PRM 2200 19071626768 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
07/18/2019 |
Paid |
$1,647.00 |
PRM 2200 19061724036 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/19/2019 |
Paid |
$1,822.00 |
PRM 2200 19061824098 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/19/2019 |
Paid |
$1,577.00 |
PRM 2200 19061223586 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/13/2019 |
Paid |
$2,733.00 |
PRM 2200 19060723285 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/11/2019 |
Paid |
$1,577.00 |
PRM 2200 19053122489 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/03/2019 |
Paid |
$1,647.00 |
PRM 2200 19053122493 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/03/2019 |
Paid |
$911.00 |
PRM 2200 19052922202 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/30/2019 |
Paid |
$1,612.00 |
PRM 2200 19052922205 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/30/2019 |
Paid |
$911.00 |
PRM 2200 19052822087 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/29/2019 |
Paid |
$1,822.00 |
PRM 2200 19052221639 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/23/2019 |
Paid |
$2,558.00 |
PRM 2200 19052221649 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/23/2019 |
Paid |
$911.00 |
PRM 2200 19052021411 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/21/2019 |
Paid |
$2,733.00 |
PRM 2200 19052021413 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/21/2019 |
Paid |
$1,822.00 |
PRM 2200 19051420983 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/17/2019 |
Paid |
$911.00 |
PRM 2200 19051320844 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/14/2019 |
Paid |
$3,224.00 |
PRM 2200 19050920549 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/10/2019 |
Paid |
$911.00 |
PRM 2200 19050219829 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/03/2019 |
Paid |
$911.00 |
PRM 2200 19050119609 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/02/2019 |
Paid |
$1,822.00 |
PRM 2200 19043019411 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/01/2019 |
Paid |
$1,752.00 |
PRM 2200 19042619081 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/29/2019 |
Paid |
$2,418.00 |
PRM 2200 19042619084 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/29/2019 |
Paid |
$1,822.00 |
PRM 2200 19042218606 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/23/2019 |
Paid |
$2,733.00 |
PRM 2200 19041818302 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/19/2019 |
Paid |
$2,068.00 |
PRM 2200 19041718118 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/18/2019 |
Paid |
$1,822.00 |
PRM 2200 19041617987 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/17/2019 |
Paid |
$911.00 |
PRM 2200 19040917296 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/10/2019 |
Paid |
$736.00 |
PRM 2200 19040216443 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/03/2019 |
Paid |
$1,822.00 |
PRM 2200 19040216447 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/03/2019 |
Paid |
$2,733.00 |
PRM 2200 19032816100 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/29/2019 |
Paid |
$911.00 |
PRM 2200 19032615788 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/27/2019 |
Paid |
$1,822.00 |
PRM 2200 19032615793 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/27/2019 |
Paid |
$2,733.00 |
PRM 2200 19032515611 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/26/2019 |
Paid |
$1,822.00 |
PRM 2200 19032115456 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/22/2019 |
Paid |
$2,208.00 |
PRM 2200 19031114235 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/12/2019 |
Paid |
$2,278.00 |
PRM 2200 19031114246 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/12/2019 |
Paid |
$911.00 |
PRM 2200 19031114258 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/12/2019 |
Paid |
$911.00 |
PRM 2200 19030714013 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/08/2019 |
Paid |
$1,822.00 |
PRM 2200 19030413525 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/05/2019 |
Paid |
$885.00 |
PRM 2200 19030113400 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/04/2019 |
Paid |
$736.00 |
PRM 2200 19022713081 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/28/2019 |
Paid |
$885.00 |
PRM 2200 19022612951 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/27/2019 |
Paid |
$2,315.00 |
PRM 2200 19022612956 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/27/2019 |
Paid |
$885.00 |
PRM 2200 19022612958 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/27/2019 |
Paid |
$885.00 |
PRM 2200 19022012494 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/21/2019 |
Paid |
$885.00 |
PRM 2200 19021912248 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/20/2019 |
Paid |
$885.00 |
PRM 2200 19021311776 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/14/2019 |
Paid |
$885.00 |
PRM 2200 19021211516 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/13/2019 |
Paid |
$885.00 |
PRM 2200 19021211525 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/13/2019 |
Paid |
$1,770.00 |
PRM 2200 19020811199 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/11/2019 |
Paid |
$1,464.00 |
PRM 2200 19020811203 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/11/2019 |
Paid |
$2,655.00 |
PRM 2200 19020610783 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/07/2019 |
Paid |
$885.00 |
PRM 2200 19020510479 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/06/2019 |
Paid |
$885.00 |
PRM 2200 19020410253 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/05/2019 |
Paid |
$1,600.00 |
PRM 2200 19013109984 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/01/2019 |
Paid |
$1,770.00 |
PRM 2200 19013109987 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/01/2019 |
Paid |
$885.00 |
PRM 2200 19012909622 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/30/2019 |
Paid |
$2,655.00 |
PRM 2200 19012509471 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/28/2019 |
Paid |
$1,770.00 |
PRM 2200 19012309258 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/24/2019 |
Paid |
$885.00 |
PRM 2200 19012309259 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/24/2019 |
Paid |
$885.00 |
PRM 2200 19011608761 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/17/2019 |
Paid |
$885.00 |
PRM 2200 19011008378 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/11/2019 |
Paid |
$2,315.00 |
PRM 2200 19011008382 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/11/2019 |
Paid |
$3,540.00 |
PRM 2200 19010908250 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/10/2019 |
Paid |
$1,498.00 |
PRM 2200 19010908257 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/10/2019 |
Paid |
$885.00 |
PRM 2200 19010207584 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/03/2019 |
Paid |
$817.00 |
PRM 2200 19010207586 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/03/2019 |
Paid |
$885.00 |
PRM 2200 18123107452 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/02/2019 |
Paid |
$3,540.00 |
PRM 2200 18123107469 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/02/2019 |
Paid |
$885.00 |
PRM 2200 18122607233 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/27/2018 |
Paid |
$1,770.00 |
PRM 2200 18122007007 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/21/2018 |
Paid |
$647.00 |
PRM 2200 18121806778 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/19/2018 |
Paid |
$885.00 |
PRM 2200 18121106308 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/12/2018 |
Paid |
$647.00 |
PRM 2200 18121106320 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/12/2018 |
Paid |
$885.00 |
PRM 2200 18120706082 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/10/2018 |
Paid |
$885.00 |
PRM 2200 18120706093 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/10/2018 |
Paid |
$1,770.00 |
PRM 2200 18120405689 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/05/2018 |
Paid |
$885.00 |
PRM 2200 18120405698 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/05/2018 |
Paid |
$1,770.00 |
PRM 2200 18113005485 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/03/2018 |
Paid |
$1,600.00 |
PRM 2200 18113005488 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/03/2018 |
Paid |
$1,770.00 |
PRM 2200 18112805148 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/29/2018 |
Paid |
$2,417.00 |
PRM 2200 18112104737 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/26/2018 |
Paid |
$885.00 |
PRM 2200 18112104752 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/26/2018 |
Paid |
$885.00 |
PRM 2200 18112004540 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/21/2018 |
Paid |
$1,770.00 |
PRM 2200 18112004551 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/21/2018 |
Paid |
$885.00 |
PRM 2200 18111504226 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/16/2018 |
Paid |
$817.00 |
PRM 2200 18111404087 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/15/2018 |
Paid |
$885.00 |
PRM 2200 18111404095 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/15/2018 |
Paid |
$885.00 |
PRM 2200 18110803788 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/09/2018 |
Paid |
$885.00 |
PRM 2200 18110603460 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/07/2018 |
Paid |
$885.00 |
PRM 2200 18110603465 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/07/2018 |
Paid |
$1,770.00 |
PRM 2200 18103103089 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/01/2018 |
Paid |
$885.00 |
PRM 2200 18103002925 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/31/2018 |
Paid |
$1,396.00 |
PRM 2200 18102902858 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/30/2018 |
Paid |
$1,770.00 |
PRM 2200 18102402600 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/25/2018 |
Paid |
$2,655.00 |
PRM 2200 18102402604 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/25/2018 |
Paid |
$885.00 |
PRM 2200 18102402606 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/25/2018 |
Paid |
$885.00 |
PRM 2200 18102202292 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/23/2018 |
Paid |
$817.00 |
PRM 2200 18102202295 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/23/2018 |
Paid |
$1,770.00 |
PRM 2200 18101601637 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/17/2018 |
Paid |
$1,430.00 |
PRM 2200 18101201208 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/15/2018 |
Paid |
$1,770.00 |
PRM 2200 18101201210 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/15/2018 |
Paid |
$885.00 |
PRM 2200 18101201219 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/15/2018 |
Paid |
$1,770.00 |
PRM 2200 18101201235 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/15/2018 |
Paid |
$885.00 |
PRM 2200 18101101035 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/12/2018 |
Paid |
$885.00 |
PRM 2200 18100100012 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/02/2018 |
Paid |
$885.00 |
PRM 2200 18092832929 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/01/2018 |
Paid |
$2,655.00 |
PRM 2200 18092732696 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/28/2018 |
Paid |
$885.00 |
PRM 2200 18092632377 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/27/2018 |
Paid |
$715.00 |
PRM 2200 18092532124 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/26/2018 |
Paid |
$885.00 |
PRM 2200 18092131895 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/24/2018 |
Paid |
$885.00 |
PRM 2200 18092131900 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/24/2018 |
Paid |
$885.00 |
PRM 2200 18091931535 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/20/2018 |
Paid |
$2,213.00 |
PRM 2200 18091831343 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/19/2018 |
Paid |
$885.00 |
PRM 2200 18091230871 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/13/2018 |
Paid |
$1,770.00 |
PRM 2200 18091230892 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/13/2018 |
Paid |
$1,770.00 |
PRM 2200 18091130587 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/12/2018 |
Paid |
$1,430.00 |
PRM 2200 18090730399 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/10/2018 |
Paid |
$885.00 |
PRM 2200 18090630239 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/07/2018 |
Paid |
$817.00 |
PRM 2200 18090630249 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/07/2018 |
Paid |
$1,770.00 |
PRM 2200 18090429859 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/05/2018 |
Paid |
$681.00 |
PRM 2200 18090429872 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
09/05/2018 |
Paid |
$1,770.00 |
PRM 2200 18083029645 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
08/31/2018 |
Paid |
$885.00 |
PRM 2200 18082929456 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
08/30/2018 |
Paid |
$885.00 |
PRM 2200 18082829287 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
08/29/2018 |
Paid |
$1,464.00 |
PRM 2200 18082829293 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
08/29/2018 |
Paid |
$885.00 |
PRM 2200 18082228975 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
08/23/2018 |
Paid |
$715.00 |
PRM 2200 18082228976 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
08/23/2018 |
Paid |
$885.00 |
PRM 2200 18082128798 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
08/22/2018 |
Paid |
$715.00 |
PRM 2200 18081728580 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
08/20/2018 |
Paid |
$885.00 |
PRM 2200 18081628454 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
08/17/2018 |
Paid |
$885.00 |
PRM 2200 18081528338 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
08/16/2018 |
Paid |
$1,464.00 |
PRM 2200 18081028137 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
08/13/2018 |
Paid |
$885.00 |
PRM 2200 18080627629 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
08/07/2018 |
Paid |
$2,724.00 |
PRM 2200 18080227447 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
08/03/2018 |
Paid |
$3,540.00 |
PRM 2200 18072526653 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
07/26/2018 |
Paid |
$885.00 |
PRM 2200 18071926168 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
07/20/2018 |
Paid |
$885.00 |
PRM 2200 18071325705 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
07/16/2018 |
Paid |
$885.00 |
PRM 2200 18071225592 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
07/13/2018 |
Paid |
$885.00 |
PRM 2200 18071225597 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
07/13/2018 |
Paid |
$885.00 |
PRM 2200 18070524876 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
07/06/2018 |
Paid |
$885.00 |
PRM 2200 18062924401 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
07/02/2018 |
Paid |
$885.00 |
PRM 2200 18062724094 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/28/2018 |
Paid |
$1,770.00 |
PRM 2200 18061923346 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/20/2018 |
Paid |
$3,540.00 |
PRM 2200 18061923350 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/20/2018 |
Paid |
$885.00 |
PRM 2200 18061823184 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/19/2018 |
Paid |
$885.00 |
PRM 2200 18061322851 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/14/2018 |
Paid |
$715.00 |
PRM 2200 18061322853 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/14/2018 |
Paid |
$885.00 |
PRM 2200 18060622347 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/07/2018 |
Paid |
$3,370.00 |
PRM 2200 18060622360 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/07/2018 |
Paid |
$885.00 |
PRM 2200 18060622362 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/07/2018 |
Paid |
$885.00 |
PRM 2200 18060121972 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/04/2018 |
Paid |
$885.00 |
PRM 2200 18060121977 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
06/04/2018 |
Paid |
$885.00 |
PRM 2200 18053021773 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/31/2018 |
Paid |
$885.00 |
PRM 2200 18052921575 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/30/2018 |
Paid |
$1,770.00 |
PRM 2200 18052921577 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/30/2018 |
Paid |
$885.00 |
PRM 2200 18052921583 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/30/2018 |
Paid |
$885.00 |
PRM 2200 18052521477 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/29/2018 |
Paid |
$715.00 |
PRM 2200 18052321203 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/24/2018 |
Paid |
$1,770.00 |
PRM 2200 18052221007 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/23/2018 |
Paid |
$885.00 |
PRM 2200 18052221018 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/23/2018 |
Paid |
$885.00 |
PRM 2200 18052120828 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/22/2018 |
Paid |
$1,770.00 |
PRM 2200 18051420307 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/15/2018 |
Paid |
$885.00 |
PRM 2200 18051420312 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/15/2018 |
Paid |
$885.00 |
PRM 2200 18051020177 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/11/2018 |
Paid |
$2,655.00 |
PRM 2200 18051020179 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/11/2018 |
Paid |
$885.00 |
PRM 2200 18050519637 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/07/2018 |
Paid |
$885.00 |
PRM 2200 18050219348 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/03/2018 |
Paid |
$885.00 |
PRM 2200 18050119171 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/02/2018 |
Paid |
$885.00 |
PRM 2200 18050119207 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
05/02/2018 |
Paid |
$885.00 |
PRM 2200 18042618825 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/27/2018 |
Paid |
$885.00 |
PRM 2200 18042618831 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/27/2018 |
Paid |
$885.00 |
PRM 2200 18042318359 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/24/2018 |
Paid |
$885.00 |
PRM 2200 18041918187 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/20/2018 |
Paid |
$2,655.00 |
PRM 2200 18041818013 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/19/2018 |
Paid |
$885.00 |
PRM 2200 18041818018 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/19/2018 |
Paid |
$885.00 |
PRM 2200 18041617716 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/17/2018 |
Paid |
$2,655.00 |
PRM 2200 18041317615 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/16/2018 |
Paid |
$1,770.00 |
PRM 2200 18040216558 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
04/03/2018 |
Paid |
$885.00 |
PRM 2200 18032916456 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/30/2018 |
Paid |
$885.00 |
PRM 2200 18032916458 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/30/2018 |
Paid |
$885.00 |
PRM 2200 18032215709 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/23/2018 |
Paid |
$885.00 |
PRM 2200 18031615121 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/19/2018 |
Paid |
$1,770.00 |
PRM 2200 18031414957 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/15/2018 |
Paid |
$885.00 |
PRM 2200 18031014582 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/12/2018 |
Paid |
$885.00 |
PRM 2200 18030714132 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/08/2018 |
Paid |
$3,540.00 |
PRM 2200 18030714134 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/08/2018 |
Paid |
$885.00 |
PRM 2200 18030613971 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
03/07/2018 |
Paid |
$885.00 |
PRM 2200 18022713143 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/28/2018 |
Paid |
$885.00 |
PRM 2200 18022713168 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/28/2018 |
Paid |
$885.00 |
PRM 2200 18022713179 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/28/2018 |
Paid |
$885.00 |
PRM 2200 18021612435 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/20/2018 |
Paid |
$885.00 |
PRM 2200 18021612439 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/20/2018 |
Paid |
$1,770.00 |
PRM 2200 18020911754 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/12/2018 |
Paid |
$885.00 |
PRM 2200 18020611464 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/07/2018 |
Paid |
$1,770.00 |
PRM 2200 18020511316 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/06/2018 |
Paid |
$1,770.00 |
PRM 2200 18020511319 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/06/2018 |
Paid |
$885.00 |
PRM 2200 18020511322 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
02/06/2018 |
Paid |
$885.00 |
PRM 2200 18013010723 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/31/2018 |
Paid |
$1,770.00 |
PRM 2200 18012410279 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/25/2018 |
Paid |
$1,770.00 |
PRM 2200 18012210003 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/23/2018 |
Paid |
$885.00 |
PRM 2200 18011009154 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/11/2018 |
Paid |
$1,770.00 |
PRM 2200 18010908974 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/10/2018 |
Paid |
$1,770.00 |
PRM 2200 18010908974 |
Welding |
01/10/2018 |
Paid |
$450.00 |
PRM 2200 18010508710 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/08/2018 |
Paid |
$885.00 |
PRM 2200 18010508720 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/08/2018 |
Paid |
$885.00 |
PRM 2200 18010208066 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/03/2018 |
Paid |
$5,310.00 |
PRM 2200 18010208070 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
01/03/2018 |
Paid |
$885.00 |
PRM 2200 17122207652 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/27/2017 |
Paid |
$885.00 |
PRM 2200 17122207659 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/27/2017 |
Paid |
$1,770.00 |
PRM 2200 17122007324 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/21/2017 |
Paid |
$885.00 |
PRM 2200 17122007334 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/21/2017 |
Paid |
$2,655.00 |
PRM 2200 17121206579 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/13/2017 |
Paid |
$885.00 |
PRM 2200 17120605967 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/07/2017 |
Paid |
$885.00 |
PRM 2200 17120405627 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/05/2017 |
Paid |
$1,770.00 |
PRM 2200 17120405634 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/05/2017 |
Paid |
$1,770.00 |
PRM 2200 17113005404 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/01/2017 |
Paid |
$885.00 |
PRM 2200 17113005406 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
12/01/2017 |
Paid |
$885.00 |
PRM 2200 17112905245 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/30/2017 |
Paid |
$885.00 |
PRM 2200 17112704933 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/28/2017 |
Paid |
$885.00 |
PRM 2200 17112704939 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/28/2017 |
Paid |
$1,770.00 |
PRM 2200 17111604176 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/17/2017 |
Paid |
$885.00 |
PRM 2200 17111604188 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/17/2017 |
Paid |
$3,370.00 |
PRM 2200 17111403993 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/15/2017 |
Paid |
$885.00 |
PRM 2200 17111403995 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/15/2017 |
Paid |
$1,770.00 |
PRM 2200 17110903664 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/13/2017 |
Paid |
$885.00 |
PRM 2200 17110303228 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/06/2017 |
Paid |
$885.00 |
PRM 2200 17110203128 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/03/2017 |
Paid |
$885.00 |
PRM 2200 17103102900 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/01/2017 |
Paid |
$885.00 |
PRM 2200 17103102906 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
11/01/2017 |
Paid |
$2,655.00 |
PRM 2200 17102402389 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/25/2017 |
Paid |
$1,770.00 |
PRM 2200 17101701782 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/18/2017 |
Paid |
$885.00 |
PRM 2200 17101701784 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/18/2017 |
Paid |
$1,770.00 |
PRM 2200 17101701796 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/18/2017 |
Paid |
$885.00 |
PRM 2200 17101601638 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/17/2017 |
Paid |
$1,770.00 |
PRM 2200 17101601654 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/17/2017 |
Paid |
$2,655.00 |
PRM 2200 17101100919 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/12/2017 |
Paid |
$1,770.00 |
PRM 2200 17101100926 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/12/2017 |
Paid |
$715.00 |
PRM 2200 17100600480 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/09/2017 |
Paid |
$885.00 |
PRM 2200 17100500361 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/06/2017 |
Paid |
$4,323.00 |
PRM 2200 17092935490 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/02/2017 |
Paid |
$1,770.00 |
PRM 2200 17093035646 |
HAULING, LIQUID BASE MATERIALS (OIL, WATER, ETC.) |
10/02/2017 |
Paid |
$1,770.00 |