Data Drill Down for All Months & All Years
PAYMENT REQUEST
CATEGORY | COMMODITIES |
---|---|
EXPENSE CATEGORY | CEMENT/CONCRETE |
DEPARTMENT | AUSTIN ENERGY |
FUND | E-TRANSMISSION CAPITAL |
PROGRAM | FY2001 TRANSMISSION PARENT |
ACTIVITY | TRANSMISSION |
PAYEE | LAUREN CONCRETE LP |
PAYMENT REQUEST | Select a payment request. |
Payment Requests | Select from Below
PAYMENT REQUEST | DESCRIPTION | CHECK DATE | CHECK STATUS | AMOUNT |
---|---|---|---|---|
PRC 1100 MAX74482 | CONCRETE, READY-MIX | 01/15/2020 | Paid | $1,140.00 |
PRC 1100 MAX74512 | CONCRETE, READY-MIX | 01/15/2020 | Paid | $920.00 |
PRC 1100 MAX74513 | CONCRETE, READY-MIX | 01/15/2020 | Paid | $2,387.00 |
PRC 1100 MAX74514 | CONCRETE, READY-MIX | 01/15/2020 | Paid | $3,612.00 |
PRC 1100 MAX74515 | CONCRETE, READY-MIX | 01/15/2020 | Paid | $1,840.00 |
PRC 1100 MAX74516 | CONCRETE, READY-MIX | 01/15/2020 | Paid | $1,824.00 |
PRC 1100 MAX74517 | CONCRETE, READY-MIX | 01/15/2020 | Paid | $1,482.00 |
PRC 1100 MAX74518 | CONCRETE, READY-MIX | 01/15/2020 | Paid | $2,052.00 |
PRC 1100 MAX74523 | CONCRETE, READY-MIX | 01/15/2020 | Paid | $3,384.00 |
PRC 1100 MAX74545 | CONCRETE, READY-MIX | 01/15/2020 | Paid | $644.00 |
PRC 1100 MAX74241 | CONCRETE, READY-MIX | 01/13/2020 | Paid | $2,692.00 |
PRC 1100 MAX74242 | CONCRETE, READY-MIX | 01/13/2020 | Paid | $3,825.00 |
PRC 1100 MAX74138 | CONCRETE, READY-MIX | 01/03/2020 | Paid | $1,482.00 |
PRC 1100 MAX74140 | CONCRETE, READY-MIX | 01/03/2020 | Paid | $627.00 |
PRC 1100 MAX73833 | CONCRETE, READY-MIX | 12/26/2019 | Paid | $920.00 |
PRC 1100 MAX73835 | CONCRETE, READY-MIX | 12/26/2019 | Paid | $2,003.00 |
PRC 1100 MAX73836 | CONCRETE, READY-MIX | 12/26/2019 | Paid | $1,819.00 |
PRC 1100 MAX73837 | CONCRETE, READY-MIX | 12/26/2019 | Paid | $1,505.75 |
PRC 1100 MAX73838 | CONCRETE, READY-MIX | 12/26/2019 | Paid | $576.00 |
PRC 1100 MAX73839 | CONCRETE, READY-MIX | 12/26/2019 | Paid | $1,065.00 |
PRC 1100 MAX73840 | CONCRETE, READY-MIX | 12/26/2019 | Paid | $736.00 |
PRC 1100 MAX73841 | CONCRETE, READY-MIX | 12/26/2019 | Paid | $798.00 |
PRC 1100 MAX73842 | CONCRETE, READY-MIX | 12/26/2019 | Paid | $426.00 |
PRC 1100 MAX73843 | CONCRETE, READY-MIX | 12/26/2019 | Paid | $920.00 |
PRC 1100 MAX73848 | CONCRETE, READY-MIX | 12/26/2019 | Paid | $1,564.00 |
PRC 1100 MAX73865 | CONCRETE, READY-MIX | 12/26/2019 | Paid | $798.00 |
PRC 1100 MAX73379 | CONCRETE, READY-MIX | 12/10/2019 | Paid | $2,166.00 |
PRC 1100 MAX73210 | CONCRETE, READY-MIX | 12/05/2019 | Paid | $1,840.00 |
PRC 1100 MAX73211 | CONCRETE, READY-MIX | 12/05/2019 | Paid | $1,755.00 |
PRC 1100 MAX73212 | CONCRETE, READY-MIX | 12/05/2019 | Paid | $1,083.00 |
PRC 1100 MAX73025 | CONCRETE, READY-MIX | 12/03/2019 | Paid | $2,585.50 |
PRC 1100 MAX73036 | CONCRETE, READY-MIX | 12/03/2019 | Paid | $2,905.00 |
PRC 1100 MAX72971 | CONCRETE, READY-MIX | 11/25/2019 | Paid | $1,026.00 |
PRC 1100 MAX72972 | CONCRETE, READY-MIX | 11/25/2019 | Paid | $1,026.00 |
PRC 1100 MAX73011 | CONCRETE, READY-MIX | 11/25/2019 | Paid | $570.00 |
PRC 1100 MAX73012 | CONCRETE, READY-MIX | 11/25/2019 | Paid | $1,840.00 |
PRC 1100 MAX73013 | CONCRETE, READY-MIX | 11/25/2019 | Paid | $920.00 |
PRC 1100 MAX73015 | CONCRETE, READY-MIX | 11/25/2019 | Paid | $1,710.00 |
PRC 1100 MAX73018 | CONCRETE, READY-MIX | 11/25/2019 | Paid | $576.00 |
PRC 1100 MAX73024 | CONCRETE, READY-MIX | 11/25/2019 | Paid | $864.00 |
PRC 1100 MAX73027 | CONCRETE, READY-MIX | 11/25/2019 | Paid | $2,024.00 |
PRC 1100 MAX73028 | CONCRETE, READY-MIX | 11/25/2019 | Paid | $1,083.00 |
PRC 1100 MAX73030 | CONCRETE, READY-MIX | 11/25/2019 | Paid | $1,840.00 |
PRC 1100 MAX72789 | CONCRETE, READY-MIX | 11/14/2019 | Paid | $1,026.00 |
PRC 1100 MAX72794 | CONCRETE, READY-MIX | 11/14/2019 | Paid | $6,875.00 |
PRC 1100 MAX72795 | CONCRETE, READY-MIX | 11/14/2019 | Paid | $4,600.00 |
PRC 1100 MAX72796 | CONCRETE, READY-MIX | 11/14/2019 | Paid | $1,824.00 |
PRC 1100 MAX72797 | CONCRETE, READY-MIX | 11/14/2019 | Paid | $2,300.00 |
PRC 1100 MAX72798 | CONCRETE, READY-MIX | 11/14/2019 | Paid | $1,026.00 |
PRC 1100 MAX72799 | CONCRETE, READY-MIX | 11/14/2019 | Paid | $570.00 |
PRC 1100 MAX72801 | CONCRETE, READY-MIX | 11/14/2019 | Paid | $3,497.50 |
PRC 1100 MAX72802 | CONCRETE, READY-MIX | 11/14/2019 | Paid | $768.00 |
PRC 1100 MAX72581 | CONCRETE, READY-MIX | 11/06/2019 | Paid | $2,188.50 |
PRC 1100 MAX72579 | CONCRETE, READY-MIX | 11/01/2019 | Paid | $920.00 |
PRC 1100 MAX72580 | CONCRETE, READY-MIX | 11/01/2019 | Paid | $2,479.00 |
PRC 1100 MAX72582 | CONCRETE, READY-MIX | 11/01/2019 | Paid | $3,680.00 |
PRC 1100 MAX72583 | CONCRETE, READY-MIX | 11/01/2019 | Paid | $1,801.00 |
PRC 1100 MAX72584 | CONCRETE, READY-MIX | 11/01/2019 | Paid | $3,825.00 |
PRC 1100 MAX72585 | CONCRETE, READY-MIX | 10/31/2019 | Paid | $684.00 |
PRC 1100 MAX72446 | CONCRETE, READY-MIX | 10/30/2019 | Paid | $1,083.00 |
PRC 1100 MAX72447 | CONCRETE, READY-MIX | 10/30/2019 | Paid | $2,585.50 |
PRC 1100 MAX72448 | CONCRETE, READY-MIX | 10/30/2019 | Paid | $4,633.50 |
PRC 1100 MAX72449 | CONCRETE, READY-MIX | 10/30/2019 | Paid | $1,840.00 |
PRC 1100 MAX72450 | CONCRETE, READY-MIX | 10/30/2019 | Paid | $2,097.00 |
PRC 1100 MAX72451 | CONCRETE, READY-MIX | 10/30/2019 | Paid | $639.00 |
PRC 1100 MAX72200 | CONCRETE, READY-MIX | 10/24/2019 | Paid | $5,137.00 |
PRC 1100 MAX72201 | CONCRETE, READY-MIX | 10/24/2019 | Paid | $2,130.00 |
PRC 1100 MAX72078 | CONCRETE, READY-MIX | 10/18/2019 | Paid | $960.00 |
PRC 1100 MAX72079 | CONCRETE, READY-MIX | 10/18/2019 | Paid | $1,152.00 |
PRC 1100 MAX72046 | CONCRETE, READY-MIX | 10/14/2019 | Paid | $582.50 |
PRC 1100 MAX72047 | CONCRETE, READY-MIX | 10/14/2019 | Paid | $535.00 |
PRC 1100 MAX71960 | CONCRETE, READY-MIX | 10/11/2019 | Paid | $1,428.00 |
PRC 1100 MAX71961 | CONCRETE, READY-MIX | 10/11/2019 | Paid | $639.00 |
PRC 1100 MAX71962 | CONCRETE, READY-MIX | 10/11/2019 | Paid | $920.00 |
PRC 1100 MAX71963 | CONCRETE, READY-MIX | 10/11/2019 | Paid | $1,482.00 |
PRC 1100 MAX71964 | CONCRETE, READY-MIX | 10/11/2019 | Paid | $684.00 |
PRC 1100 MAX71965 | CONCRETE, READY-MIX | 10/11/2019 | Paid | $1,140.00 |
PRC 1100 MAX71969 | CONCRETE, READY-MIX | 10/11/2019 | Paid | $2,416.00 |
PRC 1100 MAX71970 | CONCRETE, READY-MIX | 10/11/2019 | Paid | $3,825.00 |
PRC 1100 MAX71971 | CONCRETE, READY-MIX | 10/11/2019 | Paid | $4,507.50 |
PRC 1100 MAX71972 | CONCRETE, READY-MIX | 10/11/2019 | Paid | $736.00 |
PRC 1100 MAX71975 | CONCRETE, READY-MIX | 10/11/2019 | Paid | $816.00 |
PRC 1100 MAX71937 | CONCRETE, READY-MIX | 10/09/2019 | Paid | $1,472.00 |
PRC 1100 MAX71938 | CONCRETE, READY-MIX | 10/09/2019 | Paid | $1,140.00 |
PRC 1100 MAX71940 | CONCRETE, READY-MIX | 10/09/2019 | Paid | $2,905.00 |
PRC 1100 MAX71941 | CONCRETE, READY-MIX | 10/09/2019 | Paid | $2,905.00 |
PRC 1100 MAX71942 | CONCRETE, READY-MIX | 10/09/2019 | Paid | $612.00 |
PRC 1100 MAX71943 | CONCRETE, READY-MIX | 10/09/2019 | Paid | $3,641.00 |
PRC 1100 MAX71875 | CONCRETE, READY-MIX | 10/08/2019 | Paid | $920.00 |
PRC 1100 MAX71876 | CONCRETE, READY-MIX | 10/08/2019 | Paid | $960.00 |
PRC 1100 MAX71557 | CONCRETE, READY-MIX | 10/01/2019 | Paid | $5,520.00 |
PRC 1100 MAX71558 | CONCRETE, READY-MIX | 10/01/2019 | Paid | $1,710.00 |
PRC 1100 MAX71561 | CONCRETE, READY-MIX | 10/01/2019 | Paid | $11,760.00 |
PRC 1100 MAX71690 | CONCRETE, READY-MIX | 10/01/2019 | Paid | $4,871.00 |
PRC 1100 MAX71691 | CONCRETE, READY-MIX | 10/01/2019 | Paid | $2,130.00 |
PRC 1100 MAX71693 | CONCRETE, READY-MIX | 10/01/2019 | Paid | $920.00 |
PRC 1100 MAX71694 | CONCRETE, READY-MIX | 10/01/2019 | Paid | $1,311.00 |
PRC 1100 MAX71452 | CONCRETE, READY-MIX | 09/25/2019 | Paid | $1,638.00 |
PRC 1100 MAX71357 | CONCRETE, READY-MIX | 09/23/2019 | Paid | $3,970.00 |
PRC 1100 MAX71411 | CONCRETE, READY-MIX | 09/23/2019 | Paid | $1,863.75 |
PRC 1100 MAX71413 | CONCRETE, READY-MIX | 09/23/2019 | Paid | $3,825.00 |
PRC 1100 MAX71331 | CONCRETE, READY-MIX | 09/20/2019 | Paid | $3,825.00 |
PRC 1100 MAX71204 | CONCRETE, READY-MIX | 09/17/2019 | Paid | $4,498.00 |
PRC 1100 MAX70996 | CONCRETE, READY-MIX | 09/12/2019 | Paid | $3,258.50 |
PRC 1100 MAX70994 | CONCRETE, READY-MIX | 09/11/2019 | Paid | $3,920.00 |
PRC 1100 MAX70995 | CONCRETE, READY-MIX | 09/11/2019 | Paid | $1,140.00 |
PRC 1100 MAX70997 | CONCRETE, READY-MIX | 09/11/2019 | Paid | $3,680.00 |
PRC 1100 MAX70828 | CONCRETE, READY-MIX | 09/06/2019 | Paid | $852.00 |
PRC 1100 MAX70791 | CONCRETE, READY-MIX | 09/03/2019 | Paid | $3,825.00 |
PRC 1100 MAX70807 | CONCRETE, READY-MIX | 09/03/2019 | Paid | $4,968.00 |
PRC 1100 MAX70808 | CONCRETE, READY-MIX | 09/03/2019 | Paid | $426.00 |
PRC 1100 MAX70809 | CONCRETE, READY-MIX | 09/03/2019 | Paid | $1,864.00 |
PRC 1100 MAX70810 | CONCRETE, READY-MIX | 09/03/2019 | Paid | $1,710.00 |
PRC 1100 MAX70812 | CONCRETE, READY-MIX | 09/03/2019 | Paid | $1,840.00 |
PRC 1100 MAX70813 | CONCRETE, READY-MIX | 09/03/2019 | Paid | $3,825.00 |
PRC 1100 MAX70814 | CONCRETE, READY-MIX | 09/03/2019 | Paid | $958.50 |
PRC 1100 MAX70815 | CONCRETE, READY-MIX | 09/03/2019 | Paid | $782.00 |
PRC 1100 MAX70820 | CONCRETE, READY-MIX | 09/03/2019 | Paid | $5,796.00 |
PRC 1100 MAX70846 | CONCRETE, READY-MIX | 09/03/2019 | Paid | $570.00 |
PRC 1100 MAX70643 | CONCRETE, READY-MIX | 08/29/2019 | Paid | $1,380.00 |
PRC 1100 MAX70645 | CONCRETE, READY-MIX | 08/29/2019 | Paid | $1,840.00 |
PRC 1100 MAX70646 | CONCRETE, READY-MIX | 08/29/2019 | Paid | $958.50 |
PRC 1100 MAX70647 | CONCRETE, READY-MIX | 08/29/2019 | Paid | $1,065.00 |
PRC 1100 MAX70730 | CONCRETE, READY-MIX | 08/29/2019 | Paid | $920.00 |
PRC 1100 MAX70731 | CONCRETE, READY-MIX | 08/29/2019 | Paid | $852.00 |
PRC 1100 MAX70735 | CONCRETE, READY-MIX | 08/29/2019 | Paid | $3,825.00 |
PRC 1100 MAX70736 | CONCRETE, READY-MIX | 08/29/2019 | Paid | $3,588.00 |
PRC 1100 MAX70737 | CONCRETE, READY-MIX | 08/29/2019 | Paid | $2,760.00 |
PRC 1100 MAX70738 | CONCRETE, READY-MIX | 08/29/2019 | Paid | $1,065.00 |
PRC 1100 MAX70624 | CONCRETE, READY-MIX | 08/26/2019 | Paid | $2,614.50 |
PRC 1100 MAX70625 | CONCRETE, READY-MIX | 08/26/2019 | Paid | $2,300.00 |
PRC 1100 MAX70298 | CONCRETE, READY-MIX | 08/12/2019 | Paid | $852.00 |
PRC 1100 MAX70015 | CONCRETE, READY-MIX | 07/31/2019 | Paid | $2,956.00 |
PRC 1100 MAX70016 | CONCRETE, READY-MIX | 07/31/2019 | Paid | $510.00 |
PRC 1100 MAX70017 | CONCRETE, READY-MIX | 07/31/2019 | Paid | $1,836.00 |
PRC 1100 MAX69858 | CONCRETE, READY-MIX | 07/24/2019 | Paid | $1,514.50 |
PRC 1100 MAX69610 | CONCRETE, READY-MIX | 07/18/2019 | Paid | $798.00 |
PRC 1100 MAX69551 | CONCRETE, READY-MIX | 07/17/2019 | Paid | $582.50 |
PRC 1100 MAX69552 | CONCRETE, READY-MIX | 07/17/2019 | Paid | $466.00 |
PRC 1100 MAX69553 | CONCRETE, READY-MIX | 07/17/2019 | Paid | $3,644.00 |
PRC 1100 MAX69605 | CONCRETE, READY-MIX | 07/17/2019 | Paid | $3,771.75 |
PRC 1100 MAX69606 | CONCRETE, READY-MIX | 07/17/2019 | Paid | $1,011.75 |
PRC 1100 MAX69607 | CONCRETE, READY-MIX | 07/17/2019 | Paid | $4,139.75 |
PRC 1100 MAX69383 | CONCRETE, READY-MIX | 07/11/2019 | Paid | $1,514.50 |
PRC 1100 MAX69386 | CONCRETE, READY-MIX | 07/11/2019 | Paid | $932.00 |
PRC 1100 MAX69387 | CONCRETE, READY-MIX | 07/11/2019 | Paid | $1,106.75 |
PRC 1100 MAX69388 | CONCRETE, READY-MIX | 07/11/2019 | Paid | $2,760.00 |
PRC 1100 MAX69119 | CONCRETE, READY-MIX | 06/26/2019 | Paid | $6,808.00 |
PRC 1100 MAX69120 | CONCRETE, READY-MIX | 06/26/2019 | Paid | $2,208.00 |
PRC 1100 MAX68545 | CONCRETE, READY-MIX | 06/06/2019 | Paid | $2,622.00 |
PRC 1100 MAX68394 | CONCRETE, READY-MIX | 06/04/2019 | Paid | $1,020.00 |
PRC 1100 MAX68410 | CONCRETE, READY-MIX | 06/04/2019 | Paid | $2,797.75 |
PRC 1100 MAX68037 | CONCRETE, READY-MIX | 05/17/2019 | Paid | $1,020.00 |
PRC 1100 MAX67528 | CONCRETE, READY-MIX | 04/29/2019 | Paid | $3,633.75 |
PRC 1100 MAX67540 | CONCRETE, READY-MIX | 04/29/2019 | Paid | $4,890.00 |
PRC 1100 MAX67543 | CONCRETE, READY-MIX | 04/29/2019 | Paid | $4,783.50 |
PRC 1100 MAX67544 | CONCRETE, READY-MIX | 04/29/2019 | Paid | $426.00 |
PRC 1100 MAX67548 | CONCRETE, READY-MIX | 04/29/2019 | Paid | $1,632.00 |
PRC 1100 MAX67021 | CONCRETE, READY-MIX | 04/16/2019 | Paid | $2,706.50 |
PRC 1100 MAX67182 | CONCRETE, READY-MIX | 04/16/2019 | Paid | $2,532.25 |
PRC 1100 MAX67207 | CONCRETE, READY-MIX | 04/16/2019 | Paid | $2,760.00 |
PRC 1100 MAX67208 | CONCRETE, READY-MIX | 04/16/2019 | Paid | $5,810.00 |
PRC 1100 MAX67209 | CONCRETE, READY-MIX | 04/16/2019 | Paid | $3,771.75 |
PRC 1100 MAX67016 | CONCRETE, READY-MIX | 04/09/2019 | Paid | $3,670.00 |
PRC 1100 MAX67017 | CONCRETE, READY-MIX | 04/09/2019 | Paid | $4,415.50 |
PRC 1100 MAX67018 | CONCRETE, READY-MIX | 04/09/2019 | Paid | $3,496.00 |
PRC 1100 MAX67019 | CONCRETE, READY-MIX | 04/09/2019 | Paid | $3,437.50 |
PRC 1100 MAX67020 | CONCRETE, READY-MIX | 04/09/2019 | Paid | $1,564.00 |
PRC 1100 MAX67022 | CONCRETE, READY-MIX | 04/09/2019 | Paid | $684.00 |
PRC 1100 MAX67023 | CONCRETE, READY-MIX | 04/09/2019 | Paid | $3,825.00 |
PRC 1100 MAX67024 | CONCRETE, READY-MIX | 04/09/2019 | Paid | $741.00 |
PRC 1100 MAX66897 | CONCRETE, READY-MIX | 04/03/2019 | Paid | $3,633.75 |
PRC 1100 MAX66898 | CONCRETE, READY-MIX | 04/03/2019 | Paid | $2,752.50 |
PRC 1100 MAX66899 | CONCRETE, READY-MIX | 04/03/2019 | Paid | $1,104.00 |
PRC 1100 MAX66900 | CONCRETE, READY-MIX | 04/03/2019 | Paid | $4,832.00 |
PRC 1100 MAX66780 | CONCRETE, READY-MIX | 04/01/2019 | Paid | $1,653.00 |
PRC 1100 MAX66781 | CONCRETE, READY-MIX | 04/01/2019 | Paid | $4,600.00 |
PRC 1100 MAX66783 | CONCRETE, READY-MIX | 04/01/2019 | Paid | $1,710.00 |
PRC 1100 MAX66786 | CONCRETE, READY-MIX | 04/01/2019 | Paid | $1,957.00 |
PRC 1100 MAX66787 | CONCRETE, READY-MIX | 04/01/2019 | Paid | $1,726.00 |
PRC 1100 MAX66788 | CONCRETE, READY-MIX | 04/01/2019 | Paid | $570.00 |
PRC 1100 MAX66789 | CONCRETE, READY-MIX | 04/01/2019 | Paid | $627.00 |
PRC 1100 MAX66793 | CONCRETE, READY-MIX | 04/01/2019 | Paid | $852.00 |
PRC 1100 MAX66794 | CONCRETE, READY-MIX | 04/01/2019 | Paid | $1,748.00 |
PRC 1100 MAX66798 | CONCRETE, READY-MIX | 04/01/2019 | Paid | $852.00 |
PRC 1100 MAX66799 | CONCRETE, READY-MIX | 04/01/2019 | Paid | $745.50 |
PRC 1100 MAX66800 | CONCRETE, READY-MIX | 04/01/2019 | Paid | $2,280.00 |
PRC 1100 MAX66638 | CONCRETE, READY-MIX | 03/26/2019 | Paid | $627.00 |
PRC 1100 MAX66648 | CONCRETE, READY-MIX | 03/26/2019 | Paid | $2,622.00 |
PRC 1100 MAX66649 | CONCRETE, READY-MIX | 03/26/2019 | Paid | $1,083.00 |
PRC 1100 MAX66651 | CONCRETE, READY-MIX | 03/26/2019 | Paid | $1,065.00 |
PRC 1100 MAX66652 | CONCRETE, READY-MIX | 03/26/2019 | Paid | $1,491.00 |
PRC 1100 MAX66654 | CONCRETE, READY-MIX | 03/26/2019 | Paid | $920.00 |
PRC 1100 MAX66664 | CONCRETE, READY-MIX | 03/26/2019 | Paid | $1,026.00 |
PRC 1100 MAX66208 | CONCRETE, READY-MIX | 03/18/2019 | Paid | $2,356.50 |
PRC 1100 MAX66204 | CONCRETE, READY-MIX | 03/11/2019 | Paid | $3,084.25 |
PRC 1100 MAX66205 | CONCRETE, READY-MIX | 03/11/2019 | Paid | $5,519.50 |
PRC 1100 MAX66206 | CONCRETE, READY-MIX | 03/11/2019 | Paid | $1,539.00 |
PRC 1100 MAX66207 | CONCRETE, READY-MIX | 03/11/2019 | Paid | $627.00 |
PRC 1100 MAX66220 | CONCRETE, READY-MIX | 03/11/2019 | Paid | $1,065.00 |
PRC 1100 MAX66221 | CONCRETE, READY-MIX | 03/11/2019 | Paid | $1,710.00 |
PRC 1100 MAX66222 | CONCRETE, READY-MIX | 03/11/2019 | Paid | $627.00 |
PRC 1100 MAX66223 | CONCRETE, READY-MIX | 03/11/2019 | Paid | $4,890.00 |
PRC 1100 MAX66225 | CONCRETE, READY-MIX | 03/11/2019 | Paid | $1,083.00 |
PRC 1100 MAX66226 | CONCRETE, READY-MIX | 03/11/2019 | Paid | $745.50 |
PRC 1100 MAX66161 | CONCRETE, READY-MIX | 03/08/2019 | Paid | $1,368.00 |
PRC 1100 MAX66024 | CONCRETE, READY-MIX | 03/06/2019 | Paid | $3,220.00 |
PRC 1100 MAX66025 | CONCRETE, READY-MIX | 03/06/2019 | Paid | $3,825.00 |
PRC 1100 MAX66027 | CONCRETE, READY-MIX | 03/06/2019 | Paid | $1,653.00 |
PRC 1100 MAX66029 | CONCRETE, READY-MIX | 03/06/2019 | Paid | $2,166.00 |
PRC 1100 MAX66030 | CONCRETE, READY-MIX | 03/06/2019 | Paid | $3,078.00 |
PRC 1100 MAX66032 | CONCRETE, READY-MIX | 03/06/2019 | Paid | $1,311.00 |
PRC 1100 MAX66059 | CONCRETE, READY-MIX | 03/06/2019 | Paid | $1,368.00 |
PRC 1100 MAX66037 | CONCRETE, READY-MIX | 03/05/2019 | Paid | $456.00 |
PRC 1100 MAX66040 | CONCRETE, READY-MIX | 03/05/2019 | Paid | $1,083.00 |
PRC 1100 MAX65916 | CONCRETE, READY-MIX | 03/04/2019 | Paid | $6,522.00 |
PRC 1100 MAX65915 | CONCRETE, READY-MIX | 02/27/2019 | Paid | $4,774.00 |
PRC 1100 MAX65832 | CONCRETE, READY-MIX | 02/22/2019 | Paid | $1,380.00 |
PRC 1100 MAX65833 | CONCRETE, READY-MIX | 02/22/2019 | Paid | $4,745.00 |
PRC 1100 MAX65834 | CONCRETE, READY-MIX | 02/22/2019 | Paid | $3,825.00 |
PRC 1100 MAX65835 | CONCRETE, READY-MIX | 02/22/2019 | Paid | $1,597.50 |
PRC 1100 MAX65839 | CONCRETE, READY-MIX | 02/22/2019 | Paid | $2,130.00 |
PRC 1100 MAX65841 | CONCRETE, READY-MIX | 02/22/2019 | Paid | $5,670.00 |
PRC 1100 MAX65842 | CONCRETE, READY-MIX | 02/22/2019 | Paid | $5,171.00 |
PRC 1100 MAX65695 | CONCRETE, READY-MIX | 02/20/2019 | Paid | $2,484.00 |
PRC 1100 MAX65697 | CONCRETE, READY-MIX | 02/20/2019 | Paid | $4,507.75 |
PRC 1100 MAX65698 | CONCRETE, READY-MIX | 02/20/2019 | Paid | $1,840.00 |
PRC 1100 MAX65699 | CONCRETE, READY-MIX | 02/20/2019 | Paid | $1,065.00 |
PRC 1100 MAX65608 | CONCRETE, READY-MIX | 02/15/2019 | Paid | $1,254.00 |
PRC 1100 MAX65240 | CONCRETE, READY-MIX | 02/05/2019 | Paid | $2,130.00 |
PRC 1100 MAX65241 | CONCRETE, READY-MIX | 02/05/2019 | Paid | $2,576.00 |
PRC 1100 MAX65242 | CONCRETE, READY-MIX | 02/05/2019 | Paid | $3,496.00 |
PRC 1100 MAX65243 | CONCRETE, READY-MIX | 02/05/2019 | Paid | $2,760.00 |
PRC 1100 MAX65152 | CONCRETE, READY-MIX | 02/04/2019 | Paid | $1,467.00 |
PRC 1100 MAX64534 | CONCRETE, READY-MIX | 01/10/2019 | Paid | $4,324.00 |
PRC 1100 MAX64535 | CONCRETE, READY-MIX | 01/10/2019 | Paid | $3,680.00 |
PRC 1100 MAX64536 | CONCRETE, READY-MIX | 01/10/2019 | Paid | $3,680.00 |
PRC 1100 MAX64449 | CONCRETE, READY-MIX | 01/09/2019 | Paid | $684.00 |
PRC 1100 MAX64316 | CONCRETE, READY-MIX | 01/04/2019 | Paid | $408.00 |
PRC 1100 MAX64332 | CONCRETE, READY-MIX | 01/04/2019 | Paid | $2,546.75 |
PRC 1100 MAX63918 | CONCRETE, READY-MIX | 12/11/2018 | Paid | $12,420.00 |
PRC 1100 MAX63899 | CONCRETE, READY-MIX | 12/10/2018 | Paid | $4,783.25 |
PRC 1100 MAX63900 | CONCRETE, READY-MIX | 12/10/2018 | Paid | $9,614.00 |
PRC 1100 MAX63915 | CONCRETE, READY-MIX | 12/10/2018 | Paid | $1,748.00 |
PRC 1100 MAX63917 | CONCRETE, READY-MIX | 12/10/2018 | Paid | $1,020.00 |
PRC 1100 MAX63828 | CONCRETE, READY-MIX | 12/07/2018 | Paid | $627.00 |
PRC 1100 MAX63666 | CONCRETE, READY-MIX | 11/30/2018 | Paid | $1,704.00 |
PRC 1100 MAX63543 | CONCRETE, READY-MIX | 11/28/2018 | Paid | $3,680.00 |
PRC 1100 MAX63551 | CONCRETE, READY-MIX | 11/28/2018 | Paid | $4,600.00 |
PRC 1100 MAX63553 | CONCRETE, READY-MIX | 11/28/2018 | Paid | $969.00 |
PRC 1100 MAX63524 | CONCRETE, READY-MIX | 11/21/2018 | Paid | $10,591.50 |
PRC 1100 MAX62905 | CONCRETE, READY-MIX | 10/29/2018 | Paid | $684.00 |
PRC 1100 MAX62907 | CONCRETE, READY-MIX | 10/29/2018 | Paid | $319.50 |
PRC 1100 MAX62920 | CONCRETE, READY-MIX | 10/29/2018 | Paid | $828.00 |
PRC 1100 18101200156 | CONCRETE, READY-MIX | 10/17/2018 | Paid | $1,288.00 |
PRC 1100 MAX62012 | CONCRETE, READY-MIX | 09/24/2018 | Paid | $920.00 |
PRC 1100 MAX62013 | CONCRETE, READY-MIX | 09/24/2018 | Paid | $2,692.00 |
PRC 1100 MAX60506 | CONCRETE, READY-MIX | 07/24/2018 | Paid | $1,786.50 |
PRC 1100 MAX60405 | CONCRETE, READY-MIX | 07/17/2018 | Paid | $456.00 |
PRC 1100 MAX60045 | CONCRETE, READY-MIX | 07/05/2018 | Paid | $874.00 |
PRC 1100 MAX60046 | CONCRETE, READY-MIX | 07/05/2018 | Paid | $460.00 |
PRC 1100 MAX60051 | CONCRETE, READY-MIX | 07/05/2018 | Paid | $1,011.75 |
PRC 1100 MAX60052 | CONCRETE, READY-MIX | 07/05/2018 | Paid | $874.00 |
PRC 1100 MAX60053 | CONCRETE, READY-MIX | 07/05/2018 | Paid | $2,166.00 |
PRC 1100 MAX60054 | CONCRETE, READY-MIX | 07/05/2018 | Paid | $3,818.00 |
PRC 1100 MAX59833 | CONCRETE, READY-MIX | 06/26/2018 | Paid | $1,748.00 |
PRC 1100 MAX59834 | CONCRETE, READY-MIX | 06/26/2018 | Paid | $745.50 |
PRC 1100 MAX59835 | CONCRETE, READY-MIX | 06/26/2018 | Paid | $1,011.75 |
PRC 1100 MAX59296 | CONCRETE, READY-MIX | 06/06/2018 | Paid | $684.00 |
PRC 1100 MAX59297 | CONCRETE, READY-MIX | 06/06/2018 | Paid | $1,881.00 |
PRC 1100 MAX59298 | CONCRETE, READY-MIX | 06/06/2018 | Paid | $1,288.00 |
PRC 1100 MAX59014 | CONCRETE, READY-MIX | 05/22/2018 | Paid | $2,714.00 |
PRC 1100 MAX58993 | CONCRETE, READY-MIX | 05/17/2018 | Paid | $342.00 |
PRC 1100 MAX58261 | CONCRETE, READY-MIX | 04/19/2018 | Paid | $684.00 |
PRC 1100 MAX58262 | CONCRETE, READY-MIX | 04/19/2018 | Paid | $2,024.00 |
PRC 1100 MAX58238 | CONCRETE, READY-MIX | 04/18/2018 | Paid | $1,326.00 |
PRC 1100 MAX58228 | CONCRETE, READY-MIX | 04/16/2018 | Paid | $5,381.75 |
PRC 1100 MAX58025 | CONCRETE, READY-MIX | 04/12/2018 | Paid | $969.00 |
PRC 1100 MAX58026 | CONCRETE, READY-MIX | 04/12/2018 | Paid | $958.50 |
PRC 1100 MAX57863 | CONCRETE, READY-MIX | 03/30/2018 | Paid | $920.00 |
PRC 1100 MAX57864 | CONCRETE, READY-MIX | 03/30/2018 | Paid | $1,757.25 |
PRC 1100 MAX57865 | CONCRETE, READY-MIX | 03/30/2018 | Paid | $1,065.00 |
PRC 1100 MAX57866 | CONCRETE, READY-MIX | 03/30/2018 | Paid | $1,840.00 |
PRC 1100 MAX57868 | CONCRETE, READY-MIX | 03/30/2018 | Paid | $1,824.00 |
PRC 1100 MAX57880 | CONCRETE, READY-MIX | 03/30/2018 | Paid | $1,596.00 |
PRC 1100 MAX57723 | CONCRETE, READY-MIX | 03/21/2018 | Paid | $1,065.00 |
PRC 1100 MAX57724 | CONCRETE, READY-MIX | 03/21/2018 | Paid | $5,520.00 |
PRC 1100 MAX57633 | CONCRETE, READY-MIX | 03/19/2018 | Paid | $684.00 |
PRC 1100 MAX57634 | CONCRETE, READY-MIX | 03/19/2018 | Paid | $1,840.00 |
PRC 1100 MAX57636 | CONCRETE, READY-MIX | 03/19/2018 | Paid | $920.00 |
PRC 1100 MAX57637 | CONCRETE, READY-MIX | 03/19/2018 | Paid | $920.00 |
PRC 1100 MAX57638 | CONCRETE, READY-MIX | 03/19/2018 | Paid | $1,011.75 |
PRC 1100 MAX57672 | CONCRETE, READY-MIX | 03/19/2018 | Paid | $920.00 |
PRC 1100 MAX57674 | CONCRETE, READY-MIX | 03/19/2018 | Paid | $1,140.00 |
PRC 1100 MAX57675 | CONCRETE, READY-MIX | 03/19/2018 | Paid | $1,472.00 |
PRC 1100 MAX57676 | CONCRETE, READY-MIX | 03/19/2018 | Paid | $4,600.00 |
PRC 1100 MAX57569 | CONCRETE, READY-MIX | 03/14/2018 | Paid | $1,656.00 |
PRC 1100 MAX57570 | CONCRETE, READY-MIX | 03/14/2018 | Paid | $684.00 |
PRC 1100 MAX57516 | CONCRETE, READY-MIX | 03/12/2018 | Paid | $2,479.00 |
PRC 1100 MAX57517 | CONCRETE, READY-MIX | 03/12/2018 | Paid | $2,266.00 |
PRC 1100 MAX57353 | CONCRETE, READY-MIX | 03/05/2018 | Paid | $1,840.00 |
PRC 1100 MAX57354 | CONCRETE, READY-MIX | 03/05/2018 | Paid | $920.00 |
PRC 1100 MAX57355 | CONCRETE, READY-MIX | 03/05/2018 | Paid | $920.00 |
PRC 1100 MAX57356 | CONCRETE, READY-MIX | 03/05/2018 | Paid | $920.00 |
PRC 1100 MAX57357 | CONCRETE, READY-MIX | 03/05/2018 | Paid | $2,280.00 |
PRC 1100 MAX57310 | CONCRETE, READY-MIX | 03/01/2018 | Paid | $6,081.00 |
PRC 1100 MAX57317 | CONCRETE, READY-MIX | 03/01/2018 | Paid | $1,849.50 |
PRC 1100 MAX57236 | CONCRETE, READY-MIX | 02/26/2018 | Paid | $828.00 |
PRC 1100 MAX57152 | CONCRETE, READY-MIX | 02/22/2018 | Paid | $874.00 |
PRC 1100 MAX57153 | CONCRETE, READY-MIX | 02/22/2018 | Paid | $1,840.00 |
PRC 1100 MAX57154 | CONCRETE, READY-MIX | 02/22/2018 | Paid | $920.00 |
PRC 1100 MAX57155 | CONCRETE, READY-MIX | 02/22/2018 | Paid | $1,026.00 |
PRC 1100 MAX57156 | CONCRETE, READY-MIX | 02/22/2018 | Paid | $1,748.00 |
PRC 1100 MAX57037 | CONCRETE, READY-MIX | 02/20/2018 | Paid | $1,368.00 |
PRC 1100 MAX57083 | CONCRETE, READY-MIX | 02/20/2018 | Paid | $1,596.00 |
PRC 1100 MAX57085 | CONCRETE, READY-MIX | 02/20/2018 | Paid | $2,860.00 |
PRC 1100 MAX57099 | CONCRETE, READY-MIX | 02/20/2018 | Paid | $920.00 |
PRC 1100 MAX56979 | CONCRETE, READY-MIX | 02/13/2018 | Paid | $828.00 |
PRC 1100 MAX56884 | CONCRETE, READY-MIX | 02/09/2018 | Paid | $1,288.00 |
PRC 1100 MAX56623 | CONCRETE, READY-MIX | 01/31/2018 | Paid | $12,236.00 |
PRC 1100 MAX56625 | CONCRETE, READY-MIX | 01/31/2018 | Paid | $918.00 |
PRC 1100 MAX56149 | CONCRETE, READY-MIX | 01/04/2018 | Paid | $1,011.75 |
PRC 1100 MAX55960 | CONCRETE, READY-MIX | 12/29/2017 | Paid | $2,760.00 |
PRC 1100 MAX55890 | CONCRETE, READY-MIX | 12/20/2017 | Paid | $874.00 |
PRC 1100 MAX55891 | CONCRETE, READY-MIX | 12/20/2017 | Paid | $3,312.00 |
PRC 1100 MAX55791 | CONCRETE, READY-MIX | 12/19/2017 | Paid | $874.00 |
PRC 1100 MAX55800 | CONCRETE, READY-MIX | 12/19/2017 | Paid | $684.00 |
PRC 1100 MAX55801 | CONCRETE, READY-MIX | 12/19/2017 | Paid | $3,306.00 |
PRC 1100 MAX55802 | CONCRETE, READY-MIX | 12/19/2017 | Paid | $1,863.75 |
PRC 1100 MAX55648 | CONCRETE, READY-MIX | 12/08/2017 | Paid | $408.00 |
PRC 1100 MAX55649 | CONCRETE, READY-MIX | 12/08/2017 | Paid | $1,472.00 |
PRC 1100 MAX55526 | CONCRETE, READY-MIX | 12/07/2017 | Paid | $1,656.00 |
PRC 1100 MAX55428 | CONCRETE, READY-MIX | 12/06/2017 | Paid | $1,748.00 |
PRC 1100 MAX55360 | CONCRETE, READY-MIX | 12/01/2017 | Paid | $1,748.00 |
PRC 1100 MAX55363 | CONCRETE, READY-MIX | 12/01/2017 | Paid | $2,964.00 |
PRC 1100 MAX55114 | CONCRETE, READY-MIX | 11/13/2017 | Paid | $1,426.00 |
PRC 1100 MAX55116 | CONCRETE, READY-MIX | 11/13/2017 | Paid | $969.00 |
PRC 1100 MAX55123 | CONCRETE, READY-MIX | 11/13/2017 | Paid | $1,748.00 |
PRC 1100 MAX55124 | CONCRETE, READY-MIX | 11/13/2017 | Paid | $2,166.00 |
PRC 1100 MAX55125 | CONCRETE, READY-MIX | 11/13/2017 | Paid | $1,748.00 |
PRC 1100 MAX55128 | CONCRETE, READY-MIX | 11/13/2017 | Paid | $2,052.00 |
PRC 1100 MAX54978 | CONCRETE, READY-MIX | 11/07/2017 | Paid | $2,166.00 |
PRC 1100 MAX54979 | CONCRETE, READY-MIX | 11/07/2017 | Paid | $1,083.00 |
PRC 1100 MAX54853 | CONCRETE, READY-MIX | 11/01/2017 | Paid | $874.00 |
PRC 1100 MAX54497 | CONCRETE, READY-MIX | 10/16/2017 | Paid | $1,083.00 |
PRC 1100 MAX54400 | CONCRETE, READY-MIX | 10/09/2017 | Paid | $408.00 |
PRC 1100 MAX54401 | CONCRETE, READY-MIX | 10/09/2017 | Paid | $1,940.00 |
PRC 1100 MAX54022 | CONCRETE, READY-MIX | 09/26/2017 | Paid | $816.00 |
PRC 1100 MAX53828 | CONCRETE, READY-MIX | 09/20/2017 | Paid | $2,760.00 |
PRC 1100 MAX53832 | CONCRETE, READY-MIX | 09/20/2017 | Paid | $918.00 |
PRC 1100 MAX53833 | CONCRETE, READY-MIX | 09/20/2017 | Paid | $1,840.00 |
PRC 1100 MAX53835 | CONCRETE, READY-MIX | 09/20/2017 | Paid | $816.00 |
PRC 1100 MAX53836 | CONCRETE, READY-MIX | 09/20/2017 | Paid | $1,938.00 |
PRC 1100 MAX53568 | CONCRETE, READY-MIX | 09/06/2017 | Paid | $2,585.50 |
PRC 1100 MAX53569 | CONCRETE, READY-MIX | 09/06/2017 | Paid | $714.00 |
PRC 1100 MAX53147 | CONCRETE, READY-MIX | 08/22/2017 | Paid | $570.00 |
PRC 1100 MAX53151 | CONCRETE, READY-MIX | 08/22/2017 | Paid | $918.00 |
PRC 1100 MAX53098 | CONCRETE, READY-MIX | 08/17/2017 | Paid | $1,596.00 |
PRC 1100 MAX53099 | CONCRETE, READY-MIX | 08/17/2017 | Paid | $1,840.00 |
PRC 1100 MAX53100 | CONCRETE, READY-MIX | 08/17/2017 | Paid | $1,083.00 |
PRC 1100 MAX53101 | CONCRETE, READY-MIX | 08/17/2017 | Paid | $2,223.00 |
PRC 1100 MAX52997 | CONCRETE, READY-MIX | 08/16/2017 | Paid | $3,128.00 |
PRC 1100 MAX52971 | CONCRETE, READY-MIX | 08/15/2017 | Paid | $969.00 |
PRC 1100 MAX52727 | CONCRETE, READY-MIX | 08/03/2017 | Paid | $969.00 |
PRC 1100 MAX52717 | CONCRETE, READY-MIX | 08/02/2017 | Paid | $1,224.00 |
PRC 1100 MAX52723 | CONCRETE, READY-MIX | 08/02/2017 | Paid | $2,760.00 |
PRC 1100 MAX52725 | CONCRETE, READY-MIX | 08/02/2017 | Paid | $874.00 |
PRC 1100 MAX52526 | CONCRETE, READY-MIX | 07/27/2017 | Paid | $969.00 |
PRC 1100 MAX52527 | CONCRETE, READY-MIX | 07/27/2017 | Paid | $1,288.00 |
PRC 1100 MAX52528 | CONCRETE, READY-MIX | 07/27/2017 | Paid | $510.00 |
PRC 1100 MAX52529 | CONCRETE, READY-MIX | 07/27/2017 | Paid | $969.00 |
PRC 1100 MAX52531 | CONCRETE, READY-MIX | 07/27/2017 | Paid | $1,122.00 |
PRC 1100 MAX52533 | CONCRETE, READY-MIX | 07/27/2017 | Paid | $1,472.00 |
PRC 1100 MAX52536 | CONCRETE, READY-MIX | 07/27/2017 | Paid | $1,843.00 |
PRC 1100 MAX52368 | CONCRETE, READY-MIX | 07/19/2017 | Paid | $1,840.00 |
PRC 1100 MAX52276 | CONCRETE, READY-MIX | 07/13/2017 | Paid | $1,020.00 |
PRC 1100 MAX52141 | CONCRETE, READY-MIX | 07/10/2017 | Paid | $1,020.00 |
PRC 1100 MAX52142 | CONCRETE, READY-MIX | 07/10/2017 | Paid | $408.00 |
PRC 1100 MAX52106 | CONCRETE, READY-MIX | 07/06/2017 | Paid | $1,020.00 |
PRC 1100 MAX52111 | CONCRETE, READY-MIX | 07/06/2017 | Paid | $510.00 |
PRC 1100 MAX51972 | CONCRETE, READY-MIX | 07/03/2017 | Paid | $1,065.00 |
PRC 1100 MAX51974 | CONCRETE, READY-MIX | 07/03/2017 | Paid | $2,760.00 |
PRC 1100 MAX51802 | CONCRETE, READY-MIX | 06/20/2017 | Paid | $1,596.00 |
PRC 1100 MAX51576 | CONCRETE, READY-MIX | 06/12/2017 | Paid | $1,140.00 |
PRC 1100 MAX51584 | CONCRETE, READY-MIX | 06/12/2017 | Paid | $714.00 |
PRC 1100 MAX51272 | CONCRETE, READY-MIX | 05/31/2017 | Paid | $6,236.00 |
PRC 1100 MAX51353 | CONCRETE, READY-MIX | 05/30/2017 | Paid | $4,636.50 |
PRC 1100 MAX51062 | CONCRETE, READY-MIX | 05/17/2017 | Paid | $3,780.00 |
PRC 1100 MAX50891 | CONCRETE, READY-MIX | 05/09/2017 | Paid | $1,288.00 |
PRC 1100 MAX50893 | CONCRETE, READY-MIX | 05/09/2017 | Paid | $1,224.00 |
PRC 1100 MAX50639 | CONCRETE, READY-MIX | 05/01/2017 | Paid | $918.00 |
PRC 1100 MAX50640 | CONCRETE, READY-MIX | 05/01/2017 | Paid | $1,840.00 |
PRC 1100 MAX50642 | CONCRETE, READY-MIX | 05/01/2017 | Paid | $2,024.00 |
PRC 1100 MAX50464 | CONCRETE, READY-MIX | 04/20/2017 | Paid | $2,760.00 |
PRC 1100 MAX50466 | CONCRETE, READY-MIX | 04/20/2017 | Paid | $644.00 |
PRC 1100 MAX50469 | CONCRETE, READY-MIX | 04/20/2017 | Paid | $1,328.00 |
PRC 1100 MAX50470 | CONCRETE, READY-MIX | 04/20/2017 | Paid | $2,905.00 |
PRC 1100 MAX50471 | CONCRETE, READY-MIX | 04/20/2017 | Paid | $852.00 |
PRC 1100 MAX50472 | CONCRETE, READY-MIX | 04/20/2017 | Paid | $1,840.00 |
PRC 1100 MAX50475 | CONCRETE, READY-MIX | 04/20/2017 | Paid | $798.00 |
PRC 1100 MAX50246 | CONCRETE, READY-MIX | 04/19/2017 | Paid | $2,860.00 |
PRC 1100 MAX50247 | CONCRETE, READY-MIX | 04/19/2017 | Paid | $1,326.00 |
PRC 1100 MAX50244 | CONCRETE, READY-MIX | 04/14/2017 | Paid | $1,140.00 |
PRC 1100 MAX50250 | CONCRETE, READY-MIX | 04/14/2017 | Paid | $408.00 |
PRC 1100 MAX50015 | CONCRETE, READY-MIX | 04/04/2017 | Paid | $11,960.00 |
PRC 1100 MAX50016 | CONCRETE, READY-MIX | 04/04/2017 | Paid | $912.00 |
PRC 1100 MAX50017 | CONCRETE, READY-MIX | 04/04/2017 | Paid | $4,464.00 |
PRC 1100 MAX50019 | CONCRETE, READY-MIX | 04/04/2017 | Paid | $918.00 |
PRC 1100 MAX50020 | CONCRETE, READY-MIX | 04/04/2017 | Paid | $1,824.00 |
PRC 1100 MAX50025 | CONCRETE, READY-MIX | 04/04/2017 | Paid | $2,208.00 |
PRC 1100 MAX50031 | CONCRETE, READY-MIX | 04/04/2017 | Paid | $2,052.00 |
PRC 1100 MAX50032 | CONCRETE, READY-MIX | 04/04/2017 | Paid | $920.00 |
PRC 1100 MAX50035 | CONCRETE, READY-MIX | 04/04/2017 | Paid | $736.00 |
PRC 1100 MAX49650 | CONCRETE, READY-MIX | 03/15/2017 | Paid | $1,840.00 |
PRC 1100 MAX49654 | CONCRETE, READY-MIX | 03/15/2017 | Paid | $2,760.00 |
PRC 1100 MAX49655 | CONCRETE, READY-MIX | 03/15/2017 | Paid | $958.50 |
PRC 1100 MAX49656 | CONCRETE, READY-MIX | 03/15/2017 | Paid | $2,905.00 |
PRC 1100 MAX49657 | CONCRETE, READY-MIX | 03/15/2017 | Paid | $1,824.00 |
PRC 1100 MAX49659 | CONCRETE, READY-MIX | 03/15/2017 | Paid | $2,052.00 |
PRC 1100 MAX49660 | CONCRETE, READY-MIX | 03/15/2017 | Paid | $816.00 |
PRC 1100 MAX49505 | CONCRETE, READY-MIX | 03/09/2017 | Paid | $4,600.00 |
PRC 1100 MAX49502 | CONCRETE, READY-MIX | 03/08/2017 | Paid | $3,680.00 |
PRC 1100 MAX49503 | CONCRETE, READY-MIX | 03/08/2017 | Paid | $918.00 |
PRC 1100 MAX49504 | CONCRETE, READY-MIX | 03/08/2017 | Paid | $2,760.00 |
PRC 1100 MAX49531 | CONCRETE, READY-MIX | 03/08/2017 | Paid | $684.00 |
PRC 1100 MAX49534 | CONCRETE, READY-MIX | 03/08/2017 | Paid | $1,482.00 |
PRC 1100 MAX49102 | CONCRETE, READY-MIX | 02/28/2017 | Paid | $2,208.00 |
PRC 1100 MAX49103 | CONCRETE, READY-MIX | 02/28/2017 | Paid | $5,016.00 |
PRC 1100 MAX48881 | CONCRETE, READY-MIX | 02/09/2017 | Paid | $1,840.00 |
PRC 1100 MAX48795 | CONCRETE, READY-MIX | 02/06/2017 | Paid | $2,905.00 |
PRC 1100 MAX48797 | CONCRETE, READY-MIX | 02/06/2017 | Paid | $3,680.00 |
PRC 1100 MAX48570 | CONCRETE, READY-MIX | 01/31/2017 | Paid | $456.00 |
PRC 1100 MAX48572 | CONCRETE, READY-MIX | 01/31/2017 | Paid | $3,680.00 |
PRC 1100 MAX48237 | CONCRETE, READY-MIX | 01/11/2017 | Paid | $2,130.00 |
PRC 1100 MAX48238 | CONCRETE, READY-MIX | 01/11/2017 | Paid | $9,200.00 |
PRC 1100 MAX47927 | CONCRETE, READY-MIX | 12/27/2016 | Paid | $1,026.00 |
PRC 1100 MAX47932 | CONCRETE, READY-MIX | 12/27/2016 | Paid | $570.00 |
PRC 1100 MAX47933 | CONCRETE, READY-MIX | 12/27/2016 | Paid | $1,840.00 |
PRC 1100 MAX47946 | CONCRETE, READY-MIX | 12/27/2016 | Paid | $1,596.00 |
PRC 1100 MAX47947 | CONCRETE, READY-MIX | 12/27/2016 | Paid | $639.00 |
PRC 1100 MAX47952 | CONCRETE, READY-MIX | 12/27/2016 | Paid | $4,600.00 |
PRC 1100 MAX47954 | CONCRETE, READY-MIX | 12/27/2016 | Paid | $408.00 |
PRC 1100 MAX47278 | CONCRETE, READY-MIX | 11/16/2016 | Paid | $3,420.00 |
PRC 1100 MAX47279 | CONCRETE, READY-MIX | 11/16/2016 | Paid | $2,280.00 |
PRC 1100 MAX46955 | CONCRETE, READY-MIX | 10/31/2016 | Paid | $6,440.00 |
PRC 1100 MAX46957 | CONCRETE, READY-MIX | 10/31/2016 | Paid | $2,052.00 |
PRC 1100 MAX46960 | CONCRETE, READY-MIX | 10/31/2016 | Paid | $912.00 |
PRC 1100 MAX46962 | CONCRETE, READY-MIX | 10/31/2016 | Paid | $1,452.50 |
PRC 1100 MAX46964 | CONCRETE, READY-MIX | 10/31/2016 | Paid | $2,208.00 |
PRC 1100 MAX46980 | CONCRETE, READY-MIX | 10/31/2016 | Paid | $1,564.00 |
PRC 1100 MAX46721 | CONCRETE, READY-MIX | 10/21/2016 | Paid | $912.00 |
PRC 1100 MAX46722 | CONCRETE, READY-MIX | 10/21/2016 | Paid | $1,772.00 |
PRC 1100 MAX46653 | CONCRETE, READY-MIX | 10/05/2016 | Paid | $3,970.00 |
PRC 1100 MAX46656 | CONCRETE, READY-MIX | 10/05/2016 | Paid | $552.00 |
PRC 1100 MAX46657 | CONCRETE, READY-MIX | 10/05/2016 | Paid | $1,840.00 |
PRC 1100 MAX46658 | CONCRETE, READY-MIX | 10/05/2016 | Paid | $920.00 |
PRC 1100 MAX46487 | CONCRETE, READY-MIX | 09/29/2016 | Paid | $570.00 |
PRC 1100 MAX45998 | CONCRETE, READY-MIX | 09/14/2016 | Paid | $1,162.00 |
PRC 1100 MAX46013 | CONCRETE, READY-MIX | 09/14/2016 | Paid | $684.00 |
PRC 1100 MAX45352 | CONCRETE, READY-MIX | 08/11/2016 | Paid | $1,326.00 |
PRC 1100 MAX45353 | CONCRETE, READY-MIX | 08/11/2016 | Paid | $1,472.00 |
PRC 1100 MAX45195 | CONCRETE, READY-MIX | 08/05/2016 | Paid | $912.00 |
PRC 1100 MAX45197 | CONCRETE, READY-MIX | 08/05/2016 | Paid | $1,020.00 |
PRC 1100 MAX44916 | CONCRETE, READY-MIX | 07/18/2016 | Paid | $1,472.00 |
PRC 1100 MAX44718 | CONCRETE, READY-MIX | 07/12/2016 | Paid | $1,368.00 |
PRC 1100 MAX44717 | CONCRETE, READY-MIX | 07/11/2016 | Paid | $1,288.00 |
PRC 1100 MAX44719 | CONCRETE, READY-MIX | 07/11/2016 | Paid | $1,656.00 |
PRC 1100 MAX44607 | CONCRETE, READY-MIX | 06/30/2016 | Paid | $714.00 |
PRC 1100 MAX44322 | CONCRETE, READY-MIX | 06/20/2016 | Paid | $1,840.00 |
PRC 1100 MAX44323 | CONCRETE, READY-MIX | 06/20/2016 | Paid | $612.00 |
PRC 1100 MAX44324 | CONCRETE, READY-MIX | 06/20/2016 | Paid | $920.00 |
PRC 1100 MAX44325 | CONCRETE, READY-MIX | 06/20/2016 | Paid | $639.00 |
PRC 1100 MAX44158 | CONCRETE, READY-MIX | 06/15/2016 | Paid | $1,840.00 |
PRC 1100 MAX44060 | CONCRETE, READY-MIX | 06/14/2016 | Paid | $1,026.00 |
PRC 1100 MAX44065 | CONCRETE, READY-MIX | 06/14/2016 | Paid | $1,368.00 |
PRC 1100 MAX43909 | CONCRETE, READY-MIX | 05/31/2016 | Paid | $5,350.00 |
PRC 1100 MAX43809 | CONCRETE, READY-MIX | 05/27/2016 | Paid | $570.00 |
PRC 1100 MAX43810 | CONCRETE, READY-MIX | 05/27/2016 | Paid | $1,026.00 |
PRC 1100 MAX43811 | CONCRETE, READY-MIX | 05/27/2016 | Paid | $460.00 |
PRC 1100 MAX43526 | CONCRETE, READY-MIX | 05/12/2016 | Paid | $639.00 |
PRC 1100 MAX43528 | CONCRETE, READY-MIX | 05/12/2016 | Paid | $2,968.00 |
PRC 1100 MAX43529 | CONCRETE, READY-MIX | 05/12/2016 | Paid | $1,452.50 |
PRC 1100 MAX43535 | CONCRETE, READY-MIX | 05/12/2016 | Paid | $2,760.00 |
PRC 1100 MAX43536 | CONCRETE, READY-MIX | 05/12/2016 | Paid | $912.00 |
PRC 1100 MAX43537 | CONCRETE, READY-MIX | 05/12/2016 | Paid | $1,026.00 |
PRC 1100 MAX43538 | CONCRETE, READY-MIX | 05/12/2016 | Paid | $532.50 |
PRC 1100 MAX43539 | CONCRETE, READY-MIX | 05/12/2016 | Paid | $2,082.00 |
PRC 1100 MAX43546 | CONCRETE, READY-MIX | 05/12/2016 | Paid | $1,840.00 |
PRC 1100 MAX43547 | CONCRETE, READY-MIX | 05/12/2016 | Paid | $1,026.00 |
PRC 1100 MAX42879 | CONCRETE, READY-MIX | 04/08/2016 | Paid | $532.50 |
PRC 1100 MAX42880 | CONCRETE, READY-MIX | 04/08/2016 | Paid | $426.00 |
PRC 1100 MAX42882 | CONCRETE, READY-MIX | 04/08/2016 | Paid | $2,266.00 |
PRC 1100 MAX42883 | CONCRETE, READY-MIX | 04/08/2016 | Paid | $684.00 |
PRC 1100 MAX42884 | CONCRETE, READY-MIX | 04/08/2016 | Paid | $1,840.00 |
PRC 1100 MAX42885 | CONCRETE, READY-MIX | 04/08/2016 | Paid | $1,026.00 |
PRC 1100 MAX42902 | CONCRETE, READY-MIX | 04/08/2016 | Paid | $4,745.00 |
PRC 1100 MAX42904 | CONCRETE, READY-MIX | 04/08/2016 | Paid | $920.00 |
PRC 1100 MAX42906 | CONCRETE, READY-MIX | 04/08/2016 | Paid | $920.00 |
PRC 1100 MAX42788 | CONCRETE, READY-MIX | 04/01/2016 | Paid | $920.00 |
PRC 1100 MAX42789 | CONCRETE, READY-MIX | 04/01/2016 | Paid | $1,026.00 |
PRC 1100 MAX42790 | CONCRETE, READY-MIX | 04/01/2016 | Paid | $2,324.00 |
PRC 1100 MAX42791 | CONCRETE, READY-MIX | 04/01/2016 | Paid | $920.00 |
PRC 1100 MAX42792 | CONCRETE, READY-MIX | 04/01/2016 | Paid | $532.50 |
PRC 1100 MAX42793 | CONCRETE, READY-MIX | 04/01/2016 | Paid | $1,288.00 |
PRC 1100 MAX42683 | CONCRETE, READY-MIX | 03/31/2016 | Paid | $1,026.00 |
PRC 1100 MAX42549 | CONCRETE, READY-MIX | 03/22/2016 | Paid | $920.00 |
PRC 1100 MAX42550 | CONCRETE, READY-MIX | 03/22/2016 | Paid | $1,026.00 |
PRC 1100 MAX42551 | CONCRETE, READY-MIX | 03/22/2016 | Paid | $1,026.00 |
PRC 1100 MAX42552 | CONCRETE, READY-MIX | 03/22/2016 | Paid | $736.00 |
PRC 1100 MAX42553 | CONCRETE, READY-MIX | 03/22/2016 | Paid | $552.00 |
PRC 1100 MAX42134 | CONCRETE, READY-MIX | 03/10/2016 | Paid | $1,026.00 |
PRC 1100 MAX42135 | CONCRETE, READY-MIX | 03/10/2016 | Paid | $1,840.00 |
PRC 1100 MAX42136 | CONCRETE, READY-MIX | 03/10/2016 | Paid | $920.00 |
PRC 1100 MAX42137 | CONCRETE, READY-MIX | 03/10/2016 | Paid | $1,026.00 |
PRC 1100 MAX42138 | CONCRETE, READY-MIX | 03/10/2016 | Paid | $1,196.00 |
PRC 1100 MAX42141 | CONCRETE, READY-MIX | 03/10/2016 | Paid | $2,585.50 |
PRC 1100 MAX42142 | CONCRETE, READY-MIX | 03/10/2016 | Paid | $552.00 |
PRC 1100 MAX42143 | CONCRETE, READY-MIX | 03/10/2016 | Paid | $1,083.00 |