10803 PLATT LANE BUILDING REHABILITION - WASTEWATER |
$37,586.41 |
25TH STREET WASTEWATER IMPROVEMENTS ROOF IMPROVEMENTS |
$53,394.09 |
30-INCH WASTEWATER MAIN EASEMENT ACQUISITION |
$94,643.90 |
38TH AND 40TH STREETS WASTEWATER PIPELINE REHABILITATION |
$1,445,506.99 |
4315 AVENUE A PROPOSED WASTEWATER SERVICE LINE EXTENSION |
$632.66 |
51ST STREET TOWER WASHOUT WASTEWATER |
$8,294.94 |
ADP - SAR WWTP LIFT STATION NO. 2 INFLUENT WET WELL DEBRIS R |
$217,500.00 |
ADP - WALNUT CREEK FACILITIES IMPROVEMENTS |
$276,674.17 |
ADP - WALNUT CREEK WWTP ACCESS STAIR IMPROVEMENTS |
$117,280.00 |
ADP - WALNUT CREEK WWTP POLYMER DOSING |
$307,000.00 |
ADP - WALNUT CREEK WWTP SOUTHERN SECURITY FENCE |
$99,236.08 |
ADP-HORNSBY BEND STRUVITE REMOVAL SYSTEM |
$36,200.00 |
ADP-SAR TRAIN B RAS VALVE REPLACEMENT |
$46,569.00 |
ADP-WCWWTP 2013 MISC FACILITY IMPROVEMENTS |
$92,130.00 |
ADP-WALNUT CREEK WWTP FACILITY DOOR REPLACEMENT |
$43,872.00 |
AWU PHONE SWITCH REPLACEMENT-COATN |
$367,929.92 |
ABANDONED WILLIAMSON CRK WW SITE |
$84,398.00 |
ACCESS LAYER SWITCH REPLACEMENT (FY21-25) |
$152,529.90 |
ADINA STREET AND ROB SCOTT STREET WATER REHABILITATION PROJ |
$1,479,087.61 |
ANDERSON MILL WWTP RELIEF |
$753,621.88 |
ANDERSON MILL ZONE WW LINE RELOCATION |
$26,649.63 |
ANNEX TELEMETRY RIVER PLACE, LOST CREEK, SHADY HOLLOW - WW |
$2,692,446.80 |
ANNEXED AREA 4480 PARENT |
$18,660,624.09 |
APPLICATION LIFECYCLE MANAGEMENT (FY24-FY28) |
$69,423.86 |
ASPHALT AND CONCRETE RESTORATION - WASTEWATER |
$29,320.98 |
ASPHALT AND CONCRETE RESTORATION FY21-23 - WASTEWATER |
$130.81 |
AUSTIN WATER FURNITURE PURCHASES |
$3,578.57 |
AUTOMATIC TRANSFER SWITCH REPLACEMENTS |
$126,231.43 |
BALCONES WWTP - CLARIFIER REHAB IMPROVEMENTS |
$31,841.24 |
BALCONES WWTP EFFLUENT BOX REPLACEMENT (IDIQ) |
$162,055.14 |
BALCONES WWTP PHASE 2 - REHAB IMPROVEMENTS |
$95,040.71 |
BARRINGTON OAKS LIFT STATION EMERGENCY GENERATOR INSTALL |
$8,709.65 |
BARRINGTON WAY FM RET & GRAVITY SYS UPGD (LS) |
$284.48 |
BARRINGTON WAY FM RET & GRAVITY SYS UPGD (REHAB) |
$2,185,876.36 |
BARTON CREEK PLAZA LIFT STATION DOWNSTREAM IMPROVEMENTS |
$1,188,165.76 |
BARTON CREEK PLAZA LIFT STATION IMPROVEMENTS |
$597,512.40 |
BARTON HILLS WASTEWATER PIPELINE RENEWAL: HORSESHOE |
$1,135,680.91 |
BILLING METER ASSESSMENTS |
$433,542.89 |
BINTLIFF LIFT STATION EMERGENCY GENERATOR INSTALLATION |
$8,711.22 |
BLOCKS 2 & 4 ODOR ABATEMENT - WASTEWATER COLLECTION SYSTEM |
$37,397.20 |
BLUFFINGTON #1 FORCE MAIN REPLACEMENT |
$49,722.80 |
BLUFFINGTON LIFT STATION EMERGENCY REPAIR |
$17,067.44 |
BLUFFINGTON LIFT STATION NO. 3 ACCESS IMPROVEMENTS |
$231,603.40 |
BOAT PUMP OUT FACILITY |
$42,266.61 |
BOGGY LOWER BASIN INFLOW AND INFILTRATION STUDY |
$111,444.98 |
BOGGY LOWER BASIN INFLOW AND INFILTRATION IMPROVEMENTS |
$221,075.52 |
BOULDER LANE LIFT STATION - EMERGENCY REHABILITATION |
$10,835.00 |
BRENTWOOD WASTEWATER PIPELINE RENEWAL - KOENIG NORTH |
$292,664.62 |
BRUSHY CREEK REGIONAL WWTP EXPANSION PARTICIPATION |
$84,364.90 |
BRYKER ROAD WASTEWATER REPLACEMENT |
$777,913.24 |
BULL CREEK BASIN WASTEWATER LINE IMPROVEMENTS - REPLACEMENT |
$3,168,146.55 |
BURNET ROAD AE KRAMER SITE (BURN-AE) - WW LINE |
$40,464.56 |
BUSINESS PROCESS AUTOMATION - ELECTRONIC FORMS AND WORKFLOWS |
$290,274.75 |
CMOM MANUAL UPDATES |
$165,598.09 |
CAPITAL EQUIPMENT - VEHICLES FY17 |
$3,054,276.27 |
CAPITAL EQUIPMENT - VEHICLES FY18 |
$702,427.51 |
CAPITAL EQUIPMENT - VEHICLES FY19 |
$1,617,238.77 |
CAPITAL EQUIPMENT - VEHICLES FY20 |
$3,907,955.85 |
CAPITAL EQUIPMENT - VEHICLES FY21 |
$3,417,127.64 |
CAPITAL EQUIPMENT - VEHICLES FY22 |
$1,586,610.81 |
CAPITAL EQUIPMENT - VEHICLES FY23 |
$1,958,041.54 |
CAPITAL EQUIPMENT - VEHICLES FY24 |
$3,100,808.61 |
CENTRAL EAST AUSTIN WASTEWATER PIPELINE RENEWAL |
$246,635.23 |
CLOUD-BASED DATA ANALYTICS UPGRADE |
$543,450.12 |
CMMS HANSEN |
$1,479,258.86 |
COLLABORATION 2023 |
$1,061,966.30 |
COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM-HORIZONTAL ASSETS |
$558,786.35 |
COMPUTERIZED MAINTENANCE MGMT SYST - VERTICAL ASSETS FY20-25 |
$448,683.79 |
CONTROL SYSTEM STANDARDIZATION AND RENOVATION |
$29,320.75 |
CONVENTION CENTER EXPANSION - AUSTIN WATER UTILITY SUPPORT |
$8,324.35 |
CORE NETWORK AND DATA CENTER REPLACEMENT (FY19-23) |
$182,585.22 |
COST OF SERVICE STUDY 2007-WW |
$50,345.55 |
COST OF SERVICE STUDY WASTEWATER |
$399,196.38 |
COUNTRY CLUB WEST - CATALINA DRIVE STREAM STABILIZATION WW |
$220,592.29 |
CROSSTN, BIG&LITTLE WALNT, ON CRK TUNNEL VENTILATION STUDY |
$289,463.02 |
CROSSTOWN SIPHON AIR JUMPTER |
$1,309,788.02 |
CROSSTOWN TUNNEL CENTRALIZED ODOR CONTROL FACILITY |
$6,766,608.22 |
DAFFAN LANE LIFT STATION EMERGENCY REPAIR |
$26,486.83 |
DATA ANALYTICS SOFTWARE IMPLEMENTATION (FY21-FY25) |
$171,324.67 |
DATA CENTER REFRESH (FY21-25) |
$781,762.52 |
DATA MGMT/INTEGRATION TOOL |
$927,987.23 |
DATACENTER LIFE CYCLE MANAGEMENT FY24-26 |
$59,201.51 |
DAVIS SPRINGS #1 LIFT STATION EMERGENCY REPAIRS |
$259,099.19 |
DAVIS SPRINGS LIFT STATION PUMP REPLACEMENT |
$40,370.00 |
DESSAU LIFT STATION IMPROVEMENTS |
$43,432.99 |
DESSAU WWTP REHAB |
$49,171.60 |
DEVELOPER LS INSPECTOR SERVICES - PEARCE LN INFLUENT LIFT ST |
$7,855.27 |
DEVELOPER LIFT STATION INSPECTOR SERVICES - BAYSHORE BEND |
$1,078.01 |
DEVELOPER LIFT STATION INSPECTOR SERVICES - HARRIS RIDGE |
$3,308.37 |
DEVELOPER LIFT STATION INSPECTOR SERVICES - HILLS BEAR CREEK |
$4,833.12 |
DEVELOPER LIFT STATION INSPECTOR SERVICES - PILOT KNOB COMMO |
$2,571.60 |
DEWATERING DUMPSTERS FOR EXPANDED PAD AT WALNUT CREEK |
$65,882.00 |
DISASTER RECOVERY AND DATA ARCHIVE REPLACEMENTS (FY19-22) |
$72,285.93 |
E 49TH WASTEWATER EXTENSION |
$42,921.20 |
E MONROE ST WASTEWATER PIPELINE RENEWAL |
$23,536.03 |
EANES BASIN & SKUNK HOLLOW CREEK WW INFRASTR RISK ASSESSMENT |
$313,912.29 |
EASEMENT FOR EXISTING DAVIS SPRINGS LIFT STATION #81 |
$45,161.39 |
EAST 13TH ST. WASTEWATER MAIN EXTENSION |
$2,172.44 |
EAST 7TH ST CORRIDOR/ CHICON- PLEASANT VALLEY |
$593,263.24 |
EAST AUSTIN COMAL AND CHICON WW CAPACITY PLANNING |
$282,516.57 |
ENCLAVE VISTA NO. 152 EMERGENCY LIFT STATION IMPROVEMENTS |
$19,593.61 |
END USER COMPUTE LIFECYCLE MANAGEMENT FY24-26 |
$39,838.52 |
ENVIRONMENTAL COMPLIANCE SOFTWARE (WIERS) |
$450,163.62 |
EXCHANGE DRIVE WW LINE REPLACEMENT (RELAY OF SEGMENT 156371) |
$3,078.29 |
FM 973 WASTEWATER LINE IMPROVEMENTS |
$1,858,414.62 |
FACILITIES AND FORCE MAIN IDIQ CONTRACT DEVELOPMENT SERVICES |
$179,246.16 |
FACILITIES MASTER PLAN - WASTERWATER |
$15,000.00 |
FACILITIES AND FORCE MAIN IDIQ - WASTEWATER FY17 |
$417,220.50 |
FACILITY MASTER PLAN STUDY - WASTEWATER |
$330,912.49 |
FALLWELL LANE CAPITAL RENEWAL PROJECT - WW TREATMENT |
$125,801.32 |
FIRST ROUND OMNI-SITE INSTALLATION |
$332,510.00 |
FLOOD CONTROL DRAINAGE BANK |
$63,263.75 |
FM 969 WASTEWATER IMPROVEMENTS PHASE 1 |
$434,416.62 |
FORT DESSAU LIFT STATION JIB CRANE INSTALLATION |
$3,953.49 |
FOUR POINT #2 FORCE MAIN EMERGENCY REPAIR |
$20,337.22 |
FOUR POINTS 1 LIFT STATION EMERGENCY REPAIR |
$2,478.97 |
FOUR POINTS CENTER LS #3 PUMP IMPROVS |
$109,898.25 |
GBSC ROOF TOP UNIT REPLACEMENT |
$16,589.39 |
GBSC-RADIO CONSOLE & MODULAR SYS REPLMT |
$354,880.18 |
GARDEN VILLA LANE WASTEWATER PIPELINE RENEWAL |
$139,499.08 |
GENERAL UTILITY RELOCATIONS |
$298,875.47 |
GEOGRAPHIC INFORMATION SYSTEM DATA MODEL |
$450,035.39 |
GEOGRAPHIC INFORMATION SYSTEM EQUIPMENT (FY19-23) |
$89,125.15 |
GEOGRAPHIC INFORMATION SYSTEM UPGRADE (FY19-23) |
$162,663.12 |
GILLIS STREET WASTEWATER LINE REPLACEMENT - RENEWING AUSTIN |
$10,137.82 |
GIS |
$745,009.58 |
GLEN BELL SERVICE CENTER - BUILDING SEWAGE LINE REHAB |
$714,384.26 |
GLEN BELL SERVICE CENTER - FIRE SYSTEM UPGRADE |
$88,426.50 |
GLEN BELL SERVICE CENTER ELEVATOR MODERNIZATION |
$65,558.31 |
GLEN BELL SERVICE CENTER HVAC REPLACEMENT |
$120,286.00 |
GLEN BELL SERVICE CENTER HVAC |
$234,415.75 |
GLEN BELL SERVICE CENTER HVAC UNITS REPLACEMENT |
$129,866.59 |
GLEN BELL SERVICE CENTER ICE MACHINE REPLACEMENT |
$52,688.00 |
GLEN BELL SERVICE CENTER SECURITY CONVERSION TO GENETEC |
$92,152.00 |
GLEN BELL SERVICE CENTER SECURITY GATE AW6 REPLACEMENT |
$82,088.51 |
GLEN BELL SERVICE CENTER STORES SECURITY UPGRADE |
$37,500.20 |
GLEN BELL WAREHOUSE EMERGENCY CAGE AND OFFICE EXPANSION |
$24,944.55 |
GONZALES LIFT STATION ABANDONMENT |
$1,444,586.29 |
GOVALLE -BOGGY CREEK- WASTEWATER PIPELINE RENEWAL |
$22,532.59 |
GOVALLE MAINTENANCE SHOP ROOFTOP UNIT REPLACEMENT |
$31,951.60 |
GOVALLE NEW TRAILER INSTALL |
$89,815.82 |
GOVALLE ODS BLOWER BUILDING ROOF REHAB |
$89,771.00 |
GOVALLE ODS CHLORINE BUILDING ROOF REHAB |
$11,163.88 |
GOVALLE SECURITY GATE RENEWAL |
$21,957.85 |
GOVALLE SECURITY INSTALLATION |
$189,977.40 |
GOVALLE WASTEWATER SERVICE IMPROVEMENTS |
$737,389.27 |
GOVALLE WORK SITE FLOORPLAN IMPROVEMENTS |
$256,922.39 |
GOVALLE WWTP ADMIN BUILDING FIRE SYSTEM |
$71,144.00 |
GOVALLE WWTP DIVERSION BOX REPAIR |
$35,391.52 |
GOVALLE WWTP EMERGENCY ROAD REPAIR |
$10,040.59 |
GOVALLE WWTP SECURITY IMPROVEMENTS |
$32,238.59 |
GPS DATA COLLECTION |
$84,989.02 |
GREATER WALNUT WWTP AND COLLECTION SYSTEM ODOR STUDY |
$243,862.09 |
HB HVAC CONTROLS |
$174,855.00 |
HAROLD COURT EAST REGIONAL SERVICE CENTER IMPROVEMENTS |
$14,066.88 |
HARPERS BRANCH CREEK INTERCEPTOR |
$1,976,191.74 |
HIGHWAY RENEWAL PROJECTS |
$658,701.07 |
HILLS OF BEAR CREEK LIFT STATION JIB CRANE INSTALLATION |
$28,159.77 |
HILLSPRING AND SCOTTSDALE WASTEWATER SYSTEM RENEWAL |
$83,543.28 |
HOLLY NEIGHBORHOOD WASTEWATER SYSTEM UPGRADES |
$32,864.66 |
HORIZONTAL ASSET MANAGEMENT - FORECASTING |
$11,360.58 |
HORIZONTAL ASSET MANAGEMENT PEER REVIEW |
$92,868.42 |
HORNSBY BEND ADMIN BLDG. ROOF IMPROVEMENTS |
$358,770.00 |
HORNSBY BEND ADMIN BUILDING COMMUNICATION CLOSET RELOCATION |
$182,209.10 |
HORNSBY BEND ADMINISTRATION LAB WASHROOM REHAB PROJECT |
$69,611.15 |
HORNSBY BEND BMP ANAMMOX PILOT STUDY |
$90,830.00 |
HORNSBY BEND BMP AUSTIN RESOURCE RECOVERY PAD SITE |
$2,487,353.81 |
HORNSBY BEND BMP BIOGAS UTILIZATION ASSESSMENT |
$442,209.71 |
HORNSBY BEND BMP SCRAP YARD CLEANUP |
$112,472.90 |
HORNSBY BEND BMP STORM DAMAGE REPAIRS |
$221,385.00 |
HORNSBY BEND BMP SULFATREAT TANK |
$320,985.52 |
HORNSBY BEND BMP TREE MITIGATION PLAN |
$274,738.08 |
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT HEADWORKS IMPROVEMEN |
$2,262,041.35 |
HORNSBY BEND BIOSOLIDS DEMOLISH ABANDONED ASBESTOS |
$83,920.56 |
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT TREE MANAGEMENT |
$243,346.67 |
HORNSBY BEND BIOSOLIDS PLANT SAR DIGESTER ROOF REPLACEMENT |
$592,376.08 |
HORNSBY BEND BMP MAINTENANCE BLDG BREAKROOM MODERNIZATION |
$205,207.00 |
HORNSBY BEND BMP PROCESS AMMONIA REMOVAL FACILITY |
$1,108,933.04 |
HORNSBY BEND COGEN BLDG ROOF IMPROVEMENTS |
$342,167.00 |
HORNSBY BEND DEWATERING BUILDING HVAC UNIT REPLACEMENT |
$17,590.00 |
HORNSBY BEND DEWATERING FACILITY ROOF AND WALL REHAB |
$384,823.00 |
HORNSBY BEND DEWATERING FACILITY ROOF AND WALL REPLACEMENT |
$1,258,636.53 |
HORNSBY BEND DRAINAGE IMPROVEMENTS |
$24,953.13 |
HORNSBY BEND FEB BLDG ROOF IMPROVEMENTS |
$184,482.00 |
HORNSBY BEND FIRE ALARM REPLACEMENT ADMIN & MAINT SHOP |
$73,870.00 |
HORNSBY BEND INTEGRATION SYSTEM SERVICES |
$125,000.00 |
HORNSBY BEND LAB AND ADMIN BUILDING HVAC REHAB - PHASE 2 |
$19,776.35 |
HORNSBY BEND LIFT STATION VALVE REPLACEMENT |
$42,807.02 |
HORNSBY BEND LIFT STATIONS REHAB (THICKENER AND BELT FILTER) |
$38,041.07 |
HORNSBY BEND MAINTENANCE BUILDING ROOF REHAB |
$194,212.00 |
HORNSBY BEND MAINTENANCE LAB AND ADMIN BUILDING HVAC REHAB |
$891,366.97 |
HORNSBY BEND MAINTENANCE SHOP 2 ROOF REHAB |
$71,000.00 |
HORNSBY BEND MASTER PLAN |
$1,947,668.50 |
HORNSBY BEND MGMT PLANT GOVALLE BLDG ROOF IMPROVEMENTS |
$357,923.00 |
HORNSBY BEND MOMENTUM CONTROLLERS REPLACEMENT |
$52,994.91 |
HORNSBY BEND NEW TRAILER |
$127,959.17 |
HORNSBY BEND OBSOLETE SCADA EQUIPMENT REPLACEMENT |
$51,404.36 |
HORNSBY BEND RADIO ANTENNA IMPROVEMENTS |
$405,312.03 |
HORNSBY BEND SECURITY ACCESS SYSTEM UPGRADE |
$882,686.10 |
HORNSBY BEND SEWER SYSTEM REHABILITATION |
$25,167.60 |
HORNSBY BEND SHED ROOF IMPROVEMENTS |
$8,950.00 |
HORNSBY BEND SLUDGE LINE EMERGENCY REHABILITATION |
$7,456.50 |
HORNSBY BEND SLUDGE LINE EMERGENCY AT SAR DIGESTER COMPLEX |
$21,232.07 |
HORNSBY BEND THICKENER COMPLEX REHAB CONSTRUCTION |
$17,660,506.80 |
HORNSBY BEND THICKNER BUILDING ROOF REHAB |
$307,476.00 |
HORNSBY BUILDING ENVELOPE RESEAL ADMINISTRATION |
$20,500.00 |
HYDE PARK (E 38TH ST/GROOMS ST/AVENUE F) WASTEWATER PIPELINE |
$15,553.63 |
IDIQ HORNSBY BEND PROJECT IMPROVEMENTS |
$333,997.29 |
IDIQ-BRITTLYNS COURT LIFT STATION IMPROVEMENTS |
$13,197.86 |
IDIQ-HOWARD LANE PUMP STATION |
$30,825.60 |
IDIQ-LONG VISTA LIFT STATION REHABILITATION |
$60,488.12 |
IDIQ-MARBRIDGE LIFT STATION IMPROVEMENTS |
$26,601.27 |
IDIQ-WALNUT CRK BUS PARK STATION FLOODING-EMERGENCY |
$234,574.35 |
IH 35 WW LINE BETTERMENT-BEN WHITE TO WILLIAM CANNON SEGMENT |
$45,084.54 |
IT PLATFORM |
$2,672,917.32 |
IH 35 WW LINE BETTERMENT - RUNDBERG TO 290 E SEGMENT |
$239,638.90 |
IMPROVEMENTS AT SCOTLAND WELL LIFT STATION |
$82,032.97 |
IMPROVEMENTS AT SPICEWOOD PARKWAY LIFT STATION |
$472,673.33 |
IN SITU WASTEWATER LINE RENEWAL PROGRAM (2022 TO 2024) |
$2,607,289.59 |
INVENTORY AND BARCODE MANAGEMENT PROJECT |
$277,752.00 |
IT NETWORK IMPROVEMENTS |
$999,580.31 |
IT SECURITY TOOLS AND SERVICES |
$447,208.89 |
IVANHOE TRAIL WASTEWATER PIPELINE IMPROVEMENT |
$23,781.39 |
JUSTIN LANE FROM BURNET TO LAMAR |
$97,274.00 |
LS TELEMETRY-TOP END & CON REPLACEMENT |
$1,631,174.25 |
LABORATORY INFO MGMT SYSTEM |
$587,866.98 |
LABORATORY INFORMATION MANAGEMENT SYSTEM CLOUD MIGRATION |
$23,220.50 |
LABORATORY INFORMATION MANAGEMENT SYSTEM FY19-24 |
$65,173.99 |
LADY BIRD LAKE - WEST AUSTIN PARK WATER QUALITY RETROFITS |
$30,387.59 |
LARGE WASTEWATER INTERCEPTORS - ASSESS AND REHAB |
$786,859.72 |
LARGE WASTEWATER INTERCEPTORS ASSESSMENT - PILOT II |
$67,450.10 |
LENOX OAKS |
$381,528.43 |
LIFT STATION 4480 PARENT |
$1,580,590.28 |
LIFT STATION 4570 PARENT |
$39,108.00 |
LIFT STATION COMMUNICATION UPGRADE TO CELLULAR |
$198,052.39 |
LIFT STATION IMPROVEMENTS PEARCE LANE UPGRADES |
$68,673.06 |
LITTLE WALNUT CREEK 24-INCH WASTEWATER MAIN |
$3,912,042.35 |
LOST CREEK PACKAGE WWTP IMPROVEMENTS |
$222,150.39 |
LOST CREEK PUMPING RENEWAL |
$178,571.38 |
LOST CREEK WWTP HEADWORKS REPLACEMENT |
$117,255.15 |
LOST CREEK WASTEWATER TREATMENT PLANT CLARIFIER REHAB |
$1,792,047.17 |
LOWER LAKE AND RATTAN CREEK INTERCEPTORS: ROUTE STUDY |
$316,192.03 |
MABEL DAVIS LIFT STATION WET WELL EMERGENCY REPAIR |
$5,825.65 |
MANHOLE ACCESS AREA SURFACE IMPROVEMENTS |
$28,255.65 |
MCNEIL LIFT STATION IMPROVEMENTS |
$67,009.44 |
MERION CIRCLE WASTEWATER PIPELINE REHABILITATION |
$148,614.97 |
MISCELLANEOUS CAPITAL EQUIPMENT-WW |
$452,307.79 |
MLK(GIVENS DISTRICT PARK) WASTEWATER PIPELINE RENEWAL |
$73,153.74 |
NELRAY & EVANS UTIL IMPROVS-WW |
$1,594,939.53 |
NETWORK LIFE CYCLE MANAGEMENT FY24-26 |
$227,334.52 |
NEW CENTRAL LIBRARY WASTEWATER SERVICE |
$200,000.00 |
NORTH ROSEDALE PHASE II NEIGHBORHOOD WASTEWATER |
$1,725,964.88 |
NORTH SERVICE ANNEX BUILDING ROOF REPLACEMENT - WASTEWATER |
$160,965.97 |
NORTH SERVICE CENTER BUILDING ENVELOPE INSPECTION AND REHAB |
$37,044.00 |
NORTH SERVICE CENTER ENTRY DOOR REPLACEMENT |
$31,603.38 |
NORTH SERVICE CENTER GENERATOR INSTALLATION |
$51,139.50 |
NORTH SERVICE CENTER PARKING LOT REHABILITATION |
$7,205.80 |
NORTH SERVICE CENTER RESTROOMS AND SHOWERS REHAB |
$27,799.63 |
NORTH SERVICE CENTER ROOF REPLACEMENT |
$25,150.00 |
NORTH SERVICE CENTER SECURITY SYSTEM UPGRADE |
$15,146.56 |
NORTHEAST AREA WASTEWATER TREATMENT CAPACITY STUDY |
$236,904.84 |
NORTHWEST AREA - BOULDER LANE LIFT STATION |
$904,162.70 |
NORTHWEST AREA - FOUR POINTS CENTER LIFT STATION |
$635,576.73 |
NORTHWEST AREA LS IMPROVEMENTS SPRING LAKE #2 |
$782,298.36 |
NORTHWEST AREA LIFT STATION IMPROVEMENTS GREAT HILLS LIFT ST |
$868,962.84 |
NORTHWEST LIFT STATION LRP ENGINEERING STUDY |
$213,173.30 |
ONSC FLOORING REPLACEMENT - WASTEWATER |
$23,810.50 |
ONSC HOT WATER HEATER REPLACEMENT-WW |
$9,486.12 |
OAKMONT BLVD IMPROVEMENTS (CRS) |
$14,781.27 |
OLD ANDERSON MILL SITE BUILDING DEMOLITION |
$311,178.32 |
OLD ENFIELD - NILES AND NEWFIELD AREA NEIGHBRHD WW |
$266,700.32 |
OLD ENFIELD WASTEWATER PIPELINE RENEWAL - NEWFIELD LANE |
$415,695.25 |
OLD LAMPASAS LIFT STATION BYPASS VAULT INSTALLATION |
$51,410.54 |
ONION CREEK WWTP DEMOLITION |
$1,051,972.84 |
OTHER 4480 PARENT |
$4,417,750.01 |
PACKAGE PLANT PROCESS EQUIPMENT REPLACEMENT |
$91,200.41 |
PACKAGED WWTP CENTRALIZED PROCESS MONITORING SYSTEMS |
$72,165.00 |
PARK VILLAGE DRIVE WASTEWATER IMPROVEMENTS |
$398,229.85 |
PARKER LN NEIGHBORHOOD (CATALINA AND METCALFE) WASTEWATER PI |
$55,875.47 |
PC REFRESH (FY19-24) |
$1,253,822.28 |
PEARCE LANE LIFT STATION 2 EMERGENCY GENERATOR INSTALLATION |
$247,243.02 |
PEARCE LANE WWTP TEMPORARY PUMP INSTALLATION |
$342,086.03 |
PELICAN POINT LIFT STATION EMERGENCY VALVE REPLACEMENT |
$35,000.58 |
PERMITTING SOFTWARE UPGRADE (AMANDA) |
$76,320.34 |
PINO LANE WASTEWATER IMPROVEMENTS |
$290,328.03 |
PIPELINE INSPECTION SYSTEM UPGRADE - WASTEWATER |
$104,178.70 |
RA - CONCORDIA AND SW CHERRYWOOD NEIGHBORHOOD WATER SYSTEM U |
$266,065.85 |
RA - EXPOSITION BLVD WW FM REHAB - W. 35TH TO ENFIELD |
$383,766.96 |
RA-SE ALLANDALE NEIGHBORHOOD WSU |
$2,035,531.29 |
ROCIP V PROGRAM |
$1,649,133.47 |
RA - NORTH ROSEDALE / LAWNMONT NEIGHBORHOOD WW SYSTEM UPG |
$519,940.78 |
REDBUD TRAIL - WASTEWATER |
$314,688.09 |
REHABILITATION 4480 PARENT |
$44,238,636.01 |
REHABILITATION 4570 PARENT |
$488,132.50 |
REHABILITATION OF WW LINES-EPA SAAP (AWU FUNDED) |
$3,699,066.86 |
REHABILITATION OF WW LINES-EPA SAAP GRANT |
$1,400,715.72 |
REHABILITATION OF WALNUT CREEK 72" SIPHON BOX |
$145,610.47 |
RELOCATION 4480 PARENT |
$2,301,833.02 |
REMOTE FACILITIES SECURE COMMUNICATION ALTERNATIVES ASSESS |
$73,889.50 |
RENEWAL OF WALNUT INTERCEPTOR SIPHON BOXES |
$210,627.38 |
REVIEW OF COLLECTION SYSTEM ODOR & CORROSION CONTROL SYSTEMS |
$160,860.76 |
RIBELIN RANCH LIFT STATION FORCE MAIN PLUG EMERGENCY |
$497,691.23 |
RINGTAIL LIFT STATION EMERGENCY REHABILITATION |
$98,638.75 |
RINGTAIL RIDGE LIFT STATION REHABILITATION |
$33,262.00 |
RIO GRANDE FROM 24TH TO 29TH ST. RECON & UTIL ADJ |
$106,426.56 |
RIVA RIDGE LIFT STATION #117 EASEMENT |
$14,288.29 |
RIVA RIDGE LIFT STATION POWER DISTRIBUTION IMPROVEMENTS |
$10,408.50 |
RIVER PLACE WWTP DECOMMISSIONING STUDY |
$330,344.57 |
RIVER PLACE WASTEWATER TREATMENT PLANT EMERGENCY LINE REPAIR |
$8,568.46 |
RIVER PLACE WWTP CHLORINE BUILDING FOUNDATION |
$10,223.82 |
RIVERPLACE 1,CONCHOS TRAIL, & DAVENPORT LIFT STATIONS CONTRO |
$36,829.91 |
ROCIP VI PROGRAM |
$2,007,687.49 |
ROCK HARBOR EMERGENCY FORCEMAIN RENEWAL |
$20,857.09 |
ROCK HARBOR FORCEMAIN LEAK EMERGENCY |
$18,563.91 |
ROCK HARBOR LIFT STATION WET WELL COATING |
$87,594.68 |
ROCK HARBOR LS PUMP DISCHARGE LINE EMERGENCY |
$54,790.07 |
ROCK HARBOR LIFT STATION EMERGENCY |
$21,157.94 |
ROCK HARBOR LIFT STATION FORCEMAIN EMERGENCY |
$20,654.44 |
ROCK HARBOR LIFT STATION WET WELL REHAB |
$33,812.34 |
ROCK HARBOR MAIN & FOUR POINTS #2 DEMOLITION |
$812,274.92 |
ROCK HARBOUR EMERGENCY FORCEMAIN REPAIR |
$37,765.65 |
ROOFING PARENT ACCT(ASSESSMENT |
$570,045.91 |
ROSS RD NORTH WW IMPROVEMENTS |
$100,000.00 |
RUNDBERG LANE EXT. FROM METRIC TO BURNET |
$1,074.83 |
SAR BACKFLOW PREVENTION INSTALL (ADP) |
$25,532.23 |
SAR FILTER CELL NO 5 ACTUATOR REPLACEMENT ADP IDIQ |
$299,751.88 |
SAR HVAC REPLACEMENTS |
$37,785.00 |
SAR TRAIN BB CLARIFIER CONDUIT REHABILITATION |
$92,110.06 |
SAR WWTP - THICKENER HOLDING TANK MITIGATION |
$1,045,575.73 |
SAR WWTP LEAKING SLUDGE TRANSFER DRAIN LINE EMERGENCY RENEWA |
$132,434.20 |
SAR WWTP PRELIMINARY TREATMENT BUILDING B ROOF REHAB |
$282,843.12 |
SAR WWTP TRAIN A&B BLOWER OVERHEAD DOOR REPLACEMENT |
$30,966.12 |
SAR WWTP WATER REUSE BUILDING CONTROLLER REPLACEMENT |
$129,329.28 |
SAR WWTP SLUDGE TRANSFER FACILITY ROOF REHAB |
$211,136.06 |
SCADA - LIFT STATIONS |
$40,718.10 |
SCADA - WASTEWATER TREATMENT PLANTS |
$214,005.41 |
SCADA CYBER SECURITY REMEDIATION |
$648,858.44 |
SER REIMBURSEMENTS 4480 PARENT |
$5,250,336.88 |
SANITARY SEWER EVAL STUDY - WALNUT AND LITTLE WALNUT BASINS |
$785,629.98 |
SANITARY SEWER EVALUATION STUDY - GOVALLE TUNNEL AREAS |
$227,065.86 |
SANITARY SEWER EVALUATION TARGETED STUDIES CT-17 AND GT-31 |
$1,403,550.72 |
SAR ELEVATED TANK REHAB & IMPROVEMENTS |
$3,547,763.05 |
SAR INFLUENT FLOW STRUCTURE SCRUBBER VENTILATION IMPROVEMENT |
$106,014.77 |
SAR INSTALLATION OF FIRE ALARM SYSTEM - ADMIN BLDG |
$47,622.00 |
SAR NON-POTABLE WATER PUMP STATION FLOW MONITORING IMPROV |
$29,000.00 |
SAR SAFETY RAIL REPLACEMENT AND WORK PLATFORMS |
$32,546.00 |
SAR TRAIN A & B YARD LIGHTING IMPROVEMENTS |
$60,851.24 |
SAR TRAIN A&B MOTOR CONTROL CENTER ROOM RENOVATION |
$19,133.90 |
SAR TRANSFER LIFT STATION PUMP REHB |
$53,466.27 |
SAR WWTP - FILTER BUILDING FLOODING IMPROVEMENTS |
$290,812.84 |
SAR WWTP BLOWER BLDG C HVAC & ROOF RENEWAL |
$321,486.73 |
SAR WWTP FLOW EQUALIZATION BUILDING REROOF |
$168,596.80 |
SAR WWTP PRELIMINARY TREATMENT BUILDING A ROOF REHAB |
$287,876.68 |
SAR WWTP RADIO BI-DIRECTIONAL AMPLIFIER SYSTEM |
$572,110.51 |
SAR WWTP SECONDARY SLUDGE PUMP BUILDING TRAIN A ROOF REHAB |
$157,317.26 |
SCADA DATA MART AND DATA WAREHOUSE REPLACEMENT |
$337,476.92 |
SCADA TEST ENVIRONMENT WASTEWATER |
$34,813.06 |
SCADA WIDE AREA NETWORK FIREWALLING AND SEGMENTATION (WW) |
$38,672.72 |
SCHULLE BRANCH CREEK AERIAL WASTEWATER PIPELINE CROSSING REN |
$431,377.03 |
SCOTLAND WELL LIFT STATION WET WELL CLEANING (IDIQ) |
$94,863.67 |
SERVER AND ENTERPRISE STORAGE REPLACEMENT (FY20-24) |
$484,249.64 |
SEWER CLEANING EVALUATION STUDY |
$144,575.00 |
SHOAL CREEK (NORTHCROSS DRIVE) WASTEWATER PIPELINE RENEWAL |
$190,700.17 |
SHOAL CREEK AND W 38TH STREET WASTEWATER RENEWAL |
$69,770.64 |
SHOAL CREEK WASTEWATER REHAB |
$275,886.54 |
SHROPSHIRE BLVD. WASTEWATER MAIN EXTENSION |
$1,239.66 |
SINCLAIR AVENUE WASTEWATER INFRASTRUCTURE REPLACEMENT |
$65,198.47 |
SLUDGE LINE EMERGENCY REHAB |
$5,006.94 |
SMALL DIAMETER WASTEWATER LINE REPLACEMENT PROGRAM IDIQ |
$26,850.67 |
SOUTH AREA LIFT STATION IMPR - SPRINGFIELD LIFT STATION |
$532,999.62 |
SOUTH AREA LIFT STATION: BEE CAVES FORCE MAIN |
$49,722.81 |
SOUTH AREA LIFT STATION: BLUFFINGTON #2 FORCE MAIN |
$50,433.59 |
SOUTH AREA LIFT STATION: TRAVIS COUNTRY LIFT STATION |
$49,722.80 |
SOUTH AREA LIFT STATION: TREEMONT FORCE MAIN |
$49,722.80 |
SOUTH AUSTIN REGINAL WWTP UTILITY PUMP BUILDING ROOF REHAB |
$107,825.09 |
SOUTH AUSTIN REGIONAL ADMINISTRATION BUILDING HVAC CONTROLS |
$37,751.00 |
SOUTH AUSTIN REGIONAL FILTER BUILDING CORROSION IMPROVEMENTS |
$818,052.26 |
SOUTH AUSTIN REGIONAL HYPOCHLORITE DOSING IMPROVEMENTS |
$56,344.14 |
SOUTH AUSTIN REGIONAL JUNCTION BOX COVER IMPROVEMENTS |
$152,438.84 |
SOUTH AUSTIN REGIONAL LIFT STATION 1 AND 2 NON-POTABLE WATER |
$272,220.00 |
SOUTH AUSTIN REGIONAL LIFT STATION 1 ELEVATOR REHABILITATION |
$203,513.00 |
SOUTH AUSTIN REGIONAL LIFT STATION 1 PUMP REFURBISHMENT |
$91,999.00 |
SOUTH AUSTIN REGIONAL LIFT STATION 2 ELEVATOR REHABILITATION |
$191,672.00 |
SOUTH AUSTIN REGIONAL LIFT STATION 2 PUMP REFURBISHMENT |
$405,963.76 |
SOUTH AUSTIN REGIONAL TRAIN A&B GRIT CHAMBER AND PRIMARY |
$1,733.80 |
SOUTH AUSTIN REGIONAL TRAIN B BAR SCREEN REPLACEMENT |
$1,223,404.84 |
SOUTH AUSTIN REGIONAL WWTP ACCESS IMPROVEMENTS |
$302,969.22 |
SOUTH AUSTIN REGIONAL WWTP BLOWER AIR PIPING CONNECTION |
$108,411.57 |
SOUTH AUSTIN REGIONAL WWTP GAS METER AND SENSOR REPLACEMENT |
$75,681.42 |
SOUTH AUSTIN REGIONAL WWTP GOVALLE MITIGATION |
$338,346.54 |
SOUTH AUSTIN REGIONAL WWTP OUTFALL REPAIR |
$23,792.38 |
SOUTH AUSTIN REGIONAL WWTP PLAN AERATION BASIN REPAIR |
$89,516.13 |
SOUTH AUSTIN REGIONAL WWTP REUSE AND YARD PIPING IMPROVEMENT |
$206,014.07 |
SOUTH AUSTIN REGIONAL WWTP TRAIN A&B RETURN ACTIVATED SLUDGE |
$545,694.59 |
SOUTH AUSTIN REGIONAL WASTEWATER TREATMENT PLANT INTERNAL DR |
$274,832.59 |
SOUTH AUSTIN REGIONAL WWTP - WW SEED LINE INSTALLATION |
$105,909.08 |
SOUTH AUSTIN REGIONAL WWTP 2-INCH NPW LINE REPAIR |
$33,676.89 |
SOUTH AUSTIN REGIONAL WWTP DOOR REPLACEMENTS |
$999,612.80 |
SOUTH AUSTIN REGIONAL WWTP FILTER GALLERY HVAC AND ROOF REHA |
$382,414.58 |
SOUTH AUSTIN REGIONAL WWTP FY2020 MINOR RENEWAL PROJECT |
$465,488.60 |
SOUTH AUSTIN REGIONAL WWTP LIFT STATION REHABILITATION |
$1,482,390.83 |
SOUTH AUSTIN REGIONAL WWTP-WATER STATION DEMO |
$113,313.50 |
SOUTH AUSTIN REGIONAL ZAPS ANALYZER INSTALLATION |
$58,075.90 |
SOUTH FIRST CENTER LIEBERT MINI SPLITS RENEWAL |
$29,116.00 |
SOUTH LIFT STATION IMPROVEMENTS - BEND O'RIVER FORCE MAIN |
$348,614.91 |
SOUTH RIVER CITY (BONNIEVIEW ST) WASTEWATER PIPELINE RENEWAL |
$98,461.24 |
SOUTH ROUND ROCK INTERCEPTOR MANHOLE REHABILITATION PROJECT |
$389,354.42 |
SOUTH SERVICE CENTER FIRE ALARM REPLACEMENT |
$105,490.02 |
SOUTH SERVICE CENTER RESTROOM REHAB |
$14,998.52 |
SOUTH SERVICE CENTER WINDOW REPLACEMENT |
$23,490.00 |
SOUTH SVC CENTER BLDG 600 EXTERIOR WALLS & ROOF IMPROVEMENTS |
$12,850.00 |
SOUTHLAND OAKS LIFT STATION 12-INCH PIPE RENEWAL |
$14,269.93 |
SOUTHLAND OAKS LIFT STATION FLOOD REHABILITATION |
$512,907.63 |
SOUTHLAND OAKS LIFT STATION FORCE MAIN LEAK |
$30,853.91 |
SOUTHLAND OAKS LIFT STATION LEAK REPAIR EMERGNECY |
$37,662.66 |
SOUTHLAND OAKS WET WELL CONVERSION |
$894,037.09 |
SOUTHWEST ALLANDALE NEIGHBORHOOD WASTEWATER SYSTEM UPGRADES |
$2,999,702.84 |
SPACE PLANNING MODULE AND WORK ORDER SYSTEM |
$191,405.31 |
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
$36,782.11 |
SPRINGFIELD LIFT STATION EMERGENCY RESPONSE HALLOWEEN 2015 |
$21,923.28 |
SPRINGFIELD LIFT STATION FORCE MAIN ASSESSMENT` |
$13,944.01 |
SPRINGLAKE LIFT STATION #2 REHABILITATION |
$45,328.37 |
SPRINGLAKE LIFT STATION PLUG REMOVAL |
$65,528.10 |
ST JOHNS & CORONADO HILLS (BUTTERMILK CREEK) WASTEWATER PIPE |
$240,939.89 |
SUBDIV ENGINEERING & INSPECTION |
$837,177.23 |
SUMMIT LAB FIRE ALARM SYSTEM REPLACEMENT - WASTEWATER |
$15,456.00 |
SUNNY LANE WASTEWATER REPLACEMENT - RENEW AUSTIN |
$103,837.15 |
T. LOUVIERE SERVICE CENTER FIRE ALARM REPLACEMENT |
$17,122.50 |
TARGETED WASTEWATER LINE IMPROVEMENTS - SOUTH BOGGY BASIN |
$1,670,267.36 |
TARGETED WASTEWATER LINE IMPROVEMENTS - TOWN LAKE BASIN |
$814,843.33 |
TARGETED WASTEWATER LINE IMPROVEMENTS IN FORT UPPER BASIN |
$2,912,866.22 |
TARRYTWN/HILLVIEW & CLEARVIEW AREA NEIGHBD WW |
$1,838,839.80 |
TAYLOR LANE PACKAGE WWTP IMPROVEMENTS |
$52,028.39 |
TAYLOR LANE WWTP CLARIFIER INFLUENT PIPE REHAB |
$1,725.15 |
TEXAS PLUME LIFT STATION VALVE REPLACEMENT |
$413,987.15 |
THERESA AVE MANHOLE INSTALLATION |
$648.58 |
THOROUGHBRED FARMS HEADWORKS REPLACEMENT |
$80,513.26 |
THOROUGHBRED FARMS MEMORIAL DAY 2016 FLOOD RECOVERY |
$84,593.93 |
THOROUGHBRED FARMS WWTP DISINFECTION AND LIFT STATION IMPROV |
$248,238.64 |
THOROUGHBRED FARMS WWTP HYPOCHLORITE IMPROVEMENTS |
$42,777.77 |
THOUSAND OAKS LIFT STATION ACCESS IMPROVEMENTS |
$109,481.94 |
TIM LOUVIERE SERVICE CENTER GENERATOR INSTALLATION - WINTER |
$53,161.50 |
TIM LOUVIERE SERVICE CENTER ICE MACHINE REPLACEMENT |
$9,527.00 |
TIM LOUVIERE SERVICE CENTER TECH SHOP REMODEL |
$83,362.83 |
TOWN LAKE METRO PARK |
$2,500.00 |
TRACOR LIFT STATION EMERGENCY GENERATOR INSTALLATION |
$8,709.65 |
TRAVIS COUNTRY LIFT STATION EMERGENCY GENERATOR INSTALLATION |
$8,709.67 |
TREATMENT PLANT 4480 PARENT |
$72,294,193.26 |
TREATMENT PLANT ASSET REPLACEMENT COST DEVELOPEMENT |
$27,964.79 |
TRUMAN HEIGHTS WASTEWATER PIPELINE RENEWAL |
$1,250,214.22 |
TURNER'S CROSSING - WASTEWATER SER |
$177,739.86 |
TX DOT 360 AT RM2222 AND COURTYARD WASTEWATER RELOCATION |
$5,536,248.75 |
TX PLUME LIFT STATION IMPROVEMENTS |
$79,732.50 |
TXDOT FM 620 AT ANDERSON MILL RD |
$3,737.75 |
TXDOT FM 973 FROM FM 969 TO THYNE - WASTEWATER |
$878,962.24 |
TXDOT 360 AT LAKEWOOD DRIVE WASTEWATER RELO |
$92,119.90 |
TXDOT IH 35 CENTRAL WW RELOCATION-US 183 TO RIVERSIDE DRIVE |
$6,236,325.06 |
TXDOT IH 35 NORTH PROJECT WW RELOCATION: SH 45 N TO US Q |
$3,684,230.53 |
TXDOT LOOP 1 WASTEWATER LINE RELOCATION |
$204,741.76 |
TXDOT LOOP 360 AT SPICEWOOD SPRINGS WW LINE RELOCATION |
$50,304.97 |
TXDOT LOOP 360 AT WESTLAKE DRIVE WASTEWATER RELOCATION |
$1,127,720.38 |
TXDOT US 183/SH71 RELO: S OF THOMPSON/SW OF AIRPORT - WW |
$11,320.21 |
TXDOT US 290 AT OAK HILL PARKWAY WASTEWATER LINE RELOCATION |
$7,088,722.06 |
TXDOT US183 N RELOCATION: SH 45 N TO LOOP 1 |
$64.05 |
US290 INTERSECT AT SH71 WM CANNON JOE TANNER |
$128,338.00 |
UT BRACKENRIDGE FIELD LAB - 24" AERIAL CROSSSING |
$20,835.50 |
UPPER BOGGY WEST WASTEWATER LINE IMPROVEMENTS- PHASE 1 |
$1,290,566.69 |
UPPER TANNEHILL CAMERON ROAD WASTEWATER IMPROVEMENTS |
$697,281.17 |
UPPER TANNEHILL WW INTERCEPTOR - PHASE 1: MORRIS WILLIAMS |
$1,104,201.18 |
VACUUM TRUCK TV-SOFTWARE |
$398,327.29 |
VIRTUALIZATION CAPABILITIES - WASTEWATER TREATMENT PLANTS |
$121,519.02 |
VISION DRIVE WASTEWATER PIPELINE UPGRADE |
$406,243.34 |
WCC - BICYCLE SHOWER PROJECT |
$44,680.00 |
WCC DOOR REPLACEMENT RM 105 |
$6,152.50 |
WCC-REPLACE AIR HANDLERS |
$964,045.62 |
WCWWTP 100 MGD EXPANSION |
$15,038,185.94 |
WW FACILITY IDIQ |
$761,796.27 |
WW PIPE NETWORK INFLOW AND INFILTRATION EVALUATION |
$270,304.50 |
WW RELAY AND SPOT REPAIR SERVICE CONTRACT IDIQ (2017-2019) |
$9,412,839.74 |
WALLER CREEK - REMOVAL OF ABANDONED GAS LINE |
$6,182.61 |
WALLER CREEK CENTER - 9TH FLOOR RENOVATION |
$136,586.00 |
WALLER CREEK CENTER - CIRTAIN WALL |
$813,342.30 |
WALLER CREEK CENTER - FIRE MONITORING WORKSTATION |
$34,124.00 |
WALLER CREEK CENTER - TENTH FLOOR RENOVATION |
$281,871.88 |
WALLER CREEK CENTER 3RD, 6TH & 8TH FLOOR LOBBY REFRESH |
$15,894.93 |
WALLER CREEK CENTER 6TH FLOOR RENOVATION |
$307,378.54 |
WALLER CREEK CENTER BUILDING AUTOMATION SYSTEM |
$26,090.84 |
WALLER CREEK CENTER CARPET REPLACEMENT 2ND AND 3RD FLOOR |
$21,822.65 |
WALLER CREEK CENTER CHILLER BELL HOUSING REPLACEMENT |
$4,677.50 |
WALLER CREEK CENTER CONFERENCE ROOM 104 IMPROVEMENTS |
$1,223,104.59 |
WALLER CREEK CENTER CONTROLS - WASTEWATER |
$247,238.72 |
WALLER CREEK CENTER FIRE NOTIFICATION SYSTEM REPLACEMENT |
$428,096.99 |
WALLER CREEK CENTER INSULATION |
$18,817.50 |
WALLER CREEK CENTER PARKING GARAGE STAIRWELL INSPECTION |
$226,814.76 |
WALLER CREEK CENTER PARKING GARAGE IMPROVEMENTS |
$78,936.99 |
WALLER CREEK CENTER PATCH & SEAL DRIVEWAY SURFACE |
$28,051.12 |
WALLER CREEK CENTER RECLAIM WATER PROJECT |
$81,114.54 |
WALLER CREEK CENTER RENOVATION |
$496,965.88 |
WALLER CREEK CENTER SECURITY SYSTEM CONVERSION |
$98,298.05 |
WALLER CREEK CHILLER DRIVE REBUILD AND DRIVE REPLACEMENTS |
$352,493.43 |
WALLER CREEK DISTRICT - CREEK DELTA -AERIAL WW LINE |
$139,436.25 |
WALLER CREEK SECURITY ENHANCEMENTS |
$133,068.76 |
WALLER: SECURITY OPERATION CENTER'S BUILD-OUT |
$38,849.19 |
WALNUT CREEK ADMIN BUILDING AND MAINTENANCE SHOP BOILER REPL |
$59,662.85 |
WALNUT CREEK BUSINESS PARK LIFT STATION REHABILITATION |
$322,814.38 |
WALNUT CREEK FLOW DISTRIBUTION BOX STAIR REPLACEMENT |
$48,767.31 |
WALNUT CREEK MODIFICATIONS TO CHLORINE SOLUTION LINES |
$68,049.76 |
WALNUT CREEK PRIMARY CLARIFIER AND FLOW |
$12,779,207.91 |
WALNUT CREEK REPLACE CHLORINE LINES TO RECLAIMED TANK |
$45,663.84 |
WALNUT CREEK SIPHON ODOR CONTROL |
$87,108.74 |
WALNUT CREEK TREATMENT PLANT MAINTENANCE BUILDING FIRE ALARM |
$39,673.00 |
WALNUT CREEK WW TREATMENT PLANT GARAGE DOOR REPLACEMENT |
$58,900.58 |
WALNUT CREEK WWTP EFFLUENT SAMPLE PUMP MODIFICATIONS |
$1,448,118.54 |
WALNUT CREEK WWTP EMERGENCY 3 NON-POTABLE WATER PIPE |
$18,074.71 |
WALNUT CREEK WWTP MAINTENANCE STORAGE BUILDING REPLACEMENT |
$104,967.69 |
WALNUT CREEK WWTP NON-PENETRATING SAFETY RAILING FOR SKYLIGH |
$29,957.50 |
WALNUT CREEK WWTP OPTIMIZATION AND FACILITY PLAN |
$2,129,878.04 |
WALNUT CREEK WWTP PRIMARY CLARIFIER GATE REPLACEMENTS |
$28,797.90 |
WALNUT CREEK WWTP PROCESS AREA DOOR REPLACEMENTS |
$2,494.32 |
WALNUT CREEK WWTP RADIO ANTENNAE IMPROVEMENTS |
$588,826.40 |
WALNUT CREEK WWTP SAFETY AND PROCESS IMPR PROJECT-ADP (IDIQ) |
$119,597.93 |
WALNUT CREEK WWTP SAMPLE RECEIVING LAB RENOVATION |
$62,014.69 |
WALNUT CREEK WWTP STORMWATER IMPROVEMENTS |
$271,089.70 |
WALNUT CREEK WWTP TO SAR WWTP FLOW TRANSFER |
$748,803.49 |
WALNUT CREEK WASTEWATER TREATMENT PLANT AERATION BASIN REPAI |
$71,613.31 |
WALNUT CREEK WASTEWATER TREATMENT PLANT CHLORINE LINE REPAIR |
$4,208.85 |
WALNUT CREEK WASTEWATER TREATMENT PLANT LINE BREAK EMERGENCY |
$18,837.97 |
WALNUT CREEK WASTEWATER TREATMENT PLANT SINK HOLE REPAIR |
$7,606.00 |
WALNUT CREEK WASTEWATER TREATMENT PLANT SKYLIGHT REPLACEMENT |
$115,190.65 |
WALNUT CREEK WWTP BLOW-OFF SILENCER REPLACEMENT |
$61,990.09 |
WALNUT CREEK WWTP BLOWER OPERATOR INTERFACE UNIT UPGRADES |
$137,686.96 |
WALNUT CREEK WWTP ELECTRICAL SUBSTATION 1 HVAC REPLACEMENT |
$122,296.86 |
WALNUT CREEK WWTP FIRE WATER LINE REHAB |
$52,941.74 |
WALNUT CREEK WWTP GRIT WASHER REHAB |
$261,544.00 |
WALNUT CREEK WWTP HEADWORKS #2 BAR SCREEN |
$216,037.24 |
WALNUT CREEK WWTP INFLUENT LIFT STATION |
$1,126,819.61 |
WALNUT CREEK WWTP INSTAL CL SOLUTION LINES & JIB CRANES |
$63,289.06 |
WALNUT CREEK WWTP NON-POTABLE WATER LINE EMERGENCY REPAIRS |
$35,412.80 |
WALNUT CREEK WWTP NON-POTABLE WATER TO CHLORINE INJECTORS |
$35,270.09 |
WALNUT CREEK WWTP ODOR CONTROL DUCT LEAK INVEST & REHAB |
$27,674.20 |
WALNUT CREEK WWTP POND FLUME REPAIRS |
$45,342.45 |
WALNUT CREEK WWTP SULFUR DIOXIDE BUILDING ROOF REPLACEMENT |
$92,880.00 |
WALNUT CREEK WWTP WRI HSP-3 SUCTION VALVE REPLACEMENT |
$51,454.19 |
WALNUT CRK WWTP SECURITY IMPROVS |
$1,019,024.44 |
WALNUT WWTP MAINTENANCE SHOP CHILLER, AIR HANDLER |
$1,159,127.18 |
WALNUT WWTP ADMIN BLDG CHILLED WATER SYSTEM REPLACEMENT |
$537,012.88 |
WALNUT WWTP HEADWORKS #2 HVAC RENEWAL |
$47,097.92 |
WASTEWATER COLLECTION 4480 PARENT |
$13,451,046.51 |
WASTEWATER COLLECTION SYSTEM CHEMICAL MODEL |
$258,394.95 |
WASTEWATER FUTURE PROJECTS UNF |
$190,930.00 |
WASTEWATER HYDAULIC MODELING UPDATE |
$410,759.97 |
WASTEWATER IMPVS CITY WIDE |
$18,063,770.14 |
WASTEWATER LINE RENEWAL AND SPOT REHAB SERVICE CONTRACT |
$2,941,476.38 |
WASTEWATER RELAY AND SPOT REPAIR SERVICE CONTRACT ID/IQ |
$8,293,767.29 |
WASTEWATER RENEWAL PROGRAM - MANHOLES (2019 TO 2022) |
$1,620,165.48 |
WASTEWATER RENEWAL PROGRAM - MANHOLES IDIQ (2024-2026) |
$563,674.34 |
WASTEWATER RENEWAL PROGRAM-MANHOLES (2016 TO 2019) |
$1,140,058.44 |
WATER DISTR/LIFT STATION SCADA CONTROL IMPR-PH II |
$370,605.44 |
WC WWTP LAB & ADM BLDG HVAC-P1 |
$2,870,427.29 |
WEBBERVILLE - CHILLER - REFRIGERANT MONITOR |
$2,339.50 |
WEBBERVILLE ELEVATOR MODERNIZATION |
$72,433.00 |
WEBBERVILLE ICE MACHINE REPLACEMENT |
$14,102.00 |
WEBBERVILLE IMPROVEMENT PROJ 2015 |
$22,310.48 |
WEBBERVILLE NEW TRAILER FURNITURE |
$62,729.36 |
WEBBERVILLE STORES SECURITY UPGRADE |
$56,702.84 |
WEST 35TH STREET WASTEWATER SYSTEM REHAB |
$93,769.09 |
WEST 9TH STREET WASTEWATER REPLACEMENT |
$983,344.52 |
WEST BANK LIFT STATION REHAB |
$1,869,295.71 |
WEST BANK ODOR CONTROL UNIT |
$281,827.71 |
WETHERSFIELD ROAD WASTEWATER PIPELINE RENEWAL |
$42,927.69 |
WICKERSHAM BRIDGE PROTECTION OF 24" WASTEWATER LINE |
$37,000.00 |
WILD HORSE WWTP EMERGENCY GATE REPAIR |
$106,597.08 |
WILDHORSE PACKAGE WWTP IMPROVEMENTS |
$12,202.04 |
WILDHORSE WWTP TRAVELING BRIDGE & SLUDGE PUMPING IMPR |
$912,802.78 |
WILDHORSE WWTP EFFLUENT AREA PUMPING & CLEANING EMERGENCY |
$104,314.02 |
WILLIAM WALLACE WAY LIFT STATION DEMOLITION |
$69,448.54 |
WILLIAMSON CREEK - RICHMOND TRIBUTARY REHABILITATION-WW |
$82,645.30 |
WIRELESS NETWORK INSTALLATIONS |
$247,759.58 |
WIRELESS NETWORK REPLACEMENTS (FY21-25) |
$38,635.07 |
WW - 1304 S 3RD STREET |
$29,767.12 |
WW UPSIZE AND RELOCATION AT RUNDBERG LN AND DELTA DR-MCKALLA |
$526,737.00 |
ZILKER WASTEWATER PIPELINE REHABILITATION |
$76,963.50 |
ZILKER WATER PIPELINE RENEWAL: TREADWELL ST AREA |
$2,900,990.60 |