PAYMENT REQUEST
CATEGORY | COMMODITIES |
---|---|
EXPENSE CATEGORY | CEMENT/CONCRETE |
DEPARTMENT | AUSTIN ENERGY |
FUND | E-DISTRIBUTION CAPITAL |
PROGRAM | FY2001 DISTRIBUTION PARENT |
ACTIVITY | DISTRIBUTION |
PAYEE | OLDCASTLE APG TEXAS |
PAYMENT REQUEST | Select a payment request. |
PAYMENT REQUEST | DESCRIPTION | CHECK DATE | CHECK STATUS | AMOUNT |
---|---|---|---|---|
PRM 1100 15081334800 | CONCRETE, READY MIX | 08/14/2015 | Paid | $739.53 |
PRM 1100 15060927214 | CONCRETE, READY MIX | 06/10/2015 | Paid | $2,560.03 |
PRM 1100 15052826128 | CONCRETE, READY MIX | 06/01/2015 | Paid | $923.12 |
PRM 1100 15052826138 | CONCRETE, READY MIX | 06/01/2015 | Paid | $1,689.60 |
PRM 1100 15052926249 | CONCRETE, READY MIX | 06/01/2015 | Paid | $923.12 |
PRC 1100 MAX34448 | CONCRETE, READY MIX | 03/23/2015 | Paid | $2,639.34 |
PRC 1100 MAX34867 | CONCRETE, READY MIX | 03/10/2015 | Paid | $1,868.13 |
PRC 1100 MAX33546 | CONCRETE, READY MIX | 12/29/2014 | Paid | $757.90 |
PRC 1100 MAX33547 | CONCRETE, READY MIX | 12/29/2014 | Paid | $1,383.80 |
PRC 1100 MAX33384 | CONCRETE, READY MIX | 12/18/2014 | Paid | $1,299.87 |
PRC 1100 MAX33386 | CONCRETE, READY MIX | 12/18/2014 | Paid | $771.21 |
PRC 1100 MAX33395 | CONCRETE, READY MIX | 12/18/2014 | Paid | $807.73 |
PRC 1100 MAX33165 | CONCRETE, READY MIX | 12/04/2014 | Paid | $514.14 |
PRC 1100 MAX32905 | CONCRETE, READY MIX | 11/19/2014 | Paid | $1,186.35 |
PRC 1100 MAX32842 | CONCRETE, READY MIX | 11/13/2014 | Paid | $692.34 |
PRC 1100 MAX32845 | CONCRETE, READY MIX | 11/13/2014 | Paid | $576.95 |
PRC 1100 MAX32729 | CONCRETE, READY MIX | 11/06/2014 | Paid | $599.94 |
PRC 1100 MAX32730 | CONCRETE, READY MIX | 11/06/2014 | Paid | $923.12 |
PRC 1100 MAX32741 | CONCRETE, READY MIX | 11/06/2014 | Paid | $923.12 |
PRC 1100 MAX32626 | CONCRETE, READY MIX | 11/04/2014 | Paid | $576.95 |
PRC 1100 MAX32460 | CONCRETE, READY MIX | 10/28/2014 | Paid | $771.21 |
PRC 1100 MAX32461 | CONCRETE, READY MIX | 10/28/2014 | Paid | $1,245.42 |
PRC 1100 MAX32462 | CONCRETE, READY MIX | 10/28/2014 | Paid | $860.09 |
PRC 1100 MAX32464 | CONCRETE, READY MIX | 10/28/2014 | Paid | $1,868.13 |
PRC 1100 MAX32466 | CONCRETE, READY MIX | 10/28/2014 | Paid | $692.34 |
PRC 1100 MAX32472 | CONCRETE, READY MIX | 10/28/2014 | Paid | $599.83 |
PRC 1100 MAX32037 | CONCRETE, READY MIX | 10/17/2014 | Paid | $3,410.28 |
PRC 1100 MAX32182 | CONCRETE, READY MIX | 10/17/2014 | Paid | $3,542.00 |
PRC 1100 MAX32118 | CONCRETE, READY MIX | 10/14/2014 | Paid | $2,787.84 |
PRC 1100 MAX32119 | CONCRETE, READY MIX | 10/14/2014 | Paid | $622.71 |
PRC 1100 MAX32035 | CONCRETE, READY MIX | 10/09/2014 | Paid | $1,038.51 |
PRC 1100 MAX32036 | CONCRETE, READY MIX | 10/09/2014 | Paid | $461.56 |
PRC 1100 MAX32038 | CONCRETE, READY MIX | 10/09/2014 | Paid | $771.21 |
PRC 1100 MAX31956 | CONCRETE, READY MIX | 10/02/2014 | Paid | $923.12 |
PRC 1100 MAX31957 | CONCRETE, READY MIX | 10/02/2014 | Paid | $923.12 |
PRC 1100 MAX31961 | CONCRETE, READY MIX | 10/02/2014 | Paid | $899.91 |
PRC 1100 MAX31798 | CONCRETE, READY MIX | 09/29/2014 | Paid | $576.95 |
PRC 1100 MAX31747 | CONCRETE, READY MIX | 09/26/2014 | Paid | $657.36 |
PRC 1100 MAX31765 | CONCRETE, READY MIX | 09/26/2014 | Paid | $276.76 |
PRC 1100 MAX31677 | CONCRETE, READY MIX | 09/23/2014 | Paid | $2,214.08 |
PRC 1100 MAX31576 | CONCRETE, READY MIX | 09/22/2014 | Paid | $1,868.13 |
PRC 1100 MAX31578 | CONCRETE, READY MIX | 09/22/2014 | Paid | $1,038.51 |
PRC 1100 MAX31580 | CONCRETE, READY MIX | 09/22/2014 | Paid | $1,729.75 |
PRC 1100 MAX31583 | CONCRETE, READY MIX | 09/22/2014 | Paid | $692.34 |
PRC 1100 MAX31586 | CONCRETE, READY MIX | 09/22/2014 | Paid | $576.95 |
PRC 1100 MAX31536 | CONCRETE, READY MIX | 09/16/2014 | Paid | $779.00 |
PRC 1100 MAX31537 | CONCRETE, READY MIX | 09/16/2014 | Paid | $3,019.20 |
PRC 1100 MAX31505 | CONCRETE, READY MIX | 09/15/2014 | Paid | $2,016.63 |
PRC 1100 MAX31446 | CONCRETE, READY MIX | 09/12/2014 | Paid | $629.40 |
PRC 1100 MAX31451 | CONCRETE, READY MIX | 09/12/2014 | Paid | $2,571.03 |
PRC 1100 MAX31453 | CONCRETE, READY MIX | 09/12/2014 | Paid | $2,774.53 |
PRC 1100 MAX31456 | CONCRETE, READY MIX | 09/12/2014 | Paid | $519.26 |
PRC 1100 MAX31380 | CONCRETE, READY MIX | 09/10/2014 | Paid | $2,165.13 |
PRC 1100 MAX31381 | CONCRETE, READY MIX | 09/10/2014 | Paid | $461.56 |
PRC 1100 MAX31382 | CONCRETE, READY MIX | 09/10/2014 | Paid | $771.21 |
PRC 1100 MAX31304 | CONCRETE, READY MIX | 09/08/2014 | Paid | $771.21 |
PRC 1100 MAX31276 | CONCRETE, READY MIX | 09/03/2014 | Paid | $576.95 |
PRC 1100 MAX31280 | CONCRETE, READY MIX | 09/03/2014 | Paid | $807.73 |
PRC 1100 MAX31184 | CONCRETE, READY MIX | 08/29/2014 | Paid | $1,038.51 |
PRC 1100 MAX31012 | CONCRETE, READY MIX | 08/22/2014 | Paid | $1,181.70 |
PRC 1100 MAX30940 | CONCRETE, READY MIX | 08/21/2014 | Paid | $3,785.10 |
PRC 1100 MAX30893 | CONCRETE, READY MIX | 08/19/2014 | Paid | $514.14 |
PRC 1100 MAX30449 | CONCRETE, READY MIX | 07/30/2014 | Paid | $1,660.56 |
PRC 1100 MAX30507 | CONCRETE, READY MIX | 07/30/2014 | Paid | $1,899.81 |
PRC 1100 MAX30508 | CONCRETE, READY MIX | 07/30/2014 | Paid | $3,085.17 |
PRC 1100 MAX29934 | CONCRETE, READY MIX | 07/11/2014 | Paid | $771.21 |
PRC 1100 MAX29833 | CONCRETE, READY MIX | 07/09/2014 | Paid | $807.73 |
PRC 1100 MAX29834 | CONCRETE, READY MIX | 07/09/2014 | Paid | $923.12 |
PRC 1100 MAX29847 | CONCRETE, READY MIX | 07/09/2014 | Paid | $576.95 |
PRC 1100 MAX29848 | CONCRETE, READY MIX | 07/09/2014 | Paid | $461.56 |
PRC 1100 MAX29851 | CONCRETE, READY MIX | 07/09/2014 | Paid | $799.92 |
PRC 1100 MAX29866 | CONCRETE, READY MIX | 07/09/2014 | Paid | $461.56 |
PRC 1100 MAX29867 | CONCRETE, READY MIX | 07/09/2014 | Paid | $499.95 |
PRC 1100 MAX29771 | CONCRETE, READY MIX | 07/07/2014 | Paid | $699.93 |
PRC 1100 MAX29773 | CONCRETE, READY MIX | 07/07/2014 | Paid | $410.85 |
PRC 1100 MAX29745 | CONCRETE, READY MIX | 07/01/2014 | Paid | $399.96 |
PRC 1100 MAX29757 | CONCRETE, READY MIX | 07/01/2014 | Paid | $599.83 |
PRC 1100 MAX29362 | CONCRETE, READY MIX | 06/13/2014 | Paid | $629.40 |
PRC 1100 MAX29136 | CONCRETE, READY MIX | 05/29/2014 | Paid | $566.10 |
PRC 1100 MAX29137 | CONCRETE, READY MIX | 05/29/2014 | Paid | $701.10 |
PRC 1100 MAX29138 | CONCRETE, READY MIX | 05/29/2014 | Paid | $701.10 |
PRC 1100 MAX29139 | CONCRETE, READY MIX | 05/29/2014 | Paid | $1,195.10 |
PRC 1100 MAX29084 | CONCRETE, READY MIX | 05/28/2014 | Paid | $566.10 |
PRC 1100 MAX29085 | CONCRETE, READY MIX | 05/28/2014 | Paid | $629.00 |
PRC 1100 MAX29086 | CONCRETE, READY MIX | 05/28/2014 | Paid | $629.00 |
PRC 1100 MAX29087 | CONCRETE, READY MIX | 05/28/2014 | Paid | $629.00 |
PRC 1100 MAX29088 | CONCRETE, READY MIX | 05/28/2014 | Paid | $629.00 |
PRC 1100 MAX29089 | CONCRETE, READY MIX | 05/28/2014 | Paid | $566.10 |
PRC 1100 MAX29090 | CONCRETE, READY MIX | 05/28/2014 | Paid | $566.10 |
PRC 1100 MAX29058 | CONCRETE, READY MIX | 05/23/2014 | Paid | $566.10 |
PRC 1100 MAX29059 | CONCRETE, READY MIX | 05/23/2014 | Paid | $629.00 |
PRC 1100 MAX29060 | CONCRETE, READY MIX | 05/23/2014 | Paid | $701.10 |
PRC 1100 MAX29061 | CONCRETE, READY MIX | 05/23/2014 | Paid | $701.10 |
PRC 1100 MAX29062 | CONCRETE, READY MIX | 05/23/2014 | Paid | $629.00 |
PRC 1100 MAX29063 | CONCRETE, READY MIX | 05/23/2014 | Paid | $629.00 |
PRC 1100 MAX28728 | CONCRETE, READY MIX | 05/15/2014 | Paid | $727.20 |
PRC 1100 MAX28500 | CONCRETE, READY MIX | 05/06/2014 | Paid | $566.10 |
PRC 1100 MAX28501 | CONCRETE, READY MIX | 05/06/2014 | Paid | $701.10 |
PRC 1100 MAX28502 | CONCRETE, READY MIX | 05/06/2014 | Paid | $701.10 |
PRC 1100 MAX28503 | CONCRETE, READY MIX | 05/06/2014 | Paid | $566.10 |
PRC 1100 MAX28504 | CONCRETE, READY MIX | 05/06/2014 | Paid | $545.40 |
PRC 1100 MAX28505 | CONCRETE, READY MIX | 05/06/2014 | Paid | $566.10 |
PRC 1100 MAX28522 | CONCRETE, READY MIX | 05/06/2014 | Paid | $909.00 |
PRC 1100 MAX28523 | CONCRETE, READY MIX | 05/06/2014 | Paid | $636.30 |
PRC 1100 MAX28409 | CONCRETE, READY MIX | 04/30/2014 | Paid | $419.60 |
PRC 1100 MAX28299 | CONCRETE, READY MIX | 04/29/2014 | Paid | $701.10 |
PRC 1100 MAX28300 | CONCRETE, READY MIX | 04/29/2014 | Paid | $597.55 |
PRC 1100 MAX28200 | CONCRETE, READY MIX | 04/17/2014 | Paid | $891.65 |
PRC 1100 MAX28184 | CONCRETE, READY MIX | 04/16/2014 | Paid | $629.40 |
PRC 1100 MAX28185 | CONCRETE, READY MIX | 04/16/2014 | Paid | $629.40 |
PRC 1100 MAX28066 | CONCRETE, READY MIX | 04/11/2014 | Paid | $818.10 |
PRC 1100 MAX28067 | CONCRETE, READY MIX | 04/11/2014 | Paid | $818.10 |
PRC 1100 MAX28068 | CONCRETE, READY MIX | 04/11/2014 | Paid | $818.10 |
PRC 1100 MAX28070 | CONCRETE, READY MIX | 04/11/2014 | Paid | $818.10 |
PRC 1100 MAX28071 | CONCRETE, READY MIX | 04/11/2014 | Paid | $155.80 |
PRC 1100 MAX28072 | CONCRETE, READY MIX | 04/11/2014 | Paid | $701.10 |
PRC 1100 MAX28015 | CONCRETE, READY MIX | 04/10/2014 | Paid | $944.10 |
PRC 1100 MAX27890 | CONCRETE, READY MIX | 04/07/2014 | Paid | $818.10 |
PRC 1100 MAX27813 | CONCRETE, READY MIX | 04/03/2014 | Paid | $818.10 |
PRC 1100 MAX27814 | CONCRETE, READY MIX | 04/02/2014 | Paid | $454.50 |
PRC 1100 MAX27815 | CONCRETE, READY MIX | 04/02/2014 | Paid | $818.10 |
PRC 1100 MAX27816 | CONCRETE, READY MIX | 04/02/2014 | Paid | $818.10 |
PRC 1100 MAX27784 | CONCRETE, READY MIX | 04/01/2014 | Paid | $779.00 |
PRC 1100 MAX27786 | CONCRETE, READY MIX | 04/01/2014 | Paid | $740.05 |
PRC 1100 MAX27788 | CONCRETE, READY MIX | 04/01/2014 | Paid | $636.30 |
PRC 1100 MAX27632 | CONCRETE, READY MIX | 03/26/2014 | Paid | $629.40 |
PRC 1100 MAX27633 | CONCRETE, READY MIX | 03/26/2014 | Paid | $545.40 |
PRC 1100 MAX27634 | CONCRETE, READY MIX | 03/26/2014 | Paid | $298.80 |
PRC 1100 MAX27636 | CONCRETE, READY MIX | 03/26/2014 | Paid | $734.30 |
PRC 1100 MAX27637 | CONCRETE, READY MIX | 03/26/2014 | Paid | $944.10 |
PRC 1100 MAX27640 | CONCRETE, READY MIX | 03/26/2014 | Paid | $734.30 |
PRC 1100 MAX27642 | CONCRETE, READY MIX | 03/26/2014 | Paid | $734.30 |
PRC 1100 MAX27676 | CONCRETE, READY MIX | 03/26/2014 | Paid | $839.20 |
PRC 1100 MAX27677 | CONCRETE, READY MIX | 03/26/2014 | Paid | $363.60 |
PRC 1100 MAX27522 | CONCRETE, READY MIX | 03/24/2014 | Paid | $909.00 |
PRC 1100 MAX27508 | CONCRETE, READY MIX | 03/20/2014 | Paid | $779.00 |
PRC 1100 MAX27509 | CONCRETE, READY MIX | 03/20/2014 | Paid | $818.10 |
PRC 1100 MAX27510 | CONCRETE, READY MIX | 03/20/2014 | Paid | $818.10 |
PRM 1100 14031316347 | CONCRETE, READY MIX | 03/14/2014 | Paid | $727.20 |
PRC 1100 MAX27280 | CONCRETE, READY MIX | 03/11/2014 | Paid | $472.05 |
PRM 1100 14030515238 | CONCRETE, READY MIX | 03/06/2014 | Paid | $909.00 |
PRC 1100 MAX27092 | CONCRETE, READY MIX | 03/03/2014 | Paid | $818.10 |
PRC 1100 MAX27034 | CONCRETE, READY MIX | 02/27/2014 | Paid | $944.10 |
PRC 1100 MAX27036 | CONCRETE, READY MIX | 02/27/2014 | Paid | $311.60 |
PRC 1100 MAX27037 | CONCRETE, READY MIX | 02/27/2014 | Paid | $779.00 |
PRC 1100 MAX26988 | CONCRETE, READY MIX | 02/25/2014 | Paid | $734.30 |
PRC 1100 MAX26989 | CONCRETE, READY MIX | 02/25/2014 | Paid | $734.30 |
PRC 1100 MAX26992 | CONCRETE, READY MIX | 02/25/2014 | Paid | $818.10 |
PRC 1100 MAX26993 | CONCRETE, READY MIX | 02/25/2014 | Paid | $863.55 |
PRC 1100 MAX26994 | CONCRETE, READY MIX | 02/25/2014 | Paid | $701.10 |
PRC 1100 MAX26995 | CONCRETE, READY MIX | 02/25/2014 | Paid | $772.65 |
PRC 1100 MAX26996 | CONCRETE, READY MIX | 02/25/2014 | Paid | $727.20 |
PRC 1100 MAX26997 | CONCRETE, READY MIX | 02/25/2014 | Paid | $818.10 |
PRC 1100 MAX26999 | CONCRETE, READY MIX | 02/25/2014 | Paid | $311.60 |
PRC 1100 MAX26898 | CONCRETE, READY MIX | 02/21/2014 | Paid | $629.40 |
PRC 1100 MAX26899 | CONCRETE, READY MIX | 02/21/2014 | Paid | $629.40 |
PRC 1100 MAX26776 | CONCRETE, READY MIX | 02/14/2014 | Paid | $389.50 |
PRC 1100 MAX26777 | CONCRETE, READY MIX | 02/14/2014 | Paid | $1,049.00 |
PRC 1100 MAX26778 | CONCRETE, READY MIX | 02/14/2014 | Paid | $944.10 |
PRC 1100 MAX26779 | CONCRETE, READY MIX | 02/14/2014 | Paid | $818.10 |
PRC 1100 MAX26780 | CONCRETE, READY MIX | 02/14/2014 | Paid | $779.00 |
PRC 1100 MAX26781 | CONCRETE, READY MIX | 02/14/2014 | Paid | $727.20 |
PRC 1100 MAX26782 | CONCRETE, READY MIX | 02/14/2014 | Paid | $524.50 |
PRC 1100 MAX26558 | CONCRETE, READY MIX | 02/05/2014 | Paid | $944.10 |
PRC 1100 MAX26559 | CONCRETE, READY MIX | 02/03/2014 | Paid | $419.60 |
PRC 1100 MAX26561 | CONCRETE, READY MIX | 02/03/2014 | Paid | $909.00 |
PRC 1100 MAX26562 | CONCRETE, READY MIX | 02/03/2014 | Paid | $681.75 |
PRC 1100 MAX26567 | CONCRETE, READY MIX | 02/03/2014 | Paid | $623.20 |
PRC 1100 MAX26568 | CONCRETE, READY MIX | 02/03/2014 | Paid | $909.00 |
PRC 1100 MAX26569 | CONCRETE, READY MIX | 02/03/2014 | Paid | $909.00 |
PRC 1100 MAX26427 | CONCRETE, READY MIX | 01/24/2014 | Paid | $419.60 |
PRC 1100 MAX26387 | CONCRETE, READY MIX | 01/16/2014 | Paid | $909.00 |
PRC 1100 MAX26388 | CONCRETE, READY MIX | 01/16/2014 | Paid | $909.00 |
PRC 1100 MAX26389 | CONCRETE, READY MIX | 01/16/2014 | Paid | $779.00 |
PRC 1100 MAX26390 | CONCRETE, READY MIX | 01/16/2014 | Paid | $727.20 |
PRC 1100 MAX26261 | CONCRETE, READY MIX | 01/09/2014 | Paid | $545.40 |
PRC 1100 MAX26262 | CONCRETE, READY MIX | 01/09/2014 | Paid | $909.00 |
PRC 1100 MAX26263 | CONCRETE, READY MIX | 01/09/2014 | Paid | $779.00 |
PRC 1100 MAX25962 | CONCRETE, READY MIX | 12/18/2013 | Paid | $363.60 |
PRC 1100 MAX25965 | CONCRETE, READY MIX | 12/18/2013 | Paid | $909.00 |
PRC 1100 MAX25968 | CONCRETE, READY MIX | 12/18/2013 | Paid | $419.60 |
PRC 1100 MAX25969 | CONCRETE, READY MIX | 12/18/2013 | Paid | $524.50 |
PRC 1100 MAX25885 | CONCRETE, READY MIX | 12/16/2013 | Paid | $681.75 |
PRC 1100 MAX25886 | CONCRETE, READY MIX | 12/16/2013 | Paid | $389.50 |
PRC 1100 MAX25836 | CONCRETE, READY MIX | 12/11/2013 | Paid | $311.60 |
PRC 1100 MAX25797 | CONCRETE, READY MIX | 12/10/2013 | Paid | $672.30 |
PRC 1100 MAX25798 | CONCRETE, READY MIX | 12/10/2013 | Paid | $467.40 |
PRC 1100 MAX25730 | CONCRETE, READY MIX | 12/09/2013 | Paid | $233.70 |
PRC 1100 MAX25731 | CONCRETE, READY MIX | 12/09/2013 | Paid | $779.00 |
PRC 1100 MAX25732 | CONCRETE, READY MIX | 12/09/2013 | Paid | $909.00 |
PRC 1100 MAX25733 | CONCRETE, READY MIX | 12/09/2013 | Paid | $909.00 |
PRC 1100 MAX25734 | CONCRETE, READY MIX | 12/09/2013 | Paid | $909.00 |
PRC 1100 MAX25735 | CONCRETE, READY MIX | 12/09/2013 | Paid | $363.60 |
PRC 1100 MAX25711 | CONCRETE, READY MIX | 12/05/2013 | Paid | $454.50 |
PRC 1100 MAX25712 | CONCRETE, READY MIX | 12/05/2013 | Paid | $909.00 |
PRC 1100 MAX25401 | CONCRETE, READY MIX | 11/13/2013 | Paid | $545.40 |
PRC 1100 MAX25403 | CONCRETE, READY MIX | 11/13/2013 | Paid | $298.80 |
PRC 1100 MAX25368 | CONCRETE, READY MIX | 11/12/2013 | Paid | $1,049.00 |
PRC 1100 MAX25372 | CONCRETE, READY MIX | 11/12/2013 | Paid | $181.80 |
PRC 1100 MAX25373 | CONCRETE, READY MIX | 11/12/2013 | Paid | $909.00 |
PRC 1100 MAX25374 | CONCRETE, READY MIX | 11/12/2013 | Paid | $727.20 |
PRC 1100 MAX25375 | CONCRETE, READY MIX | 11/12/2013 | Paid | $727.20 |
PRC 1100 MAX25377 | CONCRETE, READY MIX | 11/12/2013 | Paid | $779.00 |
PRC 1100 MAX25382 | CONCRETE, READY MIX | 11/12/2013 | Paid | $311.60 |
PRC 1100 MAX25231 | CONCRETE, READY MIX | 11/04/2013 | Paid | $545.40 |
PRC 1100 MAX24933 | CONCRETE, READY MIX | 11/01/2013 | Paid | $909.00 |
PRC 1100 MAX24931 | CONCRETE, READY MIX | 10/29/2013 | Paid | $389.50 |
PRC 1100 MAX24949 | CONCRETE, READY MIX | 10/29/2013 | Paid | $779.00 |
PRC 1100 MAX24950 | CONCRETE, READY MIX | 10/29/2013 | Paid | $503.20 |
PRC 1100 MAX24951 | CONCRETE, READY MIX | 10/29/2013 | Paid | $701.10 |
PRC 1100 MAX24952 | CONCRETE, READY MIX | 10/29/2013 | Paid | $629.00 |
PRC 1100 MAX24954 | CONCRETE, READY MIX | 10/29/2013 | Paid | $779.00 |
PRC 1100 MAX24961 | CONCRETE, READY MIX | 10/29/2013 | Paid | $944.10 |
PRC 1100 MAX24962 | CONCRETE, READY MIX | 10/29/2013 | Paid | $524.50 |
PRC 1100 MAX24963 | CONCRETE, READY MIX | 10/29/2013 | Paid | $377.40 |
PRC 1100 MAX24965 | CONCRETE, READY MIX | 10/29/2013 | Paid | $909.00 |
PRC 1100 MAX24935 | CONCRETE, READY MIX | 10/24/2013 | Paid | $909.00 |
PRC 1100 MAX24939 | CONCRETE, READY MIX | 10/24/2013 | Paid | $727.20 |
PRC 1100 MAX24968 | CONCRETE, READY MIX | 10/24/2013 | Paid | $909.00 |
PRC 1100 MAX24545 | CONCRETE, READY MIX | 10/02/2013 | Paid | $909.00 |
PRC 1100 MAX24540 | CONCRETE, READY MIX | 09/30/2013 | Paid | $389.50 |
PRC 1100 MAX24541 | CONCRETE, READY MIX | 09/30/2013 | Paid | $363.60 |
PRC 1100 MAX24542 | CONCRETE, READY MIX | 09/30/2013 | Paid | $818.10 |
PRC 1100 MAX24543 | CONCRETE, READY MIX | 09/30/2013 | Paid | $311.60 |
PRC 1100 MAX24547 | CONCRETE, READY MIX | 09/30/2013 | Paid | $314.70 |
PRC 1100 MAX24548 | CONCRETE, READY MIX | 09/30/2013 | Paid | $311.60 |
PRC 1100 MAX24550 | CONCRETE, READY MIX | 09/30/2013 | Paid | $314.70 |
PRC 1100 MAX24552 | CONCRETE, READY MIX | 09/30/2013 | Paid | $944.10 |
PRC 1100 MAX24553 | CONCRETE, READY MIX | 09/30/2013 | Paid | $734.30 |
PRC 1100 MAX24554 | CONCRETE, READY MIX | 09/30/2013 | Paid | $629.40 |
PRC 1100 MAX24555 | CONCRETE, READY MIX | 09/30/2013 | Paid | $629.40 |
PRC 1100 MAX24556 | CONCRETE, READY MIX | 09/30/2013 | Paid | $909.00 |
PRC 1100 MAX24558 | CONCRETE, READY MIX | 09/30/2013 | Paid | $311.60 |
PRC 1100 MAX24559 | CONCRETE, READY MIX | 09/30/2013 | Paid | $909.00 |
PRC 1100 MAX24567 | CONCRETE, READY MIX | 09/30/2013 | Paid | $1,049.00 |
PRC 1100 MAX24264 | CONCRETE, READY MIX | 09/16/2013 | Paid | $727.20 |
PRC 1100 MAX24265 | CONCRETE, READY MIX | 09/16/2013 | Paid | $389.50 |
PRC 1100 MAX24266 | CONCRETE, READY MIX | 09/16/2013 | Paid | $636.30 |
PRC 1100 MAX24267 | CONCRETE, READY MIX | 09/16/2013 | Paid | $1,049.00 |
PRC 1100 MAX24279 | CONCRETE, READY MIX | 09/16/2013 | Paid | $566.10 |
PRC 1100 MAX24280 | CONCRETE, READY MIX | 09/16/2013 | Paid | $1,049.00 |
PRC 1100 MAX24281 | CONCRETE, READY MIX | 09/16/2013 | Paid | $909.00 |
PRC 1100 MAX24282 | CONCRETE, READY MIX | 09/16/2013 | Paid | $389.50 |
PRC 1100 MAX24146 | CONCRETE, READY MIX | 09/11/2013 | Paid | $373.50 |
PRC 1100 MAX24147 | CONCRETE, READY MIX | 09/11/2013 | Paid | $311.60 |
PRC 1100 MAX24148 | CONCRETE, READY MIX | 09/11/2013 | Paid | $818.10 |
PRC 1100 MAX24149 | CONCRETE, READY MIX | 09/11/2013 | Paid | $818.10 |
PRC 1100 MAX24150 | CONCRETE, READY MIX | 09/11/2013 | Paid | $818.10 |
PRC 1100 MAX24151 | CONCRETE, READY MIX | 09/11/2013 | Paid | $311.60 |
PRC 1100 MAX24152 | CONCRETE, READY MIX | 09/11/2013 | Paid | $311.60 |
PRC 1100 MAX24153 | CONCRETE, READY MIX | 09/11/2013 | Paid | $944.10 |
PRC 1100 MAX24154 | CONCRETE, READY MIX | 09/11/2013 | Paid | $944.10 |
PRC 1100 MAX24155 | CONCRETE, READY MIX | 09/11/2013 | Paid | $944.10 |
PRC 1100 MAX24134 | CONCRETE, READY MIX | 09/10/2013 | Paid | $909.00 |
PRC 1100 MAX24138 | CONCRETE, READY MIX | 09/10/2013 | Paid | $909.00 |
PRC 1100 MAX24139 | CONCRETE, READY MIX | 09/10/2013 | Paid | $448.20 |
PRC 1100 MAX23978 | CONCRETE, READY MIX | 09/05/2013 | Paid | $909.00 |
PRC 1100 MAX23979 | CONCRETE, READY MIX | 09/05/2013 | Paid | $311.60 |
PRC 1100 MAX23976 | CONCRETE, READY MIX | 08/30/2013 | Paid | $701.10 |
PRC 1100 MAX23928 | CONCRETE, READY MIX | 08/28/2013 | Paid | $311.60 |
PRC 1100 MAX23889 | CONCRETE, READY MIX | 08/27/2013 | Paid | $524.50 |
PRC 1100 MAX23890 | CONCRETE, READY MIX | 08/27/2013 | Paid | $839.20 |
PRC 1100 MAX23892 | CONCRETE, READY MIX | 08/27/2013 | Paid | $818.10 |
PRC 1100 MAX23817 | CONCRETE, READY MIX | 08/23/2013 | Paid | $636.30 |
PRC 1100 MAX23818 | CONCRETE, READY MIX | 08/23/2013 | Paid | $779.00 |
PRC 1100 MAX23819 | CONCRETE, READY MIX | 08/23/2013 | Paid | $779.00 |
PRC 1100 MAX23821 | CONCRETE, READY MIX | 08/23/2013 | Paid | $623.20 |
PRC 1100 MAX23822 | CONCRETE, READY MIX | 08/23/2013 | Paid | $909.00 |
PRC 1100 MAX23823 | CONCRETE, READY MIX | 08/23/2013 | Paid | $909.00 |
PRC 1100 MAX23824 | CONCRETE, READY MIX | 08/23/2013 | Paid | $623.20 |
PRC 1100 MAX23784 | CONCRETE, READY MIX | 08/21/2013 | Paid | $52.45 |
PRC 1100 MAX23785 | CONCRETE, READY MIX | 08/21/2013 | Paid | $1,049.00 |
PRC 1100 MAX23786 | CONCRETE, READY MIX | 08/21/2013 | Paid | $1,049.00 |
PRC 1100 MAX23790 | CONCRETE, READY MIX | 08/21/2013 | Paid | $709.65 |
PRC 1100 MAX23800 | CONCRETE, READY MIX | 08/21/2013 | Paid | $623.20 |
PRC 1100 MAX23801 | CONCRETE, READY MIX | 08/21/2013 | Paid | $701.10 |
PRC 1100 MAX23802 | CONCRETE, READY MIX | 08/21/2013 | Paid | $779.00 |
PRC 1100 MAX23803 | CONCRETE, READY MIX | 08/21/2013 | Paid | $779.00 |
PRC 1100 MAX23804 | CONCRETE, READY MIX | 08/21/2013 | Paid | $629.00 |
PRC 1100 MAX23805 | CONCRETE, READY MIX | 08/21/2013 | Paid | $629.00 |
PRC 1100 MAX23806 | CONCRETE, READY MIX | 08/21/2013 | Paid | $629.00 |
PRC 1100 MAX23748 | CONCRETE, READY MIX | 08/20/2013 | Paid | $566.10 |
PRC 1100 MAX23749 | CONCRETE, READY MIX | 08/20/2013 | Paid | $629.40 |
PRC 1100 MAX23752 | CONCRETE, READY MIX | 08/20/2013 | Paid | $944.10 |
PRC 1100 MAX23753 | CONCRETE, READY MIX | 08/20/2013 | Paid | $944.10 |
PRC 1100 MAX23717 | CONCRETE, READY MIX | 08/16/2013 | Paid | $311.60 |
PRC 1100 MAX23718 | CONCRETE, READY MIX | 08/16/2013 | Paid | $818.10 |
PRC 1100 MAX23719 | CONCRETE, READY MIX | 08/16/2013 | Paid | $311.60 |
PRC 1100 MAX23720 | CONCRETE, READY MIX | 08/16/2013 | Paid | $818.10 |
PRC 1100 MAX23721 | CONCRETE, READY MIX | 08/16/2013 | Paid | $839.20 |
PRC 1100 MAX23722 | CONCRETE, READY MIX | 08/16/2013 | Paid | $896.40 |
PRC 1100 MAX23723 | CONCRETE, READY MIX | 08/16/2013 | Paid | $524.50 |
PRC 1100 MAX23697 | CONCRETE, READY MIX | 08/15/2013 | Paid | $818.10 |
PRC 1100 MAX23700 | CONCRETE, READY MIX | 08/15/2013 | Paid | $311.60 |
PRC 1100 MAX23702 | CONCRETE, READY MIX | 08/15/2013 | Paid | $311.60 |
PRC 1100 MAX23703 | CONCRETE, READY MIX | 08/15/2013 | Paid | $818.10 |
PRC 1100 MAX23603 | CONCRETE, READY MIX | 08/08/2013 | Paid | $740.05 |
PRC 1100 MAX23604 | CONCRETE, READY MIX | 08/08/2013 | Paid | $701.10 |
PRC 1100 MAX23605 | CONCRETE, READY MIX | 08/08/2013 | Paid | $909.00 |
PRC 1100 MAX23606 | CONCRETE, READY MIX | 08/08/2013 | Paid | $909.00 |
PRC 1100 MAX23607 | CONCRETE, READY MIX | 08/08/2013 | Paid | $909.00 |
PRC 1100 MAX23608 | CONCRETE, READY MIX | 08/08/2013 | Paid | $779.00 |
PRC 1100 MAX23539 | CONCRETE, READY MIX | 08/07/2013 | Paid | $467.40 |
PRC 1100 MAX23540 | CONCRETE, READY MIX | 08/07/2013 | Paid | $779.00 |
PRC 1100 MAX23541 | CONCRETE, READY MIX | 08/07/2013 | Paid | $740.05 |
PRC 1100 MAX23542 | CONCRETE, READY MIX | 08/07/2013 | Paid | $629.00 |
PRC 1100 MAX23514 | CONCRETE, READY MIX | 08/06/2013 | Paid | $701.10 |
PRC 1100 MAX23515 | CONCRETE, READY MIX | 08/06/2013 | Paid | $233.70 |
PRC 1100 MAX23520 | CONCRETE, READY MIX | 08/06/2013 | Paid | $909.00 |
PRC 1100 MAX23457 | CONCRETE, READY MIX | 08/02/2013 | Paid | $629.00 |
PRC 1100 MAX23480 | CONCRETE, READY MIX | 08/02/2013 | Paid | $909.00 |
PRC 1100 MAX23481 | CONCRETE, READY MIX | 08/02/2013 | Paid | $909.00 |
PRC 1100 MAX23482 | CONCRETE, READY MIX | 08/02/2013 | Paid | $909.00 |
PRC 1100 MAX23483 | CONCRETE, READY MIX | 08/02/2013 | Paid | $522.90 |
PRC 1100 MAX23484 | CONCRETE, READY MIX | 08/02/2013 | Paid | $629.00 |
PRC 1100 MAX23485 | CONCRETE, READY MIX | 08/02/2013 | Paid | $629.00 |
PRC 1100 MAX23486 | CONCRETE, READY MIX | 08/02/2013 | Paid | $311.60 |
PRC 1100 MAX23388 | CONCRETE, READY MIX | 07/29/2013 | Paid | $311.60 |
PRC 1100 MAX23389 | CONCRETE, READY MIX | 07/29/2013 | Paid | $419.60 |
PRC 1100 MAX23390 | CONCRETE, READY MIX | 07/29/2013 | Paid | $314.50 |
PRC 1100 MAX23261 | CONCRETE, READY MIX | 07/25/2013 | Paid | $623.20 |
PRC 1100 MAX23298 | CONCRETE, READY MIX | 07/25/2013 | Paid | $298.80 |
PRC 1100 MAX23037 | CONCRETE, READY MIX | 07/18/2013 | Paid | $298.80 |
PRC 1100 MAX23088 | CONCRETE, READY MIX | 07/18/2013 | Paid | $629.00 |
PRC 1100 MAX23024 | CONCRETE, READY MIX | 07/16/2013 | Paid | $629.00 |
PRC 1100 MAX23025 | CONCRETE, READY MIX | 07/16/2013 | Paid | $629.00 |
PRC 1100 MAX23026 | CONCRETE, READY MIX | 07/16/2013 | Paid | $629.00 |
PRC 1100 MAX22939 | CONCRETE, READY MIX | 07/15/2013 | Paid | $377.40 |
PRC 1100 MAX22948 | CONCRETE, READY MIX | 07/15/2013 | Paid | $629.00 |
PRC 1100 MAX22949 | CONCRETE, READY MIX | 07/15/2013 | Paid | $629.00 |
PRC 1100 MAX22950 | CONCRETE, READY MIX | 07/15/2013 | Paid | $629.00 |
PRC 1100 MAX22951 | CONCRETE, READY MIX | 07/15/2013 | Paid | $629.00 |
PRC 1100 MAX22961 | CONCRETE, READY MIX | 07/15/2013 | Paid | $629.00 |
PRC 1100 MAX22962 | CONCRETE, READY MIX | 07/15/2013 | Paid | $629.00 |
PRC 1100 MAX22963 | CONCRETE, READY MIX | 07/15/2013 | Paid | $629.00 |
PRC 1100 MAX22964 | CONCRETE, READY MIX | 07/15/2013 | Paid | $629.00 |
PRC 1100 MAX22966 | CONCRETE, READY MIX | 07/15/2013 | Paid | $298.80 |
PRC 1100 MAX22967 | CONCRETE, READY MIX | 07/15/2013 | Paid | $909.00 |
PRC 1100 MAX22968 | CONCRETE, READY MIX | 07/15/2013 | Paid | $1,258.00 |
PRC 1100 MAX22977 | CONCRETE, READY MIX | 07/15/2013 | Paid | $629.00 |
PRC 1100 MAX23015 | CONCRETE, READY MIX | 07/15/2013 | Paid | $629.00 |
PRC 1100 MAX23016 | CONCRETE, READY MIX | 07/15/2013 | Paid | $629.00 |
PRC 1100 MAX23017 | CONCRETE, READY MIX | 07/15/2013 | Paid | $629.00 |
PRC 1100 MAX22920 | CONCRETE, READY MIX | 07/11/2013 | Paid | $298.80 |
PRC 1100 MAX22911 | CONCRETE, READY MIX | 07/09/2013 | Paid | $314.50 |
PRC 1100 MAX22912 | CONCRETE, READY MIX | 07/09/2013 | Paid | $629.00 |
PRC 1100 MAX22913 | CONCRETE, READY MIX | 07/09/2013 | Paid | $629.00 |
PRC 1100 MAX22914 | CONCRETE, READY MIX | 07/09/2013 | Paid | $629.00 |
PRC 1100 MAX22915 | CONCRETE, READY MIX | 07/09/2013 | Paid | $629.00 |
PRC 1100 MAX22916 | CONCRETE, READY MIX | 07/09/2013 | Paid | $629.00 |
PRC 1100 MAX22917 | CONCRETE, READY MIX | 07/09/2013 | Paid | $691.90 |
PRC 1100 MAX22919 | CONCRETE, READY MIX | 07/09/2013 | Paid | $672.30 |
PRC 1100 MAX22921 | CONCRETE, READY MIX | 07/09/2013 | Paid | $691.90 |
PRC 1100 MAX22878 | CONCRETE, READY MIX | 07/05/2013 | Paid | $629.40 |
PRC 1100 MAX22795 | CONCRETE, READY MIX | 07/02/2013 | Paid | $524.50 |
PRC 1100 MAX22796 | CONCRETE, READY MIX | 07/02/2013 | Paid | $524.50 |
PRC 1100 MAX22797 | CONCRETE, READY MIX | 07/02/2013 | Paid | $629.00 |
PRC 1100 MAX22798 | CONCRETE, READY MIX | 07/02/2013 | Paid | $298.80 |
PRC 1100 MAX22704 | CONCRETE, READY MIX | 06/27/2013 | Paid | $629.00 |
PRC 1100 MAX22705 | CONCRETE, READY MIX | 06/27/2013 | Paid | $629.00 |
PRC 1100 MAX22706 | CONCRETE, READY MIX | 06/27/2013 | Paid | $629.00 |
PRC 1100 MAX22708 | CONCRETE, READY MIX | 06/27/2013 | Paid | $909.00 |
PRC 1100 MAX22709 | CONCRETE, READY MIX | 06/27/2013 | Paid | $454.50 |
PRC 1100 MAX22764 | CONCRETE, READY MIX | 06/27/2013 | Paid | $629.00 |
PRC 1100 MAX22666 | CONCRETE, READY MIX | 06/24/2013 | Paid | $629.00 |
PRC 1100 MAX22667 | CONCRETE, READY MIX | 06/24/2013 | Paid | $629.00 |
PRC 1100 MAX22668 | CONCRETE, READY MIX | 06/24/2013 | Paid | $566.10 |
PRC 1100 MAX22694 | CONCRETE, READY MIX | 06/24/2013 | Paid | $629.00 |
PRC 1100 MAX22695 | CONCRETE, READY MIX | 06/24/2013 | Paid | $629.00 |
PRC 1100 MAX22696 | CONCRETE, READY MIX | 06/24/2013 | Paid | $629.00 |
PRC 1100 MAX22697 | CONCRETE, READY MIX | 06/24/2013 | Paid | $566.10 |
PRC 1100 MAX22698 | CONCRETE, READY MIX | 06/24/2013 | Paid | $629.00 |
PRC 1100 MAX22699 | CONCRETE, READY MIX | 06/24/2013 | Paid | $629.00 |
PRC 1100 MAX22602 | CONCRETE, READY MIX | 06/20/2013 | Paid | $629.00 |
PRC 1100 MAX22603 | CONCRETE, READY MIX | 06/20/2013 | Paid | $314.50 |
PRC 1100 MAX22604 | CONCRETE, READY MIX | 06/20/2013 | Paid | $701.10 |
PRC 1100 MAX22605 | CONCRETE, READY MIX | 06/20/2013 | Paid | $701.10 |
PRC 1100 MAX22607 | CONCRETE, READY MIX | 06/20/2013 | Paid | $629.00 |
PRC 1100 MAX22608 | CONCRETE, READY MIX | 06/20/2013 | Paid | $314.50 |
PRC 1100 MAX22609 | CONCRETE, READY MIX | 06/20/2013 | Paid | $566.10 |
PRC 1100 MAX22610 | CONCRETE, READY MIX | 06/20/2013 | Paid | $629.00 |
PRC 1100 MAX22611 | CONCRETE, READY MIX | 06/20/2013 | Paid | $629.00 |
PRC 1100 MAX22625 | CONCRETE, READY MIX | 06/20/2013 | Paid | $944.10 |
PRC 1100 MAX22626 | CONCRETE, READY MIX | 06/20/2013 | Paid | $1,049.00 |
PRC 1100 MAX22627 | CONCRETE, READY MIX | 06/20/2013 | Paid | $629.00 |
PRC 1100 MAX22628 | CONCRETE, READY MIX | 06/20/2013 | Paid | $629.00 |
PRC 1100 MAX22629 | CONCRETE, READY MIX | 06/20/2013 | Paid | $251.60 |
PRC 1100 MAX22630 | CONCRETE, READY MIX | 06/20/2013 | Paid | $701.10 |
PRC 1100 MAX22631 | CONCRETE, READY MIX | 06/20/2013 | Paid | $701.10 |
PRC 1100 MAX22632 | CONCRETE, READY MIX | 06/20/2013 | Paid | $629.40 |
PRC 1100 MAX22633 | CONCRETE, READY MIX | 06/20/2013 | Paid | $524.50 |
PRC 1100 MAX22562 | CONCRETE, READY MIX | 06/18/2013 | Paid | $909.00 |
PRC 1100 MAX22564 | CONCRETE, READY MIX | 06/18/2013 | Paid | $629.00 |
PRC 1100 MAX22565 | CONCRETE, READY MIX | 06/18/2013 | Paid | $629.00 |
PRC 1100 MAX22566 | CONCRETE, READY MIX | 06/18/2013 | Paid | $839.20 |
PRC 1100 MAX22567 | CONCRETE, READY MIX | 06/18/2013 | Paid | $454.50 |
PRC 1100 MAX22568 | CONCRETE, READY MIX | 06/18/2013 | Paid | $909.00 |
PRC 1100 MAX22569 | CONCRETE, READY MIX | 06/18/2013 | Paid | $909.00 |
PRC 1100 MAX22570 | CONCRETE, READY MIX | 06/18/2013 | Paid | $636.30 |
PRC 1100 MAX22518 | CONCRETE, READY MIX | 06/14/2013 | Paid | $623.20 |
PRC 1100 MAX22519 | CONCRETE, READY MIX | 06/14/2013 | Paid | $691.90 |
PRC 1100 MAX22520 | CONCRETE, READY MIX | 06/14/2013 | Paid | $629.00 |
PRC 1100 MAX22521 | CONCRETE, READY MIX | 06/14/2013 | Paid | $298.80 |
PRC 1100 MAX22522 | CONCRETE, READY MIX | 06/14/2013 | Paid | $944.10 |
PRC 1100 MAX22523 | CONCRETE, READY MIX | 06/14/2013 | Paid | $734.30 |
PRC 1100 MAX22524 | CONCRETE, READY MIX | 06/14/2013 | Paid | $909.00 |
PRC 1100 MAX22432 | CONCRETE, READY MIX | 06/07/2013 | Paid | $629.00 |
PRC 1100 MAX22433 | CONCRETE, READY MIX | 06/07/2013 | Paid | $1,258.00 |
PRC 1100 MAX22434 | CONCRETE, READY MIX | 06/07/2013 | Paid | $629.00 |
PRC 1100 MAX22436 | CONCRETE, READY MIX | 06/07/2013 | Paid | $503.20 |
PRC 1100 MAX22404 | CONCRETE, READY MIX | 06/06/2013 | Paid | $629.00 |
PRC 1100 MAX22370 | CONCRETE, READY MIX | 06/05/2013 | Paid | $629.00 |
PRC 1100 MAX22328 | CONCRETE, READY MIX | 06/04/2013 | Paid | $629.00 |
PRC 1100 MAX22331 | CONCRETE, READY MIX | 06/04/2013 | Paid | $629.00 |
PRC 1100 MAX22335 | CONCRETE, READY MIX | 06/04/2013 | Paid | $1,049.00 |
PRC 1100 MAX22336 | CONCRETE, READY MIX | 06/04/2013 | Paid | $629.00 |
PRC 1100 MAX22337 | CONCRETE, READY MIX | 06/04/2013 | Paid | $629.00 |
PRC 1100 MAX22285 | CONCRETE, READY MIX | 06/03/2013 | Paid | $440.30 |
PRC 1100 MAX22293 | CONCRETE, READY MIX | 06/03/2013 | Paid | $629.00 |
PRC 1100 MAX22295 | CONCRETE, READY MIX | 06/03/2013 | Paid | $629.00 |
PRC 1100 MAX22296 | CONCRETE, READY MIX | 06/03/2013 | Paid | $566.10 |
PRC 1100 MAX22298 | CONCRETE, READY MIX | 06/03/2013 | Paid | $629.00 |
PRC 1100 MAX22299 | CONCRETE, READY MIX | 06/03/2013 | Paid | $629.00 |
PRC 1100 MAX22300 | CONCRETE, READY MIX | 06/03/2013 | Paid | $629.00 |
PRC 1100 MAX22302 | CONCRETE, READY MIX | 06/03/2013 | Paid | $629.00 |
PRC 1100 MAX22304 | CONCRETE, READY MIX | 06/03/2013 | Paid | $440.30 |
PRC 1100 MAX22306 | CONCRETE, READY MIX | 06/03/2013 | Paid | $629.00 |
PRC 1100 MAX22169 | CONCRETE, READY MIX | 05/24/2013 | Paid | $1,069.30 |
PRC 1100 MAX22174 | CONCRETE, READY MIX | 05/24/2013 | Paid | $1,101.45 |
PRC 1100 MAX22178 | CONCRETE, READY MIX | 05/24/2013 | Paid | $1,101.45 |
PRC 1100 MAX22179 | CONCRETE, READY MIX | 05/24/2013 | Paid | $629.00 |
PRC 1100 MAX22181 | CONCRETE, READY MIX | 05/24/2013 | Paid | $524.50 |
PRC 1100 MAX22089 | CONCRETE, READY MIX | 05/21/2013 | Paid | $1,887.00 |
PRC 1100 MAX22050 | CONCRETE, READY MIX | 05/20/2013 | Paid | $524.50 |
PRC 1100 MAX22051 | CONCRETE, READY MIX | 05/20/2013 | Paid | $629.00 |
PRC 1100 MAX22052 | CONCRETE, READY MIX | 05/20/2013 | Paid | $410.85 |
PRC 1100 MAX21915 | CONCRETE, READY MIX | 05/14/2013 | Paid | $691.90 |
PRC 1100 MAX21940 | CONCRETE, READY MIX | 05/14/2013 | Paid | $298.80 |
PRC 1100 MAX21710 | CONCRETE, READY MIX | 04/30/2013 | Paid | $251.60 |
PRC 1100 MAX21554 | CONCRETE, READY MIX | 04/23/2013 | Paid | $373.50 |
PRC 1100 MAX21457 | CONCRETE, READY MIX | 04/17/2013 | Paid | $298.80 |
PRC 1100 MAX21377 | CONCRETE, READY MIX | 04/11/2013 | Paid | $839.20 |
PRC 1100 MAX21379 | CONCRETE, READY MIX | 04/11/2013 | Paid | $672.30 |
PRC 1100 MAX21062 | CONCRETE, READY MIX | 03/29/2013 | Paid | $377.40 |
PRC 1100 MAX20452 | CONCRETE, READY MIX | 02/21/2013 | Paid | $1,084.25 |
GAX 1100 13012907114 | 01/31/2013 | Paid | ($805.68) | |
PRC 1100 MAX20051 | CONCRETE, READY MIX | 01/31/2013 | Paid | $3,817.60 |
PRC 1100 MAX20052 | CONCRETE, READY MIX | 01/31/2013 | Paid | $1,558.20 |
PRC 1100 MAX19914 | CONCRETE, READY MIX | 01/25/2013 | Paid | $311.60 |
PRC 1100 MAX19844 | CONCRETE, READY MIX | 01/23/2013 | Paid | $298.80 |
PRC 1100 MAX19848 | CONCRETE, READY MIX | 01/23/2013 | Paid | $1,009.80 |
PRC 1100 MAX19832 | CONCRETE, READY MIX | 01/18/2013 | Paid | $1,610.10 |
PRC 1100 MAX19761 | CONCRETE, READY MIX | 01/16/2013 | Paid | $701.10 |
PRC 1100 MAX19763 | CONCRETE, READY MIX | 01/16/2013 | Paid | $1,636.20 |
PRC 1100 MAX19764 | CONCRETE, READY MIX | 01/16/2013 | Paid | $373.50 |
PRC 1100 MAX19766 | CONCRETE, READY MIX | 01/16/2013 | Paid | $350.55 |
PRC 1100 MAX19767 | CONCRETE, READY MIX | 01/16/2013 | Paid | $311.60 |
PRC 1100 MAX19769 | CONCRETE, READY MIX | 01/16/2013 | Paid | $636.30 |
PRC 1100 MAX19730 | CONCRETE, READY MIX | 01/15/2013 | Paid | $467.40 |
PRC 1100 MAX19733 | CONCRETE, READY MIX | 01/15/2013 | Paid | $909.00 |
PRC 1100 MAX19656 | CONCRETE, READY MIX | 01/11/2013 | Paid | $298.80 |
PRC 1100 MAX19478 | CONCRETE, READY MIX | 01/03/2013 | Paid | $311.60 |
PRC 1100 MAX19479 | CONCRETE, READY MIX | 01/03/2013 | Paid | $363.60 |
PRC 1100 MAX19483 | CONCRETE, READY MIX | 01/03/2013 | Paid | $1,129.70 |
PRC 1100 MAX19484 | CONCRETE, READY MIX | 01/03/2013 | Paid | $701.10 |
PRC 1100 MAX19491 | CONCRETE, READY MIX | 01/03/2013 | Paid | $734.30 |
PRC 1100 MAX19522 | CONCRETE, READY MIX | 01/03/2013 | Paid | $2,687.90 |
PRC 1100 MAX19523 | CONCRETE, READY MIX | 01/03/2013 | Paid | $298.80 |
PRC 1100 MAX19524 | CONCRETE, READY MIX | 01/03/2013 | Paid | $909.00 |
PRC 1100 MAX19525 | CONCRETE, READY MIX | 01/03/2013 | Paid | $311.60 |
PRC 1100 MAX19570 | CONCRETE, READY MIX | 01/02/2013 | Paid | $1,258.80 |
PRC 1100 MAX19302 | CONCRETE, READY MIX | 12/19/2012 | Paid | $524.50 |
PRC 1100 MAX19300 | CONCRETE, READY MIX | 12/18/2012 | Paid | $419.60 |
PRC 1100 MAX19305 | CONCRETE, READY MIX | 12/18/2012 | Paid | $298.80 |
PRC 1100 MAX19239 | CONCRETE, READY MIX | 12/17/2012 | Paid | $419.60 |
PRC 1100 MAX19240 | CONCRETE, READY MIX | 12/17/2012 | Paid | $419.60 |
PRC 1100 MAX19243 | CONCRETE, READY MIX | 12/17/2012 | Paid | $419.60 |
PRC 1100 MAX19245 | CONCRETE, READY MIX | 12/17/2012 | Paid | $524.50 |
PRC 1100 MAX19253 | CONCRETE, READY MIX | 12/17/2012 | Paid | $1,714.05 |
PRC 1100 MAX19255 | CONCRETE, READY MIX | 12/17/2012 | Paid | $1,532.20 |
PRC 1100 MAX19287 | CONCRETE, READY MIX | 12/17/2012 | Paid | $629.40 |
PRC 1100 MAX19211 | CONCRETE, READY MIX | 12/13/2012 | Paid | $419.60 |
PRC 1100 MAX19019 | CONCRETE, READY MIX | 11/30/2012 | Paid | $448.20 |
PRC 1100 MAX19020 | CONCRETE, READY MIX | 11/30/2012 | Paid | $1,376.40 |
PRC 1100 MAX19026 | CONCRETE, READY MIX | 11/30/2012 | Paid | $623.20 |
PRC 1100 MAX18919 | CONCRETE, READY MIX | 11/21/2012 | Paid | $2,103.60 |
PRC 1100 MAX18732 | CONCRETE, READY MIX | 11/09/2012 | Paid | $691.00 |
PRC 1100 MAX18737 | CONCRETE, READY MIX | 11/09/2012 | Paid | $428.45 |
PRC 1100 MAX18697 | CONCRETE, READY MIX | 11/08/2012 | Paid | $298.80 |
PRC 1100 MAX18699 | CONCRETE, READY MIX | 11/08/2012 | Paid | $298.80 |
PRC 1100 MAX18700 | CONCRETE, READY MIX | 11/08/2012 | Paid | $298.80 |
PRC 1100 MAX18604 | CONCRETE, READY MIX | 11/01/2012 | Paid | $846.80 |
PRC 1100 MAX18605 | CONCRETE, READY MIX | 11/01/2012 | Paid | $647.00 |
PRC 1100 MAX18506 | CONCRETE, READY MIX | 10/30/2012 | Paid | $298.80 |
PRC 1100 MAX18349 | CONCRETE, READY MIX | 10/25/2012 | Paid | $503.10 |
PRC 1100 MAX18350 | CONCRETE, READY MIX | 10/25/2012 | Paid | $559.00 |
PRC 1100 MAX18421 | CONCRETE, READY MIX | 10/25/2012 | Paid | $419.60 |
PRC 1100 MAX18422 | CONCRETE, READY MIX | 10/25/2012 | Paid | $779.00 |
PRC 1100 MAX18423 | CONCRETE, READY MIX | 10/25/2012 | Paid | $629.40 |
PRC 1100 MAX18244 | CONCRETE, READY MIX | 10/10/2012 | Paid | $2,441.20 |
PRC 1100 MAX18085 | CONCRETE, READY MIX | 10/03/2012 | Paid | $1,376.40 |
PRC 1100 MAX18086 | CONCRETE, READY MIX | 10/03/2012 | Paid | $524.50 |
PRC 1100 MAX18088 | CONCRETE, READY MIX | 10/03/2012 | Paid | $223.60 |
PRC 1100 MAX18089 | CONCRETE, READY MIX | 10/03/2012 | Paid | $524.50 |
PRC 1100 MAX18091 | CONCRETE, READY MIX | 10/03/2012 | Paid | $891.65 |
PRC 1100 MAX17995 | CONCRETE, READY MIX | 09/27/2012 | Paid | $563.15 |
PRC 1100 MAX17996 | CONCRETE, READY MIX | 09/27/2012 | Paid | $298.80 |
PRC 1100 MAX17997 | CONCRETE, READY MIX | 09/27/2012 | Paid | $2,843.75 |
PRC 1100 MAX17998 | CONCRETE, READY MIX | 09/27/2012 | Paid | $2,597.00 |
PRC 1100 MAX17999 | CONCRETE, READY MIX | 09/27/2012 | Paid | $818.10 |
PRC 1100 MAX18000 | CONCRETE, READY MIX | 09/27/2012 | Paid | $2,155.50 |
PRC 1100 MAX17870 | CONCRETE, READY MIX | 09/20/2012 | Paid | $1,066.25 |
PRC 1100 MAX17872 | CONCRETE, READY MIX | 09/20/2012 | Paid | $545.30 |
PRC 1100 MAX17624 | CONCRETE, READY MIX | 09/07/2012 | Paid | $298.80 |
PRC 1100 MAX17625 | CONCRETE, READY MIX | 09/07/2012 | Paid | $636.30 |
PRC 1100 MAX17628 | CONCRETE, READY MIX | 09/07/2012 | Paid | $1,610.10 |
PRC 1100 MAX17634 | CONCRETE, READY MIX | 09/07/2012 | Paid | $3,376.00 |
PRC 1100 MAX17638 | CONCRETE, READY MIX | 09/07/2012 | Paid | $1,986.80 |
PRC 1100 MAX17639 | CONCRETE, READY MIX | 09/07/2012 | Paid | $702.90 |
PRC 1100 MAX17551 | CONCRETE, READY MIX | 08/29/2012 | Paid | $971.10 |
PRC 1100 MAX17519 | CONCRETE, READY MIX | 08/28/2012 | Paid | $298.80 |
PRC 1100 MAX17521 | CONCRETE, READY MIX | 08/28/2012 | Paid | $373.50 |
PRC 1100 MAX17522 | CONCRETE, READY MIX | 08/28/2012 | Paid | $389.50 |
PRC 1100 MAX17434 | CONCRETE, READY MIX | 08/23/2012 | Paid | $373.50 |
PRC 1100 MAX17430 | CONCRETE, READY MIX | 08/22/2012 | Paid | $619.05 |
PRC 1100 MAX17242 | CONCRETE, READY MIX | 08/08/2012 | Paid | $2,519.10 |
PRC 1100 MAX17244 | CONCRETE, READY MIX | 08/08/2012 | Paid | $503.10 |
PRC 1100 MAX17216 | CONCRETE, READY MIX | 08/07/2012 | Paid | $675.20 |
PRC 1100 MAX17224 | CONCRETE, READY MIX | 08/07/2012 | Paid | $559.00 |
PRC 1100 MAX17149 | CONCRETE, READY MIX | 08/06/2012 | Paid | $298.80 |
PRC 1100 MAX17150 | CONCRETE, READY MIX | 08/06/2012 | Paid | $311.60 |
PRC 1100 MAX17158 | CONCRETE, READY MIX | 08/06/2012 | Paid | $2,519.10 |
PRC 1100 MAX17105 | CONCRETE, READY MIX | 08/01/2012 | Paid | $559.00 |
PRC 1100 MAX17106 | CONCRETE, READY MIX | 08/01/2012 | Paid | $2,597.00 |
PRC 1100 MAX17107 | CONCRETE, READY MIX | 08/01/2012 | Paid | $545.40 |
PRC 1100 MAX16936 | CONCRETE, READY MIX | 07/25/2012 | Paid | $298.80 |
PRC 1100 MAX16900 | CONCRETE, READY MIX | 07/23/2012 | Paid | $3,204.05 |
PRC 1100 MAX16791 | CONCRETE, READY MIX | 07/18/2012 | Paid | $1,449.80 |
PRC 1100 MAX11877 | Ready-Mix Concrete | 10/04/2011 | Paid | $867.90 |
PRC 1100 MAX11810 | Ready-Mix Concrete | 09/28/2011 | Paid | $2,584.50 |
PRC 1100 MAX11811 | Ready-Mix Concrete | 09/28/2011 | Paid | $2,079.40 |
PRC 1100 MAX11812 | Ready-Mix Concrete | 09/28/2011 | Paid | $1,550.70 |
PRC 1100 MAX11813 | Ready-Mix Concrete | 09/28/2011 | Paid | $2,742.30 |
PRC 1100 MAX11567 | Ready-Mix Concrete | 09/09/2011 | Paid | $268.40 |
PRC 1100 MAX11221 | Ready-Mix Concrete | 08/23/2011 | Paid | $469.70 |
PRC 1100 MAX11094 | Ready-Mix Concrete | 08/18/2011 | Paid | $268.40 |
PRC 1100 MAX11095 | Ready-Mix Concrete | 08/18/2011 | Paid | $603.90 |
PRC 1100 MAX11096 | Ready-Mix Concrete | 08/18/2011 | Paid | $603.90 |
PRC 1100 MAX11097 | Ready-Mix Concrete | 08/18/2011 | Paid | $536.80 |
PRC 1100 MAX10898 | Ready-Mix Concrete | 08/11/2011 | Paid | $2,801.30 |
PRC 1100 MAX10899 | Ready-Mix Concrete | 08/11/2011 | Paid | $827.40 |
PRC 1100 MAX10785 | Ready-Mix Concrete | 08/04/2011 | Paid | $966.70 |
PRC 1100 MAX10786 | Ready-Mix Concrete | 08/04/2011 | Paid | $966.70 |
PRC 1100 MAX10431 | Ready-Mix Concrete | 07/20/2011 | Paid | $441.35 |
PRC 1100 MAX10432 | Ready-Mix Concrete | 07/20/2011 | Paid | $407.40 |
PRC 1100 MAX10433 | Ready-Mix Concrete | 07/20/2011 | Paid | $475.30 |
PRC 1100 MAX10434 | Ready-Mix Concrete | 07/20/2011 | Paid | $339.50 |
PRC 1100 MAX10436 | Ready-Mix Concrete | 07/20/2011 | Paid | $441.35 |
PRC 1100 MAX10438 | Ready-Mix Concrete | 07/20/2011 | Paid | $1,025.70 |
PRC 1100 MAX10439 | Ready-Mix Concrete | 07/20/2011 | Paid | $271.60 |
PRC 1100 MAX10441 | Ready-Mix Concrete | 07/20/2011 | Paid | $271.60 |
PRC 1100 MAX10443 | Ready-Mix Concrete | 07/20/2011 | Paid | $789.00 |
PRC 1100 MAX10445 | Ready-Mix Concrete | 07/20/2011 | Paid | $1,878.10 |
PRC 1100 MAX10446 | Ready-Mix Concrete | 07/20/2011 | Paid | $1,325.80 |
PRC 1100 MAX10447 | Ready-Mix Concrete | 07/20/2011 | Paid | $966.70 |
PRC 1100 MAX10500 | Ready-Mix Concrete | 07/20/2011 | Paid | $1,676.80 |
PRC 1100 MAX10403 | Ready-Mix Concrete | 07/13/2011 | Paid | $1,337.60 |
PRC 1100 MAX10408 | Ready-Mix Concrete | 07/13/2011 | Paid | $946.80 |
PRC 1100 MAX10405 | Ready-Mix Concrete | 07/11/2011 | Paid | $1,735.80 |
PRC 1100 MAX10137 | Ready-Mix Concrete | 06/29/2011 | Paid | $4,136.60 |
PRC 1100 MAX10152 | Ready-Mix Concrete | 06/29/2011 | Paid | $335.50 |
PRC 1100 MAX10162 | Ready-Mix Concrete | 06/29/2011 | Paid | $671.00 |
PRC 1100 MAX10163 | Ready-Mix Concrete | 06/29/2011 | Paid | $469.70 |
PRC 1100 MAX10077 | Ready-Mix Concrete | 06/28/2011 | Paid | $631.20 |
PRC 1100 MAX10067 | Ready-Mix Concrete | 06/24/2011 | Paid | $1,735.80 |
PRC 1100 MAX10068 | Ready-Mix Concrete | 06/24/2011 | Paid | $1,814.70 |
PRC 1100 MAX10069 | Ready-Mix Concrete | 06/24/2011 | Paid | $1,025.70 |
PRC 1100 MAX10070 | Ready-Mix Concrete | 06/24/2011 | Paid | $1,814.70 |
PRC 1100 MAX10071 | Ready-Mix Concrete | 06/24/2011 | Paid | $1,893.60 |
PRC 1100 MAX10072 | Ready-Mix Concrete | 06/24/2011 | Paid | $789.00 |
PRC 1100 MAX10073 | Ready-Mix Concrete | 06/24/2011 | Paid | $1,025.70 |
PRC 1100 MAX10074 | Ready-Mix Concrete | 06/24/2011 | Paid | $1,459.65 |
PRC 1100 MAX10075 | Ready-Mix Concrete | 06/24/2011 | Paid | $1,420.20 |
PRC 1100 MAX10076 | Ready-Mix Concrete | 06/24/2011 | Paid | $271.60 |
PRC 1100 MAX9881 | Ready-Mix Concrete | 06/20/2011 | Paid | $1,065.15 |
PRC 1100 MAX9882 | Ready-Mix Concrete | 06/20/2011 | Paid | $335.50 |
PRC 1100 MAX9883 | Ready-Mix Concrete | 06/20/2011 | Paid | $335.50 |
PRC 1100 MAX9884 | Ready-Mix Concrete | 06/20/2011 | Paid | $670.80 |
PRC 1100 MAX9885 | Ready-Mix Concrete | 06/20/2011 | Paid | $469.70 |
PRC 1100 MAX9886 | Ready-Mix Concrete | 06/20/2011 | Paid | $271.60 |
PRC 1100 MAX9888 | Ready-Mix Concrete | 06/20/2011 | Paid | $268.40 |
PRC 1100 MAX9889 | Ready-Mix Concrete | 06/20/2011 | Paid | $369.05 |
PRC 1100 MAX9890 | Ready-Mix Concrete | 06/20/2011 | Paid | $402.60 |
PRC 1100 MAX9891 | Ready-Mix Concrete | 06/20/2011 | Paid | $469.70 |
PRC 1100 MAX9955 | Ready-Mix Concrete | 06/20/2011 | Paid | $402.60 |
PRC 1100 MAX9956 | Ready-Mix Concrete | 06/20/2011 | Paid | $369.05 |
PRC 1100 MAX9958 | Ready-Mix Concrete | 06/20/2011 | Paid | $271.60 |
PRC 1100 MAX9968 | Ready-Mix Concrete | 06/20/2011 | Paid | $1,025.70 |
PRC 1100 MAX9970 | Ready-Mix Concrete | 06/20/2011 | Paid | $402.60 |
PRC 1100 MAX9971 | Ready-Mix Concrete | 06/20/2011 | Paid | $603.90 |
PRC 1100 MAX9972 | Ready-Mix Concrete | 06/20/2011 | Paid | $631.20 |
PRC 1100 MAX9973 | Ready-Mix Concrete | 06/20/2011 | Paid | $867.90 |
PRC 1100 MAX9974 | Ready-Mix Concrete | 06/20/2011 | Paid | $1,104.60 |
PRC 1100 MAX9858 | Ready-Mix Concrete | 06/15/2011 | Paid | $2,445.90 |
PRC 1100 MAX9859 | Ready-Mix Concrete | 06/15/2011 | Paid | $335.50 |
PRC 1100 MAX9860 | Ready-Mix Concrete | 06/15/2011 | Paid | $369.05 |
PRC 1100 MAX9861 | Ready-Mix Concrete | 06/15/2011 | Paid | $1,183.50 |
PRC 1100 MAX9862 | Ready-Mix Concrete | 06/15/2011 | Paid | $603.90 |
PRC 1100 MAX9863 | Ready-Mix Concrete | 06/15/2011 | Paid | $1,341.30 |
PRC 1100 MAX9864 | Ready-Mix Concrete | 06/15/2011 | Paid | $1,656.90 |
PRC 1100 MAX9848 | Ready-Mix Concrete | 06/10/2011 | Paid | $335.50 |
PRC 1100 MAX9667 | Ready-Mix Concrete | 05/27/2011 | Paid | $402.60 |
PRC 1100 MAX9693 | Ready-Mix Concrete | 05/27/2011 | Paid | $872.30 |
PRC 1100 MAX9694 | Ready-Mix Concrete | 05/27/2011 | Paid | $1,263.50 |
PRC 1100 MAX9695 | Ready-Mix Concrete | 05/27/2011 | Paid | $1,787.40 |
PRC 1100 MAX9696 | Ready-Mix Concrete | 05/27/2011 | Paid | $1,191.60 |
PRC 1100 MAX9697 | Ready-Mix Concrete | 05/27/2011 | Paid | $552.30 |
PRC 1100 MAX9467 | Ready-Mix Concrete | 05/18/2011 | Paid | $335.40 |
PRC 1100 MAX9469 | Ready-Mix Concrete | 05/18/2011 | Paid | $305.55 |
PRC 1100 MAX9509 | Ready-Mix Concrete | 05/18/2011 | Paid | $436.15 |
PRC 1100 MAX9510 | Ready-Mix Concrete | 05/18/2011 | Paid | $946.80 |
PRC 1100 MAX9511 | Ready-Mix Concrete | 05/18/2011 | Paid | $1,814.70 |
PRC 1100 MAX9512 | Ready-Mix Concrete | 05/18/2011 | Paid | $1,025.70 |
PRC 1100 MAX9513 | Ready-Mix Concrete | 05/18/2011 | Paid | $268.40 |
PRC 1100 MAX9465 | Ready-Mix Concrete | 05/16/2011 | Paid | $335.50 |
PRC 1100 MAX9466 | Ready-Mix Concrete | 05/16/2011 | Paid | $867.90 |
PRC 1100 MAX9334 | Ready-Mix Concrete | 05/13/2011 | Paid | $1,578.00 |
PRC 1100 MAX9335 | Ready-Mix Concrete | 05/13/2011 | Paid | $1,499.10 |
PRC 1100 MAX9336 | Ready-Mix Concrete | 05/13/2011 | Paid | $512.85 |
PRC 1100 MAX9337 | Ready-Mix Concrete | 05/13/2011 | Paid | $1,025.70 |
PRC 1100 MAX9338 | Ready-Mix Concrete | 05/13/2011 | Paid | $867.90 |
PRC 1100 MAX9339 | Ready-Mix Concrete | 05/13/2011 | Paid | $907.35 |
PRC 1100 MAX9347 | Ready-Mix Concrete | 05/13/2011 | Paid | $1,499.10 |
PRC 1100 MAX9370 | Ready-Mix Concrete | 05/13/2011 | Paid | $670.80 |
PRC 1100 MAX9381 | Ready-Mix Concrete | 05/13/2011 | Paid | $402.60 |
PRC 1100 MAX9389 | Ready-Mix Concrete | 05/13/2011 | Paid | $335.50 |
PRC 1100 MAX9392 | Ready-Mix Concrete | 05/13/2011 | Paid | $369.05 |
PRC 1100 MAX9394 | Ready-Mix Concrete | 05/13/2011 | Paid | $335.50 |
PRC 1100 MAX9297 | Ready-Mix Concrete | 05/11/2011 | Paid | $1,025.70 |
PRC 1100 MAX9152 | Ready-Mix Concrete | 05/02/2011 | Paid | $335.50 |
PRC 1100 MAX9154 | Ready-Mix Concrete | 05/02/2011 | Paid | $369.05 |
PRC 1100 MAX9206 | Ready-Mix Concrete | 05/02/2011 | Paid | $268.40 |
PRC 1100 MAX9142 | Ready-Mix Concrete | 04/29/2011 | Paid | $789.00 |
PRC 1100 MAX9144 | Ready-Mix Concrete | 04/29/2011 | Paid | $1,025.70 |
PRC 1100 MAX9146 | Ready-Mix Concrete | 04/29/2011 | Paid | $828.45 |
PRC 1100 MAX9147 | Ready-Mix Concrete | 04/29/2011 | Paid | $1,656.90 |
PRC 1100 MAX9148 | Ready-Mix Concrete | 04/29/2011 | Paid | $946.80 |
PRC 1100 MAX9149 | Ready-Mix Concrete | 04/29/2011 | Paid | $710.10 |
PRC 1100 MAX9150 | Ready-Mix Concrete | 04/29/2011 | Paid | $543.20 |
PRC 1100 MAX9158 | Ready-Mix Concrete | 04/29/2011 | Paid | $946.80 |
PRC 1100 MAX9159 | Ready-Mix Concrete | 04/29/2011 | Paid | $1,025.70 |
PRC 1100 MAX9160 | Ready-Mix Concrete | 04/29/2011 | Paid | $867.90 |
PRC 1100 MAX9161 | Ready-Mix Concrete | 04/29/2011 | Paid | $789.00 |
PRC 1100 MAX9163 | Ready-Mix Concrete | 04/29/2011 | Paid | $946.80 |
PRC 1100 MAX9173 | Ready-Mix Concrete | 04/29/2011 | Paid | $1,025.70 |
PRC 1100 MAX9179 | Ready-Mix Concrete | 04/29/2011 | Paid | $1,696.35 |
PRC 1100 MAX9182 | Ready-Mix Concrete | 04/29/2011 | Paid | $946.80 |
PRC 1100 MAX9183 | Ready-Mix Concrete | 04/29/2011 | Paid | $789.00 |
PRC 1100 MAX9184 | Ready-Mix Concrete | 04/29/2011 | Paid | $946.80 |
PRC 1100 MAX9185 | Ready-Mix Concrete | 04/29/2011 | Paid | $946.80 |
PRC 1100 MAX9187 | Ready-Mix Concrete | 04/29/2011 | Paid | $710.10 |
PRC 1100 MAX9076 | Ready-Mix Concrete | 04/26/2011 | Paid | $369.05 |
PRC 1100 MAX9077 | Ready-Mix Concrete | 04/26/2011 | Paid | $335.50 |
PRC 1100 MAX9078 | Ready-Mix Concrete | 04/26/2011 | Paid | $369.05 |
PRC 1100 MAX9079 | Ready-Mix Concrete | 04/26/2011 | Paid | $301.95 |
PRC 1100 MAX9080 | Ready-Mix Concrete | 04/26/2011 | Paid | $268.40 |
PRC 1100 MAX9081 | Ready-Mix Concrete | 04/26/2011 | Paid | $402.60 |
PRC 1100 MAX9083 | Ready-Mix Concrete | 04/26/2011 | Paid | $268.40 |
PRC 1100 MAX9085 | Ready-Mix Concrete | 04/26/2011 | Paid | $402.60 |
PRC 1100 MAX9086 | Ready-Mix Concrete | 04/26/2011 | Paid | $268.40 |
PRC 1100 MAX9087 | Ready-Mix Concrete | 04/26/2011 | Paid | $402.60 |
PRC 1100 MAX9088 | Ready-Mix Concrete | 04/26/2011 | Paid | $469.70 |
PRC 1100 MAX9089 | Ready-Mix Concrete | 04/26/2011 | Paid | $268.40 |
PRC 1100 MAX9090 | Ready-Mix Concrete | 04/26/2011 | Paid | $268.40 |
PRC 1100 MAX9091 | Ready-Mix Concrete | 04/26/2011 | Paid | $671.00 |
PRC 1100 MAX9000 | Ready-Mix Concrete | 04/25/2011 | Paid | $536.80 |
PRC 1100 MAX9049 | Ready-Mix Concrete | 04/22/2011 | Paid | $268.40 |
PRC 1100 MAX9057 | Ready-Mix Concrete | 04/22/2011 | Paid | $223.60 |
PRC 1100 MAX8828 | Ready-Mix Concrete | 04/18/2011 | Paid | $946.80 |
PRC 1100 MAX8829 | Ready-Mix Concrete | 04/18/2011 | Paid | $789.00 |
PRC 1100 MAX8830 | Ready-Mix Concrete | 04/18/2011 | Paid | $402.60 |
PRC 1100 MAX8831 | Ready-Mix Concrete | 04/18/2011 | Paid | $3,858.25 |
PRC 1100 MAX8832 | Ready-Mix Concrete | 04/18/2011 | Paid | $671.00 |
PRC 1100 MAX8833 | Ready-Mix Concrete | 04/18/2011 | Paid | $771.65 |
PRC 1100 MAX8834 | Ready-Mix Concrete | 04/18/2011 | Paid | $1,285.70 |
PRC 1100 MAX8836 | Ready-Mix Concrete | 04/18/2011 | Paid | $536.80 |
PRC 1100 MAX8845 | Ready-Mix Concrete | 04/18/2011 | Paid | $710.10 |
PRC 1100 MAX8576 | Ready-Mix Concrete | 04/05/2011 | Paid | $614.90 |
PRC 1100 MAX8577 | Ready-Mix Concrete | 04/05/2011 | Paid | $670.80 |
PRC 1100 MAX8584 | Ready-Mix Concrete | 04/05/2011 | Paid | $671.00 |
PRC 1100 MAX8585 | Ready-Mix Concrete | 04/05/2011 | Paid | $268.40 |
PRC 1100 MAX8503 | Ready-Mix Concrete | 04/04/2011 | Paid | $559.00 |
PRC 1100 MAX8511 | Ready-Mix Concrete | 03/31/2011 | Paid | $339.50 |
PRC 1100 MAX8502 | Ready-Mix Concrete | 03/30/2011 | Paid | $1,342.00 |
PRC 1100 MAX8504 | Ready-Mix Concrete | 03/30/2011 | Paid | $614.90 |
PRC 1100 MAX8512 | Ready-Mix Concrete | 03/30/2011 | Paid | $603.80 |
PRC 1100 MAX8229 | Ready-Mix Concrete | 03/14/2011 | Paid | $394.50 |
PRC 1100 MAX8228 | Ready-Mix Concrete | 03/10/2011 | Paid | $1,893.60 |
PRC 1100 MAX8165 | Ready-Mix Concrete | 03/09/2011 | Paid | $1,006.30 |
PRC 1100 MAX8166 | Ready-Mix Concrete | 03/09/2011 | Paid | $1,342.00 |
PRC 1100 MAX8167 | Ready-Mix Concrete | 03/09/2011 | Paid | $268.40 |
PRC 1100 MAX8168 | Ready-Mix Concrete | 03/09/2011 | Paid | $271.60 |
PRC 1100 MAX8112 | Ready-Mix Concrete | 03/04/2011 | Paid | $369.05 |
PRM 1100 11030215110 | Ready-Mix Concrete | 03/03/2011 | Paid | $469.70 |
PRM 1100 11021813899 | Ready-Mix Concrete | 02/22/2011 | Paid | $2,996.80 |
PRC 1100 MAX7768 | Ready-Mix Concrete | 02/15/2011 | Paid | $805.20 |
PRC 1100 MAX7771 | Ready-Mix Concrete | 02/15/2011 | Paid | $268.40 |
PRC 1100 MAX7772 | Ready-Mix Concrete | 02/15/2011 | Paid | $315.60 |
PRM 1100 10121507827 | Ready-Mix Concrete | 12/16/2010 | Paid | $540.00 |
PRM 1100 10121307675 | Ready-Mix Concrete | 12/14/2010 | Paid | $1,006.50 |
PRM 1100 10121007567 | Ready-Mix Concrete | 12/13/2010 | Paid | $626.20 |
PRM 1100 10113006220 | Ready-Mix Concrete | 12/01/2010 | Paid | $1,230.10 |
PRM 1100 10111905625 | Ready-Mix Concrete | 11/22/2010 | Paid | $1,073.60 |
PRM 1100 10111805464 | Ready-Mix Concrete | 11/19/2010 | Paid | $540.00 |
PRM 1100 10111705267 | Ready-Mix Concrete | 11/18/2010 | Paid | $848.75 |
PRM 1100 10110804334 | Ready-Mix Concrete | 11/09/2010 | Paid | $1,990.20 |
PRM 1100 10110203790 | Ready-Mix Concrete | 11/03/2010 | Paid | $2,038.50 |
PRM 1100 10102903537 | Ready-Mix Concrete | 11/01/2010 | Paid | $339.50 |
PRM 1100 10102703190 | Ready-Mix Concrete | 10/28/2010 | Paid | $3,720.45 |
PRM 1100 10101801969 | Ready-Mix Concrete | 10/19/2010 | Paid | $603.90 |
PRM 1100 10100600580 | Ready-Mix Concrete | 10/07/2010 | Paid | $315.60 |
PRM 1100 10100500393 | Ready-Mix Concrete | 10/06/2010 | Paid | $2,964.90 |
PRM 1100 10092838682 | Ready-Mix Concrete | 09/29/2010 | Paid | $1,306.00 |
PRM 1100 10092438436 | Ready-Mix Concrete | 09/27/2010 | Paid | $2,516.25 |
PRM 1100 10092137999 | Ready-Mix Concrete | 09/22/2010 | Paid | $666.75 |
PRM 1100 10092037800 | Ready-Mix Concrete | 09/21/2010 | Paid | $2,366.90 |
PRM 1100 10092037801 | Ready-Mix Concrete | 09/21/2010 | Paid | $5,670.40 |
PRM 1100 10091537244 | Ready-Mix Concrete | 09/16/2010 | Paid | $4,514.10 |
PRM 1100 10090836381 | Ready-Mix Concrete | 09/09/2010 | Paid | $3,704.40 |
PRM 1100 10090235851 | Ready-Mix Concrete | 09/03/2010 | Paid | $2,122.40 |
PRM 1100 10090235852 | Ready-Mix Concrete | 09/03/2010 | Paid | $1,863.65 |
PRM 1100 10082735215 | Ready-Mix Concrete | 08/30/2010 | Paid | $1,127.20 |
PRM 1100 10081233549 | Ready-Mix Concrete | 08/13/2010 | Paid | $3,124.40 |
PRM 1100 10073032294 | Ready-Mix Concrete | 08/02/2010 | Paid | $3,510.90 |
PRM 1100 10072932144 | Ready-Mix Concrete | 07/30/2010 | Paid | $4,122.70 |
PRM 1100 10072731769 | Ready-Mix Concrete | 07/28/2010 | Paid | $2,016.75 |
PRM 1100 10072331479 | Ready-Mix Concrete | 07/26/2010 | Paid | $670.90 |
PRM 1100 10072131096 | Ready-Mix Concrete | 07/22/2010 | Paid | $1,476.20 |
PRM 1100 10071530498 | Ready-Mix Concrete | 07/16/2010 | Paid | $533.40 |
PRM 1100 10070829686 | Ready-Mix Concrete | 07/09/2010 | Paid | $757.00 |
PRM 1100 10070629427 | Ready-Mix Concrete | 07/07/2010 | Paid | $936.50 |
PRM 1100 10070229242 | Ready-Mix Concrete | 07/06/2010 | Paid | $894.50 |
PRM 1100 10070129056 | Ready-Mix Concrete | 07/02/2010 | Paid | $4,079.05 |
PRM 1100 10062928804 | Ready-Mix Concrete | 06/30/2010 | Paid | $2,475.60 |
PRM 1100 10062227854 | Ready-Mix Concrete | 06/23/2010 | Paid | $2,055.80 |
PRM 1100 10061727388 | Ready-Mix Concrete | 06/18/2010 | Paid | $3,519.30 |
PRM 1100 10061527089 | Ready-Mix Concrete | 06/16/2010 | Paid | $3,460.90 |
PRM 1100 10061126873 | Ready-Mix Concrete | 06/14/2010 | Paid | $2,162.00 |
PRM 1100 10061026685 | Ready-Mix Concrete | 06/11/2010 | Paid | $2,260.80 |
PRM 1100 10060325981 | Ready-Mix Concrete | 06/04/2010 | Paid | $4,973.30 |
PRM 1100 10052825481 | Ready-Mix Concrete | 06/01/2010 | Paid | $8,145.40 |
PRM 1100 10052524997 | Ready-Mix Concrete | 05/26/2010 | Paid | $503.10 |
PRM 1100 10052424799 | Ready-Mix Concrete | 05/25/2010 | Paid | $1,597.90 |
PRM 1100 10052224645 | Ready-Mix Concrete | 05/24/2010 | Paid | $741.30 |
PRM 1100 10051323952 | Ready-Mix Concrete | 05/14/2010 | Paid | $623.05 |
PRM 1100 10051123554 | Ready-Mix Concrete | 05/12/2010 | Paid | $536.80 |
PRM 1100 10050623205 | Ready-Mix Concrete | 05/07/2010 | Paid | $1,312.15 |
PRM 1100 10043022601 | Ready-Mix Concrete | 05/03/2010 | Paid | $1,845.25 |
PRM 1100 10042922466 | Ready-Mix Concrete | 04/30/2010 | Paid | $1,006.50 |
PRM 1100 10042321887 | Ready-Mix Concrete | 04/26/2010 | Paid | $3,196.10 |
PRM 1100 10042121723 | Ready-Mix Concrete | 04/22/2010 | Paid | $841.70 |
PRM 1100 10041621470 | Ready-Mix Concrete | 04/19/2010 | Paid | $2,512.20 |
PRM 1100 10041320994 | Ready-Mix Concrete | 04/14/2010 | Paid | $805.20 |
PRM 1100 10040119889 | Ready-Mix Concrete | 04/02/2010 | Paid | $1,758.70 |
PRM 1100 10032619235 | Ready-Mix Concrete | 03/29/2010 | Paid | $726.70 |
PRM 1100 10032519060 | Ready-Mix Concrete | 03/26/2010 | Paid | $726.70 |
PRM 1100 10032418923 | Ready-Mix Concrete | 03/25/2010 | Paid | $3,700.65 |
PRM 1100 10032318727 | Ready-Mix Concrete | 03/24/2010 | Paid | $315.60 |
PRM 1100 10031918377 | Ready-Mix Concrete | 03/22/2010 | Paid | $271.60 |
PRM 1100 10031617894 | Ready-Mix Concrete | 03/17/2010 | Paid | $271.60 |
PRM 1100 10031017004 | Ready-Mix Concrete | 03/11/2010 | Paid | $3,773.95 |
PRM 1100 10030916757 | Ready-Mix Concrete | 03/10/2010 | Paid | $745.00 |
PRM 1100 10030416356 | Ready-Mix Concrete | 03/05/2010 | Paid | $2,057.60 |
PRM 1100 10022415163 | Ready-Mix Concrete | 02/25/2010 | Paid | $603.90 |
PRM 1100 10022214805 | Ready-Mix Concrete | 02/23/2010 | Paid | $718.20 |
PRM 1100 10021013813 | Ready-Mix Concrete | 02/11/2010 | Paid | $1,677.40 |
PRM 1100 10020112621 | Ready-Mix Concrete | 02/02/2010 | Paid | $2,265.60 |
PRM 1100 10012712101 | Ready-Mix Concrete | 01/28/2010 | Paid | $671.00 |
PRM 1100 10012511804 | Ready-Mix Concrete | 01/26/2010 | Paid | $726.70 |
PRM 1100 10011310744 | Ready-Mix Concrete | 01/14/2010 | Paid | $811.60 |
PRM 1100 10011110407 | Ready-Mix Concrete | 01/12/2010 | Paid | $492.00 |
PRM 1100 10010710114 | Ready-Mix Concrete | 01/08/2010 | Paid | $793.00 |
PRM 1100 09123109300 | Ready-Mix Concrete | 01/04/2010 | Paid | $842.39 |
PRM 1100 09121607996 | Ready-Mix Concrete | 12/17/2009 | Paid | $3,359.22 |
PRM 1100 09121507853 | Ready-Mix Concrete | 12/16/2009 | Paid | $5,316.95 |
PRM 1100 09112305847 | Ready-Mix Concrete | 11/24/2009 | Paid | $8,213.81 |