2021 WATERLINE ON-CALL SERVICES IDIQ |
$5,441,741.92 |
4321 CITY PARK RD 8 INCH WATER LINE EXTENSION |
$24,260.87 |
5503 LAKEMOORE DR WATER LINE EXTENSION |
$27,732.36 |
720 UPSON WATER LINE EXTENSION |
$53,958.68 |
ADVANCED METERING INFRASTRUCTURE CONSULTANT |
$1,149,122.79 |
ANDERSON MILL ZONE WATER LINE RELOCATION |
$3,572.53 |
ANN AND MAYE PLACE WATER IMPROVEMENTS |
$2,340.00 |
ANNEXED AREA 3920 PARENT |
$193,433.27 |
ATLANTA AND FOSTER WATERLINE IMPROVEMENTS |
$78,207.44 |
BARTON HILLS WATER PIPELINE RENEWAL: HORSESHOE BEND AREA |
$154,427.39 |
BRIGHT LEAF HIGH GAME FENCING ALONG MT. BONNELL RD., SOUTH B |
$162,091.34 |
BRYKER ROAD WATER REPLACEMENT |
$533,000.79 |
CANYON CREEK TRACT FENCING |
$155,803.41 |
CAROL LEE FENCING |
$53,196.55 |
CENTER STREET PUMP STATION HVAC |
$26,347.43 |
CESAR CHAVEZ TWO WAY CONV- W |
$7,695.00 |
CORTANA HIGH EAST BOUNDARY AT TRAILHEAD HIGH GAME FENCING |
$184,705.54 |
CREEDMOOR DRIVE WATER PIPELINE REPLACEMENT |
$3,780.00 |
DAFFAN LANE WATER SERVICE LINE EXTENSION |
$45.00 |
DAVID WATER TREATMENT PLANT EMERGENCY WASTEWATER MAIN REPAIR |
$105,692.22 |
DAVIS CONTROL ROOM REHABILITATION |
$413,459.80 |
DAVIS LANE #1 RESERVOIR IMPROVEMENTS |
$4,894,421.12 |
DAVIS RAPID MIX PUMPS MECHANICAL SEAL POTABLE IMPROVEMENTS |
$40,072.12 |
DAVIS WTP - METER REPLACEMENT (ADP) |
$206,058.40 |
DAVIS WTP CO2 TANKS, GUARD STATION, AND MISC FACILITY IMPR |
$474,570.39 |
DAVIS WTP CHEMICAL BUILDING REMODEL |
$84,181.93 |
DAVIS WTP CHEMICAL BUILDING ROOFTOP HVAC UNITS |
$67,756.00 |
DAVIS WTP FILTER 1, 26 AND 27 VALVE REPLACEMENT |
$60,063.16 |
DAVIS WTP HIGH SERVICE REPLACEMENT OF AIR HANDLERS |
$376,211.80 |
DAVIS WTP LUBRICANT STORAGE SHED AND HANDLING EQUIPMENT |
$7,980.00 |
DAVIS WTP MAINTENANCE SHOP - REPLACE SHOP HEATERS |
$400,117.00 |
DAVIS WTP SEDIMENTATION BASIN FLOW METER REPLACEMENT (ADP) |
$162,800.00 |
DAVIS WATER TREATMENT PLANT - FIRE MONITORING UPGRADE |
$67,185.12 |
DAVIS WATER TREATMENT PLANT ADMIN BUILDING ROOFTOP UNIT REPL |
$85,523.00 |
DAVIS WATER TREATMENT PLANT BASIN CONCRETE IMPROVEMENTS |
$38,757.72 |
DAVIS WATER TREATMENT PLANT CALGON PUMP IMPROVEMENTS |
$215,507.01 |
DAVIS WATER TREATMENT PLANT CHLORINE VACUUM REGULATOR IMPROV |
$28,696.00 |
DAVIS WATER TREATMENT PLANT FY2020 MINOR RENEWAL PROJECT |
$145,300.00 |
DAVIS WATER TREATMENT PLANT FILTER MEDIA |
$349,645.60 |
DAVIS WATER TREATMENT PLANT LIME BLOWER REPLACEMENT |
$19,911.00 |
DAVIS WATER TREATMENT PLANT-RECYCLE BUILDING NO.2 WATER |
$50,720.00 |
DAVIS WTP BASIN WASHWATER PIPE RENEWAL |
$148,892.41 |
DAVIS WTP CHEMICAL BLDG CHLORINE & AMMONIA LEAK DETECTION |
$179,246.71 |
DAVIS WTP CO2 TANKS PRESSURE RELIEF VALVE IMPROVEMENTS |
$33,073.83 |
DAVIS WTP HIGH SERVICE PUMP STATION PUMP 21 MOTOR REHAB |
$44,602.66 |
DAVIS WTP HIGH SVC PUMP STATION MOTOR 21 EMERGENCY REPAIR |
$263,623.00 |
DAVIS WTP RAW WATER INFLUENT PIPE AND APPURTENANCE REHAB |
$35,050.00 |
DEMOLITION OF RESIDENTIAL INFRASTRUCTURE |
$21,925.00 |
DEPLOY ESAS AT WTP4 |
$257,625.00 |
DOWNTOWN DRINKING WATER FOUNTAINS |
$9,424.70 |
EAST 55TH STREET & HARMON AVENUE WATERLINE REHABILITATION |
$18,877.81 |
EAST 7TH ST CORRIDOR/ CHICON- PLEASANT VALLEY |
$436,982.08 |
ED'S CROSSING HIGH GAME FENCE |
$379,990.48 |
FACILITIES AND FORCE MAIN IDIQ - WATER FY17 |
$416,598.36 |
FIRE ALARM SYSTEM WSC |
$25,929.00 |
FOREST NORTH PHASE 2 WATER LINE RELOCATION |
$2,157,949.05 |
FOREST RIDGE ENTIRE BOUNDARY HIGH GAME FENCING |
$75,177.72 |
FOREST RIDGE PUMP STATION & RESERVOIR HVAC |
$26,992.69 |
FORT UPPER BASIN WATER PIPELINE RENEWAL |
$116,808.59 |
GBSC-RADIO CONSOLE & MODULAR SYS REPLMT |
$6,807.75 |
GLEN BELL SERVICE CENTER ELEVATOR MODERNIZATION |
$34,091.31 |
GLEN BELL SERVICE CENTER HVAC |
$72,843.64 |
GLEN BELL SERVICE CENTER HVAC UNITS REPLACEMENT |
$129,866.60 |
GLEN BELL WAREHOUSE EMERGENCY CAGE AND OFFICE EXPANSION |
$16,437.50 |
GLENLAKE PUMP STATION DECOMMISSIONING |
$98,254.93 |
GOODNIGHT RANCH PHASE TWO |
$239,150.65 |
GREEN DECOMMISSIONING |
$6,006,743.64 |
GREEN WTP ENVIRONMENTAL DECOMISSION |
$2,733,824.00 |
HANDCOX WTP PROCESS BUILDINGS HVAC |
$768,558.55 |
HANDCOX WATER TREATMENT PLANT DOOR REPLACEMENT |
$38,918.61 |
HANDCOX WTP HEAT EXCHANGERS REPLACEMENT |
$120,433.49 |
HAROLD COURT EAST REGIONAL SERVICE CENTER IMPROVEMENTS |
$9,387.97 |
HIELSHER NET WIRE FENCING PIPELINE TO MCKOWN RD NE BOUNDARY |
$129,676.45 |
HIGH GAME FENCING FOR THE ANTHEM TRACT OF THE WQPL |
$210,483.48 |
HIGH GAME FENCING AT TABOR NORTH, ALONG SH45 |
$130,901.75 |
HIGHLAND PARK IMPROVEMENTS |
$105,729.65 |
HOWARD LANE PUMP STATION HVAC |
$165,386.05 |
IH 35 W LINE BETTERMENT-BEN WHITE TO WILLIAM CANNON SEGMENT |
$161,247.12 |
IH 35 W LINE BETTERMENT-OLTORF TO BEN WHITE SEGMENT |
$1,281,257.90 |
IH 35 W LINE BETTERMENT - RUNDBERG TO 290 E SEGMENT |
$197,658.36 |
IH 35 W LINE RELO - RUNDBERG TO 290 E SEGMENT |
$932.13 |
JJ&T HIGH MURFIN RD AND SOUTH BOUNDARY HIGH GAME FENCING |
$133,808.95 |
KENT BUTLER HIGH GAME FENCING |
$42,045.06 |
LAKELINE |
$83,064.50 |
LANDS LITTLE BEAR TRACT/REUNION HIGH GAME FENCE |
$120,117.55 |
LEUTHAN LANE PUMP STATION HVAC |
$21,072.00 |
LEUTHAN LANE TANK IMPROVEMENTS |
$2,823,283.39 |
LITTLE WALNUT CREEK 8-INCH WATER MAIN |
$968,591.81 |
LONG CANYON HIGH GAME FENCING |
$192,745.29 |
METER UPGRADES-3-IN DIAMETER AND LARGER |
$718,320.07 |
MT. LARSON HYDRO TANK REPLACEMENTS |
$174,973.23 |
NET WIRE FENCING HAFIF TRACT ALONG FM1826 BOUNDARY |
$186,922.11 |
NEVER BEND COVE PUMP STATION HVAC REPLACEMENT |
$60,237.80 |
NORTH AUSTIN RESERVOIR & PS CONSTRUCTION SITE BLD |
$88,426.50 |
NORTH ROSEDALE PHASE II NEIGHBORHOOD WATER |
$604,605.68 |
NORTH SERVICE CENTER BUILDING ENVELOPE INSPECTION AND REHAB |
$37,044.00 |
NORTH SERVICE CENTER ENTRY DOOR REPLACEMENT |
$17,042.35 |
NORTH SERVICE CENTER PARKING LOT REHABILITATION |
$7,205.80 |
NORTH SERVICE CENTER RESTROOMS AND SHOWERS REHAB |
$27,799.64 |
NORTH SERVICE CENTER ROOF REPLACEMENT |
$25,150.00 |
ONION TRACT HIGH GAME FENCING |
$178,319.30 |
ONION TRACT WIRE FENCING ALONG FM150 |
$123,183.74 |
OTHER 3920 PARENT |
$1,220,279.62 |
PARKWEST HIGH GAME FENCING |
$29,708.13 |
PEARSON RANCH ROAD |
$212,661.09 |
PILAND TRIANGLE INTERCONNECT |
$1,521,766.26 |
PLAZA SALTILLO POD |
$69,140.20 |
PLAZA SALTILLO PH2 WATER LN REPLACEMENT - CFA |
$408,651.51 |
PUMP STATION 3920 PARENT |
$2,457,324.73 |
RA-KELLAM RD WL |
$105,190.37 |
READJUSTMENT OF WATER LINE APPURTENANCES ON SLAUGHTER LANE |
$48,350.00 |
REHABILITATION 3920 PARENT |
$9,839,483.79 |
REICHER RANCH FIRE SAFETY IMPROVEMENTS |
$76,446.59 |
REICHER RANCH RENOVTN-OFFICES |
$60,799.39 |
REICHER RANCH SECURITY SYSTEM UPGRADE |
$49,424.68 |
RELOCATION 3920 PARENT |
$53,007.00 |
RELOCATION OF NEENAH ROAD WATER LINE AND APPURTENANCES |
$107,640.55 |
RESERVOIR 3920 PARENT |
$3,551,614.49 |
ROBINSON RANCH - DRIVEWAY REPAIR |
$19,278.58 |
ROGERS TRACT FENCING |
$605,023.60 |
ROOFING PARENT ACCT(ASSESSMENT |
$1,885.32 |
SCADA - WATER TREATMENT PLANTS |
$8,823.49 |
SSC BUILDING 600 REHABILITATION |
$39,037.10 |
SEAHOLM POWER PLANT REHAB |
$100,000.00 |
SHAW LANE SECURITY AND FACILITY IMPROVEMENTS |
$246,419.03 |
SLAUGHTER LANE WATERLINE EXTENSION |
$161.53 |
SLAUGHTER LN EXT-BLUFF SPRINGS TO GOOD NIGHT RANCH |
$25,622.50 |
SOUTH FIRST CENTER LIEBERT MINI SPLITS RENEWAL |
$29,116.00 |
SOUTH SERVICE CENTER FIRE ALARM REPLACEMENT |
$53,177.36 |
SOUTH SERVICE CENTER RESTROOM REHAB |
$14,998.52 |
SOUTH SERVICE CENTER UNINTERUPTED POWER SUPPLY REPLACEMENT |
$146,160.52 |
SOUTH SVC CENTER BLDG 600 EXTERIOR WALLS & ROOF IMPROVEMENTS |
$12,850.00 |
SOUTHWEST ALLANDALE NEIGHBORHOOD WATER SYSTEM UPGRADES |
$1,448,930.84 |
SPILLAR TRACT NET WIRE FENCING |
$220,334.88 |
SUBURBAN DR. WATER SERVICE LINE (WSL) RELAYS |
$585.00 |
SUMMIT LAB FIRE ALARM SYSTEM REPLACEMENT - WATER |
$15,456.00 |
SUN TREE PARK FLOW METER & GOLF COURSE SERVICE CONNECTION |
$32,219.93 |
SUNNY LANE WATERLINE REPLACEMENT - RENEW AUSTIN |
$85.00 |
SUNRISE CIRCLE 6" WL IMPROVEMENTS |
$39,590.38 |
SUNSET CIRCLE 6-INCH WATERLINE IMPROVEMENTS |
$30,705.78 |
TXDOT-US 183 BERGSTROM EXPWAY (US 290 TO SH 71) |
$1,226,052.89 |
TANGLEWOOD TRAIL WATER PIPELINE RENEWAL |
$50,835.74 |
TIM LOUVIERE SERVICE CENTER GENERATOR INSTALLATION - WINTER |
$53,161.50 |
TRAVIS CNTY UTIL RELO: FM 969 (PHASE I): DECKER LANE TO FM 9 |
$1,283,784.84 |
TRAVIS COUNTY UTILITY RELO: OLD MANOR ROAD SAFETY IMPR |
$694,104.60 |
TRAVIS COUNTY UTILITY RELOCATION THOMAS SPRINGS ROAD |
$17,160.00 |
TRAVIS COUNTY UTILITY RELOCATION: ELROY ROAD |
$389,878.69 |
TREATMENT PLANT 3920 PARENT |
$15,335,289.68 |
TXDOT BOYCE LANE WATER LINE RELOCATION |
$174,110.68 |
TXDOT OLD GREGG LANE WATERLINE RELOCATION AT HARRIS BRANCH |
$187,002.03 |
TXDOT SH 71 FROM E OF SH 130 TO EOF KELLAM RD WATER RELO |
$108,460.95 |
TXDOT FM 2222 WL RELOCATION: BONAVENTURE DRIVE TO RIBELIN |
$4,839,117.18 |
TXDOT US 290 AT OAK HILL PARKWAY WATER LINE RELOCATION |
$14,135,900.95 |
ULLRICH ADMIN BUILDING LAB HVAC REPLACEMENT |
$17,518.00 |
ULLRICH BASIN #2 STRUCTURAL ANALYSIS AND REPAIR OF CLARIFIER |
$148,494.12 |
ULLRICH FILTER BASINS 1-18 STAIRWAY REHABILITATION |
$104,515.21 |
ULLRICH PRIVATE AUTOMATED BRANCH EXCHANGE ROOM RELOCATION |
$72,574.91 |
ULLRICH SLUDGE HANDLING VALVES AND COMPRESSOR REPLACEMENT |
$87,443.47 |
ULLRICH TRUCK SCALE SYSTEM REHABILITATION |
$24,471.39 |
ULLRICH WTP CONTROL ROOM REHABILITATION |
$403,250.55 |
ULLRICH WTP LSPS SAFETY STRUCTURES RENEWAL |
$8,188.05 |
ULLRICH WTP ROOF REPLACEMENTS |
$1,362,038.75 |
ULLRICH WTP WASHWATER BASIN CLARIFIER RAKE DRIVE RENEWAL |
$124,225.00 |
ULLRICH WATER TREATMENT PLANT - FIRE MONITORING UPDATE |
$63,800.00 |
ULLRICH WATER TREATMENT PLANT ADMIN & CENTRIFUGE SCADA ASSET |
$1,671,260.52 |
ULLRICH WATER TREATMENT PLANT CENTRIFUGE BUILDING HVAC |
$33,615.00 |
ULLRICH WATER TREATMENT PLANT RAW WATER METERING PLATFORM |
$196,576.58 |
ULLRICH WTP MEDIUM/HIGH SERVICE CHILLER AND AIR HANDLER |
$762,058.26 |
ULLRICH WTP UFC#2 TURBINE DRIVE REPLACEMENT |
$152,000.00 |
UNIVERSITY AVENUE ALLEY WATER PIPELINE IMPROVEMENTS |
$773,523.32 |
WCC - BICYCLE SHOWER PROJECT |
$44,680.00 |
WCC-REPLACE AIR HANDLER |
$735,420.50 |
WQPL WILDFLOWER NET WIRE FENCE |
$220,803.05 |
WTP4 SCADA PROGRAMMING, PUMP, AND OTHER BETTERMENTS |
$189,738.95 |
WTP4 SECURITY GUARD HOUSE AND IMPROVEMENTS |
$162,479.33 |
WALLER CREEK - REMOVAL OF ABANDONED GAS LINE |
$6,182.61 |
WALLER CREEK CENTER - 9TH FLOOR RENOVATION |
$290.52 |
WALLER CREEK CENTER - CURTAIN WALL |
$716,455.02 |
WALLER CREEK CENTER - FIRE MONITORING WORKSTATION |
$34,124.00 |
WALLER CREEK CENTER - TENTH FLOOR RENOVATION |
$1,472.77 |
WALLER CREEK CENTER 3RD, 6TH & 8TH FLOOR LOBBY REFRESH |
$15,894.93 |
WALLER CREEK CENTER 6TH FLOOR RENOVATION |
$163,678.31 |
WALLER CREEK CENTER CONFERENCE ROOM 104 IMPROVEMENTS |
$536,319.33 |
WALLER CREEK CENTER FIRE NOTIFICATION SYSTEM REPLACEMENT |
$428,097.01 |
WALLER CREEK CENTER INSULATION |
$18,817.50 |
WALLER CREEK CENTER PARKING GARAGE STAIRWELL INSPECTION |
$157,213.88 |
WALLER CREEK CENTER PATCH & SEAL DRIVEWAY SURFACE |
$28,051.13 |
WALLER CREEK CENTER PLUMBING CODE COMPLIANCE |
$17,896.51 |
WALLER: SECURITY OPERATION CENTER'S BUILD-OUT |
$29,684.09 |
WATER DISTR/LIFT STATION SCADA CONTROL IMPR-PH II |
$5,686.84 |
WATER IMPVS CITYWIDE |
$26,245,922.99 |
WATER QUALITY PROTECTION LANDS HUDSON TRACT W GAP FENCING |
$355,956.38 |
WATER RECLAMATION INITIATIVE 3960 PARENT |
$6,506,214.25 |
WATER TREATMENT PLAN #4 APRIL 2017 STORM REPAIRS |
$41,281.00 |
WATERLINE ON-CALL SERVICES (FY18 - FY20) |
$5,956,166.72 |
WEBBERVILLE ELEVATOR MODERNIZATION |
$72,433.00 |
WEBBERVILLE IMPROVEMENT PROJ 2015 |
$13,185.50 |
WEST 9TH STREET WATER REPLACEMENT |
$876,494.32 |
WHIRLPOOL KARST HIGH GAME FENCING |
$23,062.69 |
WILDFLOWER CENTER GAME FENCING |
$48,700.00 |
WILLOW STREET WATER LINE RENEWAL |
$39.75 |
WTP 4 SODIUM HYPOCHLORITE DISTRIBUTION VALVE |
$51,806.58 |
WTP4 BACKUP SITE DEMOLITION OF EXISTING STRUCTURES |
$84,195.11 |
ZEBRA MUSSEL MITIGATION |
$1,502,028.28 |
ZEBRA MUSSEL MITIGATION - HANDCOX WTP |
$272,575.86 |
ZEBRA MUSSEL MITIGATION - ULLRICH WTP |
$1,713,492.99 |
ZILKER WATER PIPELINE RENEWAL: TREADWELL ST AREA |
$411,537.91 |
OR DAM REMOVAL |
$300,783.84 |