ACADEMY ROAD WATERLINE REPLACEMENT - RENEW AUSTIN |
$116,024.15 |
ANNEX TELEMETRY RIVER PLACE, LOST CREEK, SHADY HOLLOW -WATER |
$357,307.65 |
ANNEXED AREA 3960 PARENT |
$230,641.38 |
ASBESTOS CEMENT WATER PIPE LINE REPLACEMENT (NORTHEAST) |
$2,163,437.06 |
ASTOR PLACE WATER PIPELINE REHABILITATION |
$118,150.63 |
AUSTIN FILM STUDIOS |
$132,362.26 |
BEVERLY ROAD WATERLINE REPLACEMENT - RENEW AUSTIN |
$82,826.53 |
BLYTHEWOOD DRIVE WATER PIPELINE REPLACEMENT PROJECT |
$76,795.99 |
BRYKER WOODS NEIGHBORHOOD WATER PIIPELINE RENEWAL PROJECT |
$97,476.82 |
BRYKER WOODS WATER PIPELINE RENEWAL |
$17,708.44 |
BURRELL DRIVE WATER IMPROVEMENTS |
$3,363.38 |
CBD ALLEYS - WATER |
$17,481.75 |
CAMERON RD: GREGG LN TO SCHOOL (I130) |
$157,642.43 |
CENTRAL EAST AUSTIN WATER PIPELINE RENEWAL |
$157,262.61 |
CONCORDIA NEIGHBORHOOD WATER PIPELINE RENEWAL |
$59,004.38 |
DAVIS CHEMICAL FEED SYSTEM IMPROVEMENTS - PKG 2 |
$120,205.02 |
DAVIS LANE COOLING TOWERS |
$77,582.00 |
DAVIS LANE PUMP STATION I&C AND SCADA IMPROVEMENTS |
$328,592.76 |
DAVIS SCADA SYSTEM |
$247,957.11 |
DAVIS WTP PLANT POWER DISTRIBUTION UPGRADE |
$6,522,104.41 |
DAVIS WTP RESILIENCY IMPROVEMENTS |
$776,068.24 |
DAVIS WTP SLUDGE DISPOSAL IMPROVS |
$659,849.16 |
DAVIS WATER TREATMENT PLANT - HIGH SERVICE PUMP STATION POWE |
$218,129.35 |
EAST BOULDIN - ANNIE STREET FLOOD RISK REDUCTION WATER |
$272,811.25 |
FALLWELL LANE APPROACH 16-INCH WATER LINE |
$29,230.00 |
FOREST RIDGE RESERVOIR IMPROVEMENTS |
$448,966.69 |
FOUR POINTS ELEVATED TANK IMPROVEMENTS |
$555,465.93 |
GWTP-ECONOMIC GROWTH & REDEVELOPMENT SVC OFC |
$59,560.05 |
GENERAL UTILITY RELOCATINS |
$678,127.27 |
GREEN WTP DECOMM TM RELOCATION |
$123,517.93 |
GUADALUPE ST, W. 35-37TH STORM DRAIN IMPROVEMENTS WATERLINE |
$259,537.20 |
GUILDFORD COVE HYDROPNEUMATIC (LONG CANYON) DISTRIBUTION IMP |
$290,287.82 |
HANDCOX WATER PLANT RESILIENCY IMPROVEMENTS - COLORADO RIVER |
$725,255.48 |
HARMON AVENUE AREA WATER RENEWAL |
$83,305.00 |
HIGHLAND PARK IMPROVEMENTS |
$16,339.50 |
HILLSPRING AND SCOTTSDALE WATER SYSTEM RENEWAL |
$64,006.66 |
HOWARD LANE RESERVOIR #1 IMPROVEMENTS |
$217,903.95 |
HOWARD LANE WATER MAIN EXTENSION |
$343,868.56 |
HYDE PARK WATER SYSTEM UPGRADES |
$521,722.36 |
INTERSTATE 35 - OLTORF LOW PRESSURE PROJECT |
$440,475.40 |
IVANHOE TRAIL WATER PIPELINE IMPROVEMENT |
$266,078.47 |
JOLLYVILLE PUMP STATION I AND C IMPROVEMENTS |
$108,176.01 |
JOLLYVILLE RESERVOIR IMPROVEMENTS |
$237,097.58 |
JUSTIN LANE FROM BURNET TO LAMAR |
$117,307.39 |
LA CASA DRIVE WATERLINE REPLACEMENT - RENEW AUSTIN |
$26,749.31 |
LACROSS RESERVOIR ACCESS IMPS |
$31,619.48 |
LADYBIRD LAKE-CANTERBURY-MILDRED ST. W UTILITY IMPROVEMENT |
$188,268.11 |
LOCKHEED SHAFT REHABILITATION |
$1,013,779.16 |
LOOKOUT PUMP STATION IMPROVEMENTS |
$463,751.65 |
LOST CREEK RESERVOIRS IMPROVEMENTS |
$8,869.00 |
MARTIN HILL RESERVOIR MIXING IMPROVEMENTS |
$202,237.56 |
MONTOPOLIS NEIGHBORHOOD WATER AND WW PIPELINE RENEWAL |
$234,770.68 |
MORROW AND GAULT WATER AND WASTEWATER REHAB |
$15,807.00 |
NELRAY & EVANS UTIL IMPROVS-WATER |
$7,771.83 |
NUECES AND 2ND ST EXTENSION-ENGINEERING |
$59,605.87 |
OLTORF ROAD - PHASE 1 - SPANSION TO PARKER LN - WATER |
$7,505.74 |
OLTORF ROAD - PHASE 2 - PARKER TO S. CONGRESS - WATER |
$1,106.74 |
OTHER 3960 PARENT |
$86,528.78 |
PRESSURE POINT IMPROVEMENTS |
$269,173.23 |
PROJECT CONNECT - WATER RELOCATION SUPPORT |
$428,078.88 |
PUMP STATION 3960 PARENT |
$4,233,701.43 |
RA - ALLEN STREET WATER LINE REPLACEMENT |
$3,967.63 |
RA - BENGSTON AND KAY WATER LINE REPLACEMENT |
$5,542.43 |
RA - CHERICO/SELLERS WATER LINE REPLACEMENTS |
$3,517.70 |
RA - EXPOSITION BLVD WL REHAB - W. 35TH TO ENFIELD |
$534,536.47 |
RA - GARWOOD STREET WATER LINE REPLACEMENT |
$3,701.77 |
RA - PRADO/GARWOOD WATER LINE REPLACEMENT |
$3,722.22 |
RA-AUSTIN HTS NEIGHBORHOOD WSU |
$502,398.41 |
RA-CONCORDIA & SW CHERRYWOOD NEIGHBORHOOD WSU |
$353,351.40 |
RA-NW BRENTWOOD NGHBRHD WSU |
$104,955.04 |
RA-WEST ALLANDALE AND TRAILRIDGE DRIVE |
$7,191.00 |
RA - NE BRENTWOOD / ARCADIA STREET NEIGHBORHOOD WATER SYSTEM |
$483,959.79 |
REHABILITATION 3920 PARENT |
$391,193.49 |
REHABILITATION 3960 PARENT |
$2,433,953.67 |
RELOCATION 3960 PARENT |
$1,582,963.89 |
RELOCATION OF 24-INCH WATER LINE ALONG COLORADO RIVER |
$79,595.10 |
RESERVOIR 3960 PARENT |
$4,510,681.86 |
RESERVOIR IMPROVEMENTS CONSULTANT |
$416,311.20 |
S LAMAR-BARTON SPRINGS TO US290-WATER LINES |
$354,571.40 |
SERVICE TO ANNEXED AREAS |
$713,674.23 |
SINCLAIR AVENUE WATER INFRASTRUCTURE REPLACEMENT |
$52,767.32 |
SO. IH35 WATER INFRASTRUCTURE IMPROVS PMC |
$6,017,752.85 |
SPICEWOOD SPRINGS ROAD WATERLINE IMPROVEMENTS |
$264,784.43 |
SUNSET LANE WATER LINE EXTENSION CRS |
$362,862.19 |
TX DOT SH 71 WATER LINE RELOCATION - SH71 @ US 183 INTERCHAN |
$762,920.33 |
TXDOT-MOPAC 42-INCH WATER TM RELOCATION |
$760,838.97 |
TAYLOR SLOUGH SOUTH-WARREN ST STORM DRAIN IMPROVEMENTS-WATER |
$56,666.65 |
TRANSMISSION / DISTRIBUTION 3960 PARENT |
$1,563,943.35 |
TREATMENT PLANT 3960 PARENT |
$13,250,965.07 |
TRUMAN HEIGHTS WATER PIPELINE RENEWAL |
$237,978.11 |
TXDOT FM 2222 WATER LN RELO: W OF PARKER CTR TO LOOP 360 |
$263,636.86 |
TXDOT SH 71 WATER LINE RELOCATION: PROJECT B |
$6,028.40 |
ULLRICH WTP LIME FEED LOOP |
$2,082,377.79 |
ULLRICH WTP ONSITE GENERATION OF CHLORINE AND AMMON SULFATE |
$5,138,603.39 |
ULLRICH WTP SWGR 15KVA SWITCH REPLACEMENT |
$2,077,014.98 |
ULLRICH WATER PLANT RESILIENCY IMPROVEMENTS - COLORADO RIVER |
$1,006,272.49 |
ULLRICH WATER TREATMENT PLANT REHABILITATION |
$1,094,480.76 |
W. 35TH/W. 38TH WATER SYSTEM IMPROVEMENTS |
$146,204.93 |
WRI-DUNCAN AVE EXT |
$146,477.40 |
WATER FUTURE PROJECTS UNFUNDED |
$49,227,005.66 |
WATER RECLAMATION INITIATIVE 3960 PARENT |
$1,523,915.40 |
WATER TREATMENT PLANT #4 |
$73,578,781.62 |
WILLIAM CANNON DRIVE CORRIDOR- RUNNING WATER DR TO MCKINNEY |
$42,115.60 |
WILLIAMSON CREEK BLARWOOD STORM DRAIN IMPR |
$64,435.95 |
WILSHIRE BLVD AREA WATER PIPELINE RENEWAL |
$188,675.43 |
ZILKER WATER PIPELINE REHABILITATION |
$229,055.93 |