55TH ST TO 45TH ST (ARPT-C1A) - WW LINE |
$107,423.68 |
ANNEXED AREA 4570 PARENT |
$603,892.78 |
ASBESTOS CEMENT WASTEWATER LINE REPLACEMENT (NORTHEAST) |
$1,169,284.29 |
ASTOR PLACE WASTEWATER PIPELINE REHABILITATION |
$275,684.81 |
BEVERLY ROAD WASTEWATER REPLACEMENT - RENEW AUSTIN |
$90,272.24 |
BEVERLY SHEFFIELD NW DISTRICT PARK WASTEWATER PIPELINE RENEW |
$64,275.19 |
BOGGY CREEK (MLK & PLEASANT VALLEY) WASTEWATER PIPELINE |
$231,742.93 |
BRUSHY CREEK REGIONAL WWTP EXPANSION PARTICIPATION |
$9,552,928.70 |
BRYKER WOODS NEIGHBORHOOD WW PIPELINE RENEWAL PROJECT |
$53,490.65 |
BRYKER WOODS WASTEWATER PIPELINE RENEWAL |
$17,708.42 |
BULL CREEK BASIN -LARGE DIAMETER WASTEWATER PIPELINE RENEWAL |
$299,885.30 |
BURRELL DRIVE WASTEWATER IMPROVEMENTS |
$254,865.75 |
CESAR CHAVEZ TWO WAY CONV- WW |
$2,376.90 |
CONCORDIA NEIGHBORHOOD WASTEWATER PIPELINE RENEWAL |
$36,163.98 |
DESSAU WWTP EXPANSION TO 1.0 MGD |
$1,934,602.46 |
DESSAU WWTP INTERIM IMPROVEMENTS |
$782,228.80 |
EAST BOULDIN - ANNIE STREET FLOOD RISK REDUCTION WASTEWATER |
$230,755.85 |
FORT BRANCH CREEK (MLK & NORWOOD HILL) WW PIPELINE |
$181,304.88 |
GALINDO WASTEWATER PIPELINE RENEWAL |
$234,769.67 |
GREATER STRATFORD DRIVE WASTEWATER PIPELINE RENEWAL |
$82,083.04 |
GUADALUPE ST, W. 35-37TH STORM DRAIN IMPROVEMENTS WASTEWATER |
$128,330.32 |
HB DIGESTER DOMES REPAIR |
$4,176,695.80 |
HB PROCESS AMMONIA REMOVAL SYSTEM |
$194,573.00 |
HARMON AVENUE AREA WASTEWATER RENEWAL |
$71,353.72 |
HERGOTZ-LOCKHEED WASTEWATER IMPROVEMENTS |
$1,641,657.50 |
HORNSBY BEND BIOGAS ENERGY PROJECT |
$3,359,237.04 |
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT CENTRIFUGES |
$814,710.26 |
HORNSBY BEND GROUNDWATER MONITORING WELLS |
$46,691.60 |
HORNSBY BEND IRRIGATION SYSTEM IMPROVEMENTS |
$2,695,975.14 |
HORNSBY BEND THICKENER COMPLEX REHAB |
$1,101,496.06 |
HYDE PARK WASTEWATER PIPELINE RENEWAL |
$612,859.94 |
IN SITU WASTEWATER LINE RENEWAL PROGRAM (2018 TO 2020) |
$143,173.40 |
JOHNNY MORRIS RD - WASTEWATER |
$29,272.72 |
LA CASA DRIVE WASTEWATER REPLACEMENT - RENEW AUSTIN |
$178,191.86 |
LA CASA DRIVE WASTEWATER REPLACEMENT - RENEW AUSTIN |
$16,176.79 |
LOST CREEK WWTP ELECTRIC DUCT BANK INSTALLATION |
$48,175.05 |
MORROW AND GAULT WATER AND WASTEWATER REHAB |
$990,983.42 |
NORTH EAST PACKAGE PLANT REHAB |
$90,967.79 |
ONION CREEK ODOR CONTROL FACILITY STREAM BANK STABILIZATION |
$431,660.66 |
PLANT O & M MGMT SYSTEMS |
$1,244,902.44 |
PROJECT CONNECT - WASTEWATER RELOCATION SUPPORT |
$373,224.32 |
RA - NE BRENTWOOD / ARCADIA STREET NEIGHBORHOOD WW SYSTEM |
$463,396.23 |
REHABILITATION 4570 PARENT |
$1,023,771.59 |
RELOCATION 4570 PARENT |
$185,635.60 |
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
$908,618.72 |
S LAMAR-BARTON SPRINGS TO US290-WW LINES |
$751,357.11 |
SAR BLOWER VALVE REHABILITATION |
$88,569.45 |
SAR REPLACE TRAINS A&B BLOWERS |
$4,112,662.10 |
SAR WWTP PLANT CONTROL SYSTEM UPGRADE |
$696,879.13 |
SAR WWTP SLUDGE TRANSFER LINE |
$397,434.24 |
SER REIMBURSEMENTS 4570 PARENT |
$1,642,202.31 |
SAR TRAINS A&B IMPR - CONSTRUCTION |
$1,666,069.35 |
SEAHOLM WW MODIFICATIONS |
$1,155,565.76 |
SO. IH35 WW INFRASTRUCTURE IMPROVS PMC |
$7,543,719.54 |
SOUTH AUSTIN REGIONAL WWTP SCRUBBER REHABILITATION |
$488,427.87 |
SOUTHLAND OAKS WASTEWATER IMPROVEMENTS |
$388,178.75 |
TARGETED WASTEWATER LINE IMPROVEMENTS - BULL CREEK BASIN |
$536,951.96 |
TARRYTOWN NEIGHBORHOOD WASTEWATER PIPELINE RENEWAL |
$272,562.91 |
TAYLOR SLOUGH SOUTH-WARREN ST STORM DRAIN IMPROVEMENTS-WASTE |
$39,580.76 |
TREATMENT PLANT 4570 PARENT |
$18,917,573.52 |
TX DOT SH 71 WASTEWATER LINE RELO- SH71 @ US 183 INTERCHANGE |
$9,709.11 |
TXDOT FM 973 FROM FM 969 TO THYONE - SLUDGE LINE (WASTEWATER |
$89,258.41 |
TXDOT SH 71 WASTEWATER LINE RELOCATION: PROJECT B |
$1,063.83 |
UT CAMPUS AREA UTILITY IMPROVEMENT-WW |
$138,730.34 |
UPPER BRUSHY CREEK WCID WWL RELO AT DAM 7 |
$406,198.28 |
UPPER HARRIS BRANCH INTERCEPTOR EAST |
$1,194,296.97 |
WCWWTP 100 MGD EXPANSION - PRELIM ENGINEERING |
$12,783,476.52 |
WCWWTP 100 MGD EXPANSION- ENGINEERING SVCS |
$6,589,194.28 |
WW REPLACEMENT JAR PROJECTS GROUP A |
$45,666.57 |
WALNUT CREEK METRO PARK (WELLS BRANCH CREEK) WW PIPELINE |
$153,149.97 |
WALNUT CREEK WWTP PLANT CONTROL SYSTEM UPGRADE |
$139,705.34 |
WALNUT CREEK WWTP SCRUBBER REHABILITATION |
$361,537.08 |
WALNUT CREEK WWTP THICKENER BUILDING REHAB |
$1,904,359.28 |
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK |
$2,458,720.19 |
WALNUT CREEK WWTP HEADWORKS IMPROVEMENTS |
$5,075,955.77 |
WALNUT INTERCEPTOR CAPACITY IMPROVEMENT - PARALLEL CREEK |
$89,696.45 |
WALNUT INTERCEPTOR CAPACITY IMPROVEMENTS - SPRINKLE DRIVE |
$337,750.57 |
WALNUT INTERCEPTOR ODOR AND CORROSION IMPROVEMENTS |
$623,866.68 |
WASTEWATER COLLECTION 4570 PARENT |
$1,976,134.93 |
WASTEWATER COLLECTION SYSTEM REHAB OF LINES GROUP B |
$64,277.45 |
WASTEWATER COLLECTION SYSTEM REPLACEMENT LINES GROUP B |
$50,571.88 |
WASTEWATER FUTURE PROJECTS UNF |
$24,600,048.38 |
WASTEWATER IMPVS CITY WIDE |
$2,064,592.23 |
WASTEWATER PIPELINE REPLACEMENT PROGRAM: GROUP C |
$375,650.33 |
WEST CONGRESS (RADAM/ST. ELMO) WASTEWATER PIPELINE RENEWAL |
$71,423.67 |
WILLIAMSON BASIN WASTEWATER PIPELINE RENEWAL |
$15,002.23 |
WILLIAMSON CREEK - TRIBUTARY 4 CHANNEL STABILIZATION WW |
$91,699.66 |
WILLIAMSON CREEK WASTEWATER INTERCEPTOR |
$6,430,372.39 |
WILSHIRE BLVD AREA WASTEWATER PIPELINE RENEWAL |
$233,592.53 |