| 10803 PLATT LANE BUILDING REHABILITION - WASTEWATER |
$502,363.66 |
| 38TH AND 40TH STREETS WASTEWATER PIPELINE REHABILITATION |
$1,930,456.39 |
| 51ST STREET TOWER WASHOUT WASTEWATER |
$15,690.61 |
| 71 EAST - 428 ACRE TRACT - WASTEWATER SER |
$1,585,572.22 |
| ADP - SAR WWTP LIFT STATION NO. 2 INFLUENT WET WELL DEBRIS R |
$217,500.00 |
| ADP - WALNUT CREEK FACILITIES IMPROVEMENTS |
$151,331.17 |
| ADP - WALNUT CREEK WWTP ACCESS STAIR IMPROVEMENTS |
$117,280.00 |
| ADP - WALNUT CREEK WWTP POLYMER DOSING |
$307,000.00 |
| ADP - WALNUT CREEK WWTP SOUTHERN SECURITY FENCE |
$96,985.00 |
| ADP-WCWWTP 2013 MISC FACILITY IMPROVEMENTS |
$32,885.00 |
| ADP-WALNUT CREEK WWTP FACILITY DOOR REPLACEMENT |
$43,872.00 |
| ANDERSON MILL WWTP RELIEF |
$746,293.47 |
| ANDERSON MILL ZONE WW LINE RELOCATION |
$3,572.53 |
| ANNEX TELEMETRY RIVER PLACE, LOST CREEK, SHADY HOLLOW - WW |
$2,332,428.65 |
| ANNEXED AREA 4480 PARENT |
$15,234,082.31 |
| AUSTIN WATER FURNITURE UPGRADES |
$1,820.81 |
| AUSTIN WATER KEY SYSTEM UPGRADE - WASTEWATER |
$326,865.21 |
| AUTOMATIC TRANSFER SWITCH REPLACEMENTS |
$126,231.43 |
| BALCONES WWTP - CLARIFIER REHAB IMPROVEMENTS |
$31,841.24 |
| BALCONES WWTP PHASE 2 - REHAB IMPROVEMENTS |
$763,513.32 |
| BARRINGTON WAY FM RET & GRAVITY SYS UPGD (LS) |
$157.88 |
| BARRINGTON WAY FM RET & GRAVITY SYS UPGD (REHAB) |
$1,860,492.61 |
| BARTON HILLS WASTEWATER PIPELINE RENEWAL: HORSESHOE |
$1,180,866.03 |
| BISMARK AND MARBRIDGE LIFT STATIONS CONTROLLER REPLACEMENT |
$76,526.42 |
| BLOCKS 2 & 4 ODOR ABATEMENT - WASTEWATER COLLECTION SYSTEM |
$36,860.35 |
| BLUFFINGTON LIFT STATION EMERGENCY REPAIR |
$17,067.44 |
| BLUFFINGTON LIFT STATION NO. 3 ACCESS IMPROVEMENTS |
$231,603.40 |
| BOULDER LANE LIFT STATION - EMERGENCY REHABILITATION |
$10,835.00 |
| BRYKER ROAD WASTEWATER REPLACEMENT |
$681,400.22 |
| BULL CREEK BASIN WASTEWATER LINE IMPROVEMENTS - REPLACEMENT |
$3,235,311.48 |
| BURNET ROAD AE KRAMER SITE (BURN-AE) - WW LINE |
$42,318.12 |
| CROSSTOWN SIPHON AIR JUMPTER |
$1,092,906.79 |
| DAFFAN LANE LIFT STATION DISCHARGE PIPING EMERGENCY REPAIR |
$108,837.33 |
| DAFFAN LANE LIFT STATION EMERGENCY REPAIR |
$26,486.83 |
| DAVIS SPRINGS #1 LIFT STATION EMERGENCY REPAIRS |
$259,099.19 |
| DAVIS SPRINGS LIFT STATION PUMP REPLACEMENT |
$40,370.00 |
| DESSAU LIFT STATION IMPROVEMENTS |
$43,432.99 |
| DESSAU WWTP REHAB |
$25,548.03 |
| EAST 7TH ST CORRIDOR/ CHICON- PLEASANT VALLEY |
$530,223.40 |
| ENCLAVE VISTA NO. 152 EMERGENCY LIFT STATION IMPROVEMENTS |
$19,593.61 |
| FM 973 WASTEWATER LINE IMPROVEMENTS |
$1,854,280.18 |
| FACILITIES AND FORCE MAIN IDIQ - WASTEWATER FY17 |
$416,598.35 |
| FIRST ROUND OMNI-SITE INSTALLATION |
$332,510.00 |
| FLOOD CONTROL DRAINAGE BANK |
$63,263.75 |
| FORT DESSAU LIFT STATION JIB CRANE INSTALLATION |
$3,953.49 |
| FOUR POINTS 1 LIFT STATION EMERGENCY REPAIR |
$2,478.97 |
| GBSC-RADIO CONSOLE & MODULAR SYS REPLMT |
$6,807.75 |
| GARDEN VILLA LANE WASTEWATER PIPELINE RENEWAL |
$989.76 |
| GENERAL UTILITY RELOCATIONS |
$294,360.27 |
| GILLIS STREET WASTEWATER LINE REPLACEMENT - RENEWING AUSTIN |
$647,724.75 |
| GLEN BELL DISPATCH CENTER MODERNIZATION - WASTEWATER |
$103,467.07 |
| GLEN BELL SERVICE CENTER - BUILDING SEWAGE LINE REHAB |
$705,935.16 |
| GLEN BELL SERVICE CENTER - FIRE SYSTEM UPGRADE |
$88,426.50 |
| GLEN BELL SERVICE CENTER ELEVATOR MODERNIZATION |
$65,558.31 |
| GLEN BELL SERVICE CENTER HVAC |
$224,901.42 |
| GLEN BELL SERVICE CENTER HVAC UNITS REPLACEMENT |
$129,866.59 |
| GLEN BELL SERVICE CENTER ICE MACHINE REPLACEMENT |
$55,066.42 |
| GLEN BELL SERVICE CENTER SECURITY GATE AW6 REPLACEMENT |
$87,529.86 |
| GLEN BELL WAREHOUSE EMERGENCY CAGE AND OFFICE EXPANSION |
$24,944.55 |
| GONZALES LIFT STATION ABANDONMENT |
$1,204,078.92 |
| GOVALLE MAINTENANCE SHOP ROOFTOP UNIT REPLACEMENT |
$31,951.60 |
| GOVALLE NEW TRAILER INSTALL |
$77,589.85 |
| GOVALLE ODS BLOWER BUILDING ROOF REHAB |
$89,771.00 |
| GOVALLE SECURITY GATE RENEWAL |
$26,708.08 |
| GOVALLE WWTP DIVERSION BOX EMERGENCY REPAIR |
$90,055.68 |
| GOVALLE WWTP SITE REFRESH |
$601.42 |
| GOVALLE WASTEWATER SERVICE IMPROVEMENTS |
$1,153,979.66 |
| GOVALLE WWTP ADMIN BUILDING FIRE SYSTEM |
$71,144.00 |
| GOVALLE WWTP DIVERSION BOX REPAIR |
$35,391.52 |
| GOVALLE WWTP EMERGENCY ROAD REPAIR |
$10,040.59 |
| GOVALLE WWTP SECURITY IMPROVEMENTS |
$32,238.59 |
| GREAT HILLS LIFT STATION SITE SECURITY |
$158,255.48 |
| HAROLD COURT EAST REGIONAL SERVICE CENTER IMPROVEMENTS |
$9,387.97 |
| HARPERS BRANCH CREEK INTERCEPTOR |
$1,264,865.40 |
| HILLS OF BEAR CREEK LIFT STATION JIB CRANE INSTALLATION |
$955.80 |
| HILLSPRING AND SCOTTSDALE WASTEWATER SYSTEM RENEWAL |
$589,905.14 |
| HORNSBY BEND ADMIN BLDG. ROOF IMPROVEMENTS |
$358,770.00 |
| HORNSBY BEND ADMIN BUILDING COMMUNICATION CLOSET RELOCATION |
$182,209.10 |
| HORNSBY BEND ADMINISTRATION LAB WASHROOM REHAB PROJECT |
$84,254.08 |
| HORNSBY BEND BMP ANAMMOX PILOT STUDY |
$90,830.00 |
| HORNSBY BEND BMP AUSTIN RESOURCE RECOVERY PAD SITE |
$2,161,516.51 |
| HORNSBY BEND BMP SCRAP YARD CLEANUP |
$112,472.90 |
| HORNSBY BEND BMP STORM DAMAGE REPAIRS |
$221,385.00 |
| HORNSBY BEND BMP SULFATREAT TANK |
$320,985.52 |
| HORNSBY BEND BMP TREE MITIGATION PLAN |
$212,674.50 |
| HORNSBY BEND BIOSOLIDS DEMOLISH ABANDONED ASBESTOS |
$79,057.13 |
| HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT TREE MANAGEMENT |
$239,848.00 |
| HORNSBY BEND BIOSOLIDS PLANT SAR DIGESTER ROOF REPLACEMENT |
$575,754.08 |
| HORNSBY BEND BMP MAINTENANCE BLDG BREAKROOM MODERNIZATION |
$199,907.00 |
| HORNSBY BEND COGEN BLDG ROOF IMPROVEMENTS |
$332,678.00 |
| HORNSBY BEND DEWATERING BUILDING HVAC UNIT REPLACEMENT |
$17,590.00 |
| HORNSBY BEND DEWATERING FACILITY ROOF AND WALL REHAB |
$384,823.00 |
| HORNSBY BEND FEB BLDG ROOF IMPROVEMENTS |
$184,482.00 |
| HORNSBY BEND FIRE ALARM REPLACEMENT ADMIN & MAINT SHOP |
$73,870.00 |
| HORNSBY BEND GAS STORAGE COVER REPLACEMENT |
$153,471.40 |
| HORNSBY BEND LAB AND ADMIN BUILDING HVAC REHAB - PHASE 2 |
$321,533.17 |
| HORNSBY BEND LIFT STATION VALVE REPLACEMENT |
$42,807.02 |
| HORNSBY BEND LIFT STATIONS REHAB (THICKENER AND BELT FILTER) |
$38,041.07 |
| HORNSBY BEND MAINTENANCE BUILDING ROOF REHAB |
$194,212.00 |
| HORNSBY BEND MAINTENANCE LAB AND ADMIN BUILDING HVAC REHAB |
$891,366.97 |
| HORNSBY BEND MGMT PLANT GOVALLE BLDG ROOF IMPROVEMENTS |
$360,899.50 |
| HORNSBY BEND NEW TRAILER |
$128,392.41 |
| HORNSBY BEND OBSOLETE SCADA EQUIPMENT REPLACEMENT |
$51,404.36 |
| HORNSBY BEND RADIO ANTENNA IMPROVEMENTS |
$281,372.00 |
| HORNSBY BEND SEWER SYSTEM REHABILITATION |
$25,167.60 |
| HORNSBY BEND SHED ROOF IMPROVEMENTS |
$8,950.00 |
| HORNSBY BEND SLUDGE LINE EMERGENCY REHABILITATION |
$7,456.50 |
| HORNSBY BEND SLUDGE LINE EMERGENCY AT SAR DIGESTER COMPLEX |
$21,232.07 |
| HORNSBY BEND THICKENER COMPLEX REHAB CONSTRUCTION |
$16,279,752.22 |
| HORNSBY BEND THICKNER BUILDING ROOF REHAB |
$307,476.00 |
| HORNSBY BUILDING ENVELOPE RESEAL ADMINISTRATION |
$20,500.00 |
| HYDE PARK (E 38TH ST/GROOMS ST/AVENUE F) WASTEWATER PIPELINE |
$729,295.40 |
| IDIQ HORNSBY BEND PROJECT IMPROVEMENTS |
$333,997.29 |
| IDIQ-BRITTLYNS COURT LIFT STATION IMPROVEMENTS |
$13,197.86 |
| IDIQ-LONG VISTA LIFT STATION REHABILITATION |
$60,488.12 |
| IDIQ-MARBRIDGE LIFT STATION IMPROVEMENTS |
$26,601.27 |
| IDIQ-WALNUT CRK BUS PARK STATION FLOODING-EMERGENCY |
$42,638.28 |
| IH 35 WW LINE BETTERMENT-BEN WHITE TO WILLIAM CANNON SEGMENT |
$45,084.54 |
| IH 35 WW LINE BETTERMENT - RUNDBERG TO 290 E SEGMENT |
$239,638.90 |
| IMPROVEMENTS AT SCOTLAND WELL LIFT STATION |
$82,032.97 |
| IMPROVEMENTS AT SPICEWOOD PARKWAY LIFT STATION |
$146,143.26 |
| IN SITU WASTEWATER LINE RENEWAL PROGRAM (2022 TO 2024) |
$3,512,480.58 |
| IN SITU WASTEWATER LINE RENEWAL PROGRAM IDIQ (2025 TO 2027) |
$439,522.50 |
| JUSTIN LANE FROM BURNET TO LAMAR |
$97,274.00 |
| LA CROSSE LIFT STATION EMERGENCY DISCHARGE PIPING REPAIR |
$10,423.54 |
| LAUREL HILL LIFT STATION EMERGENCY REPAIR |
$25,309.87 |
| LENOX OAKS |
$381,291.45 |
| LIFT STATION 4480 PARENT |
$558,914.61 |
| LIFT STATION COMMUNICATION UPGRADE TO CELLULAR |
$1,031,711.28 |
| LIFT STATIONS SCADA EQUIPMENT REPLACEMENT |
$44,227.97 |
| LITTLE WALNUT CREEK 24-INCH WASTEWATER MAIN |
$5,035,594.59 |
| LOST CREEK PACKAGE WWTP IMPROVEMENTS |
$223,113.39 |
| LOST CREEK PUMPING RENEWAL |
$178,571.38 |
| LOST CREEK WWTP HEADWORKS REPLACEMENT |
$117,255.15 |
| LOST CREEK WASTEWATER TREATMENT PLANT CLARIFIER REHAB |
$1,717,847.85 |
| MABEL DAVIS LIFT STATION WET WELL EMERGENCY REPAIR |
$5,825.65 |
| MANHOLE ACCESS AREA SURFACE IMPROVEMENTS |
$28,255.65 |
| MARLBOROUGH & FAYLIN DR. WASTEWATER PIPELINE RENEWAL |
$789,366.87 |
| NELRAY & EVANS UTIL IMPROVS-WW |
$1,545,888.09 |
| NEW CENTRAL LIBRARY WASTEWATER SERVICE |
$200,000.00 |
| NORTH ROSEDALE PHASE II NEIGHBORHOOD WASTEWATER |
$1,452,059.01 |
| NORTH SERVICE ANNEX BUILDING ROOF REPLACEMENT - WASTEWATER |
$311,108.52 |
| NORTH SERVICE CENTER BUILDING ENVELOPE INSPECTION AND REHAB |
$37,044.00 |
| NORTH SERVICE CENTER ENTRY DOOR REPLACEMENT |
$34,221.60 |
| NORTH SERVICE CENTER GENERATOR INSTALLATION |
$51,139.50 |
| NORTH SERVICE CENTER PARKING LOT REHABILITATION |
$7,205.80 |
| NORTH SERVICE CENTER RESTROOMS AND SHOWERS REHAB |
$27,799.63 |
| NORTH SERVICE CENTER ROOF REPLACEMENT |
$25,150.00 |
| NORTHWEST AREA - BOULDER LANE LIFT STATION |
$1,690,283.43 |
| NORTHWEST AREA - FOUR POINTS CENTER LIFT STATION |
$1,464.65 |
| NORTHWEST AREA LS IMPROVEMENTS SPRING LAKE #2 |
$373,855.10 |
| NORTHWEST AREA LIFT STATION IMPROVEMENTS GREAT HILLS LIFT ST |
$6,416,701.98 |
| OAKMONT BLVD IMPROVEMENTS (CRS) |
$2,070.00 |
| OLD ANDERSON MILL SITE BUILDING DEMOLITION |
$210,059.58 |
| OLD LAMPASAS DAM WW LINE REPLACEMENT |
$491,557.72 |
| OLD LAMPASAS LIFT STATION BYPASS VAULT INSTALLATION |
$51,410.54 |
| ONION CREEK WWTP DEMOLITION |
$691,513.25 |
| OTHER 4480 PARENT |
$1,095,146.92 |
| PACKAGE PLANT PROCESS EQUIPMENT REPLACEMENT |
$91,200.41 |
| PARKFIELD DR. WASTEWATER PIPELINE RENEWAL |
$678,566.47 |
| PEARCE LANE LIFT STATION 2 EMERGENCY GENERATOR INSTALLATION |
$247,243.02 |
| PEARCE LANE WWTP TEMPORARY PUMP INSTALLATION |
$342,086.03 |
| PELICAN POINT LIFT STATION EMERGENCY VALVE REPLACEMENT |
$35,000.58 |
| RA - EXPOSITION BLVD WW FM REHAB - W. 35TH TO ENFIELD |
$321,844.28 |
| RA-SE ALLANDALE NEIGHBORHOOD WSU |
$2,028,849.42 |
| REHABILITATION 4480 PARENT |
$41,788,863.21 |
| REHABILITATION 4570 PARENT |
$459,766.54 |
| REHABILITATION OF WW LINES-EPA SAAP (AWU FUNDED) |
$3,697,849.49 |
| REHABILITATION OF WW LINES-EPA SAAP GRANT |
$1,400,715.72 |
| RELOCATION 4480 PARENT |
$2,214,692.23 |
| RENEWAL OF WALNUT INTERCEPTOR SIPHON BOXES |
$210,627.38 |
| RIBELIN RANCH LIFT STATION FORCE MAIN PLUG EMERGENCY |
$497,691.23 |
| RINGTAIL LIFT STATION EMERGENCY REHABILITATION |
$98,638.75 |
| RIO GRANDE FROM 24TH TO 29TH ST. RECON & UTIL ADJ |
$105,328.41 |
| RIVER PLACE WASTEWATER TREATMENT PLANT EMERGENCY LINE REPAIR |
$8,568.46 |
| RIVER PLACE WWTP CHLORINE BUILDING FOUNDATION |
$10,223.82 |
| RIVERPLACE 1,CONCHOS TRAIL, & DAVENPORT LIFT STATIONS CONTRO |
$88,001.42 |
| ROCK HARBOR EMERGENCY FORCEMAIN RENEWAL |
$20,857.09 |
| ROCK HARBOR FORCEMAIN LEAK EMERGENCY |
$18,563.91 |
| ROCK HARBOR LIFT STATION WET WELL COATING |
$87,594.68 |
| ROCK HARBOR LS PUMP DISCHARGE LINE EMERGENCY |
$54,790.07 |
| ROCK HARBOR LIFT STATION EMERGENCY |
$21,157.94 |
| ROCK HARBOR LIFT STATION FORCEMAIN EMERGENCY |
$20,654.44 |
| ROCK HARBOR LIFT STATION WET WELL REHAB |
$33,812.34 |
| ROCK HARBOR MAIN & FOUR POINTS #2 DEMOLITION |
$1,463,593.58 |
| ROCK HARBOUR EMERGENCY FORCEMAIN REPAIR |
$37,765.65 |
| ROOFING PARENT ACCT(ASSESSMENT |
$474,999.98 |
| ROSS RD NORTH WW IMPROVEMENTS |
$173,490.64 |
| SAR BACKFLOW PREVENTION INSTALL (ADP) |
$25,532.23 |
| SAR FILTER CELL NO 5 ACTUATOR REPLACEMENT ADP IDIQ |
$299,751.88 |
| SAR HVAC REPLACEMENTS |
$23,299.00 |
| SAR TRAIN BB CLARIFIER CONDUIT REHABILITATION |
$92,110.06 |
| SAR WWTP - THICKENER HOLDING TANK MITIGATION |
$1,045,575.73 |
| SAR WWTP LEAKING SLUDGE TRANSFER DRAIN LINE EMERGENCY RENEWA |
$132,434.20 |
| SAR WWTP PRELIMINARY TREATMENT BUILDING B ROOF REHAB |
$282,843.12 |
| SAR WWTP TRAIN A&B BLOWER OVERHEAD DOOR REPLACEMENT |
$30,966.12 |
| SAR WWTP WATER REUSE BUILDING CONTROLLER REPLACEMENT |
$188,032.58 |
| SAR WWTP SLUDGE TRANSFER FACILITY ROOF REHAB |
$211,136.06 |
| SCADA - WASTEWATER TREATMENT PLANTS |
$18,604.55 |
| SER REIMBURSEMENTS 4480 PARENT |
$5,248,347.24 |
| SAR ELEVATED TANK REHAB & IMPROVEMENTS |
$5,052,824.92 |
| SAR INFLUENT FLOW STRUCTURE SCRUBBER VENTILATION IMPROVEMENT |
$106,014.77 |
| SAR INSTALLATION OF FIRE ALARM SYSTEM - ADMIN BLDG |
$47,622.00 |
| SAR SAFETY RAIL REPLACEMENT AND WORK PLATFORMS |
$32,546.00 |
| SAR TRAIN A&B MOTOR CONTROL CENTER ROOM RENOVATION |
$19,133.90 |
| SAR TRANSFER LIFT STATION PUMP REHB |
$53,466.27 |
| SAR WWTP - FILTER BUILDING FLOODING IMPROVEMENTS |
$290,812.84 |
| SAR WWTP BLOWER BLDG C HVAC & ROOF RENEWAL |
$321,486.73 |
| SAR WWTP FLOW EQUALIZATION BUILDING REROOF |
$168,596.80 |
| SAR WWTP PRELIMINARY TREATMENT BUILDING A ROOF REHAB |
$287,876.68 |
| SAR WWTP RADIO BI-DIRECTIONAL AMPLIFIER SYSTEM |
$560,123.00 |
| SAR WWTP SECONDARY SLUDGE PUMP BUILDING TRAIN A ROOF REHAB |
$157,317.26 |
| SAR WWTP SECURITY GATE REPLACEMENT AW37 & AW38 |
$151,800.47 |
| SCOTLAND WELL LIFT STATION WET WELL CLEANING (IDIQ) |
$94,863.67 |
| SHOAL CREEK WASTEWATER REHAB |
$275,886.54 |
| SHROPSHIRE BLVD. WASTEWATER MAIN EXTENSION |
$34,216.70 |
| SINCLAIR AVENUE WASTEWATER INFRASTRUCTURE REPLACEMENT |
$336,098.12 |
| SOUTH AUSTIN REGINAL WWTP UTILITY PUMP BUILDING ROOF REHAB |
$100,200.97 |
| SOUTH AUSTIN REGIONAL ADMINISTRATION BUILDING HVAC CONTROLS |
$37,751.00 |
| SOUTH AUSTIN REGIONAL FILTER BUILDING CORROSION IMPROVEMENTS |
$797,018.76 |
| SOUTH AUSTIN REGIONAL HYPOCHLORITE DOSING IMPROVEMENTS |
$56,344.14 |
| SOUTH AUSTIN REGIONAL JUNCTION BOX COVER IMPROVEMENTS |
$152,438.84 |
| SOUTH AUSTIN REGIONAL LIFT STATION 1 AND 2 NON-POTABLE WATER |
$272,220.00 |
| SOUTH AUSTIN REGIONAL LIFT STATION 1 ELEVATOR REHABILITATION |
$203,513.00 |
| SOUTH AUSTIN REGIONAL LIFT STATION 2 ELEVATOR REHABILITATION |
$191,672.00 |
| SOUTH AUSTIN REGIONAL TRAIN B BAR SCREEN REPLACEMENT |
$1,134,790.29 |
| SOUTH AUSTIN REGIONAL WWTP ACCESS IMPROVEMENTS |
$302,969.22 |
| SOUTH AUSTIN REGIONAL WWTP BLOWER AIR PIPING CONNECTION |
$108,411.57 |
| SOUTH AUSTIN REGIONAL WWTP GOVALLE MITIGATION |
$338,346.54 |
| SOUTH AUSTIN REGIONAL WWTP PLAN AERATION BASIN REPAIR |
$89,516.13 |
| SOUTH AUSTIN REGIONAL WWTP REUSE AND YARD PIPING IMPROVEMENT |
$7,267.68 |
| SOUTH AUSTIN REGIONAL WWTP TRAIN A&B RETURN ACTIVATED SLUDGE |
$478,993.44 |
| SOUTH AUSTIN REGIONAL WWTP 2-INCH NPW LINE REPAIR |
$33,676.89 |
| SOUTH AUSTIN REGIONAL WWTP DOOR REPLACEMENTS |
$999,612.80 |
| SOUTH AUSTIN REGIONAL WWTP FILTER GALLERY HVAC AND ROOF REHA |
$382,414.58 |
| SOUTH AUSTIN REGIONAL WWTP FY2020 MINOR RENEWAL PROJECT |
$443,197.15 |
| SOUTH AUSTIN REGIONAL WWTP-WATER STATION DEMO |
$113,313.50 |
| SOUTH AUSTIN REGIONAL ZAPS ANALYZER INSTALLATION |
$58,075.90 |
| SOUTH FIRST CENTER LIEBERT MINI SPLITS RENEWAL |
$29,116.00 |
| SOUTH SERVICE CENTER FIRE ALARM REPLACEMENT |
$104,090.73 |
| SOUTH SERVICE CENTER RESTROOM REHAB |
$14,998.52 |
| SOUTH SERVICE CENTER WINDOW REPLACEMENT |
$23,583.92 |
| SOUTH SVC CENTER BLDG 600 EXTERIOR WALLS & ROOF IMPROVEMENTS |
$12,850.00 |
| SOUTHLAND OAKS LIFT STATION 12-INCH PIPE RENEWAL |
$14,269.93 |
| SOUTHLAND OAKS LIFT STATION EMERGENCY 12" DISCHARGE LINE REP |
$80,696.44 |
| SOUTHLAND OAKS LIFT STATION FLOOD REHABILITATION |
$512,907.63 |
| SOUTHLAND OAKS LIFT STATION FORCE MAIN LEAK |
$30,853.91 |
| SOUTHLAND OAKS LIFT STATION LEAK REPAIR EMERGNECY |
$37,662.66 |
| SOUTHLAND OAKS WET WELL CONVERSION |
$747,132.04 |
| SOUTHWEST ALLANDALE NEIGHBORHOOD WASTEWATER SYSTEM UPGRADES |
$2,940,606.77 |
| SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
$411,648.61 |
| SPRINGFIELD LIFT STATION EMERGENCY RESPONSE HALLOWEEN 2015 |
$21,923.28 |
| SPRINGFIELD LIFT STATION FORCE MAIN ASSESSMENT` |
$13,944.01 |
| SPRINGLAKE LIFT STATION #2 REHABILITATION |
$45,328.37 |
| SPRINGLAKE LIFT STATION PLUG REMOVAL |
$65,528.10 |
| SUMMIT LAB FIRE ALARM SYSTEM REPLACEMENT - WASTEWATER |
$15,456.00 |
| SUNNY LANE WASTEWATER REPLACEMENT - RENEW AUSTIN |
$4,275.00 |
| TARGETED WASTEWATER LINE IMPROVEMENTS - SOUTH BOGGY BASIN |
$2,803,849.25 |
| TARGETED WASTEWATER LINE IMPROVEMENTS IN FORT UPPER BASIN |
$2,269,426.12 |
| TARRYTWN/HILLVIEW & CLEARVIEW AREA NEIGHBD WW |
$4,275,869.30 |
| TAYLOR LANE PACKAGE WWTP IMPROVEMENTS |
$52,028.39 |
| TAYLOR LANE WWTP CLARIFIER INFLUENT PIPE REHAB |
$1,725.15 |
| TEXAS PLUME LIFT STATION VALVE REPLACEMENT |
$526,775.32 |
| THERESA AVE MANHOLE INSTALLATION |
$224.06 |
| THOROUGHBRED FARMS HEADWORKS REPLACEMENT |
$80,513.26 |
| THOROUGHBRED FARMS MEMORIAL DAY 2016 FLOOD RECOVERY |
$84,593.93 |
| THOROUGHBRED FARMS WWTP DISINFECTION AND LIFT STATION IMPROV |
$248,238.64 |
| THOROUGHBRED FARMS WWTP HYPOCHLORITE IMPROVEMENTS |
$42,777.77 |
| THOUSAND OAKS LIFT STATION ACCESS IMPROVEMENTS |
$108,620.99 |
| TIM LOUVIERE SERVICE CENTER GENERATOR INSTALLATION - WINTER |
$53,161.50 |
| TIM LOUVIERE SERVICE CENTER SECURITY GATE REPLACEMENT |
$121,771.81 |
| TIM LOUVIERE SERVICE CENTER TECH SHOP REMODEL |
$43,438.08 |
| TREATMENT PLANT 4480 PARENT |
$49,087,309.27 |
| TRUMAN HEIGHTS WASTEWATER PIPELINE RENEWAL |
$1,103,301.44 |
| TURNER'S CROSSING - WASTEWATER SER |
$177,739.86 |
| TX DOT 360 AT RM2222 AND COURTYARD WASTEWATER RELOCATION |
$5,322,769.92 |
| TXDOT FM 973 FROM FM 969 TO THYNE - WASTEWATER |
$781,001.92 |
| TXDOT IH 35 CENTRAL WW RELOCATION-US 183 TO RIVERSIDE DRIVE |
$5,815,827.29 |
| TXDOT LOOP 1 WASTEWATER LINE RELOCATION |
$203,926.01 |
| TXDOT US 290 AT OAK HILL PARKWAY WASTEWATER LINE RELOCATION |
$6,962,458.67 |
| US290 INTERSECT AT SH71 WM CANNON JOE TANNER |
$128,338.00 |
| VIRTUALIZATION CAPABILITIES - WASTEWATER TREATMENT PLANTS |
$57,951.00 |
| VISION DRIVE WASTEWATER PIPELINE UPGRADE |
$406,243.34 |
| WC WWTP EMERGENCY SO2 SCRUBBER MEDIA AND EVAP VESSEL REPLACE |
$138,248.48 |
| WCC - BICYCLE SHOWER PROJECT |
$44,680.00 |
| WCC-REPLACE AIR HANDLERS |
$735,420.50 |
| WW RELAY AND SPOT REPAIR SERVICE CONTRACT IDIQ (2017-2019) |
$9,364,882.97 |
| WALLER CREEK - REMOVAL OF ABANDONED GAS LINE |
$6,182.61 |
| WALLER CREEK CENTER - 9TH FLOOR RENOVATION |
$290.52 |
| WALLER CREEK CENTER - CIRTAIN WALL |
$716,454.98 |
| WALLER CREEK CENTER - FIRE MONITORING WORKSTATION |
$34,124.00 |
| WALLER CREEK CENTER - TENTH FLOOR RENOVATION |
$285,259.56 |
| WALLER CREEK CENTER 3RD, 6TH & 8TH FLOOR LOBBY REFRESH |
$15,894.93 |
| WALLER CREEK CENTER 6TH FLOOR RENOVATION |
$163,678.29 |
| WALLER CREEK CENTER BUILDING AUTOMATION SYSTEM |
$2,500.00 |
| WALLER CREEK CENTER CONFERENCE ROOM 104 IMPROVEMENTS |
$576,372.42 |
| WALLER CREEK CENTER FIRE NOTIFICATION SYSTEM REPLACEMENT |
$428,096.99 |
| WALLER CREEK CENTER INSULATION |
$18,817.50 |
| WALLER CREEK CENTER PARKING GARAGE STAIRWELL INSPECTION |
$901,960.48 |
| WALLER CREEK CENTER PATCH & SEAL DRIVEWAY SURFACE |
$28,051.12 |
| WALLER CREEK CENTER RENOVATION |
$45,804.55 |
| WALLER CREEK CHILLER DRIVE REBUILD AND DRIVE REPLACEMENTS |
$352,493.43 |
| WALLER CREEK DISTRICT - CREEK DELTA -AERIAL WW LINE |
$188,574.16 |
| WALLER: SECURITY OPERATION CENTER'S BUILD-OUT |
$13,877.60 |
| WALNUT CREEK ADMIN BUILDING AND MAINTENANCE SHOP BOILER REPL |
$59,662.85 |
| WALNUT CREEK PRIMARY CLARIFIER AND FLOW |
$14,915,864.52 |
| WALNUT CREEK TREATMENT PLANT MAINTENANCE BUILDING FIRE ALARM |
$39,673.00 |
| WALNUT CREEK WW TREATMENT PLANT GARAGE DOOR REPLACEMENT |
$58,105.00 |
| WALNUT CREEK WWTP EFFLUENT SAMPLE PUMP MODIFICATIONS |
$1,910,540.02 |
| WALNUT CREEK WWTP EMERGENCY 3 NON-POTABLE WATER PIPE |
$18,074.71 |
| WALNUT CREEK WWTP PRIMARY CLARIFIER GATE REPLACEMENTS |
$28,797.90 |
| WALNUT CREEK WWTP SAMPLE RECEIVING LAB RENOVATION |
$54,457.73 |
| WALNUT CREEK WASTEWATER TREATMENT PLANT AERATION BASIN REPAI |
$71,613.31 |
| WALNUT CREEK WASTEWATER TREATMENT PLANT CHLORINE LINE REPAIR |
$4,208.85 |
| WALNUT CREEK WASTEWATER TREATMENT PLANT LINE BREAK EMERGENCY |
$18,837.97 |
| WALNUT CREEK WASTEWATER TREATMENT PLANT SINK HOLE REPAIR |
$7,606.00 |
| WALNUT CREEK WASTEWATER TREATMENT PLANT SKYLIGHT REPLACEMENT |
$115,190.65 |
| WALNUT CREEK WWTP BLOW-OFF SILENCER REPLACEMENT |
$61,990.09 |
| WALNUT CREEK WWTP BLOWER OPERATOR INTERFACE UNIT UPGRADES |
$34,837.70 |
| WALNUT CREEK WWTP ELECTRICAL SUBSTATION 1 HVAC REPLACEMENT |
$122,296.86 |
| WALNUT CREEK WWTP FIRE WATER LINE REHAB |
$52,941.74 |
| WALNUT CREEK WWTP GRIT WASHER REHAB |
$261,544.00 |
| WALNUT CREEK WWTP HEADWORKS #2 BAR SCREEN |
$216,037.24 |
| WALNUT CREEK WWTP INSTAL CL SOLUTION LINES & JIB CRANES |
$63,289.06 |
| WALNUT CREEK WWTP NON-POTABLE WATER LINE EMERGENCY REPAIRS |
$35,412.80 |
| WALNUT CREEK WWTP NON-POTABLE WATER TO CHLORINE INJECTORS |
$35,270.09 |
| WALNUT CREEK WWTP ODOR CONTROL DUCT LEAK INVEST & REHAB |
$27,674.20 |
| WALNUT CREEK WWTP POND FLUME REPAIRS |
$47,728.89 |
| WALNUT CREEK WWTP SULFUR DIOXIDE BUILDING ROOF REPLACEMENT |
$92,880.00 |
| WALNUT CREEK WWTP WRI HSP-3 SUCTION VALVE REPLACEMENT |
$51,454.19 |
| WALNUT WWTP MAINTENANCE SHOP CHILLER, AIR HANDLER |
$1,099,366.02 |
| WALNUT WWTP ADMIN BLDG CHILLED WATER SYSTEM REPLACEMENT |
$537,012.88 |
| WALNUT WWTP HEADWORKS #2 HVAC RENEWAL |
$47,097.92 |
| WASTEWATER COLLECTION 4480 PARENT |
$12,030,603.46 |
| WASTEWATER FUTURE PROJECTS UNF |
$190,930.00 |
| WASTEWATER IMPVS CITY WIDE |
$11,139,622.41 |
| WASTEWATER LINE RENEWAL AND SPOT REHAB SERVICE CONTRACT |
$4,529,516.58 |
| WASTEWATER RELAY AND SPOT REPAIR SERVICE CONTRACT ID/IQ |
$8,182,521.99 |
| WASTEWATER RENEWAL PROGRAM - MANHOLES (2019 TO 2022) |
$1,619,745.56 |
| WASTEWATER RENEWAL PROGRAM - MANHOLES IDIQ (2024-2026) |
$1,040,575.07 |
| WASTEWATER RENEWAL PROGRAM-MANHOLES (2016 TO 2019) |
$1,132,494.75 |
| WC WWTP LAB & ADM BLDG HVAC-P1 |
$2,581,788.91 |
| WEBBERVILLE ELEVATOR MODERNIZATION |
$72,433.00 |
| WEBBERVILLE IMPROVEMENT PROJ 2015 |
$22,310.48 |
| WEBBERVILLE NEW TRAILER FURNITURE |
$57,722.65 |
| WEST 35TH STREET WASTEWATER SYSTEM REHAB |
$62,784.13 |
| WEST 9TH STREET WASTEWATER REPLACEMENT |
$793,890.94 |
| WEST BANK LIFT STATION REHAB |
$1,509,300.00 |
| WICKERSHAM BRIDGE PROTECTION OF 24" WASTEWATER LINE |
$37,000.00 |
| WILD HORSE WWTP EMERGENCY GATE REPAIR |
$106,597.08 |
| WILDHORSE PACKAGE WWTP IMPROVEMENTS |
$12,202.04 |
| WILDHORSE WWTP TRAVELING BRIDGE & SLUDGE PUMPING IMPR |
$912,802.78 |
| WILDHORSE WWTP EFFLUENT AREA PUMPING & CLEANING EMERGENCY |
$104,314.02 |
| WILLIAM WALLACE WAY LIFT STATION DEMOLITION |
$69,448.54 |
| WW - 1304 S 3RD STREET |
$20,955.60 |
| WW UPSIZE AND RELOCATION AT RUNDBERG LN AND DELTA DR-MCKALLA |
$526,737.00 |
| ZILKER WATER PIPELINE RENEWAL: TREADWELL ST AREA |
$3,562,513.99 |