| 10803 PLATT LANE BUILDING REHABILITION - WASTEWATER |
$502,774.57 |
| 25TH STREET WASTEWATER IMPROVEMENTS ROOF IMPROVEMENTS |
$97,216.08 |
| 30-INCH WASTEWATER MAIN EASEMENT ACQUISITION |
$94,643.90 |
| 38TH AND 40TH STREETS WASTEWATER PIPELINE REHABILITATION |
$2,156,557.06 |
| 4315 AVENUE A PROPOSED WASTEWATER SERVICE LINE EXTENSION |
$632.66 |
| 51ST STREET TOWER WASHOUT WASTEWATER |
$23,985.55 |
| 71 EAST - 428 ACRE TRACT - WASTEWATER SER |
$1,585,572.22 |
| ADP - SAR WWTP LIFT STATION NO. 2 INFLUENT WET WELL DEBRIS R |
$217,500.00 |
| ADP - WALNUT CREEK FACILITIES IMPROVEMENTS |
$276,674.17 |
| ADP - WALNUT CREEK WWTP ACCESS STAIR IMPROVEMENTS |
$117,280.00 |
| ADP - WALNUT CREEK WWTP POLYMER DOSING |
$307,000.00 |
| ADP - WALNUT CREEK WWTP SOUTHERN SECURITY FENCE |
$99,236.08 |
| ADP-HORNSBY BEND STRUVITE REMOVAL SYSTEM |
$36,200.00 |
| ADP-SAR TRAIN B RAS VALVE REPLACEMENT |
$46,569.00 |
| ADP-WCWWTP 2013 MISC FACILITY IMPROVEMENTS |
$92,130.00 |
| ADP-WALNUT CREEK WWTP FACILITY DOOR REPLACEMENT |
$43,872.00 |
| AWU PHONE SWITCH REPLACEMENT-COATN |
$367,929.92 |
| ABANDONED WILLIAMSON CRK WW SITE |
$84,398.00 |
| ACCESS LAYER SWITCH REPLACEMENT (FY21-25) |
$152,529.90 |
| ADINA STREET AND ROB SCOTT STREET WATER REHABILITATION PROJ |
$1,487,304.91 |
| ANDERSON MILL WWTP RELIEF |
$753,621.88 |
| ANDERSON MILL ZONE WW LINE RELOCATION |
$26,649.63 |
| ANNEX TELEMETRY RIVER PLACE, LOST CREEK, SHADY HOLLOW - WW |
$2,692,446.80 |
| ANNEXED AREA 4480 PARENT |
$18,660,624.09 |
| APPLICATION LIFECYCLE MANAGEMENT (FY24-FY28) |
$331,015.41 |
| ASPHALT AND CONCRETE RESTORATION - WASTEWATER |
$29,320.98 |
| ASPHALT AND CONCRETE RESTORATION FY21-23 - WASTEWATER |
$130.81 |
| AUSTIN WATER FURNITURE PURCHASES |
$3,578.57 |
| AUSTIN WATER FURNITURE UPGRADES |
$96,275.09 |
| AUSTIN WATER KEY SYSTEM UPGRADE - WASTEWATER |
$326,865.21 |
| AUTOMATIC TRANSFER SWITCH REPLACEMENTS |
$126,231.43 |
| BALCONES WWTP - CLARIFIER REHAB IMPROVEMENTS |
$31,841.24 |
| BALCONES WWTP EFFLUENT BOX REPLACEMENT (IDIQ) |
$162,055.14 |
| BALCONES WWTP PHASE 2 - REHAB IMPROVEMENTS |
$885,619.08 |
| BARRANCA CIRCLE WASTEWATER PIPELINE RENEWAL |
$44.00 |
| BARRINGTON OAKS LIFT STATION EMERGENCY GENERATOR INSTALL |
$23,721.37 |
| BARRINGTON WAY FM RET & GRAVITY SYS UPGD (LS) |
$284.48 |
| BARRINGTON WAY FM RET & GRAVITY SYS UPGD (REHAB) |
$2,185,876.36 |
| BARTON CREEK PLAZA LIFT STATION DOWNSTREAM IMPROVEMENTS |
$1,504,554.93 |
| BARTON CREEK PLAZA LIFT STATION IMPROVEMENTS |
$618,109.88 |
| BARTON HILLS WASTEWATER PIPELINE RENEWAL: HORSESHOE |
$1,194,114.63 |
| BILLING METER ASSESSMENTS |
$562,511.91 |
| BINTLIFF LIFT STATION EMERGENCY GENERATOR INSTALLATION |
$23,722.95 |
| BISMARK AND MARBRIDGE LIFT STATIONS CONTROLLER REPLACEMENT |
$76,526.42 |
| BLOCKS 2 & 4 ODOR ABATEMENT - WASTEWATER COLLECTION SYSTEM |
$37,397.20 |
| BLUFFINGTON #1 FORCE MAIN REPLACEMENT |
$49,722.80 |
| BLUFFINGTON LIFT STATION EMERGENCY REPAIR |
$17,067.44 |
| BLUFFINGTON LIFT STATION NO. 3 ACCESS IMPROVEMENTS |
$231,603.40 |
| BOAT PUMP OUT FACILITY |
$42,266.61 |
| BOGGY LOWER BASIN INFLOW AND INFILTRATION STUDY |
$111,444.98 |
| BOGGY LOWER BASIN INFLOW AND INFILTRATION IMPROVEMENTS |
$221,075.52 |
| BOULDER LANE LIFT STATION - EMERGENCY REHABILITATION |
$10,835.00 |
| BRENTWOOD WASTEWATER PIPELINE RENEWAL - KOENIG NORTH |
$304,920.97 |
| BRUSHY CREEK REGIONAL WWTP TERTIARY FILTERS PARTICIPATION |
$919,920.33 |
| BRUSHY CREEK REGIONAL WWTP EXPANSION PARTICIPATION |
$84,364.90 |
| BRYKER ROAD WASTEWATER REPLACEMENT |
$788,553.41 |
| BULL CREEK BASIN WASTEWATER LINE IMPROVEMENTS - REPLACEMENT |
$3,918,371.19 |
| BURNET ROAD AE KRAMER SITE (BURN-AE) - WW LINE |
$42,378.45 |
| BUSINESS PROCESS AUTOMATION - ELECTRONIC FORMS AND WORKFLOWS |
$290,274.75 |
| CMOM MANUAL UPDATES |
$165,598.09 |
| CAPITAL EQUIPMENT - VEHICLES FY17 |
$3,054,276.27 |
| CAPITAL EQUIPMENT - VEHICLES FY18 |
$702,427.51 |
| CAPITAL EQUIPMENT - VEHICLES FY19 |
$1,617,238.77 |
| CAPITAL EQUIPMENT - VEHICLES FY20 |
$3,907,955.85 |
| CAPITAL EQUIPMENT - VEHICLES FY21 |
$3,417,127.64 |
| CAPITAL EQUIPMENT - VEHICLES FY22 |
$1,631,660.81 |
| CAPITAL EQUIPMENT - VEHICLES FY23 |
$1,958,041.54 |
| CAPITAL EQUIPMENT - VEHICLES FY24 |
$4,163,028.73 |
| CAPITAL EQUIPMENT - VEHICLES FY25 |
$1,954,673.42 |
| CENTRAL EAST AUSTIN WASTEWATER PIPELINE RENEWAL |
$305,464.54 |
| CLOUD-BASED DATA ANALYTICS UPGRADE |
$543,450.12 |
| CMMS HANSEN |
$1,479,258.86 |
| COLLABORATION 2023 |
$1,447,686.30 |
| COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM-HORIZONTAL ASSETS |
$565,270.85 |
| COMPUTERIZED MAINTENANCE MGMT SYST - VERTICAL ASSETS FY20-25 |
$520,830.04 |
| CONTROL SYSTEM STANDARDIZATION AND RENOVATION |
$51,816.65 |
| CONVENTION CENTER EXPANSION - AUSTIN WATER UTILITY SUPPORT |
$151,254.13 |
| CORE NETWORK AND DATA CENTER REPLACEMENT (FY19-23) |
$182,585.22 |
| COST OF SERVICE STUDY 2007-WW |
$50,345.55 |
| COST OF SERVICE STUDY WASTEWATER |
$399,196.38 |
| COUNTRY CLUB WEST - CATALINA DRIVE STREAM STABILIZATION WW |
$220,592.29 |
| CROSSTN, BIG&LITTLE WALNT, ON CRK TUNNEL VENTILATION STUDY |
$289,463.02 |
| CROSSTOWN SIPHON AIR JUMPTER |
$1,309,788.02 |
| CROSSTOWN TUNNEL CENTRALIZED ODOR CONTROL FACILITY |
$6,846,534.57 |
| DAFFAN LANE LIFT STATION DISCHARGE PIPING EMERGENCY REPAIR |
$108,837.33 |
| DAFFAN LANE LIFT STATION EMERGENCY REPAIR |
$26,486.83 |
| DATA ANALYTICS SOFTWARE IMPLEMENTATION (FY21-FY25) |
$171,324.67 |
| DATA CENTER REFRESH (FY21-25) |
$781,762.52 |
| DATA MGMT/INTEGRATION TOOL |
$927,987.23 |
| DATACENTER LIFE CYCLE MANAGEMENT FY24-26 |
$137,557.71 |
| DAVIS SPRINGS #1 LIFT STATION EMERGENCY REPAIRS |
$259,099.19 |
| DAVIS SPRINGS LIFT STATION PUMP REPLACEMENT |
$40,370.00 |
| DESSAU LIFT STATION IMPROVEMENTS |
$43,432.99 |
| DESSAU WWTP INTERIM IMPROVEMENTS PHASE 2 |
$45,230.00 |
| DESSAU WWTP REHAB |
$49,171.60 |
| DEVELOPER LS INSPECTOR SERVICES - PEARCE LN INFLUENT LIFT ST |
$7,855.27 |
| DEVELOPER LIFT STATION INSPECTOR SERVICES - BAYSHORE BEND |
$1,078.01 |
| DEVELOPER LIFT STATION INSPECTOR SERVICES - HARRIS RIDGE |
$3,308.37 |
| DEVELOPER LIFT STATION INSPECTOR SERVICES - HILLS BEAR CREEK |
$4,833.12 |
| DEVELOPER LIFT STATION INSPECTOR SERVICES - PILOT KNOB COMMO |
$2,571.60 |
| DEWATERING DUMPSTERS FOR EXPANDED PAD AT WALNUT CREEK |
$65,882.00 |
| DISASTER RECOVERY AND DATA ARCHIVE REPLACEMENTS (FY19-22) |
$72,285.93 |
| E 49TH WASTEWATER EXTENSION |
$42,921.20 |
| E MONROE ST WASTEWATER PIPELINE RENEWAL |
$23,536.03 |
| EANES BASIN & SKUNK HOLLOW CREEK WW INFRASTR RISK ASSESSMENT |
$313,912.29 |
| EASEMENT FOR EXISTING DAVIS SPRINGS LIFT STATION #81 |
$50,361.39 |
| EAST 13TH ST. WASTEWATER MAIN EXTENSION |
$2,172.44 |
| EAST 7TH ST CORRIDOR/ CHICON- PLEASANT VALLEY |
$593,263.24 |
| EAST AUSTIN COMAL AND CHICON WW CAPACITY PLANNING |
$282,516.57 |
| ENCLAVE VISTA NO. 152 EMERGENCY LIFT STATION IMPROVEMENTS |
$19,593.61 |
| END USER COMPUTE LIFECYCLE MANAGEMENT FY24-26 |
$39,838.52 |
| ENHANCED CIP MONITORING AND POWERBI REPORTING |
$27,816.49 |
| ENTERPRISE BACKUP SUBSCRIPTIONS FY26 TO FY30 |
$437,028.99 |
| ENVIRONMENTAL COMPLIANCE SOFTWARE (WIERS) |
$656,221.12 |
| EXCHANGE DRIVE WW LINE REPLACEMENT (RELAY OF SEGMENT 156371) |
$3,078.29 |
| FM 973 WASTEWATER LINE IMPROVEMENTS |
$1,858,414.62 |
| FACILITIES AND FORCE MAIN IDIQ CONTRACT DEVELOPMENT SERVICES |
$210,917.64 |
| FACILITIES MASTER PLAN - WASTERWATER |
$15,000.00 |
| FACILITIES AND FORCE MAIN IDIQ - WASTEWATER FY17 |
$417,220.50 |
| FACILITY MASTER PLAN STUDY - WASTEWATER |
$330,912.49 |
| FALLWELL LANE CAPITAL RENEWAL PROJECT - WW TREATMENT |
$126,456.43 |
| FIRST ROUND OMNI-SITE INSTALLATION |
$332,510.00 |
| FLOOD CONTROL DRAINAGE BANK |
$63,263.75 |
| FM 969 WASTEWATER IMPROVEMENTS PHASE 1 |
$1,046,231.09 |
| FORT DESSAU LIFT STATION JIB CRANE INSTALLATION |
$3,953.49 |
| FOUR POINT #2 FORCE MAIN EMERGENCY REPAIR |
$20,337.22 |
| FOUR POINTS 1 LIFT STATION EMERGENCY REPAIR |
$2,478.97 |
| FOUR POINTS CENTER LS #3 PUMP IMPROVS |
$109,898.25 |
| GBSC ROOF TOP UNIT REPLACEMENT |
$16,589.39 |
| GBSC-RADIO CONSOLE & MODULAR SYS REPLMT |
$354,880.18 |
| GARDEN VILLA LANE WASTEWATER PIPELINE RENEWAL |
$187,424.46 |
| GENERAL UTILITY RELOCATIONS |
$298,875.47 |
| GEOGRAPHIC INFORMATION SYSTEM DATA MODEL |
$455,351.27 |
| GEOGRAPHIC INFORMATION SYSTEM EQUIPMENT (FY19-23) |
$89,125.15 |
| GEOGRAPHIC INFORMATION SYSTEM UPGRADE (FY19-23) |
$162,663.12 |
| GEOGRAPHIC INFORMATION SYSTEM UPGRADE (FY24-28) |
$14,886.03 |
| GILLIS STREET WASTEWATER LINE REPLACEMENT - RENEWING AUSTIN |
$664,382.19 |
| GIS |
$745,009.58 |
| GLEN BELL DISPATCH CENTER MODERNIZATION - WASTEWATER |
$115,985.77 |
| GLEN BELL SERVICE CENTER - BUILDING SEWAGE LINE REHAB |
$1,161,394.18 |
| GLEN BELL SERVICE CENTER - FIRE SYSTEM UPGRADE |
$88,426.50 |
| GLEN BELL SERVICE CENTER ELEVATOR MODERNIZATION |
$65,558.31 |
| GLEN BELL SERVICE CENTER HVAC REPLACEMENT |
$120,286.00 |
| GLEN BELL SERVICE CENTER HVAC |
$234,415.75 |
| GLEN BELL SERVICE CENTER HVAC UNITS REPLACEMENT |
$129,866.59 |
| GLEN BELL SERVICE CENTER ICE MACHINE REPLACEMENT |
$55,066.42 |
| GLEN BELL SERVICE CENTER SECURITY CONVERSION TO GENETEC |
$92,152.00 |
| GLEN BELL SERVICE CENTER SECURITY GATE AW6 REPLACEMENT |
$87,529.86 |
| GLEN BELL SERVICE CENTER STORES SECURITY UPGRADE |
$37,500.20 |
| GLEN BELL WAREHOUSE EMERGENCY CAGE AND OFFICE EXPANSION |
$24,944.55 |
| GONZALES LIFT STATION ABANDONMENT |
$1,444,586.29 |
| GOVALLE -BOGGY CREEK- WASTEWATER PIPELINE RENEWAL |
$22,532.59 |
| GOVALLE MAINTENANCE SHOP ROOFTOP UNIT REPLACEMENT |
$31,951.60 |
| GOVALLE NEW TRAILER INSTALL |
$96,085.82 |
| GOVALLE ODS BLOWER BUILDING ROOF REHAB |
$89,771.00 |
| GOVALLE ODS CHLORINE BUILDING ROOF REHAB |
$11,163.88 |
| GOVALLE SECURITY GATE RENEWAL |
$26,708.08 |
| GOVALLE SECURITY INSTALLATION |
$189,977.40 |
| GOVALLE WWTP DIVERSION BOX EMERGENCY REPAIR |
$90,055.68 |
| GOVALLE WWTP SITE REFRESH |
$601.42 |
| GOVALLE WASTEWATER SERVICE IMPROVEMENTS |
$1,351,456.22 |
| GOVALLE WORK SITE FLOORPLAN IMPROVEMENTS |
$297,655.89 |
| GOVALLE WWTP ADMIN BUILDING FIRE SYSTEM |
$71,144.00 |
| GOVALLE WWTP DIVERSION BOX REPAIR |
$35,391.52 |
| GOVALLE WWTP EMERGENCY ROAD REPAIR |
$10,040.59 |
| GOVALLE WWTP SECURITY IMPROVEMENTS |
$32,238.59 |
| GPS DATA COLLECTION |
$84,989.02 |
| GREAT HILLS LIFT STATION SITE SECURITY |
$158,255.48 |
| GREATER WALNUT WWTP AND COLLECTION SYSTEM ODOR STUDY |
$358,939.44 |
| HB HVAC CONTROLS |
$174,855.00 |
| HAROLD COURT EAST REGIONAL SERVICE CENTER IMPROVEMENTS |
$14,066.88 |
| HARPERS BRANCH CREEK INTERCEPTOR |
$1,976,191.74 |
| HIGHWAY RENEWAL PROJECTS |
$1,046,813.36 |
| HILLS OF BEAR CREEK LIFT STATION JIB CRANE INSTALLATION |
$28,207.56 |
| HILLSPRING AND SCOTTSDALE WASTEWATER SYSTEM RENEWAL |
$690,694.21 |
| HOLLY NEIGHBORHOOD WASTEWATER SYSTEM UPGRADES |
$32,864.66 |
| HORIZONTAL ASSET MANAGEMENT - FORECASTING |
$11,360.58 |
| HORIZONTAL ASSET MANAGEMENT PEER REVIEW |
$92,868.42 |
| HORNSBY BEND ADMIN BLDG. ROOF IMPROVEMENTS |
$358,770.00 |
| HORNSBY BEND ADMIN BUILDING COMMUNICATION CLOSET RELOCATION |
$182,209.10 |
| HORNSBY BEND ADMINISTRATION LAB WASHROOM REHAB PROJECT |
$103,217.29 |
| HORNSBY BEND BMP ANAMMOX PILOT STUDY |
$90,830.00 |
| HORNSBY BEND BMP AUSTIN RESOURCE RECOVERY PAD SITE |
$2,487,353.81 |
| HORNSBY BEND BMP BIOGAS UTILIZATION ASSESSMENT |
$442,209.71 |
| HORNSBY BEND BMP SCRAP YARD CLEANUP |
$112,472.90 |
| HORNSBY BEND BMP STORM DAMAGE REPAIRS |
$221,385.00 |
| HORNSBY BEND BMP SULFATREAT TANK |
$320,985.52 |
| HORNSBY BEND BMP TREE MITIGATION PLAN |
$274,738.08 |
| HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT HEADWORKS IMPROVEMEN |
$2,517,420.72 |
| HORNSBY BEND BIOSOLIDS DEMOLISH ABANDONED ASBESTOS |
$84,395.12 |
| HORNSBY BEND BIOSOLIDS MANAGEMENT PLANT TREE MANAGEMENT |
$246,397.86 |
| HORNSBY BEND BIOSOLIDS PLANT SAR DIGESTER ROOF REPLACEMENT |
$592,376.08 |
| HORNSBY BEND BMP MAINTENANCE BLDG BREAKROOM MODERNIZATION |
$205,207.00 |
| HORNSBY BEND BMP PROCESS AMMONIA REMOVAL FACILITY |
$1,899,432.21 |
| HORNSBY BEND COGEN BLDG ROOF IMPROVEMENTS |
$342,167.00 |
| HORNSBY BEND DEWATERING BUILDING HVAC UNIT REPLACEMENT |
$17,590.00 |
| HORNSBY BEND DEWATERING FACILITY ROOF AND WALL REHAB |
$384,823.00 |
| HORNSBY BEND DEWATERING FACILITY ROOF AND WALL REPLACEMENT |
$1,367,769.47 |
| HORNSBY BEND DRAINAGE IMPROVEMENTS |
$225,334.10 |
| HORNSBY BEND FEB BLDG ROOF IMPROVEMENTS |
$184,482.00 |
| HORNSBY BEND FIRE ALARM REPLACEMENT ADMIN & MAINT SHOP |
$73,870.00 |
| HORNSBY BEND GAS STORAGE COVER REPLACEMENT |
$153,471.40 |
| HORNSBY BEND INTEGRATION SYSTEM SERVICES |
$125,000.00 |
| HORNSBY BEND LAB AND ADMIN BUILDING HVAC REHAB - PHASE 2 |
$321,533.17 |
| HORNSBY BEND LIFT STATION VALVE REPLACEMENT |
$42,807.02 |
| HORNSBY BEND LIFT STATIONS REHAB (THICKENER AND BELT FILTER) |
$38,041.07 |
| HORNSBY BEND MAINTENANCE BUILDING ROOF REHAB |
$194,212.00 |
| HORNSBY BEND MAINTENANCE LAB AND ADMIN BUILDING HVAC REHAB |
$891,366.97 |
| HORNSBY BEND MAINTENANCE SHOP 2 ROOF REHAB |
$71,000.00 |
| HORNSBY BEND MASTER PLAN |
$1,947,668.50 |
| HORNSBY BEND MGMT PLANT GOVALLE BLDG ROOF IMPROVEMENTS |
$360,899.50 |
| HORNSBY BEND MOMENTUM CONTROLLERS REPLACEMENT |
$67,584.08 |
| HORNSBY BEND NEW TRAILER |
$142,583.17 |
| HORNSBY BEND OBSOLETE SCADA EQUIPMENT REPLACEMENT |
$51,404.36 |
| HORNSBY BEND RADIO ANTENNA IMPROVEMENTS |
$405,312.03 |
| HORNSBY BEND SECURITY ACCESS SYSTEM UPGRADE |
$882,686.10 |
| HORNSBY BEND SEWER SYSTEM REHABILITATION |
$25,167.60 |
| HORNSBY BEND SHED ROOF IMPROVEMENTS |
$8,950.00 |
| HORNSBY BEND SLUDGE LINE EMERGENCY REHABILITATION |
$7,456.50 |
| HORNSBY BEND SLUDGE LINE EMERGENCY AT SAR DIGESTER COMPLEX |
$21,232.07 |
| HORNSBY BEND THICKENER COMPLEX REHAB CONSTRUCTION |
$17,666,396.59 |
| HORNSBY BEND THICKNER BUILDING ROOF REHAB |
$307,476.00 |
| HORNSBY BUILDING ENVELOPE RESEAL ADMINISTRATION |
$20,500.00 |
| HYDE PARK (E 38TH ST/GROOMS ST/AVENUE F) WASTEWATER PIPELINE |
$753,467.60 |
| IDIQ HORNSBY BEND PROJECT IMPROVEMENTS |
$333,997.29 |
| IDIQ-BRITTLYNS COURT LIFT STATION IMPROVEMENTS |
$13,197.86 |
| IDIQ-HOWARD LANE PUMP STATION |
$30,825.60 |
| IDIQ-LONG VISTA LIFT STATION REHABILITATION |
$60,488.12 |
| IDIQ-MARBRIDGE LIFT STATION IMPROVEMENTS |
$26,601.27 |
| IDIQ-WALNUT CRK BUS PARK STATION FLOODING-EMERGENCY |
$234,574.35 |
| IH 35 WW LINE BETTERMENT-BEN WHITE TO WILLIAM CANNON SEGMENT |
$45,084.54 |
| IT PLATFORM |
$2,672,917.32 |
| IH 35 WW LINE BETTERMENT - RUNDBERG TO 290 E SEGMENT |
$239,638.90 |
| IMPROVEMENTS AT SCOTLAND WELL LIFT STATION |
$82,032.97 |
| IMPROVEMENTS AT SPICEWOOD PARKWAY LIFT STATION |
$472,673.33 |
| IN SITU WASTEWATER LINE RENEWAL PROGRAM (2022 TO 2024) |
$3,512,663.28 |
| IN SITU WASTEWATER LINE RENEWAL PROGRAM IDIQ (2025 TO 2027) |
$439,522.50 |
| INVENTORY AND BARCODE MANAGEMENT PROJECT |
$277,752.00 |
| IT NETWORK IMPROVEMENTS |
$999,580.31 |
| IT SECURITY TOOLS AND SERVICES |
$485,112.79 |
| IVANHOE TRAIL WASTEWATER PIPELINE IMPROVEMENT |
$23,781.39 |
| JUSTIN LANE FROM BURNET TO LAMAR |
$97,274.00 |
| LS TELEMETRY-TOP END & CON REPLACEMENT |
$1,666,347.15 |
| LA CROSSE LIFT STATION EMERGENCY DISCHARGE PIPING REPAIR |
$10,423.54 |
| LABORATORY INFO MGMT SYSTEM |
$587,866.98 |
| LABORATORY INFORMATION MANAGEMENT SYSTEM CLOUD MIGRATION |
$23,220.50 |
| LABORATORY INFORMATION MANAGEMENT SYSTEM FY19-24 |
$65,173.99 |
| LADY BIRD LAKE - WEST AUSTIN PARK WATER QUALITY RETROFITS |
$76,438.96 |
| LARGE WASTEWATER INTERCEPTORS - ASSESS AND REHAB |
$786,859.72 |
| LARGE WASTEWATER INTERCEPTORS ASSESSMENT - PILOT II |
$67,450.10 |
| LAUREL HILL LIFT STATION EMERGENCY REPAIR |
$25,309.87 |
| LENOX OAKS |
$381,528.43 |
| LIFT STATION 4480 PARENT |
$1,580,590.28 |
| LIFT STATION 4570 PARENT |
$39,108.00 |
| LIFT STATION COMMUNICATION UPGRADE TO CELLULAR |
$1,203,363.60 |
| LIFT STATION IMPROVEMENTS PEARCE LANE UPGRADES |
$68,673.06 |
| LIFT STATIONS SCADA EQUIPMENT REPLACEMENT |
$44,227.97 |
| LITTLE WALNUT CREEK 24-INCH WASTEWATER MAIN |
$5,569,415.17 |
| LITTLE WALNUT CREEK WW IMPROVEMENT BETTERMENTS |
$20,062.95 |
| LORRAIN STREET WASTEWATER RENEWAL |
$1,935.00 |
| LOST CREEK PACKAGE WWTP IMPROVEMENTS |
$223,113.39 |
| LOST CREEK PUMPING RENEWAL |
$178,571.38 |
| LOST CREEK WWTP HEADWORKS REPLACEMENT |
$117,255.15 |
| LOST CREEK WASTEWATER TREATMENT PLANT CLARIFIER REHAB |
$1,792,047.17 |
| LOWER BUTTERMILK BRANCH STREAM REHABILITATION-AW LOCAL FUNDS |
$118,825.05 |
| LOWER LAKE AND RATTAN CREEK INTERCEPTORS: ROUTE STUDY |
$316,192.03 |
| MABEL DAVIS LIFT STATION WET WELL EMERGENCY REPAIR |
$5,825.65 |
| MANHOLE ACCESS AREA SURFACE IMPROVEMENTS |
$28,255.65 |
| MARLBOROUGH & FAYLIN DR. WASTEWATER PIPELINE RENEWAL |
$789,690.24 |
| MAYFIELD PARK WASTEWATER PIPELINE CONDITION ASSESSMENT |
$37,211.51 |
| MCNEIL LIFT STATION IMPROVEMENTS |
$67,009.44 |
| MERION CIRCLE WASTEWATER PIPELINE REHABILITATION |
$197,918.22 |
| MISCELLANEOUS CAPITAL EQUIPMENT-WW |
$452,307.79 |
| MLK(GIVENS DISTRICT PARK) WASTEWATER PIPELINE RENEWAL |
$117,918.90 |
| NELRAY & EVANS UTIL IMPROVS-WW |
$1,594,939.53 |
| NETWORK LIFE CYCLE MANAGEMENT FY24-26 |
$445,970.57 |
| NEW CENTRAL LIBRARY WASTEWATER SERVICE |
$200,000.00 |
| NORTH ROSEDALE PHASE II NEIGHBORHOOD WASTEWATER |
$1,768,119.02 |
| NORTH SERVICE ANNEX BUILDING ROOF REPLACEMENT - WASTEWATER |
$322,280.19 |
| NORTH SERVICE CENTER BUILDING ENVELOPE INSPECTION AND REHAB |
$37,044.00 |
| NORTH SERVICE CENTER ENTRY DOOR REPLACEMENT |
$35,738.56 |
| NORTH SERVICE CENTER GENERATOR INSTALLATION |
$51,139.50 |
| NORTH SERVICE CENTER PARKING LOT REHABILITATION |
$7,205.80 |
| NORTH SERVICE CENTER RESTROOMS AND SHOWERS REHAB |
$27,799.63 |
| NORTH SERVICE CENTER ROOF REPLACEMENT |
$25,150.00 |
| NORTH SERVICE CENTER SECURITY SYSTEM TECHNOLOGY UPDATE |
$14,995.97 |
| NORTH SERVICE CENTER SECURITY SYSTEM UPGRADE |
$15,146.56 |
| NORTHEAST AREA WASTEWATER TREATMENT CAPACITY STUDY |
$649,437.48 |
| NORTHWEST AREA - BOULDER LANE LIFT STATION |
$2,670,503.49 |
| NORTHWEST AREA - FOUR POINTS CENTER LIFT STATION |
$800,237.02 |
| NORTHWEST AREA LS IMPROVEMENTS SPRING LAKE #2 |
$793,808.95 |
| NORTHWEST AREA LIFT STATION IMPROVEMENTS GREAT HILLS LIFT ST |
$7,521,550.80 |
| NORTHWEST LIFT STATION LRP ENGINEERING STUDY |
$213,173.30 |
| ONSC FLOORING REPLACEMENT - WASTEWATER |
$23,810.50 |
| ONSC HOT WATER HEATER REPLACEMENT-WW |
$9,486.12 |
| OAKMONT BLVD IMPROVEMENTS (CRS) |
$14,781.27 |
| OLD ANDERSON MILL SITE BUILDING DEMOLITION |
$311,178.32 |
| OLD ENFIELD - NILES AND NEWFIELD AREA NEIGHBRHD WW |
$266,700.32 |
| OLD ENFIELD WASTEWATER PIPELINE RENEWAL - NEWFIELD LANE |
$455,647.94 |
| OLD LAMPASAS DAM WW LINE REPLACEMENT |
$491,557.72 |
| OLD LAMPASAS LIFT STATION BYPASS VAULT INSTALLATION |
$51,410.54 |
| ON-PREM DATA CENTER SUBSCRIPTIONS FY25 - FY29 |
$1,472,929.22 |
| ONION CREEK WWTP DEMOLITION |
$1,051,972.84 |
| OTHER 4480 PARENT |
$4,417,750.01 |
| PACKAGE PLANT PROCESS EQUIPMENT REPLACEMENT |
$91,200.41 |
| PACKAGED WWTP CENTRALIZED PROCESS MONITORING SYSTEMS |
$123,285.00 |
| PARK VILLAGE DRIVE WASTEWATER IMPROVEMENTS |
$676,631.98 |
| PARKER LN NEIGHBORHOOD (CATALINA AND METCALFE) WASTEWATER PI |
$111,533.64 |
| PARKFIELD DR. WASTEWATER PIPELINE RENEWAL |
$678,889.85 |
| PC REFRESH (FY19-24) |
$1,253,822.28 |
| PEARCE LANE LIFT STATION 2 EMERGENCY GENERATOR INSTALLATION |
$247,243.02 |
| PEARCE LANE WWTP TEMPORARY PUMP INSTALLATION |
$342,086.03 |
| PELICAN POINT LIFT STATION EMERGENCY VALVE REPLACEMENT |
$35,000.58 |
| PERMITTING SOFTWARE UPGRADE (AMANDA) |
$76,320.34 |
| PINO LANE WASTEWATER IMPROVEMENTS |
$364,743.38 |
| PIPELINE INSPECTION SYSTEM (FY24-FY28) |
$37,500.00 |
| PIPELINE INSPECTION SYSTEM UPGRADE - WASTEWATER |
$104,178.70 |
| RA - CONCORDIA AND SW CHERRYWOOD NEIGHBORHOOD WATER SYSTEM U |
$266,065.85 |
| RA - EXPOSITION BLVD WW FM REHAB - W. 35TH TO ENFIELD |
$383,766.96 |
| RA-SE ALLANDALE NEIGHBORHOOD WSU |
$2,035,531.29 |
| ROCIP V PROGRAM |
$1,649,133.47 |
| RA - NORTH ROSEDALE / LAWNMONT NEIGHBORHOOD WW SYSTEM UPG |
$755,305.93 |
| REAL STREET & MIRIAM AVENUE WASTEWATER PIPELINE RENEWAL |
$29,199.11 |
| REDBUD TRAIL - WASTEWATER |
$873,845.36 |
| REHABILITATION 4480 PARENT |
$44,238,936.01 |
| REHABILITATION 4570 PARENT |
$488,132.50 |
| REHABILITATION OF WW LINES-EPA SAAP (AWU FUNDED) |
$3,699,066.86 |
| REHABILITATION OF WW LINES-EPA SAAP GRANT |
$1,400,715.72 |
| REHABILITATION OF WALNUT CREEK 72" SIPHON BOX |
$145,610.47 |
| RELOCATION 4480 PARENT |
$2,301,833.02 |
| REMOTE FACILITIES SECURE COMMUNICATION ALTERNATIVES ASSESS |
$125,026.98 |
| RENEWAL OF WALNUT INTERCEPTOR SIPHON BOXES |
$210,627.38 |
| REVIEW OF COLLECTION SYSTEM ODOR & CORROSION CONTROL SYSTEMS |
$160,860.76 |
| RIBELIN RANCH LIFT STATION FORCE MAIN PLUG EMERGENCY |
$497,691.23 |
| RINGTAIL LIFT STATION EMERGENCY REHABILITATION |
$98,638.75 |
| RINGTAIL RIDGE LIFT STATION REHABILITATION |
$33,262.00 |
| RIO GRANDE FROM 24TH TO 29TH ST. RECON & UTIL ADJ |
$106,426.56 |
| RIVA RIDGE LIFT STATION #117 EASEMENT |
$14,288.29 |
| RIVA RIDGE LIFT STATION POWER DISTRIBUTION IMPROVEMENTS |
$10,408.50 |
| RIVER PLACE WWTP DECOMMISSIONING STUDY |
$458,840.65 |
| RIVER PLACE WASTEWATER TREATMENT PLANT EMERGENCY LINE REPAIR |
$8,568.46 |
| RIVER PLACE WWTP CHLORINE BUILDING FOUNDATION |
$10,223.82 |
| RIVERPLACE 1,CONCHOS TRAIL, & DAVENPORT LIFT STATIONS CONTRO |
$88,001.42 |
| ROCIP VI PROGRAM |
$2,007,687.49 |
| ROCK HARBOR EMERGENCY FORCEMAIN RENEWAL |
$20,857.09 |
| ROCK HARBOR FORCEMAIN LEAK EMERGENCY |
$18,563.91 |
| ROCK HARBOR LIFT STATION WET WELL COATING |
$87,594.68 |
| ROCK HARBOR LS PUMP DISCHARGE LINE EMERGENCY |
$54,790.07 |
| ROCK HARBOR LIFT STATION EMERGENCY |
$21,157.94 |
| ROCK HARBOR LIFT STATION FORCEMAIN EMERGENCY |
$20,654.44 |
| ROCK HARBOR LIFT STATION WET WELL REHAB |
$33,812.34 |
| ROCK HARBOR MAIN & FOUR POINTS #2 DEMOLITION |
$2,315,260.14 |
| ROCK HARBOUR EMERGENCY FORCEMAIN REPAIR |
$37,765.65 |
| ROOFING PARENT ACCT(ASSESSMENT |
$570,045.91 |
| ROSS RD NORTH WW IMPROVEMENTS |
$276,619.48 |
| RUNDBERG LANE EXT. FROM METRIC TO BURNET |
$1,074.83 |
| SAR BACKFLOW PREVENTION INSTALL (ADP) |
$25,532.23 |
| SAR FILTER CELL NO 5 ACTUATOR REPLACEMENT ADP IDIQ |
$299,751.88 |
| SAR HVAC REPLACEMENTS |
$37,785.00 |
| SAR TRAIN BB CLARIFIER CONDUIT REHABILITATION |
$92,110.06 |
| SAR WWTP - THICKENER HOLDING TANK MITIGATION |
$1,045,575.73 |
| SAR WWTP LEAKING SLUDGE TRANSFER DRAIN LINE EMERGENCY RENEWA |
$132,434.20 |
| SAR WWTP PRELIMINARY TREATMENT BUILDING B ROOF REHAB |
$282,843.12 |
| SAR WWTP TRAIN A&B BLOWER OVERHEAD DOOR REPLACEMENT |
$30,966.12 |
| SAR WWTP WATER REUSE BUILDING CONTROLLER REPLACEMENT |
$188,032.58 |
| SAR WWTP SLUDGE TRANSFER FACILITY ROOF REHAB |
$211,136.06 |
| SCADA - LIFT STATIONS |
$40,718.10 |
| SCADA - WASTEWATER TREATMENT PLANTS |
$214,005.41 |
| SCADA CYBER SECURITY REMEDIATION |
$648,858.44 |
| SER REIMBURSEMENTS 4480 PARENT |
$5,250,336.88 |
| SANITARY SEWER EVAL STUDY - WALNUT AND LITTLE WALNUT BASINS |
$785,629.98 |
| SANITARY SEWER EVALUATION STUDY - GOVALLE TUNNEL AREAS |
$227,065.86 |
| SANITARY SEWER EVALUATION TARGETED STUDIES CT-17 AND GT-31 |
$1,403,550.72 |
| SAR ELEVATED TANK REHAB & IMPROVEMENTS |
$6,477,631.43 |
| SAR INFLUENT FLOW STRUCTURE SCRUBBER VENTILATION IMPROVEMENT |
$106,014.77 |
| SAR INSTALLATION OF FIRE ALARM SYSTEM - ADMIN BLDG |
$47,622.00 |
| SAR NON-POTABLE WATER PUMP STATION FLOW MONITORING IMPROV |
$29,000.00 |
| SAR SAFETY RAIL REPLACEMENT AND WORK PLATFORMS |
$32,546.00 |
| SAR TRAIN A & B YARD LIGHTING IMPROVEMENTS |
$60,851.24 |
| SAR TRAIN A&B MOTOR CONTROL CENTER ROOM RENOVATION |
$19,133.90 |
| SAR TRANSFER LIFT STATION PUMP REHB |
$53,466.27 |
| SAR WWTP - FILTER BUILDING FLOODING IMPROVEMENTS |
$290,812.84 |
| SAR WWTP BLOWER BLDG C HVAC & ROOF RENEWAL |
$321,486.73 |
| SAR WWTP FLOW EQUALIZATION BUILDING REROOF |
$168,596.80 |
| SAR WWTP PRELIMINARY TREATMENT BUILDING A ROOF REHAB |
$287,876.68 |
| SAR WWTP RADIO BI-DIRECTIONAL AMPLIFIER SYSTEM |
$572,110.51 |
| SAR WWTP SECONDARY SLUDGE PUMP BUILDING TRAIN A ROOF REHAB |
$157,317.26 |
| SAR WWTP SECURITY GATE REPLACEMENT AW37 & AW38 |
$151,800.47 |
| SCADA DATA MART AND DATA WAREHOUSE REPLACEMENT |
$337,476.92 |
| SCADA TEST ENVIRONMENT WASTEWATER |
$38,149.27 |
| SCADA WIDE AREA NETWORK FIREWALLING AND SEGMENTATION (WW) |
$40,588.59 |
| SCHULLE BRANCH CREEK AERIAL WASTEWATER PIPELINE CROSSING REN |
$515,751.26 |
| SCOTLAND WELL LIFT STATION WET WELL CLEANING (IDIQ) |
$94,863.67 |
| SECURITY OPERATIONS CENTER TECHNOLOGY EXPANSION |
$49,861.34 |
| SERVER AND ENTERPRISE STORAGE REPLACEMENT (FY20-24) |
$484,249.64 |
| SEWER CLEANING EVALUATION STUDY |
$159,105.00 |
| SHOAL CREEK (NORTHCROSS DRIVE) WASTEWATER PIPELINE RENEWAL |
$387,058.63 |
| SHOAL CREEK AND W 38TH STREET WASTEWATER RENEWAL |
$309,758.86 |
| SHOAL CREEK WASTEWATER REHAB |
$275,886.54 |
| SHROPSHIRE BLVD. WASTEWATER MAIN EXTENSION |
$35,456.36 |
| SINCLAIR AVENUE WASTEWATER INFRASTRUCTURE REPLACEMENT |
$423,344.75 |
| SLUDGE LINE EMERGENCY REHAB |
$5,006.94 |
| SMALL DIAMETER WASTEWATER LINE REPLACEMENT PROGRAM IDIQ |
$41,704.14 |
| SOUTH AREA LIFT STATION IMPR - SPRINGFIELD LIFT STATION |
$756,600.04 |
| SOUTH AREA LIFT STATION: BEE CAVES FORCE MAIN |
$49,722.81 |
| SOUTH AREA LIFT STATION: BLUFFINGTON #2 FORCE MAIN |
$50,433.59 |
| SOUTH AREA LIFT STATION: TRAVIS COUNTRY LIFT STATION |
$49,722.80 |
| SOUTH AREA LIFT STATION: TREEMONT FORCE MAIN |
$49,722.80 |
| SOUTH AUSTIN REGINAL WWTP UTILITY PUMP BUILDING ROOF REHAB |
$107,825.09 |
| SOUTH AUSTIN REGIONAL ADMINISTRATION BUILDING HVAC CONTROLS |
$37,751.00 |
| SOUTH AUSTIN REGIONAL FILTER BUILDING CORROSION IMPROVEMENTS |
$818,052.26 |
| SOUTH AUSTIN REGIONAL HYPOCHLORITE DOSING IMPROVEMENTS |
$56,344.14 |
| SOUTH AUSTIN REGIONAL JUNCTION BOX COVER IMPROVEMENTS |
$152,438.84 |
| SOUTH AUSTIN REGIONAL LIFT STATION 1 AND 2 NON-POTABLE WATER |
$272,220.00 |
| SOUTH AUSTIN REGIONAL LIFT STATION 1 ELEVATOR REHABILITATION |
$203,513.00 |
| SOUTH AUSTIN REGIONAL LIFT STATION 1 PUMP REFURBISHMENT |
$91,999.00 |
| SOUTH AUSTIN REGIONAL LIFT STATION 2 ELEVATOR REHABILITATION |
$191,672.00 |
| SOUTH AUSTIN REGIONAL LIFT STATION 2 PUMP REFURBISHMENT |
$562,095.04 |
| SOUTH AUSTIN REGIONAL TRAIN A&B GRIT CHAMBER AND PRIMARY |
$1,733.80 |
| SOUTH AUSTIN REGIONAL TRAIN B BAR SCREEN REPLACEMENT |
$1,223,404.84 |
| SOUTH AUSTIN REGIONAL WWTP ACCESS IMPROVEMENTS |
$302,969.22 |
| SOUTH AUSTIN REGIONAL WWTP BLOWER AIR PIPING CONNECTION |
$108,411.57 |
| SOUTH AUSTIN REGIONAL WWTP GAS METER AND SENSOR REPLACEMENT |
$75,681.42 |
| SOUTH AUSTIN REGIONAL WWTP GOVALLE MITIGATION |
$338,346.54 |
| SOUTH AUSTIN REGIONAL WWTP OUTFALL REPAIR |
$23,792.38 |
| SOUTH AUSTIN REGIONAL WWTP PLAN AERATION BASIN REPAIR |
$89,516.13 |
| SOUTH AUSTIN REGIONAL WWTP REUSE AND YARD PIPING IMPROVEMENT |
$206,014.07 |
| SOUTH AUSTIN REGIONAL WWTP TRAIN A&B RETURN ACTIVATED SLUDGE |
$545,694.59 |
| SOUTH AUSTIN REGIONAL WASTEWATER TREATMENT PLANT INTERNAL DR |
$274,832.59 |
| SOUTH AUSTIN REGIONAL WWTP - WW SEED LINE INSTALLATION |
$105,909.08 |
| SOUTH AUSTIN REGIONAL WWTP 2-INCH NPW LINE REPAIR |
$33,676.89 |
| SOUTH AUSTIN REGIONAL WWTP DOOR REPLACEMENTS |
$999,612.80 |
| SOUTH AUSTIN REGIONAL WWTP FILTER GALLERY HVAC AND ROOF REHA |
$382,414.58 |
| SOUTH AUSTIN REGIONAL WWTP FY2020 MINOR RENEWAL PROJECT |
$484,487.66 |
| SOUTH AUSTIN REGIONAL WWTP LIFT STATION REHABILITATION |
$1,482,390.83 |
| SOUTH AUSTIN REGIONAL WWTP-WATER STATION DEMO |
$113,313.50 |
| SOUTH AUSTIN REGIONAL ZAPS ANALYZER INSTALLATION |
$58,075.90 |
| SOUTH FIRST CENTER LIEBERT MINI SPLITS RENEWAL |
$29,116.00 |
| SOUTH LIFT STATION IMPROVEMENTS - BEND O'RIVER FORCE MAIN |
$650,572.25 |
| SOUTH RIVER CITY & BOULDIN CREEK NEIGHBORHOOD WW PIPELINE |
$19,362.65 |
| SOUTH RIVER CITY (BONNIEVIEW ST) WASTEWATER PIPELINE RENEWAL |
$133,071.37 |
| SOUTH ROUND ROCK INTERCEPTOR MANHOLE REHABILITATION PROJECT |
$389,354.42 |
| SOUTH SERVICE CENTER FIRE ALARM REPLACEMENT |
$107,744.25 |
| SOUTH SERVICE CENTER RESTROOM REHAB |
$14,998.52 |
| SOUTH SERVICE CENTER SECURITY SYSTEM TECHNOLOGY REFRESH |
$14,995.43 |
| SOUTH SERVICE CENTER WINDOW REPLACEMENT |
$29,454.65 |
| SOUTH SVC CENTER BLDG 600 EXTERIOR WALLS & ROOF IMPROVEMENTS |
$12,850.00 |
| SOUTHLAND OAKS LIFT STATION 12-INCH PIPE RENEWAL |
$14,269.93 |
| SOUTHLAND OAKS LIFT STATION EMERGENCY 12" DISCHARGE LINE REP |
$80,696.44 |
| SOUTHLAND OAKS LIFT STATION FLOOD REHABILITATION |
$512,907.63 |
| SOUTHLAND OAKS LIFT STATION FORCE MAIN LEAK |
$30,853.91 |
| SOUTHLAND OAKS LIFT STATION LEAK REPAIR EMERGNECY |
$37,662.66 |
| SOUTHLAND OAKS WET WELL CONVERSION |
$1,157,968.39 |
| SOUTHWEST ALLANDALE NEIGHBORHOOD WASTEWATER SYSTEM UPGRADES |
$2,999,702.84 |
| SPACE PLANNING MODULE AND WORK ORDER SYSTEM |
$191,405.31 |
| SPICEWOOD SPRINGS ROAD REGIONAL MOBILITY IMPROVEMENTS |
$414,372.41 |
| SPRINGFIELD LIFT STATION EMERGENCY RESPONSE HALLOWEEN 2015 |
$21,923.28 |
| SPRINGFIELD LIFT STATION FORCE MAIN ASSESSMENT` |
$13,944.01 |
| SPRINGLAKE LIFT STATION #2 REHABILITATION |
$45,328.37 |
| SPRINGLAKE LIFT STATION PLUG REMOVAL |
$65,528.10 |
| ST JOHNS & CORONADO HILLS (BUTTERMILK CREEK) WASTEWATER PIPE |
$240,939.89 |
| SUBDIV ENGINEERING & INSPECTION |
$837,177.23 |
| SUMMIT LAB FIRE ALARM SYSTEM REPLACEMENT - WASTEWATER |
$15,456.00 |
| SUNNY LANE WASTEWATER REPLACEMENT - RENEW AUSTIN |
$103,837.15 |
| T. LOUVIERE SERVICE CENTER FIRE ALARM REPLACEMENT |
$17,122.50 |
| TARGETED WASTEWATER LINE IMPROVEMENTS - SOUTH BOGGY BASIN |
$3,930,244.50 |
| TARGETED WASTEWATER LINE IMPROVEMENTS - TOWN LAKE BASIN |
$854,409.26 |
| TARGETED WASTEWATER LINE IMPROVEMENTS IN FORT UPPER BASIN |
$2,912,866.22 |
| TARRYTWN/HILLVIEW & CLEARVIEW AREA NEIGHBD WW |
$4,328,788.63 |
| TAYLOR LANE PACKAGE WWTP IMPROVEMENTS |
$52,028.39 |
| TAYLOR LANE WWTP CLARIFIER INFLUENT PIPE REHAB |
$1,725.15 |
| TEXAS PLUME LIFT STATION VALVE REPLACEMENT |
$528,969.08 |
| THERESA AVE MANHOLE INSTALLATION |
$648.58 |
| THOROUGHBRED FARMS HEADWORKS REPLACEMENT |
$80,513.26 |
| THOROUGHBRED FARMS MEMORIAL DAY 2016 FLOOD RECOVERY |
$84,593.93 |
| THOROUGHBRED FARMS WWTP DISINFECTION AND LIFT STATION IMPROV |
$248,238.64 |
| THOROUGHBRED FARMS WWTP HYPOCHLORITE IMPROVEMENTS |
$42,777.77 |
| THOUSAND OAKS LIFT STATION ACCESS IMPROVEMENTS |
$109,481.94 |
| TIM LOUVIERE SERVICE CENTER GENERATOR INSTALLATION - WINTER |
$53,161.50 |
| TIM LOUVIERE SERVICE CENTER ICE MACHINE REPLACEMENT |
$9,527.00 |
| TIM LOUVIERE SERVICE CENTER SECURITY GATE REPLACEMENT |
$121,771.81 |
| TIM LOUVIERE SERVICE CENTER TECH SHOP REMODEL |
$98,039.25 |
| TOWN LAKE METRO PARK |
$2,500.00 |
| TRACOR LIFT STATION EMERGENCY GENERATOR INSTALLATION |
$23,723.01 |
| TRAVIS COUNTRY LIFT STATION EMERGENCY GENERATOR INSTALLATION |
$23,721.39 |
| TREATMENT PLANT 4480 PARENT |
$72,379,836.68 |
| TREATMENT PLANT ASSET REPLACEMENT COST DEVELOPEMENT |
$27,964.79 |
| TRUMAN HEIGHTS WASTEWATER PIPELINE RENEWAL |
$1,250,214.22 |
| TURNER'S CROSSING - WASTEWATER SER |
$177,739.86 |
| TX DOT 360 AT RM2222 AND COURTYARD WASTEWATER RELOCATION |
$5,566,030.32 |
| TX PLUME LIFT STATION IMPROVEMENTS |
$79,732.50 |
| TXDOT FM 620 AT ANDERSON MILL RD |
$34,107.29 |
| TXDOT FM 973 FROM FM 969 TO THYNE - WASTEWATER |
$883,031.09 |
| TXDOT 360 AT LAKEWOOD DRIVE WASTEWATER RELO |
$133,929.82 |
| TXDOT FM 812 WW LINES RELOCATIONS: SH 130 TO ELROY RD. |
$43,503.80 |
| TXDOT FM 812 WW LINES RELOCATIONS: US 183 TO SH 130 |
$12,294.29 |
| TXDOT IH 35 CENTRAL WW RELOCATION-US 183 TO RIVERSIDE DRIVE |
$6,236,325.06 |
| TXDOT IH 35 NORTH PROJECT WW RELOCATION: SH 45 N TO US Q |
$3,684,230.53 |
| TXDOT LOOP 1 WASTEWATER LINE RELOCATION |
$204,741.76 |
| TXDOT LOOP 360 AT SPICEWOOD SPRINGS WW LINE RELOCATION |
$56,156.66 |
| TXDOT LOOP 360 AT WESTLAKE DRIVE WASTEWATER RELOCATION |
$1,132,414.17 |
| TXDOT US 183/SH71 RELO: S OF THOMPSON/SW OF AIRPORT - WW |
$11,320.21 |
| TXDOT US 290 AT OAK HILL PARKWAY WASTEWATER LINE RELOCATION |
$7,088,722.06 |
| TXDOT US183 N RELOCATION: SH 45 N TO LOOP 1 |
$64.05 |
| US290 INTERSECT AT SH71 WM CANNON JOE TANNER |
$128,338.00 |
| UT BRACKENRIDGE FIELD LAB - 24" AERIAL CROSSSING |
$20,835.50 |
| ULLRICH & HANDCOX WTP WASTEWATER CAPACITY RISK ASSESSMEN |
$160,608.03 |
| UPPER BOGGY WEST WASTEWATER LINE IMPROVEMENTS- PHASE 1 |
$1,420,918.34 |
| UPPER TANNEHILL CAMERON ROAD WASTEWATER IMPROVEMENTS |
$802,373.58 |
| UPPER TANNEHILL WW INTERCEPTOR - PHASE 1: MORRIS WILLIAMS |
$1,345,281.30 |
| VACUUM TRUCK TV-SOFTWARE |
$398,327.29 |
| VIRTUALIZATION CAPABILITIES - WASTEWATER TREATMENT PLANTS |
$328,981.90 |
| VISION DRIVE WASTEWATER PIPELINE UPGRADE |
$406,243.34 |
| WC WWTP EMERGENCY SO2 SCRUBBER MEDIA AND EVAP VESSEL REPLACE |
$138,248.48 |
| WCC - BICYCLE SHOWER PROJECT |
$44,680.00 |
| WCC DOOR REPLACEMENT RM 105 |
$6,152.50 |
| WCC-REPLACE AIR HANDLERS |
$972,295.14 |
| WCWWTP 100 MGD EXPANSION |
$15,038,185.94 |
| WW FACILITY IDIQ |
$761,796.27 |
| WW PIPE NETWORK INFLOW AND INFILTRATION EVALUATION |
$270,304.50 |
| WW RELAY AND SPOT REPAIR SERVICE CONTRACT IDIQ (2017-2019) |
$9,412,839.74 |
| WALLER CREEK - REMOVAL OF ABANDONED GAS LINE |
$6,182.61 |
| WALLER CREEK CENTER - 9TH FLOOR RENOVATION |
$136,586.00 |
| WALLER CREEK CENTER - CIRTAIN WALL |
$813,342.30 |
| WALLER CREEK CENTER - FIRE MONITORING WORKSTATION |
$34,124.00 |
| WALLER CREEK CENTER - TENTH FLOOR RENOVATION |
$709,385.02 |
| WALLER CREEK CENTER 3RD, 6TH & 8TH FLOOR LOBBY REFRESH |
$15,894.93 |
| WALLER CREEK CENTER 6TH FLOOR RENOVATION |
$307,378.54 |
| WALLER CREEK CENTER BUILDING AUTOMATION SYSTEM |
$33,895.30 |
| WALLER CREEK CENTER CARPET REPLACEMENT 2ND AND 3RD FLOOR |
$21,822.65 |
| WALLER CREEK CENTER CHILLER BELL HOUSING REPLACEMENT |
$4,677.50 |
| WALLER CREEK CENTER CONFERENCE ROOM 104 IMPROVEMENTS |
$1,223,104.59 |
| WALLER CREEK CENTER CONTROLS - WASTEWATER |
$247,238.72 |
| WALLER CREEK CENTER FIRE NOTIFICATION SYSTEM REPLACEMENT |
$428,096.99 |
| WALLER CREEK CENTER INSULATION |
$18,817.50 |
| WALLER CREEK CENTER PARKING GARAGE STAIRWELL INSPECTION |
$976,199.50 |
| WALLER CREEK CENTER PARKING GARAGE IMPROVEMENTS |
$78,936.99 |
| WALLER CREEK CENTER PATCH & SEAL DRIVEWAY SURFACE |
$28,051.12 |
| WALLER CREEK CENTER RECLAIM WATER PROJECT |
$95,761.40 |
| WALLER CREEK CENTER RENOVATION |
$934,024.93 |
| WALLER CREEK CENTER SECURITY SYSTEM CONVERSION |
$98,298.05 |
| WALLER CREEK CHILLER DRIVE REBUILD AND DRIVE REPLACEMENTS |
$352,493.43 |
| WALLER CREEK DISTRICT - CREEK DELTA -AERIAL WW LINE |
$188,574.16 |
| WALLER CREEK SECURITY ENHANCEMENTS |
$133,068.76 |
| WALLER: SECURITY OPERATION CENTER'S BUILD-OUT |
$38,849.19 |
| WALNUT CREEK ADMIN BUILDING AND MAINTENANCE SHOP BOILER REPL |
$59,662.85 |
| WALNUT CREEK BUSINESS PARK LIFT STATION REHABILITATION |
$322,814.38 |
| WALNUT CREEK FLOW DISTRIBUTION BOX STAIR REPLACEMENT |
$48,767.31 |
| WALNUT CREEK MODIFICATIONS TO CHLORINE SOLUTION LINES |
$68,049.76 |
| WALNUT CREEK PRIMARY CLARIFIER AND FLOW |
$19,889,878.44 |
| WALNUT CREEK REPLACE CHLORINE LINES TO RECLAIMED TANK |
$45,663.84 |
| WALNUT CREEK SIPHON ODOR CONTROL |
$87,108.74 |
| WALNUT CREEK TREATMENT PLANT MAINTENANCE BUILDING FIRE ALARM |
$39,673.00 |
| WALNUT CREEK WW TREATMENT PLANT GARAGE DOOR REPLACEMENT |
$58,900.58 |
| WALNUT CREEK WWTP EFFLUENT SAMPLE PUMP MODIFICATIONS |
$2,574,081.35 |
| WALNUT CREEK WWTP EMERGENCY 3 NON-POTABLE WATER PIPE |
$18,074.71 |
| WALNUT CREEK WWTP MAINTENANCE STORAGE BUILDING REPLACEMENT |
$104,967.69 |
| WALNUT CREEK WWTP NON-PENETRATING SAFETY RAILING FOR SKYLIGH |
$29,957.50 |
| WALNUT CREEK WWTP OPTIMIZATION AND FACILITY PLAN |
$2,129,878.04 |
| WALNUT CREEK WWTP PRIMARY CLARIFIER GATE REPLACEMENTS |
$28,797.90 |
| WALNUT CREEK WWTP PROCESS AREA DOOR REPLACEMENTS |
$2,494.32 |
| WALNUT CREEK WWTP RADIO ANTENNAE IMPROVEMENTS |
$588,826.40 |
| WALNUT CREEK WWTP SAFETY AND PROCESS IMPR PROJECT-ADP (IDIQ) |
$119,597.93 |
| WALNUT CREEK WWTP SAMPLE RECEIVING LAB RENOVATION |
$62,014.69 |
| WALNUT CREEK WWTP STORMWATER IMPROVEMENTS |
$271,089.70 |
| WALNUT CREEK WWTP TO SAR WWTP FLOW TRANSFER |
$755,473.24 |
| WALNUT CREEK WASTEWATER TREATMENT PLANT AERATION BASIN REPAI |
$71,613.31 |
| WALNUT CREEK WASTEWATER TREATMENT PLANT CHLORINE LINE REPAIR |
$4,208.85 |
| WALNUT CREEK WASTEWATER TREATMENT PLANT LINE BREAK EMERGENCY |
$18,837.97 |
| WALNUT CREEK WASTEWATER TREATMENT PLANT SINK HOLE REPAIR |
$7,606.00 |
| WALNUT CREEK WASTEWATER TREATMENT PLANT SKYLIGHT REPLACEMENT |
$115,190.65 |
| WALNUT CREEK WWTP BLOW-OFF SILENCER REPLACEMENT |
$61,990.09 |
| WALNUT CREEK WWTP BLOWER OPERATOR INTERFACE UNIT UPGRADES |
$137,686.96 |
| WALNUT CREEK WWTP ELECTRICAL SUBSTATION 1 HVAC REPLACEMENT |
$122,296.86 |
| WALNUT CREEK WWTP FIRE WATER LINE REHAB |
$52,941.74 |
| WALNUT CREEK WWTP GRIT WASHER REHAB |
$261,544.00 |
| WALNUT CREEK WWTP HEADWORKS #2 BAR SCREEN |
$216,037.24 |
| WALNUT CREEK WWTP INFLUENT LIFT STATION |
$1,753,486.20 |
| WALNUT CREEK WWTP INSTAL CL SOLUTION LINES & JIB CRANES |
$63,289.06 |
| WALNUT CREEK WWTP NON-POTABLE WATER LINE EMERGENCY REPAIRS |
$35,412.80 |
| WALNUT CREEK WWTP NON-POTABLE WATER TO CHLORINE INJECTORS |
$35,270.09 |
| WALNUT CREEK WWTP ODOR CONTROL DUCT LEAK INVEST & REHAB |
$27,674.20 |
| WALNUT CREEK WWTP POND FLUME REPAIRS |
$47,728.89 |
| WALNUT CREEK WWTP SULFUR DIOXIDE BUILDING ROOF REPLACEMENT |
$92,880.00 |
| WALNUT CREEK WWTP WRI HSP-3 SUCTION VALVE REPLACEMENT |
$51,454.19 |
| WALNUT CRK WWTP SECURITY IMPROVS |
$1,019,024.44 |
| WALNUT WWTP MAINTENANCE SHOP CHILLER, AIR HANDLER |
$1,159,127.18 |
| WALNUT WWTP ADMIN BLDG CHILLED WATER SYSTEM REPLACEMENT |
$537,012.88 |
| WALNUT WWTP HEADWORKS #2 HVAC RENEWAL |
$47,097.92 |
| WASTEWATER COLLECTION 4480 PARENT |
$13,451,046.51 |
| WASTEWATER COLLECTION SYSTEM CHEMICAL MODEL |
$258,394.95 |
| WASTEWATER FACILITIES IDIQ CONTRACT FY25-FY28 |
$55,142.37 |
| WASTEWATER FUTURE PROJECTS UNF |
$190,930.00 |
| WASTEWATER HYDAULIC MODELING UPDATE |
$469,053.96 |
| WASTEWATER IMPVS CITY WIDE |
$18,063,770.14 |
| WASTEWATER LINE RENEWAL AND SPOT REHAB SERVICE CONTRACT |
$4,546,952.47 |
| WASTEWATER RELAY AND SPOT REPAIR SERVICE CONTRACT ID/IQ |
$8,293,767.29 |
| WASTEWATER RENEWAL PROGRAM - MANHOLES (2019 TO 2022) |
$1,620,165.48 |
| WASTEWATER RENEWAL PROGRAM - MANHOLES IDIQ (2024-2026) |
$1,040,759.68 |
| WASTEWATER RENEWAL PROGRAM-MANHOLES (2016 TO 2019) |
$1,140,058.44 |
| WATER DISTR/LIFT STATION SCADA CONTROL IMPR-PH II |
$370,605.44 |
| WC WWTP LAB & ADM BLDG HVAC-P1 |
$2,870,427.29 |
| WEBBERVILLE - CHILLER - REFRIGERANT MONITOR |
$2,339.50 |
| WEBBERVILLE ELEVATOR MODERNIZATION |
$72,433.00 |
| WEBBERVILLE ICE MACHINE REPLACEMENT |
$14,102.00 |
| WEBBERVILLE IMPROVEMENT PROJ 2015 |
$22,310.48 |
| WEBBERVILLE NEW TRAILER FURNITURE |
$66,679.36 |
| WEBBERVILLE STORES SECURITY UPGRADE |
$56,702.84 |
| WEST 35TH STREET WASTEWATER SYSTEM REHAB |
$164,577.83 |
| WEST 9TH STREET WASTEWATER REPLACEMENT |
$983,344.52 |
| WEST BANK LIFT STATION REHAB |
$1,869,295.71 |
| WEST BANK ODOR CONTROL UNIT |
$580,667.32 |
| WETHERSFIELD ROAD WASTEWATER PIPELINE RENEWAL |
$42,927.69 |
| WICKERSHAM BRIDGE PROTECTION OF 24" WASTEWATER LINE |
$37,000.00 |
| WILD HORSE WWTP EMERGENCY GATE REPAIR |
$106,597.08 |
| WILDHORSE PACKAGE WWTP IMPROVEMENTS |
$12,202.04 |
| WILDHORSE WWTP TRAVELING BRIDGE & SLUDGE PUMPING IMPR |
$912,802.78 |
| WILDHORSE WWTP EFFLUENT AREA PUMPING & CLEANING EMERGENCY |
$104,314.02 |
| WILLIAM WALLACE WAY LIFT STATION DEMOLITION |
$69,448.54 |
| WILLIAMSON CREEK - RICHMOND TRIBUTARY REHABILITATION-WW |
$86,495.75 |
| WIRELESS NETWORK INSTALLATIONS |
$247,759.58 |
| WIRELESS NETWORK REPLACEMENTS (FY21-25) |
$38,635.07 |
| WW - 1304 S 3RD STREET |
$29,767.12 |
| WW UPSIZE AND RELOCATION AT RUNDBERG LN AND DELTA DR-MCKALLA |
$526,737.00 |
| ZILKER WASTEWATER PIPELINE REHABILITATION |
$113,586.48 |
| ZILKER WATER PIPELINE RENEWAL: TREADWELL ST AREA |
$4,106,433.49 |