PAYMENT REQUEST
CATEGORY COMMODITIES
EXPENSE CATEGORY CEMENT/CONCRETE
DEPARTMENT AUSTIN ENERGY
FUND E-DISTRIBUTION CAPITAL
PROGRAM FY2001 DISTRIBUTION PARENT
ACTIVITY DISTRIBUTION
PAYEE OLDCASTLE APG TEXAS
PAYMENT REQUEST Select a payment request.
Payment Requests | Select from Below
PAYMENT REQUEST DESCRIPTION CHECK DATE CHECK STATUS  AMOUNT
PRM 1100 15081334800 CONCRETE, READY MIX 08/14/2015 Paid $739.53
PRM 1100 15060927214 CONCRETE, READY MIX 06/10/2015 Paid $2,560.03
PRM 1100 15052826128 CONCRETE, READY MIX 06/01/2015 Paid $923.12
PRM 1100 15052826138 CONCRETE, READY MIX 06/01/2015 Paid $1,689.60
PRM 1100 15052926249 CONCRETE, READY MIX 06/01/2015 Paid $923.12
PRC 1100 MAX34448 CONCRETE, READY MIX 03/23/2015 Paid $2,639.34
PRC 1100 MAX34867 CONCRETE, READY MIX 03/10/2015 Paid $1,868.13
PRC 1100 MAX33546 CONCRETE, READY MIX 12/29/2014 Paid $757.90
PRC 1100 MAX33547 CONCRETE, READY MIX 12/29/2014 Paid $1,383.80
PRC 1100 MAX33384 CONCRETE, READY MIX 12/18/2014 Paid $1,299.87
PRC 1100 MAX33386 CONCRETE, READY MIX 12/18/2014 Paid $771.21
PRC 1100 MAX33395 CONCRETE, READY MIX 12/18/2014 Paid $807.73
PRC 1100 MAX33165 CONCRETE, READY MIX 12/04/2014 Paid $514.14
PRC 1100 MAX32905 CONCRETE, READY MIX 11/19/2014 Paid $1,186.35
PRC 1100 MAX32842 CONCRETE, READY MIX 11/13/2014 Paid $692.34
PRC 1100 MAX32845 CONCRETE, READY MIX 11/13/2014 Paid $576.95
PRC 1100 MAX32729 CONCRETE, READY MIX 11/06/2014 Paid $599.94
PRC 1100 MAX32730 CONCRETE, READY MIX 11/06/2014 Paid $923.12
PRC 1100 MAX32741 CONCRETE, READY MIX 11/06/2014 Paid $923.12
PRC 1100 MAX32626 CONCRETE, READY MIX 11/04/2014 Paid $576.95
PRC 1100 MAX32460 CONCRETE, READY MIX 10/28/2014 Paid $771.21
PRC 1100 MAX32461 CONCRETE, READY MIX 10/28/2014 Paid $1,245.42
PRC 1100 MAX32462 CONCRETE, READY MIX 10/28/2014 Paid $860.09
PRC 1100 MAX32464 CONCRETE, READY MIX 10/28/2014 Paid $1,868.13
PRC 1100 MAX32466 CONCRETE, READY MIX 10/28/2014 Paid $692.34
PRC 1100 MAX32472 CONCRETE, READY MIX 10/28/2014 Paid $599.83
PRC 1100 MAX32037 CONCRETE, READY MIX 10/17/2014 Paid $3,410.28
PRC 1100 MAX32182 CONCRETE, READY MIX 10/17/2014 Paid $3,542.00
PRC 1100 MAX32118 CONCRETE, READY MIX 10/14/2014 Paid $2,787.84
PRC 1100 MAX32119 CONCRETE, READY MIX 10/14/2014 Paid $622.71
PRC 1100 MAX32035 CONCRETE, READY MIX 10/09/2014 Paid $1,038.51
PRC 1100 MAX32036 CONCRETE, READY MIX 10/09/2014 Paid $461.56
PRC 1100 MAX32038 CONCRETE, READY MIX 10/09/2014 Paid $771.21
PRC 1100 MAX31956 CONCRETE, READY MIX 10/02/2014 Paid $923.12
PRC 1100 MAX31957 CONCRETE, READY MIX 10/02/2014 Paid $923.12
PRC 1100 MAX31961 CONCRETE, READY MIX 10/02/2014 Paid $899.91
PRC 1100 MAX31798 CONCRETE, READY MIX 09/29/2014 Paid $576.95
PRC 1100 MAX31747 CONCRETE, READY MIX 09/26/2014 Paid $657.36
PRC 1100 MAX31765 CONCRETE, READY MIX 09/26/2014 Paid $276.76
PRC 1100 MAX31677 CONCRETE, READY MIX 09/23/2014 Paid $2,214.08
PRC 1100 MAX31576 CONCRETE, READY MIX 09/22/2014 Paid $1,868.13
PRC 1100 MAX31578 CONCRETE, READY MIX 09/22/2014 Paid $1,038.51
PRC 1100 MAX31580 CONCRETE, READY MIX 09/22/2014 Paid $1,729.75
PRC 1100 MAX31583 CONCRETE, READY MIX 09/22/2014 Paid $692.34
PRC 1100 MAX31586 CONCRETE, READY MIX 09/22/2014 Paid $576.95
PRC 1100 MAX31536 CONCRETE, READY MIX 09/16/2014 Paid $779.00
PRC 1100 MAX31537 CONCRETE, READY MIX 09/16/2014 Paid $3,019.20
PRC 1100 MAX31505 CONCRETE, READY MIX 09/15/2014 Paid $2,016.63
PRC 1100 MAX31446 CONCRETE, READY MIX 09/12/2014 Paid $629.40
PRC 1100 MAX31451 CONCRETE, READY MIX 09/12/2014 Paid $2,571.03
PRC 1100 MAX31453 CONCRETE, READY MIX 09/12/2014 Paid $2,774.53
PRC 1100 MAX31456 CONCRETE, READY MIX 09/12/2014 Paid $519.26
PRC 1100 MAX31380 CONCRETE, READY MIX 09/10/2014 Paid $2,165.13
PRC 1100 MAX31381 CONCRETE, READY MIX 09/10/2014 Paid $461.56
PRC 1100 MAX31382 CONCRETE, READY MIX 09/10/2014 Paid $771.21
PRC 1100 MAX31304 CONCRETE, READY MIX 09/08/2014 Paid $771.21
PRC 1100 MAX31276 CONCRETE, READY MIX 09/03/2014 Paid $576.95
PRC 1100 MAX31280 CONCRETE, READY MIX 09/03/2014 Paid $807.73
PRC 1100 MAX31184 CONCRETE, READY MIX 08/29/2014 Paid $1,038.51
PRC 1100 MAX31012 CONCRETE, READY MIX 08/22/2014 Paid $1,181.70
PRC 1100 MAX30940 CONCRETE, READY MIX 08/21/2014 Paid $3,785.10
PRC 1100 MAX30893 CONCRETE, READY MIX 08/19/2014 Paid $514.14
PRC 1100 MAX30449 CONCRETE, READY MIX 07/30/2014 Paid $1,660.56
PRC 1100 MAX30507 CONCRETE, READY MIX 07/30/2014 Paid $1,899.81
PRC 1100 MAX30508 CONCRETE, READY MIX 07/30/2014 Paid $3,085.17
PRC 1100 MAX29934 CONCRETE, READY MIX 07/11/2014 Paid $771.21
PRC 1100 MAX29833 CONCRETE, READY MIX 07/09/2014 Paid $807.73
PRC 1100 MAX29834 CONCRETE, READY MIX 07/09/2014 Paid $923.12
PRC 1100 MAX29847 CONCRETE, READY MIX 07/09/2014 Paid $576.95
PRC 1100 MAX29848 CONCRETE, READY MIX 07/09/2014 Paid $461.56
PRC 1100 MAX29851 CONCRETE, READY MIX 07/09/2014 Paid $799.92
PRC 1100 MAX29866 CONCRETE, READY MIX 07/09/2014 Paid $461.56
PRC 1100 MAX29867 CONCRETE, READY MIX 07/09/2014 Paid $499.95
PRC 1100 MAX29771 CONCRETE, READY MIX 07/07/2014 Paid $699.93
PRC 1100 MAX29773 CONCRETE, READY MIX 07/07/2014 Paid $410.85
PRC 1100 MAX29745 CONCRETE, READY MIX 07/01/2014 Paid $399.96
PRC 1100 MAX29757 CONCRETE, READY MIX 07/01/2014 Paid $599.83
PRC 1100 MAX29362 CONCRETE, READY MIX 06/13/2014 Paid $629.40
PRC 1100 MAX29136 CONCRETE, READY MIX 05/29/2014 Paid $566.10
PRC 1100 MAX29137 CONCRETE, READY MIX 05/29/2014 Paid $701.10
PRC 1100 MAX29138 CONCRETE, READY MIX 05/29/2014 Paid $701.10
PRC 1100 MAX29139 CONCRETE, READY MIX 05/29/2014 Paid $1,195.10
PRC 1100 MAX29084 CONCRETE, READY MIX 05/28/2014 Paid $566.10
PRC 1100 MAX29085 CONCRETE, READY MIX 05/28/2014 Paid $629.00
PRC 1100 MAX29086 CONCRETE, READY MIX 05/28/2014 Paid $629.00
PRC 1100 MAX29087 CONCRETE, READY MIX 05/28/2014 Paid $629.00
PRC 1100 MAX29088 CONCRETE, READY MIX 05/28/2014 Paid $629.00
PRC 1100 MAX29089 CONCRETE, READY MIX 05/28/2014 Paid $566.10
PRC 1100 MAX29090 CONCRETE, READY MIX 05/28/2014 Paid $566.10
PRC 1100 MAX29058 CONCRETE, READY MIX 05/23/2014 Paid $566.10
PRC 1100 MAX29059 CONCRETE, READY MIX 05/23/2014 Paid $629.00
PRC 1100 MAX29060 CONCRETE, READY MIX 05/23/2014 Paid $701.10
PRC 1100 MAX29061 CONCRETE, READY MIX 05/23/2014 Paid $701.10
PRC 1100 MAX29062 CONCRETE, READY MIX 05/23/2014 Paid $629.00
PRC 1100 MAX29063 CONCRETE, READY MIX 05/23/2014 Paid $629.00
PRC 1100 MAX28728 CONCRETE, READY MIX 05/15/2014 Paid $727.20
PRC 1100 MAX28500 CONCRETE, READY MIX 05/06/2014 Paid $566.10
PRC 1100 MAX28501 CONCRETE, READY MIX 05/06/2014 Paid $701.10
PRC 1100 MAX28502 CONCRETE, READY MIX 05/06/2014 Paid $701.10
PRC 1100 MAX28503 CONCRETE, READY MIX 05/06/2014 Paid $566.10
PRC 1100 MAX28504 CONCRETE, READY MIX 05/06/2014 Paid $545.40
PRC 1100 MAX28505 CONCRETE, READY MIX 05/06/2014 Paid $566.10
PRC 1100 MAX28522 CONCRETE, READY MIX 05/06/2014 Paid $909.00
PRC 1100 MAX28523 CONCRETE, READY MIX 05/06/2014 Paid $636.30
PRC 1100 MAX28409 CONCRETE, READY MIX 04/30/2014 Paid $419.60
PRC 1100 MAX28299 CONCRETE, READY MIX 04/29/2014 Paid $701.10
PRC 1100 MAX28300 CONCRETE, READY MIX 04/29/2014 Paid $597.55
PRC 1100 MAX28200 CONCRETE, READY MIX 04/17/2014 Paid $891.65
PRC 1100 MAX28184 CONCRETE, READY MIX 04/16/2014 Paid $629.40
PRC 1100 MAX28185 CONCRETE, READY MIX 04/16/2014 Paid $629.40
PRC 1100 MAX28066 CONCRETE, READY MIX 04/11/2014 Paid $818.10
PRC 1100 MAX28067 CONCRETE, READY MIX 04/11/2014 Paid $818.10
PRC 1100 MAX28068 CONCRETE, READY MIX 04/11/2014 Paid $818.10
PRC 1100 MAX28070 CONCRETE, READY MIX 04/11/2014 Paid $818.10
PRC 1100 MAX28071 CONCRETE, READY MIX 04/11/2014 Paid $155.80
PRC 1100 MAX28072 CONCRETE, READY MIX 04/11/2014 Paid $701.10
PRC 1100 MAX28015 CONCRETE, READY MIX 04/10/2014 Paid $944.10
PRC 1100 MAX27890 CONCRETE, READY MIX 04/07/2014 Paid $818.10
PRC 1100 MAX27813 CONCRETE, READY MIX 04/03/2014 Paid $818.10
PRC 1100 MAX27814 CONCRETE, READY MIX 04/02/2014 Paid $454.50
PRC 1100 MAX27815 CONCRETE, READY MIX 04/02/2014 Paid $818.10
PRC 1100 MAX27816 CONCRETE, READY MIX 04/02/2014 Paid $818.10
PRC 1100 MAX27784 CONCRETE, READY MIX 04/01/2014 Paid $779.00
PRC 1100 MAX27786 CONCRETE, READY MIX 04/01/2014 Paid $740.05
PRC 1100 MAX27788 CONCRETE, READY MIX 04/01/2014 Paid $636.30
PRC 1100 MAX27632 CONCRETE, READY MIX 03/26/2014 Paid $629.40
PRC 1100 MAX27633 CONCRETE, READY MIX 03/26/2014 Paid $545.40
PRC 1100 MAX27634 CONCRETE, READY MIX 03/26/2014 Paid $298.80
PRC 1100 MAX27636 CONCRETE, READY MIX 03/26/2014 Paid $734.30
PRC 1100 MAX27637 CONCRETE, READY MIX 03/26/2014 Paid $944.10
PRC 1100 MAX27640 CONCRETE, READY MIX 03/26/2014 Paid $734.30
PRC 1100 MAX27642 CONCRETE, READY MIX 03/26/2014 Paid $734.30
PRC 1100 MAX27676 CONCRETE, READY MIX 03/26/2014 Paid $839.20
PRC 1100 MAX27677 CONCRETE, READY MIX 03/26/2014 Paid $363.60
PRC 1100 MAX27522 CONCRETE, READY MIX 03/24/2014 Paid $909.00
PRC 1100 MAX27508 CONCRETE, READY MIX 03/20/2014 Paid $779.00
PRC 1100 MAX27509 CONCRETE, READY MIX 03/20/2014 Paid $818.10
PRC 1100 MAX27510 CONCRETE, READY MIX 03/20/2014 Paid $818.10
PRM 1100 14031316347 CONCRETE, READY MIX 03/14/2014 Paid $727.20
PRC 1100 MAX27280 CONCRETE, READY MIX 03/11/2014 Paid $472.05
PRM 1100 14030515238 CONCRETE, READY MIX 03/06/2014 Paid $909.00
PRC 1100 MAX27092 CONCRETE, READY MIX 03/03/2014 Paid $818.10
PRC 1100 MAX27034 CONCRETE, READY MIX 02/27/2014 Paid $944.10
PRC 1100 MAX27036 CONCRETE, READY MIX 02/27/2014 Paid $311.60
PRC 1100 MAX27037 CONCRETE, READY MIX 02/27/2014 Paid $779.00
PRC 1100 MAX26988 CONCRETE, READY MIX 02/25/2014 Paid $734.30
PRC 1100 MAX26989 CONCRETE, READY MIX 02/25/2014 Paid $734.30
PRC 1100 MAX26992 CONCRETE, READY MIX 02/25/2014 Paid $818.10
PRC 1100 MAX26993 CONCRETE, READY MIX 02/25/2014 Paid $863.55
PRC 1100 MAX26994 CONCRETE, READY MIX 02/25/2014 Paid $701.10
PRC 1100 MAX26995 CONCRETE, READY MIX 02/25/2014 Paid $772.65
PRC 1100 MAX26996 CONCRETE, READY MIX 02/25/2014 Paid $727.20
PRC 1100 MAX26997 CONCRETE, READY MIX 02/25/2014 Paid $818.10
PRC 1100 MAX26999 CONCRETE, READY MIX 02/25/2014 Paid $311.60
PRC 1100 MAX26898 CONCRETE, READY MIX 02/21/2014 Paid $629.40
PRC 1100 MAX26899 CONCRETE, READY MIX 02/21/2014 Paid $629.40
PRC 1100 MAX26776 CONCRETE, READY MIX 02/14/2014 Paid $389.50
PRC 1100 MAX26777 CONCRETE, READY MIX 02/14/2014 Paid $1,049.00
PRC 1100 MAX26778 CONCRETE, READY MIX 02/14/2014 Paid $944.10
PRC 1100 MAX26779 CONCRETE, READY MIX 02/14/2014 Paid $818.10
PRC 1100 MAX26780 CONCRETE, READY MIX 02/14/2014 Paid $779.00
PRC 1100 MAX26781 CONCRETE, READY MIX 02/14/2014 Paid $727.20
PRC 1100 MAX26782 CONCRETE, READY MIX 02/14/2014 Paid $524.50
PRC 1100 MAX26558 CONCRETE, READY MIX 02/05/2014 Paid $944.10
PRC 1100 MAX26559 CONCRETE, READY MIX 02/03/2014 Paid $419.60
PRC 1100 MAX26561 CONCRETE, READY MIX 02/03/2014 Paid $909.00
PRC 1100 MAX26562 CONCRETE, READY MIX 02/03/2014 Paid $681.75
PRC 1100 MAX26567 CONCRETE, READY MIX 02/03/2014 Paid $623.20
PRC 1100 MAX26568 CONCRETE, READY MIX 02/03/2014 Paid $909.00
PRC 1100 MAX26569 CONCRETE, READY MIX 02/03/2014 Paid $909.00
PRC 1100 MAX26427 CONCRETE, READY MIX 01/24/2014 Paid $419.60
PRC 1100 MAX26387 CONCRETE, READY MIX 01/16/2014 Paid $909.00
PRC 1100 MAX26388 CONCRETE, READY MIX 01/16/2014 Paid $909.00
PRC 1100 MAX26389 CONCRETE, READY MIX 01/16/2014 Paid $779.00
PRC 1100 MAX26390 CONCRETE, READY MIX 01/16/2014 Paid $727.20
PRC 1100 MAX26261 CONCRETE, READY MIX 01/09/2014 Paid $545.40
PRC 1100 MAX26262 CONCRETE, READY MIX 01/09/2014 Paid $909.00
PRC 1100 MAX26263 CONCRETE, READY MIX 01/09/2014 Paid $779.00
PRC 1100 MAX25962 CONCRETE, READY MIX 12/18/2013 Paid $363.60
PRC 1100 MAX25965 CONCRETE, READY MIX 12/18/2013 Paid $909.00
PRC 1100 MAX25968 CONCRETE, READY MIX 12/18/2013 Paid $419.60
PRC 1100 MAX25969 CONCRETE, READY MIX 12/18/2013 Paid $524.50
PRC 1100 MAX25885 CONCRETE, READY MIX 12/16/2013 Paid $681.75
PRC 1100 MAX25886 CONCRETE, READY MIX 12/16/2013 Paid $389.50
PRC 1100 MAX25836 CONCRETE, READY MIX 12/11/2013 Paid $311.60
PRC 1100 MAX25797 CONCRETE, READY MIX 12/10/2013 Paid $672.30
PRC 1100 MAX25798 CONCRETE, READY MIX 12/10/2013 Paid $467.40
PRC 1100 MAX25730 CONCRETE, READY MIX 12/09/2013 Paid $233.70
PRC 1100 MAX25731 CONCRETE, READY MIX 12/09/2013 Paid $779.00
PRC 1100 MAX25732 CONCRETE, READY MIX 12/09/2013 Paid $909.00
PRC 1100 MAX25733 CONCRETE, READY MIX 12/09/2013 Paid $909.00
PRC 1100 MAX25734 CONCRETE, READY MIX 12/09/2013 Paid $909.00
PRC 1100 MAX25735 CONCRETE, READY MIX 12/09/2013 Paid $363.60
PRC 1100 MAX25711 CONCRETE, READY MIX 12/05/2013 Paid $454.50
PRC 1100 MAX25712 CONCRETE, READY MIX 12/05/2013 Paid $909.00
PRC 1100 MAX25401 CONCRETE, READY MIX 11/13/2013 Paid $545.40
PRC 1100 MAX25403 CONCRETE, READY MIX 11/13/2013 Paid $298.80
PRC 1100 MAX25368 CONCRETE, READY MIX 11/12/2013 Paid $1,049.00
PRC 1100 MAX25372 CONCRETE, READY MIX 11/12/2013 Paid $181.80
PRC 1100 MAX25373 CONCRETE, READY MIX 11/12/2013 Paid $909.00
PRC 1100 MAX25374 CONCRETE, READY MIX 11/12/2013 Paid $727.20
PRC 1100 MAX25375 CONCRETE, READY MIX 11/12/2013 Paid $727.20
PRC 1100 MAX25377 CONCRETE, READY MIX 11/12/2013 Paid $779.00
PRC 1100 MAX25382 CONCRETE, READY MIX 11/12/2013 Paid $311.60
PRC 1100 MAX25231 CONCRETE, READY MIX 11/04/2013 Paid $545.40
PRC 1100 MAX24933 CONCRETE, READY MIX 11/01/2013 Paid $909.00
PRC 1100 MAX24931 CONCRETE, READY MIX 10/29/2013 Paid $389.50
PRC 1100 MAX24949 CONCRETE, READY MIX 10/29/2013 Paid $779.00
PRC 1100 MAX24950 CONCRETE, READY MIX 10/29/2013 Paid $503.20
PRC 1100 MAX24951 CONCRETE, READY MIX 10/29/2013 Paid $701.10
PRC 1100 MAX24952 CONCRETE, READY MIX 10/29/2013 Paid $629.00
PRC 1100 MAX24954 CONCRETE, READY MIX 10/29/2013 Paid $779.00
PRC 1100 MAX24961 CONCRETE, READY MIX 10/29/2013 Paid $944.10
PRC 1100 MAX24962 CONCRETE, READY MIX 10/29/2013 Paid $524.50
PRC 1100 MAX24963 CONCRETE, READY MIX 10/29/2013 Paid $377.40
PRC 1100 MAX24965 CONCRETE, READY MIX 10/29/2013 Paid $909.00
PRC 1100 MAX24935 CONCRETE, READY MIX 10/24/2013 Paid $909.00
PRC 1100 MAX24939 CONCRETE, READY MIX 10/24/2013 Paid $727.20
PRC 1100 MAX24968 CONCRETE, READY MIX 10/24/2013 Paid $909.00
PRC 1100 MAX24545 CONCRETE, READY MIX 10/02/2013 Paid $909.00
PRC 1100 MAX24540 CONCRETE, READY MIX 09/30/2013 Paid $389.50
PRC 1100 MAX24541 CONCRETE, READY MIX 09/30/2013 Paid $363.60
PRC 1100 MAX24542 CONCRETE, READY MIX 09/30/2013 Paid $818.10
PRC 1100 MAX24543 CONCRETE, READY MIX 09/30/2013 Paid $311.60
PRC 1100 MAX24547 CONCRETE, READY MIX 09/30/2013 Paid $314.70
PRC 1100 MAX24548 CONCRETE, READY MIX 09/30/2013 Paid $311.60
PRC 1100 MAX24550 CONCRETE, READY MIX 09/30/2013 Paid $314.70
PRC 1100 MAX24552 CONCRETE, READY MIX 09/30/2013 Paid $944.10
PRC 1100 MAX24553 CONCRETE, READY MIX 09/30/2013 Paid $734.30
PRC 1100 MAX24554 CONCRETE, READY MIX 09/30/2013 Paid $629.40
PRC 1100 MAX24555 CONCRETE, READY MIX 09/30/2013 Paid $629.40
PRC 1100 MAX24556 CONCRETE, READY MIX 09/30/2013 Paid $909.00
PRC 1100 MAX24558 CONCRETE, READY MIX 09/30/2013 Paid $311.60
PRC 1100 MAX24559 CONCRETE, READY MIX 09/30/2013 Paid $909.00
PRC 1100 MAX24567 CONCRETE, READY MIX 09/30/2013 Paid $1,049.00
PRC 1100 MAX24264 CONCRETE, READY MIX 09/16/2013 Paid $727.20
PRC 1100 MAX24265 CONCRETE, READY MIX 09/16/2013 Paid $389.50
PRC 1100 MAX24266 CONCRETE, READY MIX 09/16/2013 Paid $636.30
PRC 1100 MAX24267 CONCRETE, READY MIX 09/16/2013 Paid $1,049.00
PRC 1100 MAX24279 CONCRETE, READY MIX 09/16/2013 Paid $566.10
PRC 1100 MAX24280 CONCRETE, READY MIX 09/16/2013 Paid $1,049.00
PRC 1100 MAX24281 CONCRETE, READY MIX 09/16/2013 Paid $909.00
PRC 1100 MAX24282 CONCRETE, READY MIX 09/16/2013 Paid $389.50
PRC 1100 MAX24146 CONCRETE, READY MIX 09/11/2013 Paid $373.50
PRC 1100 MAX24147 CONCRETE, READY MIX 09/11/2013 Paid $311.60
PRC 1100 MAX24148 CONCRETE, READY MIX 09/11/2013 Paid $818.10
PRC 1100 MAX24149 CONCRETE, READY MIX 09/11/2013 Paid $818.10
PRC 1100 MAX24150 CONCRETE, READY MIX 09/11/2013 Paid $818.10
PRC 1100 MAX24151 CONCRETE, READY MIX 09/11/2013 Paid $311.60
PRC 1100 MAX24152 CONCRETE, READY MIX 09/11/2013 Paid $311.60
PRC 1100 MAX24153 CONCRETE, READY MIX 09/11/2013 Paid $944.10
PRC 1100 MAX24154 CONCRETE, READY MIX 09/11/2013 Paid $944.10
PRC 1100 MAX24155 CONCRETE, READY MIX 09/11/2013 Paid $944.10
PRC 1100 MAX24134 CONCRETE, READY MIX 09/10/2013 Paid $909.00
PRC 1100 MAX24138 CONCRETE, READY MIX 09/10/2013 Paid $909.00
PRC 1100 MAX24139 CONCRETE, READY MIX 09/10/2013 Paid $448.20
PRC 1100 MAX23978 CONCRETE, READY MIX 09/05/2013 Paid $909.00
PRC 1100 MAX23979 CONCRETE, READY MIX 09/05/2013 Paid $311.60
PRC 1100 MAX23976 CONCRETE, READY MIX 08/30/2013 Paid $701.10
PRC 1100 MAX23928 CONCRETE, READY MIX 08/28/2013 Paid $311.60
PRC 1100 MAX23889 CONCRETE, READY MIX 08/27/2013 Paid $524.50
PRC 1100 MAX23890 CONCRETE, READY MIX 08/27/2013 Paid $839.20
PRC 1100 MAX23892 CONCRETE, READY MIX 08/27/2013 Paid $818.10
PRC 1100 MAX23817 CONCRETE, READY MIX 08/23/2013 Paid $636.30
PRC 1100 MAX23818 CONCRETE, READY MIX 08/23/2013 Paid $779.00
PRC 1100 MAX23819 CONCRETE, READY MIX 08/23/2013 Paid $779.00
PRC 1100 MAX23821 CONCRETE, READY MIX 08/23/2013 Paid $623.20
PRC 1100 MAX23822 CONCRETE, READY MIX 08/23/2013 Paid $909.00
PRC 1100 MAX23823 CONCRETE, READY MIX 08/23/2013 Paid $909.00
PRC 1100 MAX23824 CONCRETE, READY MIX 08/23/2013 Paid $623.20
PRC 1100 MAX23784 CONCRETE, READY MIX 08/21/2013 Paid $52.45
PRC 1100 MAX23785 CONCRETE, READY MIX 08/21/2013 Paid $1,049.00
PRC 1100 MAX23786 CONCRETE, READY MIX 08/21/2013 Paid $1,049.00
PRC 1100 MAX23790 CONCRETE, READY MIX 08/21/2013 Paid $709.65
PRC 1100 MAX23800 CONCRETE, READY MIX 08/21/2013 Paid $623.20
PRC 1100 MAX23801 CONCRETE, READY MIX 08/21/2013 Paid $701.10
PRC 1100 MAX23802 CONCRETE, READY MIX 08/21/2013 Paid $779.00
PRC 1100 MAX23803 CONCRETE, READY MIX 08/21/2013 Paid $779.00
PRC 1100 MAX23804 CONCRETE, READY MIX 08/21/2013 Paid $629.00
PRC 1100 MAX23805 CONCRETE, READY MIX 08/21/2013 Paid $629.00
PRC 1100 MAX23806 CONCRETE, READY MIX 08/21/2013 Paid $629.00
PRC 1100 MAX23748 CONCRETE, READY MIX 08/20/2013 Paid $566.10
PRC 1100 MAX23749 CONCRETE, READY MIX 08/20/2013 Paid $629.40
PRC 1100 MAX23752 CONCRETE, READY MIX 08/20/2013 Paid $944.10
PRC 1100 MAX23753 CONCRETE, READY MIX 08/20/2013 Paid $944.10
PRC 1100 MAX23717 CONCRETE, READY MIX 08/16/2013 Paid $311.60
PRC 1100 MAX23718 CONCRETE, READY MIX 08/16/2013 Paid $818.10
PRC 1100 MAX23719 CONCRETE, READY MIX 08/16/2013 Paid $311.60
PRC 1100 MAX23720 CONCRETE, READY MIX 08/16/2013 Paid $818.10
PRC 1100 MAX23721 CONCRETE, READY MIX 08/16/2013 Paid $839.20
PRC 1100 MAX23722 CONCRETE, READY MIX 08/16/2013 Paid $896.40
PRC 1100 MAX23723 CONCRETE, READY MIX 08/16/2013 Paid $524.50
PRC 1100 MAX23697 CONCRETE, READY MIX 08/15/2013 Paid $818.10
PRC 1100 MAX23700 CONCRETE, READY MIX 08/15/2013 Paid $311.60
PRC 1100 MAX23702 CONCRETE, READY MIX 08/15/2013 Paid $311.60
PRC 1100 MAX23703 CONCRETE, READY MIX 08/15/2013 Paid $818.10
PRC 1100 MAX23603 CONCRETE, READY MIX 08/08/2013 Paid $740.05
PRC 1100 MAX23604 CONCRETE, READY MIX 08/08/2013 Paid $701.10
PRC 1100 MAX23605 CONCRETE, READY MIX 08/08/2013 Paid $909.00
PRC 1100 MAX23606 CONCRETE, READY MIX 08/08/2013 Paid $909.00
PRC 1100 MAX23607 CONCRETE, READY MIX 08/08/2013 Paid $909.00
PRC 1100 MAX23608 CONCRETE, READY MIX 08/08/2013 Paid $779.00
PRC 1100 MAX23539 CONCRETE, READY MIX 08/07/2013 Paid $467.40
PRC 1100 MAX23540 CONCRETE, READY MIX 08/07/2013 Paid $779.00
PRC 1100 MAX23541 CONCRETE, READY MIX 08/07/2013 Paid $740.05
PRC 1100 MAX23542 CONCRETE, READY MIX 08/07/2013 Paid $629.00
PRC 1100 MAX23514 CONCRETE, READY MIX 08/06/2013 Paid $701.10
PRC 1100 MAX23515 CONCRETE, READY MIX 08/06/2013 Paid $233.70
PRC 1100 MAX23520 CONCRETE, READY MIX 08/06/2013 Paid $909.00
PRC 1100 MAX23457 CONCRETE, READY MIX 08/02/2013 Paid $629.00
PRC 1100 MAX23480 CONCRETE, READY MIX 08/02/2013 Paid $909.00
PRC 1100 MAX23481 CONCRETE, READY MIX 08/02/2013 Paid $909.00
PRC 1100 MAX23482 CONCRETE, READY MIX 08/02/2013 Paid $909.00
PRC 1100 MAX23483 CONCRETE, READY MIX 08/02/2013 Paid $522.90
PRC 1100 MAX23484 CONCRETE, READY MIX 08/02/2013 Paid $629.00
PRC 1100 MAX23485 CONCRETE, READY MIX 08/02/2013 Paid $629.00
PRC 1100 MAX23486 CONCRETE, READY MIX 08/02/2013 Paid $311.60
PRC 1100 MAX23388 CONCRETE, READY MIX 07/29/2013 Paid $311.60
PRC 1100 MAX23389 CONCRETE, READY MIX 07/29/2013 Paid $419.60
PRC 1100 MAX23390 CONCRETE, READY MIX 07/29/2013 Paid $314.50
PRC 1100 MAX23261 CONCRETE, READY MIX 07/25/2013 Paid $623.20
PRC 1100 MAX23298 CONCRETE, READY MIX 07/25/2013 Paid $298.80
PRC 1100 MAX23037 CONCRETE, READY MIX 07/18/2013 Paid $298.80
PRC 1100 MAX23088 CONCRETE, READY MIX 07/18/2013 Paid $629.00
PRC 1100 MAX23024 CONCRETE, READY MIX 07/16/2013 Paid $629.00
PRC 1100 MAX23025 CONCRETE, READY MIX 07/16/2013 Paid $629.00
PRC 1100 MAX23026 CONCRETE, READY MIX 07/16/2013 Paid $629.00
PRC 1100 MAX22939 CONCRETE, READY MIX 07/15/2013 Paid $377.40
PRC 1100 MAX22948 CONCRETE, READY MIX 07/15/2013 Paid $629.00
PRC 1100 MAX22949 CONCRETE, READY MIX 07/15/2013 Paid $629.00
PRC 1100 MAX22950 CONCRETE, READY MIX 07/15/2013 Paid $629.00
PRC 1100 MAX22951 CONCRETE, READY MIX 07/15/2013 Paid $629.00
PRC 1100 MAX22961 CONCRETE, READY MIX 07/15/2013 Paid $629.00
PRC 1100 MAX22962 CONCRETE, READY MIX 07/15/2013 Paid $629.00
PRC 1100 MAX22963 CONCRETE, READY MIX 07/15/2013 Paid $629.00
PRC 1100 MAX22964 CONCRETE, READY MIX 07/15/2013 Paid $629.00
PRC 1100 MAX22966 CONCRETE, READY MIX 07/15/2013 Paid $298.80
PRC 1100 MAX22967 CONCRETE, READY MIX 07/15/2013 Paid $909.00
PRC 1100 MAX22968 CONCRETE, READY MIX 07/15/2013 Paid $1,258.00
PRC 1100 MAX22977 CONCRETE, READY MIX 07/15/2013 Paid $629.00
PRC 1100 MAX23015 CONCRETE, READY MIX 07/15/2013 Paid $629.00
PRC 1100 MAX23016 CONCRETE, READY MIX 07/15/2013 Paid $629.00
PRC 1100 MAX23017 CONCRETE, READY MIX 07/15/2013 Paid $629.00
PRC 1100 MAX22920 CONCRETE, READY MIX 07/11/2013 Paid $298.80
PRC 1100 MAX22911 CONCRETE, READY MIX 07/09/2013 Paid $314.50
PRC 1100 MAX22912 CONCRETE, READY MIX 07/09/2013 Paid $629.00
PRC 1100 MAX22913 CONCRETE, READY MIX 07/09/2013 Paid $629.00
PRC 1100 MAX22914 CONCRETE, READY MIX 07/09/2013 Paid $629.00
PRC 1100 MAX22915 CONCRETE, READY MIX 07/09/2013 Paid $629.00
PRC 1100 MAX22916 CONCRETE, READY MIX 07/09/2013 Paid $629.00
PRC 1100 MAX22917 CONCRETE, READY MIX 07/09/2013 Paid $691.90
PRC 1100 MAX22919 CONCRETE, READY MIX 07/09/2013 Paid $672.30
PRC 1100 MAX22921 CONCRETE, READY MIX 07/09/2013 Paid $691.90
PRC 1100 MAX22878 CONCRETE, READY MIX 07/05/2013 Paid $629.40
PRC 1100 MAX22795 CONCRETE, READY MIX 07/02/2013 Paid $524.50
PRC 1100 MAX22796 CONCRETE, READY MIX 07/02/2013 Paid $524.50
PRC 1100 MAX22797 CONCRETE, READY MIX 07/02/2013 Paid $629.00
PRC 1100 MAX22798 CONCRETE, READY MIX 07/02/2013 Paid $298.80
PRC 1100 MAX22704 CONCRETE, READY MIX 06/27/2013 Paid $629.00
PRC 1100 MAX22705 CONCRETE, READY MIX 06/27/2013 Paid $629.00
PRC 1100 MAX22706 CONCRETE, READY MIX 06/27/2013 Paid $629.00
PRC 1100 MAX22708 CONCRETE, READY MIX 06/27/2013 Paid $909.00
PRC 1100 MAX22709 CONCRETE, READY MIX 06/27/2013 Paid $454.50
PRC 1100 MAX22764 CONCRETE, READY MIX 06/27/2013 Paid $629.00
PRC 1100 MAX22666 CONCRETE, READY MIX 06/24/2013 Paid $629.00
PRC 1100 MAX22667 CONCRETE, READY MIX 06/24/2013 Paid $629.00
PRC 1100 MAX22668 CONCRETE, READY MIX 06/24/2013 Paid $566.10
PRC 1100 MAX22694 CONCRETE, READY MIX 06/24/2013 Paid $629.00
PRC 1100 MAX22695 CONCRETE, READY MIX 06/24/2013 Paid $629.00
PRC 1100 MAX22696 CONCRETE, READY MIX 06/24/2013 Paid $629.00
PRC 1100 MAX22697 CONCRETE, READY MIX 06/24/2013 Paid $566.10
PRC 1100 MAX22698 CONCRETE, READY MIX 06/24/2013 Paid $629.00
PRC 1100 MAX22699 CONCRETE, READY MIX 06/24/2013 Paid $629.00
PRC 1100 MAX22602 CONCRETE, READY MIX 06/20/2013 Paid $629.00
PRC 1100 MAX22603 CONCRETE, READY MIX 06/20/2013 Paid $314.50
PRC 1100 MAX22604 CONCRETE, READY MIX 06/20/2013 Paid $701.10
PRC 1100 MAX22605 CONCRETE, READY MIX 06/20/2013 Paid $701.10
PRC 1100 MAX22607 CONCRETE, READY MIX 06/20/2013 Paid $629.00
PRC 1100 MAX22608 CONCRETE, READY MIX 06/20/2013 Paid $314.50
PRC 1100 MAX22609 CONCRETE, READY MIX 06/20/2013 Paid $566.10
PRC 1100 MAX22610 CONCRETE, READY MIX 06/20/2013 Paid $629.00
PRC 1100 MAX22611 CONCRETE, READY MIX 06/20/2013 Paid $629.00
PRC 1100 MAX22625 CONCRETE, READY MIX 06/20/2013 Paid $944.10
PRC 1100 MAX22626 CONCRETE, READY MIX 06/20/2013 Paid $1,049.00
PRC 1100 MAX22627 CONCRETE, READY MIX 06/20/2013 Paid $629.00
PRC 1100 MAX22628 CONCRETE, READY MIX 06/20/2013 Paid $629.00
PRC 1100 MAX22629 CONCRETE, READY MIX 06/20/2013 Paid $251.60
PRC 1100 MAX22630 CONCRETE, READY MIX 06/20/2013 Paid $701.10
PRC 1100 MAX22631 CONCRETE, READY MIX 06/20/2013 Paid $701.10
PRC 1100 MAX22632 CONCRETE, READY MIX 06/20/2013 Paid $629.40
PRC 1100 MAX22633 CONCRETE, READY MIX 06/20/2013 Paid $524.50
PRC 1100 MAX22562 CONCRETE, READY MIX 06/18/2013 Paid $909.00
PRC 1100 MAX22564 CONCRETE, READY MIX 06/18/2013 Paid $629.00
PRC 1100 MAX22565 CONCRETE, READY MIX 06/18/2013 Paid $629.00
PRC 1100 MAX22566 CONCRETE, READY MIX 06/18/2013 Paid $839.20
PRC 1100 MAX22567 CONCRETE, READY MIX 06/18/2013 Paid $454.50
PRC 1100 MAX22568 CONCRETE, READY MIX 06/18/2013 Paid $909.00
PRC 1100 MAX22569 CONCRETE, READY MIX 06/18/2013 Paid $909.00
PRC 1100 MAX22570 CONCRETE, READY MIX 06/18/2013 Paid $636.30
PRC 1100 MAX22518 CONCRETE, READY MIX 06/14/2013 Paid $623.20
PRC 1100 MAX22519 CONCRETE, READY MIX 06/14/2013 Paid $691.90
PRC 1100 MAX22520 CONCRETE, READY MIX 06/14/2013 Paid $629.00
PRC 1100 MAX22521 CONCRETE, READY MIX 06/14/2013 Paid $298.80
PRC 1100 MAX22522 CONCRETE, READY MIX 06/14/2013 Paid $944.10
PRC 1100 MAX22523 CONCRETE, READY MIX 06/14/2013 Paid $734.30
PRC 1100 MAX22524 CONCRETE, READY MIX 06/14/2013 Paid $909.00
PRC 1100 MAX22432 CONCRETE, READY MIX 06/07/2013 Paid $629.00
PRC 1100 MAX22433 CONCRETE, READY MIX 06/07/2013 Paid $1,258.00
PRC 1100 MAX22434 CONCRETE, READY MIX 06/07/2013 Paid $629.00
PRC 1100 MAX22436 CONCRETE, READY MIX 06/07/2013 Paid $503.20
PRC 1100 MAX22404 CONCRETE, READY MIX 06/06/2013 Paid $629.00
PRC 1100 MAX22370 CONCRETE, READY MIX 06/05/2013 Paid $629.00
PRC 1100 MAX22328 CONCRETE, READY MIX 06/04/2013 Paid $629.00
PRC 1100 MAX22331 CONCRETE, READY MIX 06/04/2013 Paid $629.00
PRC 1100 MAX22335 CONCRETE, READY MIX 06/04/2013 Paid $1,049.00
PRC 1100 MAX22336 CONCRETE, READY MIX 06/04/2013 Paid $629.00
PRC 1100 MAX22337 CONCRETE, READY MIX 06/04/2013 Paid $629.00
PRC 1100 MAX22285 CONCRETE, READY MIX 06/03/2013 Paid $440.30
PRC 1100 MAX22293 CONCRETE, READY MIX 06/03/2013 Paid $629.00
PRC 1100 MAX22295 CONCRETE, READY MIX 06/03/2013 Paid $629.00
PRC 1100 MAX22296 CONCRETE, READY MIX 06/03/2013 Paid $566.10
PRC 1100 MAX22298 CONCRETE, READY MIX 06/03/2013 Paid $629.00
PRC 1100 MAX22299 CONCRETE, READY MIX 06/03/2013 Paid $629.00
PRC 1100 MAX22300 CONCRETE, READY MIX 06/03/2013 Paid $629.00
PRC 1100 MAX22302 CONCRETE, READY MIX 06/03/2013 Paid $629.00
PRC 1100 MAX22304 CONCRETE, READY MIX 06/03/2013 Paid $440.30
PRC 1100 MAX22306 CONCRETE, READY MIX 06/03/2013 Paid $629.00
PRC 1100 MAX22169 CONCRETE, READY MIX 05/24/2013 Paid $1,069.30
PRC 1100 MAX22174 CONCRETE, READY MIX 05/24/2013 Paid $1,101.45
PRC 1100 MAX22178 CONCRETE, READY MIX 05/24/2013 Paid $1,101.45
PRC 1100 MAX22179 CONCRETE, READY MIX 05/24/2013 Paid $629.00
PRC 1100 MAX22181 CONCRETE, READY MIX 05/24/2013 Paid $524.50
PRC 1100 MAX22089 CONCRETE, READY MIX 05/21/2013 Paid $1,887.00
PRC 1100 MAX22050 CONCRETE, READY MIX 05/20/2013 Paid $524.50
PRC 1100 MAX22051 CONCRETE, READY MIX 05/20/2013 Paid $629.00
PRC 1100 MAX22052 CONCRETE, READY MIX 05/20/2013 Paid $410.85
PRC 1100 MAX21915 CONCRETE, READY MIX 05/14/2013 Paid $691.90
PRC 1100 MAX21940 CONCRETE, READY MIX 05/14/2013 Paid $298.80
PRC 1100 MAX21710 CONCRETE, READY MIX 04/30/2013 Paid $251.60
PRC 1100 MAX21554 CONCRETE, READY MIX 04/23/2013 Paid $373.50
PRC 1100 MAX21457 CONCRETE, READY MIX 04/17/2013 Paid $298.80
PRC 1100 MAX21377 CONCRETE, READY MIX 04/11/2013 Paid $839.20
PRC 1100 MAX21379 CONCRETE, READY MIX 04/11/2013 Paid $672.30
PRC 1100 MAX21062 CONCRETE, READY MIX 03/29/2013 Paid $377.40
PRC 1100 MAX20452 CONCRETE, READY MIX 02/21/2013 Paid $1,084.25
GAX 1100 13012907114 01/31/2013 Paid ($805.68)
PRC 1100 MAX20051 CONCRETE, READY MIX 01/31/2013 Paid $3,817.60
PRC 1100 MAX20052 CONCRETE, READY MIX 01/31/2013 Paid $1,558.20
PRC 1100 MAX19914 CONCRETE, READY MIX 01/25/2013 Paid $311.60
PRC 1100 MAX19844 CONCRETE, READY MIX 01/23/2013 Paid $298.80
PRC 1100 MAX19848 CONCRETE, READY MIX 01/23/2013 Paid $1,009.80
PRC 1100 MAX19832 CONCRETE, READY MIX 01/18/2013 Paid $1,610.10
PRC 1100 MAX19761 CONCRETE, READY MIX 01/16/2013 Paid $701.10
PRC 1100 MAX19763 CONCRETE, READY MIX 01/16/2013 Paid $1,636.20
PRC 1100 MAX19764 CONCRETE, READY MIX 01/16/2013 Paid $373.50
PRC 1100 MAX19766 CONCRETE, READY MIX 01/16/2013 Paid $350.55
PRC 1100 MAX19767 CONCRETE, READY MIX 01/16/2013 Paid $311.60
PRC 1100 MAX19769 CONCRETE, READY MIX 01/16/2013 Paid $636.30
PRC 1100 MAX19730 CONCRETE, READY MIX 01/15/2013 Paid $467.40
PRC 1100 MAX19733 CONCRETE, READY MIX 01/15/2013 Paid $909.00
PRC 1100 MAX19656 CONCRETE, READY MIX 01/11/2013 Paid $298.80
PRC 1100 MAX19478 CONCRETE, READY MIX 01/03/2013 Paid $311.60
PRC 1100 MAX19479 CONCRETE, READY MIX 01/03/2013 Paid $363.60
PRC 1100 MAX19483 CONCRETE, READY MIX 01/03/2013 Paid $1,129.70
PRC 1100 MAX19484 CONCRETE, READY MIX 01/03/2013 Paid $701.10
PRC 1100 MAX19491 CONCRETE, READY MIX 01/03/2013 Paid $734.30
PRC 1100 MAX19522 CONCRETE, READY MIX 01/03/2013 Paid $2,687.90
PRC 1100 MAX19523 CONCRETE, READY MIX 01/03/2013 Paid $298.80
PRC 1100 MAX19524 CONCRETE, READY MIX 01/03/2013 Paid $909.00
PRC 1100 MAX19525 CONCRETE, READY MIX 01/03/2013 Paid $311.60
PRC 1100 MAX19570 CONCRETE, READY MIX 01/02/2013 Paid $1,258.80
PRC 1100 MAX19302 CONCRETE, READY MIX 12/19/2012 Paid $524.50
PRC 1100 MAX19300 CONCRETE, READY MIX 12/18/2012 Paid $419.60
PRC 1100 MAX19305 CONCRETE, READY MIX 12/18/2012 Paid $298.80
PRC 1100 MAX19239 CONCRETE, READY MIX 12/17/2012 Paid $419.60
PRC 1100 MAX19240 CONCRETE, READY MIX 12/17/2012 Paid $419.60
PRC 1100 MAX19243 CONCRETE, READY MIX 12/17/2012 Paid $419.60
PRC 1100 MAX19245 CONCRETE, READY MIX 12/17/2012 Paid $524.50
PRC 1100 MAX19253 CONCRETE, READY MIX 12/17/2012 Paid $1,714.05
PRC 1100 MAX19255 CONCRETE, READY MIX 12/17/2012 Paid $1,532.20
PRC 1100 MAX19287 CONCRETE, READY MIX 12/17/2012 Paid $629.40
PRC 1100 MAX19211 CONCRETE, READY MIX 12/13/2012 Paid $419.60
PRC 1100 MAX19019 CONCRETE, READY MIX 11/30/2012 Paid $448.20
PRC 1100 MAX19020 CONCRETE, READY MIX 11/30/2012 Paid $1,376.40
PRC 1100 MAX19026 CONCRETE, READY MIX 11/30/2012 Paid $623.20
PRC 1100 MAX18919 CONCRETE, READY MIX 11/21/2012 Paid $2,103.60
PRC 1100 MAX18732 CONCRETE, READY MIX 11/09/2012 Paid $691.00
PRC 1100 MAX18737 CONCRETE, READY MIX 11/09/2012 Paid $428.45
PRC 1100 MAX18697 CONCRETE, READY MIX 11/08/2012 Paid $298.80
PRC 1100 MAX18699 CONCRETE, READY MIX 11/08/2012 Paid $298.80
PRC 1100 MAX18700 CONCRETE, READY MIX 11/08/2012 Paid $298.80
PRC 1100 MAX18604 CONCRETE, READY MIX 11/01/2012 Paid $846.80
PRC 1100 MAX18605 CONCRETE, READY MIX 11/01/2012 Paid $647.00
PRC 1100 MAX18506 CONCRETE, READY MIX 10/30/2012 Paid $298.80
PRC 1100 MAX18349 CONCRETE, READY MIX 10/25/2012 Paid $503.10
PRC 1100 MAX18350 CONCRETE, READY MIX 10/25/2012 Paid $559.00
PRC 1100 MAX18421 CONCRETE, READY MIX 10/25/2012 Paid $419.60
PRC 1100 MAX18422 CONCRETE, READY MIX 10/25/2012 Paid $779.00
PRC 1100 MAX18423 CONCRETE, READY MIX 10/25/2012 Paid $629.40
PRC 1100 MAX18244 CONCRETE, READY MIX 10/10/2012 Paid $2,441.20
PRC 1100 MAX18085 CONCRETE, READY MIX 10/03/2012 Paid $1,376.40
PRC 1100 MAX18086 CONCRETE, READY MIX 10/03/2012 Paid $524.50
PRC 1100 MAX18088 CONCRETE, READY MIX 10/03/2012 Paid $223.60
PRC 1100 MAX18089 CONCRETE, READY MIX 10/03/2012 Paid $524.50
PRC 1100 MAX18091 CONCRETE, READY MIX 10/03/2012 Paid $891.65
PRC 1100 MAX17995 CONCRETE, READY MIX 09/27/2012 Paid $563.15
PRC 1100 MAX17996 CONCRETE, READY MIX 09/27/2012 Paid $298.80
PRC 1100 MAX17997 CONCRETE, READY MIX 09/27/2012 Paid $2,843.75
PRC 1100 MAX17998 CONCRETE, READY MIX 09/27/2012 Paid $2,597.00
PRC 1100 MAX17999 CONCRETE, READY MIX 09/27/2012 Paid $818.10
PRC 1100 MAX18000 CONCRETE, READY MIX 09/27/2012 Paid $2,155.50
PRC 1100 MAX17870 CONCRETE, READY MIX 09/20/2012 Paid $1,066.25
PRC 1100 MAX17872 CONCRETE, READY MIX 09/20/2012 Paid $545.30
PRC 1100 MAX17624 CONCRETE, READY MIX 09/07/2012 Paid $298.80
PRC 1100 MAX17625 CONCRETE, READY MIX 09/07/2012 Paid $636.30
PRC 1100 MAX17628 CONCRETE, READY MIX 09/07/2012 Paid $1,610.10
PRC 1100 MAX17634 CONCRETE, READY MIX 09/07/2012 Paid $3,376.00
PRC 1100 MAX17638 CONCRETE, READY MIX 09/07/2012 Paid $1,986.80
PRC 1100 MAX17639 CONCRETE, READY MIX 09/07/2012 Paid $702.90
PRC 1100 MAX17551 CONCRETE, READY MIX 08/29/2012 Paid $971.10
PRC 1100 MAX17519 CONCRETE, READY MIX 08/28/2012 Paid $298.80
PRC 1100 MAX17521 CONCRETE, READY MIX 08/28/2012 Paid $373.50
PRC 1100 MAX17522 CONCRETE, READY MIX 08/28/2012 Paid $389.50
PRC 1100 MAX17434 CONCRETE, READY MIX 08/23/2012 Paid $373.50
PRC 1100 MAX17430 CONCRETE, READY MIX 08/22/2012 Paid $619.05
PRC 1100 MAX17242 CONCRETE, READY MIX 08/08/2012 Paid $2,519.10
PRC 1100 MAX17244 CONCRETE, READY MIX 08/08/2012 Paid $503.10
PRC 1100 MAX17216 CONCRETE, READY MIX 08/07/2012 Paid $675.20
PRC 1100 MAX17224 CONCRETE, READY MIX 08/07/2012 Paid $559.00
PRC 1100 MAX17149 CONCRETE, READY MIX 08/06/2012 Paid $298.80
PRC 1100 MAX17150 CONCRETE, READY MIX 08/06/2012 Paid $311.60
PRC 1100 MAX17158 CONCRETE, READY MIX 08/06/2012 Paid $2,519.10
PRC 1100 MAX17105 CONCRETE, READY MIX 08/01/2012 Paid $559.00
PRC 1100 MAX17106 CONCRETE, READY MIX 08/01/2012 Paid $2,597.00
PRC 1100 MAX17107 CONCRETE, READY MIX 08/01/2012 Paid $545.40
PRC 1100 MAX16936 CONCRETE, READY MIX 07/25/2012 Paid $298.80
PRC 1100 MAX16900 CONCRETE, READY MIX 07/23/2012 Paid $3,204.05
PRC 1100 MAX16791 CONCRETE, READY MIX 07/18/2012 Paid $1,449.80
PRC 1100 MAX11877 Ready-Mix Concrete 10/04/2011 Paid $867.90
PRC 1100 MAX11810 Ready-Mix Concrete 09/28/2011 Paid $2,584.50
PRC 1100 MAX11811 Ready-Mix Concrete 09/28/2011 Paid $2,079.40
PRC 1100 MAX11812 Ready-Mix Concrete 09/28/2011 Paid $1,550.70
PRC 1100 MAX11813 Ready-Mix Concrete 09/28/2011 Paid $2,742.30
PRC 1100 MAX11567 Ready-Mix Concrete 09/09/2011 Paid $268.40
PRC 1100 MAX11221 Ready-Mix Concrete 08/23/2011 Paid $469.70
PRC 1100 MAX11094 Ready-Mix Concrete 08/18/2011 Paid $268.40
PRC 1100 MAX11095 Ready-Mix Concrete 08/18/2011 Paid $603.90
PRC 1100 MAX11096 Ready-Mix Concrete 08/18/2011 Paid $603.90
PRC 1100 MAX11097 Ready-Mix Concrete 08/18/2011 Paid $536.80
PRC 1100 MAX10898 Ready-Mix Concrete 08/11/2011 Paid $2,801.30
PRC 1100 MAX10899 Ready-Mix Concrete 08/11/2011 Paid $827.40
PRC 1100 MAX10785 Ready-Mix Concrete 08/04/2011 Paid $966.70
PRC 1100 MAX10786 Ready-Mix Concrete 08/04/2011 Paid $966.70
PRC 1100 MAX10431 Ready-Mix Concrete 07/20/2011 Paid $441.35
PRC 1100 MAX10432 Ready-Mix Concrete 07/20/2011 Paid $407.40
PRC 1100 MAX10433 Ready-Mix Concrete 07/20/2011 Paid $475.30
PRC 1100 MAX10434 Ready-Mix Concrete 07/20/2011 Paid $339.50
PRC 1100 MAX10436 Ready-Mix Concrete 07/20/2011 Paid $441.35
PRC 1100 MAX10438 Ready-Mix Concrete 07/20/2011 Paid $1,025.70
PRC 1100 MAX10439 Ready-Mix Concrete 07/20/2011 Paid $271.60
PRC 1100 MAX10441 Ready-Mix Concrete 07/20/2011 Paid $271.60
PRC 1100 MAX10443 Ready-Mix Concrete 07/20/2011 Paid $789.00
PRC 1100 MAX10445 Ready-Mix Concrete 07/20/2011 Paid $1,878.10
PRC 1100 MAX10446 Ready-Mix Concrete 07/20/2011 Paid $1,325.80
PRC 1100 MAX10447 Ready-Mix Concrete 07/20/2011 Paid $966.70
PRC 1100 MAX10500 Ready-Mix Concrete 07/20/2011 Paid $1,676.80
PRC 1100 MAX10403 Ready-Mix Concrete 07/13/2011 Paid $1,337.60
PRC 1100 MAX10408 Ready-Mix Concrete 07/13/2011 Paid $946.80
PRC 1100 MAX10405 Ready-Mix Concrete 07/11/2011 Paid $1,735.80
PRC 1100 MAX10137 Ready-Mix Concrete 06/29/2011 Paid $4,136.60
PRC 1100 MAX10152 Ready-Mix Concrete 06/29/2011 Paid $335.50
PRC 1100 MAX10162 Ready-Mix Concrete 06/29/2011 Paid $671.00
PRC 1100 MAX10163 Ready-Mix Concrete 06/29/2011 Paid $469.70
PRC 1100 MAX10077 Ready-Mix Concrete 06/28/2011 Paid $631.20
PRC 1100 MAX10067 Ready-Mix Concrete 06/24/2011 Paid $1,735.80
PRC 1100 MAX10068 Ready-Mix Concrete 06/24/2011 Paid $1,814.70
PRC 1100 MAX10069 Ready-Mix Concrete 06/24/2011 Paid $1,025.70
PRC 1100 MAX10070 Ready-Mix Concrete 06/24/2011 Paid $1,814.70
PRC 1100 MAX10071 Ready-Mix Concrete 06/24/2011 Paid $1,893.60
PRC 1100 MAX10072 Ready-Mix Concrete 06/24/2011 Paid $789.00
PRC 1100 MAX10073 Ready-Mix Concrete 06/24/2011 Paid $1,025.70
PRC 1100 MAX10074 Ready-Mix Concrete 06/24/2011 Paid $1,459.65
PRC 1100 MAX10075 Ready-Mix Concrete 06/24/2011 Paid $1,420.20
PRC 1100 MAX10076 Ready-Mix Concrete 06/24/2011 Paid $271.60
PRC 1100 MAX9881 Ready-Mix Concrete 06/20/2011 Paid $1,065.15
PRC 1100 MAX9882 Ready-Mix Concrete 06/20/2011 Paid $335.50
PRC 1100 MAX9883 Ready-Mix Concrete 06/20/2011 Paid $335.50
PRC 1100 MAX9884 Ready-Mix Concrete 06/20/2011 Paid $670.80
PRC 1100 MAX9885 Ready-Mix Concrete 06/20/2011 Paid $469.70
PRC 1100 MAX9886 Ready-Mix Concrete 06/20/2011 Paid $271.60
PRC 1100 MAX9888 Ready-Mix Concrete 06/20/2011 Paid $268.40
PRC 1100 MAX9889 Ready-Mix Concrete 06/20/2011 Paid $369.05
PRC 1100 MAX9890 Ready-Mix Concrete 06/20/2011 Paid $402.60
PRC 1100 MAX9891 Ready-Mix Concrete 06/20/2011 Paid $469.70
PRC 1100 MAX9955 Ready-Mix Concrete 06/20/2011 Paid $402.60
PRC 1100 MAX9956 Ready-Mix Concrete 06/20/2011 Paid $369.05
PRC 1100 MAX9958 Ready-Mix Concrete 06/20/2011 Paid $271.60
PRC 1100 MAX9968 Ready-Mix Concrete 06/20/2011 Paid $1,025.70
PRC 1100 MAX9970 Ready-Mix Concrete 06/20/2011 Paid $402.60
PRC 1100 MAX9971 Ready-Mix Concrete 06/20/2011 Paid $603.90
PRC 1100 MAX9972 Ready-Mix Concrete 06/20/2011 Paid $631.20
PRC 1100 MAX9973 Ready-Mix Concrete 06/20/2011 Paid $867.90
PRC 1100 MAX9974 Ready-Mix Concrete 06/20/2011 Paid $1,104.60
PRC 1100 MAX9858 Ready-Mix Concrete 06/15/2011 Paid $2,445.90
PRC 1100 MAX9859 Ready-Mix Concrete 06/15/2011 Paid $335.50
PRC 1100 MAX9860 Ready-Mix Concrete 06/15/2011 Paid $369.05
PRC 1100 MAX9861 Ready-Mix Concrete 06/15/2011 Paid $1,183.50
PRC 1100 MAX9862 Ready-Mix Concrete 06/15/2011 Paid $603.90
PRC 1100 MAX9863 Ready-Mix Concrete 06/15/2011 Paid $1,341.30
PRC 1100 MAX9864 Ready-Mix Concrete 06/15/2011 Paid $1,656.90
PRC 1100 MAX9848 Ready-Mix Concrete 06/10/2011 Paid $335.50
PRC 1100 MAX9667 Ready-Mix Concrete 05/27/2011 Paid $402.60
PRC 1100 MAX9693 Ready-Mix Concrete 05/27/2011 Paid $872.30
PRC 1100 MAX9694 Ready-Mix Concrete 05/27/2011 Paid $1,263.50
PRC 1100 MAX9695 Ready-Mix Concrete 05/27/2011 Paid $1,787.40
PRC 1100 MAX9696 Ready-Mix Concrete 05/27/2011 Paid $1,191.60
PRC 1100 MAX9697 Ready-Mix Concrete 05/27/2011 Paid $552.30
PRC 1100 MAX9467 Ready-Mix Concrete 05/18/2011 Paid $335.40
PRC 1100 MAX9469 Ready-Mix Concrete 05/18/2011 Paid $305.55
PRC 1100 MAX9509 Ready-Mix Concrete 05/18/2011 Paid $436.15
PRC 1100 MAX9510 Ready-Mix Concrete 05/18/2011 Paid $946.80
PRC 1100 MAX9511 Ready-Mix Concrete 05/18/2011 Paid $1,814.70
PRC 1100 MAX9512 Ready-Mix Concrete 05/18/2011 Paid $1,025.70
PRC 1100 MAX9513 Ready-Mix Concrete 05/18/2011 Paid $268.40
PRC 1100 MAX9465 Ready-Mix Concrete 05/16/2011 Paid $335.50
PRC 1100 MAX9466 Ready-Mix Concrete 05/16/2011 Paid $867.90
PRC 1100 MAX9334 Ready-Mix Concrete 05/13/2011 Paid $1,578.00
PRC 1100 MAX9335 Ready-Mix Concrete 05/13/2011 Paid $1,499.10
PRC 1100 MAX9336 Ready-Mix Concrete 05/13/2011 Paid $512.85
PRC 1100 MAX9337 Ready-Mix Concrete 05/13/2011 Paid $1,025.70
PRC 1100 MAX9338 Ready-Mix Concrete 05/13/2011 Paid $867.90
PRC 1100 MAX9339 Ready-Mix Concrete 05/13/2011 Paid $907.35
PRC 1100 MAX9347 Ready-Mix Concrete 05/13/2011 Paid $1,499.10
PRC 1100 MAX9370 Ready-Mix Concrete 05/13/2011 Paid $670.80
PRC 1100 MAX9381 Ready-Mix Concrete 05/13/2011 Paid $402.60
PRC 1100 MAX9389 Ready-Mix Concrete 05/13/2011 Paid $335.50
PRC 1100 MAX9392 Ready-Mix Concrete 05/13/2011 Paid $369.05
PRC 1100 MAX9394 Ready-Mix Concrete 05/13/2011 Paid $335.50
PRC 1100 MAX9297 Ready-Mix Concrete 05/11/2011 Paid $1,025.70
PRC 1100 MAX9152 Ready-Mix Concrete 05/02/2011 Paid $335.50
PRC 1100 MAX9154 Ready-Mix Concrete 05/02/2011 Paid $369.05
PRC 1100 MAX9206 Ready-Mix Concrete 05/02/2011 Paid $268.40
PRC 1100 MAX9142 Ready-Mix Concrete 04/29/2011 Paid $789.00
PRC 1100 MAX9144 Ready-Mix Concrete 04/29/2011 Paid $1,025.70
PRC 1100 MAX9146 Ready-Mix Concrete 04/29/2011 Paid $828.45
PRC 1100 MAX9147 Ready-Mix Concrete 04/29/2011 Paid $1,656.90
PRC 1100 MAX9148 Ready-Mix Concrete 04/29/2011 Paid $946.80
PRC 1100 MAX9149 Ready-Mix Concrete 04/29/2011 Paid $710.10
PRC 1100 MAX9150 Ready-Mix Concrete 04/29/2011 Paid $543.20
PRC 1100 MAX9158 Ready-Mix Concrete 04/29/2011 Paid $946.80
PRC 1100 MAX9159 Ready-Mix Concrete 04/29/2011 Paid $1,025.70
PRC 1100 MAX9160 Ready-Mix Concrete 04/29/2011 Paid $867.90
PRC 1100 MAX9161 Ready-Mix Concrete 04/29/2011 Paid $789.00
PRC 1100 MAX9163 Ready-Mix Concrete 04/29/2011 Paid $946.80
PRC 1100 MAX9173 Ready-Mix Concrete 04/29/2011 Paid $1,025.70
PRC 1100 MAX9179 Ready-Mix Concrete 04/29/2011 Paid $1,696.35
PRC 1100 MAX9182 Ready-Mix Concrete 04/29/2011 Paid $946.80
PRC 1100 MAX9183 Ready-Mix Concrete 04/29/2011 Paid $789.00
PRC 1100 MAX9184 Ready-Mix Concrete 04/29/2011 Paid $946.80
PRC 1100 MAX9185 Ready-Mix Concrete 04/29/2011 Paid $946.80
PRC 1100 MAX9187 Ready-Mix Concrete 04/29/2011 Paid $710.10
PRC 1100 MAX9076 Ready-Mix Concrete 04/26/2011 Paid $369.05
PRC 1100 MAX9077 Ready-Mix Concrete 04/26/2011 Paid $335.50
PRC 1100 MAX9078 Ready-Mix Concrete 04/26/2011 Paid $369.05
PRC 1100 MAX9079 Ready-Mix Concrete 04/26/2011 Paid $301.95
PRC 1100 MAX9080 Ready-Mix Concrete 04/26/2011 Paid $268.40
PRC 1100 MAX9081 Ready-Mix Concrete 04/26/2011 Paid $402.60
PRC 1100 MAX9083 Ready-Mix Concrete 04/26/2011 Paid $268.40
PRC 1100 MAX9085 Ready-Mix Concrete 04/26/2011 Paid $402.60
PRC 1100 MAX9086 Ready-Mix Concrete 04/26/2011 Paid $268.40
PRC 1100 MAX9087 Ready-Mix Concrete 04/26/2011 Paid $402.60
PRC 1100 MAX9088 Ready-Mix Concrete 04/26/2011 Paid $469.70
PRC 1100 MAX9089 Ready-Mix Concrete 04/26/2011 Paid $268.40
PRC 1100 MAX9090 Ready-Mix Concrete 04/26/2011 Paid $268.40
PRC 1100 MAX9091 Ready-Mix Concrete 04/26/2011 Paid $671.00
PRC 1100 MAX9000 Ready-Mix Concrete 04/25/2011 Paid $536.80
PRC 1100 MAX9049 Ready-Mix Concrete 04/22/2011 Paid $268.40
PRC 1100 MAX9057 Ready-Mix Concrete 04/22/2011 Paid $223.60
PRC 1100 MAX8828 Ready-Mix Concrete 04/18/2011 Paid $946.80
PRC 1100 MAX8829 Ready-Mix Concrete 04/18/2011 Paid $789.00
PRC 1100 MAX8830 Ready-Mix Concrete 04/18/2011 Paid $402.60
PRC 1100 MAX8831 Ready-Mix Concrete 04/18/2011 Paid $3,858.25
PRC 1100 MAX8832 Ready-Mix Concrete 04/18/2011 Paid $671.00
PRC 1100 MAX8833 Ready-Mix Concrete 04/18/2011 Paid $771.65
PRC 1100 MAX8834 Ready-Mix Concrete 04/18/2011 Paid $1,285.70
PRC 1100 MAX8836 Ready-Mix Concrete 04/18/2011 Paid $536.80
PRC 1100 MAX8845 Ready-Mix Concrete 04/18/2011 Paid $710.10
PRC 1100 MAX8576 Ready-Mix Concrete 04/05/2011 Paid $614.90
PRC 1100 MAX8577 Ready-Mix Concrete 04/05/2011 Paid $670.80
PRC 1100 MAX8584 Ready-Mix Concrete 04/05/2011 Paid $671.00
PRC 1100 MAX8585 Ready-Mix Concrete 04/05/2011 Paid $268.40
PRC 1100 MAX8503 Ready-Mix Concrete 04/04/2011 Paid $559.00
PRC 1100 MAX8511 Ready-Mix Concrete 03/31/2011 Paid $339.50
PRC 1100 MAX8502 Ready-Mix Concrete 03/30/2011 Paid $1,342.00
PRC 1100 MAX8504 Ready-Mix Concrete 03/30/2011 Paid $614.90
PRC 1100 MAX8512 Ready-Mix Concrete 03/30/2011 Paid $603.80
PRC 1100 MAX8229 Ready-Mix Concrete 03/14/2011 Paid $394.50
PRC 1100 MAX8228 Ready-Mix Concrete 03/10/2011 Paid $1,893.60
PRC 1100 MAX8165 Ready-Mix Concrete 03/09/2011 Paid $1,006.30
PRC 1100 MAX8166 Ready-Mix Concrete 03/09/2011 Paid $1,342.00
PRC 1100 MAX8167 Ready-Mix Concrete 03/09/2011 Paid $268.40
PRC 1100 MAX8168 Ready-Mix Concrete 03/09/2011 Paid $271.60
PRC 1100 MAX8112 Ready-Mix Concrete 03/04/2011 Paid $369.05
PRM 1100 11030215110 Ready-Mix Concrete 03/03/2011 Paid $469.70
PRM 1100 11021813899 Ready-Mix Concrete 02/22/2011 Paid $2,996.80
PRC 1100 MAX7768 Ready-Mix Concrete 02/15/2011 Paid $805.20
PRC 1100 MAX7771 Ready-Mix Concrete 02/15/2011 Paid $268.40
PRC 1100 MAX7772 Ready-Mix Concrete 02/15/2011 Paid $315.60
PRM 1100 10121507827 Ready-Mix Concrete 12/16/2010 Paid $540.00
PRM 1100 10121307675 Ready-Mix Concrete 12/14/2010 Paid $1,006.50
PRM 1100 10121007567 Ready-Mix Concrete 12/13/2010 Paid $626.20
PRM 1100 10113006220 Ready-Mix Concrete 12/01/2010 Paid $1,230.10
PRM 1100 10111905625 Ready-Mix Concrete 11/22/2010 Paid $1,073.60
PRM 1100 10111805464 Ready-Mix Concrete 11/19/2010 Paid $540.00
PRM 1100 10111705267 Ready-Mix Concrete 11/18/2010 Paid $848.75
PRM 1100 10110804334 Ready-Mix Concrete 11/09/2010 Paid $1,990.20
PRM 1100 10110203790 Ready-Mix Concrete 11/03/2010 Paid $2,038.50
PRM 1100 10102903537 Ready-Mix Concrete 11/01/2010 Paid $339.50
PRM 1100 10102703190 Ready-Mix Concrete 10/28/2010 Paid $3,720.45
PRM 1100 10101801969 Ready-Mix Concrete 10/19/2010 Paid $603.90
PRM 1100 10100600580 Ready-Mix Concrete 10/07/2010 Paid $315.60
PRM 1100 10100500393 Ready-Mix Concrete 10/06/2010 Paid $2,964.90
PRM 1100 10092838682 Ready-Mix Concrete 09/29/2010 Paid $1,306.00
PRM 1100 10092438436 Ready-Mix Concrete 09/27/2010 Paid $2,516.25
PRM 1100 10092137999 Ready-Mix Concrete 09/22/2010 Paid $666.75
PRM 1100 10092037800 Ready-Mix Concrete 09/21/2010 Paid $2,366.90
PRM 1100 10092037801 Ready-Mix Concrete 09/21/2010 Paid $5,670.40
PRM 1100 10091537244 Ready-Mix Concrete 09/16/2010 Paid $4,514.10
PRM 1100 10090836381 Ready-Mix Concrete 09/09/2010 Paid $3,704.40
PRM 1100 10090235851 Ready-Mix Concrete 09/03/2010 Paid $2,122.40
PRM 1100 10090235852 Ready-Mix Concrete 09/03/2010 Paid $1,863.65
PRM 1100 10082735215 Ready-Mix Concrete 08/30/2010 Paid $1,127.20
PRM 1100 10081233549 Ready-Mix Concrete 08/13/2010 Paid $3,124.40
PRM 1100 10073032294 Ready-Mix Concrete 08/02/2010 Paid $3,510.90
PRM 1100 10072932144 Ready-Mix Concrete 07/30/2010 Paid $4,122.70
PRM 1100 10072731769 Ready-Mix Concrete 07/28/2010 Paid $2,016.75
PRM 1100 10072331479 Ready-Mix Concrete 07/26/2010 Paid $670.90
PRM 1100 10072131096 Ready-Mix Concrete 07/22/2010 Paid $1,476.20
PRM 1100 10071530498 Ready-Mix Concrete 07/16/2010 Paid $533.40
PRM 1100 10070829686 Ready-Mix Concrete 07/09/2010 Paid $757.00
PRM 1100 10070629427 Ready-Mix Concrete 07/07/2010 Paid $936.50
PRM 1100 10070229242 Ready-Mix Concrete 07/06/2010 Paid $894.50
PRM 1100 10070129056 Ready-Mix Concrete 07/02/2010 Paid $4,079.05
PRM 1100 10062928804 Ready-Mix Concrete 06/30/2010 Paid $2,475.60
PRM 1100 10062227854 Ready-Mix Concrete 06/23/2010 Paid $2,055.80
PRM 1100 10061727388 Ready-Mix Concrete 06/18/2010 Paid $3,519.30
PRM 1100 10061527089 Ready-Mix Concrete 06/16/2010 Paid $3,460.90
PRM 1100 10061126873 Ready-Mix Concrete 06/14/2010 Paid $2,162.00
PRM 1100 10061026685 Ready-Mix Concrete 06/11/2010 Paid $2,260.80
PRM 1100 10060325981 Ready-Mix Concrete 06/04/2010 Paid $4,973.30
PRM 1100 10052825481 Ready-Mix Concrete 06/01/2010 Paid $8,145.40
PRM 1100 10052524997 Ready-Mix Concrete 05/26/2010 Paid $503.10
PRM 1100 10052424799 Ready-Mix Concrete 05/25/2010 Paid $1,597.90
PRM 1100 10052224645 Ready-Mix Concrete 05/24/2010 Paid $741.30
PRM 1100 10051323952 Ready-Mix Concrete 05/14/2010 Paid $623.05
PRM 1100 10051123554 Ready-Mix Concrete 05/12/2010 Paid $536.80
PRM 1100 10050623205 Ready-Mix Concrete 05/07/2010 Paid $1,312.15
PRM 1100 10043022601 Ready-Mix Concrete 05/03/2010 Paid $1,845.25
PRM 1100 10042922466 Ready-Mix Concrete 04/30/2010 Paid $1,006.50
PRM 1100 10042321887 Ready-Mix Concrete 04/26/2010 Paid $3,196.10
PRM 1100 10042121723 Ready-Mix Concrete 04/22/2010 Paid $841.70
PRM 1100 10041621470 Ready-Mix Concrete 04/19/2010 Paid $2,512.20
PRM 1100 10041320994 Ready-Mix Concrete 04/14/2010 Paid $805.20
PRM 1100 10040119889 Ready-Mix Concrete 04/02/2010 Paid $1,758.70
PRM 1100 10032619235 Ready-Mix Concrete 03/29/2010 Paid $726.70
PRM 1100 10032519060 Ready-Mix Concrete 03/26/2010 Paid $726.70
PRM 1100 10032418923 Ready-Mix Concrete 03/25/2010 Paid $3,700.65
PRM 1100 10032318727 Ready-Mix Concrete 03/24/2010 Paid $315.60
PRM 1100 10031918377 Ready-Mix Concrete 03/22/2010 Paid $271.60
PRM 1100 10031617894 Ready-Mix Concrete 03/17/2010 Paid $271.60
PRM 1100 10031017004 Ready-Mix Concrete 03/11/2010 Paid $3,773.95
PRM 1100 10030916757 Ready-Mix Concrete 03/10/2010 Paid $745.00
PRM 1100 10030416356 Ready-Mix Concrete 03/05/2010 Paid $2,057.60
PRM 1100 10022415163 Ready-Mix Concrete 02/25/2010 Paid $603.90
PRM 1100 10022214805 Ready-Mix Concrete 02/23/2010 Paid $718.20
PRM 1100 10021013813 Ready-Mix Concrete 02/11/2010 Paid $1,677.40
PRM 1100 10020112621 Ready-Mix Concrete 02/02/2010 Paid $2,265.60
PRM 1100 10012712101 Ready-Mix Concrete 01/28/2010 Paid $671.00
PRM 1100 10012511804 Ready-Mix Concrete 01/26/2010 Paid $726.70
PRM 1100 10011310744 Ready-Mix Concrete 01/14/2010 Paid $811.60
PRM 1100 10011110407 Ready-Mix Concrete 01/12/2010 Paid $492.00
PRM 1100 10010710114 Ready-Mix Concrete 01/08/2010 Paid $793.00
PRM 1100 09123109300 Ready-Mix Concrete 01/04/2010 Paid $842.39
PRM 1100 09121607996 Ready-Mix Concrete 12/17/2009 Paid $3,359.22
PRM 1100 09121507853 Ready-Mix Concrete 12/16/2009 Paid $5,316.95
PRM 1100 09112305847 Ready-Mix Concrete 11/24/2009 Paid $8,213.81