3401 SOUTH LAMAR WW IMPROVEMENTS WOLF RANCH SEGMENT 1 |
$1,919,994.34 |
55TH ST TO 45TH ST (ARPT-C1A) - WW LINE |
$107,423.68 |
ANNEXED AREA 4570 PARENT |
$1,880,739.97 |
ASBESTOS CEMENT WASTEWATER LINE REPLACEMENT (NORTHEAST) |
$1,465,555.95 |
ASTOR PLACE WASTEWATER PIPELINE REHABILITATION |
$339,696.26 |
AUSTIN COMMUNITY COLLEGE WASTEWATER LINE E (SER-3145) |
$2,389,957.41 |
BALCONES WWTP AIR HEADER AND INFLUENT LINE REPAIR - ADP IDIQ |
$5,612.84 |
BELLA FORTUNA WASTEWATER INTERCEPTOR |
$1,019,092.10 |
BEVERLY ROAD WASTEWATER REPLACEMENT - RENEW AUSTIN |
$510,475.83 |
BEVERLY SHEFFIELD NW DISTRICT PARK WASTEWATER PIPELINE RENEW |
$341,892.02 |
BLDG PURCHASE FOR THE WATER OPERATION CONTROL CENTER-WOCC |
$11,930,531.66 |
BOGGY CREEK (MLK & PLEASANT VALLEY) WASTEWATER PIPELINE |
$232,999.78 |
BOGGY CREEK LIFT STATION FORCE MAIN EXTENSION |
$71,580.03 |
BOULDIN CREEK NEIGHBORHOOD WATER & WASTEWATER PIPELINE RENEW |
$10,817.25 |
BRUSHY CREEK REGIONAL WWTP EXPANSION PARTICIPATION |
$31,438,301.59 |
BRUSHY CREEK WW SYSTEM SW/ LAKE CRK INTERCEPTOR |
$997,848.33 |
BRYKER WOODS NEIGHBORHOOD WW PIPELINE RENEWAL PROJECT |
$243,605.79 |
BRYKER WOODS WASTEWATER PIPELINE RENEWAL |
$2,765,781.48 |
BULL CREEK BASIN -LARGE DIAMETER WASTEWATER PIPELINE RENEWAL |
$1,420,580.79 |
BURRELL DRIVE WASTEWATER IMPROVEMENTS |
$2,144,880.11 |
CSS/CSE CCTV SERVER |
$49,998.41 |
CARSON CREEK BASIN WW IMPROVEMENTS |
$1,697,867.14 |
CESAR CHAVEZ TWO WAY CONV- WW |
$18,149.80 |
CLARKSON TRIBUTARY WASTEWATER PIPELINE RENEWAL |
$16,318.60 |
COLORADO ST. RECONSTRUCTION FROM 7TH ST TO 10TH ST |
$324,758.36 |
CONCORDIA NEIGHBORHOOD WASTEWATER PIPELINE RENEWAL |
$227,857.04 |
COUNTRY CLUB CREEK (BETWEEN METCALFE & OLTORF) WASTEWATER IM |
$190,000.00 |
CROSSTOWN TUNNEL CENTRALIZED ODOR CONTROL FACILITY |
$69,211.80 |
DEL CURTO ROAD WASTEWATER IMPROVEMENTS (SER-3486R) |
$305,805.76 |
DESSAU WWTP CLARIFIER DRIVE REPLACEMENT |
$207,315.67 |
DESSAU WWTP EXPANSION TO 1.0 MGD |
$2,287,790.98 |
DESSAU WWTP INTERIM IMPROVEMENTS |
$8,647,999.93 |
DEV LIFT STATION INSP SERV-HWY 71/LANDMARK CONS |
$2,310.81 |
DOVE SPRINGS WASTEWATER IMPROVEMENTS |
$250,876.94 |
EAST ALLANDALE WHITE ROCK WASTEWATER REHAB |
$482,435.59 |
EAST BOULDIN - ANNIE STREET FLOOD RISK REDUCTION WASTEWATER |
$287,552.78 |
EMERGENCY LAKE CREEK FORCEMAIN REPAIR |
$168,711.15 |
FORT BRANCH CREEK (MLK & NORWOOD HILL) WW PIPELINE |
$217,709.55 |
FORT DESSAU WW |
$1,389,815.09 |
FOUR POINTS CENTER FORCEMAIN IMPROVEMENTS |
$1,082,614.93 |
GALINDO WASTEWATER PIPELINE RENEWAL |
$2,473,525.89 |
GREATER STRATFORD DRIVE WASTEWATER PIPELINE RENEWAL |
$416,942.62 |
GUADALUPE ST, W. 35-37TH STORM DRAIN IMPROVEMENTS WASTEWATER |
$154,092.19 |
HB DIGESTER DOMES REPAIR |
$4,255,836.32 |
HB PROCESS AMMONIA REMOVAL SYSTEM |
$194,573.00 |
HARMON AVENUE AREA WASTEWATER RENEWAL |
$1,428,424.61 |
HERGOTZ-LOCKHEED WASTEWATER IMPROVEMENTS |
$2,328,367.41 |
HIGHLAND PARK WASTEWATER IMPROVEMENTS |
$4,059,257.24 |
HORNSBY BEND BIOGAS ENERGY PROJECT |
$4,648,730.87 |
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT CENTRIFUGES |
$11,560,391.07 |
HORNSBY BEND GROUNDWATER MONITORING WELLS |
$46,691.60 |
HORNSBY BEND IRRIGATION SYSTEM IMPROVEMENTS |
$18,977,759.97 |
HORNSBY BEND THICKENER COMPLEX REHAB |
$1,107,679.21 |
HYDE PARK WASTEWATER PIPELINE RENEWAL |
$4,037,333.25 |
IDIQ - SAR WWTP PRIMARY CLARIFIER 1A |
$245,643.42 |
IDIQ-DESSAU WWTP GENERATOR STANDBY INSTALLATION |
$58,046.44 |
IDIQ-GONZALES LIFT STATION PUMP REPLACEMENT |
$90,097.45 |
IDIQ-NE WWTP GENERATOR STANDBY INSTALLATION |
$64,691.65 |
IDIQ-PARKSTONE LIFT STATION IMPROVEMENTS |
$89,446.08 |
IDIQ-WESTLAKE COVE LIFT STATION IMPROVEMENTS |
$66,442.48 |
IDIQ-WESTVIEW AT LAKE AUSTIN LIFT STATION IMPROVEMENTS |
$59,997.84 |
IN SITU WASTEWATER LINE RENEWAL PROGRAM (2018 TO 2020) |
$2,545,445.14 |
JOHNNY MORRIS RD - WASTEWATER |
$93,447.62 |
LA CASA DRIVE WASTEWATER REPLACEMENT - RENEW AUSTIN |
$1,350,899.15 |
LA CASA DRIVE WASTEWATER REPLACEMENT - RENEW AUSTIN |
$16,176.79 |
LADYBIRD LAKE - CANTERBURY AT MILDRED ST. WW UTILITY IMPROVE |
$300,000.00 |
LEGENDS WAY SUBDIVISION |
$1,905,058.22 |
LINGER LN TO BOGGY CRK LIFT STATION GRAVITY WW LINE |
$2,828,436.04 |
LITTLE WALNUT CREEK - PARK PLAZA STREAM STABILIZATION |
$23,940.00 |
LOCKHEED SHAFT - FLOW METER INSTALLATION |
$179,478.21 |
LOCKHEED SHAFT REHABILITATION |
$2,446,798.67 |
LOCKHEED SHAFT REHABILITATION - INSPECTION |
$1,513,041.83 |
LOST CREEK WWTP ELECTRIC DUCT BANK INSTALLATION |
$382,817.28 |
MONTOPOLIS NEIGHBORHOOD WATER AND WW PIPELINE RENEWAL |
$3,652.50 |
MOORE'S CROSSING LIFT STATION RELIEF MAIN - SER |
$75,401.01 |
MORROW AND GAULT WATER AND WASTEWATER REHAB |
$5,972,075.27 |
N SERVICE CENTER AIR HANDLER REPLACEMENT WW |
$57,625.70 |
NORTH EAST PACKAGE PLANT REHAB |
$297,039.86 |
NORTHUMBERLAND ROAD WASTEWATER IMPROVEMENT - RENEWING AUSTIN |
$5,485.00 |
OLD ENFIELD WW PIPELINE RENEWAL NEWFIELD LANE CONSTRUCTION |
$407.97 |
OLTORF ST RECON & UTIL ADJ-S 1ST TO CONGRESS |
$21,675.65 |
ONION CREEK ODOR CONTROL FACILITY STREAM BANK STABILIZATION |
$867,170.69 |
OTHER 4570 PARENT |
$103,219.36 |
PLANT O & M MGMT SYSTEMS |
$1,244,902.44 |
PONCA STREET WASTEWATER IMPROVEMENTS |
$211,350.39 |
PROJECT CONNECT - WASTEWATER RELOCATION - BLUE LINE |
$106,631.16 |
PROJECT CONNECT - WASTEWATER RELOCATION SUPPORT |
$442,059.89 |
RA - NE BRENTWOOD / ARCADIA STREET NEIGHBORHOOD WW SYSTEM |
$3,083,907.36 |
REHABILITATION 4570 PARENT |
$11,076,878.54 |
RELOCATION 4570 PARENT |
$977,394.66 |
RENEWAL OF CRITICAL WASTEWATER ASSETS - SAR BASINS |
$86,775.27 |
ROCK HARBOUR LIFT STATION IMPROVEMENTS |
$7,747,303.11 |
S LAMAR-BARTON SPRINGS TO US290-WW LINES |
$938,688.58 |
SAR BLOWER VALVE REHABILITATION |
$88,569.45 |
SAR REPLACE TRAINS A&B BLOWERS |
$27,840,177.64 |
SAR WWTP PLANT CONTROL SYSTEM UPGRADE |
$975,732.37 |
SAR WWTP SLUDGE TRANSFER LINE |
$3,232,235.05 |
SER REIMBURSEMENTS 4570 PARENT |
$5,765,675.58 |
SH 71(W): SSOUTHWEST PARKWAY TO US 290-WW |
$202,768.65 |
SH 71: EAST OF US 183 TO ONION CREEK (TOLL ROAD) |
$1,467,941.97 |
SALESFORCE ENTERPRISE IMPLEMENTATION |
$533,498.00 |
SAR TRAINS A&B IMPR - CONSTRUCTION |
$28,899,069.29 |
SAR WWTP CHEMICAL CONSOLIDATION |
$70,148.46 |
SAR WWTP FALLWELL/SHEC PHASE B FLOOD PROTECTION |
$41,860.00 |
SEAHOLM WW MODIFICATIONS |
$1,186,790.24 |
SENDERO HILLS WASTEWATER IMPROVEMENTS PHASE I |
$185,645.04 |
SO. CONGRESS AVE: NORTH BLUFF DR TO FOREMOST DR |
$222,807.00 |
SO. IH35 WW INFRASTRUCTURE IMPROVS PMC |
$28,194,202.86 |
SOUTH AREA LIFT STATION IMPR - SPRINGFIELD LS-CONSTRUCTION |
$429.99 |
SOUTH AUSTIN REGIONAL WWTP SCRUBBER REHABILITATION |
$1,702,643.84 |
SOUTH HUB SITE |
$59,729.14 |
SOUTHLAND OAKS WASTEWATER IMPROVEMENTS |
$2,034,585.59 |
SPRINGLAKE LIFT STATION VALVE REPLACEMENT |
$6,480.32 |
TARGETED WASTEWATER LINE IMPROVEMENTS - BULL CREEK BASIN |
$5,772,307.83 |
TARRYTOWN NEIGHBORHOOD WASTEWATER PIPELINE RENEWAL |
$665,760.69 |
TAYLOR SLOUGH SOUTH-WARREN ST STORM DRAIN IMPROVEMENTS-WASTE |
$42,517.49 |
TERI ROAD AND DOWNSTREAM OF STASSNEY LANE WASTEWATER IMPROV |
$932,897.38 |
TEXAS PLUME LIFT STATION REHABILITATION |
$1,319,385.49 |
THOROUGHBRED FARMS WWTP TANK REHAB |
$24,500.00 |
TREATMENT PLANT 4570 PARENT |
$138,438,133.25 |
TX DOT SH 71 WASTEWATER LINE RELO- SH71 @ US 183 INTERCHANGE |
$2,027,574.86 |
TXDOT FM 973 FROM FM 969 TO THYONE - SLUDGE LINE (WASTEWATER |
$411,200.84 |
TXDOT IH 35 CENTRAL WW RELOCATION-US 183 TO RIVERSIDE DRIVE |
$15,135.19 |
TXDOT SH 71 WASTEWATER LINE RELOCATION: PROJECT B |
$42,177.46 |
US 183 BERGSTROM EXPRESSWAY RELOCATION - TXDOT |
$699,901.38 |
UT CAMPUS AREA UTILITY IMPROVEMENT-WW |
$2,113,766.54 |
UPPER BRUSHY CREEK WCID WWL RELO AT DAM 7 |
$3,749,984.74 |
UPPER HARRIS BRANCH INTERCEPTOR EAST |
$2,263,842.47 |
WCC REPLACE CHILLERS WW |
$316,922.38 |
WCWWTP 100 MGD EXPANSION - PRELIM ENGINEERING |
$12,783,603.70 |
WCWWTP 100 MGD EXPANSION- ENGINEERING SVCS |
$21,802,104.51 |
WW LINE RENEWAL AND SPOT REHAB IDIQ |
$7,121,708.91 |
WW PLANT ELECTRICAL DIST IMPROVEMENTS |
$35,275.02 |
WW REHAB - CIPP HIGH PRIORITY 1 PROJECTS GROUP A |
$933,813.17 |
WW REPLACEMENT JAR PROJECTS GROUP A |
$1,016,108.62 |
WALLER CREEK CENTER ELEVATOR MODERNIZATION |
$540,736.65 |
WALLER CREEK DISTRICT - SABINE ST PROMENADE |
$84,453.33 |
WALNUT CREEK INTERIM WWTP REHABILITATION |
$309,214.68 |
WALNUT CREEK METRO PARK (WELLS BRANCH CREEK) WW PIPELINE |
$366,184.94 |
WALNUT CREEK PRIMARY CLARIFIER AND FLOW |
$3,626,308.44 |
WALNUT CREEK WWTP PLANT CONTROL SYSTEM UPGRADE |
$207,191.13 |
WALNUT CREEK WWTP SCRUBBER REHABILITATION |
$7,562,651.79 |
WALNUT CREEK WWTP THICKENER BUILDING REHAB |
$2,058,197.57 |
WALNUT CREEK WASTEWATER PLANT ELEVATOR REPLACEMENT |
$188,227.50 |
WALNUT CREEK WASTEWATER TREATMENT PLANT CONTROLS AND NETWORK |
$10,040,597.63 |
WALNUT CREEK WWTP HEADWORKS IMPROVEMENTS |
$5,560,440.62 |
WALNUT INTERCEPTOR CAPACITY IMPROVEMENT - PARALLEL CREEK |
$89,696.45 |
WALNUT INTERCEPTOR CAPACITY IMPROVEMENTS - SPRINKLE DRIVE |
$543,855.42 |
WALNUT INTERCEPTOR ODOR AND CORROSION IMPROVEMENTS |
$2,498,841.37 |
WASTEWATER COLLECTION 4570 PARENT |
$23,609,940.32 |
WASTEWATER COLLECTION SYSTEM REHAB OF LINES GROUP B |
$2,447,331.47 |
WASTEWATER COLLECTION SYSTEM REPLACEMENT LINES GROUP B |
$3,742,914.92 |
WASTEWATER FUTURE PROJECTS UNF |
$214,789,348.42 |
WASTEWATER IMPVS CITY WIDE |
$2,568,153.84 |
WASTEWATER PIPELINE REPLACEMENT PROGRAM: GROUP C |
$494,106.08 |
WCWWTP 100 MGD EXPANSION-PRECONSTRUCTION SERVICES |
$9,056,656.47 |
WEST ALLANDALE AND TRAILRIDGE DR WW REHAB |
$2,034,769.88 |
WEST CONGRESS (RADAM/ST. ELMO) WASTEWATER PIPELINE RENEWAL |
$118,231.93 |
WHISPER VALLEY-AWU: HARD COSTS WWTP |
$729,633.11 |
WHISPER VALLEY-CRA: HARD COSTS WWTP |
$6,000,000.00 |
WHISPER VALLEY-CRA: NON-PLEDGED SOFT COSTS WWTP |
$1,644,210.99 |
WILLIAMSON BASIN WASTEWATER PIPELINE RENEWAL |
$550,123.78 |
WILLIAMSON CREEK - TRIBUTARY 4 CHANNEL STABILIZATION WW |
$374,583.13 |
WILLIAMSON CREEK WASTEWATER INTERCEPTOR |
$8,756,206.10 |
WILSHIRE BLVD AREA WASTEWATER PIPELINE RENEWAL |
$247,398.70 |
WINDSOR PARK (BERKMAN AND NORTHRIDGE) WATER & WW PIPELINE RE |
$8,707.24 |