PRM 6100 17071928071 |
Construction, Parking Lot and Alley |
07/21/2017 |
Paid |
$20,712.23 |
PRM 6100 17051622209 |
Construction, Parking Lot and Alley |
05/18/2017 |
Paid |
$42,300.55 |
PRM 6100 17051622215 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/18/2017 |
Paid |
$4,676.42 |
PRM 6100 17041819511 |
Construction, Parking Lot and Alley |
04/20/2017 |
Paid |
$8,996.75 |
PRM 6100 17030615183 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/08/2017 |
Paid |
$59,550.49 |
PRM 6100 17010308832 |
Construction, Parking Lot and Alley |
01/05/2017 |
Paid |
$20,187.20 |
PRM 6100 16112905421 |
Construction, Parking Lot and Alley |
12/01/2016 |
Paid |
$33,001.10 |
PRM 6100 16110803933 |
Construction, Parking Lot and Alley |
11/10/2016 |
Paid |
$75,980.52 |
PRM 6100 16080132334 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/02/2016 |
Paid |
$1,363.50 |
PRM 6100 16061327089 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
06/14/2016 |
Paid |
$23,453.33 |
PRM 6100 16061327098 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
06/14/2016 |
Paid |
$4,180.90 |
PRM 6100 16042522669 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
04/27/2016 |
Paid |
$3,860.53 |
PRM 6100 16033120258 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
04/06/2016 |
Paid |
$1,296.18 |
PRM 6100 16033120260 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
04/06/2016 |
Paid |
$30,688.46 |
PRM 6100 16033120262 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
04/06/2016 |
Paid |
$15,209.79 |
PRM 6100 16021114135 |
Construction, Parking Lot and Alley |
02/17/2016 |
Paid |
$143,395.37 |
PRM 6100 16020313160 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/09/2016 |
Paid |
$33,890.33 |
PRM 6100 16020112919 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
02/04/2016 |
Paid |
$15,142.16 |
PRM 6100 16020112920 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
02/04/2016 |
Paid |
$11,479.93 |
PRM 6100 16011511380 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
01/22/2016 |
Paid |
$10,969.17 |
PRM 6100 15121007404 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/11/2015 |
Paid |
$13,269.29 |
PRM 6100 15121007405 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/11/2015 |
Paid |
$37,516.91 |
PRM 6100 15090237338 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
09/09/2015 |
Paid |
$17,611.75 |
PRM 6100 15080333563 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
08/07/2015 |
Paid |
$16,747.52 |
PRM 6100 15072332569 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
07/29/2015 |
Paid |
$9,663.94 |
PRM 6100 15072332570 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
07/29/2015 |
Paid |
$6,212.78 |
PRM 6100 15070730337 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
07/10/2015 |
Paid |
$31,490.90 |
PRM 6100 15070730339 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
07/10/2015 |
Paid |
$8,872.97 |
PRM 6100 15031617648 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/17/2015 |
Paid |
$25,128.98 |
PRM 6100 15021814642 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
02/19/2015 |
Paid |
$92,945.75 |
PRM 6100 15021814678 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
02/19/2015 |
Paid |
$354,424.48 |
PRM 6100 15021714420 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/18/2015 |
Paid |
$9,299.82 |
PRM 6100 15021714421 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/18/2015 |
Paid |
$22,520.20 |
PRM 6100 15021714425 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/18/2015 |
Paid |
$11,268.45 |
PRM 6100 15021714426 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/18/2015 |
Paid |
$1,340.56 |
PRM 6100 15021714430 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/18/2015 |
Paid |
$22,032.30 |
PRM 6100 15021714431 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/18/2015 |
Paid |
$3,153.12 |
PRM 6100 15012612048 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
01/28/2015 |
Paid |
$22,988.52 |
PRM 6100 14112506047 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
12/02/2014 |
Paid |
$21,004.24 |
PRM 6100 14111705273 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/20/2014 |
Paid |
$38,806.89 |
PRM 6100 14082734985 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/28/2014 |
Paid |
$9,419.25 |
PRM 6100 14080532552 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/06/2014 |
Paid |
$114,587.43 |
PRM 6100 14080532554 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/06/2014 |
Paid |
$75,864.43 |
PRM 6100 14070728573 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/10/2014 |
Paid |
$60,851.04 |
PRM 6100 14061726569 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/18/2014 |
Paid |
$121,108.17 |
PRM 6100 14050521987 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/06/2014 |
Paid |
$198,536.32 |
PRM 6100 14032017012 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/24/2014 |
Paid |
$70,129.94 |
PRM 6100 14031216241 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/14/2014 |
Paid |
$49,230.21 |
PRM 6100 14020612813 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/07/2014 |
Paid |
$75,531.89 |
PRM 6100 14020612817 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
02/07/2014 |
Paid |
$16,160.35 |
PRM 6100 14020612821 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
02/07/2014 |
Paid |
$2,396.85 |
PRM 6100 14011310682 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
01/14/2014 |
Paid |
$181,986.56 |
PRM 6100 13121607978 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/17/2013 |
Paid |
$28,380.63 |
PRM 6100 13121607993 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/17/2013 |
Paid |
$46,657.82 |
PRM 6100 13112506057 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/26/2013 |
Paid |
$50,464.63 |
PRM 6100 13112506057 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
11/26/2013 |
Paid |
$86,911.41 |
PRM 6100 13110504398 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/06/2013 |
Paid |
$256,301.23 |
PRM 6100 13110504402 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/06/2013 |
Paid |
$123,069.75 |
PRM 6100 13110504409 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/06/2013 |
Paid |
$25,470.69 |
PRM 6100 13102202464 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/23/2013 |
Paid |
$168,273.19 |
PRM 6100 13100700657 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
10/08/2013 |
Paid |
$136,009.91 |
PRM 6100 13100700664 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
10/08/2013 |
Paid |
$37,127.64 |
PRM 6100 13092536319 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
09/26/2013 |
Paid |
$117,749.18 |
PRM 6100 13091335121 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
09/16/2013 |
Paid |
$168,586.41 |
PRM 6100 13082032638 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/21/2013 |
Paid |
$130,953.92 |
PRM 6100 13081632376 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
08/19/2013 |
Paid |
$136,472.87 |
PRM 6100 13072630395 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/29/2013 |
Paid |
$296,784.18 |
PRM 6100 13071528288 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/16/2013 |
Paid |
$227,581.77 |
PRM 6100 13071528294 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
07/16/2013 |
Paid |
$80,336.04 |
PRM 6100 13071528298 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
07/16/2013 |
Paid |
$116,062.67 |
PRM 6100 13062626856 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/27/2013 |
Paid |
$141,267.65 |
PRM 6100 13053024456 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/31/2013 |
Paid |
$11,855.19 |
PRM 6100 13053024462 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/31/2013 |
Paid |
$7,908.00 |
PRM 6100 13053024466 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/31/2013 |
Paid |
$61,108.59 |
PRM 6100 13053024468 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/31/2013 |
Paid |
$2,132.75 |
PRM 6100 13053024469 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/31/2013 |
Paid |
$119,937.41 |
PRM 6100 13053024470 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/31/2013 |
Paid |
$30,939.14 |
PRM 6100 13053024473 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/31/2013 |
Paid |
$53,804.67 |
PRM 6100 13053024474 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
05/31/2013 |
Paid |
$36,222.31 |
PRM 6100 13053024475 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
05/31/2013 |
Paid |
$161,160.85 |
PRM 6100 13053024476 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
05/31/2013 |
Paid |
$142,368.52 |
PRM 6100 13053024477 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
05/31/2013 |
Paid |
$3,844.65 |
PRM 6100 13053024479 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
05/31/2013 |
Paid |
$17,526.86 |
PRM 6100 13052423854 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
05/28/2013 |
Paid |
$210,713.72 |
PRM 6100 13042621175 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/29/2013 |
Paid |
$48,043.78 |
PRM 6100 13042621176 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/29/2013 |
Paid |
$23,691.84 |
PRM 6100 13041820149 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/19/2013 |
Paid |
$202,667.05 |
PRM 6100 13041720012 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/18/2013 |
Paid |
$7,618.99 |
PRM 6100 13041720014 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
04/18/2013 |
Paid |
$4,246.50 |
PRM 6100 13032217652 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/25/2013 |
Paid |
$159,019.14 |
PRM 6100 13030816385 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
03/11/2013 |
Paid |
$477,450.59 |
PRM 6100 13022715240 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
02/28/2013 |
Paid |
$75,202.47 |
PRM 6100 13022715244 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
02/28/2013 |
Paid |
$45,662.70 |
PRM 6100 13022715245 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
02/28/2013 |
Paid |
$65,540.06 |
PRM 6100 13022715246 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
02/28/2013 |
Paid |
$6,840.00 |
PRM 6100 13022715247 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
02/28/2013 |
Paid |
$43,470.22 |
PRM 6100 13011510827 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
01/16/2013 |
Paid |
$84,220.22 |
PRM 6100 12121307546 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
12/14/2012 |
Paid |
$80,874.53 |
PRM 6100 12111304857 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
11/14/2012 |
Paid |
$54,836.76 |
PRM 6100 12100300475 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/04/2012 |
Paid |
$129,981.59 |
PRM 6100 12100300477 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/04/2012 |
Paid |
$77,833.28 |
PRM 6100 12100300478 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/04/2012 |
Paid |
$566,083.06 |
PRM 6100 12100300479 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
10/04/2012 |
Paid |
$91,075.77 |
PRM 6100 12090633069 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
09/07/2012 |
Paid |
$25,446.89 |
PRM 6100 12082331500 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
08/24/2012 |
Paid |
$135,845.66 |
PRM 6100 12082331501 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
08/24/2012 |
Paid |
$254,137.58 |
PRM 6100 12071727720 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
07/18/2012 |
Paid |
$187,699.64 |
PRM 6100 12061924784 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
06/20/2012 |
Paid |
$318,554.35 |
PRM 6100 12061824665 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/19/2012 |
Paid |
$176,696.54 |
PRM 6100 12060423402 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/05/2012 |
Paid |
$336,808.08 |
PRM 6100 12060123250 |
Construction, Sidewalk and Driveway (incl Handicapped ramps) |
06/04/2012 |
Paid |
$100,932.47 |
PRM 6100 12050320693 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
05/04/2012 |
Paid |
$24,627.40 |
PRM 6100 12042719955 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
04/30/2012 |
Paid |
$64,065.15 |
PRM 6100 12042519680 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
04/26/2012 |
Paid |
$888.25 |
PRM 6100 12042519681 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
04/26/2012 |
Paid |
$5,560.44 |
PRM 6100 12041018015 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
04/11/2012 |
Paid |
$118,480.20 |
PRM 6100 12032016136 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
03/21/2012 |
Paid |
$83,120.96 |
PRM 6100 12032016137 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
03/21/2012 |
Paid |
$125,293.17 |
PRM 6100 12031915941 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
03/20/2012 |
Paid |
$24,334.25 |
PRM 6100 12031915943 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
03/20/2012 |
Paid |
$16,508.63 |
PRM 6100 12030214319 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
03/05/2012 |
Paid |
$493,903.76 |
PRM 6100 12012610791 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
01/27/2012 |
Paid |
$38,242.77 |
PRM 6100 12012610792 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
01/27/2012 |
Paid |
$27,321.53 |
PRM 6100 11121907518 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
12/20/2011 |
Paid |
$146,772.91 |
PRM 6100 11121907519 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
12/20/2011 |
Paid |
$98,409.74 |
PRM 6100 11120906736 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
12/12/2011 |
Paid |
$89,660.69 |
PRM 6100 11120906737 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
12/12/2011 |
Paid |
$63,932.62 |
PRM 6100 11062026062 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
06/21/2011 |
Paid |
$135,175.97 |
PRM 6100 11041419853 |
SIDEWALK W/RAMPS FOR THE HANDICAPPED. |
04/15/2011 |
Paid |
$65,545.87 |