472 |
Site Work |
07/14/2020 |
Paid |
$495,372.16 |
PRM 6100 20070727140 |
CONSTRUCTION SERVICES, HEAVY |
07/10/2020 |
Paid |
$505,913.02 |
PRM 6100 20070226898 |
Site Work |
07/08/2020 |
Paid |
$96,232.19 |
PRM 6100 20062226012 |
Construction, Pipeline |
06/24/2020 |
Paid |
$8,682.85 |
PRM 6100 20060824867 |
Construction, Water System, Main and Service Line |
06/10/2020 |
Paid |
$376,102.52 |
PRM 6100 20060124277 |
Site Work |
06/03/2020 |
Paid |
$175,860.61 |
PRM 6100 20052924152 |
Construction, Water System, Main and Service Line |
06/02/2020 |
Paid |
$35,078.65 |
PRM 6100 20051823253 |
Site Work |
05/22/2020 |
Paid |
$26,621.18 |
PRM 6100 20051823259 |
Site Work |
05/22/2020 |
Paid |
$26,399.10 |
PRM 6100 20051523069 |
Site Work |
05/20/2020 |
Paid |
$19,660.21 |
PRM 6100 20051523071 |
Site Work |
05/20/2020 |
Paid |
$48,471.80 |
PRM 6100 20042020538 |
Construction, Water System, Main and Service Line |
04/24/2020 |
Paid |
$175,428.10 |
PRM 6100 20032518018 |
Site Work |
03/26/2020 |
Paid |
$174,746.25 |
PRM 6100 20031116571 |
Construction, Water System, Main and Service Line |
03/13/2020 |
Paid |
$241,953.16 |
PRM 6100 20030616107 |
Construction, Sewer and Storm Drain |
03/11/2020 |
Paid |
$101,654.48 |
PRM 6100 20012911406 |
Site Work |
02/05/2020 |
Paid |
$251,454.98 |
PRM 6100 20020412110 |
Construction, Water System, Main and Service Line |
02/05/2020 |
Paid |
$172,834.52 |
PRM 6100 19122307852 |
Construction, Water System, Main and Service Line |
12/26/2019 |
Paid |
$179,026.55 |
PRM 6100 19121607240 |
Site Work |
12/19/2019 |
Paid |
$276,252.69 |
PRM 6100 19121607167 |
Construction, Water System, Main and Service Line |
12/18/2019 |
Paid |
$219,545.37 |
PRM 6100 19120906535 |
Construction, Water System, Main and Service Line |
12/11/2019 |
Paid |
$110,746.03 |
PRM 6100 19111504714 |
Site Work |
11/20/2019 |
Paid |
$332,919.30 |
PRM 6100 19111304478 |
Construction, Water System, Main and Service Line |
11/15/2019 |
Paid |
$281,708.23 |
PRM 6100 19110704114 |
Construction, Water System, Main and Service Line |
11/13/2019 |
Paid |
$46,816.00 |
PRM 6100 19102803002 |
Site Work |
10/31/2019 |
Paid |
$4,130.64 |
PRM 6100 19102903056 |
Site Work |
10/31/2019 |
Paid |
$22,186.19 |
PRM 6100 19102802930 |
Site Work |
10/30/2019 |
Paid |
$3,320.01 |
PRM 6100 19100900674 |
Construction, Water System, Main and Service Line |
10/11/2019 |
Paid |
$196,570.17 |
PRM 6100 19091332610 |
CONSTRUCTION SERVICES, GENERAL |
09/16/2019 |
Paid |
$55,520.97 |
PRM 6100 19091032182 |
Site Work |
09/12/2019 |
Paid |
$36,794.00 |
PRM 6100 19090431684 |
Construction, Pipeline |
09/09/2019 |
Paid |
$54,364.71 |
PRM 6100 19082730920 |
Construction, Water System, Main and Service Line |
08/30/2019 |
Paid |
$37,669.84 |
PRM 6100 19082130428 |
Site Work |
08/23/2019 |
Paid |
$168,778.08 |
PRM 6100 19073128252 |
Construction, Water System, Main and Service Line |
08/02/2019 |
Paid |
$24,620.65 |
PRM 6100 19072927920 |
Construction, Water System, Main and Service Line |
08/01/2019 |
Paid |
$24,869.94 |
PRM 6100 19073028023 |
Construction, Water System, Main and Service Line |
08/01/2019 |
Paid |
$9,924.50 |
PRM 6100 19072427549 |
Site Work |
07/26/2019 |
Paid |
$94,702.17 |
PRM 6100 19071126456 |
Site Work |
07/16/2019 |
Paid |
$191,042.48 |
PRM 6100 19071026187 |
Construction, Water System, Main and Service Line |
07/11/2019 |
Paid |
$73,590.65 |
PRM 6100 19061724049 |
Construction, Water System, Main and Service Line |
06/20/2019 |
Paid |
$111,877.97 |
PRM 6100 19061723994 |
Construction, Street (Major and Residential)(Incl Reconstruc |
06/19/2019 |
Paid |
$18,066.90 |
PRM 6100 19051020764 |
Construction, Pipeline |
05/14/2019 |
Paid |
$100,422.60 |
PRM 6100 19050119692 |
Construction, Water System, Main and Service Line |
05/03/2019 |
Paid |
$210,435.62 |
PRM 6100 19041618051 |
Site Work |
04/18/2019 |
Paid |
$108,001.03 |
PRM 6100 19041017464 |
Site Work |
04/12/2019 |
Paid |
$27,120.00 |
PRM 6100 19041017469 |
Construction, Water System, Main and Service Line |
04/12/2019 |
Paid |
$16,299.38 |
PRM 6100 19040216530 |
CONSTRUCTION SERVICES, GENERAL |
04/04/2019 |
Paid |
$44,863.97 |
PRM 6100 19040116286 |
Construction, Water System, Main and Service Line |
04/03/2019 |
Paid |
$146,276.66 |
PRM 6100 19032715989 |
Site Work |
03/29/2019 |
Paid |
$41,257.31 |
PRM 6100 19031815029 |
Site Work |
03/20/2019 |
Paid |
$150,754.07 |
PRM 6100 19031414708 |
CONSTRUCTION SERVICES, GENERAL |
03/18/2019 |
Paid |
$52,674.03 |
PRM 6100 19031314564 |
Construction, Water System, Main and Service Line |
03/15/2019 |
Paid |
$30,527.28 |
PRM 6100 19030413573 |
Construction, Street (Major and Residential)(Incl Reconstruc |
03/06/2019 |
Paid |
$49,136.51 |
PRM 6100 19030413573 |
Construction, Water System, Main and Service Line |
03/06/2019 |
Paid |
$49,498.48 |
PRM 6100 19030113434 |
Construction, Street (Major and Residential)(Incl Reconstruc |
03/05/2019 |
Paid |
$6,055.30 |
PRM 6100 19022612987 |
Site Work |
02/28/2019 |
Paid |
$5,529.81 |
PRM 6100 19022212756 |
Site Work |
02/26/2019 |
Paid |
$2,100.00 |
PRM 6100 19021311863 |
Site Work |
02/15/2019 |
Paid |
$88,527.65 |
PRM 6100 19021211600 |
Site Work |
02/14/2019 |
Paid |
$266,505.86 |
PRM 6100 19020610882 |
Site Work |
02/07/2019 |
Paid |
$2,614.52 |
PRM 6100 19020410340 |
CONSTRUCTION SERVICES, GENERAL |
02/06/2019 |
Paid |
$152,954.33 |
PRM 6100 19020410340 |
Construction, Water System, Main and Service Line |
02/06/2019 |
Paid |
$122,435.22 |
PRM 6100 19012309287 |
Site Work |
01/25/2019 |
Paid |
$12,880.00 |
PRM 6100 19012209175 |
Construction, Pipeline |
01/24/2019 |
Paid |
$107,946.98 |
PRM 6100 19012209181 |
Site Work |
01/24/2019 |
Paid |
$185,756.22 |
PRM 6100 19012209183 |
Site Work |
01/24/2019 |
Paid |
$19,950.00 |
PRM 6100 19012209189 |
Construction, Water System, Main and Service Line |
01/24/2019 |
Paid |
$161,428.85 |
PRM 6100 19012209191 |
Construction, Water System, Main and Service Line |
01/24/2019 |
Paid |
$246,339.23 |
PRM 6100 19010908305 |
Site Work |
01/11/2019 |
Paid |
$12,950.00 |
PRM 6100 18123107504 |
Site Work |
01/03/2019 |
Paid |
$25,441.45 |
PRM 6100 18122007075 |
Site Work |
12/24/2018 |
Paid |
$19,950.00 |
PRM 6100 18121806868 |
Site Work |
12/20/2018 |
Paid |
$265,511.09 |
PRM 6100 18121806871 |
Site Work |
12/20/2018 |
Paid |
$90,733.70 |
PRM 6100 18121106346 |
Construction, Sewer and Storm Drain |
12/13/2018 |
Paid |
$15,462.77 |
PRM 6100 18121106352 |
Construction, Street (Major and Residential)(Incl Reconstruc |
12/13/2018 |
Paid |
$42,810.80 |
PRM 6100 18120505895 |
Construction, Water System, Main and Service Line |
12/07/2018 |
Paid |
$163,008.54 |
PRM 6100 18120305618 |
Construction, Water System, Main and Service Line |
12/05/2018 |
Paid |
$443,578.19 |
PRM 6100 18112004617 |
Construction, Street (Major and Residential)(Incl Reconstruc |
11/26/2018 |
Paid |
$245,268.50 |
PRM 6100 18112004617 |
Construction, Water System, Main and Service Line |
11/26/2018 |
Paid |
$238,788.94 |
PRM 6100 18111304006 |
Site Work |
11/15/2018 |
Paid |
$49,675.88 |
PRM 6100 18110603576 |
Site Work |
11/08/2018 |
Paid |
$4,104.00 |
PRM 6100 18110603580 |
Construction, Water System, Main and Service Line |
11/08/2018 |
Paid |
$543,666.15 |
PRM 6100 18100500680 |
Construction, Water System, Main and Service Line |
10/09/2018 |
Paid |
$558,761.20 |
PRM 6100 18092732756 |
CONSTRUCTION SERVICES, GENERAL |
10/01/2018 |
Paid |
$195,579.70 |
PRM 6100 18091831412 |
Site Work |
09/20/2018 |
Paid |
$153,318.36 |
PRM 6100 18091230981 |
Site Work |
09/14/2018 |
Paid |
$26,692.48 |
PRM 6100 18091030528 |
Construction, Water System, Main and Service Line |
09/12/2018 |
Paid |
$265,486.33 |
PRM 6100 18090530110 |
Site Work |
09/07/2018 |
Paid |
$101,145.55 |
PRM 6100 18082729238 |
CONSTRUCTION SERVICES, GENERAL |
08/29/2018 |
Paid |
$314,688.65 |
PRM 6100 18082228991 |
Construction, Water System, Main and Service Line |
08/24/2018 |
Paid |
$541,846.26 |
PRM 6100 18081528380 |
Site Work |
08/17/2018 |
Paid |
$491,895.74 |
PRM 6100 18081428286 |
Construction, Water System, Main and Service Line |
08/16/2018 |
Paid |
$45,666.65 |
PRM 6100 18081428290 |
Construction, Water System, Main and Service Line |
08/16/2018 |
Paid |
$269,352.04 |
PRM 6100 18080627673 |
Construction, Pipeline |
08/08/2018 |
Paid |
$31,219.09 |
PRM 6100 18080627673 |
Construction, Sewer and Storm Drain |
08/08/2018 |
Paid |
$35,070.31 |
PRM 6100 18080227479 |
Construction, Water System, Main and Service Line |
08/06/2018 |
Paid |
$138,236.69 |
PRM 6100 18073127259 |
Construction, Utility/Underground Projects |
08/02/2018 |
Paid |
$216,326.44 |
PRM 6100 18070324770 |
Construction, Water System, Main and Service Line |
07/06/2018 |
Paid |
$398,757.90 |
PRM 6100 18070324772 |
Construction, Water System, Main and Service Line |
07/06/2018 |
Paid |
$205,933.69 |
PRM 6100 18070224608 |
Site Work |
07/03/2018 |
Paid |
$199,968.33 |
PRM 6100 18062123654 |
Construction, Pipeline |
06/25/2018 |
Paid |
$165,976.25 |
PRM 6100 18062023507 |
Construction, Sewer and Storm Drain |
06/22/2018 |
Paid |
$186,276.55 |
PRM 6100 18061122669 |
Site Work |
06/13/2018 |
Paid |
$94,948.07 |
PRM 6100 18060522257 |
Construction, Water System, Main and Service Line |
06/07/2018 |
Paid |
$377,212.55 |
PRM 6100 18060522261 |
Site Work |
06/07/2018 |
Paid |
$44,200.42 |
PRM 6100 18060422122 |
Construction, Pipeline |
06/06/2018 |
Paid |
$164,974.11 |
PRM 6100 18060422122 |
Construction, Water System, Main and Service Line |
06/06/2018 |
Paid |
$255,175.07 |
PRM 6100 18060422122 |
Site Work |
06/06/2018 |
Paid |
$59,481.86 |
PRM 6100 18050719715 |
Construction, Pipeline |
05/09/2018 |
Paid |
$55,351.98 |
PRM 6100 18050219408 |
Site Work |
05/04/2018 |
Paid |
$107,602.83 |
PRM 6100 18050119235 |
CONSTRUCTION SERVICES, GENERAL |
05/03/2018 |
Paid |
$125,115.43 |
PRM 6100 18042318383 |
Construction, Water System, Main and Service Line |
04/25/2018 |
Paid |
$377,089.61 |
PRM 6100 18041617775 |
Construction, Sewer and Storm Drain |
04/18/2018 |
Paid |
$49,208.55 |
PRM 6100 18041617781 |
Construction, Water System, Main and Service Line |
04/18/2018 |
Paid |
$113,150.30 |
PRM 6100 18040316734 |
Site Work |
04/05/2018 |
Paid |
$265,770.48 |
PRM 6100 18032015419 |
Construction, Pipeline |
03/21/2018 |
Paid |
$55,142.62 |
PRM 6100 18030513834 |
Construction, Water System, Main and Service Line |
03/07/2018 |
Paid |
$267,073.04 |
PRM 6100 18030513846 |
Construction, Sewer and Storm Drain |
03/07/2018 |
Paid |
$31,884.43 |
PRM 6100 18030513846 |
Construction, Water System, Main and Service Line |
03/07/2018 |
Paid |
$137,655.38 |
PRM 6100 18022112748 |
Construction, Pipeline |
02/23/2018 |
Paid |
$132,776.17 |
PRM 6100 18022112748 |
Construction, Sewer and Storm Drain |
02/23/2018 |
Paid |
$126,708.17 |
PRM 6100 18022112748 |
Construction, Water System, Main and Service Line |
02/23/2018 |
Paid |
$211,875.37 |
PRM 6100 18020511376 |
CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, |
02/06/2018 |
Paid |
$126,462.38 |
PRM 6100 18011909907 |
Construction, Utility/Underground Projects |
01/23/2018 |
Paid |
$73,466.49 |
PRM 6100 18010308381 |
Construction, Pipeline |
01/05/2018 |
Paid |
$98,819.52 |
PRM 6100 18010308381 |
Construction, Water System, Main and Service Line |
01/05/2018 |
Paid |
$457,087.14 |
PRM 6100 17122707808 |
Construction, Water System, Main and Service Line |
12/29/2017 |
Paid |
$21,028.25 |
PRM 6100 17122007395 |
Construction, Water System, Main and Service Line |
12/22/2017 |
Paid |
$42,898.57 |
PRM 6100 17122007397 |
Construction, Sewer and Storm Drain |
12/22/2017 |
Paid |
$39,865.41 |
PRM 6100 17122007399 |
Construction, Utility/Underground Projects |
12/22/2017 |
Paid |
$341,165.16 |
PRM 6100 17122007399 |
Construction, Water System, Main and Service Line |
12/22/2017 |
Paid |
$375,437.49 |
PRM 6100 17121807098 |
Construction, Pipeline |
12/19/2017 |
Paid |
$3,513.50 |
PRM 6100 17121306749 |
Construction, Pipeline |
12/14/2017 |
Paid |
$2,490.53 |
PRM 6100 17120505809 |
Construction, Water System, Main and Service Line |
12/07/2017 |
Paid |
$89,298.44 |
PRM 6100 17120505830 |
Construction, Water System, Main and Service Line |
12/07/2017 |
Paid |
$131,343.83 |
PRM 6100 17120405678 |
Construction, Pipeline |
12/05/2017 |
Paid |
$238,866.77 |
PRM 6100 17112104740 |
Construction, Water System, Main and Service Line |
11/27/2017 |
Paid |
$21,496.17 |
PRM 6100 17112104753 |
Construction, Water System, Main and Service Line |
11/27/2017 |
Paid |
$117,083.82 |
PRM 6100 17112104756 |
Construction, Water System, Main and Service Line |
11/27/2017 |
Paid |
$519,234.92 |
PRM 6100 17112104763 |
Construction, Utility/Underground Projects |
11/27/2017 |
Paid |
$137,694.32 |
PRM 6100 17112104741 |
Construction, Pipeline |
11/22/2017 |
Paid |
$1,911.92 |
PRM 6100 17112104743 |
Construction, Pipeline |
11/22/2017 |
Paid |
$17,509.33 |
PRM 6100 17112104745 |
Construction, Pipeline |
11/22/2017 |
Paid |
$3,701.88 |
PRM 6100 17112104747 |
Construction, Pipeline |
11/22/2017 |
Paid |
$1,265.99 |
PRM 6100 17112104749 |
Construction, Pipeline |
11/22/2017 |
Paid |
$14,807.92 |
PRM 6100 17112104751 |
Construction, Pipeline |
11/22/2017 |
Paid |
$15,444.74 |
PRM 6100 17112104771 |
Construction, Pipeline |
11/22/2017 |
Paid |
$60,683.02 |
PRM 6100 17102002193 |
Construction, Water System, Main and Service Line |
10/24/2017 |
Paid |
$226,544.75 |
PRM 6100 17101701845 |
Construction, Utility/Underground Projects |
10/19/2017 |
Paid |
$366,315.22 |
PRM 6100 17101701851 |
Construction, Utility/Underground Projects |
10/19/2017 |
Paid |
$314,703.40 |
PRM 6100 17101201253 |
Construction, Water System, Main and Service Line |
10/13/2017 |
Paid |
$0.02 |
PRM 6100 17101000754 |
Construction, Water System, Main and Service Line |
10/11/2017 |
Paid |
$106,544.00 |
PRM 6100 17100300133 |
Construction, Sewer and Storm Drain |
10/05/2017 |
Paid |
$82,614.11 |
PRM 6100 17100300139 |
Site Work |
10/05/2017 |
Paid |
$3,970.31 |
PRM 6100 17100200024 |
Construction, Pipeline |
10/03/2017 |
Paid |
$7,866.95 |
PRM 6100 17092034153 |
Construction, Pipeline |
09/21/2017 |
Paid |
$273,386.77 |
PRM 6100 17091934004 |
Construction, Pipeline |
09/20/2017 |
Paid |
$24,053.83 |
PRM 6100 17090532574 |
Site Work |
09/07/2017 |
Paid |
$114,681.15 |
PRM 6100 17082431617 |
Construction, Water System, Main and Service Line |
08/28/2017 |
Paid |
$150,760.65 |
PRM 6100 17080729817 |
Construction, Water System, Main and Service Line |
08/09/2017 |
Paid |
$71,333.44 |
PRM 6100 17071727854 |
Construction, Pipeline |
07/18/2017 |
Paid |
$159,819.83 |
PRM 6100 17070326669 |
Construction, Utility/Underground Projects |
07/06/2017 |
Paid |
$96,559.83 |
PRM 6100 17070326669 |
Construction, Water System, Main and Service Line |
07/06/2017 |
Paid |
$143,966.52 |
PRM 6100 17070326660 |
Construction, Pipeline |
07/05/2017 |
Paid |
$47,320.09 |
PRM 6100 17070326664 |
Construction, Pipeline |
07/05/2017 |
Paid |
$52,397.99 |
PRM 6100 17060523935 |
Construction, Sewer and Storm Drain |
06/07/2017 |
Paid |
$85,369.67 |
PRM 6100 17060523935 |
Construction, Water System, Main and Service Line |
06/07/2017 |
Paid |
$210,087.28 |
PRM 6100 17060523940 |
Construction, Utility/Underground Projects |
06/07/2017 |
Paid |
$100,722.08 |
PRM 6100 17060523940 |
Construction, Water System, Main and Service Line |
06/07/2017 |
Paid |
$191,001.58 |
PRM 6100 17051622186 |
Construction, Utility/Underground Projects |
05/18/2017 |
Paid |
$65,020.92 |
PRM 6100 17050220814 |
Construction, Sewer and Storm Drain |
05/04/2017 |
Paid |
$59,307.33 |
PRM 6100 17050120692 |
Construction, Water System, Main and Service Line |
05/03/2017 |
Paid |
$268,856.18 |
PRM 6100 17041819513 |
CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, |
04/20/2017 |
Paid |
$186,841.25 |
PRM 6100 17041819513 |
Construction, Pipeline |
04/20/2017 |
Paid |
$372,575.82 |
PRM 6100 17041819513 |
Construction, Utility/Underground Projects |
04/20/2017 |
Paid |
$261,958.50 |
PRM 6100 17041819533 |
CONSTRUCTION SERVICES, HEAVY |
04/20/2017 |
Paid |
$115,003.86 |
PRM 6100 17041118696 |
Construction, Pipeline |
04/13/2017 |
Paid |
$65,188.51 |
PRM 6100 17040518371 |
Construction, Water System, Main and Service Line |
04/07/2017 |
Paid |
$182,717.65 |
PRM 6100 17032817457 |
Construction, Sewer and Storm Drain |
03/30/2017 |
Paid |
$299,384.81 |
PRM 6100 17032417201 |
Construction, Utility/Underground Projects |
03/28/2017 |
Paid |
$235,884.92 |
PRM 6100 17032016643 |
CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, |
03/22/2017 |
Paid |
$161,163.23 |
PRM 6100 17031716480 |
Construction, Pipeline |
03/21/2017 |
Paid |
$36,991.29 |
PRM 6100 17030715427 |
Construction, Water System, Main and Service Line |
03/09/2017 |
Paid |
$412,916.88 |
PRM 6100 17022214048 |
CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, |
02/24/2017 |
Paid |
$191,795.50 |
PRM 6100 17020912792 |
Construction, Water System, Main and Service Line |
02/13/2017 |
Paid |
$131,522.76 |
PRM 6100 17020912794 |
Construction, Utility/Underground Projects |
02/13/2017 |
Paid |
$349,906.50 |
PRM 6100 17020612273 |
Construction, Water System, Main and Service Line |
02/08/2017 |
Paid |
$409,602.99 |
PRM 6100 17012010407 |
Site Work |
01/24/2017 |
Paid |
$44,664.25 |
PRM 6100 17011810285 |
CONSTRUCTION SERVICES, HEAVY |
01/20/2017 |
Paid |
$7,075.15 |
PRM 6100 17011209883 |
Construction, Pipeline |
01/17/2017 |
Paid |
$615,007.98 |
PRM 6100 17010509209 |
Construction, Utility/Underground Projects |
01/09/2017 |
Paid |
$228,438.51 |
PRM 6100 17010409035 |
Construction, Water System, Main and Service Line |
01/06/2017 |
Paid |
$215,090.77 |
PRM 6100 16121907540 |
Construction, Water System, Main and Service Line |
12/21/2016 |
Paid |
$19,798.00 |
PRM 6100 16121907545 |
CONSTRUCTION SERVICES, HEAVY |
12/21/2016 |
Paid |
$347,702.01 |
PRM 6100 16120505911 |
Construction, Utility/Underground Projects |
12/07/2016 |
Paid |
$163,907.44 |
PRM 6100 16120505916 |
Construction, Sewer and Storm Drain |
12/07/2016 |
Paid |
$525.35 |
PRM 6100 16120505916 |
Construction, Water System, Main and Service Line |
12/07/2016 |
Paid |
$176,797.41 |
PRM 6100 16112905423 |
Construction, Pipeline |
12/01/2016 |
Paid |
$10,214.40 |
PRM 6100 16112905425 |
Construction, Pipeline |
12/01/2016 |
Paid |
$19,328.64 |
PRM 6100 16112104867 |
CONSTRUCTION SERVICES, HEAVY |
11/23/2016 |
Paid |
$259,840.20 |
PRM 6100 16110703831 |
Construction, Utility/Underground Projects |
11/09/2016 |
Paid |
$331,410.58 |
PRM 6100 16110703831 |
Construction, Water System, Main and Service Line |
11/09/2016 |
Paid |
$447,338.13 |
PRM 6100 16102502362 |
CONSTRUCTION SERVICES, HEAVY |
10/27/2016 |
Paid |
$151,481.52 |
PRM 6100 16102502362 |
Site Work |
10/27/2016 |
Paid |
$38,386.70 |
PRM 6100 16102502376 |
Construction, Pipeline |
10/27/2016 |
Paid |
$100,005.26 |
PRM 6100 16100700518 |
Construction, Pipeline |
10/11/2016 |
Paid |
$180,466.61 |
PRM 6100 16100400299 |
Construction, Sewer and Storm Drain |
10/06/2016 |
Paid |
$5,315.25 |
PRM 6100 16100400299 |
Construction, Utility/Underground Projects |
10/06/2016 |
Paid |
$271,034.30 |
PRM 6100 16100400299 |
Construction, Water System, Main and Service Line |
10/06/2016 |
Paid |
$236,310.88 |
PRM 6100 16092739050 |
Site Work |
09/29/2016 |
Paid |
$25,528.40 |
PRM 6100 16092338661 |
CONSTRUCTION SERVICES, HEAVY |
09/27/2016 |
Paid |
$83,821.11 |
PRM 6100 16092038191 |
CONSTRUCTION, (BACKFILL, DIGGING, DITCHING, ROAD GRADING, |
09/22/2016 |
Paid |
$85,676.22 |
PRM 6100 16092038191 |
Construction, Pipeline |
09/22/2016 |
Paid |
$38,129.36 |
PRM 6100 16090836922 |
Construction, Pipeline |
09/14/2016 |
Paid |
$678.82 |
PRM 6100 16090736693 |
Construction, Utility/Underground Projects |
09/09/2016 |
Paid |
$267,049.57 |
PRM 6100 16090736693 |
Construction, Water System, Main and Service Line |
09/09/2016 |
Paid |
$271,672.22 |
PRM 6100 16090136105 |
Construction, Pipeline |
09/02/2016 |
Paid |
$1,825.48 |
PRM 6100 16082935616 |
Construction, Pipeline |
08/30/2016 |
Paid |
$30,536.99 |
PRM 6100 16082935619 |
Construction, Pipeline |
08/30/2016 |
Paid |
$919.80 |
PRM 6100 16082535355 |
Construction, Pipeline |
08/26/2016 |
Paid |
$94,600.58 |
PRM 6100 16082535357 |
Construction, Pipeline |
08/26/2016 |
Paid |
$55,797.24 |
PRM 6100 16082535359 |
Construction, Pipeline |
08/26/2016 |
Paid |
$19,302.18 |
PRM 6100 16082334984 |
Site Work |
08/25/2016 |
Paid |
$136,070.59 |
PRM 6100 16080232478 |
Construction, Utility/Underground Projects |
08/03/2016 |
Paid |
$305,634.09 |
PRM 6100 16080232478 |
Construction, Water System, Main and Service Line |
08/03/2016 |
Paid |
$192,483.96 |
PRM 6100 16071130521 |
Site Work |
07/12/2016 |
Paid |
$500,985.92 |
PRM 6100 16071130529 |
Construction, Pipeline |
07/12/2016 |
Paid |
$302,494.91 |
PRM 6100 16070529887 |
Construction, Utility/Underground Projects |
07/06/2016 |
Paid |
$311,086.71 |
PRM 6100 16060926772 |
Construction, Pipeline |
06/10/2016 |
Paid |
$436,865.35 |
PRM 6100 16060926772 |
Construction, Utility/Underground Projects |
06/10/2016 |
Paid |
$183,925.32 |
PRM 6100 16060926772 |
Site Work |
06/10/2016 |
Paid |
$327,770.71 |
PRM 6100 16052325289 |
Construction, Pipeline |
05/24/2016 |
Paid |
$38,028.93 |
PRM 6100 16051224521 |
Site Work |
05/13/2016 |
Paid |
$400,750.85 |
PRM 6100 16050223623 |
Construction, Pipeline |
05/03/2016 |
Paid |
$118,760.00 |
PRM 6100 16050223626 |
Construction, Pipeline |
05/03/2016 |
Paid |
$27,202.82 |
PRM 6100 16041221332 |
Construction, Pipeline |
04/18/2016 |
Paid |
$6,982.50 |
PRM 6100 16041221333 |
Construction, Pipeline |
04/18/2016 |
Paid |
$10,493.70 |
PRM 6100 16041221334 |
Construction, Pipeline |
04/18/2016 |
Paid |
$14,915.00 |
PRM 6100 16040420567 |
Site Work |
04/08/2016 |
Paid |
$292,218.05 |
PRM 6100 16040120411 |
Construction, Pipeline |
04/04/2016 |
Paid |
$12,897.68 |
PRM 6100 16033020055 |
Construction, Pipeline |
03/31/2016 |
Paid |
$5,186.28 |
PRM 6100 16033020056 |
Construction, Pipeline |
03/31/2016 |
Paid |
$44,188.44 |
PRM 6100 16032118837 |
Construction, Utility/Underground Projects |
03/25/2016 |
Paid |
$57,161.25 |
PRM 6100 16031117876 |
Construction, Pipeline |
03/16/2016 |
Paid |
$2,968.75 |
PRM 6100 16031117877 |
Construction, Pipeline |
03/16/2016 |
Paid |
$7,087.24 |
PRM 6100 16031117878 |
Construction, Pipeline |
03/16/2016 |
Paid |
$12,222.98 |
PRM 6100 16031017694 |
Construction, Pipeline |
03/15/2016 |
Paid |
$21,150.33 |
PRM 6100 16031017695 |
Construction, Pipeline |
03/15/2016 |
Paid |
$31,763.95 |
PRM 6100 16022415477 |
Site Work |
03/01/2016 |
Paid |
$192,121.25 |
PRM 6100 16022215056 |
Construction, Utility/Underground Projects |
02/26/2016 |
Paid |
$43,738.39 |
PRM 6100 16020112903 |
Construction, Pipeline |
02/02/2016 |
Paid |
$131,488.14 |
PRM 6100 16020112910 |
Construction, Water System, Main and Service Line |
02/02/2016 |
Paid |
$33,696.33 |
PRM 6100 16020112910 |
Site Work |
02/02/2016 |
Paid |
$47,335.61 |
PRM 6100 15122809035 |
Construction, Pipeline |
12/29/2015 |
Paid |
$175,888.57 |
PRM 6100 15122809040 |
Construction, Pipeline |
12/29/2015 |
Paid |
$41,775.30 |
PRM 6100 15122208749 |
Construction, Water System, Main and Service Line |
12/23/2015 |
Paid |
$42,369.40 |
PRM 6100 15122208767 |
Site Work |
12/23/2015 |
Paid |
$152,737.11 |
PRM 6100 15122208783 |
Construction, Utility/Underground Projects |
12/23/2015 |
Paid |
$250,668.11 |
PRM 6100 15121808425 |
Site Work |
12/21/2015 |
Paid |
$110,222.70 |
PRM 6100 15120706830 |
Construction, Pipeline |
12/08/2015 |
Paid |
$46,527.87 |
PRM 6100 15111905203 |
Site Work |
11/20/2015 |
Paid |
$271,199.37 |
PRM 6100 15110203621 |
Construction, Utility/Underground Projects |
11/03/2015 |
Paid |
$50,100.79 |
PRM 6100 15101901962 |
Construction, Pipeline |
10/20/2015 |
Paid |
$314,869.80 |
PRM 6100 15101901964 |
Construction, Pipeline |
10/20/2015 |
Paid |
$79,339.68 |
PRM 6100 15101901972 |
Construction, Pipeline |
10/20/2015 |
Paid |
$576,011.94 |
PRM 6100 15101901974 |
Construction, Pipeline |
10/20/2015 |
Paid |
$6,683.25 |
PRM 6100 15100500351 |
Site Work |
10/06/2015 |
Paid |
$437,957.86 |
PRM 6100 15092139185 |
Construction, Pipeline |
09/22/2015 |
Paid |
$28,153.44 |
PRM 6100 15092139192 |
Construction, Pipeline |
09/22/2015 |
Paid |
$26,044.25 |
PRM 6100 15092139193 |
Construction, Water System, Main and Service Line |
09/22/2015 |
Paid |
$98,165.40 |
PRM 6100 15092139211 |
Construction, Pipeline |
09/22/2015 |
Paid |
$6,911.38 |
PRM 6100 15082436074 |
Site Work |
08/25/2015 |
Paid |
$284,768.39 |
PRM 6100 15080333530 |
Construction, Pipeline |
08/04/2015 |
Paid |
$25,731.27 |
PRM 6100 15080333532 |
Construction, Pipeline |
08/04/2015 |
Paid |
$122,627.24 |
PRM 6100 15080333535 |
Construction, Pipeline |
08/04/2015 |
Paid |
$31,072.13 |
PRM 6100 15080333538 |
Construction, Utility/Underground Projects |
08/04/2015 |
Paid |
$108,522.15 |
PRM 6100 15072031974 |
Site Work |
07/21/2015 |
Paid |
$40,790.15 |
PRM 6100 15072031975 |
Construction, Pipeline |
07/21/2015 |
Paid |
$18,319.09 |
PRM 6100 15072031978 |
Construction, Pipeline |
07/21/2015 |
Paid |
$19,290.65 |
PRM 6100 15070630169 |
Construction, Utility/Underground Projects |
07/07/2015 |
Paid |
$332,066.84 |
PRM 6100 15061828361 |
Construction, Water System, Main and Service Line |
06/19/2015 |
Paid |
$48,628.35 |
PRM 6100 15061527870 |
Site Work |
06/16/2015 |
Paid |
$86,847.11 |
PRM 6100 15060126399 |
Construction, Pipeline |
06/02/2015 |
Paid |
$327,517.41 |
PRM 6100 15052926282 |
Construction, Utility/Underground Projects |
06/01/2015 |
Paid |
$315,717.00 |
PRM 6100 15050824267 |
Site Work |
05/11/2015 |
Paid |
$321,879.00 |
PRM 6100 15042923029 |
Construction, Utility/Underground Projects |
04/30/2015 |
Paid |
$213,634.11 |
PRM 6100 15041621578 |
Construction, Pipeline |
04/17/2015 |
Paid |
$135,148.28 |
PRM 6100 15041421166 |
Construction, Pipeline |
04/15/2015 |
Paid |
$113,430.89 |
PRM 6100 15040620167 |
Site Work |
04/07/2015 |
Paid |
$323,048.45 |
PRM 6100 15031617650 |
Construction, Utility/Underground Projects |
03/17/2015 |
Paid |
$230,260.39 |
PRM 6100 15030216019 |
Site Work |
03/03/2015 |
Paid |
$299,696.50 |
PRM 6100 15022515574 |
Construction, Pipeline |
02/26/2015 |
Paid |
$166,286.73 |
PRM 6100 15021714440 |
Construction, Utility/Underground Projects |
02/18/2015 |
Paid |
$172,735.51 |
PRM 6100 15020212697 |
Construction, Pipeline |
02/03/2015 |
Paid |
$213,918.17 |
PRM 6100 15020212706 |
Site Work |
02/03/2015 |
Paid |
$255,588.95 |
PRM 6100 15012812262 |
Construction, Utility/Underground Projects |
01/29/2015 |
Paid |
$316,963.59 |
PRM 6100 14122308708 |
Construction, Utility/Underground Projects |
12/26/2014 |
Paid |
$267,752.35 |
PRM 6100 14121607799 |
Construction, Pipeline |
12/17/2014 |
Paid |
$291,411.57 |
PRM 6100 14121507581 |
Site Work |
12/16/2014 |
Paid |
$71,023.43 |
PRM 6100 14112606234 |
Construction, Pipeline |
12/01/2014 |
Paid |
$232,336.46 |
PRM 6100 14112405881 |
Construction, Utility/Underground Projects |
11/25/2014 |
Paid |
$258,815.25 |
PRM 6100 14112405881 |
Construction, Water System, Main and Service Line |
11/25/2014 |
Paid |
$139,767.80 |
PRM 6100 14102102656 |
Construction, Utility/Underground Projects |
10/22/2014 |
Paid |
$630,091.35 |
PRM 6100 14100600500 |
Construction, Pipeline |
10/07/2014 |
Paid |
$368,732.43 |
PRM 6100 14100100070 |
Construction, Pipeline |
10/02/2014 |
Paid |
$296,004.32 |
PRM 6100 14091536831 |
Construction, Utility/Underground Projects |
09/16/2014 |
Paid |
$281,380.50 |
PRM 6100 14091536831 |
Site Work |
09/16/2014 |
Paid |
$208,526.23 |
PRM 6100 14091236681 |
Construction, Water System, Main and Service Line |
09/15/2014 |
Paid |
$88,547.60 |
PRM 6100 14082735001 |
Construction, Pipeline |
08/28/2014 |
Paid |
$188,985.78 |
PRM 6100 14080432372 |
Construction, Utility/Underground Projects |
08/05/2014 |
Paid |
$121,439.26 |
PRM 6100 14080432372 |
Site Work |
08/05/2014 |
Paid |
$770,376.52 |
PRM 6100 14080432380 |
Construction, Water System, Main and Service Line |
08/05/2014 |
Paid |
$7,762.55 |
PRM 6100 14072931622 |
Construction, Pipeline |
07/30/2014 |
Paid |
$359,503.18 |
PRM 6100 14071730155 |
Construction, Water System, Main and Service Line |
07/18/2014 |
Paid |
$66,000.87 |
PRM 6100 14062727781 |
Construction, Pipeline |
06/30/2014 |
Paid |
$119,180.22 |
PRM 6100 14061626385 |
Construction, Water System, Main and Service Line |
06/17/2014 |
Paid |
$50,437.39 |
PRM 6100 14061626385 |
Site Work |
06/17/2014 |
Paid |
$32,031.69 |
PRM 6100 14061626386 |
Site Work |
06/17/2014 |
Paid |
$200,757.79 |
PRM 6100 14052824486 |
Construction, Pipeline |
05/29/2014 |
Paid |
$84,470.58 |
PRM 6100 14050522007 |
Construction, Pipeline |
05/06/2014 |
Paid |
$117,979.83 |
PRM 6100 14050221835 |
Construction, Water System, Main and Service Line |
05/05/2014 |
Paid |
$72,442.55 |
PRM 6100 14042421061 |
Construction, Water System, Main and Service Line |
04/25/2014 |
Paid |
$20,469.52 |
PRM 6100 14042120629 |
Construction, Water System, Main and Service Line |
04/22/2014 |
Paid |
$88,621.27 |
PRM 6100 14041620315 |
Site Work |
04/17/2014 |
Paid |
$68,478.84 |
PRM 6100 14032517613 |
Site Work |
03/26/2014 |
Paid |
$46,851.22 |
PRM 6100 14031416524 |
Construction, Water System, Main and Service Line |
03/17/2014 |
Paid |
$276,825.57 |
PRM 6100 14030415179 |
Construction, Water System, Main and Service Line |
03/05/2014 |
Paid |
$390,735.11 |
PRM 6100 14020312341 |
Construction, Water System, Main and Service Line |
02/04/2014 |
Paid |
$105,055.28 |
PRM 6100 14011310681 |
Construction, Water System, Main and Service Line |
01/14/2014 |
Paid |
$195,523.30 |
PRM 6100 14010709847 |
Construction, Water System, Main and Service Line |
01/08/2014 |
Paid |
$8,830.55 |
PRM 6100 13121607990 |
Construction, Sewer and Storm Drain |
12/17/2013 |
Paid |
$19,292.99 |
PRM 6100 13121607990 |
Construction, Water System, Main and Service Line |
12/17/2013 |
Paid |
$10,878.18 |
PRM 6100 13121607990 |
Site Work |
12/17/2013 |
Paid |
$102,237.51 |
PRM 6100 13120406854 |
Construction, Water System, Main and Service Line |
12/05/2013 |
Paid |
$229,237.37 |
PRM 6100 13120306613 |
Construction, Water System, Main and Service Line |
12/04/2013 |
Paid |
$4,156.25 |
PRM 6100 13110504369 |
Construction, Water System, Main and Service Line |
11/06/2013 |
Paid |
$218,005.05 |
PRM 6100 13110504388 |
Construction, Sewer and Storm Drain |
11/06/2013 |
Paid |
$130,946.18 |
PRM 6100 13110504388 |
Construction, Water System, Main and Service Line |
11/06/2013 |
Paid |
$1,371.84 |
PRM 6100 13110504388 |
Site Work |
11/06/2013 |
Paid |
$149,930.43 |
PRM 6100 13100700656 |
Construction, Sewer and Storm Drain |
10/08/2013 |
Paid |
$216,865.92 |
PRM 6100 13100700656 |
Construction, Water System, Main and Service Line |
10/08/2013 |
Paid |
$4,645.06 |
PRM 6100 13100700656 |
Site Work |
10/08/2013 |
Paid |
$134,997.46 |
PRM 6100 13090333766 |
Construction, Water System, Main and Service Line |
09/04/2013 |
Paid |
$73,786.90 |
PRM 6100 13090333766 |
Site Work |
09/04/2013 |
Paid |
$169,555.88 |
PRM 6100 13080531350 |
Construction, Sewer and Storm Drain |
08/06/2013 |
Paid |
$18,789.10 |
PRM 6100 13080531350 |
Construction, Water System, Main and Service Line |
08/06/2013 |
Paid |
$142,307.15 |
PRM 6100 13080531350 |
Site Work |
08/06/2013 |
Paid |
$55,980.36 |
PRM 6100 12110203910 |
Construction, Pipeline |
11/05/2012 |
Paid |
$46,591.80 |
PRM 6100 12031915951 |
Construction, Pipeline |
03/20/2012 |
Paid |
$150,927.74 |
PRM 6100 11121907521 |
Construction, Street (Major and Residential)(Incl Reconstruc |
12/20/2011 |
Paid |
$62,807.10 |
PRM 6100 11110804065 |
Construction, Pipeline |
11/09/2011 |
Paid |
$53,945.14 |
PRM 6100 11091934744 |
Construction, Pipeline |
09/20/2011 |
Paid |
$68,203.26 |
PRM 6100 11090633600 |
Construction, Street (Major and Residential)(Incl Reconstruc |
09/07/2011 |
Paid |
$137,169.90 |
PRM 6100 11081531339 |
Construction, Pipeline |
08/16/2011 |
Paid |
$53,226.12 |
PRM 6100 11072028779 |
Construction, Pipeline |
07/21/2011 |
Paid |
$477,785.40 |
PRM 6100 11061725935 |
Construction, Pipeline |
06/20/2011 |
Paid |
$81,156.60 |