SOLICITATION DETAILS
Type: | Invitation For Bids (IFB) |
---|---|
Status: | Closed |
Solicitation Number: | IFB 6100 CLMC819 |
Description: | Highland Park Water and Wastewater Improvements - Phase 2 |
Summary: | Highland Park reservoir and pump station have reached the end of their useful life and are undersized for the area. The area (approximately 622 accounts) is currently supplied with a single 12" line with no looping. The project is to construct a second feed into the area. The improvements for this area would equalize the level of service and allow for the decommissioning of an antiquated pump station and reservoir. Note that the project is divided into two phases. Phase 1 is currently in construction. This request is to bid Phase 2 at this time. |
Estimated Amount for Solicitation: | $6,477,749.00 |
Vendor Name | Doing Business As | File Name |
---|---|---|
AUSTIN UNDERGROUND INC | Price Offer Document | |
D Guerra Construction LLC | Price Offer Document | |
M.A. SMITH CONTRACTING CO INC | SMITH CONTRACTING CO INC | Price Offer Document |
PGC General Contractors, LLC | Peabody General Contractors | Price Offer Document |
SANTA CLARA CONSTRUCTION LTD | Price Offer Document |
African American | 1.60% |
---|---|
Hispanic American | 6.00% |
Native/Asian American | 0.39% |
WBE | 1.23% |
Authorized Contact Names: | |
---|---|
Project Related Questions: |
Tony Lopez (512) 974-6581 tony.lopez@austintexas.gov |
Solicitation Specific Questions: |
Steve Cocke (512) 974-7998 steven.cocke@austintexas.gov |
Small Minority Business Resources Questions: |
Cassidy Villegan (512) 974-9113 smbrcompliancedocuments@austintexas.gov |
Important Solicitation Dates: | |
---|---|
Solicitation Published: | 08/31/2020 07:21 AM |
Response Due: |
Prior to 11/05/2020, 02:00 PM eResponse |
Compliance Plan Due: | Prior to 11/05/2020 02:00 PM Required |
Response Opening: | 11/05/2020, 03:00 PM |
Vendor Meetings/Conference, Site Visits (Date/Time): | |
---|---|
Meeting: | 09/10/2020, 10:00 AM |
Special Notes: |
Insurance is Required. Required Compliance Plan Required. |
---|
BIDDERS / PROPOSERS:
Listed below are the various documents that have been issued as part of this Solicitation. Each document contains specific information about the solicitation. We recommend that you view and/or download each document before preparing your response to the solicitation, and that you use the bid subscription link to record your interest in this solicitation.
File Description | Type | Date | |
---|---|---|---|
Certified Bid Tabulations | 11/23/2020 | Download | |
Addendum 3 | 10/28/2020 | Download | |
Addendum 2 | 09/29/2020 | Download | |
Addendum 1 | 09/22/2020 | Download | |
Pre-Bid Attendance List | 09/10/2020 | Download | |
Volume 1 | 08/31/2020 | Download | |
MBE/WBE/DBE Procurement Packet Volume 2 | 08/31/2020 | Download | |
Plans/Drawings | 08/31/2020 | Download |
Description | Code |
---|---|
Construction, Pipeline | 91340 |
Description | Category | Code |
---|---|---|
Barricades, Traffic, Portable | Goods | 5507818 |
Concrete, Precast | Goods | 75030 |
Flexible Base | Goods | 75052 |
Signs, Construction Project Identification Signs ( | Goods | 80198 |
Demolition Services | Construction | 91240 |
Excavation Services | Construction | 91244 |
Construction, Pipeline | Construction | 91340 |
Paving/Resurfacing, Street (Major And Residential) | Construction | 91396 |
Concrete | Construction | 91430 |
Arborist, Professional Services | Non-professional | 96101 |
Pavement Marking Services (Including Removal Of Ma | Non-professional | 96861 |
Erosion Control Services | Non-professional | 98814 |