Notice: As of April 12, 2024, we moved some information on this site. Visit AustinTexas.gov/FSD to find Financial Documents, Performance Management, Unclaimed Property, and Contact information.

Data Drill Down for All Months & All Years

PAYMENT REQUEST
DEPARTMENT PUBLIC WORKS - TRANSPORTATION
FUND TRANSPORTATION FUND
PROGRAM STREET PREVENTIVE MAINTENANCE
ACTIVITY ASPHALT OVERLAY
EXPENSE CATEGORY ASPHALT
PAYEE APAC-TEXAS INC
PAYMENT REQUEST Select a payment request.
PAYMENT REQUESTS | Select from Below
PAYMENT REQUEST DESCRIPTION CHECK DATE CHECK STATUS 
Checks cleared as of 01/31/2015 have been reflected as paid on the reports
AMOUNT
PRM 6200 16111604549 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/17/2016 Paid $89,288.64
PRM 6200 16110703836 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/08/2016 Paid $44,100.56
PRM 6200 16110303612 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/04/2016 Paid $20,621.44
PRM 6200 16110303613 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/04/2016 Paid $12,734.96
PRM 6200 16110303620 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/04/2016 Paid $2,419.26
PRM 6200 16110303621 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/04/2016 Paid $41,777.68
PRM 6200 16110303622 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/04/2016 Paid $14,518.80
PRM 6200 16110303623 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/04/2016 Paid $23,898.17
PRM 6200 16110303625 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/04/2016 Paid $18,147.92
PRM 6200 16110303626 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/04/2016 Paid $402.64
PRM 6200 16110103191 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/02/2016 Paid $14,833.84
PRM 6200 16110103192 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/02/2016 Paid $126.56
PRM 6200 16110103203 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/02/2016 Paid $16,971.09
PRM 6200 16102001935 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/21/2016 Paid $3,284.96
PRM 6200 16101401081 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/20/2016 Paid $20,957.07
PRM 6200 16101401083 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/20/2016 Paid $14,650.72
PRM 6200 16100400305 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/05/2016 Paid $56,923.70
PRM 6200 16091637863 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/19/2016 Paid $148,134.79
PRM 6200 16091337408 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/14/2016 Paid $18,987.56
PRM 6200 16091337410 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/14/2016 Paid $27,123.63
PRM 6200 16091337412 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/14/2016 Paid $128,086.21
PRM 6200 16091337414 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/14/2016 Paid $81,446.96
PRM 6200 16090236208 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/06/2016 Paid $66,670.80
PRM 6200 16082535362 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/26/2016 Paid $32,979.52
PRM 6200 16082535364 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/26/2016 Paid $61,297.04
PRM 6200 16082535368 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/26/2016 Paid $33,736.64
PRM 6200 16082535370 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/26/2016 Paid $48,980.52
PRM 6200 16082234792 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/23/2016 Paid $100,092.16
PRM 6200 16081534011 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/16/2016 Paid $54,114.41
PRM 6200 16080933459 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/10/2016 Paid $186,730.62
PRM 6200 16080332769 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/04/2016 Paid $294,812.26
PRM 6200 16080332775 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/04/2016 Paid $1,409.96
PRM 6200 16080232507 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/03/2016 Paid $574.00
PRM 6200 16072932144 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/01/2016 Paid $43,517.60
PRM 6200 16071931328 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/20/2016 Paid $20,601.28
PRM 6200 16070529905 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/06/2016 Paid $34,321.83
PRM 6200 16070529906 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/06/2016 Paid $18,962.72
PRM 6200 16070529907 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/06/2016 Paid $595.43
PRM 6200 16070529908 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/06/2016 Paid $27,886.32
PRM 6200 16070229759 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/05/2016 Paid $98,957.04
PRM 6200 16062829058 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/29/2016 Paid $22,910.16
PRM 6200 16062829060 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/29/2016 Paid $17,204.32
PRM 6200 16062228287 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/23/2016 Paid $75,676.16
PRM 6200 16061627648 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/17/2016 Paid $19,177.76
PRM 6200 16061627650 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/17/2016 Paid $42,147.28
PRM 6200 16061627653 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/17/2016 Paid $36,896.16
PRM 6200 16061627655 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/17/2016 Paid $20,385.42
PRM 6200 16061527446 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/16/2016 Paid $31,712.80
PRM 6200 16061026937 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/13/2016 Paid $42,806.40
PRM 6200 16060926779 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/10/2016 Paid $51,704.80
PRM 6200 16060326303 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/06/2016 Paid $32,712.40
PRM 6200 16060126145 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/02/2016 Paid $81,083.52
PRM 6200 16060126149 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/02/2016 Paid $17,640.00
PRM 6200 16060126151 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/02/2016 Paid $6,468.56
PRM 6200 16051124403 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/12/2016 Paid $134,449.28
PRM 6200 16051024263 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/11/2016 Paid $114,162.72
PRM 6200 16042723322 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/28/2016 Paid $12,875.52
PRM 6200 16042723324 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/28/2016 Paid $24,197.60
PRM 6200 16042723325 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/28/2016 Paid $16,773.68
PRM 6200 16041922149 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/20/2016 Paid $129,117.52
PRM 6200 16041922151 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/20/2016 Paid $37,660.56
PRM 6200 16041922153 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/20/2016 Paid $11,452.00
PRM 6200 16041221337 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/13/2016 Paid $13,871.59
PRM 6200 16041221342 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/13/2016 Paid $35,544.88
PRM 6200 16041221344 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/13/2016 Paid $22,205.68
PRM 6200 16041221346 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/13/2016 Paid $42,654.03
PRM 6200 16041221348 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/13/2016 Paid $6,399.68
PRM 6200 16041221350 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/13/2016 Paid $17,515.12
PRM 6200 16041221352 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/13/2016 Paid $20,924.96
PRM 6200 16041221354 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/13/2016 Paid $33,900.16
PRM 6200 16040120419 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/04/2016 Paid $1,009.80
PRM 6200 16040120423 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/04/2016 Paid $2,637.78
PRM 6200 16032819586 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/29/2016 Paid $78,324.04
PRM 6200 16032118847 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/22/2016 Paid $31,460.21
PRM 6200 16031618437 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/17/2016 Paid $103,269.42
GAX 6200 16030108100 03/14/2016 Paid ($753.72)
GAX 6200 16030108103 03/14/2016 Paid ($708.84)
GAX 6200 16030108106 03/14/2016 Paid ($684.42)
PRM 6200 16031117888 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/14/2016 Paid $25,737.60
PRM 6200 16031017710 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/11/2016 Paid $146,637.50
PRM 6200 16030917465 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/10/2016 Paid $12,384.40
PRM 6200 16030917467 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/10/2016 Paid $16,894.64
PRM 6200 16030716906 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/08/2016 Paid $8,395.52
PRM 6200 16030416758 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/07/2016 Paid $47,410.72
PRM 6200 16022615821 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/29/2016 Paid $46,806.48
PRM 6200 16022515686 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/26/2016 Paid $14,104.72
PRM 6200 16022515688 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/26/2016 Paid $12,150.88
PRM 6200 16022515690 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/26/2016 Paid $20,902.56
PRM 6200 16022515694 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/26/2016 Paid $10,975.44
PRM 6200 16022515696 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/26/2016 Paid $14,730.24
PRM 6200 16022515700 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/26/2016 Paid $115,694.32
PRM 6200 16021214191 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/16/2016 Paid $2,557.50
PRM 6200 16021114138 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/12/2016 Paid $17,706.64
PRM 6200 16020913833 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/10/2016 Paid $198,692.90
PRM 6200 16020112923 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/02/2016 Paid $105,916.72
PRM 6200 16012812750 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/29/2016 Paid $50,182.16
PRM 6200 16012812752 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/29/2016 Paid $42,770.56
PRM 6200 16011511382 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/19/2016 Paid $42,063.28
PRM 6200 16011110501 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/12/2016 Paid $47,342.96
PRM 6200 16010710172 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/08/2016 Paid $2,784.32
PRM 6200 16010609968 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/07/2016 Paid $5,118.30
PRM 6200 16010609969 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/07/2016 Paid $2,976.96
PRM 6200 16010609973 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/07/2016 Paid $26,551.28
PRM 6200 16010509757 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/06/2016 Paid $30,273.60
PRM 6200 16010509760 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/06/2016 Paid $7,393.12
PRM 6200 15121808430 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/21/2015 Paid $18,535.44
PRM 6200 15121808432 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/21/2015 Paid $1,750.54
PRM 6200 15121508041 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/16/2015 Paid $23,041.20
PRM 6200 15121508043 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/16/2015 Paid $44,337.44
PRM 6200 15121508045 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/16/2015 Paid $3,684.24
PRM 6200 15121107555 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/14/2015 Paid $28,496.72
PRM 6200 15113006066 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/01/2015 Paid $70,219.52
PRM 6200 15113006070 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/01/2015 Paid $37,816.24
PRM 6200 15112405752 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/25/2015 Paid $2,922.48
PRM 6200 15112405777 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/25/2015 Paid $8,781.36
PRM 6200 15111304784 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/16/2015 Paid $18,980.03
PRM 6200 15111304786 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/16/2015 Paid $10,512.32
PRM 6200 15110504103 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/06/2015 Paid $17,693.76
PRM 6200 15110504106 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/06/2015 Paid $19,468.40
PRM 6200 15110504108 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/06/2015 Paid $11,639.60
PRM 6200 15110504109 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/06/2015 Paid $33,790.40
PRM 6200 15110504110 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/06/2015 Paid $64,967.76
PRM 6200 15110504111 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/06/2015 Paid $7,712.88
PRM 6200 15110504113 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/06/2015 Paid $25,504.64
PRM 6200 15102703066 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/28/2015 Paid $27,378.12
PRM 6200 15102703067 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/28/2015 Paid $15,886.08
PRM 6200 15101301061 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/14/2015 Paid $52,956.42
PRM 6200 15101301063 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/14/2015 Paid $1,588.99
PRM 6200 15101301071 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/14/2015 Paid $1,734.30
PRM 6200 15100900872 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/12/2015 Paid $10,897.92
PRM 6200 15100500361 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/06/2015 Paid $19,645.56
PRM 6200 15100500363 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/06/2015 Paid $205,147.80
PRM 6200 15092940257 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/30/2015 Paid $183,067.64
PRM 6200 15091438404 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/15/2015 Paid $58,397.92
PRM 6200 15091438405 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/15/2015 Paid $61,860.48
PRM 6200 15091138277 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/14/2015 Paid $167,215.18
PRM 6200 15090938042 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/10/2015 Paid $100,050.97
PRM 6200 15090938044 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/10/2015 Paid $47,266.24
PRM 6200 15090137127 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/02/2015 Paid $88,411.92
PRM 6200 15090137131 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/02/2015 Paid $16,484.16
PRM 6200 15090137135 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/02/2015 Paid $22,192.80
PRM 6200 15082836820 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/31/2015 Paid $56,916.32
PRM 6200 15082736688 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/28/2015 Paid $3,872.60
PRM 6200 15082436087 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/25/2015 Paid $2,868.24
PRM 6200 15082436089 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/25/2015 Paid $60,473.28
PRM 6200 15082436090 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/25/2015 Paid $39,469.92
PRM 6200 15082436091 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/25/2015 Paid $688.24
PRM 6200 15082436092 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/25/2015 Paid $29,666.56
PRM 6200 15082436093 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/25/2015 Paid $34,486.48
PRM 6200 15082035737 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/21/2015 Paid $694.40
PRM 6200 15082035738 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/21/2015 Paid $784.00
PRM 6200 15082035740 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/21/2015 Paid $3,735.20
PRM 6200 15082035742 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/21/2015 Paid $5,260.64
PRM 6200 15082035746 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/21/2015 Paid $6,937.70
PRM 6200 15081435013 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/17/2015 Paid $323,116.22
PRM 6200 15081334871 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/14/2015 Paid $19,921.44
PRM 6200 15080734256 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/10/2015 Paid $14,621.04
PRM 6200 15080533980 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/06/2015 Paid $724.08
PRM 6200 15080533981 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/06/2015 Paid $49,372.78
PRM 6200 15080533982 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/06/2015 Paid $39,208.00
PRM 6200 15080533983 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/06/2015 Paid $699.44
PRM 6200 15080533985 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/06/2015 Paid $6,105.68
PRM 6200 15080533986 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/06/2015 Paid $6,525.12
PRM 6200 15072933156 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/30/2015 Paid $57,086.96
PRM 6200 15072933158 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/30/2015 Paid $8,963.36
PRM 6200 15072933162 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/30/2015 Paid $37,053.52
PRM 6200 15072332599 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/24/2015 Paid $2,312.80
PRM 6200 15072232424 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/23/2015 Paid $833.28
PRM 6200 15072232425 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/23/2015 Paid $33,519.36
PRM 6200 15072232426 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/23/2015 Paid $491.12
PRM 6200 15072132184 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/22/2015 Paid $31,828.85
PRM 6200 15072132185 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/22/2015 Paid $24,166.80
PRM 6200 15072132186 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/22/2015 Paid $39,469.36
PRM 6200 15072132187 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/22/2015 Paid $15,971.76
PRM 6200 15072132188 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/22/2015 Paid $534.80
PRM 6200 15070730356 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/08/2015 Paid $31,239.60
PRM 6200 15070730368 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/08/2015 Paid $11,280.08
PRM 6200 15070730372 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/08/2015 Paid $337.12
PRM 6200 15070630176 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/07/2015 Paid $205.92
PRM 6200 15070630178 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/07/2015 Paid $33,435.36
PRM 6200 15062328827 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/24/2015 Paid $91,054.66
PRM 6200 15062228583 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/23/2015 Paid $56,455.74
PRM 6200 15061928484 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/22/2015 Paid $23,290.40
PRM 6200 15061527898 Asphaltic Concrete, Cold Laid 06/16/2015 Paid $239.94
PRM 6200 15061527900 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/16/2015 Paid $595.84
PRM 6200 15061527902 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/16/2015 Paid $20,415.36
PRM 6200 15061527907 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/16/2015 Paid $289.52
PRM 6200 15060226550 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/03/2015 Paid $22,527.12
PRM 6200 15052726081 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/28/2015 Paid $26,311.30
PRM 6200 15052726083 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/28/2015 Paid $52,421.60
PRM 6200 15052625937 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/27/2015 Paid $66,127.04
PRM 6200 15050523705 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/06/2015 Paid $274,895.02
PRM 6200 15050523707 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/06/2015 Paid $254.24
PRM 6200 15042822870 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/29/2015 Paid $32,118.77
PRM 6200 15042822872 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/29/2015 Paid $70,100.53
PRM 6200 15042222217 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/23/2015 Paid $63,430.22
PRM 6200 15042122049 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/22/2015 Paid $248,390.65
PRM 6200 15041321000 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/14/2015 Paid $88,747.46
PRM 6200 15040820582 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/09/2015 Paid $2,097.76
PRM 6200 15040320067 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/06/2015 Paid $59,967.68
PRM 6200 15032619193 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/27/2015 Paid $80,190.10
PRM 6200 15031918134 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/20/2015 Paid $19,026.00
PRM 6200 15031317487 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/16/2015 Paid $75,400.12
PRM 6200 15031217398 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/13/2015 Paid $48,482.40
PRM 6200 15030416347 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/05/2015 Paid $90,179.60
PRM 6200 15022515585 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/26/2015 Paid $101,764.32
PRM 6200 15021114067 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/12/2015 Paid $109,098.84
PRM 6200 15011511063 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/16/2015 Paid $117,610.08
PRM 6200 15010209699 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/05/2015 Paid $80,273.20
PRM 6200 14122308718 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/26/2014 Paid $2,478.56
PRM 6200 14121808082 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/19/2014 Paid $64,212.40
PRM 6200 14121808084 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/19/2014 Paid $220,259.20
PRM 6200 14112105769 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/24/2014 Paid $52,257.52
PRM 6200 14112105771 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/24/2014 Paid $66,048.64
PRM 6200 14110304038 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/04/2014 Paid $75,024.32
PRM 6200 14110304040 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/04/2014 Paid $99,263.56
PRM 6200 14100800915 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/09/2014 Paid $29,433.37
PRM 6200 14100800916 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/09/2014 Paid $15,783.24
PRM 6200 14100800918 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/09/2014 Paid $48,895.85
PRM 6200 14100700684 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/08/2014 Paid $24,036.75
PRM 6200 14100700686 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/08/2014 Paid $33,977.04
PRM 6200 14100700688 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/08/2014 Paid $1,165.36
PRM 6200 14100100081 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/02/2014 Paid $18,420.64
PRM 6200 14092938480 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/01/2014 Paid $29,806.56
PRM 6200 14092938487 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/01/2014 Paid $361,500.05
PRM 6200 14093038662 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/01/2014 Paid $64,334.48
PRM 6200 14092237494 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/23/2014 Paid $120,069.77
PRM 6200 14090936304 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/10/2014 Paid $34,980.40
PRM 6200 14090936306 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/10/2014 Paid $56,072.80
PRM 6200 14090936308 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/10/2014 Paid $103.04
PRM 6200 14090235506 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/03/2014 Paid $25,721.36
PRM 6200 14090235508 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/03/2014 Paid $4,331.60
PRM 6200 14090235510 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/03/2014 Paid $38,762.64
PRM 6200 14090235513 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/03/2014 Paid $53,833.36
PRM 6200 14082634751 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/27/2014 Paid $13,936.94
PRM 6200 14082634755 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/27/2014 Paid $413.16
PRM 6200 14082634757 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/27/2014 Paid $110,958.75
PRM 6200 14082634758 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/27/2014 Paid $93,652.08
PRM 6200 14080832952 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/11/2014 Paid $74,362.75
PRM 6200 14073132091 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/01/2014 Paid $325.36
PRM 6200 14073132096 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/01/2014 Paid $227.92
PRM 6200 14073132100 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/01/2014 Paid $24,117.52
PRM 6200 14073132103 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/01/2014 Paid $120,030.15
PRM 6200 14073031890 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/31/2014 Paid $398.72
PRM 6200 14072431181 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/25/2014 Paid $62,808.00
PRM 6200 14072431183 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/25/2014 Paid $106,804.31
PRM 6200 14071629923 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/17/2014 Paid $25,772.32
PRM 6200 14071629925 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/17/2014 Paid $120,511.37
PRM 6200 14071429326 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/15/2014 Paid $95,509.12
PRM 6200 14070928866 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/10/2014 Paid $26,700.80
PRM 6200 14070928870 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/10/2014 Paid $6,707.12
PRM 6200 14070928877 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/10/2014 Paid $20,870.08
PRM 6200 14070928879 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/10/2014 Paid $27,367.76
PRM 6200 14070728577 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/09/2014 Paid $217,007.84
PRM 6200 14062427379 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/26/2014 Paid $23,358.16
PRM 6200 14062527561 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/26/2014 Paid $458.64
PRM 6200 14062527579 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/26/2014 Paid $283.92
PRM 6200 14062427377 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/25/2014 Paid $30,369.92
PRM 6200 14062427380 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/25/2014 Paid $23,658.88
PRM 6200 14062427382 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/25/2014 Paid $11,064.48
PRM 6200 14062427383 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/25/2014 Paid $37,917.60
PRM 6200 14062427384 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/25/2014 Paid $43,179.92
PRM 6200 14060625484 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/09/2014 Paid $1,569.68
PRM 6200 14060625486 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/09/2014 Paid $139,334.16
PRM 6200 14053024862 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/02/2014 Paid $136,060.40
PRM 6200 14053024864 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/02/2014 Paid $82,815.08
PRM 6200 14052824510 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/29/2014 Paid $556.08
PRM 6200 14051323133 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/14/2014 Paid $4,893.84
PRM 6200 14051323135 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/14/2014 Paid $56,529.76
PRM 6200 14051222953 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/13/2014 Paid $115,584.56
PRM 6200 14051222963 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/13/2014 Paid $65,994.00
PRM 6200 14051222965 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/13/2014 Paid $13,561.80
PRM 6200 14050922781 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/12/2014 Paid $16,128.56
PRM 6200 14050221849 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/05/2014 Paid $51,186.24
PRM 6200 14050221851 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/05/2014 Paid $37,638.16
PRM 6200 14042421062 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/25/2014 Paid $30,544.64
PRM 6200 14041620321 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/17/2014 Paid $297,282.16
PRM 6200 14040919617 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/10/2014 Paid $48,788.32
PRM 6200 14040519058 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/07/2014 Paid $236.32
PRM 6200 14040519062 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/07/2014 Paid $17,831.52
PRM 6200 14033118213 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/01/2014 Paid $25,089.68
PRM 6200 14032617749 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/27/2014 Paid $10,340.40
PRM 6200 14032617751 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/27/2014 Paid $24,889.20
PRM 6200 14031216262 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/13/2014 Paid $19,851.13
PRM 6200 14031015874 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/11/2014 Paid $33,798.80
PRM 6200 14030715586 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/10/2014 Paid $87,256.00
PRM 6200 14022114315 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/24/2014 Paid $93,299.17
PRM 6200 14021813923 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/19/2014 Paid $17,188.64
PRM 6200 14021113175 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/12/2014 Paid $860.72
PRM 6200 14021113179 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/12/2014 Paid $330.96
PRM 6200 14021113181 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/12/2014 Paid $158,284.56
PRM 6200 14021113183 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/12/2014 Paid $31,366.72
PRM 6200 14012711724 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/28/2014 Paid $56,844.48
PRM 6200 14010810202 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/09/2014 Paid $38,167.92
PRM 6200 13121007380 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/11/2013 Paid $25,845.12
PRM 6200 13121007382 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/11/2013 Paid $4,748.80
PRM 6200 13121007384 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/11/2013 Paid $59,493.28
PRM 6200 13121007389 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/11/2013 Paid $8,027.04
PRM 6200 13121007391 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/11/2013 Paid $27,091.12
PRM 6200 13120607072 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/09/2013 Paid $18,674.32
PRM 6200 13112506062 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/26/2013 Paid $12,041.68
PRM 6200 13111305186 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/14/2013 Paid $242,908.40
PRM 6200 13111205004 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/13/2013 Paid $26,167.12
PRM 6200 13110404168 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/05/2013 Paid $290.64
PRM 6200 13110404170 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/05/2013 Paid $124.88
PRM 6200 13102202470 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/23/2013 Paid $1,094.80
PRM 6200 13102102225 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/22/2013 Paid $111,371.12
PRM 6200 13101501484 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/16/2013 Paid $808.08
PRM 6200 13100400541 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/07/2013 Paid $28,611.52
PRM 6200 13100400544 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/07/2013 Paid $79,536.80
PRM 6200 13091835576 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/19/2013 Paid $93,871.12
PRM 6200 13091835578 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/19/2013 Paid $50,939.84
PRM 6200 13091635301 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/17/2013 Paid $229,730.56
PRM 6200 13091134676 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/12/2013 Paid $152,280.12
PRM 6200 13091034469 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/11/2013 Paid $6,141.52
PRM 6200 13091034473 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/11/2013 Paid $22,588.16
PRM 6200 13091034475 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/11/2013 Paid $18,004.56
PRM 6200 13091034477 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/11/2013 Paid $54,812.24
PRM 6200 13091034481 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/11/2013 Paid $36,279.04
PRM 6200 13090533998 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/06/2013 Paid $148,762.04
PRM 6200 13082232979 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/23/2013 Paid $41,570.36
PRM 6200 13081332136 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/14/2013 Paid $56,685.60
PRM 6200 13080131038 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/02/2013 Paid $123,824.08
PRM 6200 13072430064 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/25/2013 Paid $234,021.63
PRM 6200 13072329900 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/24/2013 Paid $15,864.80
PRM 6200 13071528306 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/16/2013 Paid $290.64
PRM 6200 13071528313 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/16/2013 Paid $1,425.76
PRM 6200 13071528315 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/16/2013 Paid $25,436.88
PRM 6200 13071528318 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/16/2013 Paid $14,837.76
PRM 6200 13071528321 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/16/2013 Paid $53,566.20
PRM 6200 13071528323 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/16/2013 Paid $25,458.16
PRM 6200 13071528326 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/16/2013 Paid $11,842.32
PRM 6200 13062827028 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/01/2013 Paid $235,024.06
PRM 6200 13062426574 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/25/2013 Paid $24,946.32
PRM 6200 13062426576 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/25/2013 Paid $52,409.84
PRM 6200 13061425806 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/17/2013 Paid $1,647.52
PRM 6200 13061125432 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/12/2013 Paid $126,675.72
PRM 6200 13061125434 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/12/2013 Paid $183.68
PRM 6200 13061125436 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/12/2013 Paid $27,980.96
PRM 6200 13061125438 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/12/2013 Paid $32,961.00
PRM 6200 13061125442 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/12/2013 Paid $38,937.92
PRM 6200 13061125446 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/12/2013 Paid $26,360.32
PRM 6200 13060524999 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/06/2013 Paid $29,010.80
PRM 6200 13060424830 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/05/2013 Paid $9,365.85
PRM 6200 13051723145 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/20/2013 Paid $311,213.82
PRM 6200 13050121645 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/02/2013 Paid $77,206.64
PRM 6200 13042621192 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/29/2013 Paid $95,556.54
PRM 6200 13041720024 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/18/2013 Paid $232,803.12
PRM 6200 13040418885 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/05/2013 Paid $9,197.10
PRM 6200 13032617957 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/27/2013 Paid $13,677.84
PRM 6200 13032617963 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/27/2013 Paid $81,260.52
PRM 6200 13031316825 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/14/2013 Paid $273.24
PRM 6200 13031316831 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/14/2013 Paid $55,479.60
PRM 6200 13031316833 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/14/2013 Paid $11,792.88
PRM 6200 13022615039 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/27/2013 Paid $20,850.72
PRM 6200 13022615050 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/27/2013 Paid $57,996.80
PRM 6200 13022615058 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/27/2013 Paid $2,718.54
PRM 6200 13022615062 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/27/2013 Paid $331.98
PRM 6200 13022615070 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/27/2013 Paid $2,956.80
PRM 6200 13022615079 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/27/2013 Paid $29,419.30
PRM 6200 13022615083 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/27/2013 Paid $28,076.80
PRM 6200 13022615086 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/27/2013 Paid $25,630.08
PRM 6200 13022615096 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/27/2013 Paid $85,541.94
PRM 6200 13022014450 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/21/2013 Paid $4,587.66
PRM 6200 13022014452 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/21/2013 Paid $53,175.54
PRM 6200 13020413061 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/05/2013 Paid $52,630.38
PRM 6200 13013112807 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/01/2013 Paid $287.10
PRM 6200 13013012680 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/31/2013 Paid $79,931.28
PRM 6200 13012812312 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/29/2013 Paid $25,786.86
PRM 6200 13012812314 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/29/2013 Paid $43,758.66
PRM 6200 13010409483 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/07/2013 Paid $3,123.78
PRM 6200 13010409489 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/07/2013 Paid $29,497.38
PRM 6200 13010409491 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/07/2013 Paid $22,509.30
PRM 6200 13010409493 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/07/2013 Paid $1,328.58
PRM 6200 13010409497 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/07/2013 Paid $59,192.10
PRM 6200 13010409499 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/07/2013 Paid $57,283.38
PRM 6200 12122608506 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/27/2012 Paid $35,599.08
PRM 6200 12121908208 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/20/2012 Paid $33,877.80
PRM 6200 12112906274 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/30/2012 Paid $14,314.74
PRM 6200 12111405049 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/15/2012 Paid $69,905.88
PRM 6200 12110103814 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/02/2012 Paid $844.80
PRM 6200 12110103816 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/02/2012 Paid $39,898.98
PRM 6200 12103003608 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/31/2012 Paid $205.26
PRM 6200 12103003610 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/31/2012 Paid $21,997.14
PRM 6200 12101701966 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/18/2012 Paid $865.26
PRM 6200 12101601687 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/17/2012 Paid $33,919.38
PRM 6200 12100400690 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/05/2012 Paid $11,413.38
PRM 6200 12100200277 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/03/2012 Paid $22,337.28
PRM 6200 12100200280 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/03/2012 Paid $36,484.14
PRM 6200 12100200284 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/03/2012 Paid $16,811.52
PRM 6200 12100200286 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/03/2012 Paid $69,801.26
PRM 6200 12092134671 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/24/2012 Paid $90,946.56
PRM 6200 12092034568 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/21/2012 Paid $221,449.26
PRM 6200 12090633080 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/07/2012 Paid $173,012.68
PRM 6200 12082331507 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/24/2012 Paid $19,105.68
PRM 6200 12082331509 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/24/2012 Paid $40,603.86
PRM 6200 12082331511 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/24/2012 Paid $39,353.16
PRM 6200 12082331513 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/24/2012 Paid $19,398.72
PRM 6200 12080930077 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/10/2012 Paid $131,180.80
PRM 6200 12080930078 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/10/2012 Paid $8,953.56
PRM 6200 12080229322 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/03/2012 Paid $88,702.28
PRM 6200 12080129208 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/02/2012 Paid $54,411.74
PRM 6200 12072628632 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/27/2012 Paid $129,003.13
PRM 6200 12072328173 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/24/2012 Paid $21,341.59
PRM 6200 12071727734 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/18/2012 Paid $647.55
PRM 6200 12070526619 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/06/2012 Paid $51,688.02
PRM 6200 12070526621 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/06/2012 Paid $17,730.36
PRM 6200 12070526623 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/06/2012 Paid $24,064.38
PRM 6200 12062625534 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/27/2012 Paid $14,298.30
PRM 6200 12061324243 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/14/2012 Paid $18,128.88
PRM 6200 12061324245 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/14/2012 Paid $160.00
PRM 6200 12061324247 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/14/2012 Paid $485,767.11
PRM 6200 12061224088 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/13/2012 Paid $158,179.24
PRM 6200 12060823838 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/11/2012 Paid $70,911.53
PRM 6200 12060623647 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/07/2012 Paid $410.17
PRM 6200 12052922670 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/30/2012 Paid $83,938.03
PRM 6200 12052922672 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/30/2012 Paid $33,569.28
PRM 6200 12052922675 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/30/2012 Paid $24,470.51
PRM 6200 12052522541 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/29/2012 Paid $31,352.03
PRM 6200 12051021230 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/11/2012 Paid $262.39
PRM 6200 12051021235 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/11/2012 Paid $57,227.58
PRM 6200 12050320711 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/04/2012 Paid $18,945.13
PRM 6200 12042619862 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/27/2012 Paid $28,286.55
PRM 6200 12042619863 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/27/2012 Paid $33,190.51
PRM 6200 12042519696 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/26/2012 Paid $122.76
PRM 6200 12041118167 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/12/2012 Paid $105,661.31
PRM 6200 12040517748 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/06/2012 Paid $75,630.47
PRM 6200 12032917097 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/30/2012 Paid $106,094.77
PRM 6200 12032316517 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/26/2012 Paid $760.41
PRM 6200 12032116284 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/22/2012 Paid $107,437.55
PRM 6200 12031415553 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/15/2012 Paid $38,618.13
PRM 6200 12031315374 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/14/2012 Paid $64,538.50
PRM 6200 12030915103 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/12/2012 Paid $326.39
PRM 6200 12030814945 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/09/2012 Paid $75,407.23
PRM 6200 12030714777 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/08/2012 Paid $1,667.44
PRM 6200 12022813818 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/29/2012 Paid $48,238.78
PRM 6200 12022413576 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/27/2012 Paid $1,158.44
PRM 6200 12021512542 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/16/2012 Paid $258,459.06
PRM 6200 12013111151 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/01/2012 Paid $342.68
PRM 6200 12012410516 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/25/2012 Paid $270,871.56
PRM 6200 12011009280 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/11/2012 Paid $22,475.54
PRM 6200 11123008424 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/03/2012 Paid $2,556.68
PRM 6200 11122808162 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/29/2011 Paid $57,570.28
PRM 6200 11122808163 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/29/2011 Paid $20,531.73
PRM 6200 11121907541 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/20/2011 Paid $492.20
PRM 6200 11120806590 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/09/2011 Paid $155,132.32
PRM 6200 11120606372 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/07/2011 Paid $85,201.72
PRM 6200 11111805014 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/21/2011 Paid $64,225.51
PRM 6200 11111704913 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/18/2011 Paid $18,138.80
PRM 6200 11111704914 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/18/2011 Paid $20,325.78
PRM 6200 11110904235 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/10/2011 Paid $97,026.24
PRM 6200 11102402276 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/25/2011 Paid $48,126.15
PRM 6200 11101701687 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/18/2011 Paid $156,238.33
PRM 6200 11100700785 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/10/2011 Paid $749.36
PRM 6200 11100600640 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/07/2011 Paid $47,217.15
PRM 6200 11092735592 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/28/2011 Paid $427.04
PRM 6200 11092635456 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/27/2011 Paid $127,497.97
PRM 6200 11092135033 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/22/2011 Paid $108,983.90
PRM 6200 11091634664 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/19/2011 Paid $34,914.21
PRM 6200 11090934024 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/12/2011 Paid $96,378.78
PRM 6200 11083133268 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/01/2011 Paid $116,984.99
PRM 6200 11082932914 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/30/2011 Paid $45,562.30
PRM 6200 11082932915 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/30/2011 Paid $115,968.40
PRM 6200 11081731724 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/18/2011 Paid $20,840.03
PRM 6200 11081731725 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/18/2011 Paid $72,959.49
PRM 6200 11081031035 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/11/2011 Paid $104,926.22
PRM 6200 11080930777 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/10/2011 Paid $426.34
PRM 6200 11080930778 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/10/2011 Paid $10,535.05
PRM 6200 11080830571 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/09/2011 Paid $185,495.60
PRM 6200 11071928637 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/20/2011 Paid $38,002.93
PRM 6200 11071828521 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/19/2011 Paid $84,379.80
PRM 6200 11070727580 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/08/2011 Paid $84,999.22
PRM 6200 11070127258 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/05/2011 Paid $114.20
PRM 6200 11063027138 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/01/2011 Paid $31,048.84
PRM 6200 11061325337 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/14/2011 Paid $96,984.05
PRM 6200 11060824922 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/09/2011 Paid $85,262.98
PRM 6200 11052523792 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/26/2011 Paid $61,726.77
PRM 6200 11052523793 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/26/2011 Paid $22,924.45
PRM 6200 11051823124 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/19/2011 Paid $108,303.72
PRM 6200 11051122525 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/12/2011 Paid $53,460.43
PRM 6200 11050922225 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/10/2011 Paid $27,731.62
PRM 6200 11042821119 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/29/2011 Paid $34,164.26
PRM 6200 11042620845 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/27/2011 Paid $51,563.66
PRM 6200 11041519980 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/18/2011 Paid $43,974.37
PRM 6200 11040719192 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/08/2011 Paid $18,015.54
PRM 6200 11040719193 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/08/2011 Paid $323.02
PRM 6200 11040518907 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 04/06/2011 Paid $14,069.75
PRM 6200 11032817820 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/29/2011 Paid $35,587.88
PRM 6200 11032417534 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/25/2011 Paid $20,066.68
PRM 6200 11032217277 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/23/2011 Paid $168,314.82
PRM 6200 11031616784 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/17/2011 Paid $100,002.11
PRM 6200 11030916091 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 03/10/2011 Paid $19,471.84
PRM 6200 11022514730 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/28/2011 Paid $42,082.52
PRM 6200 11022414512 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/25/2011 Paid $25,175.24
PRM 6200 11020913108 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 02/10/2011 Paid $220.78
PRM 6200 11012511677 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/26/2011 Paid $334.98
PRM 6200 11011110235 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 01/12/2011 Paid $12,501.40
PRM 6200 10122108382 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/22/2010 Paid $78,912.97
PRM 6200 10113006315 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 12/01/2010 Paid $44,157.10
PRM 6200 10111905660 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/22/2010 Paid $28,775.16
PRM 6200 10111605186 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 11/17/2010 Paid $30,954.16
PRM 6200 10101902178 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/20/2010 Paid $101,579.71
PRM 6200 10101201384 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/13/2010 Paid $147,897.91
PRM 6200 10101101210 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/12/2010 Paid $49,465.68
PRM 6200 10100500497 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/06/2010 Paid $133,223.40
PRM 6200 10100400259 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 10/05/2010 Paid $91,726.00
PRM 6200 10092938955 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/30/2010 Paid $271.36
PRM 6200 10092037916 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/21/2010 Paid $50,187.30
PRM 6200 10091737748 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/20/2010 Paid $24,449.22
PRM 6200 10091537380 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/16/2010 Paid $28,053.57
PRM 6200 10091036819 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/13/2010 Paid $80,142.00
PRM 6200 10090135761 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/02/2010 Paid $65,424.57
PRM 6200 10083135612 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 09/01/2010 Paid $16,275.92
PRM 6200 10081734118 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/18/2010 Paid $23,854.34
PRM 6200 10081333775 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/16/2010 Paid $206,095.29
PRM 6200 10080633024 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/09/2010 Paid $832.02
PRM 6200 10080232517 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 08/03/2010 Paid $263,863.80
PRM 6200 10072731869 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/28/2010 Paid $96,315.14
PRM 6200 10072231404 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/23/2010 Paid $91,324.73
PRM 6200 10072031021 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/21/2010 Paid $4,902.36
PRM 6200 10071530598 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/16/2010 Paid $39,370.56
PRM 6200 10070829763 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/09/2010 Paid $51,879.07
PRM 6200 10070729584 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 07/08/2010 Paid $42,198.90
PRM 6200 10062928871 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/30/2010 Paid $153,330.89
PRM 6200 10062227930 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/23/2010 Paid $67,967.92
PRM 6200 10061827696 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/21/2010 Paid $23,437.23
PRM 6200 10061527171 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/16/2010 Paid $10,918.42
PRM 6200 10061026794 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/11/2010 Paid $20,480.05
PRM 6200 10060326090 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 06/04/2010 Paid $34,852.67
PRM 6200 10052625252 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/27/2010 Paid $32,297.40
PRM 6200 10052224707 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/24/2010 Paid $14,415.58
PRM 6200 10052024599 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/21/2010 Paid $11,122.90
PRM 6200 10051924511 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/20/2010 Paid $328.45
PRM 6200 10051424121 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/17/2010 Paid $19,706.21
PRM 6200 10051424122 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/17/2010 Paid $39,513.60
PRM 6200 10051123657 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/12/2010 Paid $22,297.97
PRM 6200 10050623253 ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT 05/07/2010 Paid $19,636.72
The data contained on this website is for informational purposes only and contains expenditure information for the City of Austin. Certain Austin Energy transactions have been excluded as competitive matters under Texas Government Code Section 552.133 and City Council Resolution 20051201-002; therefore, the line amounts may not reflect the total check amount if certain Austin Energy invoices were included on the check.