AMOUNT |
---|---|---|---|---|
PRM 8100 22021512466 | Bridges, Passenger Loading | 02/17/2022 | Paid | $74.10 |
PRM 8100 22020811716 | Bridges, Passenger Loading | 02/10/2022 | Paid | $824.22 |
PRM 8100 22011309495 | Bridges, Passenger Loading | 01/14/2022 | Paid | $173.28 |
PRM 8100 21122808157 | Bridges, Passenger Loading | 12/29/2021 | Paid | $353.40 |
PRM 8100 21122808166 | Heating, Air Conditioning, Vent., Maintain.,Repair, Install | 12/29/2021 | Paid | $615.60 |
PRM 8100 21122808188 | Heating, Air Conditioning, Vent., Maintain.,Repair, Install | 12/29/2021 | Paid | $4,902.00 |
PRM 8100 21120906700 | Bridges, Passenger Loading | 12/13/2021 | Paid | $2,382.60 |
PRM 8100 21120706372 | Bridges, Passenger Loading | 12/09/2021 | Paid | $1,048.80 |
PRM 8100 21111604436 | Bridges, Passenger Loading | 11/18/2021 | Paid | $57.00 |
PRM 8100 21111504259 | Bridges, Passenger Loading | 11/16/2021 | Paid | $10,403.64 |
PRM 8100 21111504272 | Bridges, Passenger Loading | 11/16/2021 | Paid | $1,272.24 |
PRM 8100 21110503686 | Bridges, Passenger Loading | 11/09/2021 | Paid | $2,120.00 |
PRM 8100 21110303397 | Bridges, Passenger Loading | 11/08/2021 | Paid | $3,874.00 |
PRM 8100 21110503584 | Bridges, Passenger Loading | 11/08/2021 | Paid | $2,991.16 |
PRM 8100 21110503592 | Bridges, Passenger Loading | 11/08/2021 | Paid | $1,244.00 |
PRM 8100 21102802826 | Bridges, Passenger Loading | 11/01/2021 | Paid | $3,869.68 |
PRM 8100 21102802856 | Bridges, Passenger Loading | 11/01/2021 | Paid | $2,414.00 |
PRM 8100 21102802856 | Heating, Air Conditioning, Vent., Maintain.,Repair, Install | 11/01/2021 | Paid | $68.00 |
PRM 8100 21100800794 | Bridges, Passenger Loading | 10/11/2021 | Paid | $1,174.80 |
PRM 8100 21092333087 | Bridges, Passenger Loading | 09/27/2021 | Paid | $2,884.20 |
PRM 8100 21092032691 | Bridges, Passenger Loading | 09/23/2021 | Paid | $1,696.32 |
PRM 8100 21090731262 | Bridges, Passenger Loading | 09/09/2021 | Paid | $5,453.76 |
PRM 8100 21090831314 | Bridges, Passenger Loading | 09/09/2021 | Paid | $2,232.12 |
PRM 8100 21081028866 | Bridges, Passenger Loading | 08/12/2021 | Paid | $1,810.32 |
PRM 8100 21072226996 | Bridges, Passenger Loading | 07/26/2021 | Paid | $14,236.78 |
PRM 8100 21072227007 | Bridges, Passenger Loading | 07/26/2021 | Paid | $4,617.00 |
PRM 8100 21070625179 | Bridges, Passenger Loading | 07/07/2021 | Paid | $11,629.14 |
PRM 8100 21070625181 | Bridges, Passenger Loading | 07/07/2021 | Paid | $23.94 |
PRM 8100 21062323956 | Bridges, Passenger Loading | 06/24/2021 | Paid | $574.56 |
PRM 8100 21062323958 | Bridges, Passenger Loading | 06/24/2021 | Paid | $126.54 |
PRM 8100 21062123480 | Bridges, Passenger Loading | 06/22/2021 | Paid | $3,852.06 |
PRM 8100 21060922460 | Bridges, Passenger Loading | 06/10/2021 | Paid | $337.44 |
PRM 8100 21060722123 | Bridges, Passenger Loading | 06/08/2021 | Paid | $280.44 |
PRM 8100 21052121032 | Bridges, Passenger Loading | 05/24/2021 | Paid | $2,580.96 |
PRM 8100 21051420296 | Bridges, Passenger Loading | 05/17/2021 | Paid | $8,032.44 |
PRM 8100 21050719719 | Bridges, Passenger Loading | 05/10/2021 | Paid | $79.80 |
PRM 8100 21050419298 | Bridges, Passenger Loading | 05/06/2021 | Paid | $6,152.58 |
PRM 8100 21050419306 | Bridges, Passenger Loading | 05/06/2021 | Paid | $110.95 |
PRM 8100 21050419310 | Bridges, Passenger Loading | 05/06/2021 | Paid | $9,120.00 |
PRM 8100 21042618364 | Bridges, Passenger Loading | 04/27/2021 | Paid | $3,273.51 |
PRM 8100 21040916891 | Bridges, Passenger Loading | 04/12/2021 | Paid | $1,710.00 |
PRM 8100 21040916893 | Bridges, Passenger Loading | 04/12/2021 | Paid | $4,560.00 |
PRM 8100 21040616442 | Bridges, Passenger Loading | 04/08/2021 | Paid | $1,444.38 |
PRM 8100 21031914926 | Heating, Air Conditioning, Vent., Maintain.,Repair, Install | 03/22/2021 | Paid | $478.80 |
PRM 8100 21022312364 | Bridges, Passenger Loading | 02/24/2021 | Paid | $1,444.38 |
PRM 8100 20122807618 | Bridges, Passenger Loading | 12/29/2020 | Paid | $383.04 |
PRM 8100 20121406576 | Heating, Air Conditioning, Vent., Maintain.,Repair, Install | 12/15/2020 | Paid | $5,050.20 |
PRM 8100 20121406578 | Bridges, Passenger Loading | 12/15/2020 | Paid | $1,516.20 |
PRM 8100 20121106492 | Bridges, Passenger Loading | 12/14/2020 | Paid | $3,520.32 |
PRM 8100 20112004641 | Bridges, Passenger Loading | 11/23/2020 | Paid | $5,050.20 |
PRM 8100 20110903603 | Bridges, Passenger Loading | 11/10/2020 | Paid | $3,303.72 |
PRM 8100 20102602405 | Bridges, Passenger Loading | 10/29/2020 | Paid | $1,068.18 |
PRM 8100 20100800856 | Bridges, Passenger Loading | 10/12/2020 | Paid | $5,782.08 |
PRM 8100 20100800859 | Bridges, Passenger Loading | 10/12/2020 | Paid | $930.24 |
PRM 8100 20093035495 | Bridges, Passenger Loading | 10/05/2020 | Paid | $234.84 |
PRM 8100 20092835116 | Bridges, Passenger Loading | 09/29/2020 | Paid | $704.52 |
PRM 8100 20092835122 | Bridges, Passenger Loading | 09/29/2020 | Paid | $2,253.78 |
PRM 8100 20092835127 | Bridges, Passenger Loading | 09/29/2020 | Paid | $383.04 |
PRM 8100 20090232851 | Bridges, Passenger Loading | 09/03/2020 | Paid | $1,162.80 |
PRM 8100 20082832376 | Bridges, Passenger Loading | 08/31/2020 | Paid | $7,182.00 |
PRM 8100 20073129754 | Bridges, Passenger Loading | 08/03/2020 | Paid | $1,290.48 |
PRM 8100 20073129758 | Bridges, Passenger Loading | 08/03/2020 | Paid | $1,096.00 |
PRM 8100 20072729251 | Bridges, Passenger Loading | 07/28/2020 | Paid | $13,700.52 |
PRM 8100 20072729260 | Bridges, Passenger Loading | 07/28/2020 | Paid | $240.00 |
PRM 8100 20072729262 | Bridges, Passenger Loading | 07/28/2020 | Paid | $620.16 |
PRM 8100 20070927397 | Bridges, Passenger Loading | 07/13/2020 | Paid | $384.00 |
PRM 8100 20071027495 | Bridges, Passenger Loading | 07/13/2020 | Paid | $506.16 |
PRM 8100 20052023463 | Bridges, Passenger Loading | 05/21/2020 | Paid | $356.82 |
PRM 8100 20050121717 | Bridges, Passenger Loading | 05/04/2020 | Paid | $3,303.72 |
PRM 8100 20050121721 | Bridges, Passenger Loading | 05/04/2020 | Paid | $556.27 |
PRM 8100 20040919688 | Bridges, Passenger Loading | 04/13/2020 | Paid | $7,433.94 |
PRM 8100 20040919692 | Bridges, Passenger Loading | 04/13/2020 | Paid | $4,751.52 |
PRM 8100 20022514852 | Bridges, Passenger Loading | 02/27/2020 | Paid | $5,629.32 |
PRM 8100 20022514854 | Bridges, Passenger Loading | 02/27/2020 | Paid | $5,403.60 |
PRM 8100 20022614976 | Bridges, Passenger Loading | 02/27/2020 | Paid | $2,274.00 |
PRM 8100 20022614978 | Bridges, Passenger Loading | 02/27/2020 | Paid | $638.40 |
PRM 8100 20022514746 | Bridges, Passenger Loading | 02/26/2020 | Paid | $1,591.44 |
PRM 8100 20022514748 | Bridges, Passenger Loading | 02/26/2020 | Paid | $2,277.72 |
PRM 8100 20010809349 | Bridges, Passenger Loading | 01/09/2020 | Paid | $2,130.66 |
PRM 8100 20010809351 | Bridges, Passenger Loading | 01/09/2020 | Paid | $4,922.52 |
PRM 8100 19122607951 | Bridges, Passenger Loading | 12/27/2019 | Paid | $4,472.22 |
PRM 8100 19122607956 | Bridges, Passenger Loading | 12/27/2019 | Paid | $272.46 |
PRM 8100 19122607959 | Bridges, Passenger Loading | 12/27/2019 | Paid | $1,322.40 |
PRM 8100 19120406112 | Bridges, Passenger Loading | 12/05/2019 | Paid | $12,745.20 |
PRM 8100 19112605705 | Bridges, Passenger Loading | 11/27/2019 | Paid | $3,718.68 |
PRM 8100 19112505592 | Bridges, Passenger Loading | 11/26/2019 | Paid | $1,104.66 |
PRM 8100 19112005286 | Bridges, Passenger Loading | 11/22/2019 | Paid | $2,338.14 |
PRM 8100 19111504683 | Bridges, Passenger Loading | 11/18/2019 | Paid | $2,818.08 |
PRM 8100 19111304526 | Bridges, Passenger Loading | 11/15/2019 | Paid | $1,130.88 |
PRM 8100 19110503610 | Bridges, Passenger Loading | 11/06/2019 | Paid | $4,801.68 |
PRM 8100 19103003289 | Bridges, Passenger Loading | 11/01/2019 | Paid | $6,600.60 |
PRM 8100 19103003291 | Bridges, Passenger Loading | 11/01/2019 | Paid | $574.56 |
PRM 8100 19103003293 | Bridges, Passenger Loading | 11/01/2019 | Paid | $4,505.28 |
PRM 8100 19103003295 | Bridges, Passenger Loading | 11/01/2019 | Paid | $964.44 |
PRM 8100 19103003261 | Bridges, Passenger Loading | 10/31/2019 | Paid | $3,009.60 |
PRM 8100 19092333492 | Bridges, Passenger Loading | 09/25/2019 | Paid | $1,468.32 |
PRM 8100 19092333499 | Bridges, Passenger Loading | 09/25/2019 | Paid | $13,322.04 |
PRM 8100 19082230560 | Bridges, Passenger Loading | 08/23/2019 | Paid | $399.00 |
PRM 8100 19082230574 | Bridges, Passenger Loading | 08/23/2019 | Paid | $2,207.04 |
PRM 8100 19080528697 | Bridges, Passenger Loading | 08/06/2019 | Paid | $2,542.20 |
PRM 8100 19080528700 | Bridges, Passenger Loading | 08/06/2019 | Paid | $2,585.52 |
PRM 8100 19080528703 | Bridges, Passenger Loading | 08/06/2019 | Paid | $16,087.68 |
PRM 8100 19080528705 | Bridges, Passenger Loading | 08/06/2019 | Paid | $6,723.72 |
PRM 8100 19071626817 | Bridges, Passenger Loading | 07/18/2019 | Paid | $5,430.94 |
PRM 8100 19071026242 | Bridges, Passenger Loading | 07/11/2019 | Paid | $1,028.28 |
PRM 8100 19071026256 | Bridges, Passenger Loading | 07/11/2019 | Paid | $411.54 |
PRM 8100 19061323788 | Bridges, Passenger Loading | 06/14/2019 | Paid | $4,644.36 |
PRM 8100 19061323796 | Bridges, Passenger Loading | 06/14/2019 | Paid | $4,384.44 |
PRM 8100 19061323807 | Bridges, Passenger Loading | 06/14/2019 | Paid | $9,605.64 |
PRM 8100 19060623123 | Bridges, Passenger Loading | 06/07/2019 | Paid | $22,524.12 |
PRM 8100 19060422892 | Bridges, Passenger Loading | 06/05/2019 | Paid | $279.30 |
PRM 8100 19050920653 | Bridges, Passenger Loading | 05/10/2019 | Paid | $1,296.08 |
PRM 8100 19050920658 | Bridges, Passenger Loading | 05/10/2019 | Paid | $487.92 |
PRM 8100 19050219936 | Bridges, Passenger Loading | 05/03/2019 | Paid | $7,161.48 |
PRM 8100 19050219942 | Bridges, Passenger Loading | 05/03/2019 | Paid | $42,952.92 |
PRM 8100 19042418911 | Bridges, Passenger Loading | 04/25/2019 | Paid | $20,393.46 |
PRM 8100 19042418914 | Bridges, Passenger Loading | 04/25/2019 | Paid | $592.80 |
PRM 8100 19040216582 | Bridges, Passenger Loading | 04/03/2019 | Paid | $704.52 |
PRM 8100 19032816182 | Bridges, Passenger Loading | 03/29/2019 | Paid | $1,060.20 |
PRM 8100 19032215558 | Bridges, Passenger Loading | 03/25/2019 | Paid | $6,659.88 |
PRM 8100 19032215560 | Bridges, Passenger Loading | 03/25/2019 | Paid | $21,653.16 |
PRM 8100 19031514899 | Bridges, Passenger Loading | 03/18/2019 | Paid | $10,704.60 |
PRM 8100 19031414767 | Bridges, Passenger Loading | 03/15/2019 | Paid | $2,683.56 |
PRM 8100 19031414780 | Bridges, Passenger Loading | 03/15/2019 | Paid | $437.76 |
PRM 8100 18123107519 | Bridges, Passenger Loading | 01/02/2019 | Paid | $1,118.34 |
PRM 8100 18123107520 | Bridges, Passenger Loading | 01/02/2019 | Paid | $572.28 |
PRM 8100 18123107521 | Bridges, Passenger Loading | 01/02/2019 | Paid | $416.10 |
PRM 8100 18122807403 | Bridges, Passenger Loading | 12/31/2018 | Paid | $416.10 |
PRM 8100 18122807404 | Bridges, Passenger Loading | 12/31/2018 | Paid | $656.64 |
PRM 8100 18122807405 | Bridges, Passenger Loading | 12/31/2018 | Paid | $738.72 |
PRM 8100 18122807406 | Bridges, Passenger Loading | 12/31/2018 | Paid | $883.50 |
PRM 8100 18122807407 | Bridges, Passenger Loading | 12/31/2018 | Paid | $6,723.72 |
PRM 8100 18121306509 | Bridges, Passenger Loading | 12/14/2018 | Paid | $21,108.38 |
PRM 8100 18121306516 | Bridges, Passenger Loading | 12/14/2018 | Paid | $14,565.78 |
PRM 8100 18111504279 | Bridges, Passenger Loading | 11/16/2018 | Paid | $4,090.32 |
PRM 8100 18101501567 | Bridges, Passenger Loading | 10/16/2018 | Paid | $6,374.88 |
PRM 8100 18101201338 | Bridges, Passenger Loading | 10/15/2018 | Paid | $3,933.00 |
PRM 8100 18101201343 | Bridges, Passenger Loading | 10/15/2018 | Paid | $5,838.12 |
PRM 8100 18101201356 | Bridges, Passenger Loading | 10/15/2018 | Paid | $3,187.44 |
PRM 8100 18101201361 | Bridges, Passenger Loading | 10/15/2018 | Paid | $5,839.08 |
PRM 8100 18101201363 | Bridges, Passenger Loading | 10/15/2018 | Paid | $2,088.48 |
PRM 8100 18101201372 | Bridges, Passenger Loading | 10/15/2018 | Paid | $10,773.00 |
PRM 8100 18101201385 | Bridges, Passenger Loading | 10/15/2018 | Paid | $1,333.80 |
PRM 8100 18101201388 | Bridges, Passenger Loading | 10/15/2018 | Paid | $570.00 |
PRM 8100 18101101133 | Bridges, Passenger Loading | 10/12/2018 | Paid | $14,565.78 |
PRM 8100 18100800787 | Bridges, Passenger Loading | 10/09/2018 | Paid | $384.18 |
PRM 8100 18092833025 | Bridges, Passenger Loading | 10/01/2018 | Paid | $1,152.54 |
PRM 8100 18092833030 | Bridges, Passenger Loading | 10/01/2018 | Paid | $4,766.34 |
PRM 8100 18082429191 | Bridges, Passenger Loading | 08/27/2018 | Paid | $7,298.28 |
PRM 8100 18082329107 | Bridges, Passenger Loading | 08/24/2018 | Paid | $422.00 |
PRM 8100 18082028770 | Bridges, Passenger Loading | 08/21/2018 | Paid | $5,084.40 |
PRM 8100 18081628521 | Bridges, Passenger Loading | 08/17/2018 | Paid | $1,655.28 |
PRM 8100 18070925153 | Bridges, Passenger Loading | 07/10/2018 | Paid | $448.02 |
PRM 8100 18070925159 | Bridges, Passenger Loading | 07/10/2018 | Paid | $4,002.54 |
PRM 8100 18070925159 | Heating, Air Conditioning, Vent., Maintain.,Repair, Install | 07/10/2018 | Paid | $1,363.44 |
PRM 8100 18061523113 | Bridges, Passenger Loading | 06/18/2018 | Paid | $10,169.94 |
PRM 8100 18061523118 | Bridges, Passenger Loading | 06/18/2018 | Paid | $17,766.90 |
PRM 8100 18060722563 | Bridges, Passenger Loading | 06/08/2018 | Paid | $1,915.20 |
PRM 8100 18060722570 | Bridges, Passenger Loading | 06/08/2018 | Paid | $3,950.16 |
PRM 8100 18050219445 | Bridges, Passenger Loading | 05/03/2018 | Paid | $3,573.48 |
PRM 8100 18050119271 | Bridges, Passenger Loading | 05/02/2018 | Paid | $9,063.00 |
PRM 8100 18042718959 | Bridges, Passenger Loading | 04/30/2018 | Paid | $1,162.80 |
PRM 8100 18042718961 | Bridges, Passenger Loading | 04/30/2018 | Paid | $1,812.60 |
PRM 8100 18040917235 | Bridges, Passenger Loading | 04/10/2018 | Paid | $1,533.30 |
PRM 8100 18040917240 | Bridges, Passenger Loading | 04/10/2018 | Paid | $4,788.00 |
PRM 8100 18032115621 | Bridges, Passenger Loading | 03/22/2018 | Paid | $3,133.86 |
PRM 8100 18032115640 | Bridges, Passenger Loading | 03/22/2018 | Paid | $4,129.08 |
PRM 8100 18032115641 | Bridges, Passenger Loading | 03/22/2018 | Paid | $2,161.44 |
PRM 8100 18030513889 | Bridges, Passenger Loading | 03/06/2018 | Paid | $13,262.76 |
PRM 8100 18011109465 | ACTUATORS, VALVE, ELECTRONIC (VALVE OPERATORS) | 01/12/2018 | Paid | $2,512.56 |
PRM 8100 18011109465 | MOTORS, ELECTRIC (MISC) | 01/12/2018 | Paid | $6,311.04 |
PRM 8100 18011109465 | SENSORS, TRANSMISSION, DISTANCE MEASURING INSTRUME | 01/12/2018 | Paid | $4,016.22 |
PRM 8100 18011009313 | CONTACTORS | 01/11/2018 | Paid | $410.40 |
PRM 8100 17122007429 | Bridges, Passenger Loading | 12/21/2017 | Paid | $3,092.82 |
PRM 8100 17121607047 | Bridges, Passenger Loading | 12/18/2017 | Paid | $1,482.00 |
PRM 8100 17120706230 | Bridges, Passenger Loading | 12/08/2017 | Paid | $1,446.66 |
PRM 8100 17120505885 | Bridges, Passenger Loading | 12/06/2017 | Paid | $8,405.22 |
PRM 8100 17112905326 | Bridges, Passenger Loading | 11/30/2017 | Paid | $9,710.52 |
PRM 8100 17112104801 | Bridges, Passenger Loading | 11/22/2017 | Paid | $8,577.36 |
PRM 8100 17112104804 | Bridges, Passenger Loading | 11/22/2017 | Paid | $3,990.00 |
PRM 8100 17111404040 | Bridges, Passenger Loading | 11/15/2017 | Paid | $3,963.78 |
PRM 8100 17111003815 | Bridges, Passenger Loading | 11/13/2017 | Paid | $4,288.68 |
PRM 8100 17110603411 | Bridges, Passenger Loading | 11/07/2017 | Paid | $4,420.92 |
PRM 8100 17110303276 | Bridges, Passenger Loading | 11/06/2017 | Paid | $2,891.04 |
PRM 8100 17101701908 | Bridges, Passenger Loading | 10/18/2017 | Paid | $4,316.04 |
PRM 8100 17092534843 | Bridges, Passenger Loading | 09/26/2017 | Paid | $2,492.04 |
PRM 8100 17092234533 | Bridges, Passenger Loading | 09/25/2017 | Paid | $3,714.12 |
PRM 8100 17083132304 | Bridges, Passenger Loading | 09/01/2017 | Paid | $2,492.04 |
PRM 8100 17082932033 | Bridges, Passenger Loading | 08/30/2017 | Paid | $360.00 |
PRM 8100 17082331507 | Bridges, Passenger Loading | 08/24/2017 | Paid | $168.72 |
PRM 8100 17080930162 | Bridges, Passenger Loading | 08/10/2017 | Paid | $4,582.80 |
PRM 8100 17080830018 | Bridges, Passenger Loading | 08/09/2017 | Paid | $2,398.56 |
PRM 8100 17073129172 | Bridges, Passenger Loading | 08/01/2017 | Paid | $1,466.04 |
PRM 8100 17071427763 | Heating, Air Conditioning, Vent., Maintain.,Repair, Install | 07/17/2017 | Paid | $7,752.00 |
PRM 8100 17070627041 | Heating, Air Conditioning, Vent., Maintain.,Repair, Install | 07/07/2017 | Paid | $661.20 |
PRM 8100 17062625920 | Bridges, Passenger Loading | 06/27/2017 | Paid | $1,112.64 |
PRM 8100 17060624145 | Bridges, Passenger Loading | 06/07/2017 | Paid | $9,710.52 |
PRM 8100 17053123574 | Bridges, Passenger Loading | 06/01/2017 | Paid | $916.56 |
PRM 8100 17051922615 | Bridges, Passenger Loading | 05/22/2017 | Paid | $305.52 |
PRM 8100 17051121897 | Heating, Air Conditioning, Vent., Maintain.,Repair, Install | 05/12/2017 | Paid | $9,710.52 |
PRM 8100 17042420053 | Bridges, Passenger Loading | 04/25/2017 | Paid | $8,502.12 |
PRM 8100 17041118755 | Bridges, Passenger Loading | 04/12/2017 | Paid | $8,267.28 |
PRM 8100 17032817501 | Bridges, Passenger Loading | 03/29/2017 | Paid | $1,549.26 |
PRM 8100 17032717340 | Bridges, Passenger Loading | 03/28/2017 | Paid | $3,898.80 |
PRM 8100 17032016703 | Bridges, Passenger Loading | 03/21/2017 | Paid | $1,178.76 |
PRM 8100 17022214108 | Bridges, Passenger Loading | 02/23/2017 | Paid | $774.06 |
PRM 8100 17012310564 | Bridges, Passenger Loading | 01/24/2017 | Paid | $1,933.44 |
PRM 8100 17011310008 | Bridges, Passenger Loading | 01/17/2017 | Paid | $2,900.16 |
PRM 8100 17010308867 | Bridges, Passenger Loading | 01/04/2017 | Paid | $85.27 |
PRM 8100 16122107958 | Bridges, Passenger Loading | 12/22/2016 | Paid | $5,941.68 |
PRM 8100 16121507159 | Bridges, Passenger Loading | 12/16/2016 | Paid | $1,285.92 |
PRM 8100 16121306829 | Bridges, Passenger Loading | 12/14/2016 | Paid | $58.60 |
PRM 8100 16120205807 | Bridges, Passenger Loading | 12/05/2016 | Paid | $4,981.80 |
PRM 8100 16111804776 | Bridges, Passenger Loading | 11/21/2016 | Paid | $7,159.20 |
PRM 8100 16110803974 | Bridges, Passenger Loading | 11/09/2016 | Paid | $9,892.92 |
PRM 8100 16101000581 | Bridges, Passenger Loading | 10/11/2016 | Paid | $1,618.00 |
PRM 8100 16092138503 | Bridges, Passenger Loading | 09/22/2016 | Paid | $10,773.00 |
PRM 8100 16090937042 | Bridges, Passenger Loading | 09/12/2016 | Paid | $3,132.72 |
PRM 8100 16090236217 | Bridges, Passenger Loading | 09/06/2016 | Paid | $177.84 |
PRM 8100 16090336366 | Bridges, Passenger Loading | 09/06/2016 | Paid | $6,401.10 |
PRM 8100 16083136034 | Bridges, Passenger Loading | 09/01/2016 | Paid | $59.28 |
PRM 8100 16080232557 | Bridges, Passenger Loading | 08/03/2016 | Paid | $304.38 |
PRM 8100 16070529970 | Bridges, Passenger Loading | 07/06/2016 | Paid | $2,207.04 |
PRM 8100 16063029521 | Bridges, Passenger Loading | 07/01/2016 | Paid | $2,815.80 |
PRM 8100 16063029525 | Bridges, Passenger Loading | 07/01/2016 | Paid | $11,544.78 |
PRM 8100 16062128137 | Bridges, Passenger Loading | 06/22/2016 | Paid | $840.00 |
PRM 8100 16060926807 | Bridges, Passenger Loading | 06/10/2016 | Paid | $462.84 |
PRM 8100 16060926811 | Bridges, Passenger Loading | 06/10/2016 | Paid | $761.52 |
PRM 8100 16060826633 | Bridges, Passenger Loading | 06/09/2016 | Paid | $4,142.76 |
PRM 8100 16060826639 | Bridges, Passenger Loading | 06/09/2016 | Paid | $328.32 |
PRM 8100 16060826641 | Bridges, Passenger Loading | 06/09/2016 | Paid | $357.20 |
PRM 8100 16060726517 | Bridges, Passenger Loading | 06/08/2016 | Paid | $4,883.76 |
PRM 8100 16042723363 | Bridges, Passenger Loading | 04/28/2016 | Paid | $1,652.29 |
PRM 8100 16040721086 | Bridges, Passenger Loading | 04/08/2016 | Paid | $4,981.80 |
PRM 8100 16040520785 | Bridges, Passenger Loading | 04/06/2016 | Paid | $791.16 |
PRM 8100 16033120321 | Bridges, Passenger Loading | 04/01/2016 | Paid | $6,004.38 |
PRM 8100 16032419354 | Bridges, Passenger Loading | 03/25/2016 | Paid | $2,667.60 |
PRM 8100 16031418052 | Bridges, Passenger Loading | 03/15/2016 | Paid | $2,125.34 |
PRM 8100 16030817231 | Bridges, Passenger Loading | 03/09/2016 | Paid | $2,325.60 |
PRM 8100 16022415555 | Bridges, Passenger Loading | 02/25/2016 | Paid | $5,368.00 |
PRM 8100 16022215160 | Bridges, Passenger Loading | 02/23/2016 | Paid | $648.00 |
PRM 8100 16012011945 | Bridges, Passenger Loading | 01/27/2016 | Paid | $2,119.48 |
PRM 8100 16012612546 | Bridges, Passenger Loading | 01/27/2016 | Paid | $2,083.32 |
PRM 8100 16011110543 | Bridges, Passenger Loading | 01/12/2016 | Paid | $2,270.88 |
PRM 8100 16010509776 | Bridges, Passenger Loading | 01/06/2016 | Paid | $5,155.08 |
PRM 8100 16010509783 | Bridges, Passenger Loading | 01/06/2016 | Paid | $2,353.73 |
PRM 8100 15123009438 | Bridges, Passenger Loading | 12/31/2015 | Paid | $1,235.76 |
PRM 8100 15122308945 | Bridges, Passenger Loading | 12/28/2015 | Paid | $3,293.23 |
PRM 8100 15120106300 | Bridges, Passenger Loading | 12/02/2015 | Paid | $3,629.76 |