CURRENT CONTRACTS
Industrial & Maintenance Repair and Operations Contracts
Industrial and MRO contracts include general maintenance and repair, building supplies, sand/gravel/aggregate, non-medical test equipment, chillers, generators, industrial equipment and associated professional services.
Industrial & Maintenance Repair and Operations Contracts
| CONTRACT/DESCRIPTION | EXPIRES | AUTHORIZED | ORDERED | SPENT |
|---|---|---|---|---|
|
MA - 2200 - GA220000004
FIRE HYDRANT REPAIR PARTS |
11/04/2026
Expires: 1 days |
$2,640,590.00 | $2,522,915.12 | $2,453,841.76 |
|
MA - 1100 - GA210000026
SUBSTATION SHUNT CAPACITOR BANK, 31.2 MVAR, 145KV |
11/05/2026
Expires: 2 days |
$2,160,000.00 | $1,548,143.44 | $1,269,543.44 |
|
MA - 1100 - NA230000228
SIMPLE CYCLE GENERATOR - TESTING-REPAIR-MAINTENANCE |
11/06/2026
Expires: 3 days |
$6,000,000.00 | $1,892,084.39 | $1,841,416.37 |
|
MA - 2200 - NS220000011
LAB AND ENVIRO ANALYTICAL -MAINTENANCE AND EMERGENCY SERV |
11/08/2026
Expires: 5 days |
$100,000.00 | $48,886.43 | $48,886.43 |
|
MA - 6300 - NS220000013
HYDROLAB DATA SONDE REPAIR/REPLACEMENT |
11/09/2026
Expires: 6 days |
$100,000.00 | $46,329.60 | $46,329.60 |
|
MA - 1100 - NA250000225
ELECTRICAL SWITCHGEAR PREVENTATIVE MAINTENANCE & INSTALLATIO |
11/11/2026
Expires: 8 days |
$1,205,000.00 | $264,875.00 | $97,227.72 |
|
MA - 1100 - GA210000016
THREE PHASE DISTRIBUTION PADMOUNT TRANSFORMERS |
11/15/2026
Expires: 12 days |
$36,869,238.83 | $34,678,469.81 | $31,900,311.76 |
|
MA - 1100 - NA210000097
DISTRIBUTION ELECTRICAL SERVICES |
11/15/2026
Expires: 12 days |
$160,000,000.00 | $105,081,517.92 | $104,304,103.39 |
|
MA - 1100 - NA230000139
OVERHEAD DISTRIBUTION ELECTRICAL SERIVCES |
11/15/2026
Expires: 12 days |
$54,000,000.00 | $52,293,374.82 | $52,125,268.74 |
|
MA - 1100 - GA240000011
AIR FILTERS, ELECTRIC UTILTIY |
11/16/2026
Expires: 13 days |
$250,002.00 | $76,050.15 | $76,050.15 |
|
MA - 2200 - GA210000070
OEM MULTILIN AND PQM |
11/22/2026
Expires: 19 days |
$1,000,000.00 | $93,755.51 | $68,525.01 |
|
MA - 2200 - PA240000077
LARGE DIAMETER MAIN LEAK DETECTION |
11/22/2026
Expires: 19 days |
$2,000,000.00 | $326,111.26 | $151,841.26 |
|
MA - 1500 - NA200000164
REFURBISHING OF TRASH AND RECYCLING RECEPTACLES |
11/23/2026
Expires: 20 days |
$158,141.80 | $120,109.19 | $74,944.00 |
|
MA - 2200 - GA210000068
FLUOROSILICIC ACID |
11/25/2026
Expires: 22 days |
$1,628,000.00 | $1,455,749.54 | $1,365,749.54 |
|
MA - 1100 - NA240000009
NETWORK UNDERGROUND TRANSFORMER REMOVAL/INSTALLATION-FORKLIF |
11/30/2026
Expires: 27 days |
$1,040,000.00 | $319,926.65 | $305,681.80 |
|
MA - 1100 - NA240000011
HEAVY EQUIPMENT HAULING SERVICES |
11/30/2026
Expires: 27 days |
$1,333,333.34 | $384,550.00 | $354,400.00 |
|
MA - 5000 - NC260000045
CITYWIDE HVAC VRF & CHILLER SYSTEMS |
11/30/2026
Expires: 27 days |
$27,635,000.00 | $3,160,644.37 | $98,070.30 |
|
MA - 1100 - NA250000236
MIXED BED RESIN AND REVERSE OSMOSIS FILTER SERVICES |
12/07/2026
Expires: 34 days |
$76,000.00 | $46,330.00 | $37,830.00 |
|
MA - 2200 - GS210000003
CONTRACT FOR FLYGT PUMPS |
12/07/2026
Expires: 34 days |
$1,291,760.00 | $846,628.31 | $822,717.07 |
|
MA - 1100 - NA230000245
POLE INSPECTION AND REMEDIATION |
12/12/2026
Expires: 39 days |
$9,600,000.00 | $5,700,722.64 | $5,700,722.64 |
|
MA - 2200 - NS230000078
FULL PREVENTATIVE MAINTENANCE SERVICE ON AUTO-TITRATOR |
12/23/2026
Expires: 50 days |
$48,000.00 | $37,068.00 | $30,072.00 |
|
MA - 1100 - NA210000109
OVERHEAD TRANSMISSION ELECTRICAL MAINTENANCE |
12/24/2026
Expires: 51 days |
$32,000,000.00 | $25,733,665.49 | $20,650,459.05 |
|
MA - 2200 - NA240000046
PIPE INSULATION SERVICES |
12/26/2026
Expires: 53 days |
$1,000,000.00 | $482,948.46 | $434,614.63 |
|
MA - 1100 - GA160000070
THREE-PHASE POWER TRANSFORMERS (DO NOT PLACE NEW ORDERS) |
12/31/2026
Expires: 58 days |
$105,618,446.00 | $35,965,278.75 | $38,860,389.75 |
|
MA - 1100 - NA190000108
PUMP MAINTENANCE FOR DECKER AND SAND HILL |
12/31/2026
Expires: 58 days |
$3,022,000.00 | $1,739,885.15 | $1,330,001.15 |
|
MA - 1100 - NA230000084
SHEC UNIT 5 GE CONTROL SYSTEM UPGRADE |
12/31/2026
Expires: 58 days |
$2,600,000.00 | $1,462,162.13 | $1,462,162.13 |
|
MA - 1100 - NS260000053
GT SPARE GENERATOR ROTOR |
12/31/2026
Expires: 58 days |
$1,750,000.00 | $1,750,000.00 | $0.00 |
|
MA - 5000 - GC200000007
MAINTENANCE, REPAIR, OPERATING, AND INDUSTRIAL SUPPLIES |
12/31/2026
Expires: 58 days |
$13,107,300.00 | $12,247,977.35 | $12,187,240.09 |
|
MA - 1100 - GS220000005
QUALITROL TRANSFORMER GAUGES |
01/03/2027
Expires: 61 days |
$174,329.26 | $66,259.88 | $57,466.98 |
|
MA - 6200 - NA220000060
PWD STREET & BRIDGE/ASPHALT CLEANER |
01/04/2027
Expires: 62 days |
$56,100.00 | $55,902.50 | $42,852.50 |
|
MA - 1100 - NA220000034
AUTHORIZED INSPECTOR SERVICES FOR BOILER CODE WORK |
01/10/2027
Expires: 68 days |
$45,745.00 | $0.00 | $0.00 |
|
MA - 2200 - NS250000027
LEASE FOR GAS DETECTION SYSTEMS |
01/15/2027
Expires: 73 days |
$188,505.60 | $117,816.00 | $117,816.00 |
|
MA - 1100 - GA210000071
PRECAST CONCRETE MANHOLES |
01/20/2027
Expires: 78 days |
$5,000,000.00 | $1,450,312.19 | $1,165,205.65 |
|
MA - 2200 - GA220000011
CLAMPS AND COUPLINGS |
01/25/2027
Expires: 83 days |
$310,000.00 | $157,804.49 | $157,804.49 |
|
MA - 5000 - NA220000036
AUTOMATIC DOOR MAINTENANCE, REPAIR, REPLACEMENT, AND INSPECT |
01/28/2027
Expires: 86 days |
$2,723,000.01 | $1,996,005.97 | $1,703,912.68 |
|
MA - 6200 - GA220000012
ASPHALT EMULSION PRODUCTS |
01/30/2027
Expires: 88 days |
$6,750,520.00 | $5,907,969.67 | $5,907,969.67 |
|
MA - 2200 - GA220000021
CATIONIC POLYMER COAGULANT |
02/06/2027
Expires: 95 days |
$2,739,200.00 | $1,419,753.58 | $1,184,752.50 |
|
MA - 1100 - NS220000038
SV - ELECTRICAL SAFETY EDUCATION FOR KIDS |
02/07/2027
Expires: 96 days |
$57,375.00 | $57,375.00 | $57,375.00 |
|
MA - 1100 - GA240000026
BATTERY CHARGERS AND BATTERY BANKS |
02/11/2027
Expires: 100 days |
$1,680,000.00 | $45,377.55 | $43,795.55 |
|
MA - 1100 - GA210000033
FIBERGLASS POLES IN INVENTORY FOR EMERGENCY FIELD OPERATIONS |
02/12/2027
Expires: 101 days |
$800,000.00 | $482,002.12 | $375,067.46 |
|
MA - 1100 - NA200000076
STEAM TURBINE MAINTENANCE & REPAIR |
02/12/2027
Expires: 101 days |
$30,000,000.00 | $14,653,428.87 | $13,190,928.87 |
|
MA - 8300 - NS220000022
SERVICE MAINTENANCE FOR HYDROGEN GENERATOR |
02/19/2027
Expires: 108 days |
$15,750.00 | $6,300.00 | $6,300.00 |
|
MA - 2200 - NA210000195
ODOR CONTROL UNITS |
02/25/2027
Expires: 114 days |
$635,295.00 | $610,834.35 | $571,748.84 |
|
MA - 9300 - NA210000191
COMPRESSED MEDICAL GRADE OXYGEN SERVICES |
02/27/2027
Expires: 116 days |
$652,000.00 | $248,425.91 | $223,425.91 |
|
MA - 1100 - GA210000028
INDUSTRIAL GASES FOR AUSTIN ENERGY |
03/01/2027
Expires: 118 days |
$50,000.00 | $36,432.59 | $29,369.09 |
|
MA - 1100 - GA240000030
BECKWITH TAPCHANGER CONTROLLER PANELS |
03/03/2027
Expires: 120 days |
$73,590.00 | $1,967.88 | $0.00 |
|
MA - 1100 - GA240000028
ION METERS |
03/05/2027
Expires: 122 days |
$1,500,000.00 | $142,534.43 | $102,211.13 |
|
MA - 1100 - GS240000007
UPS SYSTEM UPGRADE AND MAINTENANCE |
03/05/2027
Expires: 122 days |
$785,764.20 | $778,414.08 | $75,262.59 |
|
MA - 2200 - GA240000019
ELECTROLYTIC CELLS AND PARTS |
03/05/2027
Expires: 122 days |
$304,884.80 | $269,828.38 | $269,743.38 |
|
MA - 1100 - GC240000002
INDUSTRIAL EQUIPMENT RENTALS AND SYSTEM MAINTENANCE |
03/07/2027
Expires: 124 days |
$1,800,000.00 | $173,365.18 | $160,393.80 |
|
MA - 1100 - GA220000018
15 KV ATO DOUBLE TANK SWITCHGEAR |
03/08/2027
Expires: 125 days |
$1,350,000.00 | $1,194,459.25 | $1,164,941.25 |
|
MA - 2200 - GA220000025
SEEPEX PARTS |
03/10/2027
Expires: 127 days |
$300,000.00 | $156,938.04 | $156,938.04 |
|
MA - 1100 - GA250000015
RECLOSERS, ELECTRIC UTILITY |
03/12/2027
Expires: 129 days |
$13,000,000.00 | $6,044,405.00 | $5,967,905.00 |
|
MA - 1100 - NA220000089
RELAY SERVICES |
03/13/2027
Expires: 130 days |
$5,760,000.00 | $5,747,064.90 | $4,686,104.55 |
|
MA - 2200 - GA240000039
SODA ASH (SODIUM CARBONATE) |
03/19/2027
Expires: 136 days |
$50,000.00 | $0.00 | $0.00 |
|
MA - 6300 - NA230000102
SERVICE CONTRACT FOR DATALOGGERS & PRESSURE SENSORS |
03/19/2027
Expires: 136 days |
$104,809.05 | $75,532.52 | $75,532.52 |
|
MA - 1100 - NS230000040
ANNUAL CALIBRATION OF THE F6080 FIELD CALIBRATOR |
03/20/2027
Expires: 137 days |
$18,320.00 | $5,496.03 | $5,496.03 |
|
MA - 1100 - NA220000094
INSTALLATION & UPGRADE OF CONTROLS/AUTOMATION SYSTEMS |
03/28/2027
Expires: 145 days |
$3,500,000.00 | $2,025,092.74 | $1,489,006.62 |
|
MA - 2200 - GA220000031
LIQUID SODIUM PERMANGANATE |
03/29/2027
Expires: 146 days |
$3,287,600.00 | $0.00 | $0.00 |
|
MA - 1100 - NA190000195
INSULATION AND HEAT TRACE SERVICES |
03/31/2027
Expires: 148 days |
$8,253,000.00 | $5,278,951.33 | $5,146,296.19 |
|
MA - 8100 - NS240000073
WESTMATIC WASH BAY O&M SERVICES |
04/03/2027
Expires: 151 days |
$116,000.00 | $25,938.54 | $25,938.54 |
|
MA - 8700 - NS220000050
MAINTENANCE AGREEMENT FOR QIAGILITY HEPA/UV 1126 & 39 |
04/05/2027
Expires: 153 days |
$50,020.00 | $50,020.00 | $50,020.00 |
|
MA - 1100 - GA220000032
STEEL REINFORCING BAR |
04/07/2027
Expires: 155 days |
$1,800,000.00 | $1,010,014.54 | $934,901.49 |
|
MA - 1100 - NA220000019
INSPECTION AND NONDESTRUCTIVE TESTING SERVICES |
04/10/2027
Expires: 158 days |
$1,920,000.00 | $1,544,918.16 | $977,329.76 |
|
MA - 7500 - NS250000075
PREVENTIVE MAINT & REPAIR AUTOMATIC TRANSFER SWITCHES |
04/10/2027
Expires: 158 days |
$300,000.00 | $3,457.00 | $3,457.00 |
|
MA - 1100 - GA220000003
STREETLIGHT POLES AND POLE PARTS. |
04/12/2027
Expires: 160 days |
$3,856,000.00 | $3,540,617.76 | $3,500,316.06 |
|
MA - 1100 - GA220000058
THREE-PHASE POWER TRANSFORMERS |
04/12/2027
Expires: 160 days |
$48,000,000.00 | $34,822,913.54 | $11,587,943.57 |
|
MA - 1100 - GA230000015
VOLTAGE TRANSFORMERS |
04/12/2027
Expires: 160 days |
$5,040,000.00 | $3,071,684.06 | $2,235,059.06 |
|
MA - 2200 - GA220000033
DUCTILE IRON FITTINGS |
04/13/2027
Expires: 161 days |
$800,000.00 | $204,416.15 | $188,809.65 |
|
MA - 8200 - NA240000130
INDOOR AIR QUALITY TESTING |
04/22/2027
Expires: 170 days |
$51,840.00 | $20,500.00 | $16,000.00 |
|
MA - 2200 - NS220000066
MAINTENANCE & SERVICE OF WATER METER TEST BENCHES. |
04/25/2027
Expires: 173 days |
$96,430.00 | $86,667.25 | $86,667.25 |
|
MA - 1100 - GA220000020
CAPACITOR BANKS & ASSOCIATED PARTS |
04/27/2027
Expires: 175 days |
$2,852,000.00 | $2,410,283.40 | $2,216,360.40 |
|
MA - 1100 - NS260000033
ACOUSTIC COMBUSTION TURBINE MONITORING SYSTEM AT SHEC |
04/29/2027
Expires: 177 days |
$24,720.00 | $24,000.00 | $24,000.00 |
|
MA - 1100 - GA210000025
DON'T USE. OPEN FOR DELIVERY OF ORDERS-362KV CIRCUIT BREAKER |
04/30/2027
Expires: 178 days |
$6,794,704.26 | $6,794,704.26 | $1,918,828.00 |
|
MA - 1100 - NA240000032
GAS TURBINE REPAIR & MAINTENANCE |
05/02/2027 | $36,000,000.00 | $14,923,352.58 | $13,101,293.28 |
|
MA - 9000 - NS230000052
PREVENTATIVE MAINTENANCE AGREEMENT FOR NITROGEN GENERATOR |
05/02/2027 | $26,660.85 | $21,042.76 | $21,042.76 |
|
MA - 1100 - GA240000041
AIR SWITCHES |
05/09/2027 | $3,400,000.00 | $1,263,460.00 | $867,575.00 |
|
MA - 1100 - GA210000031
READY-MIX CONCRETE |
05/15/2027 | $8,700,000.00 | $5,787,358.73 | $4,086,230.69 |
|
MA - 6200 - GA200000032
READY MIX CONCRETE |
05/15/2027 | $1,388,000.00 | $18,537.90 | $18,537.90 |
|
MA - 1100 - NA230000209
DOBLE TEST EQUIPMENT LEASE |
05/20/2027 | $408,011.00 | $334,703.20 | $318,722.99 |
|
MA - 7800 - NA250000144
LIFT, CRANE, & OVERHEAD HOIST MAINTENANCE & REPAIR SVCS |
05/20/2027 | $242,000.00 | $49,911.96 | $29,911.96 |
|
MA - 8300 - NA260000142
HYDROSTATIC AIR CYLINDER TESTING SERVICES |
05/20/2027 | $13,300.00 | $4,150.00 | $4,150.00 |
|
MA - 1100 - NS240000074
OMICRON MAINTENANCE PROGRAM - SERVICE |
05/24/2027 | $30,969.75 | $30,969.75 | $30,969.75 |
|
MA - 1100 - NA260000104
AIR COMPRESSOR MAINTENANCE AND REPAIR SERVICES |
05/27/2027 | $315,741.00 | $90,185.00 | $0.00 |
|
MA - 1100 - PA240000058
RELAY TECHNICIAN TRAINING PROGRAM |
05/28/2027 | $20,000.00 | $1,200.00 | $1,200.00 |
|
MA - 1100 - NA240000033
PROGRESSION TEST VALIDATION |
05/29/2027 | $450,000.00 | $192,487.36 | $192,487.36 |
|
MA - 9000 - NA250000124
EZ2CONNECT, QIAGILITY & QIASYMPHONY PM AGREEMENT FOR FSD |
05/29/2027 | $40,538.00 | $40,538.00 | $40,538.00 |
|
MA - 1100 - GA190000034
DO NOT USE -INDOOR ARC-RESISTANT SWITCHGEAR SUPPLY AGREEMENT |
05/30/2027 | $25,158,921.39 | $25,158,921.39 | $24,733,390.55 |
|
MA - 1100 - GA230000045
POLE CLIMBING EQUIPMENT |
05/30/2027 | $1,200,000.00 | $168,404.27 | $156,395.70 |
|
MA - 1100 - GA240000053
SF6 PAD MOUNT SWITCHGEAR |
05/30/2027 | $14,400,000.00 | $4,010,985.00 | $927,281.00 |
|
MA - 1100 - NA240000087
WATER TREATMENT SERVICES FOR INDUSTRIAL FACILITIES |
05/31/2027 | $9,750,000.00 | $7,539,363.43 | $5,637,908.12 |
|
MA - 5000 - NA240000087
WATER TREATMENT SERVICES FOR COMMERCIAL FACILITIES |
05/31/2027 | $3,384,000.00 | $2,305,245.17 | $1,331,467.50 |
|
MA - 8600 - GC260000017
SWIMMING POOL CHEMICALS, SUPPLIES, AND EQUIPMENT |
05/31/2027 | $4,800,000.00 | $1,225,529.01 | $18,819.40 |
|
MA - 1100 - GA230000053
NETWORK TRANSFORMERS |
06/01/2027 | $56,000,000.00 | $16,641,629.50 | $14,840,572.17 |
|
MA - 1100 - GA240000047
LUMINAIRES AND POLES SHOEBOX STYLE (LED) |
06/02/2027 | $4,623,000.00 | $2,717,183.16 | $2,585,533.47 |
|
MA - 5000 - GA240000054
HOT MIX ASPHALTIC CONCRETE, VARIOUS TYPES |
06/03/2027 | $36,000,000.00 | $22,310,961.57 | $16,530,975.82 |
|
MA - 1100 - GS230000007
VALVE PARTS, WELLAND & TUXHORN |
06/04/2027 | $72,000.00 | $0.00 | $0.00 |
|
MA - 1100 - GA220000015
PRE-FABRICATED SUBSTATION CONTROL HOUSE SUPPLY AGREEMENT |
06/09/2027 | $8,000,000.00 | $4,353,450.67 | $4,169,518.87 |
|
MA - 2200 - GA240000057
LABORATORY GASES |
06/12/2027 | $88,964.20 | $20,880.53 | $19,589.83 |
|
MA - 7500 - NA220000126
SKILLED TRADES MAINTENANCE & REPAIR |
06/21/2027 | $52,396,000.00 | $34,219,901.34 | $30,169,738.78 |
|
MA - 2200 - NA220000093
REPAIR, PARTS AND REPLACEMENT OF PUMPS |
06/22/2027 | $778,200.00 | $579,964.47 | $364,521.47 |
|
MA - 1100 - GA250000029
ELECTRO-MECHANICAL OPERATOR DEVICE |
06/24/2027 | $44,840.00 | $0.00 | $0.00 |
|
MA - 1100 - NA250000104
POWER TRANSFORMER CONSULTING SERVICES |
06/29/2027 | $40,000.00 | $18,949.14 | $15,349.14 |
|
MA - 8100 - NC230000136
COOPERATIVE FOR GENERATOR MAINTENANCE, REPAIRS, RENTALS |
06/30/2027 | $6,750,000.00 | $4,084,556.87 | $3,985,258.54 |
|
MA - 1500 - NA220000038
POST-DISASTER DEBRIS MONITORING SERVICES |
07/03/2027 | $5,700,000.00 | $2,464,445.34 | $2,464,445.34 |
|
MA - 8100 - NA210000157
MAINTENANCE AND REPAIR SERVICES FOR AERIAL LIFTS |
07/10/2027 | $500,000.00 | $104,131.45 | $96,452.78 |
|
MA - 8100 - NA220000164
PCAIR UNITS - MAINTENANCE, REPAIRS, PARTS, AND SERVICE |
07/18/2027 | $207,377.47 | $207,026.56 | $207,026.56 |
|
MA - 8200 - NA240000155
BUILDING AUTOMATION SYSTEM MAINTENANCE & REPAIRS |
07/18/2027 | $1,362,400.00 | $646,979.48 | $442,615.48 |
|
MA - 1100 - NA230000130
MOBILE DEMINERALIZER RENTAL & WATER TREATMENT PARTS |
07/20/2027 | $1,150,719.78 | $768,696.88 | $682,896.88 |
|
MA - 1100 - GA240000071
TRANSMISSION INSULATORS AND HARDWARE |
07/23/2027 | $38,100,000.00 | $3,926,776.47 | $1,727,107.19 |
|
MA - 8100 - NA220000174
EQUIPMENT, OEM PARTS, REPAIRS & MAINT. -JANITORIAL EQUIPMENT |
07/28/2027 | $143,800.00 | $75,084.79 | $74,962.72 |
|
MA - 1100 - GA230000067
DESIGN AND FABRICATION OF DISTRIBUTION STEEL POLES. |
07/31/2027 | $12,400,000.00 | $1,591,845.70 | $1,302,857.14 |
|
MA - 2200 - GS250000003
AW-2143 LAB TESTING EQUIPMENT AND SUPPLIES |
07/31/2027 | $345,000.00 | $83,259.50 | $83,259.50 |
|
MA - 2200 - NS250000201
PREVENTATIVE MAINTENANCE FOR DUAL BEAM SPECTROPHOTOMERS |
07/31/2027 | $24,000.00 | $7,473.60 | $7,473.60 |
|
MA - 8100 - NA240000207
SHARED USE BAGGAGE SCALE SERVICE, REPAIRS, EQUIPMENT & PARTS |
08/01/2027 | $222,000.00 | $68,230.00 | $11,467.17 |
|
MA - 2200 - NA250000190
BASIN DESCALING AND DEBRIS REMOVAL SERVICES |
08/03/2027 | $1,920,000.00 | $799,468.00 | $357,883.00 |
|
MA - 2200 - GA240000065
38% SODIUM BISULFITE TOTES |
08/04/2027 | $1,286,000.00 | $765,850.00 | $765,850.00 |
|
MA - 2200 - GS220000003
WALLACE AND TIERNAN PARTS FOR PLANTS |
08/04/2027 | $1,088,000.00 | $1,079,980.72 | $1,050,779.46 |
|
MA - 1100 - GA220000047
STATION CLASS SURGE ARRESTORS |
08/11/2027 | $908,800.00 | $239,769.00 | $204,669.00 |
|
MA - 6200 - GC240000012
ASPHALT REMOVER & RELEASE AGENT/TPW-SBO |
08/18/2027 | $44,000.00 | $22,214.00 | $18,060.00 |
|
MA - 1100 - GA220000048
19% AQUEOUS AMMONIA |
08/24/2027 | $1,350,000.00 | $1,348,993.20 | $1,344,730.28 |
|
MA - 5000 - GA240000074
GEM SAND AND WASHED GRAVEL AGGREGATE |
08/29/2027 | $800,000.01 | $104,264.55 | $104,264.55 |
|
MA - 5000 - NA220000122
CITYWIDE HVAC - CHILLER MAINTENANCE AND REPAIR SERVICES |
08/30/2027 | $17,250,000.00 | $14,708,713.47 | $12,937,162.03 |
|
MA - 2200 - GC250000002
COLD WATER METERS |
08/31/2027 | $6,000,000.00 | $625,539.75 | $572,655.83 |
|
MA - 2200 - NA240000231
AW SMOKE TESTING |
09/01/2027 | $1,050,000.00 | $727,698.57 | $577,298.57 |
|
MA - 2200 - GA240000050
30 CUBIC YARD FILTER SCREENS |
09/03/2027 | $1,860,000.00 | $59,400.00 | $59,400.00 |
|
MA - 2200 - GA240000044
FLOCCULATING POLYMER |
09/04/2027 | $360,000.00 | $0.00 | $0.00 |
|
MA - 8100 - NA220000188
EV CHARGING STATIONS - MAINTENANCE, REPAIRS, AND SERVICE |
09/05/2027 | $1,050,000.00 | $192,688.83 | $78,776.83 |
|
MA - 2200 - GS240000003
SEWER INSPECTION EQUIPMENT, PARTS, AND SERVICES |
09/08/2027 | $1,386,000.00 | $540,958.80 | $532,116.07 |
|
MA - 1100 - GA250000019
VACUUM INTERRUPTER SWITCH |
09/11/2027 | $4,000,000.00 | $1,132,994.90 | $888,112.00 |
|
MA - 1100 - GA250000036
MANHOLE COVERS, BOXES, AND ACCESSORIES |
09/11/2027 | $440,000.00 | $120,589.59 | $90,290.69 |
|
MA - 1100 - NA230000178
SUBSTATION RELAY PANELS |
09/14/2027 | $12,000,000.00 | $3,352,624.66 | $1,691,649.92 |
|
MA - 1100 - GA240000076
SUBSTATION STRUCTURAL STEEL |
09/15/2027 | $16,500,000.00 | $1,989,118.68 | $985,935.81 |
|
MA - 6300 - NA220000209
LAB ANALYSIS, WATER, SEDIMENT, BULK MATERIALS |
09/15/2027 | $1,305,000.00 | $438,198.25 | $386,838.25 |
|
MA - 1100 - NA220000107
SUBSTATION MAINTENANCE |
09/18/2027 | $16,000,000.00 | $9,343,259.27 | $6,033,824.61 |
|
MA - 1100 - NA240000199
INSTALLATION AND MAINTENANCE OF DCP3 FANS |
09/18/2027 | $39,335.00 | $25,095.00 | $23,495.00 |
|
MA - 1100 - NS240000099
SHEC OVERHAUL HYDRAULIC GENERATOR CIRCUIT BREAKERS |
09/18/2027 | $2,400,231.00 | $1,900,231.00 | $267,677.00 |
|
MA - 5000 - GA240000083
TRUCKING, HAULING AND DISPOSAL SERVICES |
09/25/2027 | $4,480,000.00 | $2,467,720.74 | $1,680,663.24 |
|
MA - 1100 - GA240000082
UTILITY WOOD POLES |
09/29/2027 | $9,000,000.00 | $2,467,644.76 | $2,293,035.76 |
|
MA - 1100 - NA250000146
NETWORK PROTECTOR MAINTENANCE, PARTS AND SERVICES |
09/30/2027 | $2,000,000.00 | $180,273.70 | $0.00 |
|
MA - 2200 - GA220000062
MOBIL INDUSTRIAL LUBRICANTS |
10/03/2027 | $1,584,000.00 | $826,858.54 | $802,641.27 |
|
MA - 2200 - NA220000206
INSPECTION, REPAIR, AND TESTING OF STATIONARY CRANES |
10/03/2027 | $316,800.00 | $234,177.70 | $213,449.70 |
|
MA - 1100 - NA230000223
VALVE REPAIR, REPLACEMENT AND TESTING |
10/07/2027 | $3,200,000.00 | $367,437.77 | $243,107.77 |
|
MA - 1100 - NA230000214
POWER PRODUCTION MAINTENANCE |
10/08/2027 | $21,600,000.00 | $13,937,461.49 | $11,362,120.57 |
|
MA - 1100 - GA230000082
ELECTRICAL SUPPLIES |
10/12/2027 | $7,274,000.00 | $4,104,358.85 | $3,909,096.55 |
|
MA - 1100 - GA240000029
THREE PHASE AUTO-TRANSFORMERS |
10/15/2027 | $37,800,000.00 | $27,822,180.00 | $14,684,150.00 |
|
MA - 1100 - GA240000005
UNDERGROUND ELECTRICAL MATERIALS |
10/18/2027 | $6,800,000.00 | $3,780,344.03 | $3,437,898.44 |
|
MA - 5000 - NA250000232
SOLAR EQUIPMENT MAINTENANCE AND REPAIR |
10/22/2027 | $3,760,000.00 | $127,312.06 | $46,090.43 |
|
MA - 6300 - GA220000061
BOULDERS LIMESTONE AND LEDGESTONE |
10/24/2027 | $3,200,000.00 | $875,680.00 | $792,080.00 |
|
MA - 6200 - GA220000057
TRAP ROCK |
10/26/2027 | $3,526,000.00 | $3,510,227.27 | $3,510,227.27 |
|
MA - 1100 - NA200000019
7FA AT SHEC PARTS AND MAINTENANCE CONTRACT |
10/28/2027 | $36,000,000.00 | $25,246,161.97 | $24,858,001.48 |
|
MA - 1100 - NA240000176
CALIBRATION GASES AND A GAS CYLINDER MANAGEMENT PROGRAM |
10/31/2027 | $170,000.00 | $89,000.00 | $79,446.22 |
|
MA - 2200 - NA190000025
BIOSOLIDS BENEFICIAL REUSE |
10/31/2027 | $17,330,000.00 | $15,644,940.11 | $15,044,940.11 |
|
MA - 1100 - GA240000008
PVC CONDUIT & ACCESSORIES |
11/06/2027 | $2,720,000.00 | $894,093.60 | $837,691.06 |
|
MA - 1100 - GA240000089
DESIGN AND FABRICATION OF STEEL TRANSMISSION POLES |
11/06/2027 | $45,000,000.00 | $5,675,006.91 | $3,547,549.32 |
|
MA - 1100 - NA220000186
HEAT EXCHANGER SKIDS FOR AUSTIN ENERGY CUSTOMER SITES |
11/06/2027 | $20,000,000.00 | $2,606,325.00 | $2,514,924.00 |
|
MA - 5000 - GC230000008
MRO EQUIPMENT, SUPPLIES AND SERVICES |
11/08/2027 | $42,685,600.00 | $27,986,083.57 | $25,406,594.15 |
|
MA - 6200 - GC250000009
COMMERICAL/CONTRACTOR GRADE CONCRETE EQMT, TOOLS, AND SUPP. |
11/08/2027 | $150,000.00 | $137,864.90 | $57,657.60 |
|
MA - 1100 - NA220000108
POWER PRODUCTION MAINTENANCE |
11/09/2027 | $16,000,000.00 | $5,679,167.94 | $5,653,771.94 |
|
MA - 2200 - GA220000042
BELT PRESS PARTS |
11/15/2027 | $648,000.00 | $629,765.54 | $628,765.54 |
|
MA - 2200 - NA240000027
CLEANING, INSPECTION, AND CERTIFICATION OF BULK CHLORINE STO |
11/16/2027 | $214,788.00 | $166,419.87 | $166,419.87 |
|
MA - 2200 - GS250000002
BIOMASS CHARACTERIZATION TESTING |
11/17/2027 | $57,600.00 | $43,450.00 | $43,450.00 |
|
MA - 2200 - GS250000010
WALLACE AND TIERNAN PARTS FOR PLANTS |
11/19/2027 | $1,009,280.00 | $191,906.59 | $143,680.90 |
|
MA - 1100 - GA250000031
SWITCHGEARS, SUBSTATION, ARC-RESISTANT & OTHER |
11/23/2027 | $26,600,200.00 | $11,307,181.79 | $193,233.40 |
|
MA - 5000 - NA250000034
KITCHEN EQUIPMENT MAINTENANCE AND REPAIR |
11/24/2027 | $1,326,000.00 | $809,440.99 | $547,830.33 |
|
MA - 8100 - GA250000004
SHARED USE EQUIPMENT, CONSUMABLE SUPPLIES, PARTS & SERVICES |
11/24/2027 | $1,500,000.00 | $82,936.00 | $82,936.00 |
|
MA - 2200 - GA250000007
MAGNESIUM HYDROXIDE SLURRY |
11/25/2027 | $29,460,000.00 | $10,779,519.90 | $9,266,546.05 |
|
MA - 1100 - GA230000009
RELAYS FOR SWITCHGEAR AND RELAY PANELS |
11/27/2027 | $1,320,000.00 | $435,888.66 | $410,358.80 |
|
MA - 1100 - GA230000011
CIRCUIT SWITCHERS |
11/27/2027 | $4,800,000.00 | $0.00 | $0.00 |
|
MA - 1100 - NC240000012
SE PREFAB MAINTENANCE PROGRAM |
11/27/2027 | $134,088.39 | $88,408.49 | $66,608.12 |
|
MA - 2200 - GA250000008
WATER METERS AND PARTS |
11/27/2027 | $11,200,000.00 | $3,656,245.85 | $2,278,424.59 |
|
MA - 5000 - NA250000033
MAINTENANCE AND REPAIR OF FITNESS EQUIPMENT |
11/27/2027 | $763,200.00 | $109,105.00 | $74,075.00 |
|
MA - 5000 - GC250000007
CITYWIDE HVAC FILTERS |
11/30/2027 | $4,725,000.00 | $519,033.42 | $287,472.65 |
|
MA - 5000 - NC250000085
ELEVATOR AND ESCALATOR MAINTENANCE, REPAIR & MODERNIZATION |
11/30/2027 | $15,000,000.00 | $2,509,360.35 | $512,414.12 |
|
MA - 2200 - GA240000069
PROGRESSIVE CAVITY PUMP PARTS AND ACCESSORIES |
12/01/2027 | $348,000.00 | $105,802.40 | $99,382.40 |
|
MA - 5000 - GA230000008
WATER UTILITY SYSTEMS FITTINGS AND ACCESSORIES |
12/09/2027 | $7,800,000.00 | $7,740,506.70 | $7,507,578.19 |
|
MA - 5000 - NA260000028
INSTALLATION AND MAINTENANCE OF GREEN STORMWATER INFRASTRUCT |
12/10/2027 | $3,704,000.00 | $262,579.36 | $188,647.38 |
|
MA - 1100 - GA260000011
PADLOCK METER SEALS |
12/18/2027 | $86,000.00 | $5,200.00 | $0.00 |
|
MA - 2200 - GA230000007
BULK LIQUID ALUMINUM |
12/19/2027 | $203,000.00 | $185,861.95 | $155,732.17 |
|
MA - 2200 - GS230000001
ROTORAKE FL776 AND LOBE PUMP RR6000 AND PARTS |
12/30/2027 | $120,000.00 | $25,198.82 | $25,198.82 |
|
MA - 1100 - NA260000114
CONDENSER WATER PUMPS REPLACEMENT AT AUSTIN ENERGYS DISTRIC |
12/31/2027 | $4,571,202.00 | $2,500,000.00 | $475,000.00 |
|
MA - 2200 - GA240000087
FLEXIBLE ROAD BASE |
12/31/2027 | $3,280,000.00 | $846,814.29 | $771,913.12 |
|
MA - 2200 - GA260000014
DEIONIZED WATER FOR WATER QUALITY LABORATORY |
01/04/2028 | $152,000.00 | $32,464.18 | $11,335.78 |
|
MA - 2200 - NS230000015
MARS VEROFLOW MOBILE METER TESTERS |
01/05/2028 | $140,056.43 | $69,582.19 | $69,582.19 |
|
MA - 8100 - NA250000031
ONSITE BHS MAINTENANCE & REPAIR SUPPORT SERVICES |
01/18/2028 | $18,911,853.20 | $8,599,117.87 | $8,595,877.87 |
|
MA - 2200 - GA260000017
DISPOSABLE CLOTH WIPING RAGS |
01/22/2028 | $96,000.00 | $4,531.68 | $4,531.68 |
|
MA - 6200 - GA260000003
EMULSIFIED ASPHALT-VARIOUS TYPES |
01/24/2028 | $5,770,536.00 | $3,321,134.75 | $1,434,645.63 |
|
MA - 1100 - GA230000002
93% SULFURIC ACID |
01/30/2028 | $534,000.00 | $401,976.72 | $384,232.66 |
|
MA - 2200 - GA230000018
HI PRESSURE HOSES |
02/05/2028 | $120,000.00 | $89,013.23 | $89,013.23 |
|
MA - 2200 - GA240000088
LIQUID POLYMER FOR THICKENING AND DEWATERING SLUDGE |
02/12/2028 | $4,800,000.00 | $1,711,305.00 | $1,503,705.00 |
|
MA - 5000 - GC210000003
EQUIPMENT AND TOOLS |
02/12/2028 | $1,286,000.00 | $651,359.15 | $474,829.80 |
|
MA - 1100 - NS250000008
SV - UTILITY ANALYTICS INSTITUTE (UAI) TRAINING |
02/19/2028 | $112,840.00 | $112,840.00 | $100,385.00 |
|
MA - 1100 - GS240000006
NORTHWEST LINEMAN COLLEGE TRAINING MATERIALS |
02/20/2028 | $178,815.00 | $106,155.00 | $75,234.00 |
|
MA - 5000 - GA230000021
LAB SUPPLIES AND LAB CHEMICALS |
02/24/2028 | $4,420,000.00 | $1,013,602.14 | $989,215.28 |
|
MA - 1100 - GA250000002
ELECTRIC METER PURCHASE AND ASSOCIATED SERVICES |
02/25/2028 | $37,200,000.00 | $4,255,311.00 | $3,536,136.36 |
|
MA - 2200 - NS260000006
CATALOG FOR PARTS, SUPPLIES, AND REPAIR SERVICES |
02/26/2028 | $740,000.00 | $573,242.10 | $229,043.48 |
|
MA - 1100 - GA230000034
DECORATIVE LIGHTS, LUMINARIES, AND LAMP POLES |
03/08/2028 | $1,920,000.00 | $419,385.86 | $384,911.42 |
|
MA - 1100 - GA230000036
CRITICAL MATERIALS SUPPLY ARRANGEMENT (CMSA) |
03/14/2028 | $63,750,000.00 | $63,613,669.47 | $63,211,253.27 |
|
MA - 1100 - GA230000037
CRITICAL MATERIALS SUPPLY ARRANGEMENT (CMSA) |
03/14/2028 | $5,620,000.00 | $5,190,304.47 | $5,190,304.47 |
|
MA - 1100 - GA230000038
CRITICAL MATERIALS SUPPLY ARRANGEMENT (CMSA) |
03/14/2028 | $4,600,000.00 | $4,576,253.79 | $4,503,488.79 |
|
MA - 1100 - GA230000039
CRITICAL MATERIALS SUPPLY ARRANGEMENT (CMSA) |
03/14/2028 | $35,272,000.00 | $35,198,219.41 | $35,137,286.59 |
|
MA - 1100 - GA230000040
CRITICAL MATERIALS SUPPLY ARRANGEMENT (CMSA) |
03/14/2028 | $13,350,000.00 | $12,470,099.61 | $12,462,449.21 |
|
MA - 1100 - GA230000041
CRITICAL MATERIALS SUPPLY ARRANGEMENT (CMSA) |
03/14/2028 | $1,480,000.00 | $1,191,211.63 | $1,191,211.63 |
|
MA - 2200 - GA260000023
1" RIVER ROCK |
03/16/2028 | $1,200,000.00 | $215,001.89 | $106,735.65 |
|
MA - 2200 - NA230000131
CENTRIFUGES REPAIR SERVICES |
03/22/2028 | $2,100,000.00 | $892,668.55 | $770,850.63 |
|
MA - 5000 - GA230000043
REINFORCING STEEL |
03/23/2028 | $3,200,000.00 | $473,766.91 | $347,051.38 |
|
MA - 2200 - GA230000026
LIQUID SULFUR DIOXIDE |
03/26/2028 | $3,392,000.00 | $2,012,927.00 | $1,809,563.00 |
|
MA - 5000 - GA230000044
SODIUM HYPOCHLORITE |
03/27/2028 | $14,028,000.00 | $9,832,242.51 | $8,873,286.63 |
|
MA - 2200 - GA230000023
LIQUID AMMONIUM SULFATE |
04/02/2028 | $1,200,000.00 | $485,506.00 | $451,576.00 |
|
MA - 7500 - NA240000026
CTECC- ENCOTECH, CONSULTING/ PROJECT MANAGEMENT, BLDG SYST |
04/07/2028 | $560,000.00 | $94,998.41 | $63,700.81 |
|
MA - 1100 - GS250000011
TRANSFORMER BUSHINGS |
04/09/2028 | $400,000.00 | $228,750.00 | $0.00 |
|
MA - 2200 - GA230000006
MVR METERS AND PARTS |
04/10/2028 | $120,000.00 | $3,621.80 | $3,621.80 |
|
MA - 2200 - NA230000118
HOWDEN TURBLEX SERVICE AGREEMENT FOR COMPRESSORS |
04/12/2028 | $200,000.00 | $173,520.00 | $173,520.00 |
|
MA - 1100 - GA230000048
FAULT INDICATORS AND FIBER OPTIC LEADS |
04/17/2028 | $4,080,000.00 | $4,072,631.00 | $4,072,631.00 |
|
MA - 1100 - GA230000049
POLYURETHANE FOAM AND CONDUCTIVE POLYURETHANE FOAM BACKFILL |
04/18/2028 | $460,000.00 | $394,200.00 | $394,200.00 |
|
MA - 7500 - NA250000127
DUCT CLEANING AND FILTER REPLACEMENT |
04/27/2028 | $810,400.00 | $303,431.04 | $233,346.59 |
|
MA - 2200 - NA260000127
MAINTENANCE AND REPAIR OF AUTOCLAVE LAB EQUIPMENT |
04/30/2028 | $80,000.00 | $12,300.00 | $0.00 |
|
MA - 5000 - NC260000047
RENTAL OF TRENCH SAFETY SHORING EQUIPMENT AND PUMPING EQUIPM |
04/30/2028 | $417,600.00 | $29,142.98 | $3,771.12 |
|
MA - 9000 - NA230000154
DEIONIZED WATER SYSTEM PREVENTATIVE MAINTENANCE & REPAIR |
05/02/2028 | $240,000.00 | $74,729.17 | $71,409.31 |
|
MA - 2200 - NS250000070
PREVENTIVE MAINTENANCE FOR TOTAL ORGANIC CARBON ANALYZER |
05/06/2028 | $17,280.00 | $14,241.00 | $14,241.00 |
|
MA - 8600 - NS250000033
PUMP STATION REPAIR AND PREVENTATIVE MAINTENANCE. |
05/07/2028 | $920,000.00 | $110,914.01 | $110,914.01 |
|
MA - 2200 - NA230000155
DOME MEASUREMENT |
05/08/2028 | $72,625.00 | $48,565.00 | $48,565.00 |
|
MA - 7500 - NA260000087
SHEET METAL FABRICATION, DUCTWORK INSTALLATION, AND PIPE/DUC |
05/13/2028 | $800,000.00 | $44,778.64 | $0.00 |
|
MA - 6300 - NS220000102
EQUIPMENT AND REPAIRS FOR STORM DRAIN CAMERAS |
05/15/2028 | $240,000.00 | $108,191.54 | $108,191.54 |
|
MA - 2200 - GA230000054
HDPE PIPE |
05/22/2028 | $120,000.00 | $0.00 | $0.00 |
|
MA - 2200 - GA230000055
CALCIUM HYPOCHLORITE GRANULES AND TABLETS |
05/22/2028 | $135,141.40 | $115,413.66 | $111,413.66 |
|
MA - 2200 - GA260000040
FLUOROSILICIC ACID |
05/28/2028 | $2,360,000.00 | $154,000.00 | $71,614.05 |
|
MA - 2200 - GA260000052
POWDER ACTIVATED CARBON |
05/29/2028 | $4,300,000.00 | $285,341.80 | $73,749.30 |
|
MA - 2200 - GA230000051
LIQUID PHOSPHATE |
05/31/2028 | $4,640,000.00 | $4,325,598.41 | $4,325,598.41 |
|
MA - 2200 - GS260000002
PARTS AND SERVICES, MANSFIELD PUMP |
05/31/2028 | $3,200,000.00 | $3,859.50 | $3,859.50 |
|
MA - 1100 - GA260000021
SWITCHGEARS AIR INSULATED |
06/04/2028 | $1,600,000.00 | $122,800.00 | $0.00 |
|
MA - 8100 - NS240000088
PASSENGER BOARDING SYSTEMS PARTS & REPAIR SERVICES |
06/05/2028 | $4,500,000.00 | $1,079,093.23 | $882,116.10 |
|
MA - 2200 - GA230000057
LIQUID CHLORINE |
06/08/2028 | $15,200,000.00 | $10,961,202.91 | $10,192,987.50 |
|
MA - 2200 - GA250000024
FILTER ANTHRACITE |
06/12/2028 | $1,120,000.00 | $61,619.76 | $61,619.76 |
|
MA - 1500 - NA260000158
STATIONARY EQUIPMENT MAINTENANCE AND REPAIR SERVICES |
06/15/2028 | $78,000.00 | $25,000.00 | $21,638.80 |
|
MA - 2200 - NA260000160
PLASMA CUTTING AND WELDING SERVICES |
06/21/2028 | $160,000.00 | $0.00 | $0.00 |
|
MA - 5000 - GA260000066
INDUSTRIAL GASES AND CYLINDERS |
07/23/2028 | $472,000.00 | $38,198.50 | $821.49 |
|
MA - 2200 - GA230000068
SULFATREAT 410CHP |
07/26/2028 | $480,000.00 | $239,010.00 | $119,505.00 |
|
MA - 2200 - NA230000108
RELIANT WET WELL WIZARDS |
07/26/2028 | $620,000.00 | $58,533.33 | $58,533.33 |
|
MA - 1100 - NA260000164
UNDERGROUND UTILITY LOCATING SERVICE |
07/29/2028 | $4,420,000.00 | $160,000.00 | $154,856.00 |
|
MA - 5000 - GA230000059
TYPE 1L HYDRAULIC CEMENT |
08/02/2028 | $3,200,000.00 | $1,169,425.42 | $1,066,407.22 |
|
MA - 1100 - GA230000069
145KV METERING CURRENT TRANSFORMERS |
08/03/2028 | $600,000.00 | $0.00 | $0.00 |
|
MA - 5000 - NA260000131
MAINTENANCE & REPAIR POND PUMP AND IRRIGATION SYSTEMS |
08/04/2028 | $1,944,800.00 | $280,000.00 | $0.00 |
|
MA - 2200 - NS230000089
UPGRADE AND LICENSES FOR TEST BENCHES |
08/08/2028 | $381,464.80 | $379,848.00 | $292,372.00 |
|
MA - 1100 - GA260000064
ELECTRIC PROTECTIVE DEVICE ANNUAL PRICE AGREEMENT |
08/13/2028 | $4,000,000.00 | $0.00 | $0.00 |
|
MA - 2200 - NS260000012
MAINTENANCE AND REPAIR SERVICES FLOWCAM CYANO |
08/13/2028 | $44,000.00 | $0.00 | $0.00 |
|
MA - 2200 - GA260000177
SODIUM BISULFATE |
08/26/2028 | $2,336,000.00 | $0.00 | $0.00 |
|
MA - 2200 - NS260000043
VECTOR PARTS, COMPONENTS, & SERVICES |
08/27/2028 | $1,200,000.00 | $20,898.01 | $0.00 |
|
MA - 6200 - GA250000040
ROLL-UP SIGNS: CONSTRUCTION |
08/28/2028 | $600,000.00 | $62,624.96 | $62,624.96 |
|
MA - 2200 - NS260000086
PREV. MAINT. AND EMERGENCY SERVICES FOR SKALAR EQUIPMENT |
09/14/2028 | $220,000.00 | $57,510.00 | $0.00 |
|
MA - 2200 - NA230000135
HYDROMATIC PUMPS, PARTS, AND REPAIRS |
09/17/2028 | $500,000.00 | $235,276.69 | $235,276.69 |
|
MA - 1100 - NA260000184
OVERHEAD DISTRIBUTION ELECTRICAL SERVICES |
09/24/2028 | $80,000,000.00 | $0.00 | $0.00 |
|
MA - 2200 - NS260000042
SCRUGGS PARTS, COMPONENTS, & SERVICES |
09/24/2028 | $1,784,000.00 | $4,647.00 | $0.00 |
|
MA - 5000 - GA260000069
COMPRESSED MEDICAL-GRADE OXYGEN |
09/24/2028 | $217,710.00 | $5,235.20 | $0.00 |
|
MA - 2200 - GA250000027
LAB SUPPLIES AND LAB CHEMICALS |
09/30/2028 | $3,000,000.00 | $643,321.77 | $355,302.37 |
|
MA - 8100 - NS250000093
TK PBB SYSTEMS PART & REPAIRS |
09/30/2028 | $1,200,000.00 | $61,745.17 | $39,854.63 |
|
MA - 2200 - GA230000062
CORNELL PUMPS |
10/05/2028 | $348,000.00 | $160,086.26 | $160,086.26 |
|
MA - 1100 - GA260000063
THREE-PHASE PAD-MOUNTED DISTRIBUTION TRANSFORMERS |
10/22/2028 | $20,000,000.00 | $0.00 | $0.00 |
|
MA - 2200 - GA270000008
FILTER SAND AND GRAVEL |
10/28/2028 | $150,000.00 | $0.00 | $0.00 |
|
MA - 8100 - NS250000097
PARTS & REPAIR SERVICES FOR GPU & PCAIRE EQUIPMENT |
11/20/2028 | $750,000.00 | $315,309.37 | $275,818.36 |
|
MA - 2200 - GA240000015
AIR CUSHION SWING CHECK VALVES & REPAIR SERVICES |
11/29/2028 | $4,000,000.00 | $186,437.00 | $186,437.00 |
|
MA - 2200 - NA240000023
LAB EQUIPMENT MAINTENANCE AND REPAIR |
11/29/2028 | $192,000.00 | $31,884.70 | $31,884.70 |
|
MA - 2200 - GA240000012
LIQUID FERRIC SULFATE |
12/03/2028 | $3,760,000.00 | $2,545,162.46 | $2,228,068.84 |
|
MA - 8100 - NC260000008
ELEVATOR & ESCALATOR MAINT/REPAIR SERVICES-COOP BASED |
12/10/2028 | $7,958,609.00 | $3,474,965.05 | $1,975,798.32 |
|
MA - 1100 - NA220000116
CENTRIFUGAL CHILLER MAINTENANCE AT SAND HILL |
12/13/2028 | $2,578,000.00 | $2,421,918.56 | $1,392,881.98 |
|
MA - 1100 - NA260000047
TEST INSTRUMENT CALIBRATION SERVICES |
01/05/2029 | $72,000.00 | $36,180.00 | $22,450.00 |
|
MA - 9000 - NA240000047
REFRIGERATION & FREEZER MAINTENANCE & REPAIR FOR FSD |
01/15/2029 | $109,919.08 | $66,791.64 | $66,791.64 |
|
MA - 2200 - NS260000004
PARTS AND REPAIRS OF IBAK EQUIPMENT |
01/27/2029 | $309,549.00 | $11,434.93 | $11,434.93 |
|
MA - 2200 - GS260000001
SPECIALTY GREASE, SEALS, AND O-RINGS |
01/29/2029 | $330,000.00 | $104,831.13 | $68,530.13 |
|
MA - 8100 - NS260000011
CUP MAINTENANCE REPAIR SERVICES & PARTS |
02/01/2029 | $195,000.00 | $79,732.18 | $16,223.68 |
|
MA - 2200 - NA240000078
HYDROGEN PEROXIDE SOLUTION, FEED SYSTEM, MAINTENANCE |
02/09/2029 | $2,620,000.00 | $1,125,432.22 | $980,789.44 |
|
MA - 5000 - GA240000023
SCREENED CHOCOLATE LOAM AND SANDY LOAM |
03/05/2029 | $1,200,000.00 | $10,023.15 | $10,023.15 |
|
MA - 2200 - NA250000117
WASTEWATER FLOW MONITORING AND WW TEMPORARY FLOW MONITORING |
03/31/2029 | $9,200,000.00 | $3,118,984.90 | $2,327,165.10 |
|
MA - 2200 - GS220000002
CONSUMABLE TEST KITS FOR ELISA ANALYSIS |
04/12/2029 | $400,000.00 | $95,664.07 | $94,874.73 |
|
MA - 1100 - NA260000071
DISTRIBUTION LINE CLEARANCE - STREET &NIGHTWATCHMAN LIGHTS |
04/16/2029 | $4,500,000.00 | $65,817.40 | $49,256.84 |
|
MA - 2200 - GA240000035
HACH SUPPLIES AND SERVICES |
04/21/2029 | $4,956,408.00 | $2,107,342.78 | $2,064,658.62 |
|
MA - 8100 - GA250000017
VARIABLE FREQUENCY DRIVES- EQUIP, MAINT. & REPAIR SERVICES |
04/21/2029 | $702,720.00 | $192,903.53 | $61,213.53 |
|
MA - 2200 - NA240000134
CRANE/BOOMLIFT RENTAL SERVICES |
04/22/2029 | $3,100,000.00 | $68,758.88 | $57,387.88 |
|
MA - 2200 - NA240000146
VALVE ASSESSMENT |
05/09/2029 | $1,420,000.00 | $475,873.23 | $475,186.43 |
|
MA - 8200 - GA190000073
ELECTRICAL SUPPLIES, CUSTOM WIRE AND CABLE |
08/29/2029 | $240,000.00 | $119,039.05 | $119,039.05 |
|
MA - 2200 - NS260000085
ELISA CAAS CUBE PREVENTATIVE MAINTENANCE SERVICE |
08/30/2029 | $16,500.00 | $5,500.00 | $3,750.00 |
|
MA - 1100 - NA200000130
HEAT RECOVERY STEAM GENERATOR SERVICES |
12/31/2029 | $17,400,000.00 | $5,511,338.68 | $5,496,095.68 |
|
MA - 2200 - PA200000032
AMI METERS AND SERVICES |
04/29/1930 | $103,000,000.00 | $94,802,352.04 | $91,502,864.60 |
|
CT - 2200 - 22031800434
NAZET TRAINING |
Open | $64,000.00 | $64,000.00 | $48,255.00 |
|
CT - 2200 - 25031300246
SULZER INSPECTION AND REPAIR OR REPLACE |
Open | $2,125,070.00 | $2,125,070.00 | $198,539.55 |
|
CT - 2200 - 25031300246
SULZER INSPECTION AND REPAIR OR REPLACE |
Open | $2,125,070.00 | $2,125,070.00 | $198,539.55 |
|
CT - 2200 - 26042900237
PRODUCTION METER EVALUATION AND PITOT TESTING |
Open | $150,000.00 | $150,000.00 | $0.00 |
|
CT - 2200 - 26082000372
OVERHAUL WASHWATER RETURN VERTICAL TURBINE |
Open | $93,950.00 | $93,950.00 | $0.00 |
|
CT - 2200 - 26082000375
CUSTOM PUMP BUILD |
Open | $61,805.42 | $61,805.42 | $0.00 |
|
CT - 2200 - AW250414077
INSTALLATION OF FIBERGLASS PIPE PARTS |
Open | $32,758.00 | $32,758.00 | $32,752.00 |
|
CT - 2200 - AW250902157
REPLACEMENT BARE PUMP |
Open | $33,436.50 | $33,436.50 | $0.00 |
|
CT - 2200 - AW250918170
TRUCKER HATS WITH LOGO EMBROIDERY |
Open | $46,835.00 | $46,835.00 | $33,984.70 |
|
CT - 2200 - AW250918170
TRUCKER HATS WITH LOGO EMBROIDERY |
Open | $46,835.00 | $46,835.00 | $33,984.70 |
|
CT - 2200 - AW251024004
PLUMBING ASSISTANCE PROGRAM |
Open | $20,875.96 | $20,875.96 | $18,422.60 |
|
CT - 2200 - AW251024004
PLUMBING ASSISTANCE PROGRAM |
Open | $20,875.96 | $20,875.96 | $18,422.60 |
|
CT - 2200 - AW251024004
PLUMBING ASSISTANCE PROGRAM |
Open | $20,875.96 | $20,875.96 | $18,422.60 |
|
CT - 2200 - AW251024005
PLUMBING ASSISTANCE PROGRAM |
Open | $29,124.04 | $29,124.04 | $27,624.04 |
|
CT - 2200 - AW251024005
PLUMBING ASSISTANCE PROGRAM |
Open | $29,124.04 | $29,124.04 | $27,624.04 |
|
CT - 2200 - AW251024005
PLUMBING ASSISTANCE PROGRAM |
Open | $29,124.04 | $29,124.04 | $27,624.04 |
|
CT - 2200 - AW251112010
PARTS AND SERVICES ON IBAK EQUIPMENT |
Open | $50,000.00 | $50,000.00 | $47,208.35 |
|
CT - 2200 - AW251118013
RENTAL TEMPORARY TOILETS AT PEARCE LANE |
Open | $8,624.00 | $8,624.00 | $8,324.00 |
|
CT - 2200 - AW251203018
BCCP 15-YEAR PERMIT RENEWAL SUPPORT |
Open | $10,000.00 | $10,000.00 | $0.00 |
|
CT - 2200 - AW260205040
TRAINING PERFORMANCE AND COMPLIANCE (TPC) TRAINING |
Open | $12,920.00 | $12,920.00 | $10,970.00 |
|
CT - 2200 - AW260305053
KING INSTRUMENTS FLOWMETER PARTS |
Open | $8,135.81 | $8,135.81 | $0.00 |
|
CT - 2200 - AW260309054
INSPECTION AND ANALYSIS ON THE PUMPS AT HANDCOX WTP |
Open | $49,943.00 | $49,943.00 | $31,695.16 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,991.99 | $49,991.99 | $24,862.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,991.99 | $49,991.99 | $24,862.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,991.99 | $49,991.99 | $24,862.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,991.99 | $49,991.99 | $24,862.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,991.99 | $49,991.99 | $24,862.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,991.99 | $49,991.99 | $24,862.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,991.99 | $49,991.99 | $24,862.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,991.99 | $49,991.99 | $24,862.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,991.99 | $49,991.99 | $24,862.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,991.99 | $49,991.99 | $24,862.00 |
|
CT - 2200 - AW260401066
GAS DETECTION EQUIPMENT & SERVICES, GASES 101 |
Open | $49,991.99 | $49,991.99 | $24,862.00 |
|
CT - 2200 - AW260415072
FGC TAIL SHAFT ASSEMBLY W GASKET AND HARDWARE |
Open | $6,668.00 | $6,668.00 | $6,518.00 |
|
CT - 2200 - AW260420074
PUMP INSPECTION-REPAIR AT NORTHWEST C PUMP STATION |
Open | $8,611.50 | $8,611.50 | $0.00 |
|
CT - 2200 - AW260427076
WEMCO PARTS-LIME PUMP |
Open | $47,233.00 | $47,233.00 | $0.00 |
|
CT - 2200 - AW260513084
3 YARD SKELETON BUCKET JOHN DEERE 544 |
Open | $46,737.84 | $46,737.84 | $0.00 |
|
CT - 2200 - AW260604094
WELDING SERVICES AND FABRICATION |
Open | $50,000.00 | $50,000.00 | $25,254.81 |
|
CT - 2200 - AW260618097
SEWER LINE RELOCATION TERESINA DR |
Open | $16,912.00 | $16,912.00 | $0.00 |
|
CT - 2200 - AW260618099
CALIBRATION OF PANAMETRICS BILLING METERS |
Open | $28,420.00 | $28,420.00 | $22,360.00 |
|
CT - 2200 - AW260623100
TRAVELLING BRIDGE GRIT REMOVAL SYSTEM, SPARE PARTS |
Open | $34,532.00 | $34,532.00 | $0.00 |
|
CT - 2200 - AW260629101
TRANSFORMER REPAIR AND RECONDITIONING SERVICES |
Open | $25,848.00 | $25,848.00 | $0.00 |
|
CT - 2200 - AW260706106
VFD REPLACEMENT SERVICES-WALLER CREEK CENTER |
Open | $5,480.06 | $5,480.06 | $4,995.00 |
|
CT - 2200 - AW260717110
HORIZONTAL SPLIT CASE PUMP (HSC), FLOWSERVE |
Open | $35,439.00 | $35,439.00 | $0.00 |
|
CT - 2200 - AW260728114
REPLACEMENT ACTUATORS |
Open | $30,809.00 | $30,809.00 | $30,059.00 |
|
CT - 2200 - AW260731116
TKN DIGESTOR BLOCK - ANALYTICAL LAB EQUIPMENT FOR THE WALNUT |
Open | $31,374.70 | $31,374.70 | $0.00 |
|
CT - 2200 - AW260819119
REPAIR OF CO2 STORAGE TANK REFRIGERATION UNIT. |
Open | $40,000.00 | $40,000.00 | $0.00 |
|
CT - 2200 - AW260824120
BARE PUMP REPLACEMENT |
Open | $29,277.00 | $29,277.00 | $0.00 |
|
CT - 2200 - AW260826122
CUSTOM PARTS FOR PUMP RECONDITION | 770-25 |
Open | $14,806.50 | $14,806.50 | $0.00 |
|
CT - 2200 - AW260827123
AMMONIA PRESSURE REGULATING/CHECK VALVE ASSEMBLIES |
Open | $15,594.20 | $15,594.20 | $0.00 |
|
CT - 2200 - AW260831125
COMPLETE ANTI-TAMPERING FOX ASSEMBLY FABRICATED AND DELIVERE |
Open | $40,000.00 | $40,000.00 | $39,847.50 |
|
CT - 2200 - AW260901130
VERTICAL IN-LINE CENTRIFUGAL PUMP |
Open | $49,200.00 | $49,200.00 | $0.00 |
|
CT - 2200 - AW261016001
JOHN CRANE DUAL O-RING CARTRIDGE SEAL ASSEMBLY |
Open | $20,104.00 | $20,104.00 | $0.00 |
|
CT - 4400 - 24071600532
2024 REFRIGERANT STUDY, CLIMATE TEAM |
Open | $49,000.00 | $49,000.00 | $42,520.00 |
|
CT - 6200 - 26060300294
REPAIR SERVICE KITS FOR COBRA COMBI JACKHAMMERS |
Open | $25,049.95 | $25,049.95 | $5,045.98 |
|
CT - 6300 - 26081900369
FY26-2002870 RODRIGUEZ, MARVIN IMPELLER REPAIR |
Open | $7,500.00 | $7,500.00 | $0.00 |
|
CT - 7500 - 26082000373
HONEYWELL XLS3000 UPGRADE CITY HALL |
Open | $77,889.00 | $77,889.00 | $38,944.50 |
|
CT - 8100 - 24102400044
AUS CAMPUS CCTV TROUBLESHOOTING AND REPAIRS |
Open | $75,340.00 | $75,340.00 | $70,752.30 |
|
CT - 8100 - 26090400395
GRIPTESTER MK2 - SERVICE, CALIBRATION, & REPAIR |
Open | $25,000.00 | $25,000.00 | $0.00 |
Search Contract Catalog