PAYMENT REQUEST
DEPARTMENT | AUSTIN ENERGY |
---|---|
FUND | E-DISTRIBUTION SUBSTATIONS CAP |
PROGRAM | FY2001 DISTRIBUTION SUBST PAR |
ACTIVITY | DISTRIBUTION SUBSTATION |
EXPENSE CATEGORY | CEMENT/CONCRETE |
PAYEE | OLDCASTLE APG TEXAS |
PAYMENT REQUEST | Select a payment request. |
PAYMENT REQUEST | DESCRIPTION | CHECK DATE | CHECK STATUS Checks cleared as of 01/31/2015 have been reflected as paid on the reports |
AMOUNT |
---|---|---|---|---|
PRM 1100 15081334800 | CONCRETE, READY MIX | 08/14/2015 | Paid | $14,662.12 |
PRM 1100 15061127557 | CONCRETE, READY MIX | 06/12/2015 | Paid | $2,382.27 |
PRC 1100 MAX33545 | CONCRETE, READY MIX | 12/29/2014 | Paid | $1,868.13 |
PRC 1100 MAX33385 | CONCRETE, READY MIX | 12/18/2014 | Paid | $1,150.38 |
PRC 1100 MAX33393 | CONCRETE, READY MIX | 12/18/2014 | Paid | $622.71 |
PRC 1100 MAX33166 | CONCRETE, READY MIX | 12/04/2014 | Paid | $622.71 |
PRC 1100 MAX32954 | CONCRETE, READY MIX | 11/20/2014 | Paid | $2,850.10 |
PRC 1100 MAX32779 | CONCRETE, READY MIX | 11/10/2014 | Paid | $1,245.42 |
PRC 1100 MAX32727 | CONCRETE, READY MIX | 11/04/2014 | Paid | $345.95 |
PRC 1100 MAX32458 | CONCRETE, READY MIX | 10/28/2014 | Paid | $1,245.42 |
PRC 1100 MAX31962 | CONCRETE, READY MIX | 10/02/2014 | Paid | $622.71 |
PRC 1100 MAX31963 | CONCRETE, READY MIX | 10/02/2014 | Paid | $622.71 |
PRC 1100 MAX31964 | CONCRETE, READY MIX | 10/02/2014 | Paid | $622.71 |
PRC 1100 MAX31965 | CONCRETE, READY MIX | 10/02/2014 | Paid | $1,383.80 |
PRC 1100 MAX31749 | CONCRETE, READY MIX | 09/26/2014 | Paid | $739.53 |
PRC 1100 MAX31762 | CONCRETE, READY MIX | 09/26/2014 | Paid | $1,068.21 |
PRC 1100 MAX31763 | CONCRETE, READY MIX | 09/26/2014 | Paid | $739.53 |
PRC 1100 MAX31764 | CONCRETE, READY MIX | 09/26/2014 | Paid | $739.53 |
PRC 1100 MAX31639 | CONCRETE, READY MIX | 09/23/2014 | Paid | $1,308.23 |
PRC 1100 MAX31581 | CONCRETE, READY MIX | 09/22/2014 | Paid | $2,767.60 |
PRC 1100 MAX31449 | CONCRETE, READY MIX | 09/12/2014 | Paid | $1,245.42 |
PRC 1100 MAX31450 | CONCRETE, READY MIX | 09/12/2014 | Paid | $739.53 |
PRC 1100 MAX31274 | CONCRETE, READY MIX | 09/03/2014 | Paid | $622.71 |
PRC 1100 MAX31275 | CONCRETE, READY MIX | 09/03/2014 | Paid | $1,245.42 |
PRC 1100 MAX30972 | CONCRETE, READY MIX | 08/21/2014 | Paid | $1,199.66 |
PRC 1100 MAX30973 | CONCRETE, READY MIX | 08/21/2014 | Paid | $1,176.23 |
PRC 1100 MAX30975 | CONCRETE, READY MIX | 08/21/2014 | Paid | $739.53 |
PRC 1100 MAX30976 | CONCRETE, READY MIX | 08/21/2014 | Paid | $739.53 |
PRC 1100 MAX30450 | CONCRETE, READY MIX | 07/30/2014 | Paid | $1,038.51 |
PRC 1100 MAX30451 | CONCRETE, READY MIX | 07/30/2014 | Paid | $739.53 |
PRC 1100 MAX30453 | CONCRETE, READY MIX | 07/30/2014 | Paid | $2,490.84 |
PRC 1100 MAX30506 | CONCRETE, READY MIX | 07/30/2014 | Paid | $739.53 |
PRC 1100 MAX29831 | CONCRETE, READY MIX | 07/09/2014 | Paid | $2,077.02 |
PRC 1100 MAX29832 | CONCRETE, READY MIX | 07/09/2014 | Paid | $1,615.46 |
PRC 1100 MAX29836 | CONCRETE, READY MIX | 07/09/2014 | Paid | $622.71 |
PRC 1100 MAX29837 | CONCRETE, READY MIX | 07/09/2014 | Paid | $771.21 |
PRC 1100 MAX29849 | CONCRETE, READY MIX | 07/09/2014 | Paid | $2,570.15 |
PRC 1100 MAX29850 | CONCRETE, READY MIX | 07/09/2014 | Paid | $1,245.42 |
PRC 1100 MAX29779 | CONCRETE, READY MIX | 07/07/2014 | Paid | $514.14 |
PRC 1100 MAX29735 | CONCRETE, READY MIX | 07/01/2014 | Paid | $1,051.16 |
PRC 1100 MAX29737 | CONCRETE, READY MIX | 07/01/2014 | Paid | $553.52 |
PRC 1100 MAX29739 | CONCRETE, READY MIX | 07/01/2014 | Paid | $692.34 |
PRC 1100 MAX29741 | CONCRETE, READY MIX | 07/01/2014 | Paid | $514.14 |
PRC 1100 MAX29743 | CONCRETE, READY MIX | 07/01/2014 | Paid | $622.71 |
PRC 1100 MAX29364 | CONCRETE, READY MIX | 06/13/2014 | Paid | $7,107.70 |
PRC 1100 MAX29368 | CONCRETE, READY MIX | 06/13/2014 | Paid | $2,222.80 |
PRC 1100 MAX29052 | CONCRETE, READY MIX | 05/23/2014 | Paid | $623.20 |
PRC 1100 MAX29054 | CONCRETE, READY MIX | 05/23/2014 | Paid | $701.10 |
PRC 1100 MAX28508 | CONCRETE, READY MIX | 05/06/2014 | Paid | $839.20 |
PRC 1100 MAX28509 | CONCRETE, READY MIX | 05/06/2014 | Paid | $701.10 |
PRC 1100 MAX28510 | CONCRETE, READY MIX | 05/06/2014 | Paid | $629.00 |
PRC 1100 MAX28511 | CONCRETE, READY MIX | 05/06/2014 | Paid | $734.30 |
PRC 1100 MAX28328 | CONCRETE, READY MIX | 04/29/2014 | Paid | $566.10 |
PRC 1100 MAX28330 | CONCRETE, READY MIX | 04/29/2014 | Paid | $419.60 |
PRC 1100 MAX28343 | CONCRETE, READY MIX | 04/29/2014 | Paid | $734.30 |
PRC 1100 MAX28344 | CONCRETE, READY MIX | 04/29/2014 | Paid | $944.10 |
PRC 1100 MAX28345 | CONCRETE, READY MIX | 04/29/2014 | Paid | $1,049.00 |
PRC 1100 MAX28346 | CONCRETE, READY MIX | 04/29/2014 | Paid | $734.30 |
PRC 1100 MAX28025 | CONCRETE, READY MIX | 04/11/2014 | Paid | $779.00 |
PRC 1100 MAX28026 | CONCRETE, READY MIX | 04/11/2014 | Paid | $566.10 |
PRC 1100 MAX28027 | CONCRETE, READY MIX | 04/11/2014 | Paid | $566.10 |
PRC 1100 MAX28028 | CONCRETE, READY MIX | 04/11/2014 | Paid | $629.00 |
PRC 1100 MAX28016 | CONCRETE, READY MIX | 04/10/2014 | Paid | $188.70 |
PRC 1100 MAX28017 | CONCRETE, READY MIX | 04/10/2014 | Paid | $629.00 |
PRC 1100 MAX28018 | CONCRETE, READY MIX | 04/10/2014 | Paid | $629.00 |
PRC 1100 MAX28019 | CONCRETE, READY MIX | 04/10/2014 | Paid | $629.00 |
PRC 1100 MAX28020 | CONCRETE, READY MIX | 04/10/2014 | Paid | $629.00 |
PRC 1100 MAX28021 | CONCRETE, READY MIX | 04/10/2014 | Paid | $701.10 |
PRC 1100 MAX27506 | CONCRETE, READY MIX | 03/20/2014 | Paid | $298.80 |
PRC 1100 MAX27507 | CONCRETE, READY MIX | 03/20/2014 | Paid | $629.00 |
PRC 1100 MAX27492 | CONCRETE, READY MIX | 03/19/2014 | Paid | $566.10 |
PRC 1100 MAX27493 | CONCRETE, READY MIX | 03/19/2014 | Paid | $311.60 |
PRC 1100 MAX27494 | CONCRETE, READY MIX | 03/19/2014 | Paid | $672.30 |
PRC 1100 MAX27495 | CONCRETE, READY MIX | 03/19/2014 | Paid | $672.30 |
PRC 1100 MAX27405 | CONCRETE, READY MIX | 03/14/2014 | Paid | $1,153.90 |
PRC 1100 MAX27312 | CONCRETE, READY MIX | 03/12/2014 | Paid | $251.60 |
PRC 1100 MAX27279 | CONCRETE, READY MIX | 03/11/2014 | Paid | $747.00 |
PRC 1100 MAX27281 | CONCRETE, READY MIX | 03/11/2014 | Paid | $944.10 |
PRC 1100 MAX27290 | CONCRETE, READY MIX | 03/11/2014 | Paid | $629.00 |
PRC 1100 MAX27093 | CONCRETE, READY MIX | 03/03/2014 | Paid | $944.10 |
PRC 1100 MAX26991 | CONCRETE, READY MIX | 02/27/2014 | Paid | $629.40 |
PRC 1100 MAX26985 | CONCRETE, READY MIX | 02/25/2014 | Paid | $944.10 |
PRC 1100 MAX26986 | CONCRETE, READY MIX | 02/25/2014 | Paid | $839.20 |
PRC 1100 MAX26987 | CONCRETE, READY MIX | 02/25/2014 | Paid | $566.10 |
PRC 1100 MAX26990 | CONCRETE, READY MIX | 02/25/2014 | Paid | $566.10 |
PRC 1100 MAX26900 | CONCRETE, READY MIX | 02/21/2014 | Paid | $251.60 |
PRC 1100 MAX26901 | CONCRETE, READY MIX | 02/21/2014 | Paid | $629.00 |
PRC 1100 MAX26902 | CONCRETE, READY MIX | 02/21/2014 | Paid | $629.00 |
PRC 1100 MAX26774 | CONCRETE, READY MIX | 02/14/2014 | Paid | $747.00 |
PRC 1100 MAX26775 | CONCRETE, READY MIX | 02/14/2014 | Paid | $629.00 |
PRC 1100 MAX26560 | CONCRETE, READY MIX | 02/03/2014 | Paid | $566.10 |
PRC 1100 MAX26564 | CONCRETE, READY MIX | 02/03/2014 | Paid | $672.30 |
PRC 1100 MAX26565 | CONCRETE, READY MIX | 02/03/2014 | Paid | $597.55 |
PRC 1100 MAX26566 | CONCRETE, READY MIX | 02/03/2014 | Paid | $672.30 |
PRC 1100 MAX26383 | CONCRETE, READY MIX | 01/16/2014 | Paid | $566.10 |
PRC 1100 MAX26384 | CONCRETE, READY MIX | 01/16/2014 | Paid | $747.00 |
PRC 1100 MAX26385 | CONCRETE, READY MIX | 01/16/2014 | Paid | $1,049.00 |
PRC 1100 MAX26386 | CONCRETE, READY MIX | 01/16/2014 | Paid | $629.00 |
PRC 1100 MAX26176 | CONCRETE, READY MIX | 01/09/2014 | Paid | $629.00 |
PRC 1100 MAX26177 | CONCRETE, READY MIX | 01/09/2014 | Paid | $566.10 |
PRC 1100 MAX26178 | CONCRETE, READY MIX | 01/09/2014 | Paid | $701.10 |
PRC 1100 MAX26179 | CONCRETE, READY MIX | 01/09/2014 | Paid | $467.40 |
PRC 1100 MAX26180 | CONCRETE, READY MIX | 01/09/2014 | Paid | $629.00 |
PRC 1100 MAX26182 | CONCRETE, READY MIX | 01/09/2014 | Paid | $1,887.00 |
PRC 1100 MAX26183 | CONCRETE, READY MIX | 01/09/2014 | Paid | $779.00 |
PRC 1100 MAX26184 | CONCRETE, READY MIX | 01/09/2014 | Paid | $629.00 |
PRC 1100 MAX26259 | CONCRETE, READY MIX | 01/09/2014 | Paid | $1,049.00 |
PRC 1100 MAX25787 | CONCRETE, READY MIX | 01/03/2014 | Paid | $629.00 |
PRC 1100 MAX25961 | CONCRETE, READY MIX | 12/18/2013 | Paid | $629.00 |
PRC 1100 MAX25963 | CONCRETE, READY MIX | 12/18/2013 | Paid | $944.10 |
PRC 1100 MAX25964 | CONCRETE, READY MIX | 12/18/2013 | Paid | $209.80 |
PRC 1100 MAX25966 | CONCRETE, READY MIX | 12/18/2013 | Paid | $629.00 |
PRC 1100 MAX25967 | CONCRETE, READY MIX | 12/18/2013 | Paid | $629.00 |
PRC 1100 MAX25779 | CONCRETE, READY MIX | 12/10/2013 | Paid | $629.00 |
PRC 1100 MAX25782 | CONCRETE, READY MIX | 12/10/2013 | Paid | $629.00 |
PRC 1100 MAX25784 | CONCRETE, READY MIX | 12/10/2013 | Paid | $629.00 |
PRC 1100 MAX25785 | CONCRETE, READY MIX | 12/10/2013 | Paid | $629.00 |
PRC 1100 MAX25789 | CONCRETE, READY MIX | 12/10/2013 | Paid | $629.00 |
PRC 1100 MAX25791 | CONCRETE, READY MIX | 12/10/2013 | Paid | $629.00 |
PRC 1100 MAX25794 | CONCRETE, READY MIX | 12/10/2013 | Paid | $629.00 |
PRC 1100 MAX25795 | CONCRETE, READY MIX | 12/10/2013 | Paid | $629.00 |
PRC 1100 MAX25796 | CONCRETE, READY MIX | 12/10/2013 | Paid | $779.00 |
PRC 1100 MAX25729 | CONCRETE, READY MIX | 12/09/2013 | Paid | $779.00 |
PRC 1100 MAX25736 | CONCRETE, READY MIX | 12/09/2013 | Paid | $629.00 |
PRC 1100 MAX25737 | CONCRETE, READY MIX | 12/09/2013 | Paid | $1,049.00 |
PRC 1100 MAX25738 | CONCRETE, READY MIX | 12/09/2013 | Paid | $629.00 |
PRC 1100 MAX25739 | CONCRETE, READY MIX | 12/09/2013 | Paid | $747.00 |
PRC 1100 MAX25713 | CONCRETE, READY MIX | 12/05/2013 | Paid | $1,049.00 |
PRC 1100 MAX25714 | CONCRETE, READY MIX | 12/05/2013 | Paid | $503.20 |
PRC 1100 MAX25376 | CONCRETE, READY MIX | 11/12/2013 | Paid | $629.00 |
PRC 1100 MAX22333 | CONCRETE, READY MIX | 06/04/2013 | Paid | $909.00 |
PRC 1100 MAX21376 | CONCRETE, READY MIX | 04/11/2013 | Paid | $336.15 |
PRC 1100 MAX21276 | CONCRETE, READY MIX | 04/08/2013 | Paid | $672.30 |
PRC 1100 MAX21277 | CONCRETE, READY MIX | 04/08/2013 | Paid | $112.05 |
GAX 1100 13022708670 | 03/05/2013 | Paid | ($57.36) | |
PRC 1100 MAX20642 | CONCRETE, READY MIX | 03/05/2013 | Paid | $503.10 |
PRC 1100 MAX20636 | CONCRETE, READY MIX | 03/04/2013 | Paid | $279.50 |
PRC 1100 MAX20637 | CONCRETE, READY MIX | 03/04/2013 | Paid | $467.40 |
PRC 1100 MAX20638 | CONCRETE, READY MIX | 03/04/2013 | Paid | $467.40 |
PRC 1100 MAX20341 | CONCRETE, READY MIX | 02/20/2013 | Paid | $1,419.30 |
PRC 1100 MAX19829 | CONCRETE, READY MIX | 01/18/2013 | Paid | $672.30 |
PRC 1100 MAX19830 | CONCRETE, READY MIX | 01/18/2013 | Paid | $701.10 |
PRC 1100 MAX19831 | CONCRETE, READY MIX | 01/18/2013 | Paid | $2,016.90 |
PRC 1100 MAX19806 | CONCRETE, READY MIX | 01/17/2013 | Paid | $7,248.45 |
PRC 1100 MAX19808 | CONCRETE, READY MIX | 01/17/2013 | Paid | $298.80 |
PRC 1100 MAX19762 | CONCRETE, READY MIX | 01/16/2013 | Paid | $311.60 |
PRC 1100 MAX19731 | CONCRETE, READY MIX | 01/15/2013 | Paid | $1,118.00 |
PRC 1100 MAX19732 | CONCRETE, READY MIX | 01/15/2013 | Paid | $4,024.80 |
PRC 1100 MAX19480 | CONCRETE, READY MIX | 01/03/2013 | Paid | $1,083.15 |
PRC 1100 MAX19482 | CONCRETE, READY MIX | 01/03/2013 | Paid | $701.10 |
PRC 1100 MAX19485 | CONCRETE, READY MIX | 01/03/2013 | Paid | $971.10 |
PRC 1100 MAX19486 | CONCRETE, READY MIX | 01/03/2013 | Paid | $779.00 |
PRC 1100 MAX19487 | CONCRETE, READY MIX | 01/03/2013 | Paid | $311.60 |
PRC 1100 MAX19488 | CONCRETE, READY MIX | 01/03/2013 | Paid | $779.00 |
PRC 1100 MAX19518 | CONCRETE, READY MIX | 01/03/2013 | Paid | $4,136.60 |
PRC 1100 MAX19520 | CONCRETE, READY MIX | 01/03/2013 | Paid | $2,016.90 |
PRC 1100 MAX19521 | CONCRETE, READY MIX | 01/03/2013 | Paid | $909.00 |
PRC 1100 MAX19526 | CONCRETE, READY MIX | 01/03/2013 | Paid | $5,310.50 |
PRC 1100 MAX19527 | CONCRETE, READY MIX | 01/03/2013 | Paid | $2,322.20 |
PRC 1100 MAX19529 | CONCRETE, READY MIX | 01/03/2013 | Paid | $3,328.40 |
PRC 1100 MAX19568 | CONCRETE, READY MIX | 01/02/2013 | Paid | $5,974.10 |
PRC 1100 MAX19569 | CONCRETE, READY MIX | 01/02/2013 | Paid | $4,037.80 |
PRC 1100 MAX19530 | CONCRETE, READY MIX | 12/28/2012 | Paid | $1,621.10 |
PRC 1100 MAX19531 | CONCRETE, READY MIX | 12/28/2012 | Paid | $6,708.00 |
PRC 1100 MAX19307 | CONCRETE, READY MIX | 12/18/2012 | Paid | $2,266.30 |
PRC 1100 MAX19309 | CONCRETE, READY MIX | 12/18/2012 | Paid | $814.70 |
PRC 1100 MAX19241 | CONCRETE, READY MIX | 12/17/2012 | Paid | $1,897.00 |
PRC 1100 MAX19286 | CONCRETE, READY MIX | 12/17/2012 | Paid | $4,722.30 |
PRC 1100 MAX19210 | CONCRETE, READY MIX | 12/13/2012 | Paid | $7,793.20 |
PRC 1100 MAX18983 | CONCRETE, READY MIX | 11/30/2012 | Paid | $2,144.40 |
PRC 1100 MAX18603 | CONCRETE, READY MIX | 11/01/2012 | Paid | $2,456.00 |
PRC 1100 MAX18606 | CONCRETE, READY MIX | 11/01/2012 | Paid | $870.60 |
PRC 1100 MAX18345 | CONCRETE, READY MIX | 10/25/2012 | Paid | $6,589.00 |
PRC 1100 MAX18347 | CONCRETE, READY MIX | 10/25/2012 | Paid | $5,534.10 |
PRC 1100 MAX18083 | CONCRETE, READY MIX | 10/03/2012 | Paid | $3,633.50 |
PRC 1100 MAX18084 | CONCRETE, READY MIX | 10/03/2012 | Paid | $1,062.10 |
PRC 1100 MAX18001 | CONCRETE, READY MIX | 09/27/2012 | Paid | $2,012.40 |
PRC 1100 MAX17626 | CONCRETE, READY MIX | 09/07/2012 | Paid | $1,045.80 |
PRC 1100 MAX17627 | CONCRETE, READY MIX | 09/07/2012 | Paid | $2,124.20 |
PRC 1100 MAX17517 | CONCRETE, READY MIX | 08/28/2012 | Paid | $1,083.15 |
PRC 1100 MAX17243 | CONCRETE, READY MIX | 08/08/2012 | Paid | $1,791.70 |
PRC 1100 MAX17226 | CONCRETE, READY MIX | 08/07/2012 | Paid | $1,792.65 |
PRC 1100 MAX16902 | CONCRETE, READY MIX | 07/23/2012 | Paid | $1,006.20 |
PRC 1100 MAX16903 | CONCRETE, READY MIX | 07/23/2012 | Paid | $559.00 |
PRC 1100 MAX15590 | Ready-Mix Concrete | 05/09/2012 | Paid | $305.55 |
PRC 1100 MAX11680 | Ready-Mix Concrete | 09/19/2011 | Paid | $1,710.70 |
PRC 1100 MAX11676 | Ready-Mix Concrete | 09/16/2011 | Paid | $301.95 |
PRC 1100 MAX11569 | Ready-Mix Concrete | 09/09/2011 | Paid | $1,095.80 |
PRC 1100 MAX11099 | Ready-Mix Concrete | 08/18/2011 | Paid | $559.00 |
PRC 1100 MAX10861 | Ready-Mix Concrete | 08/11/2011 | Paid | $279.50 |
PRC 1100 MAX10800 | Ready-Mix Concrete | 08/08/2011 | Paid | $1,118.00 |
PRC 1100 MAX10801 | Ready-Mix Concrete | 08/08/2011 | Paid | $271.60 |
PRC 1100 MAX10837 | Ready-Mix Concrete | 08/08/2011 | Paid | $1,095.80 |
PRC 1100 MAX10776 | Ready-Mix Concrete | 08/04/2011 | Paid | $1,084.65 |
PRC 1100 MAX10658 | Ready-Mix Concrete | 08/01/2011 | Paid | $1,229.80 |
PRC 1100 MAX10442 | Ready-Mix Concrete | 07/20/2011 | Paid | $559.00 |
PRC 1100 MAX10496 | Ready-Mix Concrete | 07/20/2011 | Paid | $559.00 |
PRC 1100 MAX10286 | Ready-Mix Concrete | 07/07/2011 | Paid | $726.70 |
PRC 1100 MAX10164 | Ready-Mix Concrete | 06/29/2011 | Paid | $603.90 |
PRC 1100 MAX8233 | Ready-Mix Concrete | 03/14/2011 | Paid | $402.60 |
PRC 1100 MAX8234 | Ready-Mix Concrete | 03/14/2011 | Paid | $670.80 |
PRC 1100 MAX8202 | Ready-Mix Concrete | 03/10/2011 | Paid | $7,312.10 |
PRM 1100 10111004618 | Ready-Mix Concrete | 11/12/2010 | Paid | $1,207.80 |
PRM 1100 10110203790 | Ready-Mix Concrete | 11/03/2010 | Paid | $3,163.20 |
PRM 1100 10100500393 | Ready-Mix Concrete | 10/06/2010 | Paid | $5,917.50 |
PRM 1100 10090836381 | Ready-Mix Concrete | 09/09/2010 | Paid | $355.60 |
PRM 1100 10052224645 | Ready-Mix Concrete | 05/24/2010 | Paid | $827.40 |
PRM 1100 10041320994 | Ready-Mix Concrete | 04/14/2010 | Paid | $883.35 |
PRM 1100 10040920639 | Ready-Mix Concrete | 04/12/2010 | Paid | $928.00 |
PRM 1100 10040520083 | Ready-Mix Concrete | 04/06/2010 | Paid | $268.40 |
PRM 1100 10040119889 | Ready-Mix Concrete | 04/02/2010 | Paid | $335.50 |
PRM 1100 10033019591 | Ready-Mix Concrete | 03/31/2010 | Paid | $1,308.20 |
PRM 1100 10032519060 | Ready-Mix Concrete | 03/26/2010 | Paid | $1,147.10 |
PRM 1100 10031217465 | Ready-Mix Concrete | 03/15/2010 | Paid | $469.70 |
PRM 1100 10030916757 | Ready-Mix Concrete | 03/10/2010 | Paid | $1,859.30 |
PRM 1100 10030516494 | Ready-Mix Concrete | 03/08/2010 | Paid | $2,605.55 |
PRM 1100 10022615524 | Ready-Mix Concrete | 03/01/2010 | Paid | $355.60 |
PRM 1100 10022415163 | Ready-Mix Concrete | 02/25/2010 | Paid | $268.40 |
PRM 1100 10022214805 | Ready-Mix Concrete | 02/23/2010 | Paid | $402.60 |
PRM 1100 10021013813 | Ready-Mix Concrete | 02/11/2010 | Paid | $1,026.60 |
PRM 1100 10020513304 | Ready-Mix Concrete | 02/08/2010 | Paid | $3,879.90 |
PRM 1100 10012812319 | Ready-Mix Concrete | 01/29/2010 | Paid | $268.40 |
PRM 1100 10012111460 | Ready-Mix Concrete | 01/22/2010 | Paid | $2,851.10 |
PRM 1100 10012111461 | Ready-Mix Concrete | 01/22/2010 | Paid | $402.60 |
The data contained on this website is for informational purposes only and contains expenditure information for the City of Austin. Certain Austin Energy transactions have been excluded as competitive matters under Texas Government Code Section 552.133 and City Council Resolution 20051201-002; therefore, the line amounts may not reflect the total check amount if certain Austin Energy invoices were included on the check.