DO 1100 22090911807 |
n/a
|
Tree Trimming, Utility Lines (Energized) OSHA 29CFR 1910.269 |
117 |
10/03/2022 |
Paid |
$14,920.87 |
DO 1100 22090911807 |
n/a
|
Tree Trimming, Utility Lines (Energized) OSHA 29CFR 1910.269 |
115 |
10/03/2022 |
Paid |
$929.06 |
DO 1100 22090911807 |
n/a
|
Tree Trimming, Utility Lines (Energized) OSHA 29CFR 1910.269 |
111 |
10/03/2022 |
Paid |
$452.40 |
DO 1100 22090911807 |
n/a
|
Tree Trimming, Utility Lines (Energized) OSHA 29CFR 1910.269 |
114 |
10/03/2022 |
Paid |
$10,783.34 |
DO 1100 22090911807 |
n/a
|
Tree Trimming, Utility Lines (Energized) OSHA 29CFR 1910.269 |
112 |
10/03/2022 |
Paid |
$296.20 |
DO 1100 22090911807 |
n/a
|
Tree Trimming, Utility Lines (Energized) OSHA 29CFR 1910.269 |
119 |
10/03/2022 |
Paid |
$537.11 |
DO 1100 22090911807 |
n/a
|
Tree Trimming, Utility Lines (Energized) OSHA 29CFR 1910.269 |
118 |
10/03/2022 |
Paid |
$1,244.50 |
DO 1100 22090911807 |
n/a
|
Tree Trimming, Utility Lines (Energized) OSHA 29CFR 1910.269 |
1110 |
10/03/2022 |
Paid |
$12,498.10 |
DO 1100 22090911807 |
n/a
|
Tree Trimming, Utility Lines (Energized) OSHA 29CFR 1910.269 |
113 |
10/03/2022 |
Paid |
$16,330.65 |
DO 1100 22090911823 |
n/a
|
Tree Trimming, Utility Lines (Energized) OSHA 29CFR 1910.269 |
125 |
10/03/2022 |
Paid |
$1,045.00 |
DO 1100 22090911823 |
n/a
|
Tree Trimming, Utility Lines (Energized) OSHA 29CFR 1910.269 |
122 |
10/03/2022 |
Paid |
$1,045.00 |
DO 1100 22090911823 |
n/a
|
Tree Trimming, Utility Lines (Energized) OSHA 29CFR 1910.269 |
124 |
10/03/2022 |
Paid |
$5,625.80 |
DO 1100 22090911823 |
n/a
|
Tree Trimming, Utility Lines (Energized) OSHA 29CFR 1910.269 |
121 |
10/03/2022 |
Paid |
$1,257.70 |