2021 WATERLINE ON-CALL SERVICES IDIQ |
$5,441,988.62 |
25TH STREET WATER IMPROVEMENTS |
$26,377.59 |
38TH AND 40TH STREETS WATER PIPELINE REHABILITATION |
$141,576.63 |
4321 CITY PARK RD 8 INCH WATER LINE EXTENSION |
$29,835.85 |
5503 LAKEMOORE DR WATER LINE EXTENSION |
$31,459.16 |
55TH ST TO 45TH ST (ARPT-C1A) - WATER LINE |
$8,257.02 |
720 UPSON WATER LINE EXTENSION |
$59,944.61 |
ADP - REPLACEMENT OF FILTER BASIN BASEMENT DEHUMIDIFIERS |
$355,699.30 |
ADP-ULLRICH CONCRETE REHABILITATION |
$187,061.00 |
ADP-ULLRICH WTP PROTECTIVE COATING SYSTEM REHABILITATION |
$102,009.68 |
ASR PRELIMINARY INVESTIGATION AND FEASIBILITY ANALYSIS |
$144,164.60 |
AWU PHONE SWITCH REPLACEMENT-GAATN |
$342,847.25 |
ACCESS LAYER SWITCH REPLACEMENT (FY21-25) |
$152,529.91 |
ACCUMULATED BALANCE |
$364,919.49 |
ADINA STREET AND ROB SCOTT STREET WATER REHABILITATION PROJ |
$30,074.72 |
ADVANCED METERING INFRASTRUCTURE CONSULTANT |
$4,674,939.92 |
ALTERNATIVE PROCESS EVALUATION FOR AUSTIN WATER TRTMT PLANTS |
$199,624.00 |
ANDERSON MILL TRANSMISSION MAIN III |
$76.00 |
ANDERSON MILL ZONE WATER LINE RELOCATION |
$26,649.63 |
ANN AND MAYE PLACE WATER IMPROVEMENTS |
$88,245.94 |
ANNEXED AREA 3920 PARENT |
$290,875.07 |
AQUIFER STORAGE & RECOVERY (ASR) PILOT |
$1,527,160.39 |
ASPHALT AND CONCRETE RESTORATION - WATER |
$29,655.32 |
ASPHALT AND CONCRETE RESTORATION FY21-23 - WATER |
$173.37 |
ATLANTA AND FOSTER WATERLINE IMPROVEMENTS |
$90,070.08 |
BARN BATHROOM INSTALLATION |
$60,055.11 |
BARTON HILLS WATER PIPELINE RENEWAL: HORSESHOE BEND AREA |
$241,752.77 |
BEST MANAGEMENT PRACTICES FOR PIPELINE SYSTEMS |
$11,360.58 |
BOUNDARY FENCING (MULTIPLE) |
$66,445.00 |
BRENTWOOD WATER PIPELINE RENEWAL - KOENIG NORTH |
$199,042.93 |
BRIGHT LEAF HIGH GAME FENCING ALONG MT. BONNELL RD., SOUTH B |
$162,091.34 |
BRYKER ROAD WATER REPLACEMENT |
$610,059.23 |
BUSINESS PROCESS AUTOMATION - ELECTRONIC FORMS AND WORKFLOWS |
$165,364.50 |
CANYON CREEK TRACT FENCING |
$155,803.41 |
CAPITAL EQUIPMENT - VEHICLES FY17 |
$1,024,822.50 |
CAPITAL EQUIPMENT - VEHICLES FY18 |
$149,208.76 |
CAPITAL EQUIPMENT - VEHICLES FY19 |
$1,676,389.90 |
CAPITAL EQUIPMENT - VEHICLES FY20 |
$2,784,481.30 |
CAPITAL EQUIPMENT - VEHICLES FY21 |
$2,415,876.09 |
CAPITAL EQUIPMENT - VEHICLES FY22 |
$1,111,133.68 |
CAPITAL EQUIPMENT - VEHICLES FY23 |
$104,535.80 |
CAROL LEE FENCING |
$53,196.55 |
CENTER ST. RESERVOIR ANCHOR BOLT ANALYSIS |
$9,553.00 |
CENTER STREET PUMP STATION HVAC |
$26,347.43 |
CESAR CHAVEZ TWO WAY CONV- W |
$9,071.10 |
CLOUD-BASED DATA ANALYTICS UPGRADE |
$451,971.47 |
CMMS HANSEN |
$1,497,503.82 |
COLLABORATION 2023 |
$411,932.23 |
COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM-HORIZONTAL ASSETS |
$346,983.04 |
COMPUTERIZED MAINTENANCE MGMT SYST - VERTICAL ASSETS FY20-25 |
$392,316.44 |
CORE NETWORK AND DATA CENTER REPLACEMENT (FY19-23) |
$182,585.22 |
CORTANA HIGH EAST BOUNDARY AT TRAILHEAD HIGH GAME FENCING |
$184,705.54 |
COST OF SERVICE STUDY 2007 |
$100,270.51 |
COST OF SERVICE STUDY WATER |
$399,196.39 |
CREEDMOOR DRIVE WATER PIPELINE REPLACEMENT |
$135,112.74 |
DAFFAN LANE WATER SERVICE LINE EXTENSION |
$45.00 |
DATA ANALYTICS SOFTWARE IMPLEMENTATION (FY21-FY25) |
$127,836.68 |
DATA CENTER REFRESH (FY21-25) |
$733,544.03 |
DATA MGMT/INTEGRATION TOOL |
$1,081,699.02 |
DAVID WATER TREATMENT PLANT EMERGENCY WASTEWATER MAIN REPAIR |
$105,692.22 |
DAVIS CONTROL ROOM REHABILITATION |
$413,459.80 |
DAVIS LANE #1 RESERVOIR IMPROVEMENTS |
$5,751,146.55 |
DAVIS RAPID MIX PUMPS MECHANICAL SEAL POTABLE IMPROVEMENTS |
$40,072.12 |
DAVIS RAW WATER EFFICIENCY LSPS IMPROVEMENTS |
$102,095.27 |
DAVIS WTP - LOW SERVICE BUILDING HVAC REPLACEMENT |
$85,474.00 |
DAVIS WTP - METER REPLACEMENT (ADP) |
$206,058.40 |
DAVIS WTP CO2 TANKS, GUARD STATION, AND MISC FACILITY IMPR |
$527,834.79 |
DAVIS WTP CHEMICAL BUILDING REMODEL |
$84,181.93 |
DAVIS WTP CHEMICAL BUILDING ROOFTOP HVAC UNITS |
$67,756.00 |
DAVIS WTP FILTER 1, 26 AND 27 VALVE REPLACEMENT |
$60,063.16 |
DAVIS WTP HIGH SERVICE REPLACEMENT OF AIR HANDLERS |
$376,211.80 |
DAVIS WTP LUBRICANT STORAGE SHED AND HANDLING EQUIPMENT |
$7,980.00 |
DAVIS WTP MAINTENANCE SHOP - REPLACE SHOP HEATERS |
$519,582.66 |
DAVIS WTP RECYCLE PUMP STATION DISCHARGE SOLID GRIT REMOVAL |
$145,126.20 |
DAVIS WTP SEDIMENTATION BASIN FLOW METER REPLACEMENT (ADP) |
$162,800.00 |
DAVIS WATER QUALITY & DETENTION IMPROVEMENTS |
$105,418.90 |
DAVIS WATER TREATMENT PLANT - FIRE MONITORING UPGRADE |
$67,185.12 |
DAVIS WATER TREATMENT PLANT ADMIN BUILDING ROOFTOP UNIT REPL |
$85,523.00 |
DAVIS WATER TREATMENT PLANT BASIN CONCRETE IMPROVEMENTS |
$38,757.72 |
DAVIS WATER TREATMENT PLANT BASIN CONCRETE REPAIRS |
$52,652.80 |
DAVIS WATER TREATMENT PLANT CALGON PUMP IMPROVEMENTS |
$215,507.01 |
DAVIS WATER TREATMENT PLANT CHLORINE VACUUM REGULATOR IMPROV |
$28,696.00 |
DAVIS WATER TREATMENT PLANT FY2020 MINOR RENEWAL PROJECT |
$145,300.00 |
DAVIS WATER TREATMENT PLANT FILTER MEDIA |
$478,143.88 |
DAVIS WATER TREATMENT PLANT LIME BLOWER REPLACEMENT |
$19,911.00 |
DAVIS WATER TREATMENT PLANT REHAB OF MAINTENANCE SHOP |
$63,155.91 |
DAVIS WATER TREATMENT PLANT-RECYCLE BUILDING NO.2 WATER |
$50,720.00 |
DAVIS WTP BASIN FIBERGLASS SAFETY GRATING REPLACEMENT |
$8,017.85 |
DAVIS WTP BASIN WASHWATER PIPE RENEWAL |
$148,892.41 |
DAVIS WTP CHEMICAL BLDG CHLORINE & AMMONIA LEAK DETECTION |
$179,246.71 |
DAVIS WTP CO2 TANKS PRESSURE RELIEF VALVE IMPROVEMENTS |
$33,073.83 |
DAVIS WTP HIGH SERVICE PUMP STATION PUMP 21 MOTOR REHAB |
$44,602.66 |
DAVIS WTP HIGH SVC PUMP STATION MOTOR 21 EMERGENCY REPAIR |
$263,623.00 |
DAVIS WTP RAW WATER INFLUENT PIPE AND APPURTENANCE REHAB |
$35,050.00 |
DECKER LN (BETWEEN LOYOLA & MAYVIEW) WATER PIPELINE RENEWAL |
$2,604.11 |
DEMOLITION OF RESIDENTIAL INFRASTRUCTURE |
$21,925.00 |
DEPLOY ESAS AT WTP4 |
$1,273,744.00 |
DISASTER RECOVERY AND DATA ARCHIVE REPLACEMENTS (FY19-22) |
$72,285.94 |
DOWNTOWN DRINKING WATER FOUNTAINS |
$9,424.70 |
EAST 55TH STREET & HARMON AVENUE WATERLINE REHABILITATION |
$40,730.22 |
EAST 7TH ST CORRIDOR/ CHICON- PLEASANT VALLEY |
$503,817.10 |
EAST AUSTIN TRANSMISSION LINE |
$82,984.28 |
EAST BRAKER LANE WATERLINE EXTENSION |
$1,245.05 |
ED'S CROSSING HIGH GAME FENCE |
$379,990.48 |
ELROY AREA TEMPORARY PRESSURE MONITORING |
$107,182.34 |
ENVIRONMENTAL COMPLIANCE SOFTWARE (WIERS) |
$254,131.37 |
FACILITIES AND FORCE MAIN IDIQ CONTRACT DEVELOPMENT SERVICES |
$50,000.00 |
FACILITIES AND FORCE MAIN IDIQ - WATER FY17 |
$417,220.52 |
FACILITY MASTER PLAN STUDY - WATER |
$330,912.51 |
FEASIBILITY AND ENGINEERING ANALYSES (FEA) FOR SUPPLY-SIDE |
$729,755.00 |
FIRE ALARM SYSTEM WSC |
$25,929.00 |
FM-812 & US-183 WATERLINE IMPROVEMENTS |
$155,536.35 |
FOREST NORTH PHASE 2 WATER LINE RELOCATION |
$2,206,151.01 |
FOREST RIDGE ENTIRE BOUNDARY HIGH GAME FENCING |
$75,177.72 |
FOREST RIDGE PUMP STATION & RESERVOIR HVAC |
$26,992.69 |
FORT UPPER BASIN WATER PIPELINE RENEWAL |
$117,165.11 |
GBSC ROOF TOP UNIT REPLACEMENT |
$16,589.39 |
GBSC-RADIO CONSOLE & MODULAR SYS REPLMT |
$362,150.58 |
GIS EALP (ABIA UTILITY LOCATION) |
$50,000.00 |
GARDEN VILLA LANE WATER PIPELINE RENEWAL |
$134,081.17 |
GEOGRAPHIC INFORMATION SYSTEM DATA MODEL |
$352,987.78 |
GEOGRAPHIC INFORMATION SYSTEM EQUIPMENT (FY19-23) |
$89,125.15 |
GEOGRAPHIC INFORMATION SYSTEM UPGRADE (FY19-23) |
$134,556.87 |
GIS 2006 |
$745,955.72 |
GLEN BELL SERVICE CENTER ELEVATOR MODERNIZATION |
$34,091.31 |
GLEN BELL SERVICE CENTER HVAC REPLACEMENT |
$120,286.00 |
GLEN BELL SERVICE CENTER HVAC |
$81,525.74 |
GLEN BELL SERVICE CENTER HVAC UNITS REPLACEMENT |
$129,866.60 |
GLEN BELL SERVICE CENTER SECURITY CONVERSION TO GENETEC |
$75,678.23 |
GLEN BELL SERVICE CENTER STORES SECURITY UPGRADE |
$7,285.20 |
GLEN BELL WAREHOUSE EMERGENCY CAGE AND OFFICE EXPANSION |
$16,437.50 |
GLENLAKE PUMP STATION DECOMMISSIONING |
$116,860.69 |
GOODNIGHT RANCH PHASE TWO |
$239,365.05 |
GPS DATA COLLECTION |
$84,988.99 |
GREEN DECOMMISSIONING |
$7,750,526.42 |
GREEN WTP ENVIRONMENTAL DECOMISSION |
$2,733,824.00 |
GUILFORD COVE PUMP STATION IMPROVEMENTS |
$373,155.79 |
HANDCOX WTP PROCESS BUILDINGS HVAC |
$1,011,304.52 |
HANDCOX WATER TREATMENT PLANT DOOR REPLACEMENT |
$38,918.61 |
HANDCOX WTP HEAT EXCHANGERS REPLACEMENT |
$120,433.49 |
HANDCOX WTP-SODIUM PERMANGANATE FEED-FIRE SUPPRESSION SYSTE |
$45,128.65 |
HAROLD COURT EAST REGIONAL SERVICE CENTER IMPROVEMENTS |
$10,839.32 |
HIELSHER NET WIRE FENCING PIPELINE TO MCKOWN RD NE BOUNDARY |
$129,676.45 |
HIGH GAME FENCING FOR THE ANTHEM TRACT OF THE WQPL |
$227,981.58 |
HIGH GAME FENCING AT TABOR NORTH, ALONG SH45 |
$130,901.75 |
HIGHLAND PARK IMPROVEMENTS |
$107,382.31 |
HOLLY NEIGHBORHOOD WATER SYSTEM UPGRADES |
$41,627.64 |
HOWARD LANE PUMP STATION HVAC |
$165,386.05 |
IH 35 SOUTH RESERVOIR |
$110,075.00 |
IH 35 W LINE BETTERMENT-BEN WHITE TO WILLIAM CANNON SEGMENT |
$161,247.12 |
IH 35 W LINE BETTERMENT-OLTORF TO BEN WHITE SEGMENT |
$1,281,257.90 |
IT PLATFORM |
$2,735,690.19 |
IH 35 W LINE BETTERMENT - RUNDBERG TO 290 E SEGMENT |
$197,739.69 |
IH 35 W LINE RELO - RUNDBERG TO 290 E SEGMENT |
$5,798.40 |
INTEGRATED WATER MANAGEMENT PLAN |
$1,049,328.21 |
INTERSTATE 35 WATER LINE EXTENSION |
$19,779.23 |
INVENTORY AND BARCODE MANAGEMENT PROJECT |
$277,752.00 |
IT NETWORK IMPROVEMENTS |
$1,011,083.98 |
IT SECURITY TOOLS AND SERVICES |
$97,547.41 |
JJ&T HIGH MURFIN RD AND SOUTH BOUNDARY HIGH GAME FENCING |
$133,808.95 |
KENT BUTLER HIGH GAME FENCING |
$42,045.06 |
LABORATORY INFORMATION MANAGEMENT SYSTEM FY19-24 |
$66,853.98 |
LADYBIRD LAKE - CANTERBURY AT MILDRED STREET UTILITY REPAIR |
$28,697.18 |
LAKELINE |
$83,064.50 |
LANDS LITTLE BEAR TRACT/REUNION HIGH GAME FENCE |
$120,117.55 |
LEUTHAN LANE PUMP STATION HVAC |
$21,072.00 |
LEUTHAN LANE TANK IMPROVEMENTS |
$3,111,443.98 |
LIME RESIDUAL DISPOSAL MASTER PLAN |
$166,867.54 |
LITTLE WALNUT CREEK 8-INCH WATER MAIN |
$1,090,446.89 |
LONG CANYON HIGH GAME FENCING |
$192,745.29 |
LONGHORN DAM TRANSITION IMPROVEMENTS |
$31,250.00 |
MAINTENANCE SHOP A/C REPLACEMENT |
$32,996.00 |
MERION CIRCLE WATER PIPELINE REHABILITATION |
$50,460.83 |
METER UPGRADES-3-IN DIAMETER AND LARGER |
$931,550.08 |
MISCELLANEOUS CAPITAL EQUIPMENT-W |
$103,944.94 |
MOTHERAL DRIVE SITE IMPROVEMENTS |
$194,273.06 |
MT. LARSON HYDRO TANK REPLACEMENTS |
$174,973.23 |
NET WIRE FENCING HAFIF TRACT ALONG FM1826 BOUNDARY |
$186,922.11 |
NEVER BEND COVE PUMP STATION HVAC REPLACEMENT |
$60,237.80 |
NEWPORT AVENUE WATER PIPELINE REHABILITATION |
$177,418.61 |
NORTH AUSTIN RESERVOIR & PS CONSTRUCTION SITE BLD |
$88,426.50 |
NORTH ROSEDALE PHASE II NEIGHBORHOOD WATER |
$783,220.08 |
NORTH SERVICE CENTER BUILDING ENVELOPE INSPECTION AND REHAB |
$37,044.00 |
NORTH SERVICE CENTER ENTRY DOOR REPLACEMENT |
$17,042.35 |
NORTH SERVICE CENTER PARKING LOT REHABILITATION |
$7,205.80 |
NORTH SERVICE CENTER RESTROOMS AND SHOWERS REHAB |
$27,799.64 |
NORTH SERVICE CENTER ROOF REPLACEMENT |
$25,150.00 |
NORTH SERVICE CENTER SECURITY SYSTEM UPGRADE |
$15,146.57 |
NORTHWEST A & B ZONE BOUNDARY PROJECT |
$180,858.42 |
ONSC FLOORING REPLACEMENT - WATER |
$23,810.50 |
ONSC HOT WATER HEATER REPLACEMENT-WATER |
$9,486.12 |
OCTOBER 16, 2018 FLOOD EVENT - WATER |
$320,780.35 |
OLD ENFIELD WATER PIPELINE RENEWAL - NEWFIELD LANE |
$157,092.06 |
OLTORF PRESSURE ZONE IMPROVEMENTS - WEST AREA PHASE 1 |
$537,347.68 |
ONION TRACT HIGH GAME FENCING |
$178,319.30 |
ONION TRACT WIRE FENCING ALONG FM150 |
$123,183.74 |
OPERATIONAL RISK MODEL DEVELOPMENT |
$59,996.00 |
OTHER 3920 PARENT |
$5,628,653.55 |
PARKWEST HIGH GAME FENCING |
$29,708.13 |
PC REFRESH (FY19-24) |
$1,121,359.92 |
PEARSON RANCH ROAD |
$212,661.09 |
PERMITTING SOFTWARE UPGRADE (AMANDA) |
$76,326.42 |
PILAND TRIANGLE INTERCONNECT |
$1,988,937.44 |
PIPELINE INSPECTION SYSTEM UPGRADE - WATER |
$104,178.68 |
PLAZA SALTILLO EAST 6TH STREET WATERLINE |
$2,994.75 |
PLAZA SALTILLO POD |
$69,140.20 |
PLAZA SALTILLO PH2 WATER LN REPLACEMENT - CFA |
$408,651.51 |
PUMP STATION 3920 PARENT |
$3,854,736.19 |
RA - NORTH ROSEDALE / LAWNMONT NEIGHBORHOOD WATER SYSTEM UPG |
$329,394.61 |
RA-KELLAM RD WL |
$157,390.36 |
READJUSTMENT OF WATER LINE APPURTENANCES ON SLAUGHTER LANE |
$48,350.00 |
REDBUD TRAIL - WATER |
$204,022.80 |
REHABILITATION 3920 PARENT |
$10,151,727.78 |
REICHER RANCH FIRE SAFETY IMPROVEMENTS |
$76,446.59 |
REICHER RANCH RENOVTN-OFFICES |
$76,650.03 |
REICHER RANCH SECURITY SYSTEM UPGRADE |
$49,424.68 |
REICHER RANCH SEPTIC SYSTEM |
$48,800.00 |
RELOCATION 3920 PARENT |
$321,894.09 |
RELOCATION OF NEENAH ROAD WATER LINE AND APPURTENANCES |
$107,640.55 |
REPLACEMENT OF FAILING ULLRICH FILTER REMOTE IO PANELS |
$122,453.67 |
RESERVOIR 3920 PARENT |
$3,647,735.72 |
RESERVOIR IMPROVEMENT PROGRAM TANK EVALUATION |
$180,484.49 |
ROBINSON RANCH - DRIVEWAY REPAIR |
$19,278.58 |
ROCIP PROGRAM |
$5,260,988.50 |
ROGERS TRACT FENCING |
$605,023.60 |
ROOFING PARENT ACCT(ASSESSMENT |
$1,885.32 |
ROSS RD NORTH W IMPROVEMENTS |
$45,739.61 |
ROSS ROAD WATER PIPELINE RELOCATION |
$143,280.07 |
SCADA - PUMP STATIONS |
$10,591.72 |
SCADA - WATER TREATMENT PLANTS |
$163,433.14 |
SSC BUILDING 600 REHABILITATION |
$77,849.99 |
SCADA DATA MART & DATA WAREHOUSE SUPPORT SERVICES PROJECT |
$81,477.06 |
SCADA DATA MART AND DATA WAREHOUSE REPLACEMENT |
$324,837.20 |
SCADA WIDE AREA NETWORK FIREWALLING AND SEGMENTATION (WATER) |
$24,172.72 |
SEAHOLM POWER PLANT REHAB |
$100,000.00 |
SERVER AND ENTERPRISE STORAGE REPLACEMENT (FY20-24) |
$484,249.64 |
SHAW LANE AERIAL SURVEY |
$93,804.10 |
SHAW LANE SECURITY AND FACILITY IMPROVEMENTS |
$247,054.51 |
SLAUGHTER LANE RESERVOIR IMPROVEMENTS |
$398,122.52 |
SLAUGHTER LANE WATERLINE EXTENSION |
$7,768.11 |
SLAUGHTER LANE AND CAP OF TX GROUND STORAGE RESERVOIR IMPR |
$4,020,491.93 |
SLAUGHTER LN EXT-BLUFF SPRINGS TO GOOD NIGHT RANCH |
$25,622.50 |
SMALL DIAMETER WATERLINE REPLACEMENT PROGRAM IDIQ |
$19,894.15 |
SO. SVC CTR-BOILER REPLACEMENT |
$17,731.62 |
SOUTH 1ST SERVICE CENTER HVAC RENEWAL PROJECT |
$43,628.22 |
SOUTH FIRST CENTER LIEBERT MINI SPLITS RENEWAL |
$29,116.00 |
SOUTH SERVICE CENTER FIRE ALARM REPLACEMENT |
$56,830.88 |
SOUTH SERVICE CENTER HVAC REHAB |
$454,538.00 |
SOUTH SERVICE CENTER RESTROOM REHAB |
$14,998.52 |
SOUTH SERVICE CENTER UNINTERUPTED POWER SUPPLY REPLACEMENT |
$152,055.44 |
SOUTH SVC CENTER BLDG 600 EXTERIOR WALLS & ROOF IMPROVEMENTS |
$12,850.00 |
SOUTHWEST ALLANDALE NEIGHBORHOOD WATER SYSTEM UPGRADES |
$1,503,574.10 |
SPACE PLANNING MODULE AND WORK ORDER SYSTEM |
$32,840.34 |
SPILLAR TRACT NET WIRE FENCING |
$220,334.88 |
ST. JOHNS CIRCLE WATER SYSTEM RENEWAL PROJECT |
$17,180.67 |
STARLINE DRIVE AND LAWNDALE DRIVE PRESSURE ZONE CONVERSION |
$41,933.93 |
SUBDIV ENGINEERING & INSPECTION |
$929,753.13 |
SUBURBAN DR. WATER SERVICE LINE (WSL) RELAYS |
$4,021.32 |
SUMMIT LAB FIRE ALARM SYSTEM REPLACEMENT - WATER |
$15,456.00 |
SUN TREE PARK FLOW METER & GOLF COURSE SERVICE CONNECTION |
$32,219.93 |
SUNNY LANE WATERLINE REPLACEMENT - RENEW AUSTIN |
$85,674.27 |
SUNRISE CIRCLE 6" WL IMPROVEMENTS |
$42,955.18 |
SUNSET CIRCLE 6-INCH WATERLINE IMPROVEMENTS |
$33,382.74 |
TXDOT-US 183 BERGSTROM EXPWAY (US 290 TO SH 71) |
$1,373,152.40 |
TANGLEWOOD TRAIL WATER PIPELINE RENEWAL |
$56,708.71 |
TARGETED WATER LINE IMPROVEMENTS - SOUTH BOGGY BASIN |
$26,672.56 |
TARGETED WATER LINE IMPROVEMENTS - TOWN LAKE BASIN |
$47,607.89 |
TARRYTWN/HILLVIEW & CLEARVIEW AREA NEIGHBD WS |
$18,629.79 |
TIM LOUVIERE SERVICE CENTER FIRE ALARM REPLACEMENT |
$17,122.50 |
TIM LOUVIERE SERVICE CENTER GENERATOR INSTALLATION - WINTER |
$53,161.50 |
TIM LOUVIERE SERVICE CENTER ICE MACHINE REPLACEMENT |
$9,527.00 |
TRANSMISSION / DISTRIBUTION 3920 PARENT |
$2,638,296.81 |
TRAVIS CNTY UTIL RELO: FM 969 (PHASE I): DECKER LANE TO FM 9 |
$1,322,850.34 |
TRAVIS COUNTY UTILITY RELO: OLD MANOR ROAD SAFETY IMPR |
$694,104.60 |
TRAVIS COUNTY UTILITY RELO: THOMAS SPRINGS RD CIRCLE DR |
$37,474.00 |
TRAVIS COUNTY UTILITY RELOCATION THOMAS SPRINGS ROAD |
$17,160.00 |
TRAVIS COUNTY UTILITY RELOCATION: ELROY ROAD |
$389,878.69 |
TREATMENT PLANT 3920 PARENT |
$26,454,298.04 |
TREATMENT PLANT ASSET REPLACEMENT COST DEVELOPEMENT |
$27,964.80 |
TURNER'S CROSSING PUMP STATION & RESERVOIR INSPECTION |
$3,433.67 |
TX DOT 360 AT RM2222 AND COURTYARD WATER RELOCATION |
$105,995.99 |
TXDOT BOYCE LANE WATER LINE RELOCATION |
$174,110.68 |
TXDOT OLD GREGG LANE WATERLINE RELOCATION AT HARRIS BRANCH |
$187,002.03 |
TXDOT SH 71 FROM E OF SH 130 TO EOF KELLAM RD WATER RELO |
$351,584.99 |
TXDOT FM 973 FROM FM 969 TO THYNE - WATER RELOCATION |
$20,537.23 |
TXDOT 360 AT LAKEWOOD DRIVE WATER RELO |
$105,269.55 |
TXDOT FM 2222 WL RELOCATION: BONAVENTURE DRIVE TO RIBELIN |
$5,387,131.94 |
TXDOT IH 35 CENTRAL WL RELOCATION-US 183 TO RIVERSIDE DRIVE |
$360,528.46 |
TXDOT IH 35 NORTH (16) PROJECT WL RELOC: SH 45 N. TO US 290 |
$3,684,284.96 |
TXDOT IH 35 WL RELOCATION-RIVERSIDE DRIVE TO SH 45 SE |
$1,458,445.92 |
TXDOT LOOP 360 AT SPICEWOOD SPRINGS WATER LINE RELOCATION |
$118,741.22 |
TXDOT LOOP 360 AT WESTLAKE DRIVE WATER RELOCATION |
$6,257,991.92 |
TXDOT US 290 AT OAK HILL PARKWAY WATER LINE RELOCATION |
$15,497,680.56 |
TXDOT US183 N RELOCATION: SH 45 N TO LOOP 1 |
$103.73 |
ULLRICH ADMIN BUILDING LAB HVAC REPLACEMENT |
$17,518.00 |
ULLRICH BASIN #2 STRUCTURAL ANALYSIS AND REPAIR OF CLARIFIER |
$148,494.12 |
ULLRICH CENTRIFUGES 1&3 REPLACEMENT |
$427,284.97 |
ULLRICH DACS ULLRICH WATER TREATMENT PLANT ADMIN & CENTRIFUG |
$29,961.00 |
ULLRICH FILTER BASINS 1-18 STAIRWAY REHABILITATION |
$104,515.21 |
ULLRICH PRIVATE AUTOMATED BRANCH EXCHANGE ROOM RELOCATION |
$72,574.91 |
ULLRICH REKEYING PROJECT |
$35,971.97 |
ULLRICH SLUDGE HANDLING VALVES AND COMPRESSOR REPLACEMENT |
$87,443.47 |
ULLRICH TRUCK SCALE SYSTEM REHABILITATION |
$32,458.79 |
ULLRICH WTP CONTROL ROOM REHABILITATION |
$403,250.55 |
ULLRICH WTP FILTER 2, 8, AND 16 REHAB |
$32,610.35 |
ULLRICH WTP LSPS SAFETY STRUCTURES RENEWAL |
$38,398.98 |
ULLRICH WTP ROOF REPLACEMENTS |
$1,362,038.75 |
ULLRICH WTP WASHWATER BASIN CLARIFIER RAKE DRIVE RENEWAL |
$124,225.00 |
ULLRICH WATER TREATMENT PLANT - FIRE MONITORING UPDATE |
$63,800.00 |
ULLRICH WATER TREATMENT PLANT ADMIN & CENTRIFUGE SCADA ASSET |
$3,776,830.45 |
ULLRICH WATER TREATMENT PLANT CENTRIFUGE BUILDING HVAC |
$33,615.00 |
ULLRICH WATER TREATMENT PLANT MAINTENANCE SHOP ICE MACHINE |
$9,064.99 |
ULLRICH WATER TREATMENT PLANT RAW WATER METERING PLATFORM |
$196,576.58 |
ULLRICH WTP CHLORINE PIPES AND VALVES REHABILITATION |
$153,270.28 |
ULLRICH WTP MEDIUM/HIGH SERVICE CHILLER AND AIR HANDLER |
$773,814.52 |
ULLRICH WTP ROOFING, DOOR, AND WINDOW RENEWAL |
$177,974.20 |
ULLRICH WTP SITE SOUND PROPAGATION STUDY |
$95,033.27 |
ULLRICH WTP UFC#2 TURBINE DRIVE REPLACEMENT |
$152,000.00 |
UNIVERSITY AVENUE ALLEY WATER PIPELINE IMPROVEMENTS |
$847,341.49 |
UPPER BOGGY WEST - CHERRYWOOD WATER LINE IMPROVEMENTS |
$66,699.27 |
UPPER TANNEHILL CAMERON ROAD WATER IMPROVEMENTS |
$11,478.15 |
WCC - BICYCLE SHOWER PROJECT |
$44,680.00 |
WCC DOOR REPLACEMENT RM 105 |
$6,152.50 |
WCC-REPLACE AIR HANDLER |
$963,490.98 |
WQPL WILDFLOWER NET WIRE FENCE |
$220,803.05 |
WTP4 ENVIRON COMMISSION |
$162.76 |
WTP4 SCADA PROGRAMMING, PUMP, AND OTHER BETTERMENTS |
$926,217.55 |
WTP4 SECURITY GUARD HOUSE AND IMPROVEMENTS |
$193,412.98 |
WTP4 SUPERVISORY CONTROL AND DATA ACQUISITION |
$349,982.00 |
WALLER CREEK - REMOVAL OF ABANDONED GAS LINE |
$6,182.61 |
WALLER CREEK CENTER - 9TH FLOOR RENOVATION |
$136,585.99 |
WALLER CREEK CENTER - CURTAIN WALL |
$813,342.35 |
WALLER CREEK CENTER - FIRE MONITORING WORKSTATION |
$34,124.00 |
WALLER CREEK CENTER - TENTH FLOOR RENOVATION |
$78,868.82 |
WALLER CREEK CENTER 3RD, 6TH & 8TH FLOOR LOBBY REFRESH |
$15,894.93 |
WALLER CREEK CENTER 6TH FLOOR RENOVATION |
$307,378.55 |
WALLER CREEK CENTER BUILDING AUTOMATION SYSTEM |
$16,770.64 |
WALLER CREEK CENTER CARPET REPLACEMENT 2ND AND 3RD FLOOR |
$21,822.65 |
WALLER CREEK CENTER CHILLER BELL HOUSING REPLACEMENT |
$4,677.50 |
WALLER CREEK CENTER CONFERENCE ROOM 104 IMPROVEMENTS |
$983,016.70 |
WALLER CREEK CENTER CONFERENCE ROOM 104 IMPROVEMENTS - ATXN |
$141,619.46 |
WALLER CREEK CENTER CONTROLS - WATER |
$247,238.74 |
WALLER CREEK CENTER FIRE NOTIFICATION SYSTEM REPLACEMENT |
$428,097.01 |
WALLER CREEK CENTER INSULATION |
$18,817.50 |
WALLER CREEK CENTER PARKING GARAGE STAIRWELL INSPECTION |
$196,516.38 |
WALLER CREEK CENTER PARKING GARAGE IMPROVEMENTS |
$78,936.99 |
WALLER CREEK CENTER PATCH & SEAL DRIVEWAY SURFACE |
$28,051.13 |
WALLER CREEK CENTER PLUMBING CODE COMPLIANCE |
$17,896.51 |
WALLER CREEK CENTER RECLAIM WATER PROJECT |
$35,274.57 |
WALLER CREEK CENTER RENOVATION |
$5,801.20 |
WALLER CREEK CENTER SECURITY SYSTEM CONVERSION |
$63,430.90 |
WALLER CREEK SECURITY ENHANCEMENTS |
$133,068.79 |
WALLER: SECURITY OPERATION CENTER'S BUILD-OUT |
$54,655.68 |
WATER DISTR/LIFT STATION SCADA CONTROL IMPR-PH II |
$498,785.32 |
WATER DISTRIBUTION CONTROL SYSTEM EQUIPMENT REPLACEMENT AT 3 |
$8,190.60 |
WATER DISTRIBUTION SCADA -ENERGY & WATER QUALITY MGT PHASE I |
$291,777.80 |
WATER FACILITY IDIQ |
$764,079.34 |
WATER FORWARD INTEGRATED WATER RESOURCE PLAN UPDATE |
$183,660.53 |
WATER IMPVS CITYWIDE |
$39,847,103.46 |
WATER METER UPGRADES (PHASE 2) - 3-INCH DIAMETER AND LARGER |
$279.15 |
WATER QUALITY PROTECTION LANDS HUDSON TRACT W GAP FENCING |
$355,956.38 |
WATER RECLAMATION INITIATIVE 3920 PARENT |
$249.13 |
WATER RECLAMATION INITIATIVE 3960 PARENT |
$7,198,241.17 |
WATER TREATMENT PLAN #4 APRIL 2017 STORM REPAIRS |
$41,281.00 |
WATER TREATMENT PLANT #4 |
$10,334.55 |
WATER TREATMENT PLANT 4 SECURITY GUARD STATION SETUP |
$35,647.82 |
WATER TREATMENT PLANTS HAB TREATMENT OPTIMIZATION |
$547,862.32 |
WATERLINE ON-CALL SERVICES (FY18 - FY20) |
$5,956,811.35 |
WEBBERVILLE - CHILLER - REFRIGERANT MONITOR |
$2,339.50 |
WEBBERVILLE ELEVATOR MODERNIZATION |
$72,433.00 |
WEBBERVILLE ICE MACHINE REPLACEMENT |
$14,102.00 |
WEBBERVILLE IMPROVEMENT PROJ 2015 |
$13,185.50 |
WEBBERVILLE STORES SECURITY UPGRADE |
$56,702.85 |
WEST 17TH STREET WATER PIPELINE REHABILITATION |
$261,500.21 |
WEST 35TH STREET WATER SYSTEM REHAB |
$82,717.26 |
WEST 9TH STREET WATER REPLACEMENT |
$1,150,203.46 |
WETHERSFIELD ROAD WATER PIPELINE RENEWAL |
$9,225.94 |
WHIRLPOOL KARST HIGH GAME FENCING |
$23,062.69 |
WICKSHIRE LANE AND METCALFE ROAD WATERLINE RENEWAL |
$55,280.84 |
WILDFLOWER CENTER GAME FENCING |
$48,700.00 |
WILLIAMSON CREEK - RICHMOND TRIBUTARY REHABILITATION-WATER |
$19,380.62 |
WILLOW STREET WATER LINE RENEWAL |
$6,877.67 |
WINTER STORM URI AFTER ACTION TECHNICAL REVIEW |
$256,799.38 |
WIRELESS NETWORK INSTALLATIONS |
$258,110.25 |
WIRELESS NETWORK REPLACEMENTS (FY21-25) |
$48,120.08 |
WTP 4 SODIUM HYPOCHLORITE DISTRIBUTION VALVE |
$51,806.58 |
WTP4 BACKUP SITE DEMOLITION OF EXISTING STRUCTURES |
$181,118.97 |
WTP4 LOW SERVICE PUMP STATION AND RAW WATER PIPE GALLERY COM |
$407,155.49 |
WTP4 SITE SECURITY SYSTEM CONVERSION |
$150,139.87 |
ZEBRA MUSSEL MITIGATION |
$309,041.04 |
ZEBRA MUSSEL MITIGATION |
$1,833,921.33 |
ZEBRA MUSSEL MITIGATION - HANDCOX WTP |
$327,564.02 |
ZEBRA MUSSEL MITIGATION - ULLRICH WTP |
$2,513,151.29 |
ZILKER METRO PARK - WATER LINE EXTENSION |
$28,305.00 |
ZILKER WATER PIPELINE RENEWAL: TREADWELL ST AREA |
$825,102.03 |
OR DAM REMOVAL |
$370,118.12 |