Notice: As of April 12, 2024, we moved some information on this site. Visit AustinTexas.gov/FSD to find Financial Documents, Performance Management, Unclaimed Property, and Contact information.

Data Drill Down for All Months & All Years

PROGRAM
DEPARTMENT AUSTIN WATER
FUND S-WASTEWATER IMPROVEMENTS
PROGRAM Select a program below.
ACTIVITY
EXPENSE CATEGORY
PAYEE
PAYMENT REQUEST
PROGRAMS | Select from Below
PROGRAM AMOUNT
10803 PLATT LANE BUILDING REHABILITION - WASTEWATER $37,586.41
25TH STREET WASTEWATER IMPROVEMENTS ROOF IMPROVEMENTS $53,394.09
30-INCH WASTEWATER MAIN EASEMENT ACQUISITION $94,643.90
38TH AND 40TH STREETS WASTEWATER PIPELINE REHABILITATION $1,445,506.99
4315 AVENUE A PROPOSED WASTEWATER SERVICE LINE EXTENSION $632.66
51ST STREET TOWER WASHOUT WASTEWATER $8,294.94
ADP - SAR WWTP LIFT STATION NO. 2 INFLUENT WET WELL DEBRIS R $217,500.00
ADP - WALNUT CREEK FACILITIES IMPROVEMENTS $276,674.17
ADP - WALNUT CREEK WWTP ACCESS STAIR IMPROVEMENTS $117,280.00
ADP - WALNUT CREEK WWTP POLYMER DOSING $307,000.00
ADP - WALNUT CREEK WWTP SOUTHERN SECURITY FENCE $99,236.08
ADP-HORNSBY BEND STRUVITE REMOVAL SYSTEM $36,200.00
ADP-SAR TRAIN B RAS VALVE REPLACEMENT $46,569.00
ADP-WCWWTP 2013 MISC FACILITY IMPROVEMENTS $92,130.00
ADP-WALNUT CREEK WWTP FACILITY DOOR REPLACEMENT $43,872.00
AWU PHONE SWITCH REPLACEMENT-COATN $367,929.92
ABANDONED WILLIAMSON CRK WW SITE $84,398.00
ACCESS LAYER SWITCH REPLACEMENT (FY21-25) $152,529.90
ADINA STREET AND ROB SCOTT STREET WATER REHABILITATION PROJ $1,479,087.61
ANDERSON MILL WWTP RELIEF $753,621.88
ANDERSON MILL ZONE WW LINE RELOCATION $26,649.63
ANNEX TELEMETRY RIVER PLACE, LOST CREEK, SHADY HOLLOW - WW $2,692,446.80
ANNEXED AREA 4480 PARENT $18,660,624.09
APPLICATION LIFECYCLE MANAGEMENT (FY24-FY28) $69,423.86
ASPHALT AND CONCRETE RESTORATION - WASTEWATER $29,320.98
ASPHALT AND CONCRETE RESTORATION FY21-23 - WASTEWATER $130.81
AUSTIN WATER FURNITURE PURCHASES $3,578.57
AUTOMATIC TRANSFER SWITCH REPLACEMENTS $126,231.43
BALCONES WWTP - CLARIFIER REHAB IMPROVEMENTS $31,841.24
BALCONES WWTP EFFLUENT BOX REPLACEMENT (IDIQ) $162,055.14
BALCONES WWTP PHASE 2 - REHAB IMPROVEMENTS $95,040.71
BARRINGTON OAKS LIFT STATION EMERGENCY GENERATOR INSTALL $8,709.65
BARRINGTON WAY FM RET & GRAVITY SYS UPGD (LS) $284.48
BARRINGTON WAY FM RET & GRAVITY SYS UPGD (REHAB) $2,185,876.36
BARTON CREEK PLAZA LIFT STATION DOWNSTREAM IMPROVEMENTS $1,188,165.76
BARTON CREEK PLAZA LIFT STATION IMPROVEMENTS $597,512.40
BARTON HILLS WASTEWATER PIPELINE RENEWAL: HORSESHOE $1,135,680.91
BILLING METER ASSESSMENTS $433,542.89
BINTLIFF LIFT STATION EMERGENCY GENERATOR INSTALLATION $8,711.22
BLOCKS 2 & 4 ODOR ABATEMENT - WASTEWATER COLLECTION SYSTEM $37,397.20
BLUFFINGTON #1 FORCE MAIN REPLACEMENT $49,722.80
BLUFFINGTON LIFT STATION EMERGENCY REPAIR $17,067.44
BLUFFINGTON LIFT STATION NO. 3 ACCESS IMPROVEMENTS $231,603.40
BOAT PUMP OUT FACILITY $42,266.61
BOGGY LOWER BASIN INFLOW AND INFILTRATION STUDY $111,444.98
BOGGY LOWER BASIN INFLOW AND INFILTRATION IMPROVEMENTS $221,075.52
BOULDER LANE LIFT STATION - EMERGENCY REHABILITATION $10,835.00
BRENTWOOD WASTEWATER PIPELINE RENEWAL - KOENIG NORTH $292,664.62
BRUSHY CREEK REGIONAL WWTP EXPANSION PARTICIPATION $84,364.90
BRYKER ROAD WASTEWATER REPLACEMENT $777,913.24
BULL CREEK BASIN WASTEWATER LINE IMPROVEMENTS - REPLACEMENT $3,168,146.55
BURNET ROAD AE KRAMER SITE (BURN-AE) - WW LINE $40,464.56
BUSINESS PROCESS AUTOMATION - ELECTRONIC FORMS AND WORKFLOWS $290,274.75
CMOM MANUAL UPDATES $165,598.09
CAPITAL EQUIPMENT - VEHICLES FY17 $3,054,276.27
CAPITAL EQUIPMENT - VEHICLES FY18 $702,427.51
CAPITAL EQUIPMENT - VEHICLES FY19 $1,617,238.77
CAPITAL EQUIPMENT - VEHICLES FY20 $3,907,955.85
CAPITAL EQUIPMENT - VEHICLES FY21 $3,417,127.64
CAPITAL EQUIPMENT - VEHICLES FY22 $1,586,610.81
CAPITAL EQUIPMENT - VEHICLES FY23 $1,958,041.54
CAPITAL EQUIPMENT - VEHICLES FY24 $3,100,808.61
CENTRAL EAST AUSTIN WASTEWATER PIPELINE RENEWAL $246,635.23
CLOUD-BASED DATA ANALYTICS UPGRADE $543,450.12
CMMS HANSEN $1,479,258.86
COLLABORATION 2023 $1,061,966.30
COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM-HORIZONTAL ASSETS $558,786.35
COMPUTERIZED MAINTENANCE MGMT SYST - VERTICAL ASSETS FY20-25 $448,683.79
CONTROL SYSTEM STANDARDIZATION AND RENOVATION $29,320.75
CONVENTION CENTER EXPANSION - AUSTIN WATER UTILITY SUPPORT $8,324.35
CORE NETWORK AND DATA CENTER REPLACEMENT (FY19-23) $182,585.22
COST OF SERVICE STUDY 2007-WW $50,345.55
COST OF SERVICE STUDY WASTEWATER $399,196.38
COUNTRY CLUB WEST - CATALINA DRIVE STREAM STABILIZATION WW $220,592.29
CROSSTN, BIG&LITTLE WALNT, ON CRK TUNNEL VENTILATION STUDY $289,463.02
CROSSTOWN SIPHON AIR JUMPTER $1,309,788.02
CROSSTOWN TUNNEL CENTRALIZED ODOR CONTROL FACILITY $6,766,608.22
DAFFAN LANE LIFT STATION EMERGENCY REPAIR $26,486.83
DATA ANALYTICS SOFTWARE IMPLEMENTATION (FY21-FY25) $171,324.67
DATA CENTER REFRESH (FY21-25) $781,762.52
DATA MGMT/INTEGRATION TOOL $927,987.23
DATACENTER LIFE CYCLE MANAGEMENT FY24-26 $59,201.51
DAVIS SPRINGS #1 LIFT STATION EMERGENCY REPAIRS $259,099.19
DAVIS SPRINGS LIFT STATION PUMP REPLACEMENT $40,370.00
DESSAU LIFT STATION IMPROVEMENTS $43,432.99
DESSAU WWTP REHAB $49,171.60
DEVELOPER LS INSPECTOR SERVICES - PEARCE LN INFLUENT LIFT ST $7,855.27
DEVELOPER LIFT STATION INSPECTOR SERVICES - BAYSHORE BEND $1,078.01
DEVELOPER LIFT STATION INSPECTOR SERVICES - HARRIS RIDGE $3,308.37
DEVELOPER LIFT STATION INSPECTOR SERVICES - HILLS BEAR CREEK $4,833.12
DEVELOPER LIFT STATION INSPECTOR SERVICES - PILOT KNOB COMMO $2,571.60
DEWATERING DUMPSTERS FOR EXPANDED PAD AT WALNUT CREEK $65,882.00
DISASTER RECOVERY AND DATA ARCHIVE REPLACEMENTS (FY19-22) $72,285.93
E 49TH WASTEWATER EXTENSION $42,921.20
E MONROE ST WASTEWATER PIPELINE RENEWAL $23,536.03
EANES BASIN & SKUNK HOLLOW CREEK WW INFRASTR RISK ASSESSMENT $313,912.29
EASEMENT FOR EXISTING DAVIS SPRINGS LIFT STATION #81 $45,161.39
EAST 13TH ST. WASTEWATER MAIN EXTENSION $2,172.44
EAST 7TH ST CORRIDOR/ CHICON- PLEASANT VALLEY $593,263.24
EAST AUSTIN COMAL AND CHICON WW CAPACITY PLANNING $282,516.57
ENCLAVE VISTA NO. 152 EMERGENCY LIFT STATION IMPROVEMENTS $19,593.61
END USER COMPUTE LIFECYCLE MANAGEMENT FY24-26 $39,838.52
ENVIRONMENTAL COMPLIANCE SOFTWARE (WIERS) $450,163.62
EXCHANGE DRIVE WW LINE REPLACEMENT (RELAY OF SEGMENT 156371) $3,078.29
FM 973 WASTEWATER LINE IMPROVEMENTS $1,858,414.62
FACILITIES AND FORCE MAIN IDIQ CONTRACT DEVELOPMENT SERVICES $179,246.16
FACILITIES MASTER PLAN - WASTERWATER $15,000.00
FACILITIES AND FORCE MAIN IDIQ - WASTEWATER FY17 $417,220.50
FACILITY MASTER PLAN STUDY - WASTEWATER $330,912.49
FALLWELL LANE CAPITAL RENEWAL PROJECT - WW TREATMENT $125,801.32
FIRST ROUND OMNI-SITE INSTALLATION $332,510.00
FLOOD CONTROL DRAINAGE BANK $63,263.75
FM 969 WASTEWATER IMPROVEMENTS PHASE 1 $434,416.62
FORT DESSAU LIFT STATION JIB CRANE INSTALLATION $3,953.49
FOUR POINT #2 FORCE MAIN EMERGENCY REPAIR $20,337.22
FOUR POINTS 1 LIFT STATION EMERGENCY REPAIR $2,478.97
FOUR POINTS CENTER LS #3 PUMP IMPROVS $109,898.25
GBSC ROOF TOP UNIT REPLACEMENT $16,589.39
GBSC-RADIO CONSOLE & MODULAR SYS REPLMT $354,880.18
GARDEN VILLA LANE WASTEWATER PIPELINE RENEWAL $139,499.08
GENERAL UTILITY RELOCATIONS $298,875.47
GEOGRAPHIC INFORMATION SYSTEM DATA MODEL $450,035.39
GEOGRAPHIC INFORMATION SYSTEM EQUIPMENT (FY19-23) $89,125.15
GEOGRAPHIC INFORMATION SYSTEM UPGRADE (FY19-23) $162,663.12
GILLIS STREET WASTEWATER LINE REPLACEMENT - RENEWING AUSTIN $10,137.82
GIS $745,009.58
GLEN BELL SERVICE CENTER - BUILDING SEWAGE LINE REHAB $714,384.26
GLEN BELL SERVICE CENTER - FIRE SYSTEM UPGRADE $88,426.50
GLEN BELL SERVICE CENTER ELEVATOR MODERNIZATION $65,558.31
GLEN BELL SERVICE CENTER HVAC REPLACEMENT $120,286.00
GLEN BELL SERVICE CENTER HVAC $234,415.75
GLEN BELL SERVICE CENTER HVAC UNITS REPLACEMENT $129,866.59
GLEN BELL SERVICE CENTER ICE MACHINE REPLACEMENT $52,688.00
GLEN BELL SERVICE CENTER SECURITY CONVERSION TO GENETEC $92,152.00
GLEN BELL SERVICE CENTER SECURITY GATE AW6 REPLACEMENT $82,088.51
GLEN BELL SERVICE CENTER STORES SECURITY UPGRADE $37,500.20
GLEN BELL WAREHOUSE EMERGENCY CAGE AND OFFICE EXPANSION $24,944.55
GONZALES LIFT STATION ABANDONMENT $1,444,586.29
GOVALLE -BOGGY CREEK- WASTEWATER PIPELINE RENEWAL $22,532.59
GOVALLE MAINTENANCE SHOP ROOFTOP UNIT REPLACEMENT $31,951.60
GOVALLE NEW TRAILER INSTALL $89,815.82
GOVALLE ODS BLOWER BUILDING ROOF REHAB $89,771.00
GOVALLE ODS CHLORINE BUILDING ROOF REHAB $11,163.88
GOVALLE SECURITY GATE RENEWAL $21,957.85
GOVALLE SECURITY INSTALLATION $189,977.40
GOVALLE WASTEWATER SERVICE IMPROVEMENTS $737,389.27
GOVALLE WORK SITE FLOORPLAN IMPROVEMENTS $256,922.39
GOVALLE WWTP ADMIN BUILDING FIRE SYSTEM $71,144.00
GOVALLE WWTP DIVERSION BOX REPAIR $35,391.52
GOVALLE WWTP EMERGENCY ROAD REPAIR $10,040.59
GOVALLE WWTP SECURITY IMPROVEMENTS $32,238.59
GPS DATA COLLECTION $84,989.02
GREATER WALNUT WWTP AND COLLECTION SYSTEM ODOR STUDY $243,862.09
HB HVAC CONTROLS $174,855.00
HAROLD COURT EAST REGIONAL SERVICE CENTER IMPROVEMENTS $14,066.88
HARPERS BRANCH CREEK INTERCEPTOR $1,976,191.74
HIGHWAY RENEWAL PROJECTS $658,701.07
HILLS OF BEAR CREEK LIFT STATION JIB CRANE INSTALLATION $28,159.77
HILLSPRING AND SCOTTSDALE WASTEWATER SYSTEM RENEWAL $83,543.28
HOLLY NEIGHBORHOOD WASTEWATER SYSTEM UPGRADES $32,864.66
HORIZONTAL ASSET MANAGEMENT - FORECASTING $11,360.58
HORIZONTAL ASSET MANAGEMENT PEER REVIEW $92,868.42
HORNSBY BEND ADMIN BLDG. ROOF IMPROVEMENTS $358,770.00
HORNSBY BEND ADMIN BUILDING COMMUNICATION CLOSET RELOCATION $182,209.10
HORNSBY BEND ADMINISTRATION LAB WASHROOM REHAB PROJECT $69,611.15
HORNSBY BEND BMP ANAMMOX PILOT STUDY $90,830.00
HORNSBY BEND BMP AUSTIN RESOURCE RECOVERY PAD SITE $2,487,353.81
HORNSBY BEND BMP BIOGAS UTILIZATION ASSESSMENT $442,209.71
HORNSBY BEND BMP SCRAP YARD CLEANUP $112,472.90
HORNSBY BEND BMP STORM DAMAGE REPAIRS $221,385.00
HORNSBY BEND BMP SULFATREAT TANK $320,985.52
HORNSBY BEND BMP TREE MITIGATION PLAN $274,738.08
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT HEADWORKS IMPROVEMEN $2,262,041.35
HORNSBY BEND BIOSOLIDS DEMOLISH ABANDONED ASBESTOS $83,920.56
HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT TREE MANAGEMENT $243,346.67
HORNSBY BEND BIOSOLIDS PLANT SAR DIGESTER ROOF REPLACEMENT $592,376.08
HORNSBY BEND BMP MAINTENANCE BLDG BREAKROOM MODERNIZATION $205,207.00
HORNSBY BEND BMP PROCESS AMMONIA REMOVAL FACILITY $1,108,933.04
HORNSBY BEND COGEN BLDG ROOF IMPROVEMENTS $342,167.00
HORNSBY BEND DEWATERING BUILDING HVAC UNIT REPLACEMENT $17,590.00
HORNSBY BEND DEWATERING FACILITY ROOF AND WALL REHAB $384,823.00
HORNSBY BEND DEWATERING FACILITY ROOF AND WALL REPLACEMENT $1,258,636.53
HORNSBY BEND DRAINAGE IMPROVEMENTS $24,953.13
HORNSBY BEND FEB BLDG ROOF IMPROVEMENTS $184,482.00
HORNSBY BEND FIRE ALARM REPLACEMENT ADMIN & MAINT SHOP $73,870.00
HORNSBY BEND INTEGRATION SYSTEM SERVICES $125,000.00
HORNSBY BEND LAB AND ADMIN BUILDING HVAC REHAB - PHASE 2 $19,776.35
HORNSBY BEND LIFT STATION VALVE REPLACEMENT $42,807.02
HORNSBY BEND LIFT STATIONS REHAB (THICKENER AND BELT FILTER) $38,041.07
HORNSBY BEND MAINTENANCE BUILDING ROOF REHAB $194,212.00
HORNSBY BEND MAINTENANCE LAB AND ADMIN BUILDING HVAC REHAB $891,366.97
HORNSBY BEND MAINTENANCE SHOP 2 ROOF REHAB $71,000.00
HORNSBY BEND MASTER PLAN $1,947,668.50
HORNSBY BEND MGMT PLANT GOVALLE BLDG ROOF IMPROVEMENTS $357,923.00
HORNSBY BEND MOMENTUM CONTROLLERS REPLACEMENT $52,994.91
HORNSBY BEND NEW TRAILER $127,959.17
HORNSBY BEND OBSOLETE SCADA EQUIPMENT REPLACEMENT $51,404.36
HORNSBY BEND RADIO ANTENNA IMPROVEMENTS $405,312.03
HORNSBY BEND SECURITY ACCESS SYSTEM UPGRADE $882,686.10
HORNSBY BEND SEWER SYSTEM REHABILITATION $25,167.60
HORNSBY BEND SHED ROOF IMPROVEMENTS $8,950.00
HORNSBY BEND SLUDGE LINE EMERGENCY REHABILITATION $7,456.50
HORNSBY BEND SLUDGE LINE EMERGENCY AT SAR DIGESTER COMPLEX $21,232.07
HORNSBY BEND THICKENER COMPLEX REHAB CONSTRUCTION $17,660,506.80
HORNSBY BEND THICKNER BUILDING ROOF REHAB $307,476.00
HORNSBY BUILDING ENVELOPE RESEAL ADMINISTRATION $20,500.00
HYDE PARK (E 38TH ST/GROOMS ST/AVENUE F) WASTEWATER PIPELINE $15,553.63
IDIQ HORNSBY BEND PROJECT IMPROVEMENTS $333,997.29
IDIQ-BRITTLYNS COURT LIFT STATION IMPROVEMENTS $13,197.86
IDIQ-HOWARD LANE PUMP STATION $30,825.60
IDIQ-LONG VISTA LIFT STATION REHABILITATION $60,488.12
IDIQ-MARBRIDGE LIFT STATION IMPROVEMENTS $26,601.27
IDIQ-WALNUT CRK BUS PARK STATION FLOODING-EMERGENCY $234,574.35
IH 35 WW LINE BETTERMENT-BEN WHITE TO WILLIAM CANNON SEGMENT $45,084.54
IT PLATFORM $2,672,917.32
IH 35 WW LINE BETTERMENT - RUNDBERG TO 290 E SEGMENT $239,638.90
IMPROVEMENTS AT SCOTLAND WELL LIFT STATION $82,032.97
IMPROVEMENTS AT SPICEWOOD PARKWAY LIFT STATION $472,673.33
IN SITU WASTEWATER LINE RENEWAL PROGRAM (2022 TO 2024) $2,607,289.59
INVENTORY AND BARCODE MANAGEMENT PROJECT $277,752.00
IT NETWORK IMPROVEMENTS $999,580.31
IT SECURITY TOOLS AND SERVICES $447,208.89
IVANHOE TRAIL WASTEWATER PIPELINE IMPROVEMENT $23,781.39
JUSTIN LANE FROM BURNET TO LAMAR $97,274.00
LS TELEMETRY-TOP END & CON REPLACEMENT $1,631,174.25
LABORATORY INFO MGMT SYSTEM $587,866.98
LABORATORY INFORMATION MANAGEMENT SYSTEM CLOUD MIGRATION $23,220.50
LABORATORY INFORMATION MANAGEMENT SYSTEM FY19-24 $65,173.99
LADY BIRD LAKE - WEST AUSTIN PARK WATER QUALITY RETROFITS $30,387.59
LARGE WASTEWATER INTERCEPTORS - ASSESS AND REHAB $786,859.72
LARGE WASTEWATER INTERCEPTORS ASSESSMENT - PILOT II $67,450.10
LENOX OAKS $381,528.43
LIFT STATION 4480 PARENT $1,580,590.28
LIFT STATION 4570 PARENT $39,108.00
LIFT STATION COMMUNICATION UPGRADE TO CELLULAR $198,052.39
LIFT STATION IMPROVEMENTS PEARCE LANE UPGRADES $68,673.06
LITTLE WALNUT CREEK 24-INCH WASTEWATER MAIN $3,912,042.35
LOST CREEK PACKAGE WWTP IMPROVEMENTS $222,150.39
LOST CREEK PUMPING RENEWAL $178,571.38
LOST CREEK WWTP HEADWORKS REPLACEMENT $117,255.15
LOST CREEK WASTEWATER TREATMENT PLANT CLARIFIER REHAB $1,792,047.17
LOWER LAKE AND RATTAN CREEK INTERCEPTORS: ROUTE STUDY $316,192.03
MABEL DAVIS LIFT STATION WET WELL EMERGENCY REPAIR $5,825.65
MANHOLE ACCESS AREA SURFACE IMPROVEMENTS $28,255.65
MCNEIL LIFT STATION IMPROVEMENTS $67,009.44
MERION CIRCLE WASTEWATER PIPELINE REHABILITATION $148,614.97
MISCELLANEOUS CAPITAL EQUIPMENT-WW $452,307.79
MLK(GIVENS DISTRICT PARK) WASTEWATER PIPELINE RENEWAL $73,153.74
NELRAY & EVANS UTIL IMPROVS-WW $1,594,939.53
NETWORK LIFE CYCLE MANAGEMENT FY24-26 $227,334.52
NEW CENTRAL LIBRARY WASTEWATER SERVICE $200,000.00
NORTH ROSEDALE PHASE II NEIGHBORHOOD WASTEWATER $1,725,964.88
NORTH SERVICE ANNEX BUILDING ROOF REPLACEMENT - WASTEWATER $160,965.97
NORTH SERVICE CENTER BUILDING ENVELOPE INSPECTION AND REHAB $37,044.00
NORTH SERVICE CENTER ENTRY DOOR REPLACEMENT $31,603.38
NORTH SERVICE CENTER GENERATOR INSTALLATION $51,139.50
NORTH SERVICE CENTER PARKING LOT REHABILITATION $7,205.80
NORTH SERVICE CENTER RESTROOMS AND SHOWERS REHAB $27,799.63
NORTH SERVICE CENTER ROOF REPLACEMENT $25,150.00
NORTH SERVICE CENTER SECURITY SYSTEM UPGRADE $15,146.56
NORTHEAST AREA WASTEWATER TREATMENT CAPACITY STUDY $236,904.84
NORTHWEST AREA - BOULDER LANE LIFT STATION $904,162.70
NORTHWEST AREA - FOUR POINTS CENTER LIFT STATION $635,576.73
NORTHWEST AREA LS IMPROVEMENTS SPRING LAKE #2 $782,298.36
NORTHWEST AREA LIFT STATION IMPROVEMENTS GREAT HILLS LIFT ST $868,962.84
NORTHWEST LIFT STATION LRP ENGINEERING STUDY $213,173.30
ONSC FLOORING REPLACEMENT - WASTEWATER $23,810.50
ONSC HOT WATER HEATER REPLACEMENT-WW $9,486.12
OAKMONT BLVD IMPROVEMENTS (CRS) $14,781.27
OLD ANDERSON MILL SITE BUILDING DEMOLITION $311,178.32
OLD ENFIELD - NILES AND NEWFIELD AREA NEIGHBRHD WW $266,700.32
OLD ENFIELD WASTEWATER PIPELINE RENEWAL - NEWFIELD LANE $415,695.25
OLD LAMPASAS LIFT STATION BYPASS VAULT INSTALLATION $51,410.54
ONION CREEK WWTP DEMOLITION $1,051,972.84
OTHER 4480 PARENT $4,417,750.01
PACKAGE PLANT PROCESS EQUIPMENT REPLACEMENT $91,200.41
PACKAGED WWTP CENTRALIZED PROCESS MONITORING SYSTEMS $72,165.00
PARK VILLAGE DRIVE WASTEWATER IMPROVEMENTS $398,229.85
PARKER LN NEIGHBORHOOD (CATALINA AND METCALFE) WASTEWATER PI $55,875.47
PC REFRESH (FY19-24) $1,253,822.28
PEARCE LANE LIFT STATION 2 EMERGENCY GENERATOR INSTALLATION $247,243.02
PEARCE LANE WWTP TEMPORARY PUMP INSTALLATION $342,086.03
PELICAN POINT LIFT STATION EMERGENCY VALVE REPLACEMENT $35,000.58
PERMITTING SOFTWARE UPGRADE (AMANDA) $76,320.34
PINO LANE WASTEWATER IMPROVEMENTS $290,328.03
PIPELINE INSPECTION SYSTEM UPGRADE - WASTEWATER $104,178.70
RA - CONCORDIA AND SW CHERRYWOOD NEIGHBORHOOD WATER SYSTEM U $266,065.85
RA - EXPOSITION BLVD WW FM REHAB - W. 35TH TO ENFIELD $383,766.96
RA-SE ALLANDALE NEIGHBORHOOD WSU $2,035,531.29
ROCIP V PROGRAM $1,649,133.47
RA - NORTH ROSEDALE / LAWNMONT NEIGHBORHOOD WW SYSTEM UPG $519,940.78
REDBUD TRAIL - WASTEWATER $314,688.09
REHABILITATION 4480 PARENT $44,238,636.01
REHABILITATION 4570 PARENT $488,132.50
REHABILITATION OF WW LINES-EPA SAAP (AWU FUNDED) $3,699,066.86
REHABILITATION OF WW LINES-EPA SAAP GRANT $1,400,715.72
REHABILITATION OF WALNUT CREEK 72" SIPHON BOX $145,610.47
RELOCATION 4480 PARENT $2,301,833.02
REMOTE FACILITIES SECURE COMMUNICATION ALTERNATIVES ASSESS $73,889.50
RENEWAL OF WALNUT INTERCEPTOR SIPHON BOXES $210,627.38
REVIEW OF COLLECTION SYSTEM ODOR & CORROSION CONTROL SYSTEMS $160,860.76
RIBELIN RANCH LIFT STATION FORCE MAIN PLUG EMERGENCY $497,691.23
RINGTAIL LIFT STATION EMERGENCY REHABILITATION $98,638.75
RINGTAIL RIDGE LIFT STATION REHABILITATION $33,262.00
RIO GRANDE FROM 24TH TO 29TH ST. RECON & UTIL ADJ $106,426.56
RIVA RIDGE LIFT STATION #117 EASEMENT $14,288.29
RIVA RIDGE LIFT STATION POWER DISTRIBUTION IMPROVEMENTS $10,408.50
RIVER PLACE WWTP DECOMMISSIONING STUDY $330,344.57
RIVER PLACE WASTEWATER TREATMENT PLANT EMERGENCY LINE REPAIR $8,568.46
RIVER PLACE WWTP CHLORINE BUILDING FOUNDATION $10,223.82
RIVERPLACE 1,CONCHOS TRAIL, & DAVENPORT LIFT STATIONS CONTRO $36,829.91
ROCIP VI PROGRAM $2,007,687.49
ROCK HARBOR EMERGENCY FORCEMAIN RENEWAL $20,857.09
ROCK HARBOR FORCEMAIN LEAK EMERGENCY $18,563.91
ROCK HARBOR LIFT STATION WET WELL COATING $87,594.68
ROCK HARBOR LS PUMP DISCHARGE LINE EMERGENCY $54,790.07
ROCK HARBOR LIFT STATION EMERGENCY $21,157.94
ROCK HARBOR LIFT STATION FORCEMAIN EMERGENCY $20,654.44
ROCK HARBOR LIFT STATION WET WELL REHAB $33,812.34
ROCK HARBOR MAIN & FOUR POINTS #2 DEMOLITION $812,274.92
ROCK HARBOUR EMERGENCY FORCEMAIN REPAIR $37,765.65
ROOFING PARENT ACCT(ASSESSMENT $570,045.91
ROSS RD NORTH WW IMPROVEMENTS $100,000.00
RUNDBERG LANE EXT. FROM METRIC TO BURNET $1,074.83
SAR BACKFLOW PREVENTION INSTALL (ADP) $25,532.23
SAR FILTER CELL NO 5 ACTUATOR REPLACEMENT ADP IDIQ $299,751.88
SAR HVAC REPLACEMENTS $37,785.00
SAR TRAIN BB CLARIFIER CONDUIT REHABILITATION $92,110.06
SAR WWTP - THICKENER HOLDING TANK MITIGATION $1,045,575.73
SAR WWTP LEAKING SLUDGE TRANSFER DRAIN LINE EMERGENCY RENEWA $132,434.20
SAR WWTP PRELIMINARY TREATMENT BUILDING B ROOF REHAB $282,843.12
SAR WWTP TRAIN A&B BLOWER OVERHEAD DOOR REPLACEMENT $30,966.12
SAR WWTP WATER REUSE BUILDING CONTROLLER REPLACEMENT $129,329.28
SAR WWTP SLUDGE TRANSFER FACILITY ROOF REHAB $211,136.06
SCADA - LIFT STATIONS $40,718.10
SCADA - WASTEWATER TREATMENT PLANTS $214,005.41
SCADA CYBER SECURITY REMEDIATION $648,858.44
SER REIMBURSEMENTS 4480 PARENT $5,250,336.88
SANITARY SEWER EVAL STUDY - WALNUT AND LITTLE WALNUT BASINS $785,629.98
SANITARY SEWER EVALUATION STUDY - GOVALLE TUNNEL AREAS $227,065.86
SANITARY SEWER EVALUATION TARGETED STUDIES CT-17 AND GT-31 $1,403,550.72
SAR ELEVATED TANK REHAB & IMPROVEMENTS $3,547,763.05
SAR INFLUENT FLOW STRUCTURE SCRUBBER VENTILATION IMPROVEMENT $106,014.77
SAR INSTALLATION OF FIRE ALARM SYSTEM - ADMIN BLDG $47,622.00
SAR NON-POTABLE WATER PUMP STATION FLOW MONITORING IMPROV $29,000.00
SAR SAFETY RAIL REPLACEMENT AND WORK PLATFORMS $32,546.00
SAR TRAIN A & B YARD LIGHTING IMPROVEMENTS $60,851.24
SAR TRAIN A&B MOTOR CONTROL CENTER ROOM RENOVATION $19,133.90
SAR TRANSFER LIFT STATION PUMP REHB $53,466.27
SAR WWTP - FILTER BUILDING FLOODING IMPROVEMENTS $290,812.84
SAR WWTP BLOWER BLDG C HVAC & ROOF RENEWAL $321,486.73
SAR WWTP FLOW EQUALIZATION BUILDING REROOF $168,596.80
SAR WWTP PRELIMINARY TREATMENT BUILDING A ROOF REHAB $287,876.68
SAR WWTP RADIO BI-DIRECTIONAL AMPLIFIER SYSTEM $572,110.51
SAR WWTP SECONDARY SLUDGE PUMP BUILDING TRAIN A ROOF REHAB $157,317.26
SCADA DATA MART AND DATA WAREHOUSE REPLACEMENT $337,476.92
SCADA TEST ENVIRONMENT WASTEWATER $34,813.06
SCADA WIDE AREA NETWORK FIREWALLING AND SEGMENTATION (WW) $38,672.72
SCHULLE BRANCH CREEK AERIAL WASTEWATER PIPELINE CROSSING REN $431,377.03
SCOTLAND WELL LIFT STATION WET WELL CLEANING (IDIQ) $94,863.67
SERVER AND ENTERPRISE STORAGE REPLACEMENT (FY20-24) $484,249.64
SEWER CLEANING EVALUATION STUDY $144,575.00
SHOAL CREEK (NORTHCROSS DRIVE) WASTEWATER PIPELINE RENEWAL $190,700.17
SHOAL CREEK AND W 38TH STREET WASTEWATER RENEWAL $69,770.64
SHOAL CREEK WASTEWATER REHAB $275,886.54
SHROPSHIRE BLVD. WASTEWATER MAIN EXTENSION $1,239.66
SINCLAIR AVENUE WASTEWATER INFRASTRUCTURE REPLACEMENT $65,198.47
SLUDGE LINE EMERGENCY REHAB $5,006.94
SMALL DIAMETER WASTEWATER LINE REPLACEMENT PROGRAM IDIQ $26,850.67
SOUTH AREA LIFT STATION IMPR - SPRINGFIELD LIFT STATION $532,999.62
SOUTH AREA LIFT STATION: BEE CAVES FORCE MAIN $49,722.81
SOUTH AREA LIFT STATION: BLUFFINGTON #2 FORCE MAIN $50,433.59
SOUTH AREA LIFT STATION: TRAVIS COUNTRY LIFT STATION $49,722.80
SOUTH AREA LIFT STATION: TREEMONT FORCE MAIN $49,722.80
SOUTH AUSTIN REGINAL WWTP UTILITY PUMP BUILDING ROOF REHAB $107,825.09
SOUTH AUSTIN REGIONAL ADMINISTRATION BUILDING HVAC CONTROLS $37,751.00
SOUTH AUSTIN REGIONAL FILTER BUILDING CORROSION IMPROVEMENTS $818,052.26
SOUTH AUSTIN REGIONAL HYPOCHLORITE DOSING IMPROVEMENTS $56,344.14
SOUTH AUSTIN REGIONAL JUNCTION BOX COVER IMPROVEMENTS $152,438.84
SOUTH AUSTIN REGIONAL LIFT STATION 1 AND 2 NON-POTABLE WATER $272,220.00
SOUTH AUSTIN REGIONAL LIFT STATION 1 ELEVATOR REHABILITATION $203,513.00
SOUTH AUSTIN REGIONAL LIFT STATION 1 PUMP REFURBISHMENT $91,999.00
SOUTH AUSTIN REGIONAL LIFT STATION 2 ELEVATOR REHABILITATION $191,672.00
SOUTH AUSTIN REGIONAL LIFT STATION 2 PUMP REFURBISHMENT $405,963.76
SOUTH AUSTIN REGIONAL TRAIN A&B GRIT CHAMBER AND PRIMARY $1,733.80
SOUTH AUSTIN REGIONAL TRAIN B BAR SCREEN REPLACEMENT $1,223,404.84
SOUTH AUSTIN REGIONAL WWTP ACCESS IMPROVEMENTS $302,969.22
SOUTH AUSTIN REGIONAL WWTP BLOWER AIR PIPING CONNECTION $108,411.57
SOUTH AUSTIN REGIONAL WWTP GAS METER AND SENSOR REPLACEMENT $75,681.42
SOUTH AUSTIN REGIONAL WWTP GOVALLE MITIGATION $338,346.54
SOUTH AUSTIN REGIONAL WWTP OUTFALL REPAIR $23,792.38
SOUTH AUSTIN REGIONAL WWTP PLAN AERATION BASIN REPAIR $89,516.13
SOUTH AUSTIN REGIONAL WWTP REUSE AND YARD PIPING IMPROVEMENT $206,014.07
SOUTH AUSTIN REGIONAL WWTP TRAIN A&B RETURN ACTIVATED SLUDGE $545,694.59
SOUTH AUSTIN REGIONAL WASTEWATER TREATMENT PLANT INTERNAL DR $274,832.59
SOUTH AUSTIN REGIONAL WWTP - WW SEED LINE INSTALLATION $105,909.08
SOUTH AUSTIN REGIONAL WWTP 2-INCH NPW LINE REPAIR $33,676.89
SOUTH AUSTIN REGIONAL WWTP DOOR REPLACEMENTS $999,612.80
SOUTH AUSTIN REGIONAL WWTP FILTER GALLERY HVAC AND ROOF REHA $382,414.58
SOUTH AUSTIN REGIONAL WWTP FY2020 MINOR RENEWAL PROJECT $465,488.60
SOUTH AUSTIN REGIONAL WWTP LIFT STATION REHABILITATION $1,482,390.83
SOUTH AUSTIN REGIONAL WWTP-WATER STATION DEMO $113,313.50
SOUTH AUSTIN REGIONAL ZAPS ANALYZER INSTALLATION $58,075.90
SOUTH FIRST CENTER LIEBERT MINI SPLITS RENEWAL $29,116.00
SOUTH LIFT STATION IMPROVEMENTS - BEND O'RIVER FORCE MAIN $348,614.91
SOUTH RIVER CITY (BONNIEVIEW ST) WASTEWATER PIPELINE RENEWAL $98,461.24
SOUTH ROUND ROCK INTERCEPTOR MANHOLE REHABILITATION PROJECT $389,354.42
SOUTH SERVICE CENTER FIRE ALARM REPLACEMENT $105,490.02
SOUTH SERVICE CENTER RESTROOM REHAB $14,998.52
SOUTH SERVICE CENTER WINDOW REPLACEMENT $23,490.00
SOUTH SVC CENTER BLDG 600 EXTERIOR WALLS & ROOF IMPROVEMENTS $12,850.00
SOUTHLAND OAKS LIFT STATION 12-INCH PIPE RENEWAL $14,269.93
SOUTHLAND OAKS LIFT STATION FLOOD REHABILITATION $512,907.63
SOUTHLAND OAKS LIFT STATION FORCE MAIN LEAK $30,853.91
SOUTHLAND OAKS LIFT STATION LEAK REPAIR EMERGNECY $37,662.66
SOUTHLAND OAKS WET WELL CONVERSION $894,037.09
SOUTHWEST ALLANDALE NEIGHBORHOOD WASTEWATER SYSTEM UPGRADES $2,999,702.84
SPACE PLANNING MODULE AND WORK ORDER SYSTEM $191,405.31
SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS $36,782.11
SPRINGFIELD LIFT STATION EMERGENCY RESPONSE HALLOWEEN 2015 $21,923.28
SPRINGFIELD LIFT STATION FORCE MAIN ASSESSMENT` $13,944.01
SPRINGLAKE LIFT STATION #2 REHABILITATION $45,328.37
SPRINGLAKE LIFT STATION PLUG REMOVAL $65,528.10
ST JOHNS & CORONADO HILLS (BUTTERMILK CREEK) WASTEWATER PIPE $240,939.89
SUBDIV ENGINEERING & INSPECTION $837,177.23
SUMMIT LAB FIRE ALARM SYSTEM REPLACEMENT - WASTEWATER $15,456.00
SUNNY LANE WASTEWATER REPLACEMENT - RENEW AUSTIN $103,837.15
T. LOUVIERE SERVICE CENTER FIRE ALARM REPLACEMENT $17,122.50
TARGETED WASTEWATER LINE IMPROVEMENTS - SOUTH BOGGY BASIN $1,670,267.36
TARGETED WASTEWATER LINE IMPROVEMENTS - TOWN LAKE BASIN $814,843.33
TARGETED WASTEWATER LINE IMPROVEMENTS IN FORT UPPER BASIN $2,912,866.22
TARRYTWN/HILLVIEW & CLEARVIEW AREA NEIGHBD WW $1,838,839.80
TAYLOR LANE PACKAGE WWTP IMPROVEMENTS $52,028.39
TAYLOR LANE WWTP CLARIFIER INFLUENT PIPE REHAB $1,725.15
TEXAS PLUME LIFT STATION VALVE REPLACEMENT $413,987.15
THERESA AVE MANHOLE INSTALLATION $648.58
THOROUGHBRED FARMS HEADWORKS REPLACEMENT $80,513.26
THOROUGHBRED FARMS MEMORIAL DAY 2016 FLOOD RECOVERY $84,593.93
THOROUGHBRED FARMS WWTP DISINFECTION AND LIFT STATION IMPROV $248,238.64
THOROUGHBRED FARMS WWTP HYPOCHLORITE IMPROVEMENTS $42,777.77
THOUSAND OAKS LIFT STATION ACCESS IMPROVEMENTS $109,481.94
TIM LOUVIERE SERVICE CENTER GENERATOR INSTALLATION - WINTER $53,161.50
TIM LOUVIERE SERVICE CENTER ICE MACHINE REPLACEMENT $9,527.00
TIM LOUVIERE SERVICE CENTER TECH SHOP REMODEL $83,362.83
TOWN LAKE METRO PARK $2,500.00
TRACOR LIFT STATION EMERGENCY GENERATOR INSTALLATION $8,709.65
TRAVIS COUNTRY LIFT STATION EMERGENCY GENERATOR INSTALLATION $8,709.67
TREATMENT PLANT 4480 PARENT $72,294,193.26
TREATMENT PLANT ASSET REPLACEMENT COST DEVELOPEMENT $27,964.79
TRUMAN HEIGHTS WASTEWATER PIPELINE RENEWAL $1,250,214.22
TURNER'S CROSSING - WASTEWATER SER $177,739.86
TX DOT 360 AT RM2222 AND COURTYARD WASTEWATER RELOCATION $5,536,248.75
TX PLUME LIFT STATION IMPROVEMENTS $79,732.50
TXDOT FM 620 AT ANDERSON MILL RD $3,737.75
TXDOT FM 973 FROM FM 969 TO THYNE - WASTEWATER $878,962.24
TXDOT 360 AT LAKEWOOD DRIVE WASTEWATER RELO $92,119.90
TXDOT IH 35 CENTRAL WW RELOCATION-US 183 TO RIVERSIDE DRIVE $6,236,325.06
TXDOT IH 35 NORTH PROJECT WW RELOCATION: SH 45 N TO US Q $3,684,230.53
TXDOT LOOP 1 WASTEWATER LINE RELOCATION $204,741.76
TXDOT LOOP 360 AT SPICEWOOD SPRINGS WW LINE RELOCATION $50,304.97
TXDOT LOOP 360 AT WESTLAKE DRIVE WASTEWATER RELOCATION $1,127,720.38
TXDOT US 183/SH71 RELO: S OF THOMPSON/SW OF AIRPORT - WW $11,320.21
TXDOT US 290 AT OAK HILL PARKWAY WASTEWATER LINE RELOCATION $7,088,722.06
TXDOT US183 N RELOCATION: SH 45 N TO LOOP 1 $64.05
US290 INTERSECT AT SH71 WM CANNON JOE TANNER $128,338.00
UT BRACKENRIDGE FIELD LAB - 24" AERIAL CROSSSING $20,835.50
UPPER BOGGY WEST WASTEWATER LINE IMPROVEMENTS- PHASE 1 $1,290,566.69
UPPER TANNEHILL CAMERON ROAD WASTEWATER IMPROVEMENTS $697,281.17
UPPER TANNEHILL WW INTERCEPTOR - PHASE 1: MORRIS WILLIAMS $1,104,201.18
VACUUM TRUCK TV-SOFTWARE $398,327.29
VIRTUALIZATION CAPABILITIES - WASTEWATER TREATMENT PLANTS $121,519.02
VISION DRIVE WASTEWATER PIPELINE UPGRADE $406,243.34
WCC - BICYCLE SHOWER PROJECT $44,680.00
WCC DOOR REPLACEMENT RM 105 $6,152.50
WCC-REPLACE AIR HANDLERS $964,045.62
WCWWTP 100 MGD EXPANSION $15,038,185.94
WW FACILITY IDIQ $761,796.27
WW PIPE NETWORK INFLOW AND INFILTRATION EVALUATION $270,304.50
WW RELAY AND SPOT REPAIR SERVICE CONTRACT IDIQ (2017-2019) $9,412,839.74
WALLER CREEK - REMOVAL OF ABANDONED GAS LINE $6,182.61
WALLER CREEK CENTER - 9TH FLOOR RENOVATION $136,586.00
WALLER CREEK CENTER - CIRTAIN WALL $813,342.30
WALLER CREEK CENTER - FIRE MONITORING WORKSTATION $34,124.00
WALLER CREEK CENTER - TENTH FLOOR RENOVATION $281,871.88
WALLER CREEK CENTER 3RD, 6TH & 8TH FLOOR LOBBY REFRESH $15,894.93
WALLER CREEK CENTER 6TH FLOOR RENOVATION $307,378.54
WALLER CREEK CENTER BUILDING AUTOMATION SYSTEM $26,090.84
WALLER CREEK CENTER CARPET REPLACEMENT 2ND AND 3RD FLOOR $21,822.65
WALLER CREEK CENTER CHILLER BELL HOUSING REPLACEMENT $4,677.50
WALLER CREEK CENTER CONFERENCE ROOM 104 IMPROVEMENTS $1,223,104.59
WALLER CREEK CENTER CONTROLS - WASTEWATER $247,238.72
WALLER CREEK CENTER FIRE NOTIFICATION SYSTEM REPLACEMENT $428,096.99
WALLER CREEK CENTER INSULATION $18,817.50
WALLER CREEK CENTER PARKING GARAGE STAIRWELL INSPECTION $226,814.76
WALLER CREEK CENTER PARKING GARAGE IMPROVEMENTS $78,936.99
WALLER CREEK CENTER PATCH & SEAL DRIVEWAY SURFACE $28,051.12
WALLER CREEK CENTER RECLAIM WATER PROJECT $81,114.54
WALLER CREEK CENTER RENOVATION $496,965.88
WALLER CREEK CENTER SECURITY SYSTEM CONVERSION $98,298.05
WALLER CREEK CHILLER DRIVE REBUILD AND DRIVE REPLACEMENTS $352,493.43
WALLER CREEK DISTRICT - CREEK DELTA -AERIAL WW LINE $139,436.25
WALLER CREEK SECURITY ENHANCEMENTS $133,068.76
WALLER: SECURITY OPERATION CENTER'S BUILD-OUT $38,849.19
WALNUT CREEK ADMIN BUILDING AND MAINTENANCE SHOP BOILER REPL $59,662.85
WALNUT CREEK BUSINESS PARK LIFT STATION REHABILITATION $322,814.38
WALNUT CREEK FLOW DISTRIBUTION BOX STAIR REPLACEMENT $48,767.31
WALNUT CREEK MODIFICATIONS TO CHLORINE SOLUTION LINES $68,049.76
WALNUT CREEK PRIMARY CLARIFIER AND FLOW $12,779,207.91
WALNUT CREEK REPLACE CHLORINE LINES TO RECLAIMED TANK $45,663.84
WALNUT CREEK SIPHON ODOR CONTROL $87,108.74
WALNUT CREEK TREATMENT PLANT MAINTENANCE BUILDING FIRE ALARM $39,673.00
WALNUT CREEK WW TREATMENT PLANT GARAGE DOOR REPLACEMENT $58,900.58
WALNUT CREEK WWTP EFFLUENT SAMPLE PUMP MODIFICATIONS $1,448,118.54
WALNUT CREEK WWTP EMERGENCY 3 NON-POTABLE WATER PIPE $18,074.71
WALNUT CREEK WWTP MAINTENANCE STORAGE BUILDING REPLACEMENT $104,967.69
WALNUT CREEK WWTP NON-PENETRATING SAFETY RAILING FOR SKYLIGH $29,957.50
WALNUT CREEK WWTP OPTIMIZATION AND FACILITY PLAN $2,129,878.04
WALNUT CREEK WWTP PRIMARY CLARIFIER GATE REPLACEMENTS $28,797.90
WALNUT CREEK WWTP PROCESS AREA DOOR REPLACEMENTS $2,494.32
WALNUT CREEK WWTP RADIO ANTENNAE IMPROVEMENTS $588,826.40
WALNUT CREEK WWTP SAFETY AND PROCESS IMPR PROJECT-ADP (IDIQ) $119,597.93
WALNUT CREEK WWTP SAMPLE RECEIVING LAB RENOVATION $62,014.69
WALNUT CREEK WWTP STORMWATER IMPROVEMENTS $271,089.70
WALNUT CREEK WWTP TO SAR WWTP FLOW TRANSFER $748,803.49
WALNUT CREEK WASTEWATER TREATMENT PLANT AERATION BASIN REPAI $71,613.31
WALNUT CREEK WASTEWATER TREATMENT PLANT CHLORINE LINE REPAIR $4,208.85
WALNUT CREEK WASTEWATER TREATMENT PLANT LINE BREAK EMERGENCY $18,837.97
WALNUT CREEK WASTEWATER TREATMENT PLANT SINK HOLE REPAIR $7,606.00
WALNUT CREEK WASTEWATER TREATMENT PLANT SKYLIGHT REPLACEMENT $115,190.65
WALNUT CREEK WWTP BLOW-OFF SILENCER REPLACEMENT $61,990.09
WALNUT CREEK WWTP BLOWER OPERATOR INTERFACE UNIT UPGRADES $137,686.96
WALNUT CREEK WWTP ELECTRICAL SUBSTATION 1 HVAC REPLACEMENT $122,296.86
WALNUT CREEK WWTP FIRE WATER LINE REHAB $52,941.74
WALNUT CREEK WWTP GRIT WASHER REHAB $261,544.00
WALNUT CREEK WWTP HEADWORKS #2 BAR SCREEN $216,037.24
WALNUT CREEK WWTP INFLUENT LIFT STATION $1,126,819.61
WALNUT CREEK WWTP INSTAL CL SOLUTION LINES & JIB CRANES $63,289.06
WALNUT CREEK WWTP NON-POTABLE WATER LINE EMERGENCY REPAIRS $35,412.80
WALNUT CREEK WWTP NON-POTABLE WATER TO CHLORINE INJECTORS $35,270.09
WALNUT CREEK WWTP ODOR CONTROL DUCT LEAK INVEST & REHAB $27,674.20
WALNUT CREEK WWTP POND FLUME REPAIRS $45,342.45
WALNUT CREEK WWTP SULFUR DIOXIDE BUILDING ROOF REPLACEMENT $92,880.00
WALNUT CREEK WWTP WRI HSP-3 SUCTION VALVE REPLACEMENT $51,454.19
WALNUT CRK WWTP SECURITY IMPROVS $1,019,024.44
WALNUT WWTP MAINTENANCE SHOP CHILLER, AIR HANDLER $1,159,127.18
WALNUT WWTP ADMIN BLDG CHILLED WATER SYSTEM REPLACEMENT $537,012.88
WALNUT WWTP HEADWORKS #2 HVAC RENEWAL $47,097.92
WASTEWATER COLLECTION 4480 PARENT $13,451,046.51
WASTEWATER COLLECTION SYSTEM CHEMICAL MODEL $258,394.95
WASTEWATER FUTURE PROJECTS UNF $190,930.00
WASTEWATER HYDAULIC MODELING UPDATE $410,759.97
WASTEWATER IMPVS CITY WIDE $18,063,770.14
WASTEWATER LINE RENEWAL AND SPOT REHAB SERVICE CONTRACT $2,941,476.38
WASTEWATER RELAY AND SPOT REPAIR SERVICE CONTRACT ID/IQ $8,293,767.29
WASTEWATER RENEWAL PROGRAM - MANHOLES (2019 TO 2022) $1,620,165.48
WASTEWATER RENEWAL PROGRAM - MANHOLES IDIQ (2024-2026) $563,674.34
WASTEWATER RENEWAL PROGRAM-MANHOLES (2016 TO 2019) $1,140,058.44
WATER DISTR/LIFT STATION SCADA CONTROL IMPR-PH II $370,605.44
WC WWTP LAB & ADM BLDG HVAC-P1 $2,870,427.29
WEBBERVILLE - CHILLER - REFRIGERANT MONITOR $2,339.50
WEBBERVILLE ELEVATOR MODERNIZATION $72,433.00
WEBBERVILLE ICE MACHINE REPLACEMENT $14,102.00
WEBBERVILLE IMPROVEMENT PROJ 2015 $22,310.48
WEBBERVILLE NEW TRAILER FURNITURE $62,729.36
WEBBERVILLE STORES SECURITY UPGRADE $56,702.84
WEST 35TH STREET WASTEWATER SYSTEM REHAB $93,769.09
WEST 9TH STREET WASTEWATER REPLACEMENT $983,344.52
WEST BANK LIFT STATION REHAB $1,869,295.71
WEST BANK ODOR CONTROL UNIT $281,827.71
WETHERSFIELD ROAD WASTEWATER PIPELINE RENEWAL $42,927.69
WICKERSHAM BRIDGE PROTECTION OF 24" WASTEWATER LINE $37,000.00
WILD HORSE WWTP EMERGENCY GATE REPAIR $106,597.08
WILDHORSE PACKAGE WWTP IMPROVEMENTS $12,202.04
WILDHORSE WWTP TRAVELING BRIDGE & SLUDGE PUMPING IMPR $912,802.78
WILDHORSE WWTP EFFLUENT AREA PUMPING & CLEANING EMERGENCY $104,314.02
WILLIAM WALLACE WAY LIFT STATION DEMOLITION $69,448.54
WILLIAMSON CREEK - RICHMOND TRIBUTARY REHABILITATION-WW $82,645.30
WIRELESS NETWORK INSTALLATIONS $247,759.58
WIRELESS NETWORK REPLACEMENTS (FY21-25) $38,635.07
WW - 1304 S 3RD STREET $29,767.12
WW UPSIZE AND RELOCATION AT RUNDBERG LN AND DELTA DR-MCKALLA $526,737.00
ZILKER WASTEWATER PIPELINE REHABILITATION $76,963.50
ZILKER WATER PIPELINE RENEWAL: TREADWELL ST AREA $2,900,990.60
The data contained on this website is for informational purposes only and contains expenditure information for the City of Austin. Certain Austin Energy transactions have been excluded as competitive matters under Texas Government Code Section 552.133 and City Council Resolution 20051201-002; therefore, the line amounts may not reflect the total check amount if certain Austin Energy invoices were included on the check.