PAYMENT REQUEST
CATEGORY | COMMODITIES |
---|---|
EXPENSE CATEGORY | ASPHALT |
DEPARTMENT | PUBLIC WORKS - TRANSPORTATION |
FUND | TRANSPORTATION FUND |
PROGRAM | STREET PREVENTIVE MAINTENANCE |
ACTIVITY | SEAL COAT & OTHER THIN SURFACE TREATMENTS |
PAYEE | ERGON ASPHALT & EMULSIONS INC |
PAYMENT REQUEST | Select a payment request. |
PAYMENT REQUEST | DESCRIPTION | CHECK DATE | CHECK STATUS | AMOUNT |
---|---|---|---|---|
PRM 6200 17091934012 | EMULSIONS, ASPHALT | 09/20/2017 | Paid | $2,153.85 |
PRM 6200 17091133146 | EMULSIONS, ASPHALT | 09/12/2017 | Paid | $100,940.10 |
PRM 6200 17090833034 | EMULSIONS, ASPHALT | 09/11/2017 | Paid | $39,000.58 |
PRM 6200 17090833036 | EMULSIONS, ASPHALT | 09/11/2017 | Paid | $3,916.08 |
PRM 6200 17090833038 | EMULSIONS, ASPHALT | 09/11/2017 | Paid | $10,965.03 |
PRM 6200 17090833040 | EMULSIONS, ASPHALT | 09/11/2017 | Paid | $4,617.72 |
PRM 6200 17081731034 | EMULSIONS, ASPHALT | 08/18/2017 | Paid | $49,946.62 |
PRM 6200 17080129287 | EMULSIONS, ASPHALT | 08/02/2017 | Paid | $2,453.74 |
PRM 6200 17073129132 | EMULSIONS, ASPHALT | 08/01/2017 | Paid | $5,451.37 |
PRM 6200 17073129134 | EMULSIONS, ASPHALT | 08/01/2017 | Paid | $33,463.83 |
PRM 6200 17072929017 | EMULSIONS, ASPHALT | 07/31/2017 | Paid | $33,102.61 |
PRM 6200 17072028231 | EMULSIONS, ASPHALT | 07/21/2017 | Paid | $43,543.35 |
PRM 6200 17072028233 | EMULSIONS, ASPHALT | 07/21/2017 | Paid | $11,276.39 |
PRM 6200 17072028235 | EMULSIONS, ASPHALT | 07/21/2017 | Paid | $4,753.86 |
PRM 6200 17072028238 | EMULSIONS, ASPHALT | 07/21/2017 | Paid | $17,137.16 |
PRM 6200 17071127397 | EMULSIONS, ASPHALT | 07/12/2017 | Paid | $36,632.50 |
PRM 6200 17070526794 | EMULSIONS, ASPHALT | 07/07/2017 | Paid | $16,560.07 |
PRM 6200 17070627003 | EMULSIONS, ASPHALT | 07/07/2017 | Paid | $35,115.45 |
PRM 6200 17070526790 | EMULSIONS, ASPHALT | 07/06/2017 | Paid | $10,761.88 |
PRM 6200 17070526791 | EMULSIONS, ASPHALT | 07/06/2017 | Paid | $11,992.83 |
PRM 6200 17062926426 | EMULSIONS, ASPHALT | 06/30/2017 | Paid | $19,200.12 |
PRM 6200 17062926428 | EMULSIONS, ASPHALT | 06/30/2017 | Paid | $4,580.76 |
PRM 6200 17062926430 | EMULSIONS, ASPHALT | 06/30/2017 | Paid | $12,911.66 |
PRM 6200 17062926432 | EMULSIONS, ASPHALT | 06/30/2017 | Paid | $5,786.22 |
PRM 6200 17062625892 | EMULSIONS, ASPHALT | 06/27/2017 | Paid | $53,264.86 |
PRM 6200 17062325788 | EMULSIONS, ASPHALT | 06/26/2017 | Paid | $8,650.24 |
PRM 6200 17062325790 | EMULSIONS, ASPHALT | 06/26/2017 | Paid | $5,232.41 |
PRM 6200 17062325792 | EMULSIONS, ASPHALT | 06/26/2017 | Paid | $34,442.99 |
PRM 6200 17061324843 | EMULSIONS, ASPHALT | 06/14/2017 | Paid | $5,545.13 |
PRM 6200 17061324844 | EMULSIONS, ASPHALT | 06/14/2017 | Paid | $5,678.15 |
PRM 6200 17060624098 | EMULSIONS, ASPHALT | 06/07/2017 | Paid | $28,648.46 |
PRM 6200 17060223791 | EMULSIONS, ASPHALT | 06/05/2017 | Paid | $40,349.76 |
PRM 6200 17060223794 | EMULSIONS, ASPHALT | 06/05/2017 | Paid | $3,184.08 |
PRM 6200 17053123542 | EMULSIONS, ASPHALT | 06/01/2017 | Paid | $5,383.02 |
PRM 6200 17053123543 | EMULSIONS, ASPHALT | 06/01/2017 | Paid | $5,694.77 |
PRM 6200 17053123544 | EMULSIONS, ASPHALT | 06/01/2017 | Paid | $3,928.15 |
PRM 6200 17051822489 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $2,533.10 |
PRM 6200 17051822490 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,669.83 |
PRM 6200 17051822491 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $1,995.25 |
PRM 6200 17051822492 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $4,323.04 |
PRM 6200 17051822493 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,644.89 |
PRM 6200 17051822494 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $4,734.56 |
PRM 6200 17051822495 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $91.39 |
PRM 6200 17051822497 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,353.92 |
PRM 6200 17051822499 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,017.22 |
PRM 6200 17051822500 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,657.36 |
PRM 6200 17051822501 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,473.93 |
PRM 6200 17051822502 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $4,535.04 |
PRM 6200 17051822503 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $15,248.22 |
PRM 6200 17051822504 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,719.72 |
PRM 6200 17051822505 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,008.91 |
PRM 6200 17051822507 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $22,367.58 |
PRM 6200 17051822510 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $138.92 |
GAX 6200 17051012980 | 05/16/2017 | Paid | ($3,386.60) | |
PRM 6200 17051522055 | EMULSIONS, ASPHALT | 05/16/2017 | Paid | $5,519.55 |
PRM 6200 17050921587 | EMULSIONS, ASPHALT | 05/10/2017 | Paid | $12,887.09 |
PRM 6200 17050921588 | EMULSIONS, ASPHALT | 05/10/2017 | Paid | $5,125.30 |
PRM 6200 17050321004 | EMULSIONS, ASPHALT | 05/04/2017 | Paid | $22,750.00 |
PRM 6200 17050321006 | EMULSIONS, ASPHALT | 05/04/2017 | Paid | $4,835.31 |
PRM 6200 17050220825 | EMULSIONS, ASPHALT | 05/03/2017 | Paid | $328.90 |
PRM 6200 17050120699 | EMULSIONS, ASPHALT | 05/02/2017 | Paid | $186.44 |
PRM 6200 17041218903 | EMULSIONS, ASPHALT | 04/13/2017 | Paid | $83.98 |
PRM 6200 17041218907 | EMULSIONS, ASPHALT | 04/13/2017 | Paid | $690.12 |
PRM 6200 17032317130 | EMULSIONS, ASPHALT | 03/24/2017 | Paid | $1,230.51 |
PRM 6200 17031416050 | EMULSIONS, ASPHALT | 03/15/2017 | Paid | $165.69 |
PRM 6200 17030214898 | EMULSIONS, ASPHALT | 03/03/2017 | Paid | $392.12 |
PRM 6200 17022714436 | EMULSIONS, ASPHALT | 02/28/2017 | Paid | $524.84 |
PRM 6200 17021313026 | EMULSIONS, ASPHALT | 02/14/2017 | Paid | $331.53 |
PRM 6200 17020812640 | EMULSIONS, ASPHALT | 02/09/2017 | Paid | $88.47 |
PRM 6200 17020212033 | EMULSIONS, ASPHALT | 02/03/2017 | Paid | $215.65 |
PRM 6200 17013011466 | EMULSIONS, ASPHALT | 01/31/2017 | Paid | $116.12 |
PRM 6200 17012410739 | EMULSIONS, ASPHALT | 01/25/2017 | Paid | $387.06 |
PRM 6200 17012310525 | EMULSIONS, ASPHALT | 01/24/2017 | Paid | $464.48 |
PRM 6200 17011009578 | EMULSIONS, ASPHALT | 01/11/2017 | Paid | $9,427.55 |
PRM 6200 16122808403 | EMULSIONS, ASPHALT | 12/29/2016 | Paid | $259.89 |
PRM 6200 16122007717 | EMULSIONS, ASPHALT | 12/21/2016 | Paid | $198.13 |
PRM 6200 16121206636 | EMULSIONS, ASPHALT | 12/13/2016 | Paid | $6,321.33 |
PRM 6200 16112205064 | EMULSIONS, ASPHALT | 11/23/2016 | Paid | $14,772.21 |
PRM 6200 16112104876 | EMULSIONS, ASPHALT | 11/22/2016 | Paid | $71.71 |
PRM 6200 16112104880 | EMULSIONS, ASPHALT | 11/22/2016 | Paid | $19,425.96 |
PRM 6200 16103102985 | EMULSIONS, ASPHALT | 11/01/2016 | Paid | $20,145.67 |
PRM 6200 16102602565 | EMULSIONS, ASPHALT | 10/27/2016 | Paid | $8,113.36 |
PRM 6200 16102602567 | EMULSIONS, ASPHALT | 10/27/2016 | Paid | $6,460.26 |
PRM 6200 16102602568 | EMULSIONS, ASPHALT | 10/27/2016 | Paid | $6,730.01 |
PRM 6200 16102602569 | EMULSIONS, ASPHALT | 10/27/2016 | Paid | $9,475.97 |
PRM 6200 16101401079 | EMULSIONS, ASPHALT | 10/17/2016 | Paid | $28,007.73 |
GAX 6200 16100600338 | 10/12/2016 | Paid | ($4,082.80) | |
PRM 6200 16101100671 | EMULSIONS, ASPHALT | 10/12/2016 | Paid | $8,083.14 |
PRM 6200 16100300097 | EMULSIONS, ASPHALT | 10/04/2016 | Paid | $7,848.24 |
PRM 6200 16092739081 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $18,142.15 |
PRM 6200 16092739082 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $19,047.19 |
PRM 6200 16092739083 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $5,561.48 |
PRM 6200 16092739089 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $9,692.86 |
PRM 6200 16092739090 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $9,368.15 |
PRM 6200 16092739091 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $8,442.39 |
PRM 6200 16092739092 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $16,435.72 |
PRM 6200 16092739094 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $9,216.16 |
PRM 6200 16092739095 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $14,093.68 |
PRM 6200 16092438758 | EMULSIONS, ASPHALT | 09/26/2016 | Paid | $8,995.08 |
PRM 6200 16092038211 | EMULSIONS, ASPHALT | 09/21/2016 | Paid | $9,152.74 |
PRM 6200 16091437563 | EMULSIONS, ASPHALT | 09/15/2016 | Paid | $36,815.16 |
PRM 6200 16091437566 | EMULSIONS, ASPHALT | 09/15/2016 | Paid | $4,189.14 |
PRM 6200 16090736716 | EMULSIONS, ASPHALT | 09/08/2016 | Paid | $143,543.21 |
PRM 6200 16082935623 | EMULSIONS, ASPHALT | 08/30/2016 | Paid | $46,221.36 |
PRM 6200 16082535371 | EMULSIONS, ASPHALT | 08/26/2016 | Paid | $4,386.28 |
PRM 6200 16082435212 | EMULSIONS, ASPHALT | 08/25/2016 | Paid | $119,107.89 |
PRM 6200 16082234793 | EMULSIONS, ASPHALT | 08/23/2016 | Paid | $27,103.56 |
PRM 6200 16081534009 | EMULSIONS, ASPHALT | 08/16/2016 | Paid | $18,547.86 |
PRM 6200 16081233925 | EMULSIONS, ASPHALT | 08/15/2016 | Paid | $91,323.86 |
PRM 6200 16081133848 | EMULSIONS, ASPHALT | 08/12/2016 | Paid | $21,816.69 |
PRM 6200 16080633154 | EMULSIONS, ASPHALT | 08/08/2016 | Paid | $18,905.42 |
PRM 6200 16080332772 | EMULSIONS, ASPHALT | 08/04/2016 | Paid | $8,541.69 |
PRM 6200 16080332774 | EMULSIONS, ASPHALT | 08/04/2016 | Paid | $49,757.60 |
PRM 6200 16080332776 | EMULSIONS, ASPHALT | 08/04/2016 | Paid | $34,159.74 |
PRM 6200 16080332778 | EMULSIONS, ASPHALT | 08/04/2016 | Paid | $43,724.46 |
PRM 6200 16080332780 | EMULSIONS, ASPHALT | 08/04/2016 | Paid | $22,892.28 |
PRM 6200 16071931327 | EMULSIONS, ASPHALT | 07/20/2016 | Paid | $132,757.00 |
PRM 6200 16070730265 | EMULSIONS, ASPHALT | 07/08/2016 | Paid | $7,657.90 |
PRM 6200 16070630155 | EMULSIONS, ASPHALT | 07/07/2016 | Paid | $183.77 |
PRM 6200 16070630156 | EMULSIONS, ASPHALT | 07/07/2016 | Paid | $67,305.54 |
PRM 6200 16063029494 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $8,983.45 |
PRM 6200 16063029495 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $9,425.95 |
PRM 6200 16063029496 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $9,545.36 |
PRM 6200 16063029497 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $9,341.67 |
PRM 6200 16063029498 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $7,972.02 |
PRM 6200 16063029499 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $2,746.31 |
PRM 6200 16063029500 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $7,157.26 |
PRM 6200 16063029501 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $15,691.19 |
PRM 6200 16063029502 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $7,956.82 |
PRM 6200 16063029503 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $2,989.14 |
PRM 6200 16062829052 | EMULSIONS, ASPHALT | 06/29/2016 | Paid | $175,546.07 |
PRM 6200 16062128091 | EMULSIONS, ASPHALT | 06/22/2016 | Paid | $8,428.57 |
PRM 6200 16062128092 | EMULSIONS, ASPHALT | 06/22/2016 | Paid | $5,183.57 |
PRM 6200 16062128093 | EMULSIONS, ASPHALT | 06/22/2016 | Paid | $7,431.19 |
PRM 6200 16061727838 | EMULSIONS, ASPHALT | 06/20/2016 | Paid | $6,216.07 |
PRM 6200 16061627649 | EMULSIONS, ASPHALT | 06/17/2016 | Paid | $6,770.95 |
PRM 6200 16061627651 | EMULSIONS, ASPHALT | 06/17/2016 | Paid | $17,545.48 |
PRM 6200 16061427283 | EMULSIONS, ASPHALT | 06/15/2016 | Paid | $139,710.89 |
PRM 6200 16060326304 | EMULSIONS, ASPHALT | 06/06/2016 | Paid | $24,177.21 |
PRM 6200 16060226254 | EMULSIONS, ASPHALT | 06/03/2016 | Paid | $11,497.98 |
PRM 6200 16052625726 | EMULSIONS, ASPHALT | 05/27/2016 | Paid | $36,883.11 |
PRM 6200 16052625728 | EMULSIONS, ASPHALT | 05/27/2016 | Paid | $8,665.74 |
PRM 6200 16051825124 | EMULSIONS, ASPHALT | 05/19/2016 | Paid | $362.68 |
PRM 6200 16051324663 | EMULSIONS, ASPHALT | 05/16/2016 | Paid | $105.81 |
PRM 6200 16051124398 | EMULSIONS, ASPHALT | 05/12/2016 | Paid | $295.14 |
PRM 6200 16051124399 | EMULSIONS, ASPHALT | 05/12/2016 | Paid | $6,257.99 |
PRM 6200 16050223645 | EMULSIONS, ASPHALT | 05/03/2016 | Paid | $167.06 |
PRM 6200 16042522678 | EMULSIONS, ASPHALT | 04/26/2016 | Paid | $500.13 |
PRM 6200 16041421715 | EMULSIONS, ASPHALT | 04/15/2016 | Paid | $332.81 |
PRM 6200 16041321543 | EMULSIONS, ASPHALT | 04/14/2016 | Paid | $167.06 |
PRM 6200 16040420568 | EMULSIONS, ASPHALT | 04/05/2016 | Paid | $160.54 |
PRM 6200 16032819593 | EMULSIONS, ASPHALT | 03/29/2016 | Paid | $4,817.04 |
PRM 6200 16031618433 | EMULSIONS, ASPHALT | 03/17/2016 | Paid | $83.04 |
PRM 6200 16031017723 | EMULSIONS, ASPHALT | 03/11/2016 | Paid | $404.12 |
PRM 6200 16030716905 | EMULSIONS, ASPHALT | 03/08/2016 | Paid | $564.66 |
PRM 6200 16022515692 | EMULSIONS, ASPHALT | 02/26/2016 | Paid | $457.47 |
PRM 6200 16020313165 | EMULSIONS, ASPHALT | 02/04/2016 | Paid | $231.15 |
GAX 6200 16011105397 | 01/19/2016 | Paid | ($2,363.35) | |
PRM 6200 16011511384 | EMULSIONS, ASPHALT | 01/19/2016 | Paid | $8,864.02 |
PRM 6200 16010609958 | EMULSIONS, ASPHALT | 01/07/2016 | Paid | $196.30 |
PRM 6200 15121808428 | EMULSIONS, ASPHALT | 12/21/2015 | Paid | $352.22 |
PRM 6200 15121608189 | EMULSIONS, ASPHALT | 12/17/2015 | Paid | $357.27 |
PRM 6200 15120907251 | EMULSIONS, ASPHALT | 12/10/2015 | Paid | $132.08 |
PRM 6200 15112405760 | EMULSIONS, ASPHALT | 11/25/2015 | Paid | $116.39 |
PRM 6200 15111905206 | EMULSIONS, ASPHALT | 11/20/2015 | Paid | $3,211.17 |
PRM 6200 15111004349 | EMULSIONS, ASPHALT | 11/10/2015 | Paid | $8,002.14 |
PRM 6200 15111004350 | EMULSIONS, ASPHALT | 11/10/2015 | Paid | $5,633.73 |
PRM 6200 15110403988 | EMULSIONS, ASPHALT | 11/05/2015 | Paid | $18,225.53 |
PRM 6200 15110403990 | EMULSIONS, ASPHALT | 11/05/2015 | Paid | $9,725.14 |
PRM 6200 15102102492 | EMULSIONS, ASPHALT | 10/22/2015 | Paid | $121.93 |
PRM 6200 15101301077 | EMULSIONS, ASPHALT | 10/14/2015 | Paid | $29,089.00 |
PRM 6200 15100200140 | EMULSIONS, ASPHALT | 10/05/2015 | Paid | $120,402.19 |