PRM 6200 13091835576 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/19/2013 |
Paid |
$7,292.32 |
PRM 6200 13091635301 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/17/2013 |
Paid |
$6,053.04 |
PRM 6200 13091134676 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/12/2013 |
Paid |
$8,415.12 |
PRM 6200 13091034469 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/11/2013 |
Paid |
$3,337.60 |
PRM 6200 13091034471 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/11/2013 |
Paid |
$18,578.00 |
PRM 6200 13091034477 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/11/2013 |
Paid |
$1,447.04 |
PRM 6200 13091034479 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/11/2013 |
Paid |
$1,182.16 |
PRM 6200 13090533998 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/06/2013 |
Paid |
$6,016.64 |
PRM 6200 13090333771 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/04/2013 |
Paid |
$2,250.08 |
PRM 6200 13082232979 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/23/2013 |
Paid |
$38,757.04 |
PRM 6200 13080131038 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/02/2013 |
Paid |
$8,991.92 |
PRM 6200 13072430064 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/25/2013 |
Paid |
$10,729.04 |
PRM 6200 13072329896 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/24/2013 |
Paid |
$1,009.68 |
PRM 6200 13072329900 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/24/2013 |
Paid |
$9,245.04 |
PRM 6200 13071628545 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/17/2013 |
Paid |
$32,629.52 |
PRM 6200 13071528306 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$1,399.44 |
PRM 6200 13071528308 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$2,434.32 |
PRM 6200 13071528311 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$3,139.36 |
PRM 6200 13071528315 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$17,299.52 |
PRM 6200 13071528318 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$692.16 |
PRM 6200 13071528319 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$2,835.84 |
PRM 6200 13071528323 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$6,367.87 |
PRM 6200 13071528326 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$34,475.74 |
PRM 6200 13062827028 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/01/2013 |
Paid |
$18,275.50 |
PRM 6200 13062426574 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/25/2013 |
Paid |
$13,305.04 |
PRM 6200 13062426576 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/25/2013 |
Paid |
$3,386.88 |
PRM 6200 13061425806 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/17/2013 |
Paid |
$9,367.68 |
PRM 6200 13061125432 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/12/2013 |
Paid |
$4,640.72 |
PRM 6200 13061125436 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/12/2013 |
Paid |
$2,012.64 |
PRM 6200 13061125440 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/12/2013 |
Paid |
$1,662.08 |
PRM 6200 13061125444 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/12/2013 |
Paid |
$5,925.36 |
PRM 6200 13061125446 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/12/2013 |
Paid |
$954.24 |
PRM 6200 13060524995 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/06/2013 |
Paid |
$9,898.00 |
PRM 6200 13060524999 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/06/2013 |
Paid |
$12,561.36 |
PRM 6200 13060424830 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/05/2013 |
Paid |
$5,022.49 |
PRM 6200 13051723143 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/20/2013 |
Paid |
$3,435.60 |
PRM 6200 13051723145 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/20/2013 |
Paid |
$3,651.76 |
PRM 6200 13050121645 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/02/2013 |
Paid |
$59.92 |
PRM 6200 13042621192 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/29/2013 |
Paid |
$10,913.28 |
PRM 6200 13041720023 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/18/2013 |
Paid |
$6,535.98 |
PRM 6200 13041720024 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/18/2013 |
Paid |
$30,466.26 |
PRM 6200 13041720026 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/18/2013 |
Paid |
$603.90 |
PRM 6200 13040418885 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/05/2013 |
Paid |
$7,374.18 |
PRM 6200 13032617957 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/27/2013 |
Paid |
$11,905.74 |
PRM 6200 13032617961 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/27/2013 |
Paid |
$2,722.50 |
PRM 6200 13032617963 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/27/2013 |
Paid |
$50,818.02 |
PRM 6200 13031316825 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2013 |
Paid |
$11,744.70 |
PRM 6200 13031316826 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2013 |
Paid |
$787.38 |
PRM 6200 13031316827 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2013 |
Paid |
$3,257.10 |
PRM 6200 13031316829 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2013 |
Paid |
$2,407.02 |
PRM 6200 13031316831 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2013 |
Paid |
$4,675.44 |
PRM 6200 13031316833 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2013 |
Paid |
$5,062.86 |
PRM 6200 13022615039 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$630.96 |
PRM 6200 13022615042 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$2,176.68 |
PRM 6200 13022615044 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$2,267.76 |
PRM 6200 13022615046 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$2,358.18 |
PRM 6200 13022615048 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$1,716.66 |
PRM 6200 13022615052 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$2,282.28 |
PRM 6200 13022615055 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$3,196.38 |
PRM 6200 13022615060 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$916.08 |
PRM 6200 13022615065 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$1,325.94 |
PRM 6200 13022615077 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$3,645.84 |
PRM 6200 13022615088 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$5,426.52 |
PRM 6200 13022615096 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$1,665.18 |
PRM 6200 13022014450 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/21/2013 |
Paid |
$2,157.54 |
PRM 6200 13022014452 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/21/2013 |
Paid |
$8,856.54 |
PRM 6200 13020413061 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/05/2013 |
Paid |
$13,591.38 |
PRM 6200 13013112807 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/01/2013 |
Paid |
$6,439.62 |
PRM 6200 13013012680 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/31/2013 |
Paid |
$1,535.82 |
PRM 6200 13012812312 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/29/2013 |
Paid |
$4,379.76 |
PRM 6200 13012812314 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/29/2013 |
Paid |
$2,464.44 |
PRM 6200 13012812316 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/29/2013 |
Paid |
$1,622.94 |
PRM 6200 13012412030 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/25/2013 |
Paid |
$12,829.74 |
PRM 6200 13010409483 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$6,957.72 |
PRM 6200 13010409485 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$913.44 |
PRM 6200 13010409487 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$3,555.42 |
PRM 6200 13010409489 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$3,593.70 |
PRM 6200 13010409495 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$4,697.88 |
PRM 6200 12122608506 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/27/2012 |
Paid |
$18,305.76 |
PRM 6200 12121908208 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/20/2012 |
Paid |
$90,064.92 |
PRM 6200 12121707940 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/18/2012 |
Paid |
$22,407.66 |
PRM 6200 12121707942 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/18/2012 |
Paid |
$106,836.18 |
PRM 6200 12112906274 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/30/2012 |
Paid |
$72,359.10 |
PRM 6200 12112705903 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/28/2012 |
Paid |
$6,640.26 |
PRM 6200 12112705905 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/28/2012 |
Paid |
$2,348.94 |
PRM 6200 12112705907 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/28/2012 |
Paid |
$12,737.34 |
PRM 6200 12111405049 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/15/2012 |
Paid |
$56,466.86 |
PRM 6200 12110103814 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2012 |
Paid |
$9,383.22 |
PRM 6200 12110103816 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2012 |
Paid |
$2,122.56 |
PRM 6200 12103003606 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/31/2012 |
Paid |
$1,786.62 |
PRM 6200 12103003608 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/31/2012 |
Paid |
$1,345.74 |
PRM 6200 12103003610 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/31/2012 |
Paid |
$7,085.76 |
PRM 6200 12101701966 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/18/2012 |
Paid |
$54,411.90 |
PRM 6200 12101601687 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/17/2012 |
Paid |
$121,408.32 |
PRM 6200 12100200277 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/03/2012 |
Paid |
$3,636.60 |
PRM 6200 12100200280 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/03/2012 |
Paid |
$13,470.60 |
PRM 6200 12100200282 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/03/2012 |
Paid |
$3,451.80 |
PRM 6200 12100200284 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/03/2012 |
Paid |
$7,792.62 |
PRM 6200 12100200286 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/03/2012 |
Paid |
$2,826.78 |
PRM 6200 12100200288 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/03/2012 |
Paid |
$26,949.78 |
PRM 6200 12092134671 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/24/2012 |
Paid |
$671.88 |
PRM 6200 12092034568 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/21/2012 |
Paid |
$29,041.32 |
PRM 6200 12090633080 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/07/2012 |
Paid |
$29,603.97 |
PRM 6200 12082331507 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/24/2012 |
Paid |
$8,073.78 |
PRM 6200 12082331509 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/24/2012 |
Paid |
$1,785.96 |
PRM 6200 12080930077 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/10/2012 |
Paid |
$7,357.02 |
PRM 6200 12080930078 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/10/2012 |
Paid |
$3,496.68 |
PRM 6200 12080229322 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/03/2012 |
Paid |
$2,244.66 |
PRM 6200 12080229323 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/03/2012 |
Paid |
$1,676.40 |
PRM 6200 12080229324 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/03/2012 |
Paid |
$520.08 |
PRM 6200 12080129208 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/02/2012 |
Paid |
$28,050.41 |
PRM 6200 12072628632 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/27/2012 |
Paid |
$5,524.78 |
PRM 6200 12071727734 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/18/2012 |
Paid |
$20,716.76 |
PRM 6200 12070526619 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/06/2012 |
Paid |
$9,343.72 |
PRM 6200 12070526623 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/06/2012 |
Paid |
$2,588.43 |
PRM 6200 12070526625 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/06/2012 |
Paid |
$527.11 |
PRM 6200 12062625534 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/27/2012 |
Paid |
$12,793.22 |
PRM 6200 12061324243 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/14/2012 |
Paid |
$9,262.86 |
PRM 6200 12061324245 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/14/2012 |
Paid |
$4,515.35 |
PRM 6200 12061324247 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/14/2012 |
Paid |
$65,402.46 |
PRM 6200 12061224088 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/13/2012 |
Paid |
$7,379.57 |
PRM 6200 12060823838 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/11/2012 |
Paid |
$72,239.85 |
PRM 6200 12060623647 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/07/2012 |
Paid |
$10,455.53 |
PRM 6200 12053123103 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/01/2012 |
Paid |
$728.41 |
PRM 6200 12052922670 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/30/2012 |
Paid |
$700.49 |
PRM 6200 12052922672 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/30/2012 |
Paid |
$1,466.13 |
PRM 6200 12052922675 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/30/2012 |
Paid |
$22,663.43 |
PRM 6200 12051021230 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/11/2012 |
Paid |
$2,314.98 |
PRM 6200 12051021235 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/11/2012 |
Paid |
$5,892.47 |
PRM 6200 12050320711 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/04/2012 |
Paid |
$5,998.37 |
PRM 6200 12042619862 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/27/2012 |
Paid |
$1,649.99 |
PRM 6200 12042619863 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/27/2012 |
Paid |
$1,799.52 |
PRM 6200 12042519696 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/26/2012 |
Paid |
$1,501.04 |
PRM 6200 12041118167 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/12/2012 |
Paid |
$8,587.35 |
PRM 6200 12032917097 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/30/2012 |
Paid |
$3,157.43 |
PRM 6200 12032316517 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/26/2012 |
Paid |
$5,803.46 |
PRM 6200 12032116284 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/22/2012 |
Paid |
$4,330.33 |
PRM 6200 12031415553 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/15/2012 |
Paid |
$10,301.35 |
PRM 6200 12030915103 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/12/2012 |
Paid |
$7,453.43 |
PRM 6200 12030714777 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/08/2012 |
Paid |
$2,244.59 |
PRM 6200 12022813818 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/29/2012 |
Paid |
$9,918.53 |
PRM 6200 12022413576 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2012 |
Paid |
$3,497.78 |
PRM 6200 12021512542 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/16/2012 |
Paid |
$6,803.01 |
PRM 6200 12021412445 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/15/2012 |
Paid |
$3,405.27 |
PRM 6200 12013111151 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/01/2012 |
Paid |
$1,745.40 |
PRM 6200 12012410516 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/25/2012 |
Paid |
$7,054.90 |
PRM 6200 12011009280 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/11/2012 |
Paid |
$6,573.18 |
PRM 6200 11123008424 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/03/2012 |
Paid |
$1,777.40 |
PRM 6200 11122808162 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/29/2011 |
Paid |
$1,248.54 |
PRM 6200 11122808163 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/29/2011 |
Paid |
$4,632.29 |
PRM 6200 11121907541 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/20/2011 |
Paid |
$1,470.79 |
PRM 6200 11120806590 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/09/2011 |
Paid |
$3,361.06 |
PRM 6200 11120606372 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/07/2011 |
Paid |
$5,765.64 |
PRM 6200 11111805014 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/21/2011 |
Paid |
$4,148.24 |
PRM 6200 11111704914 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/18/2011 |
Paid |
$2,990.45 |
PRM 6200 11110904235 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/10/2011 |
Paid |
$7,369.66 |
PRM 6200 11110103293 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2011 |
Paid |
$17,004.83 |
PRM 6200 11102502497 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/26/2011 |
Paid |
$23,849.76 |
PRM 6200 11102402276 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/25/2011 |
Paid |
$7,978.22 |
PRM 6200 11101701687 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/18/2011 |
Paid |
$24,152.27 |
PRM 6200 11100700785 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/10/2011 |
Paid |
$948.33 |
PRM 6200 11100600640 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/07/2011 |
Paid |
$1,704.67 |
PRM 6200 11092735592 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/28/2011 |
Paid |
$3,294.16 |
PRM 6200 11092635456 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/27/2011 |
Paid |
$9,864.43 |
PRM 6200 11092135033 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/22/2011 |
Paid |
$2,326.03 |
PRM 6200 11091634664 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/19/2011 |
Paid |
$3,794.64 |
PRM 6200 11090934024 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/12/2011 |
Paid |
$9,989.07 |
PRM 6200 11090934025 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/12/2011 |
Paid |
$2,506.92 |
PRM 6200 11083133268 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/01/2011 |
Paid |
$5,263.99 |
PRM 6200 11082932914 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/30/2011 |
Paid |
$979.38 |
PRM 6200 11082932915 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/30/2011 |
Paid |
$4,511.35 |
PRM 6200 11081731724 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/18/2011 |
Paid |
$2,646.68 |
PRM 6200 11081731725 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/18/2011 |
Paid |
$3,925.68 |
PRM 6200 11081031035 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/11/2011 |
Paid |
$3,760.91 |
PRM 6200 11080930777 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/10/2011 |
Paid |
$1,860.34 |
PRM 6200 11080930778 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/10/2011 |
Paid |
$2,500.39 |
PRM 6200 11080830571 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/09/2011 |
Paid |
$2,984.92 |
PRM 6200 11071828520 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/19/2011 |
Paid |
$1,394.30 |
PRM 6200 11071828521 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/19/2011 |
Paid |
$6,537.57 |
PRM 6200 11070727580 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/08/2011 |
Paid |
$5,626.15 |
PRM 6200 11070127258 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/05/2011 |
Paid |
$4,604.36 |
PRM 6200 11070127259 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/05/2011 |
Paid |
$1,912.00 |
PRM 6200 11063027138 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/01/2011 |
Paid |
$4,901.27 |
PRM 6200 11061325337 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/14/2011 |
Paid |
$8,881.89 |
PRM 6200 11060824922 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/09/2011 |
Paid |
$4,030.09 |
PRM 6200 11052523792 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/26/2011 |
Paid |
$5,434.19 |
PRM 6200 11051823124 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/19/2011 |
Paid |
$5,917.63 |
PRM 6200 11051122525 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/12/2011 |
Paid |
$1,018.54 |
PRM 6200 11050922225 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/10/2011 |
Paid |
$2,069.15 |
PRM 6200 11042821119 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/29/2011 |
Paid |
$3,257.37 |
PRM 6200 11042620845 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/27/2011 |
Paid |
$3,484.69 |
PRM 6200 11041519980 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/18/2011 |
Paid |
$759.69 |
PRM 6200 11040719192 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/08/2011 |
Paid |
$3,219.31 |
PRM 6200 11040719193 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/08/2011 |
Paid |
$1,469.34 |
PRM 6200 11040719194 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/08/2011 |
Paid |
$873.35 |
PRM 6200 11040518906 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/06/2011 |
Paid |
$1,467.18 |
PRM 6200 11032817820 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/29/2011 |
Paid |
$2,890.84 |
PRM 6200 11032417534 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/25/2011 |
Paid |
$5,415.72 |
PRM 6200 11032217276 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/23/2011 |
Paid |
$997.33 |
PRM 6200 11032217277 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/23/2011 |
Paid |
$23,535.64 |
PRM 6200 11031616784 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/17/2011 |
Paid |
$11,980.44 |
PRM 6200 11030916091 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/10/2011 |
Paid |
$6,017.69 |
PRM 6200 11022514730 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/28/2011 |
Paid |
$4,001.28 |
PRM 6200 11022414512 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/25/2011 |
Paid |
$3,440.09 |
PRM 6200 11022214044 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/23/2011 |
Paid |
$8,530.02 |
PRM 6200 11020913108 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/10/2011 |
Paid |
$2,960.46 |
PRM 6200 11020812995 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/09/2011 |
Paid |
$7,530.00 |
PRM 6200 11020112535 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/02/2011 |
Paid |
$3,448.79 |
PRM 6200 11012511677 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/26/2011 |
Paid |
$19,262.49 |
PRM 6200 11011310481 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/14/2011 |
Paid |
$1,028.86 |
PRM 6200 11011110235 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/12/2011 |
Paid |
$8,543.11 |
PRM 6200 10122908836 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/30/2010 |
Paid |
$2,797.85 |
PRM 6200 10122108382 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/22/2010 |
Paid |
$9,944.48 |
PRM 6200 10113006315 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/01/2010 |
Paid |
$30,932.97 |
PRM 6200 10111905660 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/22/2010 |
Paid |
$36,271.46 |
PRM 6200 10111605186 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/17/2010 |
Paid |
$6,720.82 |
PRM 6200 10111004716 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/12/2010 |
Paid |
$1,688.51 |
PRM 6200 10110804393 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/09/2010 |
Paid |
$1,314.91 |
PRM 6200 10101902178 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/20/2010 |
Paid |
$37,054.53 |
PRM 6200 10101201384 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/13/2010 |
Paid |
$24,449.81 |
PRM 6200 10101101210 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/12/2010 |
Paid |
$16,380.89 |
PRM 6200 10100500496 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/06/2010 |
Paid |
$775.46 |
PRM 6200 10100500497 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/06/2010 |
Paid |
$13,538.96 |
PRM 6200 10100400259 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/05/2010 |
Paid |
$2,778.26 |