| 10803 PLATT LANE BUILDING REHABILITION - WATER |
$412,264.57 |
| 2021 WATERLINE ON-CALL SERVICES IDIQ |
$6,035,620.10 |
| 38TH AND 40TH STREETS WATER PIPELINE REHABILITATION |
$2,254,121.51 |
| 4 NEW OFFICES AT ULLRICH WTP |
$57,294.86 |
| 4321 CITY PARK RD 8 INCH WATER LINE EXTENSION |
$24,260.87 |
| 5503 LAKEMOORE DR WATER LINE EXTENSION |
$27,732.36 |
| 71 EAST - 428 ACRE TRACT - WATER SER |
$1,169,726.32 |
| 720 UPSON WATER LINE EXTENSION |
$53,958.68 |
| ADINA STREET AND ROB SCOTT STREET WATER REHABILITATION PROJ |
$174,164.89 |
| ADVANCE METERING INFRASTRUCTURE-LOCAL FUND |
$795,813.54 |
| ADVANCED METERING INFRASTRUCTURE CONSULTANT |
$2,300,642.79 |
| ALLEYWAY NEAR PEARL ST & W 29TH ST. WATER PIPELINE RENEWAL |
$27,770.64 |
| ANDERSON MILL ZONE WATER LINE RELOCATION |
$3,572.53 |
| ANN AND MAYE PLACE WATER IMPROVEMENTS |
$2,340.00 |
| ANNEXED AREA 3920 PARENT |
$193,433.27 |
| ATLANTA AND FOSTER WATERLINE IMPROVEMENTS |
$78,207.44 |
| AUSTIN WATER JJ PICKLE BOOSTER PUMP HOUSE/STATION (WD-11) |
$60,943.07 |
| AUSTIN WATER KEY SYSTEM UPGRADE - WATER |
$326,865.20 |
| BARTON HILLS WATER PIPELINE RENEWAL: HORSESHOE BEND AREA |
$4,009,759.60 |
| BELL MOUNTAIN PUMP STATION CONTROLLER REPLACEMENT |
$44,569.87 |
| BELLA FORTUNA |
$130,345.59 |
| BIRCHWOOD COURT WATER PIPELINE RENEWAL |
$37,285.57 |
| BRIGHT LEAF FENCING NORTHERN BOUNDARY |
$147,963.02 |
| BRIGHT LEAF HIGH GAME FENCING ALONG MT. BONNELL RD., SOUTH B |
$162,091.34 |
| BRYKER ROAD WATER REPLACEMENT |
$590,010.80 |
| CANA HOUSE ROOF REPLACEMENT AND GUTTER INSTALLATION |
$56,008.00 |
| CANYON CREEK TRACT FENCING |
$155,803.41 |
| CARETAKER'S GARAGE ROOF |
$64,094.76 |
| CAROL LEE FENCING |
$53,196.55 |
| CENTER STREET PUMP STATION HVAC |
$26,347.43 |
| CESAR CHAVEZ TWO WAY CONV- W |
$7,695.00 |
| COMMUNICATION TRAILER IMPROVEMENTS AT SCADA MASTER RADIO SI |
$88,821.18 |
| COMMUNITY FIRST - PHASE 3 OFFSITE 12" DUCTILE IRON WATER MAI |
$600,000.00 |
| CORTANA HIGH EAST BOUNDARY AT TRAILHEAD HIGH GAME FENCING |
$184,705.54 |
| CREEDMOOR DRIVE WATER PIPELINE REPLACEMENT |
$3,780.00 |
| DAFFAN LANE WATER SERVICE LINE EXTENSION |
$45.00 |
| DAVID WATER TREATMENT PLANT EMERGENCY WASTEWATER MAIN REPAIR |
$105,692.22 |
| DAVIS CONTROL ROOM REHABILITATION |
$413,459.80 |
| DAVIS LANE #1 RESERVOIR IMPROVEMENTS |
$5,068,385.66 |
| DAVIS RAPID MIX PUMPS MECHANICAL SEAL POTABLE IMPROVEMENTS |
$40,072.12 |
| DAVIS WTP - METER REPLACEMENT (ADP) |
$206,058.40 |
| DAVIS WTP - ZEBRA MUSSEL MITIGATION EQZ SYSTEM LEAKS |
$32,859.24 |
| DAVIS WTP CO2 TANKS, GUARD STATION, AND MISC FACILITY IMPR |
$474,570.39 |
| DAVIS WTP CHEMICAL BUILDING REMODEL |
$84,181.93 |
| DAVIS WTP CHEMICAL BUILDING ROOFTOP HVAC UNITS |
$67,756.00 |
| DAVIS WTP EMERGENCY IRON FEED PUMP REPLACEMENT |
$109,443.93 |
| DAVIS WTP FILTER 1, 26 AND 27 VALVE REPLACEMENT |
$60,063.16 |
| DAVIS WTP HIGH SERVICE REPLACEMENT OF AIR HANDLERS |
$376,211.80 |
| DAVIS WTP LUBRICANT STORAGE SHED AND HANDLING EQUIPMENT |
$7,980.00 |
| DAVIS WTP MAINTENANCE SHOP - REPLACE SHOP HEATERS |
$400,117.00 |
| DAVIS WTP SEDIMENTATION BASIN FLOW METER REPLACEMENT (ADP) |
$162,800.00 |
| DAVIS WTP TRAINING/STORE ROOM HVAC RENEWAL |
$57,780.99 |
| DAVIS WTP TRUCK SCALE EMERGENCY |
$39,944.11 |
| DAVIS WATER TREATMENT PLANT - FIRE MONITORING UPGRADE |
$67,185.12 |
| DAVIS WATER TREATMENT PLANT - IDIQ CHLORINE SCRUBBER MEDIA R |
$130,219.11 |
| DAVIS WATER TREATMENT PLANT ADMIN BUILDING ROOFTOP UNIT REPL |
$85,523.00 |
| DAVIS WATER TREATMENT PLANT BASIN CONCRETE IMPROVEMENTS |
$38,757.72 |
| DAVIS WATER TREATMENT PLANT CALGON PUMP IMPROVEMENTS |
$215,507.01 |
| DAVIS WATER TREATMENT PLANT CHLORINE VACUUM REGULATOR IMPROV |
$28,696.00 |
| DAVIS WATER TREATMENT PLANT FY2020 MINOR RENEWAL PROJECT |
$145,300.00 |
| DAVIS WATER TREATMENT PLANT FILTER MEDIA |
$882,509.00 |
| DAVIS WATER TREATMENT PLANT FRONT ENTRANCE SECURITY GATES AW |
$124,939.22 |
| DAVIS WATER TREATMENT PLANT LIME BLOWER REPLACEMENT |
$19,911.00 |
| DAVIS WATER TREATMENT PLANT-RECYCLE BUILDING NO.2 WATER |
$50,720.00 |
| DAVIS WTP - FILTER PIPING & BASIN #5 CONCRETE FLOOR REPAIRS |
$53,011.55 |
| DAVIS WTP - IRON FEED PUMP I&C UPGRADES |
$69,501.31 |
| DAVIS WTP BASIN FIBERGLASS SAFETY GRATING REPLACEMENT |
$714,226.94 |
| DAVIS WTP BASIN WASHWATER PIPE RENEWAL |
$148,892.41 |
| DAVIS WTP CHEMICAL BLDG CHLORINE & AMMONIA LEAK DETECTION |
$179,246.71 |
| DAVIS WTP CO2 TANKS PRESSURE RELIEF VALVE IMPROVEMENTS |
$33,073.83 |
| DAVIS WTP FREEZE PROTECTION FOR CEB SLUDGE VALVES |
$34,890.00 |
| DAVIS WTP HIGH SERVICE PUMP STATION PUMP 21 MOTOR REHAB |
$44,602.66 |
| DAVIS WTP HIGH SVC PUMP STATION MOTOR 21 EMERGENCY REPAIR |
$291,144.20 |
| DAVIS WTP NEW TRAILER FURNITURE |
$75,044.32 |
| DAVIS WTP RAW WATER INFLUENT PIPE AND APPURTENANCE REHAB |
$75,360.78 |
| DEMOLITION OF RESIDENTIAL INFRASTRUCTURE |
$21,925.00 |
| DEPLOY ESAS AT WTP4 |
$257,625.00 |
| DEVON CIRCLE WATER PIPELINE RENEWAL |
$35,009.73 |
| DOWNTOWN DRINKING WATER FOUNTAINS |
$9,424.70 |
| EAST 55TH STREET & HARMON AVENUE WATERLINE REHABILITATION |
$18,877.81 |
| EAST 7TH ST CORRIDOR/ CHICON- PLEASANT VALLEY |
$436,982.08 |
| EAST BRAKER LANE WATERLINE EXTENSION |
$8,416,041.58 |
| ED'S CROSSING HIGH GAME FENCE |
$379,990.48 |
| EMMAUS HOUSE SEWER LINE REPLACEMENT |
$48,954.70 |
| FACILITIES AND FORCE MAIN IDIQ - WATER FY17 |
$416,598.36 |
| FIRE ALARM SYSTEM WSC |
$25,929.00 |
| FOREST NORTH PHASE 2 WATER LINE RELOCATION |
$2,157,949.05 |
| FOREST RIDGE ENTIRE BOUNDARY HIGH GAME FENCING |
$75,177.72 |
| FOREST RIDGE PUMP STATION & RESERVOIR HVAC |
$26,992.69 |
| FORT UPPER BASIN WATER PIPELINE RENEWAL |
$237,600.54 |
| GBSC-RADIO CONSOLE & MODULAR SYS REPLMT |
$6,807.75 |
| GARDEN VILLA LANE WATER PIPELINE RENEWAL |
$596.52 |
| GLEN BELL DISPATCH CENTER MODERNIZATION - WATER |
$103,467.02 |
| GLEN BELL SERVICE CENTER ELEVATOR MODERNIZATION |
$65,558.30 |
| GLEN BELL SERVICE CENTER HVAC |
$224,901.42 |
| GLEN BELL SERVICE CENTER HVAC UNITS REPLACEMENT |
$129,866.60 |
| GLEN BELL SERVICE CENTER ICE MACHINE REPLACEMENT |
$55,066.43 |
| GLEN BELL SERVICE CENTER SECURITY GATE AW6 REPLACEMENT |
$82,177.26 |
| GLEN BELL WAREHOUSE EMERGENCY CAGE AND OFFICE EXPANSION |
$24,944.56 |
| GLENLAKE PUMP STATION DECOMMISSIONING |
$2,004,340.53 |
| GOODNIGHT RANCH PHASE TWO |
$239,150.65 |
| GOVALLE SECURITY GATE RENEWAL |
$21,957.86 |
| GREEN DECOMMISSIONING |
$6,006,743.64 |
| GREEN WTP ENVIRONMENTAL DECOMISSION |
$2,733,824.00 |
| GUILFORD COVE PUMP STATION IMPROVEMENTS |
$2,263,567.11 |
| HANDCOX PUMP RENEWAL |
$310,823.38 |
| HANDCOX TRUCK SCALE |
$43,371.57 |
| HANDCOX WTP PROCESS BUILDINGS HVAC |
$1,035,910.59 |
| HANDCOX WATER TREATMENT PLANT DOOR REPLACEMENT |
$38,918.61 |
| HANDCOX WTP HEAT EXCHANGERS REPLACEMENT |
$120,433.49 |
| HAROLD COURT EAST REGIONAL SERVICE CENTER IMPROVEMENTS |
$9,387.97 |
| HIELSHER NET WIRE FENCING PIPELINE TO MCKOWN RD NE BOUNDARY |
$129,676.45 |
| HIGH GAME FENCING FOR THE ANTHEM TRACT OF THE WQPL |
$210,483.48 |
| HIGH GAME FENCING AT TABOR NORTH, ALONG SH45 |
$130,901.75 |
| HIGHLAND PARK IMPROVEMENTS |
$105,729.65 |
| HILLAR FENCING |
$62,776.73 |
| HOWARD LANE PUMP STATION HVAC |
$165,386.05 |
| IH 35 W LINE BETTERMENT-BEN WHITE TO WILLIAM CANNON SEGMENT |
$161,247.12 |
| IH 35 W LINE BETTERMENT-OLTORF TO BEN WHITE SEGMENT |
$1,281,257.90 |
| IH 35 W LINE BETTERMENT - RUNDBERG TO 290 E SEGMENT |
$197,658.36 |
| IH 35 W LINE RELO - RUNDBERG TO 290 E SEGMENT |
$932.13 |
| JJ&T HIGH MURFIN RD AND SOUTH BOUNDARY HIGH GAME FENCING |
$133,808.95 |
| JOLLYVILLE PUMP STATION ROOF REPLACEMENT |
$292,542.00 |
| KENT BUTLER HIGH GAME FENCING |
$42,045.06 |
| LAKELINE |
$83,064.50 |
| LANDS LITTLE BEAR TRACT/REUNION HIGH GAME FENCE |
$120,117.55 |
| LEUTHAN LANE PUMP STATION HVAC |
$21,072.00 |
| LEUTHAN LANE TANK IMPROVEMENTS |
$2,862,503.79 |
| LITTLE WALNUT CREEK 8-INCH WATER MAIN |
$1,102,599.83 |
| LIVE OAK CIRCLE WATER PIPELINE RENEWAL |
$63,106.86 |
| LONG CANYON HIGH GAME FENCING |
$192,745.29 |
| METER UPGRADES-3-IN DIAMETER AND LARGER |
$718,320.07 |
| MOTHERAL DRIVE SITE IMPROVEMENTS |
$866,755.69 |
| MT. LARSON HYDRO TANK REPLACEMENTS |
$174,973.23 |
| NET WIRE FENCING HAFIF TRACT ALONG FM1826 BOUNDARY |
$186,922.11 |
| NEVER BEND COVE PUMP STATION HVAC REPLACEMENT |
$60,237.80 |
| NORTH AUSTIN RESERVOIR & PS CONSTRUCTION SITE BLD |
$88,426.50 |
| NORTH ROSEDALE PHASE II NEIGHBORHOOD WATER |
$1,566,901.52 |
| NORTH SERVICE ANNEX BUILDING ROOF REPLACEMENT - WATER |
$310,343.98 |
| NORTH SERVICE CENTER BUILDING ENVELOPE INSPECTION AND REHAB |
$37,044.00 |
| NORTH SERVICE CENTER ENTRY DOOR REPLACEMENT |
$35,166.11 |
| NORTH SERVICE CENTER GENERATOR INSTALLATION - WINTER PREVENT |
$51,139.50 |
| NORTH SERVICE CENTER PARKING LOT REHABILITATION |
$7,205.80 |
| NORTH SERVICE CENTER RESTROOMS AND SHOWERS REHAB |
$27,799.64 |
| NORTH SERVICE CENTER ROOF REPLACEMENT |
$25,150.00 |
| ONION TRACT HIGH GAME FENCING |
$178,319.30 |
| ONION TRACT NET WIRE FENCING FM967 |
$107,974.97 |
| ONION TRACT WIRE FENCING ALONG FM150 |
$123,183.74 |
| OTHER 3920 PARENT |
$2,061,205.39 |
| PARKWEST HIGH GAME FENCING |
$29,708.13 |
| PARKWEST HIGH WEST AND SOUTH BOUNDARIES HIGH GAME FENCING |
$53,812.25 |
| PEARSON RANCH ROAD |
$212,661.09 |
| PILAND TRIANGLE INTERCONNECT |
$1,602,785.31 |
| PLAZA SALTILLO POD |
$69,140.20 |
| PLAZA SALTILLO PH2 WATER LN REPLACEMENT - CFA |
$408,651.51 |
| PRESSURE POINT 57 RTU REPLACEMENT |
$47,219.08 |
| PUMP STATION 3920 PARENT |
$2,457,324.73 |
| RA-KELLAM RD WL |
$1,020,534.96 |
| READJUSTMENT OF WATER LINE APPURTENANCES ON SLAUGHTER LANE |
$48,350.00 |
| REHABILITATION 3920 PARENT |
$9,839,483.79 |
| REICHER RANCH FIRE SAFETY IMPROVEMENTS |
$76,446.59 |
| REICHER RANCH RENOVTN-OFFICES |
$60,799.39 |
| REICHER RANCH SECURITY SYSTEM UPGRADE |
$49,424.68 |
| RELOCATION 3920 PARENT |
$53,007.00 |
| RELOCATION OF NEENAH ROAD WATER LINE AND APPURTENANCES |
$107,640.55 |
| RESERVOIR 3920 PARENT |
$3,551,614.49 |
| ROBINSON RANCH - DRIVEWAY REPAIR |
$19,278.58 |
| ROGERS TRACT FENCING |
$605,023.60 |
| ROOFING PARENT ACCT(ASSESSMENT |
$1,885.32 |
| ROSS RD NORTH W IMPROVEMENTS |
$199,864.61 |
| RUTHERFORD HOUSE ROOF REPLACEMENT |
$267,600.00 |
| SCADA - WATER TREATMENT PLANTS |
$8,823.49 |
| SSC BUILDING 600 REHABILITATION |
$39,037.10 |
| SEAHOLM POWER PLANT REHAB |
$100,000.00 |
| SHAW LANE SECURITY AND FACILITY IMPROVEMENTS |
$246,419.03 |
| SLAUGHTER LANE WATERLINE EXTENSION |
$161.53 |
| SLAUGHTER LN EXT-BLUFF SPRINGS TO GOOD NIGHT RANCH |
$25,622.50 |
| SMALL DIAMETER WATERLINE REPLACEMENT PROGRAM IDIQ |
$648,103.38 |
| SOUTH 1ST SERVICE CENTER HVAC RENEWAL PROJECT |
$503,003.60 |
| SOUTH FIRST CENTER LIEBERT MINI SPLITS RENEWAL |
$29,116.00 |
| SOUTH SERVICE CENTER FIRE ALARM REPLACEMENT |
$104,090.73 |
| SOUTH SERVICE CENTER RESTROOM REHAB |
$14,998.52 |
| SOUTH SERVICE CENTER UNINTERUPTED POWER SUPPLY REPLACEMENT |
$146,160.52 |
| SOUTH SERVICE CENTER WINDOW REPLACEMENT |
$23,490.00 |
| SOUTH SVC CENTER BLDG 600 EXTERIOR WALLS & ROOF IMPROVEMENTS |
$12,850.00 |
| SOUTHWEST ALLANDALE NEIGHBORHOOD WATER SYSTEM UPGRADES |
$2,492,470.99 |
| SPILLAR TRACT NET WIRE FENCING |
$220,334.88 |
| STARLINE DRIVE AND LAWNDALE DRIVE PRESSURE ZONE CONVERSION |
$1,359,909.95 |
| SUBURBAN DR. WATER SERVICE LINE (WSL) RELAYS |
$585.00 |
| SUMMIT LAB FIRE ALARM SYSTEM REPLACEMENT - WATER |
$15,456.00 |
| SUN TREE PARK FLOW METER & GOLF COURSE SERVICE CONNECTION |
$32,219.93 |
| SUNNY LANE WATERLINE REPLACEMENT - RENEW AUSTIN |
$85.00 |
| SUNRISE CIRCLE 6" WL IMPROVEMENTS |
$39,590.38 |
| SUNSET CIRCLE 6-INCH WATERLINE IMPROVEMENTS |
$30,705.78 |
| TXDOT-US 183 BERGSTROM EXPWAY (US 290 TO SH 71) |
$1,226,052.89 |
| TANGLEWOOD TRAIL WATER PIPELINE RENEWAL |
$50,835.74 |
| TARGETED WATER LINE IMPROVEMENTS - SOUTH BOGGY BASIN |
$98,811.12 |
| TARRYTWN/HILLVIEW & CLEARVIEW AREA NEIGHBD WS |
$2,507,791.92 |
| TIM LOUVIERE SERVICE CENTER GENERATOR INSTALLATION - WINTER |
$53,161.50 |
| TIM LOUVIERE SERVICE CENTER SECURITY GATE REPLACEMENT |
$81,240.85 |
| TIM LOUVIERE SERVICE CENTER TECH SHOP REMODEL |
$43,438.08 |
| TRAVIS CNTY UTIL RELO: FM 969 (PHASE I): DECKER LANE TO FM 9 |
$1,283,784.84 |
| TRAVIS COUNTY UTILITY RELO: OLD MANOR ROAD SAFETY IMPR |
$694,104.60 |
| TRAVIS COUNTY UTILITY RELOCATION THOMAS SPRINGS ROAD |
$17,160.00 |
| TRAVIS COUNTY UTILITY RELOCATION: ELROY ROAD |
$389,878.69 |
| TREATMENT PLANT 3920 PARENT |
$15,335,289.68 |
| TURNER'S CROSSING - WATER SER |
$597,866.24 |
| TX DOT 360 AT RM2222 AND COURTYARD WATER RELOCATION |
$3,548,513.28 |
| TXDOT BOYCE LANE WATER LINE RELOCATION |
$174,110.68 |
| TXDOT OLD GREGG LANE WATERLINE RELOCATION AT HARRIS BRANCH |
$187,002.03 |
| TXDOT SH 71 FROM E OF SH 130 TO EOF KELLAM RD WATER RELO |
$108,460.95 |
| TXDOT FM 2222 WL RELOCATION: BONAVENTURE DRIVE TO RIBELIN |
$4,839,117.18 |
| TXDOT IH 35 CENTRAL WL RELOCATION-US 183 TO RIVERSIDE DRIVE |
$5,815,827.28 |
| TXDOT US 290 AT OAK HILL PARKWAY WATER LINE RELOCATION |
$14,135,900.95 |
| ULLRICH ADMIN BUILDING LAB HVAC REPLACEMENT |
$17,518.00 |
| ULLRICH BASIN #2 STRUCTURAL ANALYSIS AND REPAIR OF CLARIFIER |
$148,494.12 |
| ULLRICH FILTER BASINS 1-18 STAIRWAY REHABILITATION |
$104,515.21 |
| ULLRICH PRIVATE AUTOMATED BRANCH EXCHANGE ROOM RELOCATION |
$99,945.05 |
| ULLRICH SLUDGE HANDLING VALVES AND COMPRESSOR REPLACEMENT |
$87,443.47 |
| ULLRICH SOLIDS HANDLING SYSTEM CENTRIFUGE PANEL REPLACEMENT |
$443,568.85 |
| ULLRICH TRUCK SCALE SYSTEM REHABILITATION |
$24,471.39 |
| ULLRICH WTP - EMERGENCY RECYCLE PUMPING REPAIRS |
$197,001.65 |
| ULLRICH WTP - HIGH SERVICE PUMP STATION DISCHARGE HEADER VAL |
$3,143.90 |
| ULLRICH WTP CHLORINE BUILDING REDUCED PRESSURE ZONE VALVE RE |
$17,572.80 |
| ULLRICH WTP CONTROL ROOM REHABILITATION |
$403,250.55 |
| ULLRICH WTP EMERGENCY 6" DRAIN LINE REPAIR |
$61,984.98 |
| ULLRICH WTP LSPS SAFETY STRUCTURES RENEWAL |
$8,582.97 |
| ULLRICH WTP LIME BUILDING HVAC REPLACEMENT |
$500,770.00 |
| ULLRICH WTP MEDIUM SERVICE PUMP STATION PLC REPLACEMENT |
$14,239.08 |
| ULLRICH WTP NEW TRAILER |
$103,463.88 |
| ULLRICH WTP ROOF REPLACEMENTS |
$1,511,945.00 |
| ULLRICH WTP TRUCK SCALE IMPROVEMENTS |
$57,441.25 |
| ULLRICH WTP WASHWATER BASIN CLARIFIER RAKE DRIVE RENEWAL |
$124,225.00 |
| ULLRICH WTP WINTER FREEZE DAMAGED PIPE REPAIRS |
$54,411.89 |
| ULLRICH WATER TREATMENT PLANT - FIRE MONITORING UPDATE |
$63,800.00 |
| ULLRICH WATER TREATMENT PLANT ADMIN & CENTRIFUGE SCADA ASSET |
$1,671,260.52 |
| ULLRICH WATER TREATMENT PLANT CENTRIFUGE BUILDING HVAC |
$33,615.00 |
| ULLRICH WATER TREATMENT PLANT RAW WATER METERING PLATFORM |
$196,576.58 |
| ULLRICH WTP FREEZE PROTECTION FOR CEB SLUDGE VALVES |
$77,597.00 |
| ULLRICH WTP MAINTENANCE BLDG. BREAKROOM MODERNIZATION |
$60,842.24 |
| ULLRICH WTP MEDIUM/HIGH SERVICE CHILLER AND AIR HANDLER |
$762,058.26 |
| ULLRICH WTP UFC#2 TURBINE DRIVE REPLACEMENT |
$152,000.00 |
| ULLRICH WTP UPFLOW CLARIFIER BASIN INSTRUMENT & CONTROL IMPR |
$287,509.70 |
| ULLRICH WTP WHOLE PLANT EMERGENCY GENERATOR SITE PREPARATION |
$934,257.72 |
| UNIVERSITY AVENUE ALLEY WATER PIPELINE IMPROVEMENTS |
$1,048,207.22 |
| VIRTUALIZATION CAPABILITIES AT WATER AND WASTEWATER FACILITI |
$173,853.00 |
| WCC - BICYCLE SHOWER PROJECT |
$44,680.00 |
| WCC-REPLACE AIR HANDLER |
$735,420.50 |
| WQPL WILDFLOWER NET WIRE FENCE |
$220,803.05 |
| WTP4 SCADA PROGRAMMING, PUMP, AND OTHER BETTERMENTS |
$189,738.95 |
| WTP4 SECURITY GUARD HOUSE AND IMPROVEMENTS |
$162,479.33 |
| WALLER CREEK - REMOVAL OF ABANDONED GAS LINE |
$6,182.61 |
| WALLER CREEK CENTER - 9TH FLOOR RENOVATION |
$290.52 |
| WALLER CREEK CENTER - CURTAIN WALL |
$716,455.02 |
| WALLER CREEK CENTER - FIRE MONITORING WORKSTATION |
$34,124.00 |
| WALLER CREEK CENTER - TENTH FLOOR RENOVATION |
$55,147.77 |
| WALLER CREEK CENTER 3RD, 6TH & 8TH FLOOR LOBBY REFRESH |
$15,894.93 |
| WALLER CREEK CENTER 6TH FLOOR RENOVATION |
$163,678.31 |
| WALLER CREEK CENTER CONFERENCE ROOM 104 IMPROVEMENTS |
$558,515.37 |
| WALLER CREEK CENTER FIRE NOTIFICATION SYSTEM REPLACEMENT |
$428,097.01 |
| WALLER CREEK CENTER INSULATION |
$18,817.50 |
| WALLER CREEK CENTER PARKING GARAGE STAIRWELL INSPECTION |
$840,957.03 |
| WALLER CREEK CENTER PATCH & SEAL DRIVEWAY SURFACE |
$28,051.13 |
| WALLER CREEK CENTER PLUMBING CODE COMPLIANCE |
$17,896.51 |
| WALLER CREEK CENTER RENOVATION |
$41,462.07 |
| WALLER CREEK CHILLER DRIVE REBUILD AND DRIVE REPLACEMENTS |
$352,493.44 |
| WALLER: SECURITY OPERATION CENTER'S BUILD-OUT |
$29,684.09 |
| WATER DISTR/LIFT STATION SCADA CONTROL IMPR-PH II |
$5,686.84 |
| WATER IMPVS CITYWIDE |
$26,245,922.99 |
| WATER QUALITY PROTECTION LANDS HUDSON TRACT W GAP FENCING |
$355,956.38 |
| WATER RECLAMATION INITIATIVE 3960 PARENT |
$6,506,214.25 |
| WATER TREATMENT PLAN #4 APRIL 2017 STORM REPAIRS |
$41,281.00 |
| WATERLINE ON-CALL SERVICES (FY18 - FY20) |
$5,956,166.72 |
| WATERLINE ON-CALL SERVICES IDIQ (24 TO 26) |
$3,798,077.61 |
| WEBBERVILLE ELEVATOR MODERNIZATION |
$72,433.00 |
| WEBBERVILLE IMPROVEMENT PROJ 2015 |
$13,185.50 |
| WEBBERVILLE NEW TRAILER FURNITURE |
$57,722.66 |
| WEST 9TH STREET WATER REPLACEMENT |
$1,346,734.62 |
| WESTWAY CIRCLE 6-INCH WATERLINE IMPROVEMENTS |
$54,031.25 |
| WHIRLPOOL KARST HIGH GAME FENCING |
$23,062.69 |
| WILDFLOWER CENTER GAME FENCING |
$48,700.00 |
| WILLOW STREET WATER LINE RENEWAL |
$39.75 |
| WTP 4 SODIUM HYPOCHLORITE DISTRIBUTION VALVE |
$51,806.58 |
| WTP4 BACKUP SITE DEMOLITION OF EXISTING STRUCTURES |
$84,195.11 |
| ZEBRA MUSSEL MITIGATION |
$2,536,336.20 |
| ZEBRA MUSSEL MITIGATION - HANDCOX WTP |
$1,302,850.39 |
| ZEBRA MUSSEL MITIGATION - ULLRICH WTP |
$2,985,547.20 |
| ZILKER WATER PIPELINE RENEWAL: TREADWELL ST AREA |
$3,653,650.78 |
| OR DAM REMOVAL |
$300,783.84 |