PROGRAM
CATEGORY CONTRACTUALS
EXPENSE CATEGORY SERVICES-CONSTRUCTION CONTR
DEPARTMENT AUSTIN WATER
FUND S-WASTEWATER IMPROVEMENTS
PROGRAM Select a program.
ACTIVITY
PAYEE
PAYMENT REQUEST
Programs | Select from Below
PROGRAM AMOUNT
ADP - SAR WWTP LIFT STATION NO. 2 INFLUENT WET WELL DEBRIS R $217,500.00
ADP - WALNUT CREEK FACILITIES IMPROVEMENTS $151,331.17
ADP - WALNUT CREEK WWTP ACCESS STAIR IMPROVEMENTS $117,280.00
ADP - WALNUT CREEK WWTP POLYMER DOSING $307,000.00
ADP - WALNUT CREEK WWTP SOUTHERN SECURITY FENCE $96,985.00
ADP-WCWWTP 2013 MISC FACILITY IMPROVEMENTS $32,885.00
ADP-WALNUT CREEK WWTP FACILITY DOOR REPLACEMENT $43,872.00
ANDERSON MILL WWTP RELIEF $746,293.47
ANDERSON MILL ZONE WW LINE RELOCATION $3,572.53
ANNEX TELEMETRY RIVER PLACE, LOST CREEK, SHADY HOLLOW - WW $2,332,428.65
ANNEXED AREA 4480 PARENT $15,234,082.31
AUTOMATIC TRANSFER SWITCH REPLACEMENTS $126,231.43
BALCONES WWTP - CLARIFIER REHAB IMPROVEMENTS $31,841.24
BARRINGTON WAY FM RET & GRAVITY SYS UPGD (LS) $157.88
BARRINGTON WAY FM RET & GRAVITY SYS UPGD (REHAB) $1,860,492.61
BARTON HILLS WASTEWATER PIPELINE RENEWAL: HORSESHOE $1,001,553.80
BLOCKS 2 & 4 ODOR ABATEMENT - WASTEWATER COLLECTION SYSTEM $36,860.35
BLUFFINGTON LIFT STATION EMERGENCY REPAIR $17,067.44
BLUFFINGTON LIFT STATION NO. 3 ACCESS IMPROVEMENTS $231,603.40
BOULDER LANE LIFT STATION - EMERGENCY REHABILITATION $10,835.00
BRYKER ROAD WASTEWATER REPLACEMENT $674,848.65
BULL CREEK BASIN WASTEWATER LINE IMPROVEMENTS - REPLACEMENT $371,939.25
BURNET ROAD AE KRAMER SITE (BURN-AE) - WW LINE $15,650.72
CROSSTOWN SIPHON AIR JUMPTER $1,092,906.79
DAFFAN LANE LIFT STATION EMERGENCY REPAIR $26,486.83
DAVIS SPRINGS LIFT STATION PUMP REPLACEMENT $40,370.00
DESSAU LIFT STATION IMPROVEMENTS $43,432.99
DESSAU WWTP REHAB $25,548.03
EAST 7TH ST CORRIDOR/ CHICON- PLEASANT VALLEY $530,223.40
ENCLAVE VISTA NO. 152 EMERGENCY LIFT STATION IMPROVEMENTS $19,593.61
FM 973 WASTEWATER LINE IMPROVEMENTS $1,854,280.18
FACILITIES AND FORCE MAIN IDIQ - WASTEWATER FY17 $416,598.35
FIRST ROUND OMNI-SITE INSTALLATION $332,510.00
FLOOD CONTROL DRAINAGE BANK $63,263.75
FORT DESSAU LIFT STATION JIB CRANE INSTALLATION $3,953.49
FOUR POINTS 1 LIFT STATION EMERGENCY REPAIR $2,478.97
GBSC-RADIO CONSOLE & MODULAR SYS REPLMT $6,807.75
GENERAL UTILITY RELOCATIONS $294,360.27
GLEN BELL SERVICE CENTER - BUILDING SEWAGE LINE REHAB $477,362.00
GLEN BELL SERVICE CENTER - FIRE SYSTEM UPGRADE $88,426.50
GLEN BELL SERVICE CENTER ELEVATOR MODERNIZATION $65,558.31
GLEN BELL SERVICE CENTER HVAC $224,901.42
GLEN BELL SERVICE CENTER HVAC UNITS REPLACEMENT $129,866.59
GLEN BELL SERVICE CENTER ICE MACHINE REPLACEMENT $52,688.00
GLEN BELL SERVICE CENTER SECURITY GATE AW6 REPLACEMENT $22,022.87
GLEN BELL WAREHOUSE EMERGENCY CAGE AND OFFICE EXPANSION $24,944.55
GONZALES LIFT STATION ABANDONMENT $1,204,078.92
GOVALLE MAINTENANCE SHOP ROOFTOP UNIT REPLACEMENT $31,951.60
GOVALLE NEW TRAILER INSTALL $71,319.85
GOVALLE ODS BLOWER BUILDING ROOF REHAB $89,771.00
GOVALLE SECURITY GATE RENEWAL $21,957.85
GOVALLE WASTEWATER SERVICE IMPROVEMENTS $545,281.96
GOVALLE WWTP ADMIN BUILDING FIRE SYSTEM $71,144.00
GOVALLE WWTP DIVERSION BOX REPAIR $35,391.52
GOVALLE WWTP EMERGENCY ROAD REPAIR $10,040.59
GOVALLE WWTP SECURITY IMPROVEMENTS $32,238.59
HAROLD COURT EAST REGIONAL SERVICE CENTER IMPROVEMENTS $9,387.97
HARPERS BRANCH CREEK INTERCEPTOR $980,024.88
HILLS OF BEAR CREEK LIFT STATION JIB CRANE INSTALLATION $908.01
HORNSBY BEND ADMIN BLDG. ROOF IMPROVEMENTS $358,770.00
HORNSBY BEND ADMIN BUILDING COMMUNICATION CLOSET RELOCATION $151,900.10
HORNSBY BEND ADMINISTRATION LAB WASHROOM REHAB PROJECT $13,167.02
HORNSBY BEND BMP ANAMMOX PILOT STUDY $90,830.00
HORNSBY BEND BMP AUSTIN RESOURCE RECOVERY PAD SITE $2,053,440.67
HORNSBY BEND BMP SCRAP YARD CLEANUP $112,472.90
HORNSBY BEND BMP STORM DAMAGE REPAIRS $221,385.00
HORNSBY BEND BMP SULFATREAT TANK $320,985.52
HORNSBY BEND BMP TREE MITIGATION PLAN $212,674.50
HORNSBY BEND BIOSOLIDS DEMOLISH ABANDONED ASBESTOS $63,270.13
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT TREE MANAGEMENT $239,848.00
HORNSBY BEND BIOSOLIDS PLANT SAR DIGESTER ROOF REPLACEMENT $575,754.08
HORNSBY BEND BMP MAINTENANCE BLDG BREAKROOM MODERNIZATION $199,907.00
HORNSBY BEND COGEN BLDG ROOF IMPROVEMENTS $332,678.00
HORNSBY BEND DEWATERING BUILDING HVAC UNIT REPLACEMENT $17,590.00
HORNSBY BEND DEWATERING FACILITY ROOF AND WALL REHAB $384,823.00
HORNSBY BEND FEB BLDG ROOF IMPROVEMENTS $184,482.00
HORNSBY BEND FIRE ALARM REPLACEMENT ADMIN & MAINT SHOP $73,870.00
HORNSBY BEND LIFT STATION VALVE REPLACEMENT $42,807.02
HORNSBY BEND LIFT STATIONS REHAB (THICKENER AND BELT FILTER) $38,041.07
HORNSBY BEND MAINTENANCE BUILDING ROOF REHAB $194,212.00
HORNSBY BEND MAINTENANCE LAB AND ADMIN BUILDING HVAC REHAB $891,366.97
HORNSBY BEND MGMT PLANT GOVALLE BLDG ROOF IMPROVEMENTS $357,923.00
HORNSBY BEND NEW TRAILER $113,768.41
HORNSBY BEND OBSOLETE SCADA EQUIPMENT REPLACEMENT $5,452.96
HORNSBY BEND RADIO ANTENNA IMPROVEMENTS $281,372.00
HORNSBY BEND SEWER SYSTEM REHABILITATION $25,167.60
HORNSBY BEND SHED ROOF IMPROVEMENTS $8,950.00
HORNSBY BEND SLUDGE LINE EMERGENCY REHABILITATION $7,456.50
HORNSBY BEND SLUDGE LINE EMERGENCY AT SAR DIGESTER COMPLEX $21,232.07
HORNSBY BEND THICKENER COMPLEX REHAB CONSTRUCTION $16,279,752.22
HORNSBY BEND THICKNER BUILDING ROOF REHAB $307,476.00
HORNSBY BUILDING ENVELOPE RESEAL ADMINISTRATION $20,500.00
IDIQ HORNSBY BEND PROJECT IMPROVEMENTS $333,997.29
IDIQ-BRITTLYNS COURT LIFT STATION IMPROVEMENTS $13,197.86
IDIQ-LONG VISTA LIFT STATION REHABILITATION $60,488.12
IDIQ-MARBRIDGE LIFT STATION IMPROVEMENTS $26,601.27
IDIQ-WALNUT CRK BUS PARK STATION FLOODING-EMERGENCY $42,638.28
IH 35 WW LINE BETTERMENT-BEN WHITE TO WILLIAM CANNON SEGMENT $45,084.54
IH 35 WW LINE BETTERMENT - RUNDBERG TO 290 E SEGMENT $239,638.90
IMPROVEMENTS AT SCOTLAND WELL LIFT STATION $82,032.97
IMPROVEMENTS AT SPICEWOOD PARKWAY LIFT STATION $146,143.26
IN SITU WASTEWATER LINE RENEWAL PROGRAM (2022 TO 2024) $2,004,456.78
JUSTIN LANE FROM BURNET TO LAMAR $97,274.00
LENOX OAKS $381,291.45
LIFT STATION 4480 PARENT $558,914.61
LIFT STATION COMMUNICATION UPGRADE TO CELLULAR $3,003.99
LITTLE WALNUT CREEK 24-INCH WASTEWATER MAIN $2,295,540.94
LOST CREEK PACKAGE WWTP IMPROVEMENTS $142,059.13
LOST CREEK PUMPING RENEWAL $178,571.38
LOST CREEK WWTP HEADWORKS REPLACEMENT $117,255.15
LOST CREEK WASTEWATER TREATMENT PLANT CLARIFIER REHAB $1,717,847.85
MABEL DAVIS LIFT STATION WET WELL EMERGENCY REPAIR $5,825.65
MANHOLE ACCESS AREA SURFACE IMPROVEMENTS $28,255.65
NELRAY & EVANS UTIL IMPROVS-WW $1,545,888.09
NEW CENTRAL LIBRARY WASTEWATER SERVICE $200,000.00
NORTH ROSEDALE PHASE II NEIGHBORHOOD WASTEWATER $1,062,823.26
NORTH SERVICE CENTER BUILDING ENVELOPE INSPECTION AND REHAB $37,044.00
NORTH SERVICE CENTER ENTRY DOOR REPLACEMENT $17,042.34
NORTH SERVICE CENTER GENERATOR INSTALLATION $51,139.50
NORTH SERVICE CENTER PARKING LOT REHABILITATION $7,205.80
NORTH SERVICE CENTER RESTROOMS AND SHOWERS REHAB $27,799.63
NORTH SERVICE CENTER ROOF REPLACEMENT $25,150.00
NORTHWEST AREA LS IMPROVEMENTS SPRING LAKE #2 $373,855.10
OAKMONT BLVD IMPROVEMENTS (CRS) $2,070.00
OLD ANDERSON MILL SITE BUILDING DEMOLITION $49,608.84
OLD LAMPASAS LIFT STATION BYPASS VAULT INSTALLATION $51,410.54
ONION CREEK WWTP DEMOLITION $691,513.25
OTHER 4480 PARENT $1,095,146.92
PACKAGE PLANT PROCESS EQUIPMENT REPLACEMENT $91,200.41
PEARCE LANE LIFT STATION 2 EMERGENCY GENERATOR INSTALLATION $247,243.02
PEARCE LANE WWTP TEMPORARY PUMP INSTALLATION $342,086.03
PELICAN POINT LIFT STATION EMERGENCY VALVE REPLACEMENT $35,000.58
RA - EXPOSITION BLVD WW FM REHAB - W. 35TH TO ENFIELD $321,844.28
RA-SE ALLANDALE NEIGHBORHOOD WSU $2,028,849.42
REHABILITATION 4480 PARENT $41,788,863.21
REHABILITATION 4570 PARENT $459,766.54
REHABILITATION OF WW LINES-EPA SAAP (AWU FUNDED) $3,697,849.49
REHABILITATION OF WW LINES-EPA SAAP GRANT $1,400,715.72
RELOCATION 4480 PARENT $2,214,692.23
RENEWAL OF WALNUT INTERCEPTOR SIPHON BOXES $210,627.38
RIBELIN RANCH LIFT STATION FORCE MAIN PLUG EMERGENCY $497,691.23
RINGTAIL LIFT STATION EMERGENCY REHABILITATION $98,638.75
RIO GRANDE FROM 24TH TO 29TH ST. RECON & UTIL ADJ $105,328.41
RIVER PLACE WASTEWATER TREATMENT PLANT EMERGENCY LINE REPAIR $8,568.46
RIVER PLACE WWTP CHLORINE BUILDING FOUNDATION $10,223.82
RIVERPLACE 1,CONCHOS TRAIL, & DAVENPORT LIFT STATIONS CONTRO $9,785.07
ROCK HARBOR EMERGENCY FORCEMAIN RENEWAL $20,857.09
ROCK HARBOR FORCEMAIN LEAK EMERGENCY $18,563.91
ROCK HARBOR LIFT STATION WET WELL COATING $87,594.68
ROCK HARBOR LIFT STATION EMERGENCY $21,157.94
ROCK HARBOR LIFT STATION FORCEMAIN EMERGENCY $20,654.44
ROCK HARBOR LIFT STATION WET WELL REHAB $33,812.34
ROCK HARBOUR EMERGENCY FORCEMAIN REPAIR $37,765.65
ROOFING PARENT ACCT(ASSESSMENT $474,999.98
SAR BACKFLOW PREVENTION INSTALL (ADP) $25,532.23
SAR FILTER CELL NO 5 ACTUATOR REPLACEMENT ADP IDIQ $299,751.88
SAR HVAC REPLACEMENTS $23,299.00
SAR TRAIN BB CLARIFIER CONDUIT REHABILITATION $92,110.06
SAR WWTP - THICKENER HOLDING TANK MITIGATION $993,296.94
SAR WWTP LEAKING SLUDGE TRANSFER DRAIN LINE EMERGENCY RENEWA $132,434.20
SAR WWTP TRAIN A&B BLOWER OVERHEAD DOOR REPLACEMENT $30,966.12
SAR WWTP WATER REUSE BUILDING CONTROLLER REPLACEMENT $50,654.50
SCADA - WASTEWATER TREATMENT PLANTS $18,604.55
SER REIMBURSEMENTS 4480 PARENT $5,248,347.24
SAR ELEVATED TANK REHAB & IMPROVEMENTS $1,043,946.92
SAR INFLUENT FLOW STRUCTURE SCRUBBER VENTILATION IMPROVEMENT $106,014.77
SAR INSTALLATION OF FIRE ALARM SYSTEM - ADMIN BLDG $47,622.00
SAR SAFETY RAIL REPLACEMENT AND WORK PLATFORMS $32,546.00
SAR TRAIN A&B MOTOR CONTROL CENTER ROOM RENOVATION $19,133.90
SAR TRANSFER LIFT STATION PUMP REHB $53,466.27
SAR WWTP - FILTER BUILDING FLOODING IMPROVEMENTS $290,812.84
SAR WWTP RADIO BI-DIRECTIONAL AMPLIFIER SYSTEM $560,123.00
SCOTLAND WELL LIFT STATION WET WELL CLEANING (IDIQ) $94,863.67
SHOAL CREEK WASTEWATER REHAB $275,886.54
SOUTH AUSTIN REGIONAL ADMINISTRATION BUILDING HVAC CONTROLS $37,751.00
SOUTH AUSTIN REGIONAL FILTER BUILDING CORROSION IMPROVEMENTS $797,018.76
SOUTH AUSTIN REGIONAL HYPOCHLORITE DOSING IMPROVEMENTS $56,344.14
SOUTH AUSTIN REGIONAL JUNCTION BOX COVER IMPROVEMENTS $152,438.84
SOUTH AUSTIN REGIONAL LIFT STATION 1 AND 2 NON-POTABLE WATER $272,220.00
SOUTH AUSTIN REGIONAL LIFT STATION 1 ELEVATOR REHABILITATION $203,513.00
SOUTH AUSTIN REGIONAL LIFT STATION 2 ELEVATOR REHABILITATION $191,672.00
SOUTH AUSTIN REGIONAL TRAIN B BAR SCREEN REPLACEMENT $1,134,790.29
SOUTH AUSTIN REGIONAL WWTP ACCESS IMPROVEMENTS $302,969.22
SOUTH AUSTIN REGIONAL WWTP BLOWER AIR PIPING CONNECTION $108,411.57
SOUTH AUSTIN REGIONAL WWTP GOVALLE MITIGATION $338,346.54
SOUTH AUSTIN REGIONAL WWTP PLAN AERATION BASIN REPAIR $89,516.13
SOUTH AUSTIN REGIONAL WWTP REUSE AND YARD PIPING IMPROVEMENT $7,267.68
SOUTH AUSTIN REGIONAL WWTP TRAIN A&B RETURN ACTIVATED SLUDGE $478,993.44
SOUTH AUSTIN REGIONAL WWTP 2-INCH NPW LINE REPAIR $33,676.89
SOUTH AUSTIN REGIONAL WWTP DOOR REPLACEMENTS $999,612.80
SOUTH AUSTIN REGIONAL WWTP FILTER GALLERY HVAC AND ROOF REHA $382,414.58
SOUTH AUSTIN REGIONAL WWTP FY2020 MINOR RENEWAL PROJECT $403,083.34
SOUTH AUSTIN REGIONAL WWTP-WATER STATION DEMO $113,313.50
SOUTH AUSTIN REGIONAL ZAPS ANALYZER INSTALLATION $58,075.90
SOUTH FIRST CENTER LIEBERT MINI SPLITS RENEWAL $29,116.00
SOUTH SERVICE CENTER FIRE ALARM REPLACEMENT $101,836.50
SOUTH SERVICE CENTER RESTROOM REHAB $14,998.52
SOUTH SERVICE CENTER WINDOW REPLACEMENT $23,490.00
SOUTH SVC CENTER BLDG 600 EXTERIOR WALLS & ROOF IMPROVEMENTS $12,850.00
SOUTHLAND OAKS LIFT STATION 12-INCH PIPE RENEWAL $14,269.93
SOUTHLAND OAKS LIFT STATION FLOOD REHABILITATION $512,907.63
SOUTHLAND OAKS LIFT STATION FORCE MAIN LEAK $30,853.91
SOUTHLAND OAKS LIFT STATION LEAK REPAIR EMERGNECY $37,662.66
SOUTHLAND OAKS WET WELL CONVERSION $499,526.31
SOUTHWEST ALLANDALE NEIGHBORHOOD WASTEWATER SYSTEM UPGRADES $2,872,575.40
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS $8,296.22
SPRINGFIELD LIFT STATION EMERGENCY RESPONSE HALLOWEEN 2015 $21,923.28
SPRINGFIELD LIFT STATION FORCE MAIN ASSESSMENT` $13,944.01
SPRINGLAKE LIFT STATION #2 REHABILITATION $45,328.37
SPRINGLAKE LIFT STATION PLUG REMOVAL $65,528.10
SUMMIT LAB FIRE ALARM SYSTEM REPLACEMENT - WASTEWATER $15,456.00
SUNNY LANE WASTEWATER REPLACEMENT - RENEW AUSTIN $4,275.00
TARGETED WASTEWATER LINE IMPROVEMENTS IN FORT UPPER BASIN $2,147,920.81
TARRYTWN/HILLVIEW & CLEARVIEW AREA NEIGHBD WW $870,767.40
TAYLOR LANE PACKAGE WWTP IMPROVEMENTS $52,028.39
TAYLOR LANE WWTP CLARIFIER INFLUENT PIPE REHAB $1,725.15
TEXAS PLUME LIFT STATION VALVE REPLACEMENT $369,484.05
THERESA AVE MANHOLE INSTALLATION $224.06
THOROUGHBRED FARMS HEADWORKS REPLACEMENT $80,513.26
THOROUGHBRED FARMS MEMORIAL DAY 2016 FLOOD RECOVERY $84,593.93
THOROUGHBRED FARMS WWTP DISINFECTION AND LIFT STATION IMPROV $248,238.64
THOROUGHBRED FARMS WWTP HYPOCHLORITE IMPROVEMENTS $42,777.77
THOUSAND OAKS LIFT STATION ACCESS IMPROVEMENTS $108,620.99
TIM LOUVIERE SERVICE CENTER GENERATOR INSTALLATION - WINTER $53,161.50
TIM LOUVIERE SERVICE CENTER TECH SHOP REMODEL $38,904.12
TREATMENT PLANT 4480 PARENT $49,087,309.27
TRUMAN HEIGHTS WASTEWATER PIPELINE RENEWAL $1,048,136.37
TURNER'S CROSSING - WASTEWATER SER $177,739.86
TXDOT FM 973 FROM FM 969 TO THYNE - WASTEWATER $19,551.15
TXDOT IH 35 CENTRAL WW RELOCATION-US 183 TO RIVERSIDE DRIVE $5,815,827.29
TXDOT LOOP 1 WASTEWATER LINE RELOCATION $203,926.01
TXDOT US 290 AT OAK HILL PARKWAY WASTEWATER LINE RELOCATION $6,962,458.67
US290 INTERSECT AT SH71 WM CANNON JOE TANNER $128,338.00
WCC - BICYCLE SHOWER PROJECT $44,680.00
WCC-REPLACE AIR HANDLERS $735,420.50
WW RELAY AND SPOT REPAIR SERVICE CONTRACT IDIQ (2017-2019) $9,364,882.97
WALLER CREEK - REMOVAL OF ABANDONED GAS LINE $6,182.61
WALLER CREEK CENTER - 9TH FLOOR RENOVATION $290.52
WALLER CREEK CENTER - CIRTAIN WALL $716,454.98
WALLER CREEK CENTER - FIRE MONITORING WORKSTATION $34,124.00
WALLER CREEK CENTER - TENTH FLOOR RENOVATION $1,472.77
WALLER CREEK CENTER 3RD, 6TH & 8TH FLOOR LOBBY REFRESH $15,894.93
WALLER CREEK CENTER 6TH FLOOR RENOVATION $163,678.29
WALLER CREEK CENTER CONFERENCE ROOM 104 IMPROVEMENTS $568,922.74
WALLER CREEK CENTER FIRE NOTIFICATION SYSTEM REPLACEMENT $428,096.99
WALLER CREEK CENTER INSULATION $18,817.50
WALLER CREEK CENTER PARKING GARAGE STAIRWELL INSPECTION $162,781.39
WALLER CREEK CENTER PATCH & SEAL DRIVEWAY SURFACE $28,051.12
WALLER CREEK CENTER RENOVATION $25,334.99
WALLER CREEK CHILLER DRIVE REBUILD AND DRIVE REPLACEMENTS $16,916.65
WALLER CREEK DISTRICT - CREEK DELTA -AERIAL WW LINE $85,172.25
WALLER: SECURITY OPERATION CENTER'S BUILD-OUT $13,877.60
WALNUT CREEK ADMIN BUILDING AND MAINTENANCE SHOP BOILER REPL $59,662.85
WALNUT CREEK PRIMARY CLARIFIER AND FLOW $1,693,944.06
WALNUT CREEK TREATMENT PLANT MAINTENANCE BUILDING FIRE ALARM $39,673.00
WALNUT CREEK WW TREATMENT PLANT GARAGE DOOR REPLACEMENT $58,105.00
WALNUT CREEK WWTP EFFLUENT SAMPLE PUMP MODIFICATIONS $267,832.21
WALNUT CREEK WWTP EMERGENCY 3 NON-POTABLE WATER PIPE $18,074.71
WALNUT CREEK WWTP PRIMARY CLARIFIER GATE REPLACEMENTS $28,797.90
WALNUT CREEK WWTP SAMPLE RECEIVING LAB RENOVATION $54,457.73
WALNUT CREEK WASTEWATER TREATMENT PLANT AERATION BASIN REPAI $71,613.31
WALNUT CREEK WASTEWATER TREATMENT PLANT CHLORINE LINE REPAIR $4,208.85
WALNUT CREEK WASTEWATER TREATMENT PLANT LINE BREAK EMERGENCY $18,837.97
WALNUT CREEK WASTEWATER TREATMENT PLANT SINK HOLE REPAIR $7,606.00
WALNUT CREEK WASTEWATER TREATMENT PLANT SKYLIGHT REPLACEMENT $115,190.65
WALNUT CREEK WWTP BLOW-OFF SILENCER REPLACEMENT $61,990.09
WALNUT CREEK WWTP BLOWER OPERATOR INTERFACE UNIT UPGRADES $34,837.70
WALNUT CREEK WWTP ELECTRICAL SUBSTATION 1 HVAC REPLACEMENT $122,296.86
WALNUT CREEK WWTP FIRE WATER LINE REHAB $52,941.74
WALNUT CREEK WWTP GRIT WASHER REHAB $261,544.00
WALNUT CREEK WWTP HEADWORKS #2 BAR SCREEN $216,037.24
WALNUT CREEK WWTP INSTAL CL SOLUTION LINES & JIB CRANES $63,289.06
WALNUT CREEK WWTP NON-POTABLE WATER LINE EMERGENCY REPAIRS $35,412.80
WALNUT CREEK WWTP NON-POTABLE WATER TO CHLORINE INJECTORS $35,270.09
WALNUT CREEK WWTP ODOR CONTROL DUCT LEAK INVEST & REHAB $27,674.20
WALNUT CREEK WWTP POND FLUME REPAIRS $45,342.45
WALNUT CREEK WWTP SULFUR DIOXIDE BUILDING ROOF REPLACEMENT $92,880.00
WALNUT CREEK WWTP WRI HSP-3 SUCTION VALVE REPLACEMENT $51,454.19
WALNUT WWTP MAINTENANCE SHOP CHILLER, AIR HANDLER $1,099,366.02
WALNUT WWTP ADMIN BLDG CHILLED WATER SYSTEM REPLACEMENT $537,012.88
WALNUT WWTP HEADWORKS #2 HVAC RENEWAL $47,097.92
WASTEWATER COLLECTION 4480 PARENT $12,030,603.46
WASTEWATER FUTURE PROJECTS UNF $190,930.00
WASTEWATER IMPVS CITY WIDE $11,139,622.41
WASTEWATER LINE RENEWAL AND SPOT REHAB SERVICE CONTRACT $1,956,712.40
WASTEWATER RELAY AND SPOT REPAIR SERVICE CONTRACT ID/IQ $8,182,521.99
WASTEWATER RENEWAL PROGRAM - MANHOLES (2019 TO 2022) $1,619,745.56
WASTEWATER RENEWAL PROGRAM - MANHOLES IDIQ (2024-2026) $101,448.89
WASTEWATER RENEWAL PROGRAM-MANHOLES (2016 TO 2019) $1,132,494.75
WC WWTP LAB & ADM BLDG HVAC-P1 $2,581,788.91
WEBBERVILLE ELEVATOR MODERNIZATION $72,433.00
WEBBERVILLE IMPROVEMENT PROJ 2015 $22,310.48
WEBBERVILLE NEW TRAILER FURNITURE $33,150.65
WEST 9TH STREET WASTEWATER REPLACEMENT $754,292.17
WEST BANK LIFT STATION REHAB $1,509,300.00
WICKERSHAM BRIDGE PROTECTION OF 24" WASTEWATER LINE $37,000.00
WILD HORSE WWTP EMERGENCY GATE REPAIR $106,597.08
WILDHORSE PACKAGE WWTP IMPROVEMENTS $12,202.04
WILDHORSE WWTP TRAVELING BRIDGE & SLUDGE PUMPING IMPR $912,802.78
WILDHORSE WWTP EFFLUENT AREA PUMPING & CLEANING EMERGENCY $104,314.02
WILLIAM WALLACE WAY LIFT STATION DEMOLITION $69,448.54
WW - 1304 S 3RD STREET $20,955.60
ZILKER WATER PIPELINE RENEWAL: TREADWELL ST AREA $1,657,512.59