CURRENT CONTRACTS
Industrial & Maintenance Repair and Operations Contracts
Industrial and MRO contracts include general maintenance and repair, building supplies, sand/gravel/aggregate, non-medical test equipment, chillers, generators, industrial equipment and associated professional services.
Industrial & Maintenance Repair and Operations Contracts
| CONTRACT/DESCRIPTION | EXPIRES | AUTHORIZED | ORDERED | SPENT |
|---|---|---|---|---|
|
MA - 1100 - GA230000082
ELECTRICAL SUPPLIES |
10/12/2026
Expires: 8 days |
$5,474,000.00 | $4,065,234.72 | $3,817,757.30 |
|
MA - 1100 - GA220000003
STREETLIGHT POLES AND POLE PARTS. |
10/14/2026
Expires: 10 days |
$3,856,000.00 | $3,540,617.76 | $3,475,243.76 |
|
MA - 1100 - NA200000130
HEAT RECOVERY STEAM GENERATOR SERVICES |
10/14/2026
Expires: 10 days |
$17,400,000.00 | $5,500,595.68 | $5,496,095.68 |
|
MA - 1100 - NS240000093
HACH INSTRUMENTS PREVENTATIVE MAINTENANCE AND REPAIRS |
10/15/2026
Expires: 11 days |
$53,356.16 | $25,652.00 | $25,652.00 |
|
MA - 1100 - NA190000195
INSULATION AND HEAT TRACE SERVICES |
10/16/2026
Expires: 12 days |
$8,253,000.00 | $5,278,951.33 | $5,078,303.77 |
|
MA - 1100 - GA240000005
UNDERGROUND ELECTRICAL MATERIALS |
10/18/2026
Expires: 14 days |
$5,100,000.00 | $3,733,811.43 | $3,405,240.82 |
|
MA - 1100 - NA210000097
DISTRIBUTION ELECTRICAL SERVICES |
10/24/2026
Expires: 20 days |
$160,000,000.00 | $102,262,393.43 | $101,790,520.06 |
|
MA - 1100 - NA230000139
OVERHEAD DISTRIBUTION ELECTRICAL SERIVCES |
10/24/2026
Expires: 20 days |
$54,000,000.00 | $51,003,369.98 | $50,606,748.54 |
|
MA - 1100 - NA200000019
7FA AT SHEC PARTS AND MAINTENANCE CONTRACT |
10/28/2026
Expires: 24 days |
$32,000,000.00 | $25,175,440.01 | $24,858,001.48 |
|
MA - 2200 - GA220000004
FIRE HYDRANT REPAIR PARTS |
11/04/2026
Expires: 31 days |
$2,640,590.00 | $2,491,990.02 | $2,453,841.76 |
|
MA - 1100 - GA210000026
SUBSTATION SHUNT CAPACITOR BANK, 31.2 MVAR, 145KV |
11/05/2026
Expires: 32 days |
$2,160,000.00 | $1,548,143.44 | $1,269,543.44 |
|
MA - 1100 - GA240000008
PVC CONDUIT & ACCESSORIES |
11/06/2026
Expires: 33 days |
$2,040,000.00 | $851,914.25 | $815,799.74 |
|
MA - 1100 - NA230000228
SIMPLE CYCLE GENERATOR - TESTING-REPAIR-MAINTENANCE |
11/06/2026
Expires: 33 days |
$6,000,000.00 | $1,892,084.39 | $1,841,416.37 |
|
MA - 2200 - NS220000011
LAB AND ENVIRO ANALYTICAL -MAINTENANCE AND EMERGENCY SERV |
11/08/2026
Expires: 35 days |
$100,000.00 | $48,891.61 | $48,117.13 |
|
MA - 5000 - GC230000008
MRO EQUIPMENT, SUPPLIES AND SERVICES |
11/08/2026
Expires: 35 days |
$42,685,600.00 | $26,626,540.57 | $24,348,930.01 |
|
MA - 6200 - GC250000009
COMMERICAL/CONTRACTOR GRADE CONCRETE EQMT, TOOLS, AND SUPP. |
11/08/2026
Expires: 35 days |
$150,000.00 | $100,993.56 | $56,257.82 |
|
MA - 6300 - NS220000013
HYDROLAB DATA SONDE REPAIR/REPLACEMENT |
11/09/2026
Expires: 36 days |
$100,000.00 | $46,329.60 | $46,329.60 |
|
MA - 1100 - NA250000225
ELECTRICAL SWITCHGEAR PREVENTATIVE MAINTENANCE & INSTALLATIO |
11/11/2026
Expires: 38 days |
$1,205,000.00 | $193,315.00 | $97,227.72 |
|
MA - 1100 - GA210000016
THREE PHASE DISTRIBUTION PADMOUNT TRANSFORMERS |
11/15/2026
Expires: 42 days |
$36,869,238.83 | $34,678,469.81 | $30,250,676.12 |
|
MA - 1100 - GA240000011
AIR FILTERS, ELECTRIC UTILTIY |
11/16/2026
Expires: 43 days |
$250,002.00 | $76,050.15 | $76,050.15 |
|
MA - 2200 - GA210000070
OEM MULTILIN AND PQM |
11/22/2026
Expires: 49 days |
$1,000,000.00 | $93,755.51 | $68,525.01 |
|
MA - 2200 - PA240000077
LARGE DIAMETER MAIN LEAK DETECTION |
11/22/2026
Expires: 49 days |
$2,000,000.00 | $326,111.26 | $151,841.26 |
|
MA - 1100 - GA250000031
SWITCHGEARS, SUBSTATION, ARC-RESISTANT & OTHER |
11/23/2026
Expires: 50 days |
$16,500,200.00 | $10,884,520.91 | $150,129.40 |
|
MA - 1500 - NA200000164
REFURBISHING OF TRASH AND RECYCLING RECEPTACLES |
11/23/2026
Expires: 50 days |
$158,141.80 | $80,141.80 | $74,944.00 |
|
MA - 2200 - GA210000068
FLUOROSILICIC ACID |
11/25/2026
Expires: 52 days |
$1,628,000.00 | $1,480,970.31 | $1,365,749.54 |
|
MA - 1100 - NC240000012
SE PREFAB MAINTENANCE PROGRAM |
11/27/2026
Expires: 54 days |
$87,288.02 | $66,608.12 | $66,608.12 |
|
MA - 1100 - NA240000009
NETWORK UNDERGROUND TRANSFORMER REMOVAL/INSTALLATION-FORKLIF |
11/30/2026
Expires: 57 days |
$1,040,000.00 | $312,055.05 | $305,681.80 |
|
MA - 1100 - NA240000011
HEAVY EQUIPMENT HAULING SERVICES |
11/30/2026
Expires: 57 days |
$1,333,333.34 | $384,550.00 | $354,400.00 |
|
MA - 5000 - NC260000045
CITYWIDE HVAC VRF & CHILLER SYSTEMS |
11/30/2026
Expires: 57 days |
$27,635,000.00 | $866,068.16 | $23,227.01 |
|
MA - 1100 - NA250000236
MIXED BED RESIN AND REVERSE OSMOSIS FILTER SERVICES |
12/07/2026
Expires: 64 days |
$76,000.00 | $46,330.00 | $33,580.00 |
|
MA - 2200 - GS210000003
CONTRACT FOR FLYGT PUMPS |
12/07/2026
Expires: 64 days |
$1,291,760.00 | $840,135.21 | $817,980.97 |
|
MA - 1100 - NA230000245
POLE INSPECTION AND REMEDIATION |
12/12/2026
Expires: 69 days |
$9,600,000.00 | $5,700,722.64 | $5,700,722.64 |
|
MA - 1100 - GA260000011
PADLOCK METER SEALS |
12/18/2026
Expires: 75 days |
$77,000.00 | $5,200.00 | $0.00 |
|
MA - 2200 - NS230000078
FULL PREVENTATIVE MAINTENANCE SERVICE ON AUTO-TITRATOR |
12/23/2026
Expires: 80 days |
$48,000.00 | $30,072.00 | $30,072.00 |
|
MA - 1100 - NA210000109
OVERHEAD TRANSMISSION ELECTRICAL MAINTENANCE |
12/24/2026
Expires: 81 days |
$32,000,000.00 | $20,873,977.49 | $20,396,905.18 |
|
MA - 2200 - NA240000046
PIPE INSULATION SERVICES |
12/26/2026
Expires: 83 days |
$1,000,000.00 | $448,421.46 | $434,614.63 |
|
MA - 1100 - GA160000070
THREE-PHASE POWER TRANSFORMERS (DO NOT PLACE NEW ORDERS) |
12/31/2026
Expires: 88 days |
$105,618,446.00 | $35,965,278.75 | $38,597,218.33 |
|
MA - 1100 - NA190000108
PUMP MAINTENANCE FOR DECKER AND SAND HILL |
12/31/2026
Expires: 88 days |
$3,022,000.00 | $1,739,885.15 | $1,261,141.15 |
|
MA - 1100 - NA230000084
SHEC UNIT 5 GE CONTROL SYSTEM UPGRADE |
12/31/2026
Expires: 88 days |
$2,600,000.00 | $1,512,162.13 | $1,462,162.13 |
|
MA - 1100 - NS260000053
GT SPARE GENERATOR ROTOR |
12/31/2026
Expires: 88 days |
$1,750,000.00 | $0.00 | $0.00 |
|
MA - 5000 - GC200000007
MAINTENANCE, REPAIR, OPERATING, AND INDUSTRIAL SUPPLIES |
12/31/2026
Expires: 88 days |
$13,107,300.00 | $11,947,977.35 | $11,889,882.64 |
|
MA - 1100 - GS220000005
QUALITROL TRANSFORMER GAUGES |
01/03/2027
Expires: 91 days |
$174,329.26 | $66,259.88 | $57,466.98 |
|
MA - 6200 - NA220000060
PWD STREET & BRIDGE/ASPHALT CLEANER |
01/04/2027
Expires: 92 days |
$56,100.00 | $45,052.50 | $42,852.50 |
|
MA - 1100 - NA220000034
AUTHORIZED INSPECTOR SERVICES FOR BOILER CODE WORK |
01/10/2027
Expires: 98 days |
$45,745.00 | $0.00 | $0.00 |
|
MA - 2200 - NS250000027
LEASE FOR GAS DETECTION SYSTEMS |
01/15/2027
Expires: 103 days |
$188,505.60 | $117,816.00 | $117,816.00 |
|
MA - 1100 - GA210000071
PRECAST CONCRETE MANHOLES |
01/20/2027
Expires: 108 days |
$5,000,000.00 | $1,302,619.90 | $1,165,205.65 |
|
MA - 2200 - GA220000011
CLAMPS AND COUPLINGS |
01/25/2027
Expires: 113 days |
$310,000.00 | $157,804.49 | $157,804.49 |
|
MA - 5000 - NA220000036
AUTOMATIC DOOR MAINTENANCE, REPAIR, REPLACEMENT, AND INSPECT |
01/28/2027
Expires: 116 days |
$2,694,000.00 | $1,828,709.61 | $1,675,735.42 |
|
MA - 6200 - GA220000012
ASPHALT EMULSION PRODUCTS |
01/30/2027
Expires: 118 days |
$6,750,520.00 | $5,907,969.67 | $5,907,969.67 |
|
MA - 2200 - GA220000021
CATIONIC POLYMER COAGULANT |
02/06/2027
Expires: 125 days |
$2,739,200.00 | $1,543,483.86 | $1,083,343.30 |
|
MA - 1100 - NS220000038
SV - ELECTRICAL SAFETY EDUCATION FOR KIDS |
02/07/2027
Expires: 126 days |
$57,375.00 | $57,375.00 | $51,000.00 |
|
MA - 1100 - GA240000026
BATTERY CHARGERS AND BATTERY BANKS |
02/11/2027
Expires: 130 days |
$1,680,000.00 | $45,377.55 | $43,795.55 |
|
MA - 1100 - GA210000033
FIBERGLASS POLES IN INVENTORY FOR EMERGENCY FIELD OPERATIONS |
02/12/2027
Expires: 131 days |
$800,000.00 | $482,002.12 | $375,067.46 |
|
MA - 1100 - NA200000076
STEAM TURBINE MAINTENANCE & REPAIR |
02/12/2027
Expires: 131 days |
$30,000,000.00 | $14,653,428.87 | $13,190,928.87 |
|
MA - 8300 - NS220000022
SERVICE MAINTENANCE FOR HYDROGEN GENERATOR |
02/19/2027
Expires: 138 days |
$15,750.00 | $6,300.00 | $6,300.00 |
|
MA - 2200 - NA210000195
ODOR CONTROL UNITS |
02/25/2027
Expires: 144 days |
$635,295.00 | $610,834.35 | $561,653.67 |
|
MA - 9300 - NA210000191
COMPRESSED MEDICAL GRADE OXYGEN SERVICES |
02/27/2027
Expires: 146 days |
$652,000.00 | $298,679.58 | $222,740.00 |
|
MA - 1100 - GA210000028
INDUSTRIAL GASES FOR AUSTIN ENERGY |
03/01/2027
Expires: 148 days |
$50,000.00 | $32,073.67 | $29,369.09 |
|
MA - 1100 - GA240000030
BECKWITH TAPCHANGER CONTROLLER PANELS |
03/03/2027
Expires: 150 days |
$73,590.00 | $1,967.88 | $0.00 |
|
MA - 1100 - GA240000028
ION METERS |
03/05/2027
Expires: 152 days |
$1,500,000.00 | $142,534.43 | $102,211.13 |
|
MA - 1100 - GS240000007
UPS SYSTEM UPGRADE AND MAINTENANCE |
03/05/2027
Expires: 152 days |
$785,764.20 | $778,414.08 | $75,262.59 |
|
MA - 2200 - GA240000019
ELECTROLYTIC CELLS AND PARTS |
03/05/2027
Expires: 152 days |
$304,884.80 | $269,828.38 | $269,743.38 |
|
MA - 1100 - GC240000002
INDUSTRIAL EQUIPMENT RENTALS AND SYSTEM MAINTENANCE |
03/07/2027
Expires: 154 days |
$1,800,000.00 | $173,365.18 | $160,393.80 |
|
MA - 1100 - GA220000018
15 KV ATO DOUBLE TANK SWITCHGEAR |
03/08/2027
Expires: 155 days |
$1,350,000.00 | $1,172,129.25 | $1,092,392.85 |
|
MA - 2200 - GA220000025
SEEPEX PARTS |
03/10/2027
Expires: 157 days |
$300,000.00 | $156,938.04 | $156,938.04 |
|
MA - 1100 - GA250000015
RECLOSERS, ELECTRIC UTILITY |
03/12/2027
Expires: 159 days |
$13,000,000.00 | $6,044,405.00 | $4,772,921.00 |
|
MA - 1100 - NA220000089
RELAY SERVICES |
03/13/2027
Expires: 160 days |
$5,760,000.00 | $5,747,064.90 | $4,474,587.61 |
|
MA - 2200 - GA240000039
SODA ASH (SODIUM CARBONATE) |
03/19/2027
Expires: 166 days |
$50,000.00 | $0.00 | $0.00 |
|
MA - 6300 - NA230000102
SERVICE CONTRACT FOR DATALOGGERS & PRESSURE SENSORS |
03/19/2027
Expires: 166 days |
$104,809.05 | $75,532.52 | $75,532.52 |
|
MA - 1100 - NS230000040
ANNUAL CALIBRATION OF THE F6080 FIELD CALIBRATOR |
03/20/2027
Expires: 167 days |
$18,320.00 | $5,496.03 | $5,496.03 |
|
MA - 1100 - NA220000094
INSTALLATION & UPGRADE OF CONTROLS/AUTOMATION SYSTEMS |
03/28/2027
Expires: 175 days |
$3,500,000.00 | $2,025,092.74 | $1,489,006.62 |
|
MA - 2200 - GA220000031
LIQUID SODIUM PERMANGANATE |
03/29/2027
Expires: 176 days |
$3,287,600.00 | $0.00 | $0.00 |
|
MA - 8100 - NS240000073
WESTMATIC WASH BAY O&M SERVICES |
04/03/2027 | $116,000.00 | $25,938.54 | $25,938.54 |
|
MA - 8700 - NS220000050
MAINTENANCE AGREEMENT FOR QIAGILITY HEPA/UV 1126 & 39 |
04/05/2027 | $50,020.00 | $50,020.00 | $50,020.00 |
|
MA - 1100 - GA220000032
STEEL REINFORCING BAR |
04/07/2027 | $1,800,000.00 | $933,333.99 | $899,661.46 |
|
MA - 1100 - NA220000019
INSPECTION AND NONDESTRUCTIVE TESTING SERVICES |
04/10/2027 | $1,920,000.00 | $1,456,018.16 | $967,570.16 |
|
MA - 7500 - NS250000075
PREVENTIVE MAINT & REPAIR AUTOMATIC TRANSFER SWITCHES |
04/10/2027 | $300,000.00 | $3,457.00 | $3,457.00 |
|
MA - 1100 - GA220000058
THREE-PHASE POWER TRANSFORMERS |
04/12/2027 | $48,000,000.00 | $34,769,546.67 | $11,542,353.96 |
|
MA - 1100 - GA230000015
VOLTAGE TRANSFORMERS |
04/12/2027 | $5,040,000.00 | $3,071,684.06 | $2,235,059.06 |
|
MA - 2200 - GA220000033
DUCTILE IRON FITTINGS |
04/13/2027 | $800,000.00 | $200,991.26 | $188,809.65 |
|
MA - 8200 - NA240000130
INDOOR AIR QUALITY TESTING |
04/22/2027 | $51,840.00 | $17,500.00 | $16,000.00 |
|
MA - 2200 - NS220000066
MAINTENANCE & SERVICE OF WATER METER TEST BENCHES. |
04/25/2027 | $96,430.00 | $86,667.25 | $86,667.25 |
|
MA - 1100 - GA220000020
CAPACITOR BANKS & ASSOCIATED PARTS |
04/27/2027 | $2,852,000.00 | $2,410,283.40 | $2,216,360.40 |
|
MA - 1100 - NS260000033
ACOUSTIC COMBUSTION TURBINE MONITORING SYSTEM AT SHEC |
04/29/2027 | $24,720.00 | $24,000.00 | $24,000.00 |
|
MA - 1100 - GA210000025
DON'T USE. OPEN FOR DELIVERY OF ORDERS-362KV CIRCUIT BREAKER |
04/30/2027 | $6,794,704.26 | $6,794,704.26 | $1,918,828.00 |
|
MA - 1100 - NA240000032
GAS TURBINE REPAIR & MAINTENANCE |
05/02/2027 | $36,000,000.00 | $14,669,227.38 | $13,097,917.33 |
|
MA - 9000 - NS230000052
PREVENTATIVE MAINTENANCE AGREEMENT FOR NITROGEN GENERATOR |
05/02/2027 | $26,660.85 | $21,042.76 | $21,042.76 |
|
MA - 1100 - GA240000041
AIR SWITCHES |
05/09/2027 | $3,400,000.00 | $1,250,965.00 | $619,175.00 |
|
MA - 1100 - GA210000031
READY-MIX CONCRETE |
05/15/2027 | $8,700,000.00 | $5,215,550.63 | $3,993,931.07 |
|
MA - 6200 - GA200000032
READY MIX CONCRETE |
05/15/2027 | $1,388,000.00 | $18,537.90 | $18,537.90 |
|
MA - 1100 - NA230000209
DOBLE TEST EQUIPMENT LEASE |
05/20/2027 | $408,011.00 | $334,703.20 | $318,722.99 |
|
MA - 7800 - NA250000144
LIFT, CRANE, & OVERHEAD HOIST MAINTENANCE & REPAIR SVCS |
05/20/2027 | $242,000.00 | $58,853.99 | $29,911.96 |
|
MA - 8300 - NA260000142
HYDROSTATIC AIR CYLINDER TESTING SERVICES |
05/20/2027 | $13,300.00 | $4,150.00 | $4,150.00 |
|
MA - 1100 - NS240000074
OMICRON MAINTENANCE PROGRAM - SERVICE |
05/24/2027 | $30,969.75 | $30,969.75 | $30,969.75 |
|
MA - 1100 - NA260000104
AIR COMPRESSOR MAINTENANCE AND REPAIR SERVICES |
05/27/2027 | $315,741.00 | $90,185.00 | $0.00 |
|
MA - 1100 - PA240000058
RELAY TECHNICIAN TRAINING PROGRAM |
05/28/2027 | $20,000.00 | $1,200.00 | $1,200.00 |
|
MA - 1100 - NA240000033
PROGRESSION TEST VALIDATION |
05/29/2027 | $450,000.00 | $192,487.36 | $192,487.36 |
|
MA - 9000 - NA250000124
EZ2CONNECT, QIAGILITY & QIASYMPHONY PM AGREEMENT FOR FSD |
05/29/2027 | $40,538.00 | $40,538.00 | $40,538.00 |
|
MA - 1100 - GA190000034
DO NOT USE -INDOOR ARC-RESISTANT SWITCHGEAR SUPPLY AGREEMENT |
05/30/2027 | $25,158,921.39 | $25,158,921.39 | $24,733,390.55 |
|
MA - 1100 - GA230000045
POLE CLIMBING EQUIPMENT |
05/30/2027 | $1,200,000.00 | $161,659.50 | $156,395.70 |
|
MA - 1100 - GA240000053
SF6 PAD MOUNT SWITCHGEAR |
05/30/2027 | $14,400,000.00 | $4,010,985.00 | $927,281.00 |
|
MA - 1100 - NA240000087
WATER TREATMENT SERVICES FOR INDUSTRIAL FACILITIES |
05/31/2027 | $6,500,000.00 | $6,312,764.29 | $5,386,194.87 |
|
MA - 5000 - NA240000087
WATER TREATMENT SERVICES FOR COMMERCIAL FACILITIES |
05/31/2027 | $3,384,000.00 | $1,614,320.60 | $1,291,928.17 |
|
MA - 8600 - GC260000017
SWIMMING POOL CHEMICALS, SUPPLIES, AND EQUIPMENT |
05/31/2027 | $4,800,000.00 | $18,550.40 | $0.00 |
|
MA - 1100 - GA230000053
NETWORK TRANSFORMERS |
06/01/2027 | $56,000,000.00 | $16,641,629.50 | $14,840,572.17 |
|
MA - 1100 - GA240000047
LUMINAIRES AND POLES SHOEBOX STYLE (LED) |
06/02/2027 | $4,623,000.00 | $2,646,803.04 | $2,572,710.27 |
|
MA - 5000 - GA240000054
HOT MIX ASPHALTIC CONCRETE, VARIOUS TYPES |
06/03/2027 | $36,000,000.00 | $22,335,543.07 | $16,204,633.42 |
|
MA - 1100 - GS230000007
VALVE PARTS, WELLAND & TUXHORN |
06/04/2027 | $72,000.00 | $0.00 | $0.00 |
|
MA - 1100 - GA220000015
PRE-FABRICATED SUBSTATION CONTROL HOUSE SUPPLY AGREEMENT |
06/09/2027 | $8,000,000.00 | $4,353,450.67 | $4,169,518.87 |
|
MA - 2200 - GA240000057
LABORATORY GASES |
06/12/2027 | $88,964.20 | $21,146.37 | $18,750.71 |
|
MA - 7500 - NA220000126
SKILLED TRADES MAINTENANCE & REPAIR |
06/21/2027 | $52,396,000.00 | $34,848,406.50 | $29,964,168.38 |
|
MA - 2200 - NA220000093
REPAIR, PARTS AND REPLACEMENT OF PUMPS |
06/22/2027 | $778,200.00 | $579,964.47 | $364,521.47 |
|
MA - 1100 - GA250000029
ELECTRO-MECHANICAL OPERATOR DEVICE |
06/24/2027 | $44,840.00 | $0.00 | $0.00 |
|
MA - 1100 - NA250000104
POWER TRANSFORMER CONSULTING SERVICES |
06/29/2027 | $40,000.00 | $18,949.14 | $14,149.14 |
|
MA - 1500 - NA220000038
POST-DISASTER DEBRIS MONITORING SERVICES |
07/03/2027 | $5,700,000.00 | $2,464,445.34 | $2,464,445.34 |
|
MA - 8100 - NA210000157
MAINTENANCE AND REPAIR SERVICES FOR AERIAL LIFTS |
07/10/2027 | $500,000.00 | $104,131.45 | $96,452.78 |
|
MA - 8100 - NA220000164
PCAIR UNITS - MAINTENANCE, REPAIRS, PARTS, AND SERVICE |
07/18/2027 | $207,377.47 | $207,026.56 | $207,026.56 |
|
MA - 8200 - NA240000155
BUILDING AUTOMATION SYSTEM MAINTENANCE & REPAIRS |
07/18/2027 | $1,362,400.00 | $679,181.49 | $442,279.48 |
|
MA - 1100 - NA230000130
MOBILE DEMINERALIZER RENTAL & WATER TREATMENT PARTS |
07/20/2027 | $1,150,719.78 | $768,696.88 | $667,896.88 |
|
MA - 1100 - GA240000071
TRANSMISSION INSULATORS AND HARDWARE |
07/23/2027 | $38,100,000.00 | $3,200,071.65 | $1,715,014.77 |
|
MA - 8100 - NA220000174
EQUIPMENT, OEM PARTS, REPAIRS & MAINT. -JANITORIAL EQUIPMENT |
07/28/2027 | $143,800.00 | $75,084.79 | $72,812.20 |
|
MA - 1100 - GA230000067
DESIGN AND FABRICATION OF DISTRIBUTION STEEL POLES. |
07/31/2027 | $12,400,000.00 | $1,547,544.01 | $1,294,468.72 |
|
MA - 2200 - GS250000003
AW-2143 LAB TESTING EQUIPMENT AND SUPPLIES |
07/31/2027 | $345,000.00 | $80,743.29 | $71,956.53 |
|
MA - 2200 - NS250000201
PREVENTATIVE MAINTENANCE FOR DUAL BEAM SPECTROPHOTOMERS |
07/31/2027 | $24,000.00 | $7,473.60 | $7,473.60 |
|
MA - 8100 - NA240000207
SHARED USE BAGGAGE SCALE SERVICE, REPAIRS, EQUIPMENT & PARTS |
08/01/2027 | $222,000.00 | $68,230.00 | $11,467.17 |
|
MA - 2200 - NA250000190
BASIN DESCALING AND DEBRIS REMOVAL SERVICES |
08/03/2027 | $1,920,000.00 | $559,163.00 | $357,883.00 |
|
MA - 2200 - GA240000065
38% SODIUM BISULFITE TOTES |
08/04/2027 | $1,286,000.00 | $765,850.00 | $765,850.00 |
|
MA - 2200 - GS220000003
WALLACE AND TIERNAN PARTS FOR PLANTS |
08/04/2027 | $1,088,000.00 | $1,079,980.72 | $1,050,779.46 |
|
MA - 1100 - GA220000047
STATION CLASS SURGE ARRESTORS |
08/11/2027 | $908,800.00 | $239,769.00 | $204,669.00 |
|
MA - 6200 - GC240000012
ASPHALT REMOVER & RELEASE AGENT/TPW-SBO |
08/18/2027 | $44,000.00 | $18,060.00 | $18,060.00 |
|
MA - 1100 - GA220000048
19% AQUEOUS AMMONIA |
08/24/2027 | $1,350,000.00 | $1,349,624.00 | $1,315,893.60 |
|
MA - 5000 - GA240000074
GEM SAND AND WASHED GRAVEL AGGREGATE |
08/29/2027 | $800,000.01 | $102,399.03 | $102,399.03 |
|
MA - 5000 - NA220000122
CITYWIDE HVAC - CHILLER MAINTENANCE AND REPAIR SERVICES |
08/30/2027 | $17,250,000.00 | $14,924,087.06 | $12,873,895.35 |
|
MA - 2200 - GC250000002
COLD WATER METERS |
08/31/2027 | $6,000,000.00 | $572,655.83 | $572,655.83 |
|
MA - 2200 - NA240000231
AW SMOKE TESTING |
09/01/2027 | $1,050,000.00 | $727,698.57 | $432,698.57 |
|
MA - 2200 - GA240000050
30 CUBIC YARD FILTER SCREENS |
09/03/2027 | $1,860,000.00 | $59,400.00 | $59,400.00 |
|
MA - 2200 - GA240000044
FLOCCULATING POLYMER |
09/04/2027 | $360,000.00 | $0.00 | $0.00 |
|
MA - 8100 - NA220000188
EV CHARGING STATIONS - MAINTENANCE, REPAIRS, AND SERVICE |
09/05/2027 | $1,050,000.00 | $192,688.83 | $78,776.83 |
|
MA - 2200 - GS240000003
SEWER INSPECTION EQUIPMENT, PARTS, AND SERVICES |
09/08/2027 | $1,386,000.00 | $527,451.89 | $523,827.81 |
|
MA - 1100 - GA250000019
VACUUM INTERRUPTER SWITCH |
09/11/2027 | $4,000,000.00 | $1,045,187.00 | $691,130.00 |
|
MA - 1100 - GA250000036
MANHOLE COVERS, BOXES, AND ACCESSORIES |
09/11/2027 | $440,000.00 | $106,298.52 | $90,290.69 |
|
MA - 1100 - NA230000178
SUBSTATION RELAY PANELS |
09/14/2027 | $12,000,000.00 | $3,037,634.05 | $1,691,649.92 |
|
MA - 6300 - NA220000209
LAB ANALYSIS, WATER, SEDIMENT, BULK MATERIALS |
09/15/2027 | $1,305,000.00 | $550,427.25 | $371,693.25 |
|
MA - 1100 - NA220000107
SUBSTATION MAINTENANCE |
09/18/2027 | $16,000,000.00 | $9,340,251.69 | $6,033,824.61 |
|
MA - 1100 - NA240000199
INSTALLATION AND MAINTENANCE OF DCP3 FANS |
09/18/2027 | $39,335.00 | $25,095.00 | $23,495.00 |
|
MA - 1100 - NS240000099
SHEC OVERHAUL HYDRAULIC GENERATOR CIRCUIT BREAKERS |
09/18/2027 | $2,400,231.00 | $1,900,231.00 | $267,677.00 |
|
MA - 5000 - GA240000083
TRUCKING, HAULING AND DISPOSAL SERVICES |
09/25/2027 | $4,480,000.00 | $1,735,319.24 | $1,645,056.74 |
|
MA - 1100 - GA240000082
UTILITY WOOD POLES |
09/29/2027 | $9,000,000.00 | $2,398,499.76 | $2,193,904.76 |
|
MA - 1100 - NA250000146
NETWORK PROTECTOR MAINTENANCE, PARTS AND SERVICES |
09/30/2027 | $2,000,000.00 | $114,579.00 | $0.00 |
|
MA - 2200 - GA220000062
MOBIL INDUSTRIAL LUBRICANTS |
10/03/2027 | $1,584,000.00 | $818,832.42 | $792,338.43 |
|
MA - 2200 - NA220000206
INSPECTION, REPAIR, AND TESTING OF STATIONARY CRANES |
10/03/2027 | $316,800.00 | $217,039.70 | $211,009.70 |
|
MA - 8100 - NC230000136
COOPERATIVE FOR GENERATOR MAINTENANCE, REPAIRS, RENTALS |
10/03/2027 | $6,750,000.00 | $4,064,762.09 | $3,975,846.20 |
|
MA - 1100 - NA230000223
VALVE REPAIR, REPLACEMENT AND TESTING |
10/07/2027 | $3,200,000.00 | $243,107.77 | $243,107.77 |
|
MA - 1100 - NA230000214
POWER PRODUCTION MAINTENANCE |
10/08/2027 | $21,600,000.00 | $13,089,802.54 | $11,362,120.57 |
|
MA - 1100 - GA240000029
THREE PHASE AUTO-TRANSFORMERS |
10/15/2027 | $37,800,000.00 | $27,822,180.00 | $14,684,150.00 |
|
MA - 5000 - NA250000232
SOLAR EQUIPMENT MAINTENANCE AND REPAIR |
10/22/2027 | $3,760,000.00 | $127,312.06 | $46,090.43 |
|
MA - 6300 - GA220000061
BOULDERS LIMESTONE AND LEDGESTONE |
10/24/2027 | $3,200,000.00 | $875,680.00 | $792,080.00 |
|
MA - 6200 - GA220000057
TRAP ROCK |
10/26/2027 | $3,526,000.00 | $3,510,227.27 | $3,510,227.27 |
|
MA - 1100 - NA240000176
CALIBRATION GASES AND A GAS CYLINDER MANAGEMENT PROGRAM |
10/31/2027 | $170,000.00 | $89,000.00 | $74,306.85 |
|
MA - 2200 - NA190000025
BIOSOLIDS BENEFICIAL REUSE |
10/31/2027 | $17,330,000.00 | $15,677,593.53 | $14,846,849.03 |
|
MA - 1100 - GA240000089
DESIGN AND FABRICATION OF STEEL TRANSMISSION POLES |
11/06/2027 | $45,000,000.00 | $5,518,109.71 | $3,547,549.32 |
|
MA - 1100 - NA220000186
HEAT EXCHANGER SKIDS FOR AUSTIN ENERGY CUSTOMER SITES |
11/06/2027 | $20,000,000.00 | $2,602,384.00 | $2,514,924.00 |
|
MA - 1100 - NA220000108
POWER PRODUCTION MAINTENANCE |
11/09/2027 | $16,000,000.00 | $5,679,167.94 | $5,653,771.94 |
|
MA - 2200 - GA220000042
BELT PRESS PARTS |
11/15/2027 | $648,000.00 | $629,865.54 | $580,248.09 |
|
MA - 2200 - NA240000027
CLEANING, INSPECTION, AND CERTIFICATION OF BULK CHLORINE STO |
11/16/2027 | $214,788.00 | $166,419.87 | $166,419.87 |
|
MA - 2200 - GS250000002
BIOMASS CHARACTERIZATION TESTING |
11/17/2027 | $57,600.00 | $56,450.00 | $42,450.00 |
|
MA - 2200 - GS250000010
WALLACE AND TIERNAN PARTS FOR PLANTS |
11/19/2027 | $1,009,280.00 | $184,176.76 | $130,461.87 |
|
MA - 5000 - NA250000034
KITCHEN EQUIPMENT MAINTENANCE AND REPAIR |
11/24/2027 | $1,230,000.00 | $678,115.07 | $526,893.61 |
|
MA - 8100 - GA250000004
SHARED USE EQUIPMENT, CONSUMABLE SUPPLIES, PARTS & SERVICES |
11/24/2027 | $1,500,000.00 | $82,936.00 | $82,936.00 |
|
MA - 2200 - GA250000007
MAGNESIUM HYDROXIDE SLURRY |
11/25/2027 | $29,460,000.00 | $10,935,451.50 | $8,950,852.85 |
|
MA - 1100 - GA230000009
RELAYS FOR SWITCHGEAR AND RELAY PANELS |
11/27/2027 | $1,320,000.00 | $435,888.66 | $390,145.80 |
|
MA - 1100 - GA230000011
CIRCUIT SWITCHERS |
11/27/2027 | $4,800,000.00 | $0.00 | $0.00 |
|
MA - 2200 - GA250000008
WATER METERS AND PARTS |
11/27/2027 | $11,200,000.00 | $2,148,619.85 | $2,069,466.47 |
|
MA - 5000 - NA250000033
MAINTENANCE AND REPAIR OF FITNESS EQUIPMENT |
11/27/2027 | $763,200.00 | $88,305.00 | $74,075.00 |
|
MA - 5000 - GC250000007
CITYWIDE HVAC FILTERS |
11/30/2027 | $4,725,000.00 | $315,415.26 | $254,072.27 |
|
MA - 5000 - NC250000085
ELEVATOR AND ESCALATOR MAINTENANCE, REPAIR & MODERNIZATION |
11/30/2027 | $15,000,000.00 | $1,588,975.34 | $466,726.11 |
|
MA - 2200 - GA240000069
PROGRESSIVE CAVITY PUMP PARTS AND ACCESSORIES |
12/01/2027 | $348,000.00 | $105,802.40 | $99,382.40 |
|
MA - 5000 - GA230000008
WATER UTILITY SYSTEMS FITTINGS AND ACCESSORIES |
12/09/2027 | $7,800,000.00 | $7,733,135.09 | $7,300,871.87 |
|
MA - 5000 - NA260000028
INSTALLATION AND MAINTENANCE OF GREEN STORMWATER INFRASTRUCT |
12/10/2027 | $3,704,000.00 | $238,132.29 | $110,941.12 |
|
MA - 2200 - GA230000007
BULK LIQUID ALUMINUM |
12/19/2027 | $203,000.00 | $155,732.17 | $155,732.17 |
|
MA - 2200 - GS230000001
ROTORAKE FL776 AND LOBE PUMP RR6000 AND PARTS |
12/30/2027 | $120,000.00 | $25,198.82 | $25,198.82 |
|
MA - 1100 - NA260000114
CONDENSER WATER PUMPS REPLACEMENT AT AUSTIN ENERGYS DISTRIC |
12/31/2027 | $4,571,202.00 | $2,500,000.00 | $475,000.00 |
|
MA - 2200 - GA240000087
FLEXIBLE ROAD BASE |
12/31/2027 | $3,280,000.00 | $843,892.26 | $728,157.22 |
|
MA - 2200 - GA260000014
DEIONIZED WATER FOR WATER QUALITY LABORATORY |
01/04/2028 | $152,000.00 | $22,898.74 | $11,335.78 |
|
MA - 2200 - NS230000015
MARS VEROFLOW MOBILE METER TESTERS |
01/05/2028 | $140,056.43 | $69,582.19 | $69,582.19 |
|
MA - 8100 - NA250000031
ONSITE BHS MAINTENANCE & REPAIR SUPPORT SERVICES |
01/18/2028 | $18,911,853.20 | $8,599,117.87 | $8,088,784.03 |
|
MA - 2200 - GA260000017
DISPOSABLE CLOTH WIPING RAGS |
01/22/2028 | $96,000.00 | $4,531.68 | $4,531.68 |
|
MA - 6200 - GA260000003
EMULSIFIED ASPHALT-VARIOUS TYPES |
01/24/2028 | $5,770,536.00 | $3,271,134.75 | $1,423,054.77 |
|
MA - 1100 - GA230000002
93% SULFURIC ACID |
01/30/2028 | $453,000.00 | $405,936.72 | $368,527.91 |
|
MA - 2200 - GA230000018
HI PRESSURE HOSES |
02/05/2028 | $120,000.00 | $89,013.23 | $88,882.73 |
|
MA - 2200 - GA240000088
LIQUID POLYMER FOR THICKENING AND DEWATERING SLUDGE |
02/12/2028 | $4,800,000.00 | $1,711,305.00 | $1,411,305.00 |
|
MA - 5000 - GC210000003
EQUIPMENT AND TOOLS |
02/12/2028 | $1,286,000.00 | $651,359.15 | $474,829.80 |
|
MA - 1100 - NS250000008
SV - UTILITY ANALYTICS INSTITUTE (UAI) TRAINING |
02/19/2028 | $112,840.00 | $112,840.00 | $100,385.00 |
|
MA - 1100 - GS240000006
NORTHWEST LINEMAN COLLEGE TRAINING MATERIALS |
02/20/2028 | $127,630.60 | $97,815.00 | $75,234.00 |
|
MA - 5000 - GA230000021
LAB SUPPLIES AND LAB CHEMICALS |
02/24/2028 | $4,420,000.00 | $1,010,198.97 | $986,584.18 |
|
MA - 1100 - GA250000002
ELECTRIC METER PURCHASE AND ASSOCIATED SERVICES |
02/25/2028 | $37,200,000.00 | $4,255,311.00 | $3,536,136.36 |
|
MA - 2200 - NS260000006
CATALOG FOR PARTS, SUPPLIES, AND REPAIR SERVICES |
02/26/2028 | $740,000.00 | $539,567.53 | $212,619.78 |
|
MA - 1100 - GA230000034
DECORATIVE LIGHTS, LUMINARIES, AND LAMP POLES |
03/08/2028 | $1,920,000.00 | $408,060.95 | $365,297.54 |
|
MA - 1100 - GA230000036
CRITICAL MATERIALS SUPPLY ARRANGEMENT (CMSA) |
03/14/2028 | $63,750,000.00 | $63,613,669.47 | $62,726,189.87 |
|
MA - 1100 - GA230000037
CRITICAL MATERIALS SUPPLY ARRANGEMENT (CMSA) |
03/14/2028 | $5,620,000.00 | $5,190,304.47 | $5,190,304.47 |
|
MA - 1100 - GA230000038
CRITICAL MATERIALS SUPPLY ARRANGEMENT (CMSA) |
03/14/2028 | $4,600,000.00 | $4,576,253.79 | $4,503,488.79 |
|
MA - 1100 - GA230000039
CRITICAL MATERIALS SUPPLY ARRANGEMENT (CMSA) |
03/14/2028 | $35,272,000.00 | $35,198,219.41 | $35,126,746.59 |
|
MA - 1100 - GA230000040
CRITICAL MATERIALS SUPPLY ARRANGEMENT (CMSA) |
03/14/2028 | $13,350,000.00 | $12,470,099.61 | $12,462,449.21 |
|
MA - 1100 - GA230000041
CRITICAL MATERIALS SUPPLY ARRANGEMENT (CMSA) |
03/14/2028 | $1,480,000.00 | $1,191,296.23 | $1,191,211.63 |
|
MA - 2200 - GA260000023
1" RIVER ROCK |
03/16/2028 | $1,200,000.00 | $224,535.73 | $68,035.55 |
|
MA - 2200 - NA230000131
CENTRIFUGES REPAIR SERVICES |
03/22/2028 | $2,100,000.00 | $783,840.63 | $760,430.69 |
|
MA - 5000 - GA230000043
REINFORCING STEEL |
03/23/2028 | $3,200,000.00 | $370,186.91 | $310,869.38 |
|
MA - 2200 - GA230000026
LIQUID SULFUR DIOXIDE |
03/26/2028 | $3,392,000.00 | $2,180,514.00 | $1,739,892.00 |
|
MA - 5000 - GA230000044
SODIUM HYPOCHLORITE |
03/27/2028 | $14,028,000.00 | $9,782,468.51 | $8,849,080.63 |
|
MA - 2200 - GA230000023
LIQUID AMMONIUM SULFATE |
04/02/2028 | $1,200,000.00 | $451,156.00 | $440,506.00 |
|
MA - 7500 - NA240000026
CTECC- ENCOTECH, CONSULTING/ PROJECT MANAGEMENT, BLDG SYST |
04/07/2028 | $560,000.00 | $94,998.41 | $63,700.81 |
|
MA - 1100 - GS250000011
TRANSFORMER BUSHINGS |
04/09/2028 | $400,000.00 | $228,750.00 | $0.00 |
|
MA - 2200 - GA230000006
MVR METERS AND PARTS |
04/10/2028 | $120,000.00 | $3,621.80 | $3,621.80 |
|
MA - 2200 - NA230000118
HOWDEN TURBLEX SERVICE AGREEMENT FOR COMPRESSORS |
04/12/2028 | $200,000.00 | $173,520.00 | $173,520.00 |
|
MA - 1100 - GA230000048
FAULT INDICATORS AND FIBER OPTIC LEADS |
04/17/2028 | $4,080,000.00 | $4,072,631.00 | $3,951,831.00 |
|
MA - 1100 - GA230000049
POLYURETHANE FOAM AND CONDUCTIVE POLYURETHANE FOAM BACKFILL |
04/18/2028 | $460,000.00 | $394,200.00 | $388,888.00 |
|
MA - 7500 - NA250000127
DUCT CLEANING AND FILTER REPLACEMENT |
04/27/2028 | $810,400.00 | $262,092.99 | $212,299.11 |
|
MA - 2200 - NA260000127
MAINTENANCE AND REPAIR OF AUTOCLAVE LAB EQUIPMENT |
04/30/2028 | $80,000.00 | $4,000.00 | $0.00 |
|
MA - 5000 - NC260000047
RENTAL OF TRENCH SAFETY SHORING EQUIPMENT AND PUMPING EQUIPM |
04/30/2028 | $417,600.00 | $14,142.98 | $1,635.12 |
|
MA - 9000 - NA230000154
DEIONIZED WATER SYSTEM PREVENTATIVE MAINTENANCE & REPAIR |
05/02/2028 | $240,000.00 | $74,729.17 | $69,632.01 |
|
MA - 2200 - NS250000070
PREVENTIVE MAINTENANCE FOR TOTAL ORGANIC CARBON ANALYZER |
05/06/2028 | $17,280.00 | $14,241.00 | $14,241.00 |
|
MA - 8600 - NS250000033
PUMP STATION REPAIR AND PREVENTATIVE MAINTENANCE. |
05/07/2028 | $920,000.00 | $110,914.01 | $110,914.01 |
|
MA - 2200 - NA230000155
DOME MEASUREMENT |
05/08/2028 | $72,625.00 | $52,570.00 | $32,570.00 |
|
MA - 7500 - NA260000087
SHEET METAL FABRICATION, DUCTWORK INSTALLATION, AND PIPE/DUC |
05/13/2028 | $800,000.00 | $38,856.24 | $0.00 |
|
MA - 6300 - NS220000102
EQUIPMENT AND REPAIRS FOR STORM DRAIN CAMERAS |
05/15/2028 | $240,000.00 | $108,191.54 | $108,191.54 |
|
MA - 2200 - GA230000054
HDPE PIPE |
05/22/2028 | $120,000.00 | $0.00 | $0.00 |
|
MA - 2200 - GA230000055
CALCIUM HYPOCHLORITE GRANULES AND TABLETS |
05/22/2028 | $135,141.40 | $115,413.66 | $111,413.66 |
|
MA - 2200 - GA260000040
FLUOROSILICIC ACID |
05/28/2028 | $2,360,000.00 | $92,000.00 | $35,436.20 |
|
MA - 2200 - GA260000052
POWDER ACTIVATED CARBON |
05/29/2028 | $4,300,000.00 | $239,000.00 | $49,278.00 |
|
MA - 2200 - GA230000051
LIQUID PHOSPHATE |
05/31/2028 | $4,640,000.00 | $4,325,598.41 | $4,325,598.41 |
|
MA - 2200 - GS260000002
PARTS AND SERVICES, MANSFIELD PUMP |
05/31/2028 | $3,200,000.00 | $3,859.50 | $3,859.50 |
|
MA - 1100 - GA260000021
SWITCHGEARS AIR INSULATED |
06/04/2028 | $1,600,000.00 | $122,800.00 | $0.00 |
|
MA - 8100 - NS240000088
PASSENGER BOARDING SYSTEMS PARTS & REPAIR SERVICES |
06/05/2028 | $4,500,000.00 | $1,058,004.16 | $868,453.59 |
|
MA - 2200 - GA230000057
LIQUID CHLORINE |
06/08/2028 | $15,200,000.00 | $11,052,479.19 | $9,870,213.96 |
|
MA - 2200 - GA250000024
FILTER ANTHRACITE |
06/12/2028 | $1,120,000.00 | $61,619.76 | $61,619.76 |
|
MA - 1500 - NA260000158
STATIONARY EQUIPMENT MAINTENANCE AND REPAIR SERVICES |
06/15/2028 | $78,000.00 | $25,000.00 | $13,040.59 |
|
MA - 2200 - NA260000160
PLASMA CUTTING AND WELDING SERVICES |
06/21/2028 | $160,000.00 | $0.00 | $0.00 |
|
MA - 5000 - GA260000066
INDUSTRIAL GASES AND CYLINDERS |
07/23/2028 | $472,000.00 | $32,670.00 | $0.00 |
|
MA - 2200 - GA230000068
SULFATREAT 410CHP |
07/26/2028 | $480,000.00 | $119,505.00 | $119,505.00 |
|
MA - 2200 - NA230000108
RELIANT WET WELL WIZARDS |
07/26/2028 | $620,000.00 | $58,533.33 | $58,533.33 |
|
MA - 1100 - NA260000164
UNDERGROUND UTILITY LOCATING SERVICE |
07/29/2028 | $4,420,000.00 | $160,000.00 | $0.00 |
|
MA - 5000 - GA230000059
TYPE 1L HYDRAULIC CEMENT |
08/02/2028 | $3,200,000.00 | $1,171,889.64 | $1,038,806.02 |
|
MA - 1100 - GA230000069
145KV METERING CURRENT TRANSFORMERS |
08/03/2028 | $600,000.00 | $0.00 | $0.00 |
|
MA - 5000 - NA260000131
MAINTENANCE & REPAIR POND PUMP AND IRRIGATION SYSTEMS |
08/04/2028 | $1,944,800.00 | $0.00 | $0.00 |
|
MA - 2200 - NS230000089
UPGRADE AND LICENSES FOR TEST BENCHES |
08/08/2028 | $381,464.80 | $292,372.00 | $292,372.00 |
|
MA - 1100 - GA260000064
ELECTRIC PROTECTIVE DEVICE ANNUAL PRICE AGREEMENT |
08/13/2028 | $4,000,000.00 | $0.00 | $0.00 |
|
MA - 2200 - NS260000012
MAINTENANCE AND REPAIR SERVICES FLOWCAM CYANO |
08/13/2028 | $44,000.00 | $0.00 | $0.00 |
|
MA - 2200 - GA260000177
SODIUM BISULFATE |
08/26/2028 | $2,336,000.00 | $0.00 | $0.00 |
|
MA - 2200 - NS260000043
VECTOR PARTS, COMPONENTS, & SERVICES |
08/27/2028 | $1,200,000.00 | $15,710.09 | $0.00 |
|
MA - 6200 - GA250000040
ROLL-UP SIGNS: CONSTRUCTION |
08/28/2028 | $600,000.00 | $62,624.96 | $59,699.96 |
|
MA - 2200 - NS260000086
PREV. MAINT. AND EMERGENCY SERVICES FOR SKALAR EQUIPMENT |
09/14/2028 | $220,000.00 | $0.00 | $0.00 |
|
MA - 2200 - NA230000135
HYDROMATIC PUMPS, PARTS, AND REPAIRS |
09/17/2028 | $500,000.00 | $235,276.69 | $219,276.69 |
|
MA - 1100 - NA260000184
OVERHEAD DISTRIBUTION ELECTRICAL SERVICES |
09/24/2028 | $80,000,000.00 | $0.00 | $0.00 |
|
MA - 2200 - NS260000042
SCRUGGS PARTS, COMPONENTS, & SERVICES |
09/24/2028 | $1,784,000.00 | $0.00 | $0.00 |
|
MA - 5000 - GA260000069
COMPRESSED MEDICAL-GRADE OXYGEN |
09/24/2028 | $435,420.00 | $0.00 | $0.00 |
|
MA - 2200 - GA250000027
LAB SUPPLIES AND LAB CHEMICALS |
09/30/2028 | $3,000,000.00 | $640,157.21 | $341,719.21 |
|
MA - 8100 - NS250000093
TK PBB SYSTEMS PART & REPAIRS |
09/30/2028 | $1,200,000.00 | $49,725.77 | $39,854.63 |
|
MA - 2200 - GA230000062
CORNELL PUMPS |
10/05/2028 | $348,000.00 | $160,086.26 | $160,086.26 |
|
MA - 8100 - NS250000097
PARTS & REPAIR SERVICES FOR GPU & PCAIRE EQUIPMENT |
11/20/2028 | $750,000.00 | $318,005.05 | $160,605.85 |
|
MA - 2200 - GA240000015
AIR CUSHION SWING CHECK VALVES & REPAIR SERVICES |
11/29/2028 | $4,000,000.00 | $186,437.00 | $155,017.00 |
|
MA - 2200 - NA240000023
LAB EQUIPMENT MAINTENANCE AND REPAIR |
11/29/2028 | $192,000.00 | $31,884.70 | $31,884.70 |
|
MA - 2200 - GA240000012
LIQUID FERRIC SULFATE |
12/03/2028 | $3,760,000.00 | $2,524,343.94 | $2,170,960.57 |
|
MA - 8100 - NC260000008
ELEVATOR & ESCALATOR MAINT/REPAIR SERVICES-COOP BASED |
12/10/2028 | $7,958,609.00 | $2,422,647.85 | $1,676,039.44 |
|
MA - 1100 - NA220000116
CENTRIFUGAL CHILLER MAINTENANCE AT SAND HILL |
12/13/2028 | $2,578,000.00 | $2,367,405.28 | $1,375,738.19 |
|
MA - 1100 - NA260000047
TEST INSTRUMENT CALIBRATION SERVICES |
01/05/2029 | $72,000.00 | $36,740.00 | $22,175.00 |
|
MA - 9000 - NA240000047
REFRIGERATION & FREEZER MAINTENANCE & REPAIR FOR FSD |
01/15/2029 | $109,919.08 | $64,500.99 | $64,500.99 |
|
MA - 2200 - NS260000004
PARTS AND REPAIRS OF IBAK EQUIPMENT |
01/27/2029 | $309,549.00 | $6,679.57 | $6,679.57 |
|
MA - 2200 - GS260000001
SPECIALTY GREASE, SEALS, AND O-RINGS |
01/29/2029 | $330,000.00 | $107,530.13 | $68,530.13 |
|
MA - 8100 - NS260000011
CUP MAINTENANCE REPAIR SERVICES & PARTS |
02/01/2029 | $195,000.00 | $73,482.18 | $12,682.93 |
|
MA - 2200 - NA240000078
HYDROGEN PEROXIDE SOLUTION, FEED SYSTEM, MAINTENANCE |
02/09/2029 | $2,620,000.00 | $1,174,925.32 | $963,853.02 |
|
MA - 5000 - GA240000023
SCREENED CHOCOLATE LOAM AND SANDY LOAM |
03/05/2029 | $1,200,000.00 | $10,023.15 | $10,023.15 |
|
MA - 2200 - NA250000117
WASTEWATER FLOW MONITORING AND WW TEMPORARY FLOW MONITORING |
03/31/2029 | $9,200,000.00 | $3,118,984.90 | $2,138,041.10 |
|
MA - 2200 - GS220000002
CONSUMABLE TEST KITS FOR ELISA ANALYSIS |
04/12/2029 | $400,000.00 | $94,874.73 | $94,874.73 |
|
MA - 1100 - NA260000071
DISTRIBUTION LINE CLEARANCE - STREET &NIGHTWATCHMAN LIGHTS |
04/16/2029 | $4,500,000.00 | $49,256.84 | $39,563.62 |
|
MA - 2200 - GA240000035
HACH SUPPLIES AND SERVICES |
04/21/2029 | $4,956,408.00 | $2,050,981.56 | $1,896,322.04 |
|
MA - 8100 - GA250000017
VARIABLE FREQUENCY DRIVES- EQUIP, MAINT. & REPAIR SERVICES |
04/21/2029 | $702,720.00 | $117,903.53 | $61,213.53 |
|
MA - 2200 - NA240000134
CRANE/BOOMLIFT RENTAL SERVICES |
04/22/2029 | $3,100,000.00 | $57,814.68 | $48,837.08 |
|
MA - 2200 - NA240000146
VALVE ASSESSMENT |
05/09/2029 | $1,420,000.00 | $475,873.23 | $465,873.23 |
|
MA - 8200 - GA190000073
ELECTRICAL SUPPLIES, CUSTOM WIRE AND CABLE |
08/29/2029 | $240,000.00 | $119,039.05 | $119,039.05 |
|
MA - 2200 - NS260000085
ELISA CAAS CUBE PREVENTATIVE MAINTENANCE SERVICE |
08/30/2029 | $16,500.00 | $5,500.00 | $0.00 |
|
MA - 2200 - PA200000032
AMI METERS AND SERVICES |
04/29/1930 | $103,000,000.00 | $94,802,352.04 | $91,373,576.53 |
|
CT - 2200 - 22031800434
NAZET TRAINING |
Open | $64,000.00 | $64,000.00 | $48,255.00 |
|
CT - 2200 - 25031300246
SULZER INSPECTION AND REPAIR OR REPLACE |
Open | $2,125,070.00 | $2,125,070.00 | $198,539.55 |
|
CT - 2200 - 25031300246
SULZER INSPECTION AND REPAIR OR REPLACE |
Open | $2,125,070.00 | $2,125,070.00 | $198,539.55 |
|
CT - 2200 - 26042900237
PRODUCTION METER EVALUATION AND PITOT TESTING |
Open | $150,000.00 | $150,000.00 | $0.00 |
|
CT - 2200 - 26082000372
OVERHAUL WASHWATER RETURN VERTICAL TURBINE |
Open | $93,950.00 | $93,950.00 | $0.00 |
|
CT - 2200 - 26082000375
CUSTOM PUMP BUILD |
Open | $61,805.42 | $61,805.42 | $0.00 |
|
CT - 2200 - AW250414077
INSTALLATION OF FIBERGLASS PIPE PARTS |
Open | $32,758.00 | $32,758.00 | $32,752.00 |
|
CT - 2200 - AW250902157
REPLACEMENT BARE PUMP |
Open | $33,436.50 | $33,436.50 | $0.00 |
|
CT - 2200 - AW250918170
TRUCKER HATS WITH LOGO EMBROIDERY |
Open | $46,835.00 | $46,835.00 | $28,387.70 |
|
CT - 2200 - AW250918170
TRUCKER HATS WITH LOGO EMBROIDERY |
Open | $46,835.00 | $46,835.00 | $28,387.70 |
|
CT - 2200 - AW251024004
PLUMBING ASSISTANCE PROGRAM |
Open | $20,875.96 | $20,875.96 | $18,422.60 |
|
CT - 2200 - AW251024004
PLUMBING ASSISTANCE PROGRAM |
Open | $20,875.96 | $20,875.96 | $18,422.60 |
|
CT - 2200 - AW251024004
PLUMBING ASSISTANCE PROGRAM |
Open | $20,875.96 | $20,875.96 | $18,422.60 |
|
CT - 2200 - AW251024005
PLUMBING ASSISTANCE PROGRAM |
Open | $29,124.04 | $29,124.04 | $25,813.04 |
|
CT - 2200 - AW251024005
PLUMBING ASSISTANCE PROGRAM |
Open | $29,124.04 | $29,124.04 | $25,813.04 |
|
CT - 2200 - AW251024005
PLUMBING ASSISTANCE PROGRAM |
Open | $29,124.04 | $29,124.04 | $25,813.04 |
|
CT - 2200 - AW251112010
PARTS AND SERVICES ON IBAK EQUIPMENT |
Open | $50,000.00 | $50,000.00 | $30,597.04 |
|
CT - 2200 - AW251118013
RENTAL TEMPORARY TOILETS AT PEARCE LANE |
Open | $8,624.00 | $8,624.00 | $8,324.00 |
|
CT - 2200 - AW251203018
BCCP 15-YEAR PERMIT RENEWAL SUPPORT |
Open | $10,000.00 | $10,000.00 | $0.00 |
|
CT - 2200 - AW260121032
BOBCAT / DOOSAN ELECTRIC PALLET JACK |
Open | $10,776.98 | $10,776.98 | $0.00 |
|
CT - 2200 - AW260205040
TRAINING PERFORMANCE AND COMPLIANCE (TPC) TRAINING |
Open | $12,920.00 | $12,920.00 | $10,970.00 |
|
CT - 2200 - AW260305053
KING INSTRUMENTS FLOWMETER PARTS |
Open | $8,135.81 | $8,135.81 | $0.00 |
|
CT - 2200 - AW260309054
INSPECTION AND ANALYSIS ON THE PUMPS AT HANDCOX WTP |
Open | $49,943.00 | $49,943.00 | $31,695.16 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,999.99 | $49,999.99 | $13,404.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,999.99 | $49,999.99 | $13,404.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,999.99 | $49,999.99 | $13,404.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,999.99 | $49,999.99 | $13,404.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,999.99 | $49,999.99 | $13,404.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,999.99 | $49,999.99 | $13,404.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,999.99 | $49,999.99 | $13,404.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,999.99 | $49,999.99 | $13,404.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,999.99 | $49,999.99 | $13,404.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,999.99 | $49,999.99 | $13,404.00 |
|
CT - 2200 - AW260415072
FGC TAIL SHAFT ASSEMBLY W GASKET AND HARDWARE |
Open | $6,668.00 | $6,668.00 | $6,518.00 |
|
CT - 2200 - AW260420074
PUMP INSPECTION-REPAIR AT NORTHWEST C PUMP STATION |
Open | $8,611.50 | $8,611.50 | $0.00 |
|
CT - 2200 - AW260427076
WEMCO PARTS-LIME PUMP |
Open | $47,233.00 | $47,233.00 | $0.00 |
|
CT - 2200 - AW260513084
3 YARD SKELETON BUCKET JOHN DEERE 544 |
Open | $46,737.84 | $46,737.84 | $0.00 |
|
CT - 2200 - AW260604094
WELDING SERVICES AND FABRICATION |
Open | $50,000.00 | $50,000.00 | $10,501.43 |
|
CT - 2200 - AW260608095
ANDCO ACTUATOR-WALNUT CREEK WWTP. |
Open | $8,206.00 | $8,206.00 | $0.00 |
|
CT - 2200 - AW260618097
SEWER LINE RELOCATION TERESINA DR |
Open | $16,912.00 | $16,912.00 | $0.00 |
|
CT - 2200 - AW260618099
CALIBRATION OF PANAMETRICS BILLING METERS |
Open | $28,420.00 | $28,420.00 | $22,360.00 |
|
CT - 2200 - AW260623100
TRAVELLING BRIDGE GRIT REMOVAL SYSTEM, SPARE PARTS |
Open | $34,532.00 | $34,532.00 | $0.00 |
|
CT - 2200 - AW260629101
TRANSFORMER REPAIR AND RECONDITIONING SERVICES |
Open | $25,848.00 | $25,848.00 | $0.00 |
|
CT - 2200 - AW260706106
VFD REPLACEMENT SERVICES-WALLER CREEK CENTER |
Open | $5,480.06 | $5,480.06 | $4,995.00 |
|
CT - 2200 - AW260717110
HORIZONTAL SPLIT CASE PUMP (HSC), FLOWSERVE |
Open | $35,439.00 | $35,439.00 | $0.00 |
|
CT - 2200 - AW260728114
REPLACEMENT ACTUATORS |
Open | $30,809.00 | $30,809.00 | $30,059.00 |
|
CT - 2200 - AW260731116
TKN DIGESTOR BLOCK - ANALYTICAL LAB EQUIPMENT FOR THE WALNUT |
Open | $31,374.70 | $31,374.70 | $0.00 |
|
CT - 2200 - AW260819119
REPAIR OF CO2 STORAGE TANK REFRIGERATION UNIT. |
Open | $40,000.00 | $40,000.00 | $0.00 |
|
CT - 2200 - AW260824120
BARE PUMP REPLACEMENT |
Open | $29,277.00 | $29,277.00 | $0.00 |
|
CT - 2200 - AW260825121
MECHANICAL CLIMBER SCREEN, REBUILD |
Open | $22,219.33 | $22,219.33 | $0.00 |
|
CT - 2200 - AW260826122
CUSTOM PARTS FOR PUMP RECONDITION | 770-25 |
Open | $14,806.50 | $14,806.50 | $0.00 |
|
CT - 2200 - AW260827123
AMMONIA PRESSURE REGULATING/CHECK VALVE ASSEMBLIES |
Open | $15,594.20 | $15,594.20 | $0.00 |
|
CT - 2200 - AW260831125
COMPLETE ANTI-TAMPERING FOX ASSEMBLY FABRICATED AND DELIVERE |
Open | $40,000.00 | $40,000.00 | $37,950.00 |
|
CT - 2200 - AW260901130
VERTICAL IN-LINE CENTRIFUGAL PUMP |
Open | $49,200.00 | $49,200.00 | $0.00 |
|
CT - 4400 - 24071600532
2024 REFRIGERANT STUDY, CLIMATE TEAM |
Open | $49,000.00 | $49,000.00 | $42,520.00 |
|
CT - 6200 - 26060300294
REPAIR SERVICE KITS FOR COBRA COMBI JACKHAMMERS |
Open | $25,049.95 | $25,049.95 | $5,045.98 |
|
CT - 6300 - 26081900369
FY26-2002870 RODRIGUEZ, MARVIN IMPELLER REPAIR |
Open | $7,500.00 | $7,500.00 | $0.00 |
|
CT - 7500 - 26082000373
HONEYWELL XLS3000 UPGRADE CITY HALL |
Open | $77,889.00 | $77,889.00 | $0.00 |
|
CT - 7800 - 26080500356
AIR COMPRESSOR SWAP SPEEDAIRE |
Open | $6,703.78 | $6,703.78 | $0.00 |
|
CT - 7800 - 26080500356
AIR COMPRESSOR SWAP SPEEDAIRE |
Open | $6,703.78 | $6,703.78 | $0.00 |
|
CT - 8100 - 24102400044
AUS CAMPUS CCTV TROUBLESHOOTING AND REPAIRS |
Open | $75,340.00 | $75,340.00 | $70,752.30 |
|
CT - 8100 - 26090400395
GRIPTESTER MK2 - SERVICE, CALIBRATION, & REPAIR |
Open | $25,000.00 | $25,000.00 | $0.00 |
|
CT - 8200 - 26050800259
EMERGENCY ELEVATOR REPAIRS |
Open | $78,000.00 | $78,000.00 | $0.00 |
Search Contract Catalog