SOLICITATION DETAILS
Solicitation Details
Type: | Invitation For Bids (IFB) |
---|---|
Status: | Closed |
Solicitation Number: | IFB 6100 CLMC831 |
Description: | Bryker Road Water and Wastewater Pipeline Renewal |
Summary: | Water - Bryker Dr. from West 34th St. to West 30th St., replacing approximately 2,630 LF of existing 6" with 8" PVC. Also, replacing 1,100 LF of 6" service line and 2,700 LF of 8" WW line including extension of all services. |
Estimated Amount for Solicitation: | $1,886,230.00 |
Vendor Name | Doing Business As | File Name |
---|---|---|
AUSTIN UNDERGROUND INC | Price Offer Document | |
Canary Construction, Inc. | Canary Construction | Price Offer Document |
D Guerra Construction LLC | Price Offer Document | |
FACILITIES REHABILITATION INC | Price Offer Document | |
HEI Civil Texas LLC | HEI Civil | Price Offer Document |
M.A. SMITH CONTRACTING CO INC | SMITH CONTRACTING CO INC | Price Offer Document |
SANTA CLARA CONSTRUCTION LTD | Price Offer Document | |
Sayers Construction, LLC | Price Offer Document |
Subcontracting Goals
African American | 1.44% |
---|---|
Hispanic American | 6.36% |
Native/Asian American | 0.38% |
WBE | 1.22% |
Contact Information
Authorized Contact Names: | |
---|---|
Project Related Questions: |
Shivani Kesar (512) 9742913 shivani.kesar@austintexas.gov |
Solicitation Specific Questions: |
Ivan Quinones (512) 9747207 ivan.quinones@austintexas.gov |
Small Minority Business Resources Questions: |
John Wesley Smith (512) 9747758 smbrcompliancedocuments@austintexas.gov |
Dates & Times
Important Solicitation Dates: | |
---|---|
Solicitation Published: | 12/07/2020 07:20 AM |
Response Due: | Prior to 01/14/2021, 02:00 PM |
Compliance Plan Due: | Prior to 01/14/2021 02:00 PM Required |
Response Opening: |
01/14/2021, 03:00 PM Virtual Bid Opening - Microsoft Teams Meeting: Please copy and paste the following link into your browser https://urlzs.com/Ngxvx |
Vendor Meetings/Conference, Site Visits (Date/Time): | |
---|---|
Meeting: | 12/17/2020, 10:00 AM |
Special Notes
Special Notes: |
Insurance is Required. Required Compliance Plan Required. |
---|
Packet Download Files
BIDDERS / PROPOSERS:
Listed below are the various documents that have been issued as part of this Solicitation. Each document contains specific information about the solicitation. We recommend that you view and/or download each document before preparing your response to the solicitation, and that you use the bid subscription link to record your interest in this solicitation.
File Description | Type | Date | |
---|---|---|---|
Certified Bid Tabulations | 02/04/2021 | Download | |
Addendum 2 | 01/06/2021 | Download | |
Addendum I | 01/05/2021 | Download | |
Clarification Document I | 01/05/2021 | Download | |
Pre-Bid Attendance List | 01/12/2021 | Download | |
Bid Documents Volume 1 of 2 | 12/07/2020 | Download | |
MBE/WBE Volume 2 of 2 | 12/07/2020 | Download | |
Plans/Drawings | 12/07/2020 | Download |
Associated Commodities
Description | Code |
---|---|
Construction, Pipeline | 91340 |
Trade Summary
Description | Category | Code |
---|---|---|
Barricades, Traffic, Portable | Goods | 5507818 |
Concrete, Precast | Goods | 75030 |
Flexible Base | Goods | 75052 |
Excavation Services | Construction | 91244 |
Construction, Pipeline | Construction | 91340 |
Paving/Resurfacing, Street (Major And Residential) | Construction | 91396 |
Erosion Control Services | Non-professional | 98814 |