PAYMENT REQUEST
CATEGORY | COMMODITIES |
---|---|
EXPENSE CATEGORY | CEMENT/CONCRETE |
DEPARTMENT | AUSTIN ENERGY |
FUND | E-TRANSMISSION CAPITAL |
PROGRAM | FY2001 TRANSMISSION PARENT |
ACTIVITY | TRANSMISSION |
PAYEE | OLDCASTLE APG TEXAS |
PAYMENT REQUEST | Select a payment request. |
PAYMENT REQUEST | DESCRIPTION | CHECK DATE | CHECK STATUS | AMOUNT |
---|---|---|---|---|
PRM 1100 15061127557 | CONCRETE, READY MIX | 06/12/2015 | Paid | $622.71 |
PRM 1100 15060326648 | CONCRETE, READY MIX | 06/04/2015 | Paid | $896.28 |
PRC 1100 MAX33383 | CONCRETE, READY MIX | 12/18/2014 | Paid | $622.71 |
PRC 1100 MAX32843 | CONCRETE, READY MIX | 11/13/2014 | Paid | $1,038.51 |
PRC 1100 MAX32742 | CONCRETE, READY MIX | 11/06/2014 | Paid | $345.95 |
PRC 1100 MAX32618 | CONCRETE, READY MIX | 11/04/2014 | Paid | $514.14 |
PRC 1100 MAX32619 | CONCRETE, READY MIX | 11/04/2014 | Paid | $1,038.51 |
PRC 1100 MAX32620 | CONCRETE, READY MIX | 11/04/2014 | Paid | $1,245.42 |
PRC 1100 MAX32621 | CONCRETE, READY MIX | 11/04/2014 | Paid | $576.95 |
PRC 1100 MAX32622 | CONCRETE, READY MIX | 11/04/2014 | Paid | $622.71 |
PRC 1100 MAX32623 | CONCRETE, READY MIX | 11/04/2014 | Paid | $2,421.65 |
PRC 1100 MAX32688 | CONCRETE, READY MIX | 11/04/2014 | Paid | $739.53 |
PRC 1100 MAX32607 | CONCRETE, READY MIX | 11/03/2014 | Paid | $1,038.51 |
PRC 1100 MAX32543 | CONCRETE, READY MIX | 10/30/2014 | Paid | $1,038.51 |
PRC 1100 MAX32544 | CONCRETE, READY MIX | 10/30/2014 | Paid | $2,019.33 |
PRC 1100 MAX32545 | CONCRETE, READY MIX | 10/30/2014 | Paid | $2,077.02 |
PRC 1100 MAX32455 | CONCRETE, READY MIX | 10/28/2014 | Paid | $1,479.06 |
PRC 1100 MAX32456 | CONCRETE, READY MIX | 10/28/2014 | Paid | $514.14 |
PRC 1100 MAX32457 | CONCRETE, READY MIX | 10/28/2014 | Paid | $1,542.42 |
PRC 1100 MAX32076 | CONCRETE, READY MIX | 10/10/2014 | Paid | $514.14 |
PRC 1100 MAX31748 | CONCRETE, READY MIX | 09/26/2014 | Paid | $2,077.02 |
PRC 1100 MAX31640 | CONCRETE, READY MIX | 09/23/2014 | Paid | $622.71 |
PRC 1100 MAX31641 | CONCRETE, READY MIX | 09/23/2014 | Paid | $2,077.02 |
PRC 1100 MAX31642 | CONCRETE, READY MIX | 09/23/2014 | Paid | $1,038.51 |
PRC 1100 MAX31643 | CONCRETE, READY MIX | 09/23/2014 | Paid | $2,077.02 |
PRC 1100 MAX31644 | CONCRETE, READY MIX | 09/23/2014 | Paid | $1,788.55 |
PRC 1100 MAX31645 | CONCRETE, READY MIX | 09/23/2014 | Paid | $2,077.02 |
PRC 1100 MAX31646 | CONCRETE, READY MIX | 09/23/2014 | Paid | $1,038.51 |
PRC 1100 MAX31678 | CONCRETE, READY MIX | 09/23/2014 | Paid | $771.21 |
PRC 1100 MAX31683 | CONCRETE, READY MIX | 09/23/2014 | Paid | $629.00 |
PRC 1100 MAX31684 | CONCRETE, READY MIX | 09/23/2014 | Paid | $566.10 |
PRC 1100 MAX31587 | CONCRETE, READY MIX | 09/22/2014 | Paid | $1,314.61 |
PRC 1100 MAX31535 | CONCRETE, READY MIX | 09/16/2014 | Paid | $1,961.63 |
PRC 1100 MAX31501 | CONCRETE, READY MIX | 09/15/2014 | Paid | $1,038.51 |
PRC 1100 MAX31502 | CONCRETE, READY MIX | 09/15/2014 | Paid | $1,038.51 |
PRC 1100 MAX31503 | CONCRETE, READY MIX | 09/15/2014 | Paid | $1,038.51 |
PRC 1100 MAX31447 | CONCRETE, READY MIX | 09/12/2014 | Paid | $896.28 |
PRC 1100 MAX31448 | CONCRETE, READY MIX | 09/12/2014 | Paid | $629.00 |
PRC 1100 MAX31458 | CONCRETE, READY MIX | 09/12/2014 | Paid | $1,245.42 |
PRC 1100 MAX31306 | CONCRETE, READY MIX | 09/08/2014 | Paid | $1,661.22 |
PRC 1100 MAX31307 | CONCRETE, READY MIX | 09/08/2014 | Paid | $1,245.42 |
PRC 1100 MAX31278 | CONCRETE, READY MIX | 09/03/2014 | Paid | $2,077.02 |
PRC 1100 MAX31279 | CONCRETE, READY MIX | 09/03/2014 | Paid | $2,705.34 |
PRC 1100 MAX31240 | CONCRETE, READY MIX | 09/02/2014 | Paid | $2,699.73 |
PRC 1100 MAX31180 | CONCRETE, READY MIX | 08/29/2014 | Paid | $3,115.53 |
PRC 1100 MAX31181 | CONCRETE, READY MIX | 08/29/2014 | Paid | $1,245.42 |
PRC 1100 MAX31182 | CONCRETE, READY MIX | 08/29/2014 | Paid | $2,077.02 |
PRC 1100 MAX31183 | CONCRETE, READY MIX | 08/29/2014 | Paid | $1,245.42 |
PRC 1100 MAX30939 | CONCRETE, READY MIX | 08/21/2014 | Paid | $1,961.63 |
PRC 1100 MAX30941 | CONCRETE, READY MIX | 08/21/2014 | Paid | $342.76 |
PRC 1100 MAX30942 | CONCRETE, READY MIX | 08/21/2014 | Paid | $2,077.02 |
PRC 1100 MAX30452 | CONCRETE, READY MIX | 07/30/2014 | Paid | $1,153.90 |
PRC 1100 MAX30509 | CONCRETE, READY MIX | 07/30/2014 | Paid | $1,136.85 |
PRC 1100 MAX30510 | CONCRETE, READY MIX | 07/30/2014 | Paid | $1,206.04 |
PRC 1100 MAX29835 | CONCRETE, READY MIX | 07/09/2014 | Paid | $657.36 |
PRC 1100 MAX29772 | CONCRETE, READY MIX | 07/07/2014 | Paid | $1,038.51 |
PRC 1100 MAX29646 | CONCRETE, READY MIX | 06/27/2014 | Paid | $996.55 |
PRC 1100 MAX28989 | CONCRETE, READY MIX | 05/23/2014 | Paid | $566.10 |
PRC 1100 MAX29000 | CONCRETE, READY MIX | 05/23/2014 | Paid | $944.10 |
PRC 1100 MAX29002 | CONCRETE, READY MIX | 05/23/2014 | Paid | $734.30 |
PRC 1100 MAX29006 | CONCRETE, READY MIX | 05/23/2014 | Paid | $701.10 |
PRC 1100 MAX29007 | CONCRETE, READY MIX | 05/23/2014 | Paid | $566.10 |
PRC 1100 MAX29008 | CONCRETE, READY MIX | 05/23/2014 | Paid | $566.10 |
PRC 1100 MAX29009 | CONCRETE, READY MIX | 05/23/2014 | Paid | $566.10 |
PRC 1100 MAX29010 | CONCRETE, READY MIX | 05/23/2014 | Paid | $629.00 |
PRC 1100 MAX29011 | CONCRETE, READY MIX | 05/23/2014 | Paid | $629.00 |
PRC 1100 MAX29012 | CONCRETE, READY MIX | 05/23/2014 | Paid | $566.10 |
PRC 1100 MAX29013 | CONCRETE, READY MIX | 05/23/2014 | Paid | $566.10 |
PRC 1100 MAX29014 | CONCRETE, READY MIX | 05/23/2014 | Paid | $566.10 |
PRC 1100 MAX29046 | CONCRETE, READY MIX | 05/23/2014 | Paid | $566.10 |
PRC 1100 MAX29047 | CONCRETE, READY MIX | 05/23/2014 | Paid | $566.10 |
PRC 1100 MAX29048 | CONCRETE, READY MIX | 05/23/2014 | Paid | $566.10 |
PRC 1100 MAX29049 | CONCRETE, READY MIX | 05/23/2014 | Paid | $566.10 |
PRC 1100 MAX29050 | CONCRETE, READY MIX | 05/23/2014 | Paid | $566.10 |
PRC 1100 MAX29051 | CONCRETE, READY MIX | 05/23/2014 | Paid | $701.10 |
PRC 1100 MAX29055 | CONCRETE, READY MIX | 05/23/2014 | Paid | $629.00 |
PRC 1100 MAX28635 | CONCRETE, READY MIX | 05/07/2014 | Paid | $629.00 |
PRC 1100 MAX28637 | CONCRETE, READY MIX | 05/07/2014 | Paid | $629.00 |
PRC 1100 MAX28638 | CONCRETE, READY MIX | 05/07/2014 | Paid | $1,195.10 |
PRC 1100 MAX28639 | CONCRETE, READY MIX | 05/07/2014 | Paid | $623.20 |
PRC 1100 MAX28640 | CONCRETE, READY MIX | 05/07/2014 | Paid | $944.10 |
PRC 1100 MAX28642 | CONCRETE, READY MIX | 05/07/2014 | Paid | $623.20 |
PRC 1100 MAX28507 | CONCRETE, READY MIX | 05/06/2014 | Paid | $629.00 |
PRC 1100 MAX28512 | CONCRETE, READY MIX | 05/06/2014 | Paid | $779.00 |
PRC 1100 MAX28513 | CONCRETE, READY MIX | 05/06/2014 | Paid | $701.10 |
PRC 1100 MAX28514 | CONCRETE, READY MIX | 05/06/2014 | Paid | $311.60 |
PRC 1100 MAX28515 | CONCRETE, READY MIX | 05/06/2014 | Paid | $629.00 |
PRC 1100 MAX28516 | CONCRETE, READY MIX | 05/06/2014 | Paid | $944.10 |
PRC 1100 MAX28517 | CONCRETE, READY MIX | 05/06/2014 | Paid | $839.20 |
PRC 1100 MAX28518 | CONCRETE, READY MIX | 05/06/2014 | Paid | $944.10 |
PRC 1100 MAX28519 | CONCRETE, READY MIX | 05/06/2014 | Paid | $839.20 |
PRC 1100 MAX28520 | CONCRETE, READY MIX | 05/06/2014 | Paid | $629.00 |
PRC 1100 MAX28521 | CONCRETE, READY MIX | 05/06/2014 | Paid | $566.10 |
PRC 1100 MAX28524 | CONCRETE, READY MIX | 05/06/2014 | Paid | $566.10 |
PRC 1100 MAX28526 | CONCRETE, READY MIX | 05/06/2014 | Paid | $701.10 |
PRC 1100 MAX28527 | CONCRETE, READY MIX | 05/06/2014 | Paid | $623.20 |
PRC 1100 MAX28529 | CONCRETE, READY MIX | 05/06/2014 | Paid | $629.00 |
PRC 1100 MAX28301 | CONCRETE, READY MIX | 04/29/2014 | Paid | $629.40 |
PRC 1100 MAX28302 | CONCRETE, READY MIX | 04/29/2014 | Paid | $839.20 |
PRC 1100 MAX28303 | CONCRETE, READY MIX | 04/29/2014 | Paid | $503.20 |
PRC 1100 MAX28304 | CONCRETE, READY MIX | 04/29/2014 | Paid | $472.05 |
PRC 1100 MAX28348 | CONCRETE, READY MIX | 04/29/2014 | Paid | $701.10 |
PRC 1100 MAX28349 | CONCRETE, READY MIX | 04/29/2014 | Paid | $629.00 |
PRC 1100 MAX28350 | CONCRETE, READY MIX | 04/29/2014 | Paid | $944.10 |
PRC 1100 MAX28351 | CONCRETE, READY MIX | 04/29/2014 | Paid | $629.40 |
PRC 1100 MAX28352 | CONCRETE, READY MIX | 04/29/2014 | Paid | $597.55 |
PRC 1100 MAX28353 | CONCRETE, READY MIX | 04/29/2014 | Paid | $440.30 |
PRC 1100 MAX28355 | CONCRETE, READY MIX | 04/29/2014 | Paid | $629.00 |
PRC 1100 MAX28356 | CONCRETE, READY MIX | 04/29/2014 | Paid | $839.20 |
PRC 1100 MAX28357 | CONCRETE, READY MIX | 04/29/2014 | Paid | $566.10 |
PRC 1100 MAX28358 | CONCRETE, READY MIX | 04/29/2014 | Paid | $566.10 |
PRC 1100 MAX28359 | CONCRETE, READY MIX | 04/29/2014 | Paid | $701.10 |
PRC 1100 MAX28284 | CONCRETE, READY MIX | 04/23/2014 | Paid | $734.30 |
PRC 1100 MAX28285 | CONCRETE, READY MIX | 04/23/2014 | Paid | $597.55 |
PRC 1100 MAX28287 | CONCRETE, READY MIX | 04/23/2014 | Paid | $944.10 |
PRC 1100 MAX28251 | CONCRETE, READY MIX | 04/22/2014 | Paid | $944.10 |
PRC 1100 MAX28252 | CONCRETE, READY MIX | 04/22/2014 | Paid | $597.55 |
PRC 1100 MAX28253 | CONCRETE, READY MIX | 04/22/2014 | Paid | $944.10 |
PRC 1100 MAX28254 | CONCRETE, READY MIX | 04/22/2014 | Paid | $629.00 |
PRC 1100 MAX28255 | CONCRETE, READY MIX | 04/22/2014 | Paid | $996.55 |
PRC 1100 MAX28256 | CONCRETE, READY MIX | 04/22/2014 | Paid | $566.10 |
PRC 1100 MAX28257 | CONCRETE, READY MIX | 04/22/2014 | Paid | $566.10 |
PRC 1100 MAX28258 | CONCRETE, READY MIX | 04/22/2014 | Paid | $629.40 |
PRC 1100 MAX28214 | CONCRETE, READY MIX | 04/21/2014 | Paid | $503.20 |
PRC 1100 MAX28215 | CONCRETE, READY MIX | 04/21/2014 | Paid | $629.00 |
PRC 1100 MAX28216 | CONCRETE, READY MIX | 04/21/2014 | Paid | $944.10 |
PRC 1100 MAX28217 | CONCRETE, READY MIX | 04/21/2014 | Paid | $944.10 |
PRC 1100 MAX28218 | CONCRETE, READY MIX | 04/21/2014 | Paid | $629.00 |
PRC 1100 MAX28219 | CONCRETE, READY MIX | 04/21/2014 | Paid | $891.65 |
PRC 1100 MAX28220 | CONCRETE, READY MIX | 04/21/2014 | Paid | $629.00 |
PRC 1100 MAX28179 | CONCRETE, READY MIX | 04/16/2014 | Paid | $1,835.75 |
PRC 1100 MAX28104 | CONCRETE, READY MIX | 04/15/2014 | Paid | $566.10 |
PRC 1100 MAX28105 | CONCRETE, READY MIX | 04/15/2014 | Paid | $566.10 |
PRC 1100 MAX28106 | CONCRETE, READY MIX | 04/15/2014 | Paid | $566.10 |
PRC 1100 MAX28107 | CONCRETE, READY MIX | 04/15/2014 | Paid | $566.10 |
PRC 1100 MAX28108 | CONCRETE, READY MIX | 04/15/2014 | Paid | $629.00 |
PRC 1100 MAX28109 | CONCRETE, READY MIX | 04/15/2014 | Paid | $629.00 |
PRC 1100 MAX28110 | CONCRETE, READY MIX | 04/15/2014 | Paid | $891.65 |
PRC 1100 MAX28029 | CONCRETE, READY MIX | 04/11/2014 | Paid | $629.00 |
PRC 1100 MAX28030 | CONCRETE, READY MIX | 04/11/2014 | Paid | $944.10 |
PRC 1100 MAX28031 | CONCRETE, READY MIX | 04/11/2014 | Paid | $377.40 |
PRC 1100 MAX28065 | CONCRETE, READY MIX | 04/11/2014 | Paid | $1,049.00 |
PRC 1100 MAX27518 | CONCRETE, READY MIX | 03/24/2014 | Paid | $597.55 |
PRC 1100 MAX27519 | CONCRETE, READY MIX | 03/24/2014 | Paid | $629.40 |
PRC 1100 MAX27520 | CONCRETE, READY MIX | 03/24/2014 | Paid | $440.30 |
PRC 1100 MAX27521 | CONCRETE, READY MIX | 03/24/2014 | Paid | $408.85 |
PRC 1100 MAX27524 | CONCRETE, READY MIX | 03/24/2014 | Paid | $944.10 |
PRC 1100 MAX27525 | CONCRETE, READY MIX | 03/24/2014 | Paid | $839.20 |
PRC 1100 MAX27526 | CONCRETE, READY MIX | 03/24/2014 | Paid | $314.70 |
PRC 1100 MAX27527 | CONCRETE, READY MIX | 03/24/2014 | Paid | $377.40 |
PRC 1100 MAX27528 | CONCRETE, READY MIX | 03/24/2014 | Paid | $629.00 |
PRC 1100 MAX27529 | CONCRETE, READY MIX | 03/24/2014 | Paid | $629.00 |
PRC 1100 MAX27530 | CONCRETE, READY MIX | 03/24/2014 | Paid | $629.00 |
PRC 1100 MAX27531 | CONCRETE, READY MIX | 03/24/2014 | Paid | $1,258.00 |
PRC 1100 MAX27532 | CONCRETE, READY MIX | 03/24/2014 | Paid | $629.00 |
PRC 1100 MAX27533 | CONCRETE, READY MIX | 03/24/2014 | Paid | $701.10 |
PRC 1100 MAX27534 | CONCRETE, READY MIX | 03/24/2014 | Paid | $566.10 |
PRC 1100 MAX27535 | CONCRETE, READY MIX | 03/24/2014 | Paid | $629.00 |
PRC 1100 MAX27536 | CONCRETE, READY MIX | 03/24/2014 | Paid | $629.00 |
PRC 1100 MAX27537 | CONCRETE, READY MIX | 03/24/2014 | Paid | $629.00 |
PRC 1100 MAX27538 | CONCRETE, READY MIX | 03/24/2014 | Paid | $566.10 |
PRC 1100 MAX27511 | CONCRETE, READY MIX | 03/20/2014 | Paid | $597.55 |
PRC 1100 MAX27512 | CONCRETE, READY MIX | 03/20/2014 | Paid | $597.55 |
PRC 1100 MAX27513 | CONCRETE, READY MIX | 03/20/2014 | Paid | $389.50 |
PRC 1100 MAX27514 | CONCRETE, READY MIX | 03/20/2014 | Paid | $566.10 |
PRC 1100 MAX27515 | CONCRETE, READY MIX | 03/20/2014 | Paid | $311.60 |
PRC 1100 MAX27516 | CONCRETE, READY MIX | 03/20/2014 | Paid | $566.10 |
PRC 1100 MAX27517 | CONCRETE, READY MIX | 03/20/2014 | Paid | $524.50 |
PRC 1100 MAX27483 | CONCRETE, READY MIX | 03/19/2014 | Paid | $629.00 |
PRC 1100 MAX27484 | CONCRETE, READY MIX | 03/19/2014 | Paid | $629.00 |
PRC 1100 MAX27485 | CONCRETE, READY MIX | 03/19/2014 | Paid | $740.05 |
PRC 1100 MAX27486 | CONCRETE, READY MIX | 03/19/2014 | Paid | $629.00 |
PRC 1100 MAX27487 | CONCRETE, READY MIX | 03/19/2014 | Paid | $629.00 |
PRC 1100 MAX27488 | CONCRETE, READY MIX | 03/19/2014 | Paid | $428.45 |
PRC 1100 MAX27489 | CONCRETE, READY MIX | 03/19/2014 | Paid | $629.00 |
PRC 1100 MAX27490 | CONCRETE, READY MIX | 03/19/2014 | Paid | $779.00 |
PRC 1100 MAX27491 | CONCRETE, READY MIX | 03/19/2014 | Paid | $779.00 |
PRC 1100 MAX27404 | CONCRETE, READY MIX | 03/14/2014 | Paid | $629.00 |
PRC 1100 MAX27406 | CONCRETE, READY MIX | 03/14/2014 | Paid | $440.30 |
PRC 1100 MAX27313 | CONCRETE, READY MIX | 03/12/2014 | Paid | $566.10 |
PRC 1100 MAX27314 | CONCRETE, READY MIX | 03/12/2014 | Paid | $311.60 |
PRC 1100 MAX27277 | CONCRETE, READY MIX | 03/11/2014 | Paid | $944.10 |
PRC 1100 MAX27278 | CONCRETE, READY MIX | 03/11/2014 | Paid | $419.60 |
PRC 1100 MAX26903 | CONCRETE, READY MIX | 02/21/2014 | Paid | $944.10 |
PRC 1100 MAX26904 | CONCRETE, READY MIX | 02/21/2014 | Paid | $314.70 |
PRC 1100 MAX25728 | CONCRETE, READY MIX | 12/09/2013 | Paid | $629.40 |
PRC 1100 MAX25740 | CONCRETE, READY MIX | 12/09/2013 | Paid | $629.00 |
PRC 1100 MAX25645 | CONCRETE, READY MIX | 11/27/2013 | Paid | $311.60 |
PRC 1100 MAX25646 | CONCRETE, READY MIX | 11/27/2013 | Paid | $629.00 |
PRC 1100 MAX25404 | CONCRETE, READY MIX | 11/13/2013 | Paid | $629.00 |
PRC 1100 MAX25405 | CONCRETE, READY MIX | 11/13/2013 | Paid | $311.60 |
PRC 1100 MAX25406 | CONCRETE, READY MIX | 11/13/2013 | Paid | $629.00 |
PRC 1100 MAX25407 | CONCRETE, READY MIX | 11/13/2013 | Paid | $629.00 |
PRC 1100 MAX25408 | CONCRETE, READY MIX | 11/13/2013 | Paid | $662.15 |
PRC 1100 MAX25409 | CONCRETE, READY MIX | 11/13/2013 | Paid | $839.20 |
PRC 1100 MAX25410 | CONCRETE, READY MIX | 11/13/2013 | Paid | $545.30 |
PRC 1100 MAX25411 | CONCRETE, READY MIX | 11/13/2013 | Paid | $629.00 |
PRC 1100 MAX25417 | CONCRETE, READY MIX | 11/13/2013 | Paid | $566.10 |
PRC 1100 MAX25378 | CONCRETE, READY MIX | 11/12/2013 | Paid | $1,049.00 |
PRC 1100 MAX25379 | CONCRETE, READY MIX | 11/12/2013 | Paid | $629.00 |
PRC 1100 MAX25380 | CONCRETE, READY MIX | 11/12/2013 | Paid | $629.00 |
PRC 1100 MAX25381 | CONCRETE, READY MIX | 11/12/2013 | Paid | $839.20 |
PRC 1100 MAX24932 | CONCRETE, READY MIX | 11/05/2013 | Paid | $1,049.00 |
PRC 1100 MAX24942 | CONCRETE, READY MIX | 11/05/2013 | Paid | $629.40 |
PRC 1100 MAX24944 | CONCRETE, READY MIX | 11/05/2013 | Paid | $1,049.00 |
PRC 1100 MAX24964 | CONCRETE, READY MIX | 11/05/2013 | Paid | $419.60 |
PRC 1100 MAX24969 | CONCRETE, READY MIX | 11/05/2013 | Paid | $524.50 |
PRC 1100 MAX25233 | CONCRETE, READY MIX | 11/05/2013 | Paid | $681.85 |
PRC 1100 MAX25234 | CONCRETE, READY MIX | 11/05/2013 | Paid | $566.10 |
PRC 1100 MAX25235 | CONCRETE, READY MIX | 11/05/2013 | Paid | $1,049.00 |
PRC 1100 MAX25236 | CONCRETE, READY MIX | 11/05/2013 | Paid | $944.10 |
PRC 1100 MAX25237 | CONCRETE, READY MIX | 11/05/2013 | Paid | $629.00 |
PRC 1100 MAX24924 | CONCRETE, READY MIX | 11/04/2013 | Paid | $629.00 |
PRC 1100 MAX24925 | CONCRETE, READY MIX | 11/04/2013 | Paid | $629.00 |
PRC 1100 MAX24927 | CONCRETE, READY MIX | 11/04/2013 | Paid | $1,049.00 |
PRC 1100 MAX24928 | CONCRETE, READY MIX | 11/04/2013 | Paid | $566.10 |
PRC 1100 MAX24936 | CONCRETE, READY MIX | 10/29/2013 | Paid | $629.00 |
PRC 1100 MAX24937 | CONCRETE, READY MIX | 10/29/2013 | Paid | $377.40 |
PRC 1100 MAX24938 | CONCRETE, READY MIX | 10/29/2013 | Paid | $623.20 |
PRC 1100 MAX24941 | CONCRETE, READY MIX | 10/29/2013 | Paid | $629.00 |
PRC 1100 MAX24945 | CONCRETE, READY MIX | 10/29/2013 | Paid | $377.40 |
PRC 1100 MAX24946 | CONCRETE, READY MIX | 10/29/2013 | Paid | $629.00 |
PRC 1100 MAX24958 | CONCRETE, READY MIX | 10/29/2013 | Paid | $419.60 |
PRC 1100 MAX24959 | CONCRETE, READY MIX | 10/29/2013 | Paid | $629.00 |
PRC 1100 MAX24960 | CONCRETE, READY MIX | 10/29/2013 | Paid | $623.20 |
PRC 1100 MAX24970 | CONCRETE, READY MIX | 10/24/2013 | Paid | $566.10 |
PRC 1100 MAX24971 | CONCRETE, READY MIX | 10/24/2013 | Paid | $629.00 |
PRC 1100 MAX24538 | CONCRETE, READY MIX | 09/30/2013 | Paid | $545.40 |
PRC 1100 MAX23750 | CONCRETE, READY MIX | 08/20/2013 | Paid | $377.40 |
PRC 1100 MAX23751 | CONCRETE, READY MIX | 08/20/2013 | Paid | $566.10 |
PRC 1100 MAX23754 | CONCRETE, READY MIX | 08/20/2013 | Paid | $629.40 |
PRC 1100 MAX23756 | CONCRETE, READY MIX | 08/20/2013 | Paid | $1,049.00 |
PRC 1100 MAX23693 | CONCRETE, READY MIX | 08/15/2013 | Paid | $597.60 |
PRC 1100 MAX23695 | CONCRETE, READY MIX | 08/15/2013 | Paid | $597.60 |
PRC 1100 MAX23512 | CONCRETE, READY MIX | 08/06/2013 | Paid | $629.00 |
PRC 1100 MAX23513 | CONCRETE, READY MIX | 08/06/2013 | Paid | $629.00 |
PRC 1100 MAX23516 | CONCRETE, READY MIX | 08/06/2013 | Paid | $944.10 |
PRC 1100 MAX23517 | CONCRETE, READY MIX | 08/06/2013 | Paid | $1,049.00 |
PRC 1100 MAX23518 | CONCRETE, READY MIX | 08/06/2013 | Paid | $734.30 |
PRC 1100 MAX23519 | CONCRETE, READY MIX | 08/06/2013 | Paid | $629.00 |
PRC 1100 MAX23458 | CONCRETE, READY MIX | 08/02/2013 | Paid | $467.40 |
PRC 1100 MAX23459 | CONCRETE, READY MIX | 08/02/2013 | Paid | $503.20 |
PRC 1100 MAX23460 | CONCRETE, READY MIX | 08/02/2013 | Paid | $467.40 |
PRC 1100 MAX23400 | CONCRETE, READY MIX | 07/30/2013 | Paid | $419.60 |
PRC 1100 MAX23329 | CONCRETE, READY MIX | 07/26/2013 | Paid | $1,049.00 |
PRC 1100 MAX23330 | CONCRETE, READY MIX | 07/26/2013 | Paid | $629.00 |
PRC 1100 MAX23331 | CONCRETE, READY MIX | 07/26/2013 | Paid | $629.00 |
PRC 1100 MAX23332 | CONCRETE, READY MIX | 07/26/2013 | Paid | $1,049.00 |
PRC 1100 MAX23333 | CONCRETE, READY MIX | 07/26/2013 | Paid | $524.50 |
PRC 1100 MAX23334 | CONCRETE, READY MIX | 07/26/2013 | Paid | $1,049.00 |
PRC 1100 MAX23335 | CONCRETE, READY MIX | 07/26/2013 | Paid | $1,049.00 |
PRC 1100 MAX23294 | CONCRETE, READY MIX | 07/25/2013 | Paid | $467.40 |
PRC 1100 MAX23295 | CONCRETE, READY MIX | 07/25/2013 | Paid | $629.00 |
PRC 1100 MAX23296 | CONCRETE, READY MIX | 07/25/2013 | Paid | $629.00 |
PRC 1100 MAX23299 | CONCRETE, READY MIX | 07/25/2013 | Paid | $629.00 |
PRC 1100 MAX23035 | CONCRETE, READY MIX | 07/18/2013 | Paid | $629.40 |
PRC 1100 MAX23036 | CONCRETE, READY MIX | 07/18/2013 | Paid | $1,049.00 |
PRC 1100 MAX23027 | CONCRETE, READY MIX | 07/16/2013 | Paid | $629.00 |
PRC 1100 MAX22938 | CONCRETE, READY MIX | 07/15/2013 | Paid | $629.00 |
PRC 1100 MAX22940 | CONCRETE, READY MIX | 07/15/2013 | Paid | $1,049.00 |
PRC 1100 MAX23014 | CONCRETE, READY MIX | 07/15/2013 | Paid | $566.10 |
PRC 1100 MAX22937 | CONCRETE, READY MIX | 07/12/2013 | Paid | $629.00 |
PRC 1100 MAX22922 | CONCRETE, READY MIX | 07/09/2013 | Paid | $629.00 |
PRC 1100 MAX22329 | CONCRETE, READY MIX | 06/04/2013 | Paid | $566.10 |
PRC 1100 MAX22330 | CONCRETE, READY MIX | 06/04/2013 | Paid | $629.00 |
PRC 1100 MAX21613 | CONCRETE, READY MIX | 04/25/2013 | Paid | $373.50 |
PRC 1100 MAX21453 | CONCRETE, READY MIX | 04/17/2013 | Paid | $597.60 |
PRC 1100 MAX21378 | CONCRETE, READY MIX | 04/11/2013 | Paid | $734.30 |
PRC 1100 MAX21380 | CONCRETE, READY MIX | 04/11/2013 | Paid | $747.00 |
PRC 1100 MAX21381 | CONCRETE, READY MIX | 04/11/2013 | Paid | $629.00 |
PRC 1100 MAX21382 | CONCRETE, READY MIX | 04/11/2013 | Paid | $747.00 |
PRC 1100 MAX21266 | CONCRETE, READY MIX | 04/08/2013 | Paid | $566.10 |
PRC 1100 MAX21237 | CONCRETE, READY MIX | 04/05/2013 | Paid | $672.30 |
PRC 1100 MAX21238 | CONCRETE, READY MIX | 04/05/2013 | Paid | $373.50 |
PRC 1100 MAX20474 | CONCRETE, READY MIX | 02/22/2013 | Paid | $701.10 |
PRC 1100 MAX20450 | CONCRETE, READY MIX | 02/21/2013 | Paid | $559.00 |
PRC 1100 MAX20451 | CONCRETE, READY MIX | 02/21/2013 | Paid | $467.40 |
PRC 1100 MAX20014 | CONCRETE, READY MIX | 02/01/2013 | Paid | $559.00 |
GAX 1100 13012907079 | 01/31/2013 | Paid | ($363.60) | |
GAX 1100 13012907111 | 01/31/2013 | Paid | ($335.60) | |
PRC 1100 MAX20013 | CONCRETE, READY MIX | 01/31/2013 | Paid | $559.00 |
PRC 1100 MAX19988 | CONCRETE, READY MIX | 01/28/2013 | Paid | $391.30 |
PRC 1100 MAX19989 | CONCRETE, READY MIX | 01/28/2013 | Paid | $447.20 |
PRC 1100 MAX19833 | CONCRETE, READY MIX | 01/18/2013 | Paid | $1,363.70 |
PRC 1100 MAX19765 | CONCRETE, READY MIX | 01/16/2013 | Paid | $818.10 |
PRC 1100 MAX19657 | CONCRETE, READY MIX | 01/11/2013 | Paid | $419.60 |
PRC 1100 MAX19658 | CONCRETE, READY MIX | 01/11/2013 | Paid | $909.00 |
PRC 1100 MAX19659 | CONCRETE, READY MIX | 01/11/2013 | Paid | $335.40 |
PRC 1100 MAX19672 | CONCRETE, READY MIX | 01/11/2013 | Paid | $1,468.60 |
PRC 1100 MAX19673 | CONCRETE, READY MIX | 01/11/2013 | Paid | $335.40 |
PRC 1100 MAX19477 | CONCRETE, READY MIX | 01/03/2013 | Paid | $448.20 |
PRC 1100 MAX19481 | CONCRETE, READY MIX | 01/03/2013 | Paid | $251.55 |
PRC 1100 MAX19489 | CONCRETE, READY MIX | 01/03/2013 | Paid | $909.00 |
PRC 1100 MAX19490 | CONCRETE, READY MIX | 01/03/2013 | Paid | $1,818.00 |
PRC 1100 MAX19492 | CONCRETE, READY MIX | 01/03/2013 | Paid | $279.50 |
PRC 1100 MAX19493 | CONCRETE, READY MIX | 01/03/2013 | Paid | $448.20 |
PRC 1100 MAX19519 | CONCRETE, READY MIX | 01/03/2013 | Paid | $1,986.45 |
PRC 1100 MAX19532 | CONCRETE, READY MIX | 12/28/2012 | Paid | $467.40 |
PRC 1100 MAX19244 | CONCRETE, READY MIX | 12/17/2012 | Paid | $623.20 |
PRC 1100 MAX19285 | CONCRETE, READY MIX | 12/17/2012 | Paid | $629.40 |
PRC 1100 MAX19209 | CONCRETE, READY MIX | 12/13/2012 | Paid | $629.40 |
PRC 1100 MAX18982 | CONCRETE, READY MIX | 11/30/2012 | Paid | $629.40 |
PRC 1100 MAX19018 | CONCRETE, READY MIX | 11/30/2012 | Paid | $223.60 |
PRC 1100 MAX19022 | CONCRETE, READY MIX | 11/30/2012 | Paid | $1,841.10 |
PRC 1100 MAX19023 | CONCRETE, READY MIX | 11/30/2012 | Paid | $363.35 |
PRC 1100 MAX19024 | CONCRETE, READY MIX | 11/30/2012 | Paid | $2,322.20 |
PRC 1100 MAX19025 | CONCRETE, READY MIX | 11/30/2012 | Paid | $1,049.00 |
PRC 1100 MAX18733 | CONCRETE, READY MIX | 11/09/2012 | Paid | $1,049.00 |
PRC 1100 MAX18734 | CONCRETE, READY MIX | 11/09/2012 | Paid | $670.80 |
PRC 1100 MAX18601 | CONCRETE, READY MIX | 11/01/2012 | Paid | $447.20 |
PRC 1100 MAX18559 | CONCRETE, READY MIX | 10/31/2012 | Paid | $614.90 |
PRC 1100 MAX18352 | CONCRETE, READY MIX | 10/25/2012 | Paid | $223.60 |
PRC 1100 MAX18424 | CONCRETE, READY MIX | 10/25/2012 | Paid | $223.60 |
PRC 1100 MAX18425 | CONCRETE, READY MIX | 10/25/2012 | Paid | $524.50 |
PRC 1100 MAX18087 | CONCRETE, READY MIX | 10/03/2012 | Paid | $1,026.40 |
PRC 1100 MAX17882 | CONCRETE, READY MIX | 09/20/2012 | Paid | $1,841.10 |
PRC 1100 MAX17623 | CONCRETE, READY MIX | 09/07/2012 | Paid | $1,120.50 |
PRC 1100 MAX17432 | CONCRETE, READY MIX | 08/22/2012 | Paid | $373.50 |
PRC 1100 MAX17433 | CONCRETE, READY MIX | 08/22/2012 | Paid | $747.00 |
PRC 1100 MAX17245 | CONCRETE, READY MIX | 08/08/2012 | Paid | $419.60 |
PRC 1100 MAX17225 | CONCRETE, READY MIX | 08/07/2012 | Paid | $701.10 |
PRC 1100 MAX17152 | CONCRETE, READY MIX | 08/06/2012 | Paid | $629.00 |
PRC 1100 MAX17156 | CONCRETE, READY MIX | 08/06/2012 | Paid | $503.10 |
PRM 1100 12072728668 | Ready-Mix Concrete | 07/30/2012 | Paid | $622.30 |
PRC 1100 MAX16966 | CONCRETE, READY MIX | 07/25/2012 | Paid | $1,835.75 |
PRC 1100 MAX16927 | CONCRETE, READY MIX | 07/24/2012 | Paid | $629.00 |
PRC 1100 MAX16929 | CONCRETE, READY MIX | 07/24/2012 | Paid | $1,034.15 |
PRC 1100 MAX16932 | CONCRETE, READY MIX | 07/24/2012 | Paid | $629.40 |
PRC 1100 MAX16934 | CONCRETE, READY MIX | 07/24/2012 | Paid | $1,118.00 |
PRC 1100 MAX16792 | Ready-Mix Concrete | 07/18/2012 | Paid | $2,000.25 |
PRC 1100 MAX16717 | CONCRETE, READY MIX | 07/12/2012 | Paid | $1,647.50 |
PRC 1100 MAX16768 | CONCRETE, READY MIX | 07/12/2012 | Paid | $373.50 |
PRC 1100 MAX14823 | Ready-Mix Concrete | 03/23/2012 | Paid | $2,000.25 |
PRC 1100 MAX14824 | Ready-Mix Concrete | 03/23/2012 | Paid | $622.30 |
PRC 1100 MAX14518 | Ready-Mix Concrete | 03/06/2012 | Paid | $1,600.20 |
PRC 1100 MAX14520 | Ready-Mix Concrete | 03/06/2012 | Paid | $444.50 |
PRC 1100 MAX14522 | Ready-Mix Concrete | 03/06/2012 | Paid | $2,000.25 |
PRC 1100 MAX14489 | Ready-Mix Concrete | 03/05/2012 | Paid | $559.00 |
PRC 1100 MAX14491 | Ready-Mix Concrete | 03/05/2012 | Paid | $1,600.20 |
PRC 1100 MAX14282 | Ready-Mix Concrete | 02/23/2012 | Paid | $889.00 |
PRC 1100 MAX14283 | Ready-Mix Concrete | 02/23/2012 | Paid | $1,789.00 |
PRC 1100 MAX14285 | Ready-Mix Concrete | 02/23/2012 | Paid | $1,600.20 |
PRC 1100 MAX14114 | Ready-Mix Concrete | 02/10/2012 | Paid | $559.00 |
PRC 1100 MAX14115 | Ready-Mix Concrete | 02/10/2012 | Paid | $889.00 |
PRC 1100 MAX14116 | Ready-Mix Concrete | 02/10/2012 | Paid | $1,689.10 |
PRC 1100 MAX14117 | Ready-Mix Concrete | 02/10/2012 | Paid | $1,778.00 |
PRC 1100 MAX14118 | Ready-Mix Concrete | 02/10/2012 | Paid | $844.55 |
PRC 1100 MAX14120 | Ready-Mix Concrete | 02/10/2012 | Paid | $533.40 |
PRC 1100 MAX14121 | Ready-Mix Concrete | 02/10/2012 | Paid | $711.20 |
PRC 1100 MAX14136 | Ready-Mix Concrete | 02/10/2012 | Paid | $2,489.20 |
PRC 1100 MAX14137 | Ready-Mix Concrete | 02/10/2012 | Paid | $1,155.70 |
PRC 1100 MAX13806 | Ready-Mix Concrete | 01/30/2012 | Paid | $711.20 |
PRC 1100 MAX13804 | Ready-Mix Concrete | 01/26/2012 | Paid | $355.60 |
PRC 1100 MAX12835 | Ready-Mix Concrete | 11/23/2011 | Paid | $402.60 |
PRC 1100 MAX12434 | Ready-Mix Concrete | 11/01/2011 | Paid | $726.70 |
PRC 1100 MAX11879 | Ready-Mix Concrete | 10/04/2011 | Paid | $268.40 |
PRC 1100 MAX12038 | Ready-Mix Concrete | 10/04/2011 | Paid | $3,086.10 |
PRC 1100 MAX11807 | Ready-Mix Concrete | 09/28/2011 | Paid | $402.60 |
PRC 1100 MAX11809 | Ready-Mix Concrete | 09/28/2011 | Paid | $1,241.35 |
PRC 1100 MAX11658 | Ready-Mix Concrete | 09/16/2011 | Paid | $671.00 |
PRC 1100 MAX11660 | Ready-Mix Concrete | 09/16/2011 | Paid | $1,207.80 |
PRC 1100 MAX11662 | Ready-Mix Concrete | 09/16/2011 | Paid | $603.90 |
PRC 1100 MAX11669 | Ready-Mix Concrete | 09/16/2011 | Paid | $603.90 |
PRC 1100 MAX11673 | Ready-Mix Concrete | 09/16/2011 | Paid | $637.45 |
PRC 1100 MAX11493 | Ready-Mix Concrete | 09/09/2011 | Paid | $1,677.00 |
PRC 1100 MAX11499 | Ready-Mix Concrete | 09/09/2011 | Paid | $1,342.00 |
PRC 1100 MAX11502 | Ready-Mix Concrete | 09/09/2011 | Paid | $1,274.90 |
PRC 1100 MAX11512 | Ready-Mix Concrete | 09/09/2011 | Paid | $671.00 |
PRC 1100 MAX11520 | Ready-Mix Concrete | 09/09/2011 | Paid | $671.00 |
PRC 1100 MAX11220 | Ready-Mix Concrete | 08/23/2011 | Paid | $4,003.20 |
PRC 1100 MAX11226 | Ready-Mix Concrete | 08/23/2011 | Paid | $1,222.20 |
PRC 1100 MAX11091 | Ready-Mix Concrete | 08/18/2011 | Paid | $611.10 |
PRC 1100 MAX11093 | Ready-Mix Concrete | 08/18/2011 | Paid | $1,358.00 |
PRC 1100 MAX10862 | Ready-Mix Concrete | 08/11/2011 | Paid | $559.00 |
PRC 1100 MAX10900 | Ready-Mix Concrete | 08/11/2011 | Paid | $2,906.80 |
PRC 1100 MAX10787 | Ready-Mix Concrete | 08/08/2011 | Paid | $2,616.40 |
PRC 1100 MAX10788 | Ready-Mix Concrete | 08/08/2011 | Paid | $1,386.50 |
PRC 1100 MAX10798 | Ready-Mix Concrete | 08/08/2011 | Paid | $447.20 |
PRC 1100 MAX10799 | Ready-Mix Concrete | 08/08/2011 | Paid | $1,252.30 |
PRC 1100 MAX10806 | Ready-Mix Concrete | 08/08/2011 | Paid | $1,721.90 |
PRC 1100 MAX10771 | Ready-Mix Concrete | 08/04/2011 | Paid | $2,213.80 |
PRC 1100 MAX10777 | Ready-Mix Concrete | 08/04/2011 | Paid | $2,012.40 |
PRC 1100 MAX10782 | Ready-Mix Concrete | 08/04/2011 | Paid | $355.60 |
PRC 1100 MAX10659 | Ready-Mix Concrete | 08/01/2011 | Paid | $3,443.80 |
PRC 1100 MAX10660 | Ready-Mix Concrete | 08/01/2011 | Paid | $3,779.30 |
PRC 1100 MAX10661 | Ready-Mix Concrete | 08/01/2011 | Paid | $2,593.95 |
PRC 1100 MAX10662 | Ready-Mix Concrete | 08/01/2011 | Paid | $1,285.90 |
PRC 1100 MAX10663 | Ready-Mix Concrete | 08/01/2011 | Paid | $1,576.85 |
PRC 1100 MAX10437 | Ready-Mix Concrete | 07/20/2011 | Paid | $355.60 |
PRC 1100 MAX10494 | Ready-Mix Concrete | 07/20/2011 | Paid | $6,037.20 |
PRC 1100 MAX10507 | Ready-Mix Concrete | 07/20/2011 | Paid | $631.75 |
PRC 1100 MAX10285 | Ready-Mix Concrete | 07/07/2011 | Paid | $889.00 |
PRC 1100 MAX10135 | Ready-Mix Concrete | 06/29/2011 | Paid | $726.70 |
PRC 1100 MAX10136 | Ready-Mix Concrete | 06/29/2011 | Paid | $402.60 |
PRC 1100 MAX10140 | Ready-Mix Concrete | 06/29/2011 | Paid | $577.85 |
PRC 1100 MAX10143 | Ready-Mix Concrete | 06/29/2011 | Paid | $355.60 |
PRC 1100 MAX10144 | Ready-Mix Concrete | 06/29/2011 | Paid | $2,258.60 |
PRC 1100 MAX10149 | Ready-Mix Concrete | 06/29/2011 | Paid | $2,415.60 |
PRC 1100 MAX10165 | Ready-Mix Concrete | 06/29/2011 | Paid | $1,342.00 |
PRC 1100 MAX10166 | Ready-Mix Concrete | 06/29/2011 | Paid | $670.80 |
PRC 1100 MAX10167 | Ready-Mix Concrete | 06/29/2011 | Paid | $670.80 |
PRC 1100 MAX10168 | Ready-Mix Concrete | 06/29/2011 | Paid | $1,229.80 |
PRC 1100 MAX10171 | Ready-Mix Concrete | 06/29/2011 | Paid | $1,308.25 |
PRC 1100 MAX10172 | Ready-Mix Concrete | 06/29/2011 | Paid | $603.90 |
PRC 1100 MAX10173 | Ready-Mix Concrete | 06/29/2011 | Paid | $1,006.50 |
PRC 1100 MAX10174 | Ready-Mix Concrete | 06/29/2011 | Paid | $469.70 |
PRC 1100 MAX10061 | Ready-Mix Concrete | 06/24/2011 | Paid | $1,006.20 |
PRC 1100 MAX10063 | Ready-Mix Concrete | 06/24/2011 | Paid | $503.10 |
PRC 1100 MAX10064 | Ready-Mix Concrete | 06/24/2011 | Paid | $531.05 |
PRC 1100 MAX9698 | Ready-Mix Concrete | 05/27/2011 | Paid | $726.70 |
PRC 1100 MAX9635 | Ready-Mix Concrete | 05/25/2011 | Paid | $559.00 |
PRC 1100 MAX9551 | Ready-Mix Concrete | 05/23/2011 | Paid | $939.20 |
PRC 1100 MAX9560 | Ready-Mix Concrete | 05/23/2011 | Paid | $2,571.40 |
PRC 1100 MAX9573 | Ready-Mix Concrete | 05/23/2011 | Paid | $3,298.10 |
PRC 1100 MAX9574 | Ready-Mix Concrete | 05/23/2011 | Paid | $1,509.75 |
PRC 1100 MAX9575 | Ready-Mix Concrete | 05/23/2011 | Paid | $726.70 |
PRC 1100 MAX9464 | Ready-Mix Concrete | 05/16/2011 | Paid | $402.60 |
PRC 1100 MAX9340 | Ready-Mix Concrete | 05/13/2011 | Paid | $4,304.30 |
PRC 1100 MAX9342 | Ready-Mix Concrete | 05/13/2011 | Paid | $726.70 |
PRC 1100 MAX9343 | Ready-Mix Concrete | 05/13/2011 | Paid | $1,900.60 |
PRC 1100 MAX9344 | Ready-Mix Concrete | 05/13/2011 | Paid | $3,913.00 |
PRC 1100 MAX9346 | Ready-Mix Concrete | 05/13/2011 | Paid | $1,409.10 |
PRC 1100 MAX9349 | Ready-Mix Concrete | 05/13/2011 | Paid | $1,118.00 |
PRC 1100 MAX9364 | Ready-Mix Concrete | 05/13/2011 | Paid | $950.30 |
PRC 1100 MAX9400 | Ready-Mix Concrete | 05/13/2011 | Paid | $559.00 |
PRC 1100 MAX9164 | Ready-Mix Concrete | 04/29/2011 | Paid | $402.60 |
PRC 1100 MAX9166 | Ready-Mix Concrete | 04/29/2011 | Paid | $559.00 |
PRC 1100 MAX9169 | Ready-Mix Concrete | 04/29/2011 | Paid | $670.80 |
PRC 1100 MAX9171 | Ready-Mix Concrete | 04/29/2011 | Paid | $614.90 |
PRC 1100 MAX9001 | Ready-Mix Concrete | 04/25/2011 | Paid | $536.80 |
PRC 1100 MAX9002 | Ready-Mix Concrete | 04/25/2011 | Paid | $2,236.00 |
PRC 1100 MAX9003 | Ready-Mix Concrete | 04/25/2011 | Paid | $670.80 |
PRC 1100 MAX9004 | Ready-Mix Concrete | 04/25/2011 | Paid | $614.90 |
PRC 1100 MAX9006 | Ready-Mix Concrete | 04/25/2011 | Paid | $614.90 |
PRC 1100 MAX9009 | Ready-Mix Concrete | 04/25/2011 | Paid | $670.80 |
PRC 1100 MAX9011 | Ready-Mix Concrete | 04/25/2011 | Paid | $614.90 |
PRC 1100 MAX9014 | Ready-Mix Concrete | 04/25/2011 | Paid | $391.30 |
PRC 1100 MAX9060 | Ready-Mix Concrete | 04/22/2011 | Paid | $1,453.40 |
PRC 1100 MAX8827 | Ready-Mix Concrete | 04/18/2011 | Paid | $339.50 |
PRC 1100 MAX8671 | Ready-Mix Concrete | 04/05/2011 | Paid | $1,689.10 |
PRC 1100 MAX8505 | Ready-Mix Concrete | 03/31/2011 | Paid | $894.50 |
PRC 1100 MAX8495 | Ready-Mix Concrete | 03/30/2011 | Paid | $889.00 |
PRC 1100 MAX8496 | Ready-Mix Concrete | 03/30/2011 | Paid | $800.10 |
PRC 1100 MAX8497 | Ready-Mix Concrete | 03/30/2011 | Paid | $889.00 |
PRC 1100 MAX8498 | Ready-Mix Concrete | 03/30/2011 | Paid | $889.00 |
PRC 1100 MAX8499 | Ready-Mix Concrete | 03/30/2011 | Paid | $889.00 |
PRC 1100 MAX8500 | Ready-Mix Concrete | 03/30/2011 | Paid | $889.00 |
PRC 1100 MAX8501 | Ready-Mix Concrete | 03/30/2011 | Paid | $889.00 |
PRC 1100 MAX8506 | Ready-Mix Concrete | 03/30/2011 | Paid | $1,006.20 |
PRC 1100 MAX8507 | Ready-Mix Concrete | 03/30/2011 | Paid | $1,788.80 |
PRC 1100 MAX8508 | Ready-Mix Concrete | 03/30/2011 | Paid | $1,923.20 |
PRC 1100 MAX8509 | Ready-Mix Concrete | 03/30/2011 | Paid | $950.30 |
PRC 1100 MAX8214 | Ready-Mix Concrete | 03/10/2011 | Paid | $889.00 |
PRC 1100 MAX8215 | Ready-Mix Concrete | 03/10/2011 | Paid | $1,066.80 |
PRC 1100 MAX8216 | Ready-Mix Concrete | 03/10/2011 | Paid | $444.50 |
PRC 1100 MAX8217 | Ready-Mix Concrete | 03/10/2011 | Paid | $533.40 |
PRC 1100 MAX8219 | Ready-Mix Concrete | 03/10/2011 | Paid | $444.50 |
PRC 1100 MAX8220 | Ready-Mix Concrete | 03/10/2011 | Paid | $889.00 |
PRC 1100 MAX8222 | Ready-Mix Concrete | 03/10/2011 | Paid | $889.00 |
PRC 1100 MAX8223 | Ready-Mix Concrete | 03/10/2011 | Paid | $1,778.00 |
PRC 1100 MAX8224 | Ready-Mix Concrete | 03/10/2011 | Paid | $889.00 |
PRC 1100 MAX8225 | Ready-Mix Concrete | 03/10/2011 | Paid | $889.00 |
PRC 1100 MAX8227 | Ready-Mix Concrete | 03/10/2011 | Paid | $844.55 |
PRM 1100 11022314129 | Ready-Mix Concrete | 02/24/2011 | Paid | $4,702.70 |
PRM 1100 11011210315 | Ready-Mix Concrete | 01/13/2011 | Paid | $6,105.30 |
PRM 1100 11010409318 | Ready-Mix Concrete | 01/05/2011 | Paid | $1,778.00 |
PRM 1100 10122808598 | Ready-Mix Concrete | 12/29/2010 | Paid | $823.90 |
PRM 1100 10121507827 | Ready-Mix Concrete | 12/16/2010 | Paid | $939.20 |
PRM 1100 10121307675 | Ready-Mix Concrete | 12/14/2010 | Paid | $1,341.80 |
PRM 1100 10120606926 | Ready-Mix Concrete | 12/07/2010 | Paid | $1,923.20 |
PRM 1100 10111004618 | Ready-Mix Concrete | 11/12/2010 | Paid | $3,055.75 |
PRM 1100 10110303922 | Ready-Mix Concrete | 11/04/2010 | Paid | $2,554.20 |
PRM 1100 10102903536 | Ready-Mix Concrete | 11/01/2010 | Paid | $670.80 |
PRM 1100 10102903537 | Ready-Mix Concrete | 11/01/2010 | Paid | $1,565.35 |
PRM 1100 10102703190 | Ready-Mix Concrete | 10/28/2010 | Paid | $939.40 |
PRM 1100 10092438436 | Ready-Mix Concrete | 09/27/2010 | Paid | $1,066.80 |
PRM 1100 10092037801 | Ready-Mix Concrete | 09/21/2010 | Paid | $825.30 |
PRM 1100 10090836381 | Ready-Mix Concrete | 09/09/2010 | Paid | $407.40 |
PRM 1100 10090235851 | Ready-Mix Concrete | 09/03/2010 | Paid | $758.20 |
PRM 1100 10090235852 | Ready-Mix Concrete | 09/03/2010 | Paid | $469.70 |
PRM 1100 10082735215 | Ready-Mix Concrete | 08/30/2010 | Paid | $801.80 |
PRM 1100 10081333665 | Ready-Mix Concrete | 08/16/2010 | Paid | $1,322.00 |
PRM 1100 10081233549 | Ready-Mix Concrete | 08/13/2010 | Paid | $268.40 |
PRM 1100 10080232429 | Ready-Mix Concrete | 08/03/2010 | Paid | $838.50 |
PRM 1100 10073032294 | Ready-Mix Concrete | 08/02/2010 | Paid | $1,554.30 |
PRM 1100 10072631655 | Ready-Mix Concrete | 07/27/2010 | Paid | $536.80 |
PRM 1100 10072131096 | Ready-Mix Concrete | 07/22/2010 | Paid | $1,844.85 |
PRM 1100 10070129056 | Ready-Mix Concrete | 07/02/2010 | Paid | $2,236.20 |
PRM 1100 10062528444 | Ready-Mix Concrete | 06/28/2010 | Paid | $1,118.00 |
PRM 1100 10061727388 | Ready-Mix Concrete | 06/18/2010 | Paid | $2,680.50 |
PRM 1100 10061126873 | Ready-Mix Concrete | 06/14/2010 | Paid | $726.70 |
PRM 1100 10061026685 | Ready-Mix Concrete | 06/11/2010 | Paid | $335.40 |
PRM 1100 10060225787 | Ready-Mix Concrete | 06/03/2010 | Paid | $2,395.80 |
PRM 1100 10060225788 | Ready-Mix Concrete | 06/03/2010 | Paid | $1,073.60 |
PRM 1100 10052825481 | Ready-Mix Concrete | 06/01/2010 | Paid | $402.60 |
PRM 1100 10052725310 | Ready-Mix Concrete | 05/28/2010 | Paid | $2,410.45 |
PRM 1100 10052424799 | Ready-Mix Concrete | 05/25/2010 | Paid | $3,697.25 |
PRM 1100 10051323952 | Ready-Mix Concrete | 05/14/2010 | Paid | $2,703.60 |
PRM 1100 10050623205 | Ready-Mix Concrete | 05/07/2010 | Paid | $966.40 |
PRM 1100 10043022601 | Ready-Mix Concrete | 05/03/2010 | Paid | $6,759.20 |
PRM 1100 10042922466 | Ready-Mix Concrete | 04/30/2010 | Paid | $444.50 |
PRM 1100 10041621470 | Ready-Mix Concrete | 04/19/2010 | Paid | $2,487.40 |
PRM 1100 10041320994 | Ready-Mix Concrete | 04/14/2010 | Paid | $4,000.80 |
PRM 1100 10040820510 | Ready-Mix Concrete | 04/09/2010 | Paid | $1,369.55 |
PRM 1100 10032619235 | Ready-Mix Concrete | 03/29/2010 | Paid | $1,066.80 |
PRM 1100 10032519060 | Ready-Mix Concrete | 03/26/2010 | Paid | $3,145.90 |
PRM 1100 10031117270 | Ready-Mix Concrete | 03/12/2010 | Paid | $1,112.15 |
PRM 1100 10031017004 | Ready-Mix Concrete | 03/11/2010 | Paid | $3,913.00 |
PRM 1100 10030916757 | Ready-Mix Concrete | 03/10/2010 | Paid | $3,857.60 |
PRM 1100 10030816597 | Ready-Mix Concrete | 03/09/2010 | Paid | $1,623.83 |
PRM 1100 10030516494 | Ready-Mix Concrete | 03/08/2010 | Paid | $3,023.30 |
PRM 1100 10022415163 | Ready-Mix Concrete | 02/25/2010 | Paid | $1,062.10 |
PRM 1100 10022214805 | Ready-Mix Concrete | 02/23/2010 | Paid | $711.20 |
PRM 1100 10021914700 | Ready-Mix Concrete | 02/22/2010 | Paid | $271.60 |
PRM 1100 10021013813 | Ready-Mix Concrete | 02/11/2010 | Paid | $2,698.60 |
PRM 1100 10020913601 | Ready-Mix Concrete | 02/10/2010 | Paid | $4,071.29 |
PRM 1100 10020813459 | Ready-Mix Concrete | 02/09/2010 | Paid | $9,385.10 |
PRM 1100 10020513304 | Ready-Mix Concrete | 02/08/2010 | Paid | $355.60 |
PRM 1100 10012712101 | Ready-Mix Concrete | 01/28/2010 | Paid | $3,904.78 |
PRM 1100 10012611917 | Ready-Mix Concrete | 01/27/2010 | Paid | $6,151.61 |
PRM 1100 10011310744 | Ready-Mix Concrete | 01/14/2010 | Paid | $271.60 |
PRM 1100 10010710114 | Ready-Mix Concrete | 01/08/2010 | Paid | $797.60 |
PRM 1100 10010409504 | Ready-Mix Concrete | 01/05/2010 | Paid | $548.04 |
PRM 1100 09123109300 | Ready-Mix Concrete | 01/04/2010 | Paid | $5,840.97 |
PRM 1100 09121607996 | Ready-Mix Concrete | 12/17/2009 | Paid | $25,947.39 |
PRM 1100 09121507853 | Ready-Mix Concrete | 12/16/2009 | Paid | $5,481.56 |
PRM 1100 09120407008 | Ready-Mix Concrete | 12/07/2009 | Paid | $8,877.81 |
PRM 1100 09112305847 | Ready-Mix Concrete | 11/24/2009 | Paid | $7,043.39 |
PRM 1100 09111905588 | Ready-Mix Concrete | 11/20/2009 | Paid | $1,290.06 |
PRM 1100 09111705298 | Ready-Mix Concrete | 11/18/2009 | Paid | $2,677.73 |