SOLICITATION DETAILS
Type: | Invitation For Bids (IFB) |
---|---|
Status: | Closed |
Solicitation Number: | IFB 6100 CLMC935 |
Description: | SAR Elevated Tank Rehab and Improvements |
Summary: | Built in 2003 and inspected in 2017, the tank has significant corrosion and coating issues. The typical lifespan of coatings on the interior and exterior of tanks is around 15 years, so the current coatings have reached the end of their lifecycle. Reclaimed water valve vaults adjacent to the tank will also have coatings and safety improvements made, including lighting improvements, ladder safety systems installed, hatch safety grating installed. Additional needed improvements include: Site Lighting, Grounding, I&C and Cathodic Protection Improvements, Yard Piping and Valve Improvements, including Installation in New Concrete Valve Vault, Coating Improvements, Improvements to tank to Comply with Austin Water Standards, including Safety Improvements |
Estimated Amount for Solicitation: | $3,517,717.00 |
Vendor Name | Doing Business As | File Name |
---|---|---|
BLASTCO TEXAS INC | Price Offer Document |
African American | 1.58% |
---|---|
Hispanic American | 4.43% |
Native/Asian American | 0.82% |
WBE | 0.89% |
Authorized Contact Names: | |
---|---|
Project Related Questions: |
Gary Jackson (512) 974-7115 gary.jackson@austintexas.gov |
Solicitation Specific Questions: |
Adriana Ybarra (512) 978-1507 adriana.ybarra2@austintexas.gov |
Small Minority Business Resources Questions: |
Kenneth Kalu (512) 974-7621 smbrcompliancedocuments@austintexas.gov |
Important Solicitation Dates: | |
---|---|
Solicitation Published: | 06/20/2022 07:21 AM |
Response Due: |
Prior to 08/04/2022, 02:00 PM Please review the solicitation instructions for submission requirements See Section 00020, Item 3 |
Compliance Plan Due: |
Prior to 08/04/2022 02:00 PM
Required
Please review the solicitation instructions for submission requirements See Section 00020, Item 3 |
Response Opening: |
08/04/2022, 03:00 PM Please use the following URL to attend Bid Opening: https://tinyurl.com/mr4bvx27 |
Vendor Meetings/Conference, Site Visits (Date/Time): | |
---|---|
Meeting: |
07/14/2022, 10:00 AM Mandatory In-Person - Attendance Required to Bid on project |
Site-Visit: | 07/14/2022, 11:30 AM Mandatory Mandatory After pre-bid |
Special Notes: |
Compliance Plan Required. |
---|
BIDDERS / PROPOSERS:
Listed below are the various documents that have been issued as part of this Solicitation. Each document contains specific information about the solicitation. We recommend that you view and/or download each document before preparing your response to the solicitation, and that you use the bid subscription link to record your interest in this solicitation.
File Description | Type | Date | |
---|---|---|---|
Reject All Bids Letter | 08/23/2022 | Download | |
Addendum - Construction # 3 | 07/25/2022 | Download | |
Addendum - Construction #2 | 07/07/2022 | Download | |
Addendum - Construction #1 | 06/28/2022 | Download | |
Clarification Document #2 | 07/25/2022 | Download | |
Clarification Document #1 | 07/07/2022 | Download | |
Pre-Bid Attendance List 1 | 07/14/2022 | Download | |
Bid Documents Volume 1 of 2 | 06/20/2022 | Download | |
MBE/WBE/DBE Procurement Packet Vol 2 of 2 | 06/20/2022 | Download | |
Plans/Drawings | 06/20/2022 | Download |