PRM 7800 24032720367 Impact Tools, Air Powered (Not Road Building) 04/01/2024 Outstanding $3,157.44
PRM 2200 24032519687 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 03/26/2024 Outstanding $916.27
PRC 1100 MAX126574 Impact Tools, Air Powered (Not Road Building) 03/25/2024 Outstanding $43,351.92
PRM 7800 24032119454 Impact Tools, Air Powered (Not Road Building) 03/25/2024 Outstanding $11,553.48
PRC 1100 MAX126249 Impact Tools, Air Powered (Not Road Building) 03/21/2024 Paid $322.48
PRC 1100 MAX126329 Impact Tools, Air Powered (Not Road Building) 03/21/2024 Paid $580.03
PRC 1100 MAX126330 Impact Tools, Air Powered (Not Road Building) 03/21/2024 Paid $680.66
PRC 1100 MAX126226 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $136.00
PRC 1100 MAX126230 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $621.00
PRC 1100 MAX126231 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $361.48
PRC 1100 MAX126232 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $288.50
PRC 1100 MAX126233 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $143.92
PRC 1100 MAX126242 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $49.50
PRC 1100 MAX126243 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $751.59
PRC 1100 MAX126244 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $1,547.93
PRC 1100 MAX126245 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $27.92
PRC 1100 MAX126246 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $8.44
PRC 1100 MAX126247 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $382.02
PRC 1100 MAX126248 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $390.82
PRC 1100 MAX126268 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $62.64
PRC 1100 MAX126271 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $192.44
PRC 1100 MAX126273 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $1,186.14
PRC 1100 MAX126276 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $136.00
PRC 1100 MAX126278 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $18.02
PRC 1100 MAX126290 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $25.32
PRC 1100 MAX126293 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $399.24
PRC 1100 MAX126294 Impact Tools, Air Powered (Not Road Building) 03/19/2024 Paid $227.43
PRM 7800 24031318377 Impact Tools, Air Powered (Not Road Building) 03/18/2024 Paid $1,788.94
PRM 7800 24031418533 Impact Tools, Air Powered (Not Road Building) 03/18/2024 Paid $5,247.80
PRM 7800 24031218198 Impact Tools, Air Powered (Not Road Building) 03/14/2024 Paid $12,299.84
PRM 7800 24030717830 Impact Tools, Air Powered (Not Road Building) 03/11/2024 Paid $5,135.67
PRM 2200 24030517294 Impact Tools, Air Powered (Not Road Building) 03/07/2024 Paid $18,816.96
PRM 2200 24022816603 Impact Tools, Air Powered (Not Road Building) 02/29/2024 Paid $974.46
PRM 7800 24022816711 Impact Tools, Air Powered (Not Road Building) 02/29/2024 Paid $99,459.07
PRC 1100 MAX125291 Impact Tools, Air Powered (Not Road Building) 02/26/2024 Paid $51,260.10
PRC 1100 MAX124167 Impact Tools, Air Powered (Not Road Building) 01/25/2024 Paid $26,576.13
PRC 1100 MAX124191 Impact Tools, Air Powered (Not Road Building) 01/25/2024 Paid $42,481.83
PRC 1100 MAX124192 Impact Tools, Air Powered (Not Road Building) 01/25/2024 Paid $139,583.17
PRC 1100 MAX124071 Impact Tools, Air Powered (Not Road Building) 01/23/2024 Paid $29,864.59
PRM 8700 24011111316 Impact Tools, Air Powered (Not Road Building) 01/16/2024 Paid $75,440.00
PRM 6200 24010910880 Impact Tools, Air Powered (Not Road Building) 01/11/2024 Paid $183.30
PRC 1100 MAX123242 Impact Tools, Air Powered (Not Road Building) 01/08/2024 Paid $130.64
PRC 1100 MAX123250 Impact Tools, Air Powered (Not Road Building) 01/08/2024 Paid $483.76
PRC 1100 MAX123271 Impact Tools, Air Powered (Not Road Building) 01/08/2024 Paid $1,154.24
PRC 1100 MAX123272 Impact Tools, Air Powered (Not Road Building) 01/08/2024 Paid $227.43
PRC 1100 MAX123274 Impact Tools, Air Powered (Not Road Building) 01/08/2024 Paid $1,009.03
PRC 1100 MAX123277 Impact Tools, Air Powered (Not Road Building) 01/08/2024 Paid $1,104.14
PRC 1100 MAX123280 Impact Tools, Air Powered (Not Road Building) 01/08/2024 Paid $1,756.00
PRC 1100 MAX123281 Impact Tools, Air Powered (Not Road Building) 01/08/2024 Paid $1,244.30
PRC 1100 MAX123283 Impact Tools, Air Powered (Not Road Building) 01/08/2024 Paid $1,318.41
PRM 2200 23122809728 Impact Tools, Air Powered (Not Road Building) 01/02/2024 Paid $16,108.34
PRC 1100 MAX122818 Impact Tools, Air Powered (Not Road Building) 12/27/2023 Paid $37.00
PRC 1100 MAX122532 Impact Tools, Air Powered (Not Road Building) 12/18/2023 Paid $355.00
PRC 1100 MAX122534 Impact Tools, Air Powered (Not Road Building) 12/18/2023 Paid $490.59
PRC 1100 MAX122535 Impact Tools, Air Powered (Not Road Building) 12/18/2023 Paid $61.30
PRC 1100 MAX122537 Impact Tools, Air Powered (Not Road Building) 12/18/2023 Paid $1,151.33
PRC 1100 MAX122544 Impact Tools, Air Powered (Not Road Building) 12/18/2023 Paid $1,708.12
PRC 1100 MAX122546 Impact Tools, Air Powered (Not Road Building) 12/18/2023 Paid $59.34
PRC 1100 MAX122579 Impact Tools, Air Powered (Not Road Building) 12/18/2023 Paid $7,292.76
PRC 1100 MAX122025 Impact Tools, Air Powered (Not Road Building) 12/04/2023 Paid $41,505.09
PRM 8700 23112906401 Impact Tools, Air Powered (Not Road Building) 12/04/2023 Paid $3,768.70
PRM 2200 23112105575 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 11/22/2023 Paid $5,042.34
PRC 1100 MAX121314 Impact Tools, Air Powered (Not Road Building) 11/09/2023 Paid $1,301.75
PRC 1100 MAX121318 Impact Tools, Air Powered (Not Road Building) 11/09/2023 Paid $188.15
PRC 1100 MAX121325 Impact Tools, Air Powered (Not Road Building) 11/09/2023 Paid $1,090.56
PRC 1100 MAX121330 Impact Tools, Air Powered (Not Road Building) 11/09/2023 Paid $2,111.00
PRC 1100 MAX121332 Impact Tools, Air Powered (Not Road Building) 11/09/2023 Paid $399.24
PRC 1100 MAX121334 Impact Tools, Air Powered (Not Road Building) 11/09/2023 Paid $1,090.56
PRC 1100 MAX121335 Impact Tools, Air Powered (Not Road Building) 11/09/2023 Paid $1,380.77
PRC 1100 MAX121288 Impact Tools, Air Powered (Not Road Building) 11/07/2023 Paid $31.23
PRM 2200 23110604081 Impact Tools, Air Powered (Not Road Building) 11/07/2023 Paid $4,020.93
PRM 6200 23103103517 Impact Tools, Air Powered (Not Road Building) 11/02/2023 Paid $6,535.47
PRC 1100 MAX120442 Impact Tools, Air Powered (Not Road Building) 10/24/2023 Paid $39,873.51
PRC 1100 23101800152 Impact Tools, Air Powered (Not Road Building) 10/23/2023 Paid $195.61
PRM 2200 23101802192 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 10/23/2023 Paid $4,468.80
PRM 2200 23101902260 Impact Tools, Air Powered (Not Road Building) 10/23/2023 Paid $2,490.64
PRC 1100 MAX120520 Impact Tools, Air Powered (Not Road Building) 10/19/2023 Paid $17.58
PRC 1100 MAX120523 Impact Tools, Air Powered (Not Road Building) 10/19/2023 Paid $72.26
PRC 1100 MAX120611 Impact Tools, Air Powered (Not Road Building) 10/19/2023 Paid $179.25
PRC 1100 MAX120613 Impact Tools, Air Powered (Not Road Building) 10/19/2023 Paid $963.39
PRC 1100 MAX120615 Impact Tools, Air Powered (Not Road Building) 10/19/2023 Paid $365.12
PRC 1100 MAX120619 Impact Tools, Air Powered (Not Road Building) 10/19/2023 Paid $173.78
PRC 1100 MAX120621 Impact Tools, Air Powered (Not Road Building) 10/19/2023 Paid $393.61
PRC 1100 MAX120624 Impact Tools, Air Powered (Not Road Building) 10/19/2023 Paid $4,910.28
PRC 1100 MAX120627 Impact Tools, Air Powered (Not Road Building) 10/19/2023 Paid $43.79
PRM 2200 23101701890 Impact Tools, Air Powered (Not Road Building) 10/19/2023 Paid $3,652.96
PRM 2200 23101802086 Impact Tools, Air Powered (Not Road Building) 10/19/2023 Paid $31,138.12
PRC 1100 MAX120515 Impact Tools, Air Powered (Not Road Building) 10/12/2023 Paid $51.57
PRC 1100 MAX120516 Impact Tools, Air Powered (Not Road Building) 10/12/2023 Paid $179.23
PRC 1100 MAX120518 Impact Tools, Air Powered (Not Road Building) 10/12/2023 Paid $37.90
PRM 2200 23101000894 Impact Tools, Air Powered (Not Road Building) 10/12/2023 Paid $3,307.43
PRM 6200 23101101142 Impact Tools, Air Powered (Not Road Building) 10/12/2023 Paid $8,925.24
PRC 1100 23100400105 Impact Tools, Air Powered (Not Road Building) 10/09/2023 Paid $424.06
PRC 1100 MAX120039 Impact Tools, Air Powered (Not Road Building) 10/09/2023 Paid $14.96
PRC 1100 MAX120040 Impact Tools, Air Powered (Not Road Building) 10/09/2023 Paid $515.83
PRC 1100 MAX119921 Impact Tools, Air Powered (Not Road Building) 10/05/2023 Paid $916.07
PRM 2200 23100300170 Impact Tools, Air Powered (Not Road Building) 10/05/2023 Paid $4,960.56
PRM 2200 23100200008 Impact Tools, Air Powered (Not Road Building) 10/03/2023 Paid $699.00
PRC 1100 MAX119491 Impact Tools, Air Powered (Not Road Building) 10/02/2023 Paid $916.07
PRC 1100 MAX119493 Impact Tools, Air Powered (Not Road Building) 10/02/2023 Paid $6,008.73
PRC 1100 MAX119495 Impact Tools, Air Powered (Not Road Building) 10/02/2023 Paid $578.74
PRC 1100 MAX119513 Impact Tools, Air Powered (Not Road Building) 10/02/2023 Paid $105.00
PRC 1100 MAX119831 Impact Tools, Air Powered (Not Road Building) 10/02/2023 Paid $1,665.28
PRC 1100 MAX119832 Impact Tools, Air Powered (Not Road Building) 10/02/2023 Paid $426.95
PRC 1100 MAX119835 Impact Tools, Air Powered (Not Road Building) 10/02/2023 Paid $2,680.43
PRC 1100 MAX119836 Impact Tools, Air Powered (Not Road Building) 10/02/2023 Paid $243.57
PRM 2200 23092836838 Impact Tools, Air Powered (Not Road Building) 10/02/2023 Paid $13,229.72
PRM 2200 23092736610 Impact Tools, Air Powered (Not Road Building) 09/28/2023 Paid $19,264.30
PRC 1100 MAX119364 Impact Tools, Air Powered (Not Road Building) 09/25/2023 Paid $43,477.28
PRM 2200 23091434976 Impact Tools, Air Powered (Not Road Building) 09/18/2023 Paid $8,601.37
PRM 2200 23091434987 Impact Tools, Air Powered (Not Road Building) 09/18/2023 Paid $1,089.32
PRM 2200 23091434995 Impact Tools, Air Powered (Not Road Building) 09/18/2023 Paid $12,939.58
PRM 2200 23090734142 Impact Tools, Air Powered (Not Road Building) 09/11/2023 Paid $28,896.45
PRM 2200 23090734150 Impact Tools, Air Powered (Not Road Building) 09/11/2023 Paid $22,922.34
PRC 1100 MAX118383 Impact Tools, Air Powered (Not Road Building) 08/31/2023 Paid $574.01
PRC 1100 MAX118384 Impact Tools, Air Powered (Not Road Building) 08/31/2023 Paid $73.36
PRC 1100 MAX118386 Impact Tools, Air Powered (Not Road Building) 08/31/2023 Paid $75.50
PRC 1100 MAX118387 Impact Tools, Air Powered (Not Road Building) 08/31/2023 Paid $232.34
PRC 1100 MAX118399 Impact Tools, Air Powered (Not Road Building) 08/31/2023 Paid $560.73
PRC 1100 MAX118400 Impact Tools, Air Powered (Not Road Building) 08/31/2023 Paid $425.40
PRC 1100 MAX118405 Impact Tools, Air Powered (Not Road Building) 08/31/2023 Paid $103.70
PRC 1100 MAX118408 Impact Tools, Air Powered (Not Road Building) 08/31/2023 Paid $67.64
PRC 1100 MAX118409 Impact Tools, Air Powered (Not Road Building) 08/31/2023 Paid $479.82
PRC 1100 MAX118410 Impact Tools, Air Powered (Not Road Building) 08/31/2023 Paid $105.64
PRC 1100 MAX118411 Impact Tools, Air Powered (Not Road Building) 08/31/2023 Paid $834.81
PRC 1100 MAX118418 Impact Tools, Air Powered (Not Road Building) 08/31/2023 Paid $107.20
PRC 1100 MAX118197 Impact Tools, Air Powered (Not Road Building) 08/25/2023 Paid $31,303.00
PRC 1100 MAX117760 Impact Tools, Air Powered (Not Road Building) 08/14/2023 Paid $380.90
PRM 2400 23081030912 Impact Tools, Air Powered (Not Road Building) 08/14/2023 Paid $6,966.29
PRM 2400 23081030917 Impact Tools, Air Powered (Not Road Building) 08/14/2023 Paid $3,173.85
PRC 1100 MAX117756 Impact Tools, Air Powered (Not Road Building) 08/10/2023 Paid $2,113.24
PRC 1100 MAX117757 Impact Tools, Air Powered (Not Road Building) 08/10/2023 Paid $755.73
PRC 1100 MAX117758 Impact Tools, Air Powered (Not Road Building) 08/10/2023 Paid $382.80
PRC 1100 MAX117701 Impact Tools, Air Powered (Not Road Building) 08/08/2023 Paid $94.17
PRC 1100 MAX117702 Impact Tools, Air Powered (Not Road Building) 08/08/2023 Paid $209.82
PRC 1100 MAX117704 Impact Tools, Air Powered (Not Road Building) 08/08/2023 Paid $337.56
PRC 1100 MAX117705 Impact Tools, Air Powered (Not Road Building) 08/08/2023 Paid $74.61
PRC 1100 MAX117081 Impact Tools, Air Powered (Not Road Building) 07/25/2023 Paid $37,135.52
PRC 1100 MAX116931 Impact Tools, Air Powered (Not Road Building) 07/17/2023 Paid $1,491.18
PRC 1100 MAX116953 Impact Tools, Air Powered (Not Road Building) 07/17/2023 Paid $455.68
PRC 1100 MAX116801 Impact Tools, Air Powered (Not Road Building) 07/13/2023 Paid $653.40
PRC 1100 MAX116802 Impact Tools, Air Powered (Not Road Building) 07/13/2023 Paid $238.17
PRC 1100 MAX116804 Impact Tools, Air Powered (Not Road Building) 07/13/2023 Paid $145.05
PRC 1100 MAX116806 Impact Tools, Air Powered (Not Road Building) 07/13/2023 Paid $632.95
PRC 1100 MAX116807 Impact Tools, Air Powered (Not Road Building) 07/13/2023 Paid $1,142.40
PRC 1100 MAX116554 Impact Tools, Air Powered (Not Road Building) 07/05/2023 Paid $27,195.58
PRC 1100 MAX115602 Impact Tools, Air Powered (Not Road Building) 06/13/2023 Paid $40.82
PRC 1100 MAX115607 Impact Tools, Air Powered (Not Road Building) 06/13/2023 Paid $2,195.80
PRC 1100 MAX115611 Impact Tools, Air Powered (Not Road Building) 06/13/2023 Paid $273.28
PRC 1100 MAX115641 Impact Tools, Air Powered (Not Road Building) 06/13/2023 Paid $873.52
PRC 1100 MAX115643 Impact Tools, Air Powered (Not Road Building) 06/13/2023 Paid $2,439.55
PRC 1100 MAX115647 Impact Tools, Air Powered (Not Road Building) 06/13/2023 Paid $796.30
PRC 1100 MAX115654 Impact Tools, Air Powered (Not Road Building) 06/13/2023 Paid $522.61
PRC 1100 MAX115659 Impact Tools, Air Powered (Not Road Building) 06/13/2023 Paid $80.12
PRC 1100 MAX115665 Impact Tools, Air Powered (Not Road Building) 06/13/2023 Paid $580.30
PRM 2200 23060824450 Impact Tools, Air Powered (Not Road Building) 06/12/2023 Paid $9,686.45
PRM 2200 23060924528 Impact Tools, Air Powered (Not Road Building) 06/12/2023 Paid $3,684.06
PRM 2200 23060724307 Impact Tools, Air Powered (Not Road Building) 06/08/2023 Paid $4,208.43
PRM 2200 23052523173 Impact Tools, Air Powered (Not Road Building) 05/30/2023 Paid $4,203.43
PRC 1100 MAX114943 Impact Tools, Air Powered (Not Road Building) 05/23/2023 Paid $38,136.85
PRC 1100 MAX114831 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $246.12
PRC 1100 MAX114832 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $1,431.40
PRC 1100 MAX114834 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $57.25
PRC 1100 MAX114836 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $642.97
PRC 1100 MAX114838 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $211.70
PRC 1100 MAX114839 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $282.50
PRC 1100 MAX114850 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $89.32
PRC 1100 MAX114851 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $76.63
PRC 1100 MAX114853 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $5,082.67
PRC 1100 MAX114854 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $387.28
PRC 1100 MAX114856 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $33.17
PRC 1100 MAX114859 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $452.60
PRC 1100 MAX114860 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $8.29
PRC 1100 MAX114862 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $57.97
PRC 1100 MAX114863 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $648.40
PRC 1100 MAX114864 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $569.60
PRC 1100 MAX114865 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $60.91
PRC 1100 MAX114866 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $167.40
PRC 1100 MAX114869 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $539.99
PRC 1100 MAX114871 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $402.10
PRC 1100 MAX114878 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $40.16
PRC 1100 MAX114879 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $47.42
PRC 1100 MAX114886 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $166.93
PRC 1100 MAX114888 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $83.49
PRC 1100 MAX114889 Impact Tools, Air Powered (Not Road Building) 05/22/2023 Paid $181.29
PRC 1100 MAX114686 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $61.74
PRC 1100 MAX114687 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $9.83
PRC 1100 MAX114688 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $52.59
PRC 1100 MAX114704 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $170.68
PRC 1100 MAX114706 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $49.25
PRC 1100 MAX114707 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $145.98
PRC 1100 MAX114708 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $658.10
PRC 1100 MAX114715 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $1,102.40
PRC 1100 MAX114724 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $391.45
PRC 1100 MAX114726 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $569.60
PRC 1100 MAX114729 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $507.10
PRC 1100 MAX114731 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $45.86
PRC 1100 MAX114732 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $2,050.35
PRC 1100 MAX114734 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $513.98
PRC 1100 MAX114735 Impact Tools, Air Powered (Not Road Building) 05/15/2023 Paid $436.48
PRC 1100 MAX113893 Impact Tools, Air Powered (Not Road Building) 04/25/2023 Paid $57,625.88
PRC 1100 MAX112839 Impact Tools, Air Powered (Not Road Building) 03/24/2023 Paid $30,520.36
PRM 2200 23030214388 Impact Tools, Air Powered (Not Road Building) 03/06/2023 Paid $8,547.86
PRC 1100 MAX111602 Impact Tools, Air Powered (Not Road Building) 02/24/2023 Outstanding $26,576.45
PRM 2200 23021412876 Impact Tools, Air Powered (Not Road Building) 02/16/2023 Paid $322.34
PRM 2200 23021312664 Impact Tools, Air Powered (Not Road Building) 02/14/2023 Paid $4,831.41
PRC 1100 MAX111323 Impact Tools, Air Powered (Not Road Building) 02/13/2023 Paid $412.80
PRC 1100 MAX111325 Impact Tools, Air Powered (Not Road Building) 02/13/2023 Paid $2,702.79
PRC 1100 MAX111326 Impact Tools, Air Powered (Not Road Building) 02/13/2023 Paid $449.88
PRC 1100 MAX111327 Impact Tools, Air Powered (Not Road Building) 02/13/2023 Paid $270.95
PRC 1100 MAX110577 Impact Tools, Air Powered (Not Road Building) 01/20/2023 Paid $21,520.82
PRC 1100 MAX110350 Impact Tools, Air Powered (Not Road Building) 01/19/2023 Paid $104.60
PRC 1100 MAX109621 Impact Tools, Air Powered (Not Road Building) 12/28/2022 Paid $705.82
PRC 1100 MAX109614 Impact Tools, Air Powered (Not Road Building) 12/22/2022 Paid $52.04
PRC 1100 MAX109615 Impact Tools, Air Powered (Not Road Building) 12/22/2022 Paid $35.76
PRC 1100 MAX109617 Impact Tools, Air Powered (Not Road Building) 12/22/2022 Paid $403.68
PRC 1100 MAX109618 Impact Tools, Air Powered (Not Road Building) 12/22/2022 Paid $109.48
PRC 1100 MAX109619 Impact Tools, Air Powered (Not Road Building) 12/22/2022 Paid $195.64
PRC 1100 MAX109622 Impact Tools, Air Powered (Not Road Building) 12/22/2022 Paid $332.20
PRC 1100 MAX109643 Impact Tools, Air Powered (Not Road Building) 12/22/2022 Paid $42,140.07
PRM 2200 22121507406 Impact Tools, Air Powered (Not Road Building) 12/19/2022 Paid $208.82
PRM 2200 22120606429 Impact Tools, Air Powered (Not Road Building) 12/08/2022 Paid $128.16
PRC 1100 MAX109210 Impact Tools, Air Powered (Not Road Building) 12/05/2022 Paid $41,448.47
PRM 2200 22113005909 Impact Tools, Air Powered (Not Road Building) 12/01/2022 Paid $11,929.44
PRM 2200 22112105124 Impact Tools, Air Powered (Not Road Building) 11/22/2022 Paid $6,965.76
PRM 2200 22111504533 Impact Tools, Air Powered (Not Road Building) 11/17/2022 Paid $3,216.22
PRM 2200 22110904186 Impact Tools, Air Powered (Not Road Building) 11/14/2022 Paid $1,268.92
PRC 1100 MAX108433 Impact Tools, Air Powered (Not Road Building) 11/10/2022 Paid $3,649.80
PRC 1100 MAX108438 Impact Tools, Air Powered (Not Road Building) 11/10/2022 Paid $2,850.96
PRM 2200 22110904087 Impact Tools, Air Powered (Not Road Building) 11/10/2022 Paid $1,743.60
PRM 2200 22110303638 Impact Tools, Air Powered (Not Road Building) 11/07/2022 Paid $6,040.79
PRM 2200 22110103372 Impact Tools, Air Powered (Not Road Building) 11/03/2022 Paid $9,555.45
PRM 2200 22110103387 Impact Tools, Air Powered (Not Road Building) 11/03/2022 Paid $5,452.91
PRM 2200 22110203488 Impact Tools, Air Powered (Not Road Building) 11/03/2022 Paid $12,010.30
PRC 1100 22101100147 Impact Tools, Air Powered (Not Road Building) 10/25/2022 Paid $30,383.40
PRM 2200 22102402685 Impact Tools, Air Powered (Not Road Building) 10/25/2022 Paid $1,708.68
PRC 1100 MAX107676 Impact Tools, Air Powered (Not Road Building) 10/17/2022 Paid $7,895.40
PRC 1100 22091402187 Impact Tools, Air Powered (Not Road Building) 09/23/2022 Paid $37,681.75
PRC 1100 MAX106579 Impact Tools, Air Powered (Not Road Building) 09/22/2022 Paid $1,143.33
PRC 1100 MAX106580 Impact Tools, Air Powered (Not Road Building) 09/22/2022 Paid $404.48
PRC 1100 MAX106581 Impact Tools, Air Powered (Not Road Building) 09/22/2022 Paid $1,213.44
PRC 1100 MAX106582 Impact Tools, Air Powered (Not Road Building) 09/22/2022 Paid $367.45
PRC 1100 MAX106583 Impact Tools, Air Powered (Not Road Building) 09/22/2022 Paid $300.66
PRC 1100 MAX106584 Impact Tools, Air Powered (Not Road Building) 09/22/2022 Paid $135.79
PRC 1100 MAX106585 Impact Tools, Air Powered (Not Road Building) 09/22/2022 Paid $875.03
PRC 1100 MAX106586 Impact Tools, Air Powered (Not Road Building) 09/22/2022 Paid $160.98
PRC 1100 MAX106587 Impact Tools, Air Powered (Not Road Building) 09/22/2022 Paid $249.30
PRC 1100 MAX106589 Impact Tools, Air Powered (Not Road Building) 09/22/2022 Paid $86.62
PRM 2200 22091331580 Impact Tools, Air Powered (Not Road Building) 09/15/2022 Paid $2,861.22
PRC 1100 22082302036 Impact Tools, Air Powered (Not Road Building) 08/31/2022 Outstanding $18,967.65
PRC 1100 MAX106010 Impact Tools, Air Powered (Not Road Building) 08/30/2022 Paid $4,589.93
PRC 1100 MAX106011 Impact Tools, Air Powered (Not Road Building) 08/30/2022 Paid $475.82
PRC 1100 MAX106015 Impact Tools, Air Powered (Not Road Building) 08/30/2022 Paid $238.17
PRC 1100 MAX106016 Impact Tools, Air Powered (Not Road Building) 08/30/2022 Paid $17.28
PRC 1100 MAX105305 Impact Tools, Air Powered (Not Road Building) 08/15/2022 Paid $167.82
PRC 1100 MAX105306 Impact Tools, Air Powered (Not Road Building) 08/15/2022 Paid $244.95
PRC 1100 MAX105307 Impact Tools, Air Powered (Not Road Building) 08/15/2022 Paid $11.66
PRC 1100 MAX105308 Impact Tools, Air Powered (Not Road Building) 08/15/2022 Paid $106.73
PRC 1100 MAX105309 Impact Tools, Air Powered (Not Road Building) 08/15/2022 Paid $38.91
PRC 1100 MAX105310 Impact Tools, Air Powered (Not Road Building) 08/15/2022 Paid $204.47
PRC 1100 MAX105311 Impact Tools, Air Powered (Not Road Building) 08/15/2022 Paid $875.69
PRC 1100 22072601863 Impact Tools, Air Powered (Not Road Building) 07/27/2022 Paid $41,528.63
PRC 1100 MAX104052 Impact Tools, Air Powered (Not Road Building) 07/11/2022 Paid $991.00
PRC 1100 22061601536 Impact Tools, Air Powered (Not Road Building) 06/24/2022 Paid $42,969.01
PRC 1100 MAX103258 Impact Tools, Air Powered (Not Road Building) 06/16/2022 Paid $4,812.20
PRC 1100 MAX102851 Impact Tools, Air Powered (Not Road Building) 06/01/2022 Paid $35,229.20
PRC 1100 22052301500 Impact Tools, Air Powered (Not Road Building) 05/31/2022 Paid $50,949.46
PRC 1100 22042201213 Impact Tools, Air Powered (Not Road Building) 04/25/2022 Outstanding $47,163.23
PRC 1100 22032101050 Impact Tools, Air Powered (Not Road Building) 03/25/2022 Paid $32,705.63
PRC 1100 MAX100180 Impact Tools, Air Powered (Not Road Building) 03/14/2022 Paid $1,386.07
PRC 1100 MAX100181 Impact Tools, Air Powered (Not Road Building) 03/14/2022 Paid $4,065.90
PRC 1100 MAX100182 Impact Tools, Air Powered (Not Road Building) 03/14/2022 Paid $15.36
PRC 1100 MAX100183 Impact Tools, Air Powered (Not Road Building) 03/14/2022 Paid $3,749.68
PRC 1100 22022500902 Impact Tools, Air Powered (Not Road Building) 02/28/2022 Paid $51,122.72
PRM 2200 22020911771 Impact Tools, Air Powered (Not Road Building) 02/10/2022 Paid $636.93
PRC 1100 MAX99000 Impact Tools, Air Powered (Not Road Building) 02/08/2022 Paid $12,096.00
PRC 1100 22012000719 Impact Tools, Air Powered (Not Road Building) 01/25/2022 Paid $38,726.87
PRM 2200 22010608855 Impact Tools, Air Powered (Not Road Building) 01/10/2022 Paid $1,029.97
PRC 1100 MAX98101 Impact Tools, Air Powered (Not Road Building) 01/06/2022 Paid $3,509.26
PRC 1100 MAX98102 Impact Tools, Air Powered (Not Road Building) 01/06/2022 Paid $30,210.00
PRM 2200 21122207812 Impact Tools, Air Powered (Not Road Building) 12/27/2021 Paid $360.76
PRC 1100 21121700549 Impact Tools, Air Powered (Not Road Building) 12/22/2021 Paid $48,890.06
PRC 1100 21111800383 Impact Tools, Air Powered (Not Road Building) 11/23/2021 Paid $40,283.99
PRC 1100 MAX96850 Impact Tools, Air Powered (Not Road Building) 11/23/2021 Paid $503.16
PRC 1100 MAX96851 Impact Tools, Air Powered (Not Road Building) 11/23/2021 Paid $666.94
PRC 1100 MAX96854 Impact Tools, Air Powered (Not Road Building) 11/23/2021 Paid $221.46
PRC 1100 MAX96859 Impact Tools, Air Powered (Not Road Building) 11/23/2021 Paid $3,741.48
PRC 1100 MAX96574 Impact Tools, Air Powered (Not Road Building) 11/18/2021 Paid $3,086.10
PRC 1100 MAX96575 Impact Tools, Air Powered (Not Road Building) 11/18/2021 Paid $616.09
PRM 2200 21110102981 Impact Tools, Air Powered (Not Road Building) 11/02/2021 Paid $269.48
PRM 2200 21110102983 Impact Tools, Air Powered (Not Road Building) 11/02/2021 Paid $1,012.78
PRM 2200 21110102985 Impact Tools, Air Powered (Not Road Building) 11/02/2021 Paid $3,393.83
PRM 2200 21110102987 Impact Tools, Air Powered (Not Road Building) 11/02/2021 Paid $7,096.05
PRM 2200 21110102990 Impact Tools, Air Powered (Not Road Building) 11/02/2021 Paid $490.81
PRM 2200 21110103015 Impact Tools, Air Powered (Not Road Building) 11/02/2021 Paid $61.00
PRC 1100 21101400150 Impact Tools, Air Powered (Not Road Building) 10/25/2021 Paid $21,696.47
PRM 2200 21102102055 Impact Tools, Air Powered (Not Road Building) 10/25/2021 Paid $119.56
PRM 2200 21102102070 Impact Tools, Air Powered (Not Road Building) 10/25/2021 Paid $3,274.65
PRC 1100 21101400154 Impact Tools, Air Powered (Not Road Building) 10/15/2021 Paid $23,061.98
PRM 2200 21100700641 Impact Tools, Air Powered (Not Road Building) 10/11/2021 Paid $4,616.88
PRM 2200 21092232861 Impact Tools, Air Powered (Not Road Building) 09/27/2021 Paid $12,611.25
PRC 1100 21092002423 Impact Tools, Air Powered (Not Road Building) 09/24/2021 Paid $28,617.40
PRM 2200 21091632187 Impact Tools, Air Powered (Not Road Building) 09/20/2021 Paid $714.35
PRM 2200 21091331636 Impact Tools, Air Powered (Not Road Building) 09/14/2021 Paid $11,031.56
PRC 1100 21081802244 Impact Tools, Air Powered (Not Road Building) 08/24/2021 Paid $35,968.28
PRM 2200 21081929624 Impact Tools, Air Powered (Not Road Building) 08/23/2021 Paid $1,436.10
PRM 2200 21080628469 Impact Tools, Air Powered (Not Road Building) 08/09/2021 Paid $1,487.63
PRC 1100 21071901839 Impact Tools, Air Powered (Not Road Building) 07/21/2021 Paid $26,200.12
PRM 2200 21070124913 Impact Tools, Air Powered (Not Road Building) 07/06/2021 Paid $1,319.24
PRC 1100 21051701486 Impact Tools, Air Powered (Not Road Building) 05/19/2021 Paid $27,195.70
PRM 2200 21051119881 Impact Tools, Air Powered (Not Road Building) 05/13/2021 Paid $827.44
PRM 2200 21042618405 Impact Tools, Air Powered (Not Road Building) 04/29/2021 Paid $701.84
PRC 1100 21042301330 Impact Tools, Air Powered (Not Road Building) 04/27/2021 Paid $38,144.10
PRM 2200 21042618287 Impact Tools, Air Powered (Not Road Building) 04/27/2021 Paid $444.06
PRM 2200 21042117875 Impact Tools, Air Powered (Not Road Building) 04/22/2021 Paid $4,233.83
PRM 2200 21041517345 Impact Tools, Air Powered (Not Road Building) 04/19/2021 Paid $671.75
PRM 2200 21041317132 Impact Tools, Air Powered (Not Road Building) 04/15/2021 Paid $6,653.64
PRC 1100 21031801159 Impact Tools, Air Powered (Not Road Building) 03/23/2021 Paid $49,002.67
PRM 7800 21022412517 Impact Tools, Air Powered (Not Road Building) 02/25/2021 Paid $152,339.75
PRC 1100 21022201006 Impact Tools, Air Powered (Not Road Building) 02/24/2021 Paid $20,846.17
PRM 2200 21020210875 Impact Tools, Air Powered (Not Road Building) 02/04/2021 Paid $4,845.36
PRC 1100 MAX87198 Impact Tools, Air Powered (Not Road Building) 01/28/2021 Paid $16,875.00
PRC 1100 MAX87200 Impact Tools, Air Powered (Not Road Building) 01/28/2021 Paid $1,276.87
PRC 1100 21011900830 Impact Tools, Air Powered (Not Road Building) 01/22/2021 Paid $19,110.57
PRC 1100 MAX86360 Impact Tools, Air Powered (Not Road Building) 01/22/2021 Paid $8,757.57
PRC 1100 20121500665 Impact Tools, Air Powered (Not Road Building) 12/23/2020 Paid $44,668.58
PRC 1100 MAX86087 Impact Tools, Air Powered (Not Road Building) 12/23/2020 Paid $461.10
PRC 1100 MAX86088 Impact Tools, Air Powered (Not Road Building) 12/23/2020 Paid $455.10
PRC 1100 MAX85747 Impact Tools, Air Powered (Not Road Building) 12/14/2020 Paid $100.00
PRC 1100 MAX85748 Impact Tools, Air Powered (Not Road Building) 12/14/2020 Paid $858.93
PRC 1100 MAX85749 Impact Tools, Air Powered (Not Road Building) 12/14/2020 Paid $624.54
PRC 1100 MAX85497 Impact Tools, Air Powered (Not Road Building) 12/03/2020 Paid $156.03
PRC 1100 MAX85498 Impact Tools, Air Powered (Not Road Building) 12/03/2020 Paid $75.86
PRC 1100 20112000357 Impact Tools, Air Powered (Not Road Building) 11/24/2020 Paid $13,290.22
PRM 2200 20111704172 Impact Tools, Air Powered (Not Road Building) 11/19/2020 Paid $7,188.94
PRC 1100 MAX84776 Impact Tools, Air Powered (Not Road Building) 11/10/2020 Paid $2,317.40
PRC 1100 MAX84777 Impact Tools, Air Powered (Not Road Building) 11/10/2020 Paid $67.00
PRC 1100 MAX84778 Impact Tools, Air Powered (Not Road Building) 11/10/2020 Paid $579.79
PRC 1100 MAX84779 Impact Tools, Air Powered (Not Road Building) 11/10/2020 Paid $523.52
PRC 1100 MAX84780 Impact Tools, Air Powered (Not Road Building) 11/10/2020 Paid $49.10
PRM 2200 20110303026 Impact Tools, Air Powered (Not Road Building) 11/05/2020 Paid $627.54
PRC 1100 MAX84411 Impact Tools, Air Powered (Not Road Building) 11/02/2020 Paid $198.70
PRC 1100 MAX84413 Impact Tools, Air Powered (Not Road Building) 11/02/2020 Paid $2,446.08
PRC 1100 MAX84415 Impact Tools, Air Powered (Not Road Building) 10/29/2020 Paid $132.20
PRC 1100 MAX84416 Impact Tools, Air Powered (Not Road Building) 10/29/2020 Paid $2,459.66
PRC 1100 MAX84418 Impact Tools, Air Powered (Not Road Building) 10/29/2020 Paid $934.81
PRM 2200 20102302156 Impact Tools, Air Powered (Not Road Building) 10/26/2020 Paid $3,116.64
PRC 1100 20100800130 Impact Tools, Air Powered (Not Road Building) 10/23/2020 Paid $13,146.69
PRC 1100 MAX83594 Impact Tools, Air Powered (Not Road Building) 10/05/2020 Paid $121.68
PRM 2200 20093035370 Impact Tools, Air Powered (Not Road Building) 10/01/2020 Paid $11,261.44
PRC 1100 MAX83286 Impact Tools, Air Powered (Not Road Building) 09/29/2020 Paid $121.68
PRC 1100 MAX83287 Impact Tools, Air Powered (Not Road Building) 09/29/2020 Paid $121.68
PRC 1100 MAX83295 Impact Tools, Air Powered (Not Road Building) 09/29/2020 Paid $1,124.05
PRC 1100 MAX83296 Impact Tools, Air Powered (Not Road Building) 09/29/2020 Paid $3,507.00
PRC 1100 20091802639 Impact Tools, Air Powered (Not Road Building) 09/24/2020 Paid $13,918.17
PRC 1100 MAX82924 Impact Tools, Air Powered (Not Road Building) 09/21/2020 Paid $244.05
PRC 1100 MAX82925 Impact Tools, Air Powered (Not Road Building) 09/21/2020 Paid $491.27
PRM 2200 20083132600 Impact Tools, Air Powered (Not Road Building) 09/03/2020 Paid $1,971.20
PRC 1100 MAX82133 Impact Tools, Air Powered (Not Road Building) 08/31/2020 Paid $488.10
PRC 1100 MAX81931 Impact Tools, Air Powered (Not Road Building) 08/25/2020 Paid $174.73
PRC 1100 20082002452 Impact Tools, Air Powered (Not Road Building) 08/24/2020 Paid $20,359.72
PRC 1100 MAX81684 Impact Tools, Air Powered (Not Road Building) 08/20/2020 Paid $237.97
PRC 1100 MAX81687 Impact Tools, Air Powered (Not Road Building) 08/20/2020 Paid $4,802.08
PRC 1100 MAX81688 Impact Tools, Air Powered (Not Road Building) 08/20/2020 Paid $41.68
PRM 2200 20081831365 Impact Tools, Air Powered (Not Road Building) 08/20/2020 Paid $3,942.40
PRM 2200 20081431073 Impact Tools, Air Powered (Not Road Building) 08/17/2020 Paid $2,183.85
PRM 2200 20081030476 Impact Tools, Air Powered (Not Road Building) 08/11/2020 Paid $3,938.88
PRC 1100 20080402302 Impact Tools, Air Powered (Not Road Building) 08/06/2020 Paid $1,280.00
PRC 1100 MAX81328 Impact Tools, Air Powered (Not Road Building) 08/06/2020 Paid $71.50
PRC 1100 MAX81329 Impact Tools, Air Powered (Not Road Building) 08/06/2020 Paid $3,346.25
PRC 1100 MAX81387 Impact Tools, Air Powered (Not Road Building) 08/06/2020 Paid $174.73
PRM 2200 20073029577 SANITIZER, INSTANT HAND 8 OZ BOTTLE 08/03/2020 Paid $14,584.32
PRM 2200 20073029581 SANITIZER, INSTANT HAND 8 OZ BOTTLE 08/03/2020 Paid $17,015.04
PRC 1100 20072002287 Impact Tools, Air Powered (Not Road Building) 07/24/2020 Paid $10,654.80
PRC 1100 MAX80708 Impact Tools, Air Powered (Not Road Building) 07/20/2020 Paid $273.00
PRM 2200 20071628033 Impact Tools, Air Powered (Not Road Building) 07/20/2020 Paid $3,357.50
PRC 1100 MAX80709 Impact Tools, Air Powered (Not Road Building) 07/16/2020 Paid $2,233.60
PRC 1100 MAX80711 Impact Tools, Air Powered (Not Road Building) 07/16/2020 Paid $136.50
PRC 1100 MAX80712 Impact Tools, Air Powered (Not Road Building) 07/16/2020 Paid $273.00
PRC 1100 MAX80713 Impact Tools, Air Powered (Not Road Building) 07/16/2020 Paid $68.25
PRC 1100 MAX80714 Impact Tools, Air Powered (Not Road Building) 07/16/2020 Paid $134.40
PRC 1100 MAX80715 Impact Tools, Air Powered (Not Road Building) 07/16/2020 Paid $63.00
PRM 2400 20070226859 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 07/07/2020 Paid $4,560.06
PRC 1100 MAX80328 Impact Tools, Air Powered (Not Road Building) 07/02/2020 Paid $14.90
PRC 1100 MAX80329 Impact Tools, Air Powered (Not Road Building) 07/02/2020 Paid $71.50
PRC 1100 MAX80330 Impact Tools, Air Powered (Not Road Building) 07/02/2020 Paid $409.62
PRC 1100 MAX80102 Impact Tools, Air Powered (Not Road Building) 06/25/2020 Paid $3,088.25
PRC 1100 MAX80104 Impact Tools, Air Powered (Not Road Building) 06/25/2020 Paid $287.82
PRC 1100 20061602123 Impact Tools, Air Powered (Not Road Building) 06/23/2020 Paid $21,118.10
PRC 1100 MAX79693 Impact Tools, Air Powered (Not Road Building) 06/15/2020 Paid $1,193.40
PRC 1100 MAX79694 Impact Tools, Air Powered (Not Road Building) 06/15/2020 Paid $1,275.40
PRC 1100 MAX79157 Impact Tools, Air Powered (Not Road Building) 06/08/2020 Paid $163.44
PRC 1100 MAX79158 Impact Tools, Air Powered (Not Road Building) 06/08/2020 Paid $179.35
PRC 1100 MAX79160 Impact Tools, Air Powered (Not Road Building) 06/08/2020 Paid $1,592.04
PRC 1100 MAX79162 Impact Tools, Air Powered (Not Road Building) 06/08/2020 Paid $7,040.22
PRC 1100 MAX79326 Impact Tools, Air Powered (Not Road Building) 06/08/2020 Paid $3,807.51
PRM 2200 20052123527 Impact Tools, Air Powered (Not Road Building) 05/26/2020 Paid $9,394.06
PRC 1100 20051401942 Impact Tools, Air Powered (Not Road Building) 05/22/2020 Paid $18,800.78
PRM 2200 20051422807 Impact Tools, Air Powered (Not Road Building) 05/18/2020 Paid $3,026.80
PRC 1100 MAX78600 Impact Tools, Air Powered (Not Road Building) 05/14/2020 Paid $220.00
PRM 2200 20051322702 Bottled Water, Case 05/14/2020 Paid $6,784.90
PRC 1100 20041701782 Impact Tools, Air Powered (Not Road Building) 04/24/2020 Paid $31,465.19
PRC 1100 MAX77831 Impact Tools, Air Powered (Not Road Building) 04/23/2020 Paid $325.40
PRC 1100 MAX77861 Impact Tools, Air Powered (Not Road Building) 04/23/2020 Paid $94.50
PRC 1100 MAX77862 Impact Tools, Air Powered (Not Road Building) 04/23/2020 Paid $141.10
PRC 1100 MAX77863 Impact Tools, Air Powered (Not Road Building) 04/23/2020 Paid $144.15
PRC 1100 MAX77864 Impact Tools, Air Powered (Not Road Building) 04/23/2020 Paid $120.96
PRM 2200 20042220709 ADAPTER CARTRIDGE RESPIRATOR, SCOTT# 805622-01 04/23/2020 Paid $896.42
PRM 2200 20042220710 CARTRIDGE COMBINATION, SCOTT# 7422-SD1 04/23/2020 Paid $780.00
PRM 2200 20041419944 ADAPTER CARTRIDGE RESPIRATOR, SCOTT# 805622-01 04/16/2020 Paid $518.98
PRM 2200 20041419957 CARTRIDGE COMBINATION, SCOTT# 7422-SD1 04/16/2020 Paid $364.00
PRC 1100 MAX77451 Impact Tools, Air Powered (Not Road Building) 04/14/2020 Paid $94.50
PRC 1100 MAX77452 Impact Tools, Air Powered (Not Road Building) 04/14/2020 Paid $94.50
PRC 1100 MAX77453 Impact Tools, Air Powered (Not Road Building) 04/14/2020 Paid $100.80
PRC 1100 MAX77454 Impact Tools, Air Powered (Not Road Building) 04/14/2020 Paid $47.20
PRC 1100 MAX77455 Impact Tools, Air Powered (Not Road Building) 04/14/2020 Paid $785.54
PRC 1100 MAX77457 Impact Tools, Air Powered (Not Road Building) 04/14/2020 Paid $926.80
PRC 1100 MAX77458 Impact Tools, Air Powered (Not Road Building) 04/14/2020 Paid $4,780.68
PRM 2200 20040719344 CARTRIDGE COMBINATION, SCOTT# 7422-SD1 04/09/2020 Paid $676.00
PRM 2200 20040819515 BARRIER TAPE YELLOW CAUTION 3 INCH X 1000 FT. 2 MIL 04/09/2020 Paid $27.60
PRM 2200 20040819515 GLOVES WORK RBR NEOPRENE COATED 14"LONG GAUNTLET 04/09/2020 Paid $438.00
PRM 2200 20040819515 HELMET SAFETY CAP STYLE 04/09/2020 Paid $160.20
PRM 2200 20040819515 KITS FIRST AID NYLON BAG COMPLETE SMALL 04/09/2020 Paid $414.60
PRM 2200 20040819515 PADS KNEE W/BUCKLE STRAPS 04/09/2020 Paid $384.75
PRM 2200 20040619220 GLOVES WORK RBR NEOPRENE COATED 31 IN LONG GAUNTLET 04/07/2020 Paid $1,311.60
PRM 2200 20040619220 RESPIRATOR CARTRIDGE MSA MULTI PURPOSE NO. GME H 04/07/2020 Paid $592.65
PRM 2200 20040619220 RESPIRATOR FULLFACE MSA ULTRA TWIN BLACK HYCAR RUBBER LARGE 04/07/2020 Paid $714.00
PRC 1100 MAX76996 Impact Tools, Air Powered (Not Road Building) 03/26/2020 Paid $144.52
PRC 1100 MAX77011 Impact Tools, Air Powered (Not Road Building) 03/26/2020 Paid $4,780.68
PRC 1100 20031601588 Impact Tools, Air Powered (Not Road Building) 03/23/2020 Paid $39,523.73
PRM 2200 20031717052 Impact Tools, Air Powered (Not Road Building) 03/18/2020 Paid $423.45
PRM 2200 20031717058 Impact Tools, Air Powered (Not Road Building) 03/18/2020 Paid $112.92
PRC 1100 MAX76645 Impact Tools, Air Powered (Not Road Building) 03/13/2020 Paid $491.60
PRC 1100 MAX76441 Impact Tools, Air Powered (Not Road Building) 03/11/2020 Paid $422.81
PRM 2200 20030415653 Impact Tools, Air Powered (Not Road Building) 03/05/2020 Paid $3,713.31
PRM 2200 20030415659 Impact Tools, Air Powered (Not Road Building) 03/05/2020 Paid $2,129.80
PRM 1600 19123008267 Impact Tools, Air Powered (Not Road Building) 03/02/2020 Paid $253.40
PRC 1100 20021201210 Impact Tools, Air Powered (Not Road Building) 02/24/2020 Paid $27,764.13
PRC 1100 MAX75799 Impact Tools, Air Powered (Not Road Building) 02/24/2020 Paid $3,007.19
PRC 1100 MAX75801 Impact Tools, Air Powered (Not Road Building) 02/24/2020 Paid $142.64
PRC 1100 MAX75311 Impact Tools, Air Powered (Not Road Building) 02/11/2020 Paid $9,813.84
PRC 1100 MAX75321 Impact Tools, Air Powered (Not Road Building) 02/11/2020 Paid $224.00
PRC 1100 MAX75312 Impact Tools, Air Powered (Not Road Building) 02/10/2020 Paid $8.65
PRC 1100 MAX74739 Impact Tools, Air Powered (Not Road Building) 01/28/2020 Paid $811.99
PRC 1100 20011601022 Impact Tools, Air Powered (Not Road Building) 01/24/2020 Paid $21,565.34
PRC 1100 MAX74326 Impact Tools, Air Powered (Not Road Building) 01/13/2020 Paid $521.50
PRC 1100 MAX74197 Impact Tools, Air Powered (Not Road Building) 01/07/2020 Paid $143.06
PRC 1100 MAX74198 Impact Tools, Air Powered (Not Road Building) 01/07/2020 Paid $935.03
PRC 1100 19121600571 Impact Tools, Air Powered (Not Road Building) 12/23/2019 Paid $19,415.75
PRC 1100 MAX73742 Impact Tools, Air Powered (Not Road Building) 12/19/2019 Paid $683.80
PRC 1100 MAX73565 Impact Tools, Air Powered (Not Road Building) 12/13/2019 Paid $1,792.76
PRC 1100 MAX73566 Impact Tools, Air Powered (Not Road Building) 12/13/2019 Paid $1,792.76
PRC 1100 MAX73567 Impact Tools, Air Powered (Not Road Building) 12/13/2019 Paid $220.84
PRC 1100 MAX73518 Impact Tools, Air Powered (Not Road Building) 12/12/2019 Paid $3,162.24
PRM 2400 19121106803 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 12/12/2019 Paid $1,666.68
PRM 8700 19120506326 Impact Tools, Air Powered (Not Road Building) 12/09/2019 Paid $1,008.24
PRM 2200 19120205858 Impact Tools, Air Powered (Not Road Building) 12/03/2019 Paid $2,917.38
PRM 2200 19120205868 Impact Tools, Air Powered (Not Road Building) 12/03/2019 Paid $2,917.38
PRC 1100 MAX73154 Impact Tools, Air Powered (Not Road Building) 12/02/2019 Paid $753.75
PRC 1100 MAX73155 Impact Tools, Air Powered (Not Road Building) 12/02/2019 Paid $232.20
PRC 1100 19111800553 Impact Tools, Air Powered (Not Road Building) 11/22/2019 Paid $28,673.68
PRM 2200 19111204394 Impact Tools, Air Powered (Not Road Building) 11/18/2019 Paid $463.33
PRM 2200 19111404604 Impact Tools, Air Powered (Not Road Building) 11/18/2019 Paid $77.11
PRM 2200 19110403451 Impact Tools, Air Powered (Not Road Building) 11/05/2019 Paid $6,608.29
PRC 1100 MAX72565 Impact Tools, Air Powered (Not Road Building) 11/01/2019 Paid $879.40
PRM 2400 19102802986 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 10/30/2019 Paid $2,529.18
PRM 8500 19102302569 Impact Tools, Air Powered (Not Road Building) 10/24/2019 Paid $1,401.50
PRM 2200 19101401078 Impact Tools, Air Powered (Not Road Building) 10/16/2019 Paid $118.91
PRM 2400 19101401081 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 10/16/2019 Paid $719.06
PRC 1100 19100800166 Impact Tools, Air Powered (Not Road Building) 10/15/2019 Paid $16,714.27
PRC 1100 MAX71607 Impact Tools, Air Powered (Not Road Building) 10/02/2019 Paid $121.36
PRM 1600 19100100011 Impact Tools, Air Powered (Not Road Building) 10/02/2019 Paid $120.41
PRM 8700 19092734223 Impact Tools, Air Powered (Not Road Building) 10/01/2019 Paid $4,754.80
PRM 8700 19092634059 Impact Tools, Air Powered (Not Road Building) 09/30/2019 Paid $1,655.01
PRM 9300 19092533926 Impact Tools, Air Powered (Not Road Building) 09/27/2019 Paid $1,524.27
PRM 1600 19092333358 Impact Tools, Air Powered (Not Road Building) 09/24/2019 Paid $118.25
PRC 1100 19091602526 Impact Tools, Air Powered (Not Road Building) 09/20/2019 Paid $19,825.52
PRM 2200 19091833008 Impact Tools, Air Powered (Not Road Building) 09/19/2019 Paid $279.24
PRM 6000 19091632875 Impact Tools, Air Powered (Not Road Building) 09/18/2019 Paid $28.26
PRC 1100 MAX71245 Impact Tools, Air Powered (Not Road Building) 09/17/2019 Paid $11,098.08
PRM 8700 19091632840 Impact Tools, Air Powered (Not Road Building) 09/17/2019 Paid $1,592.00
PRC 1100 MAX71165 Impact Tools, Air Powered (Not Road Building) 09/16/2019 Paid $4,187.21
PRC 1100 MAX71166 Impact Tools, Air Powered (Not Road Building) 09/16/2019 Paid $642.60
PRC 1100 MAX71167 Impact Tools, Air Powered (Not Road Building) 09/16/2019 Paid $143.76
PRC 1100 MAX71168 Impact Tools, Air Powered (Not Road Building) 09/16/2019 Paid $4,710.25
PRC 1100 MAX71169 Impact Tools, Air Powered (Not Road Building) 09/16/2019 Paid $47.92
PRC 1100 MAX71170 Impact Tools, Air Powered (Not Road Building) 09/16/2019 Paid $312.54
PRC 1100 MAX71171 Impact Tools, Air Powered (Not Road Building) 09/16/2019 Paid $81.22
PRC 1100 MAX71159 Impact Tools, Air Powered (Not Road Building) 09/13/2019 Paid $5,723.13
PRM 2200 19091132307 Impact Tools, Air Powered (Not Road Building) 09/12/2019 Paid $3,590.12
PRM 2400 19091032123 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 09/11/2019 Paid $1,666.68
PRM 8100 19090331458 Impact Tools, Air Powered (Not Road Building) 09/05/2019 Paid $10,318.00
PRM 8100 19090331466 Impact Tools, Air Powered (Not Road Building) 09/05/2019 Paid $5,159.00
PRC 1100 19081401792 Impact Tools, Air Powered (Not Road Building) 08/22/2019 Paid $14,938.00
PRM 2400 19081930195 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 08/20/2019 Paid $2,900.00
PRM 2400 19081930199 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 08/20/2019 Paid $5,800.00
PRC 1100 MAX70512 Impact Tools, Air Powered (Not Road Building) 08/19/2019 Paid $68.49
PRM 9300 19081630137 Impact Tools, Air Powered (Not Road Building) 08/19/2019 Paid $4,784.00
PRM 2200 19081229486 Impact Tools, Air Powered (Not Road Building) 08/13/2019 Paid $3,543.74
PRM 2400 19080628800 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 08/07/2019 Paid $10,129.73
PRM 8600 19080128452 Impact Tools, Air Powered (Not Road Building) 08/02/2019 Paid $3,007.29
PRC 1100 MAX69839 Impact Tools, Air Powered (Not Road Building) 07/24/2019 Paid $353.89
PRM 2400 19071927208 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 07/23/2019 Paid $19.16
PRC 1100 19071701611 Impact Tools, Air Powered (Not Road Building) 07/22/2019 Paid $22,224.48
PRC 1100 MAX69599 Impact Tools, Air Powered (Not Road Building) 07/18/2019 Paid $788.49
PRM 2400 19071626681 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 07/17/2019 Paid $381.64
PRM 2400 19071226471 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 07/15/2019 Paid $4,332.22
PRM 2400 19071026162 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 07/11/2019 Paid $93.96
PRM 2400 19062625032 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 06/27/2019 Paid $366.82
PRM 2400 19062625040 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 06/27/2019 Paid $1,109.08
PRC 1100 MAX69181 Impact Tools, Air Powered (Not Road Building) 06/26/2019 Paid $5,391.25
PRC 1100 MAX69182 Impact Tools, Air Powered (Not Road Building) 06/26/2019 Paid $6,489.59
PRC 1100 MAX69074 Impact Tools, Air Powered (Not Road Building) 06/25/2019 Paid $525.48
PRC 1100 MAX69076 Impact Tools, Air Powered (Not Road Building) 06/25/2019 Paid $2,846.28
PRC 1100 MAX69077 Impact Tools, Air Powered (Not Road Building) 06/25/2019 Paid $604.75
PRC 1100 19061101430 Impact Tools, Air Powered (Not Road Building) 06/21/2019 Paid $20,571.59
PRM 2400 19061824123 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 06/19/2019 Paid $423.32
PRC 1100 MAX68806 Impact Tools, Air Powered (Not Road Building) 06/17/2019 Paid $39,843.02
PRM 2400 19061323739 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 06/14/2019 Paid $7,379.07
PRC 1100 MAX68464 Impact Tools, Air Powered (Not Road Building) 06/05/2019 Paid $501.70
PRM 2400 19052922218 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 05/30/2019 Paid $1,357.68
PRM 8700 19052822188 Impact Tools, Air Powered (Not Road Building) 05/30/2019 Paid $995.00
PRM 2400 19052421933 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 05/28/2019 Paid $206.16
PRC 1100 MAX68282 Impact Tools, Air Powered (Not Road Building) 05/24/2019 Paid $524.00
PRM 8700 19052321878 Impact Tools, Air Powered (Not Road Building) 05/24/2019 Paid $8,438.40
PRC 1100 19051601410 Impact Tools, Air Powered (Not Road Building) 05/23/2019 Paid $16,090.49
PRM 2200 19052021419 Impact Tools, Air Powered (Not Road Building) 05/21/2019 Paid $4,022.70
PRC 1100 MAX67998 Impact Tools, Air Powered (Not Road Building) 05/17/2019 Paid $1,270.55
PRC 1100 MAX67891 Impact Tools, Air Powered (Not Road Building) 05/16/2019 Paid $3,654.08
PRC 1100 MAX67892 Impact Tools, Air Powered (Not Road Building) 05/16/2019 Paid $4,600.00
PRM 2400 19051320930 Impact Tools, Air Powered (Not Road Building) 05/15/2019 Paid $1,850.00
PRM 2400 19051320931 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 05/15/2019 Paid $2,101.74
PRC 1100 MAX67652 Impact Tools, Air Powered (Not Road Building) 05/08/2019 Paid $512.55
PRC 1100 MAX67653 Impact Tools, Air Powered (Not Road Building) 05/08/2019 Paid $237.18
PRC 1100 MAX67654 Impact Tools, Air Powered (Not Road Building) 05/08/2019 Paid $88.24
PRC 1100 MAX67655 Impact Tools, Air Powered (Not Road Building) 05/08/2019 Paid $675.00
PRM 2400 19050620110 Impact Tools, Air Powered (Not Road Building) 05/07/2019 Paid $1,773.69
PRM 2400 19050620117 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 05/07/2019 Paid $6,930.97
PRC 1100 MAX67504 Impact Tools, Air Powered (Not Road Building) 04/29/2019 Paid $900.00
PRC 1100 MAX67505 Impact Tools, Air Powered (Not Road Building) 04/29/2019 Paid $193.06
PRM 2400 19042619095 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 04/29/2019 Paid $570.00
PRM 2400 19042619097 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 04/29/2019 Paid $331.00
PRM 2200 19042418806 Impact Tools, Air Powered (Not Road Building) 04/25/2019 Paid $1,649.20
PRM 6200 19042418852 Impact Tools, Air Powered (Not Road Building) 04/25/2019 Paid $87.16
PRC 1100 19041201053 Impact Tools, Air Powered (Not Road Building) 04/22/2019 Paid $44,913.45
PRC 1100 MAX67251 Impact Tools, Air Powered (Not Road Building) 04/19/2019 Paid $1,350.00
PRM 2400 19041618003 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 04/17/2019 Paid $143.07
PRM 2400 19041618005 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 04/17/2019 Paid $27.00
PRM 6200 19041517927 Impact Tools, Air Powered (Not Road Building) 04/16/2019 Paid $304.59
PRM 8700 19041517956 Impact Tools, Air Powered (Not Road Building) 04/16/2019 Paid $199.00
PRM 6200 19041217780 Impact Tools, Air Powered (Not Road Building) 04/15/2019 Paid $84.09
PRC 1100 MAX67064 Impact Tools, Air Powered (Not Road Building) 04/10/2019 Paid $980.99
PRC 1100 MAX67062 Impact Tools, Air Powered (Not Road Building) 04/09/2019 Paid $135.41
PRC 1100 MAX67063 Impact Tools, Air Powered (Not Road Building) 04/09/2019 Paid $446.55
PRM 2200 19040416805 Impact Tools, Air Powered (Not Road Building) 04/05/2019 Paid $1,616.53
PRM 2400 19040416812 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 04/05/2019 Paid $5,416.53
PRM 8700 19040416937 Impact Tools, Air Powered (Not Road Building) 04/05/2019 Paid $398.00
PRC 1100 MAX66859 Impact Tools, Air Powered (Not Road Building) 04/04/2019 Paid $506.76
PRM 2400 19040316670 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 04/04/2019 Paid $5,077.15
PRC 1100 MAX66739 Impact Tools, Air Powered (Not Road Building) 03/28/2019 Paid $603.20
PRM 2200 19032515614 Impact Tools, Air Powered (Not Road Building) 03/26/2019 Paid $756.36
PRC 1100 19031400880 Impact Tools, Air Powered (Not Road Building) 03/22/2019 Paid $39,332.67
PRC 1100 MAX66546 Impact Tools, Air Powered (Not Road Building) 03/19/2019 Paid $5,866.20
PRM 8500 19031514917 Impact Tools, Air Powered (Not Road Building) 03/18/2019 Paid $170.83
PRM 2400 19031314524 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 03/14/2019 Paid $6,576.65
PRC 1100 MAX66217 Impact Tools, Air Powered (Not Road Building) 03/11/2019 Paid $984.97
PRC 1100 MAX66043 Impact Tools, Air Powered (Not Road Building) 03/06/2019 Paid $124.99
PRC 1100 MAX66044 Impact Tools, Air Powered (Not Road Building) 03/06/2019 Paid $139.30
PRC 1100 MAX66057 Impact Tools, Air Powered (Not Road Building) 03/05/2019 Paid $544.92
PRM 8500 19030413627 Impact Tools, Air Powered (Not Road Building) 03/05/2019 Paid $899.00
PRC 1100 MAX65925 Impact Tools, Air Powered (Not Road Building) 02/28/2019 Paid $5,632.00
PRC 1100 MAX65926 Impact Tools, Air Powered (Not Road Building) 02/27/2019 Paid $88.17
PRC 1100 MAX65927 Impact Tools, Air Powered (Not Road Building) 02/27/2019 Paid $146.44
PRC 1100 MAX65819 Impact Tools, Air Powered (Not Road Building) 02/25/2019 Paid $594.70
PRC 1100 MAX65820 Impact Tools, Air Powered (Not Road Building) 02/25/2019 Paid $506.76
PRC 1100 19021500750 Impact Tools, Air Powered (Not Road Building) 02/22/2019 Paid $38,865.06
PRM 8600 19022112689 Impact Tools, Air Powered (Not Road Building) 02/22/2019 Paid $1,961.89
PRC 1100 MAX65689 Impact Tools, Air Powered (Not Road Building) 02/20/2019 Paid $812.74
PRC 1100 MAX65690 Impact Tools, Air Powered (Not Road Building) 02/20/2019 Paid $57.95
PRC 1100 MAX65691 Impact Tools, Air Powered (Not Road Building) 02/20/2019 Paid $726.52
PRC 1100 MAX65500 Impact Tools, Air Powered (Not Road Building) 02/19/2019 Paid $3,506.10
PRM 2200 19021512108 Impact Tools, Air Powered (Not Road Building) 02/19/2019 Paid $1,799.00
PRC 1100 MAX65496 Impact Tools, Air Powered (Not Road Building) 02/14/2019 Paid $5,989.76
PRC 1100 MAX65497 Impact Tools, Air Powered (Not Road Building) 02/14/2019 Paid $444.60
PRC 1100 MAX65498 Impact Tools, Air Powered (Not Road Building) 02/14/2019 Paid $6,827.10
PRC 1100 MAX65499 Impact Tools, Air Powered (Not Road Building) 02/14/2019 Paid $1,064.14
PRC 1100 MAX65501 Impact Tools, Air Powered (Not Road Building) 02/14/2019 Paid $283.08
PRC 1100 MAX65502 Impact Tools, Air Powered (Not Road Building) 02/14/2019 Paid $291.20
PRC 1100 MAX65503 Impact Tools, Air Powered (Not Road Building) 02/14/2019 Paid $3,708.80
PRC 1100 MAX65504 Impact Tools, Air Powered (Not Road Building) 02/14/2019 Paid $3,708.80
PRM 2200 19021111361 Impact Tools, Air Powered (Not Road Building) 02/12/2019 Paid $31.50
PRM 2400 19020711053 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 02/08/2019 Paid $2,032.25
PRM 2400 19020711055 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 02/08/2019 Paid $1,204.66
PRM 8600 19020711161 Impact Tools, Air Powered (Not Road Building) 02/08/2019 Paid $2,236.00
PRM 8500 19020610975 Impact Tools, Air Powered (Not Road Building) 02/07/2019 Paid $1,878.72
PRC 1100 MAX65154 Impact Tools, Air Powered (Not Road Building) 02/04/2019 Paid $45.00
PRC 1100 MAX65156 Impact Tools, Air Powered (Not Road Building) 02/04/2019 Paid $233.81
PRC 1100 MAX64882 Impact Tools, Air Powered (Not Road Building) 01/30/2019 Paid $617.14
PRC 1100 MAX64906 Impact Tools, Air Powered (Not Road Building) 01/30/2019 Paid $99.22
PRC 1100 19011500555 Impact Tools, Air Powered (Not Road Building) 01/24/2019 Paid $21,459.47
PRC 1100 MAX64632 Impact Tools, Air Powered (Not Road Building) 01/24/2019 Paid $130.60
PRC 1100 MAX64633 Impact Tools, Air Powered (Not Road Building) 01/24/2019 Paid $916.68
PRM 2400 19012209150 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 01/23/2019 Paid $2,224.12
PRM 8600 19011809077 Impact Tools, Air Powered (Not Road Building) 01/22/2019 Paid $3,656.96
PRM 6200 19011608850 Impact Tools, Air Powered (Not Road Building) 01/17/2019 Paid $1,612.52
PRM 2400 19011508668 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 01/16/2019 Paid $512.17
PRC 1100 MAX64422 Impact Tools, Air Powered (Not Road Building) 01/09/2019 Paid $39.89
PRC 1100 MAX64424 Impact Tools, Air Powered (Not Road Building) 01/09/2019 Paid $674.44
PRM 2200 19010808076 Impact Tools, Air Powered (Not Road Building) 01/09/2019 Paid $3,782.87
PRM 8500 19010708006 Impact Tools, Air Powered (Not Road Building) 01/08/2019 Paid $8,300.66
PRM 8500 19010708007 Impact Tools, Air Powered (Not Road Building) 01/08/2019 Paid $1,055.20
PRM 2200 18123107463 Impact Tools, Air Powered (Not Road Building) 01/02/2019 Paid $6,234.33
PRC 1100 18121400400 Impact Tools, Air Powered (Not Road Building) 12/21/2018 Paid $23,753.77
PRM 2400 18121906931 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 12/20/2018 Paid $775.49
PRC 1100 MAX64021 Impact Tools, Air Powered (Not Road Building) 12/17/2018 Paid $2,994.88
PRM 8600 18121106393 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 12/12/2018 Paid $6,872.00
PRM 8600 18121106393 Impact Tools, Air Powered (Not Road Building) 12/12/2018 Paid $4,505.90
PRC 1100 MAX63846 Impact Tools, Air Powered (Not Road Building) 12/07/2018 Paid $330.16
PRM 8600 18120606047 Impact Tools, Air Powered (Not Road Building) 12/07/2018 Paid $14,977.44
PRM 8500 18120505927 Impact Tools, Air Powered (Not Road Building) 12/06/2018 Paid $2,042.00
PRC 1100 MAX63694 Impact Tools, Air Powered (Not Road Building) 12/04/2018 Paid $1,296.75
PRC 1100 MAX63633 Impact Tools, Air Powered (Not Road Building) 11/30/2018 Paid $312.96
PRM 8500 18112805311 Impact Tools, Air Powered (Not Road Building) 11/29/2018 Paid $8,618.80
PRM 2400 18112604895 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 11/27/2018 Paid $6,245.00
PRM 2400 18112604895 Impact Tools, Air Powered (Not Road Building) 11/27/2018 Paid $993.90
PRM 2400 18112604898 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 11/27/2018 Paid $2,524.49
PRM 8600 18112104833 Impact Tools, Air Powered (Not Road Building) 11/26/2018 Paid $1,960.16
PRC 1100 18111400238 Impact Tools, Air Powered (Not Road Building) 11/21/2018 Paid $24,643.86
PRC 1100 MAX63450 Impact Tools, Air Powered (Not Road Building) 11/21/2018 Paid $878.31
PRC 1100 MAX63452 Impact Tools, Air Powered (Not Road Building) 11/21/2018 Paid $1,402.34
PRM 8600 18112004664 Impact Tools, Air Powered (Not Road Building) 11/21/2018 Paid $173.47
PRM 8600 18112004668 Impact Tools, Air Powered (Not Road Building) 11/21/2018 Paid $9,554.18
PRM 8600 18112004670 Impact Tools, Air Powered (Not Road Building) 11/21/2018 Paid $5,052.38
PRM 8600 18112004676 Impact Tools, Air Powered (Not Road Building) 11/21/2018 Paid $949.83
PRM 2400 18111904407 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 11/20/2018 Paid $485.20
PRC 1100 MAX63295 Impact Tools, Air Powered (Not Road Building) 11/19/2018 Paid $916.68
PRC 1100 MAX63292 Impact Tools, Air Powered (Not Road Building) 11/14/2018 Paid $1,607.20
PRC 1100 MAX63294 Impact Tools, Air Powered (Not Road Building) 11/14/2018 Paid $89.40
PRC 1100 MAX63296 Impact Tools, Air Powered (Not Road Building) 11/14/2018 Paid $2,065.69
PRM 8700 18110903958 Impact Tools, Air Powered (Not Road Building) 11/13/2018 Paid $8,216.80
PRM 2400 18110703697 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 11/08/2018 Paid $1,241.00
PRM 8500 18110603651 Impact Tools, Air Powered (Not Road Building) 11/07/2018 Paid $249.48
PRM 8600 18110203334 Impact Tools, Air Powered (Not Road Building) 11/05/2018 Paid $62,797.84
PRC 1100 MAX62872 Impact Tools, Air Powered (Not Road Building) 10/26/2018 Paid $4,652.55
PRC 1100 MAX62877 Impact Tools, Air Powered (Not Road Building) 10/26/2018 Paid $166.10
PRC 1100 MAX62878 Impact Tools, Air Powered (Not Road Building) 10/26/2018 Paid $95.56
PRM 8500 18101902244 Impact Tools, Air Powered (Not Road Building) 10/22/2018 Paid $3,912.12
PRM 2400 18101701933 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 10/18/2018 Paid $305.32
PRM 2200 18101601656 Impact Tools, Air Powered (Not Road Building) 10/17/2018 Paid $4,467.12
PRM 8500 18101601843 Impact Tools, Air Powered (Not Road Building) 10/17/2018 Paid $6,769.06
PRM 6200 18101501518 Impact Tools, Air Powered (Not Road Building) 10/16/2018 Paid $1,021.65
PRC 1100 18100900150 Impact Tools, Air Powered (Not Road Building) 10/15/2018 Paid $21,657.70
PRM 6200 18101201302 Impact Tools, Air Powered (Not Road Building) 10/15/2018 Paid $1,091.51
PRM 8500 18101101153 Impact Tools, Air Powered (Not Road Building) 10/12/2018 Paid $318.37
PRM 8600 18100100107 Impact Tools, Air Powered (Not Road Building) 10/02/2018 Paid $1,633.45
PRM 8500 18092833033 Impact Tools, Air Powered (Not Road Building) 10/01/2018 Paid $3,624.28
PRM 8500 18092833034 Impact Tools, Air Powered (Not Road Building) 10/01/2018 Paid $2,208.72
PRM 8700 18092632645 Impact Tools, Air Powered (Not Road Building) 09/27/2018 Paid $953.86
PRM 8600 18092532281 Impact Tools, Air Powered (Not Road Building) 09/26/2018 Paid $24,416.38
PRM 8600 18092532283 Impact Tools, Air Powered (Not Road Building) 09/26/2018 Paid $5,858.00
PRM 8600 18092532285 Impact Tools, Air Powered (Not Road Building) 09/26/2018 Paid $9,576.00
PRM 2400 18092431984 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 09/25/2018 Paid $1,303.03
PRC 1100 18091202051 Impact Tools, Air Powered (Not Road Building) 09/24/2018 Paid $19,308.23
PRM 8600 18091831476 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 09/19/2018 Paid $3,063.00
PRM 1100 18091230852 Impact Tools, Air Powered (Not Road Building) 09/13/2018 Paid $1,933.66
PRM 9200 18091231065 Impact Tools, Air Powered (Not Road Building) 09/13/2018 Paid $183.14
PRM 9200 18091231066 Impact Tools, Air Powered (Not Road Building) 09/13/2018 Paid $1,530.24
PRM 2200 18091130609 Impact Tools, Air Powered (Not Road Building) 09/12/2018 Paid $4,418.97
PRM 2400 18091130623 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 09/12/2018 Paid $2,502.43
PRM 1100 18091030471 Impact Tools, Air Powered (Not Road Building) 09/11/2018 Paid $984.24
PRM 9200 18090530220 Impact Tools, Air Powered (Not Road Building) 09/06/2018 Paid $54.75
PRM 2400 18090429881 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 09/05/2018 Paid $3,988.77
PRM 8500 18090429995 Impact Tools, Air Powered (Not Road Building) 09/05/2018 Paid $683.90
PRM 8500 18090429996 Impact Tools, Air Powered (Not Road Building) 09/05/2018 Paid $8,763.56
PRM 1100 18083129753 Impact Tools, Air Powered (Not Road Building) 09/04/2018 Paid $50.10
PRM 1100 18083129764 Impact Tools, Air Powered (Not Road Building) 09/04/2018 Paid $4,241.80
PRM 2400 18083129777 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 09/04/2018 Paid $152.02
PRM 2200 18082929467 Impact Tools, Air Powered (Not Road Building) 08/30/2018 Paid $1,655.50
PRC 1100 18081601845 Impact Tools, Air Powered (Not Road Building) 08/23/2018 Paid $21,085.55
PRM 9200 18082229031 Impact Tools, Air Powered (Not Road Building) 08/23/2018 Paid $372.63
PRM 1100 18081528327 Impact Tools, Air Powered (Not Road Building) 08/16/2018 Paid $20.26
PRM 7500 18081528402 Impact Tools, Air Powered (Not Road Building) 08/16/2018 Paid $27,421.90
PRM 2400 18080928050 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 08/10/2018 Paid $1,478.50
PRM 1100 18080727752 Impact Tools, Air Powered (Not Road Building) 08/08/2018 Paid $352.80
PRM 2400 18080627648 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 08/07/2018 Paid $402.86
PRM 1100 18073027009 Impact Tools, Air Powered (Not Road Building) 07/31/2018 Paid $2,113.60
PRM 1100 18072326308 Impact Tools, Air Powered (Not Road Building) 07/24/2018 Paid $2,050.43
PRC 1100 18071701727 Impact Tools, Air Powered (Not Road Building) 07/23/2018 Paid $24,080.48
PRM 1100 18071725891 Impact Tools, Air Powered (Not Road Building) 07/18/2018 Paid $4,647.23
PRM 1100 18071625764 Impact Tools, Air Powered (Not Road Building) 07/17/2018 Paid $97.65
PRM 1100 18071625772 Impact Tools, Air Powered (Not Road Building) 07/17/2018 Paid $11,061.90
PRM 9200 18071125573 Impact Tools, Air Powered (Not Road Building) 07/12/2018 Paid $208.34
PRM 1100 18071025196 Impact Tools, Air Powered (Not Road Building) 07/11/2018 Paid $4,349.28
PRM 2400 18070925072 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 07/10/2018 Paid $1,017.20
PRM 2400 18070925074 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 07/10/2018 Paid $1,307.42
PRM 1100 18070224548 Impact Tools, Air Powered (Not Road Building) 07/03/2018 Paid $7,029.65
PRM 2200 18062824261 Impact Tools, Air Powered (Not Road Building) 06/29/2018 Paid $8,147.40
PRM 1100 18062623944 Impact Tools, Air Powered (Not Road Building) 06/27/2018 Paid $6,985.49
PRM 6200 18062523883 Impact Tools, Air Powered (Not Road Building) 06/26/2018 Paid $96.71
PRC 1100 18061801640 Impact Tools, Air Powered (Not Road Building) 06/22/2018 Paid $5,233.92
PRM 1100 18061923333 Impact Tools, Air Powered (Not Road Building) 06/20/2018 Paid $4,211.17
PRM 9200 18061923419 Impact Tools, Air Powered (Not Road Building) 06/20/2018 Paid $202.37
PRM 2400 18061422987 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 06/15/2018 Paid $5,478.67
PRM 9200 18061423067 Impact Tools, Air Powered (Not Road Building) 06/15/2018 Paid $387.96
PRM 2400 18061122646 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 06/12/2018 Paid $2,367.35
PRM 9200 18061122731 Impact Tools, Air Powered (Not Road Building) 06/12/2018 Paid $440.92
PRM 1100 18060622321 Impact Tools, Air Powered (Not Road Building) 06/07/2018 Paid $2,357.41
PRM 2400 18060622376 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 06/07/2018 Paid $2,510.57
PRM 9200 18052921757 Impact Tools, Air Powered (Not Road Building) 05/30/2018 Paid $61.00
PRC 1100 18051601440 Impact Tools, Air Powered (Not Road Building) 05/24/2018 Paid $22,576.74
PRM 2400 18052221035 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 05/23/2018 Paid $373.73
PRM 6200 18051720727 Impact Tools, Air Powered (Not Road Building) 05/18/2018 Paid $210.27
PRM 1100 18051620548 Impact Tools, Air Powered (Not Road Building) 05/17/2018 Paid $1,205.40
PRM 2400 18051420326 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 05/15/2018 Paid $504.20
PRM 1100 18050119140 Impact Tools, Air Powered (Not Road Building) 05/02/2018 Paid $1,268.16
PRM 1100 18050119142 Impact Tools, Air Powered (Not Road Building) 05/02/2018 Paid $1,268.16
PRM 1100 18050119144 Impact Tools, Air Powered (Not Road Building) 05/02/2018 Paid $9,479.78
PRM 1100 18050119148 Impact Tools, Air Powered (Not Road Building) 05/02/2018 Paid $11,833.14
PRM 8200 18050119277 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 05/02/2018 Paid $18,498.50
PRM 9200 18050119297 Impact Tools, Air Powered (Not Road Building) 05/02/2018 Paid $227.80
PRM 1100 18042518658 Impact Tools, Air Powered (Not Road Building) 04/26/2018 Paid $2,113.60
PRM 1100 18042518659 Impact Tools, Air Powered (Not Road Building) 04/26/2018 Paid $2,065.69
PRM 1100 18042518661 Impact Tools, Air Powered (Not Road Building) 04/26/2018 Paid $758.64
PRM 1100 18042518663 Impact Tools, Air Powered (Not Road Building) 04/26/2018 Paid $1,690.10
PRM 1100 18042518664 Impact Tools, Air Powered (Not Road Building) 04/26/2018 Paid $5,171.42
PRC 1100 18041601068 Impact Tools, Air Powered (Not Road Building) 04/23/2018 Paid $30,018.19
PRM 2400 18042018266 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 04/23/2018 Paid $1,550.91
PRM 2400 18041617731 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 04/17/2018 Paid $254.55
PRM 2400 18041617732 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 04/17/2018 Paid $1,532.94
PRM 1100 18041117400 Impact Tools, Air Powered (Not Road Building) 04/12/2018 Paid $1,258.37
PRM 2400 18040617082 Impact Tools, Air Powered (Not Road Building) 04/09/2018 Paid $2,141.08
PRM 9200 18040617163 Impact Tools, Air Powered (Not Road Building) 04/09/2018 Paid $305.75
PRM 1100 18032916451 Impact Tools, Air Powered (Not Road Building) 03/30/2018 Paid $1,523.47
PRM 8500 18032816424 Impact Tools, Air Powered (Not Road Building) 03/29/2018 Paid $187.50
PRM 9200 18032816442 Impact Tools, Air Powered (Not Road Building) 03/29/2018 Paid $394.08
PRM 9200 18032616046 Impact Tools, Air Powered (Not Road Building) 03/27/2018 Paid $32.60
PRC 1100 18031300885 Impact Tools, Air Powered (Not Road Building) 03/22/2018 Paid $15,696.24
PRM 6200 18032115571 Impact Tools, Air Powered (Not Road Building) 03/22/2018 Paid $614.26
PRM 8500 18032115650 Impact Tools, Air Powered (Not Road Building) 03/22/2018 Paid $516.84
PRM 2400 18031915244 METERS, AMP 03/20/2018 Paid $311.74
PRM 1100 18031414935 Impact Tools, Air Powered (Not Road Building) 03/15/2018 Paid $1,391.57
PRM 2200 18031014583 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 03/12/2018 Paid $2,158.85
PRM 1100 18030814390 Impact Tools, Air Powered (Not Road Building) 03/09/2018 Paid $30,055.60
PRM 1100 18030513750 Impact Tools, Air Powered (Not Road Building) 03/06/2018 Paid $3,128.92
PRM 8500 18030513904 Impact Tools, Air Powered (Not Road Building) 03/06/2018 Paid $382.55
PRM 9200 18030513925 Impact Tools, Air Powered (Not Road Building) 03/06/2018 Paid $364.88
PRM 9200 18030513929 Impact Tools, Air Powered (Not Road Building) 03/06/2018 Paid $28.98
PRM 9200 18030213739 Impact Tools, Air Powered (Not Road Building) 03/05/2018 Paid $270.49
PRM 8500 18030113655 Impact Tools, Air Powered (Not Road Building) 03/02/2018 Paid $211.05
PRC 1100 MAX57311 Impact Tools, Air Powered (Not Road Building) 03/01/2018 Paid $13,993.70
PRM 6200 18022813488 Impact Tools, Air Powered (Not Road Building) 03/01/2018 Paid $215.50
PRM 1100 18022713098 Impact Tools, Air Powered (Not Road Building) 02/28/2018 Paid $5,238.11
PRM 1100 18022713100 Impact Tools, Air Powered (Not Road Building) 02/28/2018 Paid $302.10
PRC 1100 18021400703 Impact Tools, Air Powered (Not Road Building) 02/22/2018 Paid $36,918.21
PRM 8500 18022012620 Impact Tools, Air Powered (Not Road Building) 02/22/2018 Paid $683.58
PRM 6200 18021312062 Impact Tools, Air Powered (Not Road Building) 02/14/2018 Paid $20.24
PRM 2400 18021211872 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 02/13/2018 Paid $1,958.23
PRM 8100 18021211968 Impact Tools, Air Powered (Not Road Building) 02/13/2018 Paid $554.00
PRM 1100 18020811686 Impact Tools, Air Powered (Not Road Building) 02/09/2018 Paid $2,148.70
PRM 1100 18020511303 Impact Tools, Air Powered (Not Road Building) 02/06/2018 Paid $407.65
PRM 2200 18013110938 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 02/01/2018 Paid $2,245.07
PRM 2400 18012210008 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 01/23/2018 Paid $3,211.12
PRC 1100 18011100538 Impact Tools, Air Powered (Not Road Building) 01/22/2018 Paid $25,064.58
PRM 8500 18011009333 Impact Tools, Air Powered (Not Road Building) 01/11/2018 Paid $152.46
PRM 9200 18010909118 Impact Tools, Air Powered (Not Road Building) 01/10/2018 Paid $314.21
PRM 8500 18010808922 Impact Tools, Air Powered (Not Road Building) 01/09/2018 Paid $3,119.66
PRM 8500 18010508800 Impact Tools, Air Powered (Not Road Building) 01/08/2018 Paid $293.92
PRM 8500 18010408664 Impact Tools, Air Powered (Not Road Building) 01/05/2018 Paid $132.60
PRM 1100 18010308298 Impact Tools, Air Powered (Not Road Building) 01/04/2018 Paid $712.53
PRM 1100 18010308300 Impact Tools, Air Powered (Not Road Building) 01/04/2018 Paid $616.30
PRM 1100 18010308302 Impact Tools, Air Powered (Not Road Building) 01/04/2018 Paid $2,050.43
PRM 8500 18010308434 Impact Tools, Air Powered (Not Road Building) 01/04/2018 Paid $355.69
PRM 8500 18010308435 Impact Tools, Air Powered (Not Road Building) 01/04/2018 Paid $1,150.11
PRM 8500 18010308436 Impact Tools, Air Powered (Not Road Building) 01/04/2018 Paid $179.91
PRM 8500 18010208235 Impact Tools, Air Powered (Not Road Building) 01/03/2018 Paid $2,744.37
PRM 1100 17122807903 Impact Tools, Air Powered (Not Road Building) 12/29/2017 Paid $2,282.47
PRC 1100 17121400393 Impact Tools, Air Powered (Not Road Building) 12/22/2017 Paid $20,635.52
PRM 8500 17121507002 Impact Tools, Air Powered (Not Road Building) 12/18/2017 Paid $967.63
PRM 8600 17121507006 Impact Tools, Air Powered (Not Road Building) 12/18/2017 Paid $26,493.81
PRM 1100 17121206559 Impact Tools, Air Powered (Not Road Building) 12/13/2017 Paid $3,935.21
PRM 1100 17120405617 Impact Tools, Air Powered (Not Road Building) 12/05/2017 Paid $5,244.07
PRM 8500 17112104810 Impact Tools, Air Powered (Not Road Building) 11/22/2017 Paid $85.52
PRM 8500 17112104811 Impact Tools, Air Powered (Not Road Building) 11/22/2017 Paid $352.18
PRM 8500 17112104812 Impact Tools, Air Powered (Not Road Building) 11/22/2017 Paid $652.56
PRM 8600 17112104815 Impact Tools, Air Powered (Not Road Building) 11/22/2017 Paid $3,360.00
PRC 1100 17110800191 Impact Tools, Air Powered (Not Road Building) 11/21/2017 Paid $41,436.23
PRM 1100 17111804447 Impact Tools, Air Powered (Not Road Building) 11/20/2017 Paid $1,294.11
PRM 2400 17111704317 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 11/20/2017 Paid $511.51
PRM 8500 17111704417 Impact Tools, Air Powered (Not Road Building) 11/20/2017 Paid $193.46
PRM 8500 17111404068 Impact Tools, Air Powered (Not Road Building) 11/15/2017 Paid $1,645.00
PRM 1100 17111303842 Impact Tools, Air Powered (Not Road Building) 11/14/2017 Paid $13,580.95
PRM 8500 17110703546 Impact Tools, Air Powered (Not Road Building) 11/08/2017 Paid $35,589.08
PRM 2200 17103102897 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 11/01/2017 Paid $15,472.55
PRM 8500 17102702800 Impact Tools, Air Powered (Not Road Building) 10/30/2017 Paid $2,054.30
PRM 8500 17102602748 Impact Tools, Air Powered (Not Road Building) 10/27/2017 Paid $21.72
PRM 8500 17102602749 Impact Tools, Air Powered (Not Road Building) 10/27/2017 Paid $570.41
PRM 8500 17102602750 Impact Tools, Air Powered (Not Road Building) 10/27/2017 Paid $963.17
PRM 8500 17102602751 Impact Tools, Air Powered (Not Road Building) 10/27/2017 Paid $32.48
PRM 9200 17102602761 Impact Tools, Air Powered (Not Road Building) 10/27/2017 Paid $238.64
PRM 1100 17102502543 Impact Tools, Air Powered (Not Road Building) 10/26/2017 Paid $3,176.50
PRM 1100 17102502545 Impact Tools, Air Powered (Not Road Building) 10/26/2017 Paid $1,137.54
PRM 2400 17102402400 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 10/25/2017 Paid $5,158.20
PRM 8500 17101701911 Impact Tools, Air Powered (Not Road Building) 10/18/2017 Paid $2,316.67
PRM 1100 17101601605 Impact Tools, Air Powered (Not Road Building) 10/17/2017 Paid $424.55
PRM 1100 17101601607 Impact Tools, Air Powered (Not Road Building) 10/17/2017 Paid $119.35
PRC 1100 17101000128 Impact Tools, Air Powered (Not Road Building) 10/13/2017 Paid $23,049.33
PRM 1100 17101201174 Impact Tools, Air Powered (Not Road Building) 10/13/2017 Paid $4,377.47
PRM 8500 17092534858 Impact Tools, Air Powered (Not Road Building) 09/26/2017 Paid $25,151.63
PRM 9200 17092334640 Impact Tools, Air Powered (Not Road Building) 09/25/2017 Paid $58.00
PRC 1100 17091401740 Impact Tools, Air Powered (Not Road Building) 09/22/2017 Paid $25,144.61
PRM 1100 17092034085 Impact Tools, Air Powered (Not Road Building) 09/21/2017 Paid $5,119.55
PRM 8600 17092034229 Impact Tools, Air Powered (Not Road Building) 09/21/2017 Paid $5,487.52
PRM 1100 17091333421 Impact Tools, Air Powered (Not Road Building) 09/14/2017 Paid $1,734.98
PRM 7500 17091333505 Impact Tools, Air Powered (Not Road Building) 09/14/2017 Paid $230.81
PRM 1100 17090532507 Impact Tools, Air Powered (Not Road Building) 09/06/2017 Paid $114.44
PRM 1100 17082931871 Impact Tools, Air Powered (Not Road Building) 08/30/2017 Paid $522.33
PRM 2400 17082931920 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 08/30/2017 Paid $498.77
PRM 2400 17082931936 Impact Tools, Air Powered (Not Road Building) 08/30/2017 Paid $245.01
PRC 1100 17081001518 Impact Tools, Air Powered (Not Road Building) 08/24/2017 Paid $15,425.20
PRM 1100 17081630758 Impact Tools, Air Powered (Not Road Building) 08/17/2017 Paid $496.50
PRM 1100 17081630760 Impact Tools, Air Powered (Not Road Building) 08/17/2017 Paid $11,388.62
PRM 9200 17081630938 Impact Tools, Air Powered (Not Road Building) 08/17/2017 Paid $117.15
PRM 2400 17081530575 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 08/16/2017 Paid $1,421.85
PRM 9200 17080429765 Impact Tools, Air Powered (Not Road Building) 08/07/2017 Paid $158.33
PRM 6200 17080329633 Impact Tools, Air Powered (Not Road Building) 08/04/2017 Paid $244.50
PRM 8200 17080129360 Impact Tools, Air Powered (Not Road Building) 08/02/2017 Paid $7,490.24
PRM 9200 17073129225 Impact Tools, Air Powered (Not Road Building) 08/01/2017 Paid $351.40
GAX 9200 17072117086 07/27/2017 Paid ($87.00)
PRM 9200 17072628780 Impact Tools, Air Powered (Not Road Building) 07/27/2017 Paid $87.00
PRM 1100 17072528431 Impact Tools, Air Powered (Not Road Building) 07/26/2017 Paid $837.84
PRC 1100 17071301375 Impact Tools, Air Powered (Not Road Building) 07/21/2017 Paid $18,709.02
PRM 2400 17072028155 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 07/21/2017 Paid $960.00
PRM 1100 17071127280 Impact Tools, Air Powered (Not Road Building) 07/12/2017 Paid $7,286.67
PRM 1100 17071027162 Impact Tools, Air Powered (Not Road Building) 07/11/2017 Paid $3,304.84
PRM 2200 17070727105 Impact Tools, Air Powered (Not Road Building) 07/10/2017 Paid $2,329.75
PRM 2400 17070727118 Impact Tools, Air Powered (Not Road Building) 07/10/2017 Paid $1,174.68
PRM 6200 17070627006 Impact Tools, Air Powered (Not Road Building) 07/07/2017 Paid $166.24
PRM 2400 17063026506 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 07/03/2017 Paid $4,782.88
PRM 9200 17063026598 Impact Tools, Air Powered (Not Road Building) 07/03/2017 Paid $646.44
PRM 1100 17062826159 Impact Tools, Air Powered (Not Road Building) 06/29/2017 Paid $3,167.89
PRM 1100 17062826160 Impact Tools, Air Powered (Not Road Building) 06/29/2017 Paid $343.10
PRC 1100 17061301221 Impact Tools, Air Powered (Not Road Building) 06/22/2017 Paid $13,024.16
PRM 9200 17062025443 Impact Tools, Air Powered (Not Road Building) 06/21/2017 Paid $492.13
PRM 1100 17061625108 Impact Tools, Air Powered (Not Road Building) 06/19/2017 Paid $2,043.96
PRM 1100 17060523904 Impact Tools, Air Powered (Not Road Building) 06/06/2017 Paid $3,135.01
PRM 6200 17060223799 Impact Tools, Air Powered (Not Road Building) 06/05/2017 Paid $1,467.10
PRM 9200 17060223871 Impact Tools, Air Powered (Not Road Building) 06/05/2017 Paid $21.73
PRM 2200 17053123465 Impact Tools, Air Powered (Not Road Building) 06/01/2017 Paid $705.00
PRM 1100 17052422928 Impact Tools, Air Powered (Not Road Building) 05/25/2017 Paid $950.82
PRM 2200 17052222637 Impact Tools, Air Powered (Not Road Building) 05/23/2017 Paid $750.00
PRM 2400 17052222663 Impact Tools, Air Powered (Not Road Building) 05/23/2017 Paid $6,730.06
PRC 1100 17051501068 Impact Tools, Air Powered (Not Road Building) 05/22/2017 Paid $27,121.72
PRM 2200 17051922569 Impact Tools, Air Powered (Not Road Building) 05/22/2017 Paid $3,318.64
PRM 2400 17051922587 Impact Tools, Air Powered (Not Road Building) 05/22/2017 Paid $264.60
PRM 6200 17051722356 Impact Tools, Air Powered (Not Road Building) 05/18/2017 Paid $1,559.88
PRM 9200 17051722431 Impact Tools, Air Powered (Not Road Building) 05/18/2017 Paid $128.19
PRM 2400 17051522015 Impact Tools, Air Powered (Not Road Building) 05/16/2017 Paid $1,575.85
PRM 1100 17051021677 Impact Tools, Air Powered (Not Road Building) 05/11/2017 Paid $27.26
PRM 1100 17050421098 Impact Tools, Air Powered (Not Road Building) 05/05/2017 Paid $473.45
PRM 9200 17050220917 Impact Tools, Air Powered (Not Road Building) 05/03/2017 Paid $75.34
PRM 1100 17042820600 Impact Tools, Air Powered (Not Road Building) 05/01/2017 Paid $964.11
PRM 2400 17042620354 Impact Tools, Air Powered (Not Road Building) 04/27/2017 Paid $1,278.72
PRM 6000 17042620390 Impact Tools, Air Powered (Not Road Building) 04/27/2017 Paid $26.20
PRC 1100 17041300926 Impact Tools, Air Powered (Not Road Building) 04/21/2017 Paid $30,437.28
PRM 6000 17041819504 Impact Tools, Air Powered (Not Road Building) 04/19/2017 Paid $26.20
PRM 1100 17041719297 Impact Tools, Air Powered (Not Road Building) 04/18/2017 Paid $414.01
PRM 2400 17041719330 Impact Tools, Air Powered (Not Road Building) 04/18/2017 Paid $1,904.52
PRM 2200 17041218826 Impact Tools, Air Powered (Not Road Building) 04/13/2017 Paid $2,460.00
PRM 1100 17041018540 Impact Tools, Air Powered (Not Road Building) 04/11/2017 Paid $180.20
PRM 9200 17033118003 Impact Tools, Air Powered (Not Road Building) 04/03/2017 Paid $65.62
PRM 1100 17032717285 Impact Tools, Air Powered (Not Road Building) 03/28/2017 Paid $5,721.87
PRC 1100 17032000780 Impact Tools, Air Powered (Not Road Building) 03/24/2017 Paid $23,063.25
PRM 8100 17031616427 Impact Tools, Air Powered (Not Road Building) 03/17/2017 Paid $649.50
PRM 9200 17031616444 Impact Tools, Air Powered (Not Road Building) 03/17/2017 Paid $316.08
PRM 6200 17030915737 Impact Tools, Air Powered (Not Road Building) 03/10/2017 Paid $185.63
PRM 1100 17030815521 Impact Tools, Air Powered (Not Road Building) 03/09/2017 Paid $2,097.00
PRM 2400 17030314968 Impact Tools, Air Powered (Not Road Building) 03/06/2017 Paid $3,221.95
PRM 1100 17030114647 Impact Tools, Air Powered (Not Road Building) 03/02/2017 Paid $652.95
PRM 9200 17030114829 Impact Tools, Air Powered (Not Road Building) 03/02/2017 Paid $87.53
PRM 1100 17022814487 Impact Tools, Air Powered (Not Road Building) 03/01/2017 Paid $12,533.96
PRC 1100 17020900616 Impact Tools, Air Powered (Not Road Building) 02/23/2017 Paid $21,441.57
PRM 2400 17021613431 Impact Tools, Air Powered (Not Road Building) 02/17/2017 Paid $6,474.65
PRM 9200 17021613596 Impact Tools, Air Powered (Not Road Building) 02/17/2017 Paid $148.30
PRM 1100 17021513265 Impact Tools, Air Powered (Not Road Building) 02/16/2017 Paid $6.46
PRM 9200 17021513393 Impact Tools, Air Powered (Not Road Building) 02/16/2017 Paid $91.40
PRM 9200 17020812715 Impact Tools, Air Powered (Not Road Building) 02/09/2017 Paid $348.00
PRM 1100 17020612202 Impact Tools, Air Powered (Not Road Building) 02/07/2017 Paid $1,082.99
PRM 9200 17020612355 Impact Tools, Air Powered (Not Road Building) 02/07/2017 Paid $274.53
PRM 9200 17012611204 Impact Tools, Air Powered (Not Road Building) 01/27/2017 Paid $549.88
PRM 9200 17012511065 Impact Tools, Air Powered (Not Road Building) 01/26/2017 Paid $262.29
PRM 2400 17012410671 Impact Tools, Air Powered (Not Road Building) 01/25/2017 Paid $781.20
PRC 1100 17011200467 Impact Tools, Air Powered (Not Road Building) 01/23/2017 Paid $23,169.75
PRM 1100 17011710140 Impact Tools, Air Powered (Not Road Building) 01/18/2017 Paid $2,023.41
PRM 8600 17011310049 Impact Tools, Air Powered (Not Road Building) 01/17/2017 Paid $2,830.16
PRM 1100 17010408929 Impact Tools, Air Powered (Not Road Building) 01/05/2017 Paid $6,136.90
PRM 2200 17010408953 Impact Tools, Air Powered (Not Road Building) 01/05/2017 Paid $5,538.45
PRM 2400 17010408988 Impact Tools, Air Powered (Not Road Building) 01/05/2017 Paid $1,185.33
PRM 6200 17010409046 Impact Tools, Air Powered (Not Road Building) 01/05/2017 Paid $206.53
PRM 6200 17010409048 Impact Tools, Air Powered (Not Road Building) 01/05/2017 Paid $282.20
PRM 8600 17010409101 Impact Tools, Air Powered (Not Road Building) 01/05/2017 Paid $7,933.81
PRM 8600 17010409102 Impact Tools, Air Powered (Not Road Building) 01/05/2017 Paid $2,193.00
PRM 8600 17010409113 Impact Tools, Air Powered (Not Road Building) 01/05/2017 Paid $54,526.20
PRM 2400 16122808335 Impact Tools, Air Powered (Not Road Building) 01/03/2017 Paid $3,156.87
PRM 2400 16122808336 Impact Tools, Air Powered (Not Road Building) 01/03/2017 Paid $2,989.81
PRM 1100 16122908456 Impact Tools, Air Powered (Not Road Building) 12/30/2016 Paid $779.85
PRM 9200 16122708307 Impact Tools, Air Powered (Not Road Building) 12/28/2016 Paid $114.71
PRM 6200 16122107932 Impact Tools, Air Powered (Not Road Building) 12/22/2016 Paid $139.18
PRC 1100 16121300318 Impact Tools, Air Powered (Not Road Building) 12/21/2016 Paid $32,084.93
PRM 1100 16121907463 Impact Tools, Air Powered (Not Road Building) 12/20/2016 Paid $1,032.80
PRM 2200 16121707330 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 12/19/2016 Paid $2,370.60
PRM 1100 16121406872 Impact Tools, Air Powered (Not Road Building) 12/15/2016 Paid $1,094.40
PRM 1100 16121006425 Impact Tools, Air Powered (Not Road Building) 12/12/2016 Paid $330.30
PRM 8600 16120706216 Impact Tools, Air Powered (Not Road Building) 12/08/2016 Paid $7,786.62
PRM 8600 16120706218 Impact Tools, Air Powered (Not Road Building) 12/08/2016 Paid $14,202.34
PRM 8600 16112805308 Impact Tools, Air Powered (Not Road Building) 11/30/2016 Paid $39,057.33
PRM 8600 16112805311 Impact Tools, Air Powered (Not Road Building) 11/30/2016 Paid $56,330.92
PRM 8600 16112905464 Impact Tools, Air Powered (Not Road Building) 11/30/2016 Paid $18,804.10
PRM 8600 16112905475 Impact Tools, Air Powered (Not Road Building) 11/30/2016 Paid $353.77
PRM 9300 16112805334 Impact Tools, Air Powered (Not Road Building) 11/30/2016 Paid $125.37
PRM 1100 16112805211 Impact Tools, Air Powered (Not Road Building) 11/29/2016 Paid $133.24
PRM 8600 16112205123 Impact Tools, Air Powered (Not Road Building) 11/23/2016 Paid $66,923.88
PRM 9200 16112205127 Impact Tools, Air Powered (Not Road Building) 11/23/2016 Paid $183.15
PRC 1100 16111400175 Impact Tools, Air Powered (Not Road Building) 11/22/2016 Paid $29,815.32
PRM 8600 16111704724 Impact Tools, Air Powered (Not Road Building) 11/18/2016 Paid $31,385.91
PRM 1100 16111604452 Impact Tools, Air Powered (Not Road Building) 11/17/2016 Paid $75.70
PRM 6200 16111004095 Impact Tools, Air Powered (Not Road Building) 11/14/2016 Paid $165.40
PRM 9200 16110103321 Impact Tools, Air Powered (Not Road Building) 11/02/2016 Paid $83.98
PRM 9300 16110103334 Impact Tools, Air Powered (Not Road Building) 11/02/2016 Paid $4,891.85
PRM 8700 16102602631 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 10/27/2016 Paid $285.00
PRM 1100 16102502265 Impact Tools, Air Powered (Not Road Building) 10/26/2016 Paid $16,785.56
PRM 8700 16102502458 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 10/26/2016 Paid $1,341.72
PRM 9200 16102402251 Impact Tools, Air Powered (Not Road Building) 10/25/2016 Paid $148.62
PRM 2200 16101401042 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 10/17/2016 Paid $4,000.00
PRC 1100 16100700005 Impact Tools, Air Powered (Not Road Building) 10/14/2016 Paid $29,252.16
PRM 7500 16101100705 Impact Tools, Air Powered (Not Road Building) 10/12/2016 Paid $69.72
PRM 9200 16101100800 Impact Tools, Air Powered (Not Road Building) 10/12/2016 Paid $531.63
PRM 7500 16100300129 Impact Tools, Air Powered (Not Road Building) 10/04/2016 Paid $14,710.28
PRM 1100 16092738980 Impact Tools, Air Powered (Not Road Building) 09/28/2016 Paid $98.84
PRM 1100 16092738987 Impact Tools, Air Powered (Not Road Building) 09/28/2016 Paid $2,916.00
PRC 1100 16091400690 Impact Tools, Air Powered (Not Road Building) 09/23/2016 Paid $30,185.67
PRM 8500 16092238626 Impact Tools, Air Powered (Not Road Building) 09/23/2016 Paid $350.82
PRM 9200 16092238635 Impact Tools, Air Powered (Not Road Building) 09/23/2016 Paid $830.88
PRM 2400 16092138394 Impact Tools, Air Powered (Not Road Building) 09/22/2016 Paid $37.91
PRM 2400 16092138395 Impact Tools, Air Powered (Not Road Building) 09/22/2016 Paid $49.00
PRM 1100 16091937915 Impact Tools, Air Powered (Not Road Building) 09/20/2016 Paid $13,437.04
PRM 1100 16091237068 Impact Tools, Air Powered (Not Road Building) 09/13/2016 Paid $433.35
PRM 8500 16091237175 Impact Tools, Air Powered (Not Road Building) 09/13/2016 Paid $113.00
PRM 9200 16091237281 Impact Tools, Air Powered (Not Road Building) 09/13/2016 Paid $37.60
PRM 8500 16090937048 Impact Tools, Air Powered (Not Road Building) 09/12/2016 Paid $1,565.39
PRM 9200 16090836994 Impact Tools, Air Powered (Not Road Building) 09/09/2016 Paid $315.32
PRM 2400 16090336297 Impact Tools, Air Powered (Not Road Building) 09/06/2016 Paid $1,274.90
PRM 9200 16083035900 Impact Tools, Air Powered (Not Road Building) 08/31/2016 Paid $111.80
PRM 2400 16082635484 Impact Tools, Air Powered (Not Road Building) 08/29/2016 Paid $603.65
PRM 6200 16082435213 Impact Tools, Air Powered (Not Road Building) 08/25/2016 Paid $222.94
PRC 1100 16081200537 Impact Tools, Air Powered (Not Road Building) 08/23/2016 Paid $15,764.79
PRM 1100 16082234695 Impact Tools, Air Powered (Not Road Building) 08/23/2016 Paid $4,279.75
PRM 2200 16081734366 BRUSHES (NOT OTHERWISE CLASSIFIED) 08/18/2016 Paid $17.67
PRM 2200 16081734367 Impact Tools, Air Powered (Not Road Building) 08/18/2016 Paid $5,163.80
PRM 2400 16081634108 Impact Tools, Air Powered (Not Road Building) 08/17/2016 Paid $202.80
PRM 2400 16081533965 Impact Tools, Air Powered (Not Road Building) 08/16/2016 Paid $138.80
PRM 2400 16081533966 Impact Tools, Air Powered (Not Road Building) 08/16/2016 Paid $421.83
PRM 9200 16081534059 Impact Tools, Air Powered (Not Road Building) 08/16/2016 Paid $43.65
PRM 2400 16080933404 Impact Tools, Air Powered (Not Road Building) 08/10/2016 Paid $1,809.95
PRM 9200 16080633217 Impact Tools, Air Powered (Not Road Building) 08/08/2016 Paid $3,207.86
PRM 9200 16080433017 Impact Tools, Air Powered (Not Road Building) 08/05/2016 Paid $98.22
PRM 9200 16080332880 Impact Tools, Air Powered (Not Road Building) 08/04/2016 Paid $170.82
PRM 1100 16080232386 Impact Tools, Air Powered (Not Road Building) 08/03/2016 Paid $2,067.08
PRM 8100 16080232571 Impact Tools, Air Powered (Not Road Building) 08/03/2016 Paid $3,548.80
PRM 9200 16080232642 Impact Tools, Air Powered (Not Road Building) 08/03/2016 Paid $210.12
PRC 1100 16071200395 Impact Tools, Air Powered (Not Road Building) 07/22/2016 Paid $29,637.57
PRM 2400 16071831179 Impact Tools, Air Powered (Not Road Building) 07/19/2016 Paid $880.19
PRM 9200 16071831239 Impact Tools, Air Powered (Not Road Building) 07/19/2016 Paid $203.14
PRM 1100 16071130420 Impact Tools, Air Powered (Not Road Building) 07/12/2016 Paid $956.56
PRM 9200 16070830396 Impact Tools, Air Powered (Not Road Building) 07/11/2016 Paid $6.98
PRM 9200 16070229787 Impact Tools, Air Powered (Not Road Building) 07/05/2016 Paid $334.34
PRM 9200 16062929401 Impact Tools, Air Powered (Not Road Building) 06/30/2016 Paid $351.65
PRM 1100 16062528694 Impact Tools, Air Powered (Not Road Building) 06/27/2016 Paid $2,596.69
PRC 1100 16061500241 Impact Tools, Air Powered (Not Road Building) 06/23/2016 Paid $21,654.33
PRM 1100 16061627553 Impact Tools, Air Powered (Not Road Building) 06/17/2016 Paid $431.36
PRM 1100 16061627563 Impact Tools, Air Powered (Not Road Building) 06/17/2016 Paid $108.24
PRM 1100 16061527343 Impact Tools, Air Powered (Not Road Building) 06/16/2016 Paid $549.66
PRM 2400 16061527380 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 06/16/2016 Paid $601.90
PRM 1100 16061327024 Impact Tools, Air Powered (Not Road Building) 06/14/2016 Paid $125.42
PRM 8200 16060926816 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 06/10/2016 Paid $10,200.00
PRM 1100 16060226199 Impact Tools, Air Powered (Not Road Building) 06/03/2016 Paid $3,448.84
PRC 1100 16051200106 Impact Tools, Air Powered (Not Road Building) 05/24/2016 Paid $24,829.91
PRM 2400 16051925188 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 05/20/2016 Paid $2,144.26
PRM 6200 16051324667 Impact Tools, Air Powered (Not Road Building) 05/16/2016 Paid $285.68
PRM 6000 16051224514 Impact Tools, Air Powered (Not Road Building) 05/13/2016 Paid $148.86
PRM 2400 16051024215 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 05/11/2016 Paid $287.97
PRM 2400 16051024222 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 05/11/2016 Paid $235.26
PRM 1100 16050623980 Impact Tools, Air Powered (Not Road Building) 05/09/2016 Paid $3,432.64
PRM 9200 16050223742 Impact Tools, Air Powered (Not Road Building) 05/03/2016 Paid $78.99
PRM 9200 16050223744 Impact Tools, Air Powered (Not Road Building) 05/03/2016 Paid $422.70
PRM 8500 16042823545 Impact Tools, Air Powered (Not Road Building) 04/29/2016 Paid $216.38
PRM 1100 16042522582 Impact Tools, Air Powered (Not Road Building) 04/26/2016 Paid $117.43
PRM 1100 16042522583 Impact Tools, Air Powered (Not Road Building) 04/26/2016 Paid $429.08
PRM 1100 16041421639 Impact Tools, Air Powered (Not Road Building) 04/21/2016 Paid $30,052.06
PRM 8200 16042022370 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 04/21/2016 Paid $18,427.72
PRM 2400 16041922102 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 04/20/2016 Paid $314.54
PRM 2400 16041922102 Impact Tools, Air Powered (Not Road Building) 04/20/2016 Paid $588.40
PRM 8700 16041822002 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 04/19/2016 Paid $198.00
PRM 9200 16041822012 JANITORIAL SUPPLIES, GENERAL LINE 04/19/2016 Paid $56.45
PRM 9200 16041822013 JANITORIAL SUPPLIES, GENERAL LINE 04/19/2016 Paid $89.14
PRM 9200 16041421775 JANITORIAL SUPPLIES, GENERAL LINE 04/15/2016 Paid $122.45
PRM 9200 16033120352 JANITORIAL SUPPLIES, GENERAL LINE 04/01/2016 Paid $204.11
PRM 8200 16032819678 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 03/29/2016 Paid $29,900.00
PRM 1100 16032319105 Impact Tools, Air Powered (Not Road Building) 03/24/2016 Paid $33.72
PRM 1100 16032319106 Impact Tools, Air Powered (Not Road Building) 03/24/2016 Paid $361.86
PRM 1100 16032319107 Impact Tools, Air Powered (Not Road Building) 03/24/2016 Paid $695.25
PRM 1100 16030917347 Impact Tools, Air Powered (Not Road Building) 03/22/2016 Paid $19,899.66
PRM 1100 16031818688 Impact Tools, Air Powered (Not Road Building) 03/21/2016 Paid $737.94
PRM 8700 16031718669 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 03/18/2016 Paid $34.38
PRM 8500 16031618507 Impact Tools, Air Powered (Not Road Building) 03/17/2016 Paid $32.73
PRM 1100 16031518087 Impact Tools, Air Powered (Not Road Building) 03/16/2016 Paid $901.80
PRM 2400 16031417981 Impact Tools, Air Powered (Not Road Building) 03/15/2016 Paid $823.95
PRM 9300 16030716996 Impact Tools, Air Powered (Not Road Building) 03/08/2016 Paid $1,633.96
PRM 9300 16030716998 Impact Tools, Air Powered (Not Road Building) 03/08/2016 Paid $4,147.20
PRM 6200 16030316566 Impact Tools, Air Powered (Not Road Building) 03/04/2016 Paid $69.77
PRM 8500 16030316636 Impact Tools, Air Powered (Not Road Building) 03/04/2016 Paid $292.29
PRM 2400 16030216292 Impact Tools, Air Powered (Not Road Building) 03/03/2016 Paid $361.21
PRM 6200 16030216355 Impact Tools, Air Powered (Not Road Building) 03/03/2016 Paid $106.40
PRM 9200 16030216456 JANITORIAL SUPPLIES, GENERAL LINE 03/03/2016 Paid $248.65
PRM 6200 16030116098 Impact Tools, Air Powered (Not Road Building) 03/02/2016 Paid $747.21
PRM 1100 16022915871 Impact Tools, Air Powered (Not Road Building) 03/01/2016 Paid $70.16
PRM 8500 16022515731 Impact Tools, Air Powered (Not Road Building) 02/26/2016 Paid $119.00
PRM 8500 16022515732 Impact Tools, Air Powered (Not Road Building) 02/26/2016 Paid $419.25
PRM 1100 16021714454 Impact Tools, Air Powered (Not Road Building) 02/22/2016 Paid $19,443.92
PRM 6200 16021714520 Impact Tools, Air Powered (Not Road Building) 02/18/2016 Paid $12.84
PRM 6200 16021614356 Impact Tools, Air Powered (Not Road Building) 02/17/2016 Paid $7.10
PRM 8200 16021014040 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 02/11/2016 Paid $490.00
PRM 9200 16021014080 JANITORIAL SUPPLIES, GENERAL LINE 02/11/2016 Paid $123.63
PRM 6200 16020813670 Impact Tools, Air Powered (Not Road Building) 02/09/2016 Paid $439.31
PRM 8500 16020813715 Impact Tools, Air Powered (Not Road Building) 02/09/2016 Paid $180.15
PRM 8500 16020813716 Impact Tools, Air Powered (Not Road Building) 02/09/2016 Paid $5,028.00
PRM 8500 16020813717 Impact Tools, Air Powered (Not Road Building) 02/09/2016 Paid $15.60
PRM 8200 16020513502 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 02/08/2016 Paid $94,833.60
PRM 2400 16012812709 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 01/29/2016 Paid $2,425.13
PRM 9200 16012812819 JANITORIAL SUPPLIES, GENERAL LINE 01/29/2016 Paid $378.75
PRM 1100 16012612367 Impact Tools, Air Powered (Not Road Building) 01/27/2016 Paid $329.40
PRM 2400 16012512256 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 01/26/2016 Paid $361.67
PRM 8200 16012512328 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 01/26/2016 Paid $420.00
PRM 1100 16011611503 Impact Tools, Air Powered (Not Road Building) 01/22/2016 Paid $16,619.09
PRM 1100 16011210632 Impact Tools, Air Powered (Not Road Building) 01/13/2016 Paid $987.05
PRM 2400 16011210706 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 01/13/2016 Paid $2,381.16
PRM 1100 16010910378 Impact Tools, Air Powered (Not Road Building) 01/11/2016 Paid $123.68
PRM 2200 16010609895 Impact Tools, Air Powered (Not Road Building) 01/07/2016 Paid $547.98
PRM 2400 15122809015 Impact Tools, Air Powered (Not Road Building) 12/29/2015 Paid $3,731.32
PRM 1100 15121507912 Impact Tools, Air Powered (Not Road Building) 12/22/2015 Paid $21,859.77
PRM 9200 15122108637 JANITORIAL SUPPLIES, GENERAL LINE 12/22/2015 Paid $239.09
PRM 1100 15121507937 Impact Tools, Air Powered (Not Road Building) 12/16/2015 Paid $28.20
PRM 9200 15121508109 JANITORIAL SUPPLIES, GENERAL LINE 12/16/2015 Paid $633.09
PRM 8700 15121407844 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 12/15/2015 Paid $387.36
PRM 9200 15120706968 JANITORIAL SUPPLIES, GENERAL LINE 12/08/2015 Paid $144.37
PRM 1100 15113005987 Impact Tools, Air Powered (Not Road Building) 12/01/2015 Paid $6,858.11
PRM 9200 15113006181 JANITORIAL SUPPLIES, GENERAL LINE 12/01/2015 Paid $109.82
PRM 6200 15112405768 Impact Tools, Air Powered (Not Road Building) 11/25/2015 Paid $33.60
PRM 6200 15112005301 Impact Tools, Air Powered (Not Road Building) 11/23/2015 Paid $91.72
PRM 1100 15111905147 Impact Tools, Air Powered (Not Road Building) 11/20/2015 Paid $4,184.55
PRM 1100 15111204597 Impact Tools, Air Powered (Not Road Building) 11/19/2015 Paid $27,975.62
PRM 8600 15111805132 Impact Tools, Air Powered (Not Road Building) 11/19/2015 Paid $89,425.00
PRM 6200 15111604880 Impact Tools, Air Powered (Not Road Building) 11/17/2015 Paid $1,443.70
PRM 9200 15111604907 JANITORIAL SUPPLIES, GENERAL LINE 11/17/2015 Paid $278.80
PRM 1600 15111004457 Impact Tools, Air Powered (Not Road Building) 11/12/2015 Paid $7,314.32
PRM 8500 15111004555 Impact Tools, Air Powered (Not Road Building) 11/12/2015 Paid $1,411.20
PRM 1100 15110604165 Impact Tools, Air Powered (Not Road Building) 11/09/2015 Paid $71.77
PRM 6200 15110604202 Impact Tools, Air Powered (Not Road Building) 11/09/2015 Paid $35.15
PRM 9200 15110604236 JANITORIAL SUPPLIES, GENERAL LINE 11/09/2015 Paid $257.87
PRM 6200 15110403995 Impact Tools, Air Powered (Not Road Building) 11/05/2015 Paid $451.07
PRM 8500 15110203665 Impact Tools, Air Powered (Not Road Building) 11/03/2015 Paid $170.84
PRM 1100 15102903410 Impact Tools, Air Powered (Not Road Building) 10/30/2015 Paid $322.88
PRM 8500 15102703146 Impact Tools, Air Powered (Not Road Building) 10/28/2015 Paid $485.20
PRM 8500 15102703147 Impact Tools, Air Powered (Not Road Building) 10/28/2015 Paid $170.21
PRM 9200 15102703177 JANITORIAL SUPPLIES, GENERAL LINE 10/28/2015 Paid $78.25
PRM 9100 15102002335 Impact Tools, Air Powered (Not Road Building) 10/21/2015 Paid $743.84
PRM 2400 15101501597 Impact Tools, Air Powered (Not Road Building) 10/16/2015 Paid $347.04
PRM 9200 15101501715 JANITORIAL SUPPLIES, GENERAL LINE 10/16/2015 Paid $20.92
PRM 1100 15101300965 Impact Tools, Air Powered (Not Road Building) 10/14/2015 Paid $915.30
PRM 1100 15100600469 Impact Tools, Air Powered (Not Road Building) 10/09/2015 Paid $20,215.88
PRM 8700 15100800845 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 10/09/2015 Paid $28.80
GAX 9200 15092521106 10/08/2015 Paid ($122.09)
PRM 9200 15100700775 JANITORIAL SUPPLIES, GENERAL LINE 10/08/2015 Paid $122.09
PRM 1100 15093040405 Impact Tools, Air Powered (Not Road Building) 10/02/2015 Paid $18,457.88
PRM 9200 15093040620 JANITORIAL SUPPLIES, GENERAL LINE 10/02/2015 Paid $22.12
PRM 9300 15092940392 Impact Tools, Air Powered (Not Road Building) 09/30/2015 Paid $3,587.63
PRM 8700 15092439859 Impact Tools, Air Powered (Not Road Building) 09/25/2015 Paid $7,127.91
PRM 9200 15092439876 JANITORIAL SUPPLIES, GENERAL LINE 09/25/2015 Paid $29.95
PRM 2200 15092339526 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 09/24/2015 Paid $264.50
PRM 2200 15092339526 Impact Tools, Air Powered (Not Road Building) 09/24/2015 Paid $3,105.72
PRM 9200 15092339761 JANITORIAL SUPPLIES, GENERAL LINE 09/24/2015 Paid $20.92
PRM 1100 15092239348 Impact Tools, Air Powered (Not Road Building) 09/23/2015 Paid $483.38
PRM 8200 15092139294 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 09/22/2015 Paid $69,416.80
PRM 2400 15091839056 Impact Tools, Air Powered (Not Road Building) 09/21/2015 Paid $53.69
PRM 1100 15091438347 Impact Tools, Air Powered (Not Road Building) 09/18/2015 Paid $26,438.82
PRM 2400 15091438359 Impact Tools, Air Powered (Not Road Building) 09/15/2015 Paid $911.59
PRM 9200 15091138322 JANITORIAL SUPPLIES, GENERAL LINE 09/14/2015 Paid $68.40
PRM 6200 15090837826 Impact Tools, Air Powered (Not Road Building) 09/09/2015 Paid $139.16
PRM 6200 15090837828 Impact Tools, Air Powered (Not Road Building) 09/09/2015 Paid $324.90
PRM 9200 15090837945 JANITORIAL SUPPLIES, GENERAL LINE 09/09/2015 Paid $340.42
PRM 1100 15083136853 Impact Tools, Air Powered (Not Road Building) 09/01/2015 Paid $182.57
PRM 6200 15082736685 Impact Tools, Air Powered (Not Road Building) 08/28/2015 Paid $447.30
PRM 1100 15082636422 Impact Tools, Air Powered (Not Road Building) 08/27/2015 Paid $134.60
PRM 2200 15082536229 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 08/26/2015 Paid $3,045.00
PRM 1100 15081735082 Impact Tools, Air Powered (Not Road Building) 08/21/2015 Paid $14,361.10
PRM 9200 15081935675 JANITORIAL SUPPLIES, GENERAL LINE 08/20/2015 Paid $110.41
PRM 1100 15081835283 Impact Tools, Air Powered (Not Road Building) 08/19/2015 Paid $5,896.45
PRM 1100 15081234602 Impact Tools, Air Powered (Not Road Building) 08/13/2015 Paid $195.36
PRM 1100 15081234603 Impact Tools, Air Powered (Not Road Building) 08/13/2015 Paid $1,213.32
PRM 9200 15081234793 JANITORIAL SUPPLIES, GENERAL LINE 08/13/2015 Paid $88.61
PRM 2400 15080533908 Impact Tools, Air Powered (Not Road Building) 08/06/2015 Paid $1,743.60
PRM 1100 15080433639 Impact Tools, Air Powered (Not Road Building) 08/05/2015 Paid $218.24
PRM 1100 15080333480 Impact Tools, Air Powered (Not Road Building) 08/04/2015 Paid $646.16
PRM 6200 15080333572 Impact Tools, Air Powered (Not Road Building) 08/04/2015 Paid $36.04
PRM 6200 15073033272 Impact Tools, Air Powered (Not Road Building) 07/31/2015 Paid $81.72
PRM 9100 15073033327 Impact Tools, Air Powered (Not Road Building) 07/31/2015 Paid $392.00
PRM 9200 15073033339 JANITORIAL SUPPLIES, GENERAL LINE 07/31/2015 Paid $486.50
PRM 1100 15072732787 Impact Tools, Air Powered (Not Road Building) 07/28/2015 Paid $63.32
PRM 6200 15072332588 Impact Tools, Air Powered (Not Road Building) 07/24/2015 Paid $178.65
PRM 1100 15071431169 Impact Tools, Air Powered (Not Road Building) 07/22/2015 Paid $12,946.54
PRM 6200 15071631634 Impact Tools, Air Powered (Not Road Building) 07/17/2015 Paid $499.20
PRM 9200 15071531525 JANITORIAL SUPPLIES, GENERAL LINE 07/16/2015 Paid $671.12
PRM 1100 15070830518 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 07/09/2015 Paid $11,792.90
PRM 2200 15070630095 Impact Tools, Air Powered (Not Road Building) 07/07/2015 Paid $5,036.25
PRM 9200 15070630253 JANITORIAL SUPPLIES, GENERAL LINE 07/07/2015 Paid $68.93
PRM 2200 15070129829 Impact Tools, Air Powered (Not Road Building) 07/02/2015 Paid $2,152.00
PRM 6200 15062529128 Impact Tools, Air Powered (Not Road Building) 06/26/2015 Paid $143.40
PRM 1100 15062428925 Impact Tools, Air Powered (Not Road Building) 06/25/2015 Paid $24.36
PRM 9200 15062328900 JANITORIAL SUPPLIES, GENERAL LINE 06/24/2015 Paid $91.45
PRM 1100 15061527769 Impact Tools, Air Powered (Not Road Building) 06/22/2015 Paid $15,461.53
PRM 9200 15061828398 JANITORIAL SUPPLIES, GENERAL LINE 06/19/2015 Paid $41.40
PRM 2200 15061527777 Impact Tools, Air Powered (Not Road Building) 06/16/2015 Paid $6,051.93
PRM 8100 15061527950 Impact Tools, Air Powered (Not Road Building) 06/16/2015 Paid $6,228.12
PRM 9200 15061027532 JANITORIAL SUPPLIES, GENERAL LINE 06/11/2015 Paid $88.20
PRM 6200 15060927287 Impact Tools, Air Powered (Not Road Building) 06/10/2015 Paid $33.44
PRM 6200 15060927291 Impact Tools, Air Powered (Not Road Building) 06/10/2015 Paid $823.06
PRM 9200 15060927396 JANITORIAL SUPPLIES, GENERAL LINE 06/10/2015 Paid $234.66
PRM 6200 15060426848 Impact Tools, Air Powered (Not Road Building) 06/05/2015 Paid $153.47
PRM 6200 15060226557 Impact Tools, Air Powered (Not Road Building) 06/03/2015 Paid $467.40
PRM 6200 15060226559 Impact Tools, Air Powered (Not Road Building) 06/03/2015 Paid $919.63
PRM 2400 15060126359 Impact Tools, Air Powered (Not Road Building) 06/02/2015 Paid $1,976.63
PRM 9200 15052225795 JANITORIAL SUPPLIES, GENERAL LINE 05/26/2015 Paid $19.30
PRM 1100 15051424808 Impact Tools, Air Powered (Not Road Building) 05/22/2015 Paid $20,254.21
PRM 1100 15051224512 Impact Tools, Air Powered (Not Road Building) 05/13/2015 Paid $4,924.05
PRM 9200 15050523843 JANITORIAL SUPPLIES, GENERAL LINE 05/06/2015 Paid $432.00
PRM 9200 15050123434 JANITORIAL SUPPLIES, GENERAL LINE 05/04/2015 Paid $433.73
PRM 9200 15042822944 JANITORIAL SUPPLIES, GENERAL LINE 04/29/2015 Paid $432.00
PRM 1100 15041521275 Impact Tools, Air Powered (Not Road Building) 04/23/2015 Paid $23,876.14
PRM 6200 15042021872 Impact Tools, Air Powered (Not Road Building) 04/21/2015 Paid $990.98
PRM 6200 15041320996 Impact Tools, Air Powered (Not Road Building) 04/14/2015 Paid $40.04
PRM 6200 15041320997 Impact Tools, Air Powered (Not Road Building) 04/14/2015 Paid $4,125.00
PRM 9200 15041321056 JANITORIAL SUPPLIES, GENERAL LINE 04/14/2015 Paid $57.90
PRM 9200 15040620273 JANITORIAL SUPPLIES, GENERAL LINE 04/07/2015 Paid $26.95
PRM 1600 15040219910 Impact Tools, Air Powered (Not Road Building) 04/03/2015 Paid $8,625.00
PRM 1100 15032518926 Impact Tools, Air Powered (Not Road Building) 03/26/2015 Paid $5,899.90
PRM 1100 15032018198 Impact Tools, Air Powered (Not Road Building) 03/23/2015 Paid $16,466.72
PRM 8200 15031817985 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 03/19/2015 Paid $37,020.00
PRM 9200 15031717857 JANITORIAL SUPPLIES, GENERAL LINE 03/18/2015 Paid $72.80
PRM 6200 15031317485 Impact Tools, Air Powered (Not Road Building) 03/16/2015 Paid $378.45
PRM 2400 15031016938 Impact Tools, Air Powered (Not Road Building) 03/11/2015 Paid $229.58
PRM 6300 15031017015 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 03/11/2015 Paid $2,022.71
PRM 6200 15030916787 Impact Tools, Air Powered (Not Road Building) 03/10/2015 Paid $4,125.00
PRM 9200 15030616671 JANITORIAL SUPPLIES, GENERAL LINE 03/09/2015 Paid $35.53
PRM 6300 15030416363 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 03/05/2015 Paid $1,852.26
PRM 9200 15022715941 JANITORIAL SUPPLIES, GENERAL LINE 03/02/2015 Paid $96.54
PRM 1100 15022315034 Impact Tools, Air Powered (Not Road Building) 02/24/2015 Paid $2,906.12
PRM 1100 15021214148 Impact Tools, Air Powered (Not Road Building) 02/23/2015 Paid $17,015.88
PRM 9200 15021914875 JANITORIAL SUPPLIES, GENERAL LINE 02/20/2015 Paid $638.98
PRM 6200 15021114064 Impact Tools, Air Powered (Not Road Building) 02/12/2015 Paid $3,352.45
PRM 8300 15021114098 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 02/12/2015 Paid $1,035.54
PRM 9200 15021013942 JANITORIAL SUPPLIES, GENERAL LINE 02/11/2015 Paid $145.88
PRM 9200 15020413185 JANITORIAL SUPPLIES, GENERAL LINE 02/05/2015 Paid $241.90
PRM 1600 15020212674 Impact Tools, Air Powered (Not Road Building) 02/03/2015 Paid $7,081.59
PRM 1100 15012712116 Impact Tools, Air Powered (Not Road Building) 01/28/2015 Paid $1,738.36
PRM 6400 15012712184 JANITORIAL SUPPLIES, GENERAL LINE 01/28/2015 Paid $4,236.75
PRM 8300 15012712197 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 01/28/2015 Paid $40,629.60
PRM 1100 15011310679 Impact Tools, Air Powered (Not Road Building) 01/22/2015 Paid $13,570.03
PRM 9200 15012111722 JANITORIAL SUPPLIES, GENERAL LINE 01/22/2015 Paid $181.54
PRM 8300 15011611193 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 01/20/2015 Paid $1,512.00
PRM 8300 15011310852 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 01/14/2015 Paid $141.50
PRM 9200 15011310876 JANITORIAL SUPPLIES, GENERAL LINE 01/14/2015 Paid $487.53
PRM 8600 15010910506 Impact Tools, Air Powered (Not Road Building) 01/12/2015 Paid $24,767.22
PRM 9200 15010910515 JANITORIAL SUPPLIES, GENERAL LINE 01/12/2015 Paid $276.68
PRM 8300 15010810379 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 01/09/2015 Paid $2,502.00
PRM 2200 15010509801 Impact Tools, Air Powered (Not Road Building) 01/06/2015 Paid $1,967.63
PRM 8300 15010509941 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 01/06/2015 Paid $92,410.73
PRM 8300 15010509945 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 01/06/2015 Paid $4,799.69
PRM 2400 15010209610 Impact Tools, Air Powered (Not Road Building) 01/05/2015 Paid $782.40
PRM 9200 15010209784 JANITORIAL SUPPLIES, GENERAL LINE 01/05/2015 Paid $45.26
PRM 2200 14123109463 Impact Tools, Air Powered (Not Road Building) 01/02/2015 Paid $359.40
PRM 9200 14123009394 JANITORIAL SUPPLIES, GENERAL LINE 12/31/2014 Paid $686.78
PRM 6200 14122308725 Impact Tools, Air Powered (Not Road Building) 12/26/2014 Paid $3,062.40
PRM 6200 14122308727 Impact Tools, Air Powered (Not Road Building) 12/26/2014 Paid $1,588.45
PRM 6200 14122208520 Impact Tools, Air Powered (Not Road Building) 12/23/2014 Paid $1,287.68
PRM 1100 14121607704 Impact Tools, Air Powered (Not Road Building) 12/22/2014 Paid $12,709.50
PRM 1100 14122008270 Impact Tools, Air Powered (Not Road Building) 12/22/2014 Paid $328.06
PRM 9200 14122008400 JANITORIAL SUPPLIES, GENERAL LINE 12/22/2014 Paid $84.04
PRM 6200 14121707943 Impact Tools, Air Powered (Not Road Building) 12/18/2014 Paid $324.66
PRM 9200 14121708024 JANITORIAL SUPPLIES, GENERAL LINE 12/18/2014 Paid $17.16
PRM 9200 14121507680 JANITORIAL SUPPLIES, GENERAL LINE 12/16/2014 Paid $46.99
PRM 8600 14120807002 Impact Tools, Air Powered (Not Road Building) 12/09/2014 Paid $18,945.00
PRM 9300 14120206380 Impact Tools, Air Powered (Not Road Building) 12/02/2014 Paid $345.80
PRM 9200 14112405993 JANITORIAL SUPPLIES, GENERAL LINE 11/25/2014 Paid $167.66
PRM 1100 14111705218 Impact Tools, Air Powered (Not Road Building) 11/20/2014 Paid $20,182.47
PRM 9200 14111805462 JANITORIAL SUPPLIES, GENERAL LINE 11/19/2014 Paid $80.94
PRM 6200 14111305076 Impact Tools, Air Powered (Not Road Building) 11/14/2014 Paid $72.32
PRM 8600 14111305119 Impact Tools, Air Powered (Not Road Building) 11/14/2014 Paid $18,554.40
PRM 2200 14111004669 Impact Tools, Air Powered (Not Road Building) 11/12/2014 Paid $2,152.00
PRM 6200 14111004746 Impact Tools, Air Powered (Not Road Building) 11/12/2014 Paid $10.95
PRM 8600 14111004817 Impact Tools, Air Powered (Not Road Building) 11/12/2014 Paid $19,978.04
PRM 8600 14110704615 Impact Tools, Air Powered (Not Road Building) 11/10/2014 Paid $2,266.15
PRM 8600 14110704617 Impact Tools, Air Powered (Not Road Building) 11/10/2014 Paid $906.30
PRM 8300 14110504378 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 11/06/2014 Paid $3,962.00
PRM 8600 14110504382 Impact Tools, Air Powered (Not Road Building) 11/06/2014 Paid $4,508.24
PRM 8600 14110404224 Impact Tools, Air Powered (Not Road Building) 11/05/2014 Paid $82,881.33
PRM 8300 14102903609 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 10/30/2014 Paid $640.00
PRM 9300 14102703275 Impact Tools, Air Powered (Not Road Building) 10/28/2014 Paid $1,500.28
PRM 2400 14102202780 Impact Tools, Air Powered (Not Road Building) 10/23/2014 Paid $26.10
PRM 8300 14102202865 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 10/23/2014 Paid $18,853.16
PRM 9200 14101702336 JANITORIAL SUPPLIES, GENERAL LINE 10/20/2014 Paid $81.28
PRM 2200 14101501877 Impact Tools, Air Powered (Not Road Building) 10/16/2014 Paid $2,922.88
PRM 2200 14101301310 Impact Tools, Air Powered (Not Road Building) 10/14/2014 Paid $72.41
PRM 8600 14101301433 Impact Tools, Air Powered (Not Road Building) 10/14/2014 Paid $2,739.04
PRM 9200 14101301450 JANITORIAL SUPPLIES, GENERAL LINE 10/14/2014 Paid $244.45
PRM 1100 14100600454 Impact Tools, Air Powered (Not Road Building) 10/10/2014 Paid $19,869.10
PRM 1600 14100901071 Impact Tools, Air Powered (Not Road Building) 10/10/2014 Paid $1,815.90
PRM 8500 14100800967 Impact Tools, Air Powered (Not Road Building) 10/09/2014 Paid $1,177.21
PRM 2200 14093038603 Impact Tools, Air Powered (Not Road Building) 10/01/2014 Paid $1,190.71
PRM 9200 14092938565 JANITORIAL SUPPLIES, GENERAL LINE 09/30/2014 Paid $117.10
PRM 8500 14092638339 Impact Tools, Air Powered (Not Road Building) 09/29/2014 Paid $1,988.32
PRM 9200 14092538197 JANITORIAL SUPPLIES, GENERAL LINE 09/26/2014 Paid $96.29
PRM 9200 14092538198 JANITORIAL SUPPLIES, GENERAL LINE 09/26/2014 Paid $219.88
PRM 9200 14092538199 JANITORIAL SUPPLIES, GENERAL LINE 09/26/2014 Paid $309.61
PRM 2200 14092437967 Impact Tools, Air Powered (Not Road Building) 09/25/2014 Paid $2,192.16
PRM 2200 14092437968 Impact Tools, Air Powered (Not Road Building) 09/25/2014 Paid $2,040.72
PRM 8500 14092438055 Impact Tools, Air Powered (Not Road Building) 09/25/2014 Paid $7,724.08
PRM 1600 14092337661 Impact Tools, Air Powered (Not Road Building) 09/24/2014 Paid $21,168.90
PRM 2200 14092337678 Impact Tools, Air Powered (Not Road Building) 09/24/2014 Paid $76.70
PRM 2200 14092237440 Impact Tools, Air Powered (Not Road Building) 09/23/2014 Paid $446.78
PRM 2200 14092237442 Impact Tools, Air Powered (Not Road Building) 09/23/2014 Paid $7,244.50
PRM 6000 14092237479 Impact Tools, Air Powered (Not Road Building) 09/23/2014 Paid $109.15
PRM 1100 14091236619 Impact Tools, Air Powered (Not Road Building) 09/19/2014 Paid $24,860.06
PRM 9200 14091737191 JANITORIAL SUPPLIES, GENERAL LINE 09/18/2014 Paid $77.31
PRM 8500 14091637025 Impact Tools, Air Powered (Not Road Building) 09/17/2014 Paid $317.58
PRM 2400 14091536790 Impact Tools, Air Powered (Not Road Building) 09/16/2014 Paid $455.64
PRM 2200 14091036391 Impact Tools, Air Powered (Not Road Building) 09/11/2014 Paid $4,380.00
PRM 6200 14090936299 Impact Tools, Air Powered (Not Road Building) 09/10/2014 Paid $54.86
PRM 1100 14090836045 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 09/09/2014 Paid $1,332.90
PRM 6200 14090535946 Impact Tools, Air Powered (Not Road Building) 09/08/2014 Paid $382.80
PRM 9200 14090335809 JANITORIAL SUPPLIES, GENERAL LINE 09/04/2014 Paid $127.53
PRM 9200 14090235597 JANITORIAL SUPPLIES, GENERAL LINE 09/03/2014 Paid $244.62
PRM 2400 14082634708 Impact Tools, Air Powered (Not Road Building) 08/27/2014 Paid $185.46
PRM 6200 14082634752 Impact Tools, Air Powered (Not Road Building) 08/27/2014 Paid $102.20
PRM 6200 14082634756 Impact Tools, Air Powered (Not Road Building) 08/27/2014 Paid $89.44
PRM 2200 14082534505 Impact Tools, Air Powered (Not Road Building) 08/26/2014 Paid $5,016.63
PRM 9200 14082534631 JANITORIAL SUPPLIES, GENERAL LINE 08/26/2014 Paid $559.51
PRM 1100 14081833656 Impact Tools, Air Powered (Not Road Building) 08/21/2014 Paid $12,790.96
PRM 6200 14081833732 Impact Tools, Air Powered (Not Road Building) 08/19/2014 Paid $589.98
PRM 6200 14081833735 Impact Tools, Air Powered (Not Road Building) 08/19/2014 Paid $180.00
PRM 1100 14081233116 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 08/13/2014 Paid $2,244.28
PRM 9200 14081133081 JANITORIAL SUPPLIES, GENERAL LINE 08/12/2014 Paid $171.11
PRM 1100 14073131974 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 08/01/2014 Paid $1,521.46
PRM 2200 14073132023 Impact Tools, Air Powered (Not Road Building) 08/01/2014 Paid $4,067.56
PRM 9200 14072931777 JANITORIAL SUPPLIES, GENERAL LINE 07/30/2014 Paid $143.22
PRM 2200 14072831391 Impact Tools, Air Powered (Not Road Building) 07/29/2014 Paid $334.49
PRM 1100 14072130481 Impact Tools, Air Powered (Not Road Building) 07/23/2014 Paid $10,604.10
PRM 2200 14072230721 Impact Tools, Air Powered (Not Road Building) 07/23/2014 Paid $4,296.90
PRM 2200 14072230722 Impact Tools, Air Powered (Not Road Building) 07/23/2014 Paid $302.96
PRM 2200 14072230723 Impact Tools, Air Powered (Not Road Building) 07/23/2014 Paid $10,915.71
PRM 2200 14072230724 Impact Tools, Air Powered (Not Road Building) 07/23/2014 Paid $1,031.73
PRM 2200 14072230754 Impact Tools, Air Powered (Not Road Building) 07/23/2014 Paid $3,350.26
PRM 6200 14072230824 Impact Tools, Air Powered (Not Road Building) 07/23/2014 Paid $85.82
PRM 2200 14072130513 Impact Tools, Air Powered (Not Road Building) 07/22/2014 Paid $5,225.09
PRM 9200 14071730267 JANITORIAL SUPPLIES, GENERAL LINE 07/18/2014 Paid $631.77
PRM 6200 14071629920 Impact Tools, Air Powered (Not Road Building) 07/17/2014 Paid $136.46
PRM 1100 14071529468 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 07/16/2014 Paid $3,430.13
PRM 9200 14071129195 JANITORIAL SUPPLIES, GENERAL LINE 07/14/2014 Paid $106.54
PRM 9200 14071029074 JANITORIAL SUPPLIES, GENERAL LINE 07/11/2014 Paid $295.23
PRM 6200 14070728578 Impact Tools, Air Powered (Not Road Building) 07/09/2014 Paid $1,597.45
PRM 7500 14070728593 Impact Tools, Air Powered (Not Road Building) 07/09/2014 Paid $62.90
PRM 9200 14070728646 JANITORIAL SUPPLIES, GENERAL LINE 07/09/2014 Paid $73.56
PRM 8500 14070228383 Impact Tools, Air Powered (Not Road Building) 07/03/2014 Paid $850.00
PRM 1100 14063027881 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 07/01/2014 Paid $917.73
PRM 2400 14062327128 Impact Tools, Air Powered (Not Road Building) 06/24/2014 Paid $1,381.50
PRM 8500 14062027069 Impact Tools, Air Powered (Not Road Building) 06/23/2014 Paid $3,627.27
PRM 1100 14061726471 Impact Tools, Air Powered (Not Road Building) 06/20/2014 Paid $15,789.42
PRM 2400 14061726516 Impact Tools, Air Powered (Not Road Building) 06/18/2014 Paid $176.31
PRM 2200 14061025748 Impact Tools, Air Powered (Not Road Building) 06/11/2014 Paid $432.46
PRM 9200 14061025924 JANITORIAL SUPPLIES, GENERAL LINE 06/11/2014 Paid $103.14
PRM 9200 14060325221 JANITORIAL SUPPLIES, GENERAL LINE 06/04/2014 Paid $367.05
PRM 9200 14052324228 JANITORIAL SUPPLIES, GENERAL LINE 05/27/2014 Paid $339.28
PRM 1100 14052123898 Impact Tools, Air Powered (Not Road Building) 05/23/2014 Paid $18,959.33
PRM 9200 14052124052 JANITORIAL SUPPLIES, GENERAL LINE 05/22/2014 Paid $313.70
PRM 6200 14052023802 Impact Tools, Air Powered (Not Road Building) 05/21/2014 Paid $2,143.34
PRM 9200 14051523467 JANITORIAL SUPPLIES, GENERAL LINE 05/16/2014 Paid $7.52
PRM 9200 14051423318 JANITORIAL SUPPLIES, GENERAL LINE 05/15/2014 Paid $407.74
PRM 6000 14051323108 Impact Tools, Air Powered (Not Road Building) 05/14/2014 Paid $7.13
PRM 2400 14051222891 Impact Tools, Air Powered (Not Road Building) 05/13/2014 Paid $525.00
PRM 6000 14051222930 Impact Tools, Air Powered (Not Road Building) 05/13/2014 Paid $127.13
PRM 2200 14050722392 Impact Tools, Air Powered (Not Road Building) 05/08/2014 Paid $35.71
PRM 2200 14050622151 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 05/07/2014 Paid $5,634.73
PRM 6200 14050622255 Impact Tools, Air Powered (Not Road Building) 05/07/2014 Paid $205.14
PRM 2400 14050521962 Impact Tools, Air Powered (Not Road Building) 05/06/2014 Paid $2,017.49
PRM 6200 14050522015 Impact Tools, Air Powered (Not Road Building) 05/06/2014 Paid $85.85
PRM 9200 14050522097 JANITORIAL SUPPLIES, GENERAL LINE 05/06/2014 Paid $250.00
PRM 2200 14050221776 Impact Tools, Air Powered (Not Road Building) 05/05/2014 Paid $79.59
PRM 2400 14050121694 Impact Tools, Air Powered (Not Road Building) 05/02/2014 Paid $4,946.14
PRM 6200 14043021595 Impact Tools, Air Powered (Not Road Building) 05/01/2014 Paid $138.53
PRM 9200 14042821413 JANITORIAL SUPPLIES, GENERAL LINE 04/29/2014 Paid $162.28
PRM 2200 14042521118 Impact Tools, Air Powered (Not Road Building) 04/28/2014 Paid $424.84
PRM 2200 14042521119 Impact Tools, Air Powered (Not Road Building) 04/28/2014 Paid $8.66
PRM 2200 14042521120 Impact Tools, Air Powered (Not Road Building) 04/28/2014 Paid $79.59
PRM 2200 14042220724 Impact Tools, Air Powered (Not Road Building) 04/23/2014 Paid $412.55
PRM 1100 14041720385 Impact Tools, Air Powered (Not Road Building) 04/21/2014 Paid $24,428.01
PRM 2400 14041620253 Impact Tools, Air Powered (Not Road Building) 04/17/2014 Paid $325.42
PRM 9200 14041420011 JANITORIAL SUPPLIES, GENERAL LINE 04/15/2014 Paid $117.54
PRM 2200 14041019696 Impact Tools, Air Powered (Not Road Building) 04/11/2014 Paid $795.31
PRM 2400 14041019700 Impact Tools, Air Powered (Not Road Building) 04/11/2014 Paid $6,387.32
PRM 9300 14041019779 Impact Tools, Air Powered (Not Road Building) 04/11/2014 Paid $1,473.29
PRM 2200 14040919530 Impact Tools, Air Powered (Not Road Building) 04/10/2014 Paid $8.66
PRM 2200 14040719186 Impact Tools, Air Powered (Not Road Building) 04/08/2014 Paid $365.21
PRM 2400 14040719210 Impact Tools, Air Powered (Not Road Building) 04/08/2014 Paid $1,124.19
PRM 1100 14040518977 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 04/07/2014 Paid $4,291.70
PRM 2400 14040519008 Impact Tools, Air Powered (Not Road Building) 04/07/2014 Paid $2,153.88
PRM 6200 14040218591 Impact Tools, Air Powered (Not Road Building) 04/03/2014 Paid $919.82
PRM 2200 14032918041 Impact Tools, Air Powered (Not Road Building) 03/31/2014 Paid $889.34
PRM 9200 14032818016 JANITORIAL SUPPLIES, GENERAL LINE 03/31/2014 Paid $131.52
PRM 9200 14032617789 JANITORIAL SUPPLIES, GENERAL LINE 03/27/2014 Paid $17.04
PRM 2200 14032517560 Impact Tools, Air Powered (Not Road Building) 03/26/2014 Paid $619.15
PRM 1100 14032016952 Impact Tools, Air Powered (Not Road Building) 03/24/2014 Paid $22,215.83
PRM 1600 14032117105 Impact Tools, Air Powered (Not Road Building) 03/24/2014 Paid $19,048.40
PRM 2200 14032117108 Impact Tools, Air Powered (Not Road Building) 03/24/2014 Paid $159.18
PRM 2200 14031816695 Impact Tools, Air Powered (Not Road Building) 03/19/2014 Paid $468.52
PRM 6200 14031816733 Impact Tools, Air Powered (Not Road Building) 03/19/2014 Paid $140.07
PRM 6200 14031816735 Impact Tools, Air Powered (Not Road Building) 03/19/2014 Paid $182.58
PRM 2200 14031316354 Impact Tools, Air Powered (Not Road Building) 03/14/2014 Paid $1,103.11
PRM 9200 14031316440 JANITORIAL SUPPLIES, GENERAL LINE 03/14/2014 Paid $126.81
PRM 2200 14031116006 Impact Tools, Air Powered (Not Road Building) 03/12/2014 Paid $129.36
PRM 9200 14031116122 JANITORIAL SUPPLIES, GENERAL LINE 03/12/2014 Paid $148.05
PRM 6200 14030315084 Impact Tools, Air Powered (Not Road Building) 03/04/2014 Paid $2,404.80
PRM 9200 14022614854 JANITORIAL SUPPLIES, GENERAL LINE 02/27/2014 Paid $119.85
PRM 2200 14022414400 Impact Tools, Air Powered (Not Road Building) 02/26/2014 Paid $6,440.85
PRM 2200 14022514566 Impact Tools, Air Powered (Not Road Building) 02/26/2014 Paid $1,363.64
PRM 9200 14022514753 JANITORIAL SUPPLIES, GENERAL LINE 02/26/2014 Paid $105.06
PRM 9200 14022514755 JANITORIAL SUPPLIES, GENERAL LINE 02/26/2014 Paid $145.47
PRM 6000 14022414439 Impact Tools, Air Powered (Not Road Building) 02/25/2014 Paid $141.30
PRM 1100 14021914003 Impact Tools, Air Powered (Not Road Building) 02/24/2014 Paid $22,307.23
PRM 1100 14021813805 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 02/19/2014 Paid $104.32
PRM 2200 14021313403 Impact Tools, Air Powered (Not Road Building) 02/14/2014 Paid $238.77
PRM 2200 14021012938 Impact Tools, Air Powered (Not Road Building) 02/11/2014 Paid $206.22
PRM 2200 14020612765 Impact Tools, Air Powered (Not Road Building) 02/07/2014 Paid $406.86
PRM 9200 14020612897 JANITORIAL SUPPLIES, GENERAL LINE 02/07/2014 Paid $2,524.85
PRM 9200 14020412586 JANITORIAL SUPPLIES, GENERAL LINE 02/05/2014 Paid $926.28
PRM 1100 14012111290 Impact Tools, Air Powered (Not Road Building) 01/23/2014 Paid $17,710.51
GAX 1600 14011506061 01/21/2014 Paid ($252.78)
PRM 1600 14011711188 Impact Tools, Air Powered (Not Road Building) 01/21/2014 Paid $1,783.04
PRM 6000 14011511049 Impact Tools, Air Powered (Not Road Building) 01/16/2014 Paid $360.02
PRM 6000 14011511051 Impact Tools, Air Powered (Not Road Building) 01/16/2014 Paid $256.74
PRM 6000 14011410940 Impact Tools, Air Powered (Not Road Building) 01/15/2014 Paid $44.56
PRM 9200 14011411002 JANITORIAL SUPPLIES, GENERAL LINE 01/15/2014 Paid $1,711.46
PRM 6200 14011310707 Impact Tools, Air Powered (Not Road Building) 01/14/2014 Paid $2,404.80
PRM 8100 14011310788 Impact Tools, Air Powered (Not Road Building) 01/14/2014 Paid $7,140.56
PRM 2200 13122308710 Impact Tools, Air Powered (Not Road Building) 12/26/2013 Paid $34.94
PRM 1100 13121708091 Impact Tools, Air Powered (Not Road Building) 12/20/2013 Paid $21,997.68
PRM 6200 13121808405 Impact Tools, Air Powered (Not Road Building) 12/19/2013 Paid $98.11
PRM 2200 13121708100 Impact Tools, Air Powered (Not Road Building) 12/18/2013 Paid $48.09
PRM 9300 13121107636 Impact Tools, Air Powered (Not Road Building) 12/12/2013 Paid $88.24
PRM 6200 13120907204 Impact Tools, Air Powered (Not Road Building) 12/10/2013 Paid $588.88
PRM 2400 13120406794 Impact Tools, Air Powered (Not Road Building) 12/05/2013 Paid $2,164.65
PRM 2200 13120206450 Impact Tools, Air Powered (Not Road Building) 12/03/2013 Paid $4,991.00
PRM 6200 13112506064 Impact Tools, Air Powered (Not Road Building) 11/26/2013 Paid $2,147.93
PRM 6200 13112506067 Impact Tools, Air Powered (Not Road Building) 11/26/2013 Paid $447.12
PRM 1100 13111505359 Impact Tools, Air Powered (Not Road Building) 11/22/2013 Paid $14,617.17
PRM 9200 13110504497 JANITORIAL SUPPLIES, GENERAL LINE 11/06/2013 Paid $206.80
PRM 1100 13102803213 Impact Tools, Air Powered (Not Road Building) 10/29/2013 Paid $4,427.97
PRM 2400 13102803237 Impact Tools, Air Powered (Not Road Building) 10/29/2013 Paid $362.70
PRM 2400 13102102125 Impact Tools, Air Powered (Not Road Building) 10/22/2013 Paid $38.02
PRM 6200 13102102227 Impact Tools, Air Powered (Not Road Building) 10/22/2013 Paid $66.18
PRM 9200 13102102339 JANITORIAL SUPPLIES, GENERAL LINE 10/22/2013 Paid $28.50
PRM 9200 13101802041 JANITORIAL SUPPLIES, GENERAL LINE 10/21/2013 Paid $1,982.53
PRM 9200 13101701794 JANITORIAL SUPPLIES, GENERAL LINE 10/18/2013 Paid $16.65
PRM 2400 13101601588 Impact Tools, Air Powered (Not Road Building) 10/17/2013 Paid $17.89
PRM 8500 13101601615 Impact Tools, Air Powered (Not Road Building) 10/17/2013 Paid $4,550.00
PRM 1100 13101101032 Impact Tools, Air Powered (Not Road Building) 10/16/2013 Paid $29,173.70
PRM 2400 13101501439 Impact Tools, Air Powered (Not Road Building) 10/16/2013 Paid $5.51
PRM 9200 13101401377 JANITORIAL SUPPLIES, GENERAL LINE 10/15/2013 Paid $513.14
PRM 2200 13101101080 Impact Tools, Air Powered (Not Road Building) 10/14/2013 Paid $8,584.67
PRM 8100 13100900978 Impact Tools, Air Powered (Not Road Building) 10/10/2013 Paid $5,035.09
PRM 1600 13100400436 Impact Tools, Air Powered (Not Road Building) 10/07/2013 Paid $527.64
PRM 8100 13100100090 Impact Tools, Air Powered (Not Road Building) 10/02/2013 Paid $2,822.89
PRM 8500 13100100107 JANITORIAL SUPPLIES, GENERAL LINE 10/02/2013 Paid $5,127.21
PRM 1600 13093036739 Impact Tools, Air Powered (Not Road Building) 10/01/2013 Paid $2,464.01
PRM 9200 13092636579 JANITORIAL SUPPLIES, GENERAL LINE 09/27/2013 Paid $298.40
PRM 6200 13092536321 Impact Tools, Air Powered (Not Road Building) 09/26/2013 Paid $21.71
PRM 9200 13092336094 JANITORIAL SUPPLIES, GENERAL LINE 09/24/2013 Paid $108.55
PRM 1100 13091335013 Impact Tools, Air Powered (Not Road Building) 09/20/2013 Paid $20,670.29
PRM 6200 13091835585 Impact Tools, Air Powered (Not Road Building) 09/19/2013 Paid $2,782.41
GAX 1600 13091020496 09/18/2013 Paid ($891.52)
GAX 1600 13091020505 09/18/2013 Paid ($891.52)
PRM 1600 13091635242 Impact Tools, Air Powered (Not Road Building) 09/18/2013 Paid $1,012.50
PRM 1600 13091735373 Impact Tools, Air Powered (Not Road Building) 09/18/2013 Paid $1,350.00
PRM 8500 13091735483 JANITORIAL SUPPLIES, GENERAL LINE 09/18/2013 Paid $304.52
PRM 9200 13091134801 JANITORIAL SUPPLIES, GENERAL LINE 09/12/2013 Paid $368.85
PRM 9200 13091134803 JANITORIAL SUPPLIES, GENERAL LINE 09/12/2013 Paid $508.54
PRM 8100 13082633229 Impact Tools, Air Powered (Not Road Building) 08/27/2013 Paid $1,268.40
PRM 1100 13081432190 Impact Tools, Air Powered (Not Road Building) 08/21/2013 Paid $12,212.09
PRM 9200 13081632434 JANITORIAL SUPPLIES, GENERAL LINE 08/19/2013 Paid $400.87
PRM 6000 13081432221 Impact Tools, Air Powered (Not Road Building) 08/15/2013 Paid $108.00
PRM 6200 13080931953 Impact Tools, Air Powered (Not Road Building) 08/12/2013 Paid $257.99
PRM 8500 13080931986 Impact Tools, Air Powered (Not Road Building) 08/12/2013 Paid $5,515.95
PRM 1100 13080631435 Test Equipment, Analog and Digital 08/07/2013 Paid $3,931.43
PRM 2400 13073130891 Impact Tools, Air Powered (Not Road Building) 08/01/2013 Paid $859.97
GAX 1600 13071116764 07/29/2013 Paid ($12.00)
PRM 1600 13072630331 Impact Tools, Air Powered (Not Road Building) 07/29/2013 Paid $816.14
PRM 9200 13072430162 JANITORIAL SUPPLIES, GENERAL LINE 07/25/2013 Paid $306.91
PRM 1600 13071929206 Impact Tools, Air Powered (Not Road Building) 07/22/2013 Paid $5,693.76
PRM 1100 13071127922 Impact Tools, Air Powered (Not Road Building) 07/19/2013 Paid $19,144.71
PRM 9200 13071628639 JANITORIAL SUPPLIES, GENERAL LINE 07/17/2013 Paid $132.71
PRM 8600 13071128038 Impact Tools, Air Powered (Not Road Building) 07/12/2013 Paid $2,184.00
PRM 9200 13071128064 JANITORIAL SUPPLIES, GENERAL LINE 07/12/2013 Paid $17.85
PRM 8100 13071027872 Impact Tools, Air Powered (Not Road Building) 07/11/2013 Paid $3,642.45
PRM 9200 13070927800 JANITORIAL SUPPLIES, GENERAL LINE 07/10/2013 Paid $288.27
PRM 8600 13070327413 Impact Tools, Air Powered (Not Road Building) 07/05/2013 Paid $2,387.99
PRM 8100 13062426606 Impact Tools, Air Powered (Not Road Building) 06/25/2013 Paid $1,699.81
PRM 8100 13062126503 Impact Tools, Air Powered (Not Road Building) 06/24/2013 Paid $23,797.34
PRM 1100 13061926152 Impact Tools, Air Powered (Not Road Building) 06/21/2013 Paid $36,874.73
PRM 8100 13061926266 Impact Tools, Air Powered (Not Road Building) 06/20/2013 Paid $19,426.40
PRM 9300 13061826138 Impact Tools, Air Powered (Not Road Building) 06/19/2013 Paid $3,506.75
PRM 9300 13061826140 Impact Tools, Air Powered (Not Road Building) 06/19/2013 Paid $95.50
PRC 1100 MAX22501 Impact Tools, Air Powered (Not Road Building) 06/14/2013 Paid $383.96
PRC 1100 MAX22502 Impact Tools, Air Powered (Not Road Building) 06/14/2013 Paid $104.09
PRM 9300 13061225663 Impact Tools, Air Powered (Not Road Building) 06/13/2013 Paid $9.55
PRM 9200 13060625190 JANITORIAL SUPPLIES, GENERAL LINE 06/07/2013 Paid $108.09
PRM 6200 13060524993 Impact Tools, Air Powered (Not Road Building) 06/06/2013 Paid $405.27
PRM 1600 13060424745 Impact Tools, Air Powered (Not Road Building) 06/05/2013 Paid $2,160.00
PRM 9200 13060324720 JANITORIAL SUPPLIES, GENERAL LINE 06/04/2013 Paid $194.45
PRM 1100 13052423823 Impact Tools, Air Powered (Not Road Building) 05/28/2013 Paid $613.36
PRM 6000 13052223548 Impact Tools, Air Powered (Not Road Building) 05/23/2013 Paid $218.86
PRM 1100 13051623009 Impact Tools, Air Powered (Not Road Building) 05/21/2013 Paid $19,645.90
PRC 1100 MAX22015 Impact Tools, Air Powered (Not Road Building) 05/17/2013 Paid $144.34
PRM 9200 13051422867 JANITORIAL SUPPLIES, GENERAL LINE 05/15/2013 Paid $56.01
PRM 1600 13051022513 Impact Tools, Air Powered (Not Road Building) 05/13/2013 Paid $17,019.00
PRM 6200 13050822353 Impact Tools, Air Powered (Not Road Building) 05/09/2013 Paid $51.70
PRM 9200 13050822409 JANITORIAL SUPPLIES, GENERAL LINE 05/09/2013 Paid $186.79
PRM 1100 13050221713 Impact Tools, Air Powered (Not Road Building) 05/03/2013 Paid $2,536.35
PRM 1600 13043021480 Impact Tools, Air Powered (Not Road Building) 05/01/2013 Paid $1,225.57
PRM 6200 13042921411 Impact Tools, Air Powered (Not Road Building) 04/30/2013 Paid $206.80
PRM 6200 13042621193 Impact Tools, Air Powered (Not Road Building) 04/29/2013 Paid $209.03
PRM 6200 13042621195 Impact Tools, Air Powered (Not Road Building) 04/29/2013 Paid $871.83
PRM 8100 13042621291 Impact Tools, Air Powered (Not Road Building) 04/29/2013 Paid $80.69
PRC 1100 MAX21615 Impact Tools, Air Powered (Not Road Building) 04/25/2013 Paid $126.02
PRM 1100 13042320476 Impact Tools, Air Powered (Not Road Building) 04/24/2013 Paid $985.45
PRM 1600 13042320496 Impact Tools, Air Powered (Not Road Building) 04/24/2013 Paid $8,831.76
PRM 6000 13042320583 Impact Tools, Air Powered (Not Road Building) 04/24/2013 Paid $201.04
PRM 1100 13041519707 Impact Tools, Air Powered (Not Road Building) 04/22/2013 Paid $17,822.46
PRM 9200 13041519834 JANITORIAL SUPPLIES, GENERAL LINE 04/16/2013 Paid $496.45
PRM 8100 13041019412 Impact Tools, Air Powered (Not Road Building) 04/11/2013 Paid $27.60
PRM 6000 13040118344 Impact Tools, Air Powered (Not Road Building) 04/02/2013 Paid $258.85
PRM 9200 13040118473 JANITORIAL SUPPLIES, GENERAL LINE 04/02/2013 Paid $84.66
PRC 1100 MAX21069 Impact Tools, Air Powered (Not Road Building) 03/29/2013 Paid $390.54
PRM 1600 13032718046 Impact Tools, Air Powered (Not Road Building) 03/28/2013 Paid $5,792.59
PRM 1100 13031817107 Impact Tools, Air Powered (Not Road Building) 03/21/2013 Paid $7,846.48
PRM 6200 13031917344 Impact Tools, Air Powered (Not Road Building) 03/20/2013 Paid $123.30
PRM 7500 13031917380 Impact Tools, Air Powered (Not Road Building) 03/20/2013 Paid $1,677.60
PRM 1500 13031516969 Impact Tools, Air Powered (Not Road Building) 03/18/2013 Paid $13.40
PRM 9200 13031216748 JANITORIAL SUPPLIES, GENERAL LINE 03/13/2013 Paid $175.20
PRM 1600 13030716123 Impact Tools, Air Powered (Not Road Building) 03/08/2013 Paid $17,630.53
PRM 6000 13030515829 Impact Tools, Air Powered (Not Road Building) 03/06/2013 Paid $946.80
PRM 9200 13022715392 JANITORIAL SUPPLIES, GENERAL LINE 02/28/2013 Paid $181.98
PRM 9200 13022615194 JANITORIAL SUPPLIES, GENERAL LINE 02/27/2013 Paid $84.73
PRM 1100 13022214583 Impact Tools, Air Powered (Not Road Building) 02/25/2013 Paid $281.10
PRM 1100 13021313944 Impact Tools, Air Powered (Not Road Building) 02/21/2013 Paid $22,184.89
PRM 6000 13021914311 Impact Tools, Air Powered (Not Road Building) 02/20/2013 Paid $117.27
PRC 1100 MAX20238 Impact Tools, Air Powered (Not Road Building) 02/14/2013 Paid $1,267.81
PRC 1100 MAX20109 Impact Tools, Air Powered (Not Road Building) 02/11/2013 Paid $1,036.32
PRM 6000 13020813563 Impact Tools, Air Powered (Not Road Building) 02/11/2013 Paid $1,431.00
PRC 1100 MAX20096 Impact Tools, Air Powered (Not Road Building) 02/06/2013 Paid $8,919.00
PRC 1100 MAX20100 Impact Tools, Air Powered (Not Road Building) 02/06/2013 Paid $366.60
PRC 1100 MAX20103 Impact Tools, Air Powered (Not Road Building) 02/06/2013 Paid $748.35
PRC 1100 MAX20104 Impact Tools, Air Powered (Not Road Building) 02/06/2013 Paid $748.35
PRC 1100 MAX20105 Impact Tools, Air Powered (Not Road Building) 02/06/2013 Paid $748.35
PRC 1100 MAX20106 Impact Tools, Air Powered (Not Road Building) 02/06/2013 Paid $708.06
PRC 1100 MAX20112 Impact Tools, Air Powered (Not Road Building) 02/06/2013 Paid $939.51
PRC 1100 MAX20113 Impact Tools, Air Powered (Not Road Building) 02/06/2013 Paid $4,977.96
PRC 1100 MAX20114 Impact Tools, Air Powered (Not Road Building) 02/06/2013 Paid $86.36
PRC 1100 MAX20115 Impact Tools, Air Powered (Not Road Building) 02/06/2013 Paid $2,952.17
PRM 9200 13020413146 JANITORIAL SUPPLIES, GENERAL LINE 02/05/2013 Paid $193.53
PRM 6200 13020112906 Impact Tools, Air Powered (Not Road Building) 02/04/2013 Paid $758.58
PRM 6200 13020112907 Impact Tools, Air Powered (Not Road Building) 02/04/2013 Paid $186.93
PRM 7500 13020112915 Impact Tools, Air Powered (Not Road Building) 02/04/2013 Paid $1,148.40
PRM 9200 13012912623 JANITORIAL SUPPLIES, GENERAL LINE 01/30/2013 Paid $28.98
PRM 2400 13012512127 Impact Tools, Air Powered (Not Road Building) 01/28/2013 Paid $14,644.80
PRM 9200 13012412092 JANITORIAL SUPPLIES, GENERAL LINE 01/25/2013 Paid $282.81
PRM 9200 13012211669 JANITORIAL SUPPLIES, GENERAL LINE 01/23/2013 Paid $75.80
PRM 1100 13011610924 Impact Tools, Air Powered (Not Road Building) 01/22/2013 Paid $14,376.76
PRM 6000 13010910145 Impact Tools, Air Powered (Not Road Building) 01/10/2013 Paid $305.24
PRM 1100 13010809795 Impact Tools, Air Powered (Not Road Building) 01/09/2013 Paid $5,674.25
PRM 6000 13010809930 Impact Tools, Air Powered (Not Road Building) 01/09/2013 Paid $210.60
PRM 9200 13010810071 JANITORIAL SUPPLIES, GENERAL LINE 01/09/2013 Paid $47.76
PRM 6200 13010409556 Impact Tools, Air Powered (Not Road Building) 01/07/2013 Paid $77.14
PRM 9200 13010309423 JANITORIAL SUPPLIES, GENERAL LINE 01/04/2013 Paid $541.07
PRM 1100 13010209156 Impact Tools, Air Powered (Not Road Building) 01/03/2013 Paid $5,255.10
PRM 9200 12122608565 JANITORIAL SUPPLIES, GENERAL LINE 12/27/2012 Paid $95.68
PRM 9200 12121908258 JANITORIAL SUPPLIES, GENERAL LINE 12/20/2012 Paid $54.66
PRM 9300 12121908260 Impact Tools, Air Powered (Not Road Building) 12/20/2012 Paid $678.40
PRM 1100 12121707835 Impact Tools, Air Powered (Not Road Building) 12/19/2012 Paid $10,819.37
PRM 9100 12120606822 JANITORIAL SUPPLIES, GENERAL LINE 12/07/2012 Paid $9,113.50
PRM 9200 12120606827 JANITORIAL SUPPLIES, GENERAL LINE 12/07/2012 Paid $61.12
PRM 1100 12113006317 Impact Tools, Air Powered (Not Road Building) 12/03/2012 Paid $25.51
PRM 1100 12111404960 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES AND SUPPLI 11/20/2012 Paid $13,044.86
PRM 1600 12111404967 Impact Tools, Air Powered (Not Road Building) 11/15/2012 Paid $10,810.42
PRM 1100 12102903415 Impact Tools, Air Powered (Not Road Building) 10/30/2012 Paid $4,574.03
PRM 9100 12102202740 JANITORIAL SUPPLIES, GENERAL LINE 10/23/2012 Paid $4.82
PRM 9100 12101802333 JANITORIAL SUPPLIES, GENERAL LINE 10/19/2012 Paid $153.87
PRM 9100 12101802334 JANITORIAL SUPPLIES, GENERAL LINE 10/19/2012 Paid $3.86
PRM 9100 12101802347 JANITORIAL SUPPLIES, GENERAL LINE 10/19/2012 Paid $2,527.06
PRM 9100 12101802348 JANITORIAL SUPPLIES, GENERAL LINE 10/19/2012 Paid $281.85
PRM 1500 12101701856 Impact Tools, Air Powered (Not Road Building) 10/18/2012 Paid $420.28
PRM 1100 12101201300 Impact Tools, Air Powered (Not Road Building) 10/15/2012 Paid $11,811.00
PRM 6200 12101201381 Impact Tools, Air Powered (Not Road Building) 10/15/2012 Paid $119.99
PRM 6200 12101201382 Impact Tools, Air Powered (Not Road Building) 10/15/2012 Paid $3,466.31
PRM 6000 12101101208 Impact Tools, Air Powered (Not Road Building) 10/12/2012 Paid $329.79
PRM 6200 12100901046 Impact Tools, Air Powered (Not Road Building) 10/10/2012 Paid $21.88
PRM 6000 12100500820 Impact Tools, Air Powered (Not Road Building) 10/08/2012 Paid $156.74
PRM 1600 12100400640 Impact Tools, Air Powered (Not Road Building) 10/05/2012 Paid $1,738.30
PRM 6200 12100400689 Impact Tools, Air Powered (Not Road Building) 10/05/2012 Paid $408.60
PRM 6200 12100400694 Impact Tools, Air Powered (Not Road Building) 10/05/2012 Paid $46.89
PRM 6200 12100400695 Impact Tools, Air Powered (Not Road Building) 10/05/2012 Paid $247.28
PRM 6200 12100400696 Impact Tools, Air Powered (Not Road Building) 10/05/2012 Paid $285.12
PRM 9100 12100200387 JANITORIAL SUPPLIES, GENERAL LINE 10/03/2012 Paid $689.00
PRM 1100 12092735336 Impact Tools, Air Powered (Not Road Building) 09/28/2012 Paid $35.44
PRM 9100 12092735487 JANITORIAL SUPPLIES, GENERAL LINE 09/28/2012 Paid $264.96
PRM 9100 12092735489 JANITORIAL SUPPLIES, GENERAL LINE 09/28/2012 Paid $288.54
PRM 1600 12092434758 Impact Tools, Air Powered (Not Road Building) 09/25/2012 Paid $27,384.23
PRM 9100 12092434869 JANITORIAL SUPPLIES, GENERAL LINE 09/25/2012 Paid $189.58
PRM 1100 12091433935 Impact Tools, Air Powered (Not Road Building) 09/20/2012 Paid $14,725.70
PRM 9100 12091434003 JANITORIAL SUPPLIES, GENERAL LINE 09/17/2012 Paid $277.51
PRM 9100 12091333928 JANITORIAL SUPPLIES, GENERAL LINE 09/14/2012 Paid $83.99
PRM 9100 12091233825 JANITORIAL SUPPLIES, GENERAL LINE 09/13/2012 Paid $2,645.90
PRM 8500 12091133642 Impact Tools, Air Powered (Not Road Building) 09/12/2012 Paid $168.88
PRM 6000 12091033311 Impact Tools, Air Powered (Not Road Building) 09/11/2012 Paid $472.24
PRM 9300 12090633162 Impact Tools, Air Powered (Not Road Building) 09/07/2012 Paid $18,229.42
PRM 6200 12083132544 Impact Tools, Air Powered (Not Road Building) 09/04/2012 Paid $36.56
PRM 6200 12083132545 Impact Tools, Air Powered (Not Road Building) 09/04/2012 Paid $15.70
PRM 6200 12083132546 Impact Tools, Air Powered (Not Road Building) 09/04/2012 Paid $73.04
PRM 6200 12083132547 Impact Tools, Air Powered (Not Road Building) 09/04/2012 Paid $5,496.84
PRM 6200 12083132550 Impact Tools, Air Powered (Not Road Building) 09/04/2012 Paid $276.30
PRM 6000 12082832019 Impact Tools, Air Powered (Not Road Building) 08/29/2012 Paid $35.40
PRM 1100 12082731763 Impact Tools, Air Powered (Not Road Building) 08/28/2012 Paid $470.52
PRM 1100 12082030997 Impact Tools, Air Powered (Not Road Building) 08/24/2012 Paid $9,844.10
PRM 1100 12082231293 Impact Tools, Air Powered (Not Road Building) 08/23/2012 Paid $15,686.00
GAX 8500 12051714095 08/14/2012 Paid $11.61
PRM 9300 12081030238 Impact Tools, Air Powered (Not Road Building) 08/13/2012 Paid $7,132.29
PRM 9100 12080930138 JANITORIAL SUPPLIES, GENERAL LINE 08/10/2012 Paid $158.11
PRM 9100 12080930140 JANITORIAL SUPPLIES, GENERAL LINE 08/10/2012 Paid $207.13
PRM 9300 12080829990 Impact Tools, Air Powered (Not Road Building) 08/09/2012 Paid $1,441.57
PRM 9300 12080829991 Impact Tools, Air Powered (Not Road Building) 08/09/2012 Paid $2,673.23
PRM 9100 12080329465 JANITORIAL SUPPLIES, GENERAL LINE 08/06/2012 Paid $231.98
PRM 2200 12072628588 Platform Scales 07/27/2012 Paid $1,455.38
PRM 6200 12072528429 Impact Tools, Air Powered (Not Road Building) 07/26/2012 Paid $167.58
PRM 1100 12071727637 Impact Tools, Air Powered (Not Road Building) 07/20/2012 Paid $11,861.03
PRM 6200 12071627549 Impact Tools, Air Powered (Not Road Building) 07/17/2012 Paid $3,888.69
PRM 9300 12071627610 Impact Tools, Air Powered (Not Road Building) 07/17/2012 Paid $3,691.80
PRM 9300 12071327480 Impact Tools, Air Powered (Not Road Building) 07/16/2012 Paid $9,889.63
PRM 9300 12071327482 Impact Tools, Air Powered (Not Road Building) 07/16/2012 Paid $3,970.36
PRM 6000 12071027025 Impact Tools, Air Powered (Not Road Building) 07/11/2012 Paid $180.22
PRM 6000 12071027025 Lifts and Hoists, Floor Type: Electric, Hydraulic, 07/11/2012 Paid $113.53
PRM 9300 12071027133 Impact Tools, Air Powered (Not Road Building) 07/11/2012 Paid $2,499.60
PRM 9100 12070626803 JANITORIAL SUPPLIES, GENERAL LINE 07/09/2012 Paid $98.25
PRM 9100 12070326553 JANITORIAL SUPPLIES, GENERAL LINE 07/05/2012 Paid $145.49
PRM 9100 12070326561 JANITORIAL SUPPLIES, GENERAL LINE 07/05/2012 Paid $1,056.88
PRC 1100 MAX16508 Impact Tools, Air Powered (Not Road Building) 06/28/2012 Paid $244.64
PRC 1100 MAX16509 Impact Tools, Air Powered (Not Road Building) 06/28/2012 Paid $122.32
PRC 1100 MAX16510 Impact Tools, Air Powered (Not Road Building) 06/28/2012 Paid $332.79
PRM 6000 12062225130 Lifts and Hoists, Floor Type: Electric, Hydraulic, 06/25/2012 Paid $117.59
PRM 1100 12061424331 Impact Tools, Air Powered (Not Road Building) 06/21/2012 Paid $18,135.12
PRC 1100 MAX16129 Impact Tools, Air Powered (Not Road Building) 06/13/2012 Paid $443.22
PRM 6200 12061123959 Impact Tools, Air Powered (Not Road Building) 06/12/2012 Paid $15,221.59
PRM 1100 12051621612 Impact Tools, Air Powered (Not Road Building) 05/22/2012 Paid $14,585.97
PRM 1100 12051721737 Impact Tools, Air Powered (Not Road Building) 05/18/2012 Paid $6.51
PRM 1100 12051721739 Impact Tools, Air Powered (Not Road Building) 05/18/2012 Paid $17.42
PRM 9100 12051721866 JANITORIAL SUPPLIES, GENERAL LINE 05/18/2012 Paid $164.53
PRM 6200 12050820964 Impact Tools, Air Powered (Not Road Building) 05/09/2012 Paid $13.00
PRM 6200 12050820965 Impact Tools, Air Powered (Not Road Building) 05/09/2012 Paid $447.00
PRM 1100 12050220293 Impact Tools, Air Powered (Not Road Building) 05/03/2012 Paid $2,148.45
PRM 6200 12050220430 Impact Tools, Air Powered (Not Road Building) 05/03/2012 Paid $3,100.40
PRC 1100 MAX15571 Impact Tools, Air Powered (Not Road Building) 05/01/2012 Paid $129.76
PRM 9100 12042419623 JANITORIAL SUPPLIES, GENERAL LINE 04/25/2012 Paid $87.31
PRM 1100 12041118125 Impact Tools, Air Powered (Not Road Building) 04/20/2012 Paid $17,134.84
PRM 1100 12041919014 Impact Tools, Air Powered (Not Road Building) 04/20/2012 Paid $6,869.97
PRM 9300 12041919199 Impact Tools, Air Powered (Not Road Building) 04/20/2012 Paid $2,665.05
PRC 1100 MAX15171 Impact Tools, Air Powered (Not Road Building) 04/18/2012 Paid $217.92
PRC 1100 MAX15172 Impact Tools, Air Powered (Not Road Building) 04/18/2012 Paid $199.00
PRM 2400 12041718668 Impact Tools, Air Powered (Not Road Building) 04/18/2012 Paid $1,003.97
PRM 6000 12041618539 Impact Tools, Air Powered (Not Road Building) 04/17/2012 Paid $986.00
PRM 6000 12041318432 Impact Tools, Air Powered (Not Road Building) 04/16/2012 Paid $67.28
PRM 2200 12041118149 Impact Tools, Air Powered (Not Road Building) 04/12/2012 Paid $9,368.52
PRM 9100 12041118265 JANITORIAL SUPPLIES, GENERAL LINE 04/12/2012 Paid $1,860.59
PRM 6000 12040917900 Impact Tools, Air Powered (Not Road Building) 04/10/2012 Paid $537.30
PRM 1100 12040217255 Impact Tools, Air Powered (Not Road Building) 04/03/2012 Paid $21,038.63
PRM 6200 12040217356 Impact Tools, Air Powered (Not Road Building) 04/03/2012 Paid $576.56
PRM 6200 12040217358 Impact Tools, Air Powered (Not Road Building) 04/03/2012 Paid $205.76
PRM 9100 12040217409 JANITORIAL SUPPLIES, GENERAL LINE 04/03/2012 Paid $480.00
PRM 9100 12032716871 JANITORIAL SUPPLIES, GENERAL LINE 03/28/2012 Paid $34.63
PRM 1100 12032216372 Impact Tools, Air Powered (Not Road Building) 03/23/2012 Paid $8.68
PRM 9100 12032016204 JANITORIAL SUPPLIES, GENERAL LINE 03/21/2012 Paid $19.41
PRM 1100 12031515623 Impact Tools, Air Powered (Not Road Building) 03/20/2012 Paid $12,947.78
PRM 6000 12031915915 Impact Tools, Air Powered (Not Road Building) 03/20/2012 Paid $339.53
PRM 9300 12031916035 CHOCKS, WHEEL, RUBBER, RECYCLED 03/20/2012 Paid $1,078.00
PRM 6000 12031415519 Impact Tools, Air Powered (Not Road Building) 03/15/2012 Paid $94.68
PRM 6200 12031215235 Impact Tools, Air Powered (Not Road Building) 03/13/2012 Paid $187.82
PRM 6200 12031215236 Impact Tools, Air Powered (Not Road Building) 03/13/2012 Paid $153.25
PRM 6200 12031215238 Impact Tools, Air Powered (Not Road Building) 03/13/2012 Paid $58.14
PRM 6200 12031215239 Impact Tools, Air Powered (Not Road Building) 03/13/2012 Paid $164.56
PRM 6200 12031215240 Impact Tools, Air Powered (Not Road Building) 03/13/2012 Paid $139.50
PRM 6200 12031215241 Impact Tools, Air Powered (Not Road Building) 03/13/2012 Paid $294.54
PRM 6200 12031215242 Impact Tools, Air Powered (Not Road Building) 03/13/2012 Paid $46.50
PRM 6200 12031215243 Impact Tools, Air Powered (Not Road Building) 03/13/2012 Paid $868.50
PRM 6200 12030714778 Impact Tools, Air Powered (Not Road Building) 03/08/2012 Paid $1,312.60
PRM 9100 12030714875 JANITORIAL SUPPLIES, GENERAL LINE 03/08/2012 Paid $200.44
PRM 6200 12030614606 Impact Tools, Air Powered (Not Road Building) 03/07/2012 Paid $7,075.28
PRM 1500 12022713635 Impact Tools, Air Powered (Not Road Building) 02/28/2012 Paid $1,461.60
PRM 1500 12022413526 Impact Tools, Air Powered (Not Road Building) 02/27/2012 Paid $5,164.32
PRM 1100 12022213093 Impact Tools, Air Powered (Not Road Building) 02/23/2012 Paid $2.33
PRM 9100 12022213311 JANITORIAL SUPPLIES, GENERAL LINE 02/23/2012 Paid $140.95
PRM 1100 12021512488 Impact Tools, Air Powered (Not Road Building) 02/21/2012 Paid $11,369.57
PRM 1100 12021512489 Impact Tools, Air Powered (Not Road Building) 02/16/2012 Paid $111.14
PRM 8300 12021412472 FIRE PROTECTION EQUIPMENT AND SUPPLIES 02/15/2012 Paid $494.00
PRM 7400 12021312364 Impact Tools, Air Powered (Not Road Building) 02/14/2012 Paid $915.60
PRM 2400 12020912082 Impact Tools, Air Powered (Not Road Building) 02/10/2012 Paid $1,602.28
PRM 1100 12020811884 Impact Tools, Air Powered (Not Road Building) 02/09/2012 Paid $99.99
PRM 8300 12020812018 FIRE PROTECTION EQUIPMENT AND SUPPLIES 02/09/2012 Paid $1,482.00
PRM 1100 12020211362 Impact Tools, Air Powered (Not Road Building) 02/03/2012 Paid $127.27
PRM 6200 12020211394 Impact Tools, Air Powered (Not Road Building) 02/03/2012 Paid $49.44
PRM 7400 12020211406 Impact Tools, Air Powered (Not Road Building) 02/03/2012 Paid $1,831.20
PRM 8300 12020211418 Hazardous Material Equipment, Tools and Supplies 02/03/2012 Paid $7,934.47
PRM 9100 12020111347 Impact Tools, Air Powered (Not Road Building) 02/02/2012 Paid $85.60
PRM 6000 12012710896 Impact Tools, Air Powered (Not Road Building) 01/30/2012 Paid $145.54
PRM 1100 12011709801 Impact Tools, Air Powered (Not Road Building) 01/20/2012 Paid $9,002.33
PRM 7400 12011109453 Impact Tools, Air Powered (Not Road Building) 01/12/2012 Paid $151.44
PRM 6200 12010909113 Impact Tools, Air Powered (Not Road Building) 01/10/2012 Paid $316.00
PRM 2400 12010608933 Impact Tools, Air Powered (Not Road Building) 01/09/2012 Paid $255.60
PRM 2400 12010408707 Impact Tools, Air Powered (Not Road Building) 01/05/2012 Paid $88.87
PRM 6200 12010408737 Impact Tools, Air Powered (Not Road Building) 01/05/2012 Paid $35.50
PRM 6200 12010408738 Impact Tools, Air Powered (Not Road Building) 01/05/2012 Paid $115.70
PRM 6200 12010408741 Impact Tools, Air Powered (Not Road Building) 01/05/2012 Paid $1,831.20
PRM 6200 12010408743 Impact Tools, Air Powered (Not Road Building) 01/05/2012 Paid $255.72
PRM 6200 12010408744 Impact Tools, Air Powered (Not Road Building) 01/05/2012 Paid $60.53
PRM 1100 11121907421 Impact Tools, Air Powered (Not Road Building) 12/20/2011 Paid $88.38
PRM 1100 11121507135 Impact Tools, Air Powered (Not Road Building) 12/19/2011 Paid $2,077.28
PRM 1100 11121607305 Impact Tools, Air Powered (Not Road Building) 12/19/2011 Paid $173.93
PRM 1100 11121306916 Impact Tools, Air Powered (Not Road Building) 12/14/2011 Paid $455.56
PRM 1100 11121306917 Impact Tools, Air Powered (Not Road Building) 12/14/2011 Paid $1,759.36
PRM 9100 11121307000 Impact Tools, Air Powered (Not Road Building) 12/14/2011 Paid $120.75
PRM 9100 11120906816 Impact Tools, Air Powered (Not Road Building) 12/12/2011 Paid $2,497.78
PRM 9100 11112905737 Impact Tools, Air Powered (Not Road Building) 11/30/2011 Paid $4,277.10
PRM 9100 11112805577 Impact Tools, Air Powered (Not Road Building) 11/29/2011 Paid $1,363.50
PRM 6200 11111805016 Impact Tools, Air Powered (Not Road Building) 11/21/2011 Paid $37.72
PRM 9100 11111805050 Impact Tools, Air Powered (Not Road Building) 11/21/2011 Paid $433.48
PRM 1100 11110904173 Impact Tools, Air Powered (Not Road Building) 11/10/2011 Paid $32.00
PRM 1100 11110803996 Impact Tools, Air Powered (Not Road Building) 11/09/2011 Paid $39.76
PRM 6200 11110804075 Impact Tools, Air Powered (Not Road Building) 11/09/2011 Paid $59.22
PRM 6200 11110804076 Impact Tools, Air Powered (Not Road Building) 11/09/2011 Paid $19.84
PRM 6200 11110804077 Impact Tools, Air Powered (Not Road Building) 11/09/2011 Paid $339.48
PRM 9100 11110804153 Impact Tools, Air Powered (Not Road Building) 11/09/2011 Paid $400.00
PRC 1100 MAX12556 Impact Tools, Air Powered (Not Road Building) 11/08/2011 Paid $116.52
PRC 1100 MAX12558 Impact Tools, Air Powered (Not Road Building) 11/08/2011 Paid $313.85
PRM 9100 11110703973 Impact Tools, Air Powered (Not Road Building) 11/08/2011 Paid $635.06
PRM 1100 11110403679 Impact Tools, Air Powered (Not Road Building) 11/07/2011 Paid $27.23
PRM 8500 11110103341 SCISSORLIFT, ELECTRIC 11/02/2011 Paid $1,090.80
PRM 8500 11102803067 PARTS AND ACCESSORIES, HAND TRUCKS 10/31/2011 Paid $1,485.90
PRM 6000 11102602709 Impact Tools, Air Powered (Not Road Building) 10/27/2011 Paid $280.51
PRM 6200 11102502500 Impact Tools, Air Powered (Not Road Building) 10/26/2011 Paid $15,044.76
PRM 6200 11102502501 Impact Tools, Air Powered (Not Road Building) 10/26/2011 Paid $42.44
PRM 6200 11102502502 Impact Tools, Air Powered (Not Road Building) 10/26/2011 Paid $119.16
PRM 6200 11102502503 Impact Tools, Air Powered (Not Road Building) 10/26/2011 Paid $170.67
PRM 6200 11102502504 Impact Tools, Air Powered (Not Road Building) 10/26/2011 Paid $145.73
PRM 6000 11101201193 Impact Tools, Air Powered (Not Road Building) 10/13/2011 Paid $653.49
PRM 1100 11101101008 Impact Tools, Air Powered (Not Road Building) 10/12/2011 Paid $1,319.00
PRM 1100 11101000869 Impact Tools, Air Powered (Not Road Building) 10/11/2011 Paid $78.21
PRM 6000 11100700761 Impact Tools, Air Powered (Not Road Building) 10/10/2011 Paid $694.47
PRM 2400 11100500413 Impact Tools, Air Powered (Not Road Building) 10/06/2011 Paid $1,026.75
PRM 1100 11092835774 Impact Tools, Air Powered (Not Road Building) 09/29/2011 Paid $366.08
PRC 1100 MAX11801 Impact Tools, Air Powered (Not Road Building) 09/28/2011 Paid $254.10
PRC 1100 MAX11802 Impact Tools, Air Powered (Not Road Building) 09/28/2011 Paid $21.12
PRC 1100 MAX11803 Impact Tools, Air Powered (Not Road Building) 09/28/2011 Paid $13.20
PRC 1100 MAX11804 Impact Tools, Air Powered (Not Road Building) 09/28/2011 Paid $30.80
PRM 2400 11092335245 Impact Tools, Air Powered (Not Road Building) 09/26/2011 Paid $1,135.25
PRM 6000 11092335261 Impact Tools, Air Powered (Not Road Building) 09/26/2011 Paid $68.33
PRM 6000 11092335262 Impact Tools, Air Powered (Not Road Building) 09/26/2011 Paid $20.40
PRM 6200 11092335283 Impact Tools, Air Powered (Not Road Building) 09/26/2011 Paid $1,411.02
PRM 1100 11092235118 Impact Tools, Air Powered (Not Road Building) 09/23/2011 Paid $440.00
PRC 1100 MAX11697 Impact Tools, Air Powered (Not Road Building) 09/22/2011 Paid $195.74
PRM 2400 11091434451 Impact Tools, Air Powered (Not Road Building) 09/15/2011 Paid $705.50
PRM 1100 11090733668 Impact Tools, Air Powered (Not Road Building) 09/08/2011 Paid $3,172.87
PRC 1100 MAX11296 Impact Tools, Air Powered (Not Road Building) 08/25/2011 Paid $84.70
PRC 1100 MAX11297 Impact Tools, Air Powered (Not Road Building) 08/25/2011 Paid $99.63
PRM 1100 11082232092 Impact Tools, Air Powered (Not Road Building) 08/23/2011 Paid $10.62
PRC 1100 MAX11225 Impact Tools, Air Powered (Not Road Building) 08/22/2011 Paid $15.40
PRC 1100 MAX11237 Impact Tools, Air Powered (Not Road Building) 08/22/2011 Paid $369.60
PRC 1100 MAX10841 Impact Tools, Air Powered (Not Road Building) 08/19/2011 Paid $15.40
PRM 6200 11081731726 Impact Tools, Air Powered (Not Road Building) 08/18/2011 Paid $520.92
PRM 6200 11081731727 Impact Tools, Air Powered (Not Road Building) 08/18/2011 Paid $137.22
PRM 6200 11081731728 Impact Tools, Air Powered (Not Road Building) 08/18/2011 Paid $12.41
PRM 6200 11081731729 Impact Tools, Air Powered (Not Road Building) 08/18/2011 Paid $54.51
PRM 6200 11081731730 Impact Tools, Air Powered (Not Road Building) 08/18/2011 Paid $194.33
PRM 6200 11081631494 Impact Tools, Air Powered (Not Road Building) 08/17/2011 Paid $76.68
PRC 1100 MAX10840 Impact Tools, Air Powered (Not Road Building) 08/11/2011 Paid $345.60
PRC 1100 MAX10842 Impact Tools, Air Powered (Not Road Building) 08/11/2011 Paid $223.30
PRM 1100 11081030954 Impact Tools, Air Powered (Not Road Building) 08/11/2011 Paid $57.42
PRM 1100 11080930673 Impact Tools, Air Powered (Not Road Building) 08/10/2011 Paid $2,078.39
PRM 1100 11080430194 Impact Tools, Air Powered (Not Road Building) 08/05/2011 Paid $5,528.52
PRM 1100 11080229886 Impact Tools, Air Powered (Not Road Building) 08/03/2011 Paid $1,233.90
PRM 1100 11080229887 Impact Tools, Air Powered (Not Road Building) 08/03/2011 Paid $335.26
PRM 2200 11080229922 Thermometers and Gauges 08/03/2011 Paid $3,082.20
PRM 1100 11072829541 Impact Tools, Air Powered (Not Road Building) 07/29/2011 Paid $1,920.14
PRM 6000 11072829585 Impact Tools, Air Powered (Not Road Building) 07/29/2011 Paid $209.36
PRM 6200 11072629344 Impact Tools, Air Powered (Not Road Building) 07/27/2011 Paid $114.21
PRM 6200 11072629347 Impact Tools, Air Powered (Not Road Building) 07/27/2011 Paid $16,666.80
PRM 6200 11072629348 Impact Tools, Air Powered (Not Road Building) 07/27/2011 Paid $369.90
PRC 1100 MAX10589 Impact Tools, Air Powered (Not Road Building) 07/22/2011 Paid $113.27
PRC 1100 MAX10590 Impact Tools, Air Powered (Not Road Building) 07/22/2011 Paid $34.65
PRC 1100 MAX10592 Impact Tools, Air Powered (Not Road Building) 07/22/2011 Paid $77.00
PRC 1100 MAX10593 Impact Tools, Air Powered (Not Road Building) 07/22/2011 Paid $80.85
PRC 1100 MAX10594 Impact Tools, Air Powered (Not Road Building) 07/22/2011 Paid $23.10
PRC 1100 MAX10595 Impact Tools, Air Powered (Not Road Building) 07/22/2011 Paid $46.41
PRC 1100 MAX10596 Impact Tools, Air Powered (Not Road Building) 07/22/2011 Paid $211.20
PRM 2400 11072028736 Impact Tools, Air Powered (Not Road Building) 07/21/2011 Paid $15,164.55
PRM 6000 11071428243 Impact Tools, Air Powered (Not Road Building) 07/15/2011 Paid $21.82
PRM 8500 11071428289 PARTS AND ACCESSORIES, HAND TRUCKS 07/15/2011 Paid $974.79
PRM 1100 11071127777 Impact Tools, Air Powered (Not Road Building) 07/12/2011 Paid $113.45
PRM 8500 11071127884 Chiller, Water, Large Flow Capacity (To Chill Hatc 07/12/2011 Paid $748.35
PRM 9300 11070627523 Shelving, Metal (Not Library or Shop) 07/07/2011 Paid $526.56
PRM 9300 11070527457 Shelving, Metal (Not Library or Shop) 07/06/2011 Paid $709.84
PRM 6200 11063027141 Impact Tools, Air Powered (Not Road Building) 07/01/2011 Paid $62.51
PRC 1100 MAX10114 Impact Tools, Air Powered (Not Road Building) 06/28/2011 Paid $1,599.98
PRM 6000 11062326377 Impact Tools, Air Powered (Not Road Building) 06/24/2011 Paid $54.00
PRC 1100 MAX10012 Impact Tools, Air Powered (Not Road Building) 06/22/2011 Paid $196.93
PRC 1100 MAX9832 Impact Tools, Air Powered (Not Road Building) 06/10/2011 Paid $128.07
PRC 1100 MAX9642 Impact Tools, Air Powered (Not Road Building) 05/25/2011 Paid $131.99
PRC 1100 MAX9643 Impact Tools, Air Powered (Not Road Building) 05/25/2011 Paid $131.99
PRM 8500 11051823200 Ballasts, All Kinds 05/19/2011 Paid $458.89
PRM 8500 11051823200 FILTERS, WATER, FRIGIDAIRE ICE MACHINE 05/19/2011 Paid $4,085.34
PRM 1100 11051622751 Impact Tools, Air Powered (Not Road Building) 05/17/2011 Paid $1,184.00
PRC 1100 MAX9468 Impact Tools, Air Powered (Not Road Building) 05/16/2011 Paid $250.20
PRC 1100 MAX9323 Impact Tools, Air Powered (Not Road Building) 05/12/2011 Paid $114.14
GAX 6200 11050313887 05/11/2011 Paid ($7.95)
PRM 6200 11051022366 Impact Tools, Air Powered (Not Road Building) 05/11/2011 Paid $14.02
PRM 6200 11050922227 Impact Tools, Air Powered (Not Road Building) 05/10/2011 Paid $261.13
PRM 6200 11042821121 Impact Tools, Air Powered (Not Road Building) 04/29/2011 Paid $18.68
PRM 2400 11042720933 Impact Tools, Air Powered (Not Road Building) 04/28/2011 Paid $993.95
PRM 6400 11042520696 GAUGES, PRESSURE AND VACUUM 04/26/2011 Paid $166.40
PRM 6400 11042520696 HAND LAMPS, PORTABLE 04/26/2011 Paid $38.07
PRM 9300 11041920381 CONTAINERS, HOSPITAL/LABORATORY 04/20/2011 Paid $567.63
PRC 1100 MAX8795 Impact Tools, Air Powered (Not Road Building) 04/11/2011 Paid $283.52
PRM 6200 11040719195 Impact Tools, Air Powered (Not Road Building) 04/08/2011 Paid $54.94
PRM 6200 11040719196 Impact Tools, Air Powered (Not Road Building) 04/08/2011 Paid $39.06
PRM 6200 11040719197 Impact Tools, Air Powered (Not Road Building) 04/08/2011 Paid $100.53
PRC 1100 MAX8708 Impact Tools, Air Powered (Not Road Building) 04/05/2011 Paid $59.22
PRC 1100 MAX8709 Impact Tools, Air Powered (Not Road Building) 04/05/2011 Paid $158.74
GAX 6400 11032911688 04/04/2011 Paid $58.90
GAX 6400 11032911689 04/04/2011 Paid $8.45
PRM 6000 11033018132 Impact Tools, Air Powered (Not Road Building) 03/31/2011 Paid $2,102.74
GAX 6400 11030710210 03/15/2011 Paid $25.74
PRM 7400 11031416519 Impact Tools, Air Powered (Not Road Building) 03/15/2011 Paid $351.36
PRM 6200 11030815902 Impact Tools, Air Powered (Not Road Building) 03/09/2011 Paid $140.63
PRM 6200 11030815903 Impact Tools, Air Powered (Not Road Building) 03/09/2011 Paid $40.08
PRC 1100 MAX7967 Impact Tools, Air Powered (Not Road Building) 03/03/2011 Paid $180.45
PRC 1100 MAX7968 Impact Tools, Air Powered (Not Road Building) 03/03/2011 Paid $25.54
PRC 1100 MAX7969 Impact Tools, Air Powered (Not Road Building) 03/03/2011 Paid $63.20
PRC 1100 MAX7970 Impact Tools, Air Powered (Not Road Building) 03/03/2011 Paid $40.32
PRC 1100 MAX7990 Impact Tools, Air Powered (Not Road Building) 03/03/2011 Paid $85.34
PRC 1100 MAX7991 Impact Tools, Air Powered (Not Road Building) 03/03/2011 Paid $63.92
PRC 1100 MAX7992 Impact Tools, Air Powered (Not Road Building) 03/03/2011 Paid $492.48
PRC 1100 MAX7994 Impact Tools, Air Powered (Not Road Building) 03/03/2011 Paid $140.61
PRC 1100 MAX7995 Impact Tools, Air Powered (Not Road Building) 03/03/2011 Paid $157.06
PRM 7800 11030115046 Impact Tools, Air Powered (Not Road Building) 03/02/2011 Paid $0.03
PRM 7800 11022514768 Impact Tools, Air Powered (Not Road Building) 02/28/2011 Paid $2.78
PRM 6400 11022314308 TRAILER, DOLLY, TRANSFORMER 02/24/2011 Paid $191.25
PRM 6400 11021813946 Lighting Fixtures, Indoor: All Kinds and Parts (In 02/22/2011 Paid $25.38
PRM 6400 11021813946 SOLDERING SYSTEMS, ELECTRONIC 02/22/2011 Paid $162.45
GAX 6400 11020108108 02/11/2011 Paid $136.39
PRM 2200 11011110181 Trash Pumps, Portable, Engine-Driven 01/12/2011 Paid $437.50
PRM 6000 11010609791 Impact Tools, Air Powered (Not Road Building) 01/07/2011 Paid $880.22
PRM 6000 11010509573 Impact Tools, Air Powered (Not Road Building) 01/06/2011 Paid $623.14
PRM 8300 11010509662 Bins, Cabinets, and Shelves, Metal (Not Office Typ 01/06/2011 Paid $7,358.40
PRM 8300 11010509662 Rescue Equipment, Supplies and Accessories Includi 01/06/2011 Paid $159.96
PRM 6200 11010409387 Impact Tools, Air Powered (Not Road Building) 01/05/2011 Paid $23.19
PRM 8100 10123009095 WATER JET MACHINES, PARTS, AND ACCESSORIES ( SEWER 01/03/2011 Paid $984.24
PRM 6400 10122008262 Emergency Kits for Vehicles Including First Aid Ki 12/21/2010 Paid $145.80
PRM 6400 10122008262 HAT SAFETY CAP STYLE W/HEAD GEAR & EAR MUFFS 12/21/2010 Paid $24.08
PRM 6400 10122008262 SHIELD FACE 8 X 12 IN CLEAR VISOR WITH HEAD GEAR 12/21/2010 Paid $28.83
PRM 2200 10121708104 Trash Pumps, Portable, Engine-Driven 12/20/2010 Paid $437.50
PRM 1100 10121607989 Impact Tools, Air Powered (Not Road Building) 12/17/2010 Paid $63.14
PRM 6200 10121407758 Impact Tools, Air Powered (Not Road Building) 12/15/2010 Paid $36.47
PRM 6200 10121407759 Impact Tools, Air Powered (Not Road Building) 12/15/2010 Paid $14.65
PRM 6200 10121407760 Impact Tools, Air Powered (Not Road Building) 12/15/2010 Paid $41.10
GAX 6400 10120304394 12/10/2010 Paid $49.39
GAX 6400 10120604418 12/10/2010 Paid $7.16
PRM 7400 10120707237 Impact Tools, Air Powered (Not Road Building) 12/08/2010 Paid $164.92
PRM 6400 10120607043 Batteries For Electric Vehicles (Including Recycle 12/07/2010 Paid $84.60
PRM 6200 10111705409 Impact Tools, Air Powered (Not Road Building) 11/18/2010 Paid $403.09
PRM 2200 10111504967 Impact Tools, Air Powered (Not Road Building) 11/16/2010 Paid $342.30
PRM 2200 10111504967 Pliers, All Kinds (Except Stock Tagging) 11/16/2010 Paid $208.98
PRM 2200 10111504967 WATER COOLER PLASTIC W/PRESSURE FIT LID 2 GALLONS 11/16/2010 Paid $93.56
PRM 2200 10111504967 WATER COOLER PLASTIC W/PRESSURE FIT LID 5 GALLONS 11/16/2010 Paid $68.94
PRM 9100 10110504331 3M 1860s Health Care Particulate respirator/ surgical Mask 11/08/2010 Paid $502.12
PRM 9100 10110504332 3M 1860s Health Care Particulate respirator/ surgical Mask 11/08/2010 Paid $242.04
PRM 1100 10110203797 Impact Tools, Air Powered (Not Road Building) 11/03/2010 Paid $831.47
PRM 6000 10110203848 Impact Tools, Air Powered (Not Road Building) 11/03/2010 Paid $5.61
PRM 6200 10110203873 Impact Tools, Air Powered (Not Road Building) 11/03/2010 Paid $397.31
PRM 6400 10110203878 Hand Tools, Special Automotive: Brake Tools, Body 11/03/2010 Paid $18.64
PRM 6400 10110203879 Hand Tools, Special Automotive: Brake Tools, Body 11/03/2010 Paid $809.72
PRM 1100 10102803458 Hand Tools, Special Automotive: Brake Tools, Body 10/29/2010 Paid $71.97
PRM 6000 10102803485 Impact Tools, Air Powered (Not Road Building) 10/29/2010 Paid $21.12
PRM 2400 10102703268 Impact Tools, Air Powered (Not Road Building) 10/28/2010 Paid $332.40
PRM 2400 10102603014 Impact Tools, Air Powered (Not Road Building) 10/27/2010 Paid $779.18
PRM 6200 10102603081 Impact Tools, Air Powered (Not Road Building) 10/27/2010 Paid $6.52
PRM 2200 10102102468 Controls: Limit Switches, Relays, Thermostats, Gas 10/22/2010 Paid $202.56
PRM 2200 10102102468 Fuses, Fuse Blocks and Holders, Links, etc. 10/22/2010 Paid $131.20
PRM 2200 10102102468 Meters, Hand Held: Voltage, Amperage, Multi-Hand H 10/22/2010 Paid $100.14
PRM 2200 10102102468 SHEARS LOPPING 10/22/2010 Paid $139.80
PRM 8300 10101902221 Rescue Equipment, Supplies and Accessories Includi 10/20/2010 Paid $2,792.71
PRM 6000 10101501904 Impact Tools, Air Powered (Not Road Building) 10/18/2010 Paid $389.92
PRM 6200 10101401795 Impact Tools, Air Powered (Not Road Building) 10/15/2010 Paid $253.64
PRM 8300 10101401834 Rescue Equipment, Supplies and Accessories Includi 10/15/2010 Paid $799.20
PRM 6200 10101201386 Impact Tools, Air Powered (Not Road Building) 10/13/2010 Paid $133.88
PRM 6200 10101201387 Impact Tools, Air Powered (Not Road Building) 10/13/2010 Paid $129.47
GAX 8500 10100100051 10/12/2010 Paid $126.51
PRM 6000 10101101205 Impact Tools, Air Powered (Not Road Building) 10/12/2010 Paid $1,541.56
PRM 1100 10100801067 Hand Tools, Special Automotive: Brake Tools, Body 10/11/2010 Paid $827.71
PRM 6200 10100801123 Impact Tools, Air Powered (Not Road Building) 10/11/2010 Paid $2,213.89
PRM 8300 10100801143 Rescue Equipment, Supplies and Accessories Includi 10/11/2010 Paid $2,754.28
PRM 1100 10100700890 Impact Tools, Air Powered (Not Road Building) 10/08/2010 Paid $360.29
PRM 6000 10100700939 Impact Tools, Air Powered (Not Road Building) 10/08/2010 Paid $211.00
GAX 8500 10092425760 10/06/2010 Paid $233.18
PRM 1100 10100500419 Hand Tools, Special Automotive: Brake Tools, Body 10/06/2010 Paid $561.26
PRM 6000 10100500469 Impact Tools, Air Powered (Not Road Building) 10/06/2010 Paid $238.08
PRM 8100 10100500534 Controls: Limit Switches, Relays, Thermostats, Gas 10/06/2010 Paid $65.66
PRM 8100 10100500534 Hand Tools, Special Automotive: Brake Tools, Body 10/06/2010 Paid $106.21
PRM 8100 10100500534 Impact Tools, Air Powered (Not Road Building) 10/06/2010 Paid $131.94
PRM 6400 10100400280 Bins, Cabinets, and Shelves, Metal (Not Office Typ 10/05/2010 Paid $242.72
PRM 6400 10100400280 REPELLANT INSECT 10/05/2010 Paid $34.02
PRM 1100 10100100013 Hand Tools, Special Automotive: Brake Tools, Body 10/04/2010 Paid $1,375.12
PRM 6000 10092938925 Impact Tools, Air Powered (Not Road Building) 09/30/2010 Paid $726.14
PRM 1100 10092738607 Hand Tools, Special Automotive: Brake Tools, Body 09/28/2010 Paid $223.27
PRM 1100 10092438464 Hand Tools, Special Automotive: Brake Tools, Body 09/27/2010 Paid $191.85
PRM 6400 10092138115 Tools and Equipment, Floor Installation 09/22/2010 Paid $138.81
PRM 6400 10092138116 Tools and Equipment, Floor Installation 09/22/2010 Paid $349.49
PRM 6400 10092138117 METERS, TEMPERATURE, DIGITAL 09/22/2010 Paid $151.91
PRM 8100 10092138156 AA Battery 09/22/2010 Paid $10.80
PRM 8100 10092138156 D Battery 09/22/2010 Paid $6.90
PRM 1100 10091537262 Hand Tools, Special Automotive: Brake Tools, Body 09/16/2010 Paid $994.88
GAX 8500 10090824312 09/15/2010 Paid $72.05
PRM 1100 10091336922 Hand Tools, Special Automotive: Brake Tools, Body 09/14/2010 Paid $82.77
PRM 1100 10091336923 Hand Tools, Special Automotive: Brake Tools, Body 09/14/2010 Paid $31.51
PRM 1100 10091336924 Hand Tools, Special Automotive: Brake Tools, Body 09/14/2010 Paid $2,185.88
PRM 1100 10091336925 Hand Tools, Special Automotive: Brake Tools, Body 09/14/2010 Paid $42.76
PRM 1100 10091336926 Hand Tools, Special Automotive: Brake Tools, Body 09/14/2010 Paid $205.39
PRM 2200 10090936599 Solar Heat Collector Systems and Accessories 09/10/2010 Paid $6,723.30
PRM 2200 10090936600 Air Powered Shop Tools, Regulators, and Parts 09/10/2010 Paid $1,543.10
PRM 2200 10083135568 ENGRAVER, ELECTRIC, HAND HELD 09/01/2010 Paid $20.76
PRM 2200 10083135568 GRINDERS, DRILL AND TOOL 09/01/2010 Paid $79.63
PRM 2200 10083135568 WHEELS, INDUSTRIAL 09/01/2010 Paid $34.45
PRM 1100 10083035432 Hand Tools, Special Automotive: Brake Tools, Body 08/31/2010 Paid $332.71
PRM 6200 10083035481 Impact Tools, Air Powered (Not Road Building) 08/31/2010 Paid $1,957.85
PRM 2400 10082635085 Impact Tools, Air Powered (Not Road Building) 08/27/2010 Paid $406.97
PRM 8700 10082535044 Key Duplicating Machines 08/26/2010 Paid $739.00
PRM 9100 10081734163 BAG CANVAS FOR RAISING TOOLS ON POLES 08/18/2010 Paid $193.57
PRM 9100 10081634050 BAG CANVAS FOR RAISING TOOLS ON POLES 08/17/2010 Paid $387.14
PRM 2400 10081333737 Impact Tools, Air Powered (Not Road Building) 08/16/2010 Paid $268.18
PRM 2400 10081333738 Impact Tools, Air Powered (Not Road Building) 08/16/2010 Paid $10.87
PRM 2400 10081333739 Impact Tools, Air Powered (Not Road Building) 08/16/2010 Paid $308.30
PRM 1500 10081133426 Containers, Recycling 08/12/2010 Paid $4,999.06
PRM 1100 10081033243 Hand Tools, Special Automotive: Brake Tools, Body 08/11/2010 Paid $83.34
PRM 1100 10081033244 Hand Tools, Special Automotive: Brake Tools, Body 08/11/2010 Paid $140.25
PRM 1100 10081033245 Hand Tools, Special Automotive: Brake Tools, Body 08/11/2010 Paid $87.31
PRM 2200 10081033278 Batteries, Dry Cell (Except Communications Radio a 08/11/2010 Paid $712.68
PRM 2200 10081033279 SAW CHAIN GASOLINE POWERED 16 IN BAR 08/11/2010 Paid $608.44
PRM 1100 10080632993 Hand Tools, Special Automotive: Brake Tools, Body 08/09/2010 Paid $66.47
PRM 6200 10072832057 Impact Tools, Air Powered (Not Road Building) 07/29/2010 Paid $47.29
PRM 1100 10072231318 Hand Tools, Special Automotive: Brake Tools, Body 07/23/2010 Paid $93.60
PRM 2200 10072231345 Cooler Beverage Portable Capacity 1/2 Gal 07/23/2010 Paid $555.52
PRM 2200 10072231345 Pliers, All Kinds (Except Stock Tagging) 07/23/2010 Paid $178.92
PRM 2200 10072231345 Screwdrivers, All Kinds 07/23/2010 Paid $88.88
PRM 2200 10072231345 Wrenches, All Kinds (Including Sockets) 07/23/2010 Paid $226.80
PRM 6400 10072231415 EMERGENCY LIGHTING 07/23/2010 Paid $2.30
PRM 6400 10072231416 WIPES SANITIZING HAND SIZE 5X7 WHITE 07/23/2010 Paid $91.08
PRM 6400 10071530607 MASONARY BRUSH WITH HANDLE HEAVY DUTY 6 IN 07/16/2010 Paid $2.51
PRM 6400 10071530608 BATTERY FLASHLIGHT SIZE D 07/16/2010 Paid $40.80
PRM 6400 10071530608 BATTERY PENLITE SIZE AA 07/16/2010 Paid $16.20
PRM 6400 10071530608 METERS, TEMPERATURE, DIGITAL 07/16/2010 Paid $7.98
PRM 6200 10071230102 Impact Tools, Air Powered (Not Road Building) 07/13/2010 Paid $155.11
PRM 1100 10070829700 Hand Tools, Special Automotive: Brake Tools, Body 07/09/2010 Paid $458.46
PRM 6200 10070729587 Impact Tools, Air Powered (Not Road Building) 07/08/2010 Paid $408.15
PRM 2200 10062428317 Battery Chargers and Testers, Automotive (See Also 06/25/2010 Paid $911.88
PRM 8500 10062428396 SHRINK WRAP, PLASTIC 06/25/2010 Paid $414.13
GAX 6400 10061017981 06/23/2010 Paid $12.30
PRM 1100 10062227876 Hand Tools, Special Automotive: Brake Tools, Body 06/23/2010 Paid $159.38
PRM 6400 10062227954 Fuses, Fuse Blocks and Holders, Links, etc. 06/23/2010 Paid $24.62
PRM 2200 10061827608 Flashlights and Lanterns, Battery Type 06/21/2010 Paid $95.68
PRM 2200 10061827608 HOLDERS, TOOL AND ACCESSORY 06/21/2010 Paid $36.04
PRM 2200 10061827608 Knives, Pocket 06/21/2010 Paid $11.12
PRM 2200 10061827608 Screwdrivers, All Kinds 06/21/2010 Paid $22.87
PRM 1100 10060926591 Hand Tools, Special Automotive: Brake Tools, Body 06/10/2010 Paid $305.64
PRM 6200 10060426276 Impact Tools, Air Powered (Not Road Building) 06/07/2010 Paid $9,324.61
GAX 6400 10052416662 06/03/2010 Paid $30.61
PRM 6000 10060125686 LEVELS, HAND 06/02/2010 Paid $1,206.32
PRM 7400 10052725430 Impact Tools, Air Powered (Not Road Building) 05/28/2010 Paid $798.72
PRM 6200 10052625254 Impact Tools, Air Powered (Not Road Building) 05/27/2010 Paid $52.58
PRM 6200 10052224709 Impact Tools, Air Powered (Not Road Building) 05/24/2010 Paid $121.15
PRM 6200 10052224710 Impact Tools, Air Powered (Not Road Building) 05/24/2010 Paid $152.78
PRM 6200 10052224711 Impact Tools, Air Powered (Not Road Building) 05/24/2010 Paid $178.75
PRM 6200 10052224712 Impact Tools, Air Powered (Not Road Building) 05/24/2010 Paid $170.24
PRM 6200 10052224713 Impact Tools, Air Powered (Not Road Building) 05/24/2010 Paid $58.34
PRM 1500 10052024563 PUMPS & LUBRICATORS 05/21/2010 Paid $1,026.00
PRM 1500 10052024563 RECEPTACLES, TRASH, STEEL BAR 05/21/2010 Paid $1,730.90
PRM 6200 10052024601 Impact Tools, Air Powered (Not Road Building) 05/21/2010 Paid $525.24
PRM 6400 10052024608 ANTISEPTIC AEROSOL SPRAY FAS 05/21/2010 Paid $176.16
PRM 6400 10052024608 Green Spotlight Rechargeable 05/21/2010 Paid $6.67
PRM 6400 10052024608 LIGHT TROUBLE #16 3/C 100W 50 FT 05/21/2010 Paid $12.90
PRM 6200 10051824394 Impact Tools, Air Powered (Not Road Building) 05/19/2010 Paid $1,009.12
PRM 6000 10051424113 WHEELS, DISTANCE MEASURING 05/17/2010 Paid $1,389.69
PRM 8500 10051123718 Bomb Detection Equipment and Supplies 05/12/2010 Paid $191.20
PRM 6000 10050723358 WHEELS, DISTANCE MEASURING 05/10/2010 Paid $154.41
PRM 6200 10050723378 Impact Tools, Air Powered (Not Road Building) 05/10/2010 Paid $845.32
PRM 6200 10050723379 LOCATORS, UNDERGROUND CABLE PATH AND FAULT 05/10/2010 Paid $2,952.80
PRM 6200 10050723380 Impact Tools, Air Powered (Not Road Building) 05/10/2010 Paid $864.96
PRM 6200 10050723381 Impact Tools, Air Powered (Not Road Building) 05/10/2010 Paid $1,297.44
PRM 6200 10050723382 Impact Tools, Air Powered (Not Road Building) 05/10/2010 Paid $720.80
GAX 8500 10041914068 05/05/2010 Paid $39.59
PRM 6400 10050322818 Batteries, Dry Cell (Except Communications Radio a 05/04/2010 Paid $32.40
PRM 1100 10042822379 Hand Tools, Special Automotive: Brake Tools, Body 04/29/2010 Paid $344.82
PRM 6200 10041521400 Impact Tools, Air Powered (Not Road Building) 04/16/2010 Paid $129.25
PRM 6200 10040920721 Impact Tools, Air Powered (Not Road Building) 04/12/2010 Paid $36.00
PRM 2200 10040720338 Air Powered Shop Tools, Regulators, and Parts 04/08/2010 Paid $165.96
PRM 2200 10040720348 Battery Chargers and Testers, Automotive (See Also 04/08/2010 Paid $527.65
PRM 2200 10040720364 BLOWER BACKPACK GAS W/CHEST HARNESS 04/08/2010 Paid $418.00
PRM 2200 10040720364 TRIMMER, WEEDEATER 04/08/2010 Paid $435.82
PRM 2200 10040720366 BLOWER BACKPACK GAS W/CHEST HARNESS 04/08/2010 Paid $836.00
PRM 2200 10040720366 TRIMMER, WEEDEATER 04/08/2010 Paid $217.91
PRM 1100 10033019612 Hand Tools, Special Automotive: Brake Tools, Body 03/31/2010 Paid $426.56
PRM 2200 10033019634 Air Hose and Fittings 03/31/2010 Paid $154.83
PRM 2200 10033019634 Batteries, Dry Cell (Except Communications Radio a 03/31/2010 Paid $9.98
PRM 2200 10033019634 Compressor, Base or Tank Mounted, Electric Motor o 03/31/2010 Paid $402.30
PRM 2200 10033019634 Concrete Cutters, Saws, Multipurpose Saws, and Acc 03/31/2010 Paid $742.50
PRM 6400 10033019704 BATTERY PENLITE SIZE AA 03/31/2010 Paid $10.80
PRM 6400 10033019704 PADLOCK COMBINATION LONG SHACKLE 03/31/2010 Paid $26.04
PRM 6400 10033019704 SEALANT, ASPHALT, CRACK AND JOINT 03/31/2010 Paid $671.40
PRM 6400 10033019704 WIPES SANITIZING HAND SIZE 5X7 WHITE 03/31/2010 Paid $51.30
PRM 6200 10032619289 Impact Tools, Air Powered (Not Road Building) 03/29/2010 Paid $261.60
PRM 1100 10031117293 Hand Tools, Special Automotive: Brake Tools, Body 03/12/2010 Paid $172.35
PRM 6400 10031017197 VALVES, SOLENOID CONTROL, ELECTRIC 03/11/2010 Paid $94.20
GAX 6400 10030110624 03/10/2010 Paid $19.27
GAX 6400 10030110626 03/10/2010 Paid $14.71
PRM 6400 10030216068 Controls: Limit Switches, Relays, Thermostats, Gas 03/03/2010 Paid $94.20
PRM 6200 10022415284 Hand Tools, Special Automotive: Brake Tools, Body 02/25/2010 Paid $133.56
PRM 6200 10022415285 Hand Tools, Special Automotive: Brake Tools, Body 02/25/2010 Paid $104.56
PRM 6200 10022415286 Hand Tools, Special Automotive: Brake Tools, Body 02/25/2010 Paid $58.26
PRM 6400 10021814650 BATTERY FLASHLIGHT SIZE D 02/19/2010 Paid $55.50
PRM 6400 10021814650 BATTERY PENLITE SIZE AA 02/19/2010 Paid $16.20
PRM 6400 10021814650 EAR MUFF NRR RATING 25 FOR HARD HAT 02/19/2010 Paid $46.08
PRM 1100 10021114118 Hand Tools, Special Automotive: Brake Tools, Body 02/12/2010 Paid $55.89
PRM 1100 10021114119 Hand Tools, Special Automotive: Brake Tools, Body 02/12/2010 Paid $102.36
PRM 1100 10021114120 Hand Tools, Special Automotive: Brake Tools, Body 02/12/2010 Paid $102.36
PRM 6200 10020212911 Drills, Hand, Portable, (Powered), Automatic 02/03/2010 Paid $95.16
PRM 6200 10020112728 Hand Tools, Special Automotive: Brake Tools, Body 02/02/2010 Paid $7.50
PRM 6200 10012812381 Hand Tools, Special Automotive: Brake Tools, Body 01/29/2010 Paid $1,170.00
PRM 6200 10012712193 Hand Tools, Special Automotive: Brake Tools, Body 01/28/2010 Paid $278.64
PRM 6200 10012712194 Hand Tools, Special Automotive: Brake Tools, Body 01/28/2010 Paid $430.02
PRM 6200 10012712196 Hand Tools, Special Automotive: Brake Tools, Body 01/28/2010 Paid $956.40
PRM 6200 10011411044 Drills, Hand, Portable, (Powered), Automatic 01/15/2010 Paid $845.32
PRM 6200 10011310824 Drills, Hand, Portable, (Powered), Automatic 01/14/2010 Paid $1,881.48
PRM 1100 10010810299 Hand Tools, Special Automotive: Brake Tools, Body 01/11/2010 Paid $65.43
PRM 1100 10010810300 Fuses, Fuse Blocks and Holders, Links, etc. 01/11/2010 Paid $2.86
PRM 6200 10010710190 Impact Tools, Air Powered (Not Road Building) 01/08/2010 Paid $140.40
PRM 6400 10010710211 Batteries, Dry Cell (Except Communications Radio a 01/08/2010 Paid $5.40
PRM 6400 10010710211 Controls: Limit Switches, Relays, Thermostats, Gas 01/08/2010 Paid $230.90
PRM 6200 09123109414 Impact Tools, Air Powered (Not Road Building) 01/04/2010 Paid $151.20
PRM 6200 09123109415 Impact Tools, Air Powered (Not Road Building) 01/04/2010 Paid $79.20
PRM 1100 09123009175 Hand Tools, Special Automotive: Brake Tools, Body 12/31/2009 Paid $150.00
PRM 1100 09122108424 Hand Tools, Special Automotive: Brake Tools, Body 12/22/2009 Paid $42.08
PRM 6400 09112506212 Bins, Cabinets, and Shelves, Metal (Not Office Typ 11/30/2009 Paid $1,027.38
PRM 6400 09112506213 Air Powered Shop Tools, Regulators, and Parts 11/30/2009 Paid $174.58
PRM 6400 09112506214 Bins, Cabinets, and Shelves, Metal (Not Office Typ 11/30/2009 Paid $46.00
PRM 2200 09111004683 Hand Tools, Special Automotive: Brake Tools, Body 11/12/2009 Paid $101.74
PRM 2200 09110403942 Hand Tools, Special Automotive: Brake Tools, Body 11/05/2009 Paid $178.16
PRM 6200 09110203600 Impact Tools, Air Powered (Not Road Building) 11/03/2009 Paid $29.08
PRM 6200 09102803111 Impact Tools, Air Powered (Not Road Building) 10/29/2009 Paid $423.00
PRM 6200 09101501861 Impact Tools, Air Powered (Not Road Building) 10/16/2009 Paid $451.59
PRM 2200 09100200193 Flashlights and Lanterns, Battery Type 10/05/2009 Paid $79.60
PRM 2200 09100200193 Head, Ear, Eye and Face Protection 10/05/2009 Paid $286.07
PRM 2200 09100200194 Head, Ear, Eye and Face Protection 10/05/2009 Paid $114.92
PRM 6400 09092545189 PARTS AND ACCESSORIES, BATTERY 09/28/2009 Paid $289.50
PRM 1500 09092444915 FLASHLIGHTS, RECHARGEABLE AND NON-RECHARGEABLE, AN 09/25/2009 Paid $90.00
PRM 6400 09092444997 BEVERAGES W/ELECTROLYTE GLACIER FREEZE GATORADE 09/25/2009 Paid $149.32
PRM 1500 09092344678 FLASHLIGHTS, RECHARGEABLE AND NON-RECHARGEABLE, AN 09/24/2009 Paid $3,960.00
PRM 8500 09092344828 PANELS, ELECTRICAL BOX MOUNTING 09/24/2009 Paid $244.18
PRM 1500 09092144371 AIR COMPRESSORS AND ACCESSORIES 09/22/2009 Paid $1,262.76
PRM 2200 09091443584 Impact Tools, Air Powered (Not Road Building) 09/15/2009 Paid $144.68
PRM 6200 09091143506 Chisels, Drawknives, Planes, etc. 09/14/2009 Paid $44.04
PRM 6200 09091143506 OILS, LUBRICATING, ANTI-SEIZE 09/14/2009 Paid $119.25
PRM 6200 09091043392 CHAIRS, METAL, FOLDING (PORTABLE) 09/11/2009 Paid $769.96
PRM 2200 09090943164 Impact Tools, Air Powered (Not Road Building) 09/10/2009 Paid $31.21
PRM 6000 09083142206 Concrete Cutters, Saws, Multipurpose Saws, and Acc 09/01/2009 Paid $634.50
PRM 6200 09083142229 SCREWDRIVERS, QUICK WEDGE, SCREW HOLDING, ROUND BA 09/01/2009 Paid $3.10
PRM 8500 09083142265 Trucks, Dolly 09/01/2009 Paid $232.65
GAX 6400 09081824182 08/28/2009 Paid $135.39
PRM 2200 09082040987 PARTS AND ACCESSORIES, DOMESTIC WATER TREATMENT 08/21/2009 Paid $621.27
PRM 6400 09081740545 FIRST AID AND SAFETY EQUIPMENT AND SUPPLIES (EXCEPT NUCLEAR 08/18/2009 Paid $107.64
PRM 8500 09081240056 Trucks, Dolly 08/13/2009 Paid $232.65
PRM 8500 09081139859 COOLERS, DRINKING WATER (WATER FOUNTAINS) 08/12/2009 Paid $513.00
PRM 8300 09081039670 KITS, TEST 08/11/2009 Paid $780.00
PRM 6400 09072437742 Controls: Limit Switches, Relays, Thermostats, Gas 07/27/2009 Paid $324.57
PRM 9100 09072437829 Tarpaulins and Tents, Commercial Weight (For Recre 07/27/2009 Paid $1,019.36
PRM 2200 09072337459 Trash Pumps, Portable, Engine-Driven 07/24/2009 Paid $4,700.00
GAX 6400 09071621666 07/23/2009 Paid $3.12
PRM 6000 09072237273 Precision Linear Measuring Instruments: Calipers a 07/23/2009 Paid $48.24
PRM 6000 09072237273 THERMOMETERS, INFRARED 07/23/2009 Paid $116.52
PRM 9100 09071536547 Tarpaulins and Tents, Commercial Weight (For Recre 07/16/2009 Paid $317.68
PRM 6200 09071336015 Impact Tools, Air Powered (Not Road Building) 07/14/2009 Paid $1,208.80
PRM 8100 09070835616 DRUMS, STEEL 07/09/2009 Paid $105.57
GAX 6200 09052711587 06/18/2009 Paid $100.40
GAX 6200 09052217190 06/15/2009 Paid $99.98
PRM 2200 09061232908 Impact Tools, Air Powered (Not Road Building) 06/15/2009 Paid $103.19
PRM 8100 09061132812 STRAINERS, BASIN AND SINK 06/12/2009 Paid $224.60
PRM 8100 09061132812 TOOLS, ELECTRICIAN AND LINEMAN (MISC.) 06/12/2009 Paid $445.14
PRM 8100 09061132813 TOOLS, ELECTRICIAN AND LINEMAN (MISC.) 06/12/2009 Paid $181.66
PRM 2200 09060431907 Impact Tools, Air Powered (Not Road Building) 06/05/2009 Paid $506.85
PRM 8300 09060432018 FANS, EXHAUST 06/05/2009 Paid $419.02
PRM 6200 09060231626 Impact Tools, Air Powered (Not Road Building) 06/03/2009 Paid $70.20
PRM 6300 09060231633 Carpet Laying Tools (Including Knee Pads) 06/03/2009 Paid $164.10
PRM 6200 09052831097 Impact Tools, Air Powered (Not Road Building) 05/29/2009 Paid $240.84
GAX 6200 09042915343 05/28/2009 Paid $47.56
GAX 6200 09051116195 05/28/2009 Paid $19.50
PRM 8500 09052730998 COMPRESSORS, AIR, ELECTRIC MOTOR DRIVEN 05/28/2009 Paid $881.28
PRM 2200 09052630732 Impact Tools, Air Powered (Not Road Building) 05/27/2009 Paid $358.20
PRM 2200 09052230471 Impact Tools, Air Powered (Not Road Building) 05/26/2009 Paid $1,452.58
PRM 2200 09052130234 Impact Tools, Air Powered (Not Road Building) 05/22/2009 Paid $4,366.30
GAX 6200 09050615859 05/21/2009 Paid $58.88
PRM 2200 09051329365 Impact Tools, Air Powered (Not Road Building) 05/14/2009 Paid $4,460.95
PRM 8300 09051329496 FANS, EXHAUST 05/14/2009 Paid $873.03
GAX 8300 09050716058 05/13/2009 Paid ($150.00)
PRM 8300 09051229285 Lockers, Storage (For Coats, Hats and Baggage) 05/13/2009 Paid $2,925.00
PRM 2200 09051129077 Impact Tools, Air Powered (Not Road Building) 05/12/2009 Paid $282.24
PRM 1500 09050828912 Emergency Kits for Vehicles Including First Aid Ki 05/11/2009 Paid $433.50
PRM 8300 09050628713 FANS, EXHAUST 05/07/2009 Paid $615.42
PRM 2200 09050428248 Impact Tools, Air Powered (Not Road Building) 05/05/2009 Paid $257.85
PRM 2200 09050228080 Impact Tools, Air Powered (Not Road Building) 05/04/2009 Paid $490.05
PRM 2200 09042927710 Impact Tools, Air Powered (Not Road Building) 04/30/2009 Paid $481.74
PRM 2200 09042927712 Impact Tools, Air Powered (Not Road Building) 04/30/2009 Paid $331.76
PRM 2200 09042727367 Impact Tools, Air Powered (Not Road Building) 04/28/2009 Paid $504.23
PRM 2200 09042727369 Impact Tools, Air Powered (Not Road Building) 04/28/2009 Paid $71.46
PRM 2200 09042727370 Impact Tools, Air Powered (Not Road Building) 04/28/2009 Paid $318.28
PRM 2200 09042727371 Impact Tools, Air Powered (Not Road Building) 04/28/2009 Paid $66.12
PRM 2200 09042727372 Impact Tools, Air Powered (Not Road Building) 04/28/2009 Paid $781.38
PRM 2200 09042727373 Impact Tools, Air Powered (Not Road Building) 04/28/2009 Paid $126.72
PRM 2200 09042427172 Impact Tools, Air Powered (Not Road Building) 04/27/2009 Paid $414.10
PRM 2200 09042427173 Impact Tools, Air Powered (Not Road Building) 04/27/2009 Paid $230.18
PRM 8500 09042427262 COOLERS, DRINKING WATER (WATER FOUNTAINS) 04/27/2009 Paid $353.69
PRM 2200 09042327083 Impact Tools, Air Powered (Not Road Building) 04/24/2009 Paid $3,879.25
PRM 8100 09042327116 Cleaners and Sweepers, Hand-Operated 04/24/2009 Paid $379.46
GAX 8300 09040713622 04/21/2009 Paid $97.56
PRM 7800 09042026607 Hand Tools, Special Automotive: Brake Tools, Body 04/21/2009 Paid $1,209.77
GAX 8300 09040613537 04/16/2009 Paid $57.65
PRM 6200 09041525982 CUTTERS, WIRE AND CABLE 04/16/2009 Paid $95.40
PRM 6200 09041525982 DRIVERS, DRILL, CORDLESS, INDUSTRIAL OR CONTRACTOR 04/16/2009 Paid $944.06
PRM 6200 09041525982 Meters, Hand Held: Voltage, Amperage, Multi-Hand H 04/16/2009 Paid $185.96
PRM 6200 09041525982 PLIERS, LONG NOSE 04/16/2009 Paid $71.48
PRM 6200 09041525982 PLIERS, WIRE STRIPPER AND CUTTER 04/16/2009 Paid $294.75
PRM 6200 09041525982 SCREWDRIVERS, CABINET TIP, ROUND BAR, PLASTIC HAND 04/16/2009 Paid $59.30
PRM 6200 09041525982 Tools, Electricians' and Lineman's (Including Cabl 04/16/2009 Paid $401.63
PRM 2200 09041325616 LABELS AND MATRICES FOR PLAIN PAPER COPIER (BRANDS 04/14/2009 Paid $343.51
PRM 2200 09041325624 Impact Tools, Air Powered (Not Road Building) 04/14/2009 Paid $140.50
PRM 2200 09041325625 Impact Tools, Air Powered (Not Road Building) 04/14/2009 Paid $48.19
PRM 2200 09041325627 Impact Tools, Air Powered (Not Road Building) 04/14/2009 Paid $52.22
PRM 6200 09041325667 WRENCHES, PIPE - CHAIN AND INTERNAL 04/14/2009 Paid $411.76
PRM 8300 09041325709 PAVEMENT MARKING FILM, RETROREFLECTIVE PLIANT POLY 04/14/2009 Paid $287.12
PRM 8600 09041025535 Impact Tools, Air Powered (Not Road Building) 04/13/2009 Paid $481.50
GAX 6200 09032512924 04/10/2009 Paid $124.65
PRM 2200 09040925241 Impact Tools, Air Powered (Not Road Building) 04/10/2009 Paid $30.80
PRM 2200 09040825020 Impact Tools, Air Powered (Not Road Building) 04/09/2009 Paid $79.16
PRM 2200 09040825028 Impact Tools, Air Powered (Not Road Building) 04/09/2009 Paid $329.32
PRM 7800 09040825128 Hand Tools, Special Automotive: Brake Tools, Body 04/09/2009 Paid $1,622.71
PRM 8100 09040825136 BITS, DRILL, MASONRY 04/09/2009 Paid $98.09
PRM 8100 09040825137 PROBES, TEST 04/09/2009 Paid $146.03
PRM 8100 09040825137 TOOL, CRIMPING 04/09/2009 Paid $107.15
PRM 8100 09040825137 WEDGES, HAND 04/09/2009 Paid $145.26
GAX 8300 09033013138 04/08/2009 Paid $144.74
PRM 2200 09040324357 WHEELS, DISTANCE MEASURING 04/06/2009 Paid $419.24
PRM 2200 09040324360 Impact Tools, Air Powered (Not Road Building) 04/06/2009 Paid $335.70
PRM 2200 09040324361 Impact Tools, Air Powered (Not Road Building) 04/06/2009 Paid $383.34
PRM 6400 09040324435 LUBRICANTS AND SOLVENTS 04/06/2009 Paid $46.84
PRM 8100 09040324504 GAUGES, PRESSURE, ACETYLENE 04/06/2009 Paid $29.58
PRM 8100 09040324504 Router, Electric 04/06/2009 Paid $71.10
PRM 8100 09040324506 Batteries, All Types 04/06/2009 Paid $92.40
PRM 8100 09040324506 Traffic Cones, Lane Markers, and Barricades (Porta 04/06/2009 Paid $277.80
PRM 8100 09040224209 CARTS 04/03/2009 Paid $59.67
PRM 8100 09040224209 Storage Cabinets, Metal 04/03/2009 Paid $316.13
PRM 8100 09040224210 BITS, DRILL, JOBBER LENGTH, TYPE J 04/03/2009 Paid $50.08
PRM 8100 09040224210 BITS, DRILL, STEEL 04/03/2009 Paid $341.10
PRM 8100 09040224210 BITS, SOCKET, HEX HEAD 04/03/2009 Paid $67.50
PRM 8100 09040224210 Flashlights and Lanterns, Battery Type 04/03/2009 Paid $109.91
PRM 8100 09040224210 GLOVES WORK MECHANIC SYNTHETIC LEATHER SZ LARGE 04/03/2009 Paid $246.64
PRM 8100 09040224210 GLOVES WORK MECHANIC SYNTHETIC LEATHER SZ MEDIUM 04/03/2009 Paid $92.49
PRM 8100 09040224210 GLOVES WORK MECHANIC SYNTHETIC LEATHER SZ XLARGE 04/03/2009 Paid $339.13
PRM 8100 09040224210 LEVELS, HAND 04/03/2009 Paid $47.95
PRM 8100 09040224210 SAWS, GENERAL PURPOSE (CUTS MOST MATERIALS INCL. M 04/03/2009 Paid $21.53
PRM 8100 09040224210 SCREWS, SELF TAPPING, HEX HEAD, TYPE F, CADMIUM 04/03/2009 Paid $134.19
PRM 8100 09040224210 TUBING, HEAT SHRINK 04/03/2009 Paid $151.20
PRM 8300 09040224223 Lockers, Storage (For Coats, Hats and Baggage) 04/03/2009 Paid $6,825.00
PRM 9600 09040224311 Storage Shelves, Aluminum, Chrome, and Stainless S 04/03/2009 Paid $4,272.95
GAX 2200 09032512973 04/02/2009 Paid $19.36
PRM 2200 09040123829 Impact Tools, Air Powered (Not Road Building) 04/02/2009 Paid $382.96
PRM 6200 09033123699 Blades, Power Saw, Stationary: Circular and Recipr 04/01/2009 Paid $151.20
PRM 6200 09033123699 Thermometers and Gauges 04/01/2009 Paid $199.02
PRM 8100 09033123725 CONDUIT, NON-METALLIC FLEXIBLE LOOM 04/01/2009 Paid $207.82
PRM 8100 09033123725 COUPLINGS, RIGID CONDUIT, MALLEABLE IRON 04/01/2009 Paid $21.36
PRM 8100 09033123725 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES AND SUPPLI 04/01/2009 Paid $176.53
PRM 2200 09033023531 Impact Tools, Air Powered (Not Road Building) 03/31/2009 Paid $1,036.08
PRM 2200 09033023532 Impact Tools, Air Powered (Not Road Building) 03/31/2009 Paid $860.44
PRM 2200 09033023534 Impact Tools, Air Powered (Not Road Building) 03/31/2009 Paid $749.61
PRM 6200 09033023558 BATTERY PACKS FOR ELECTRONIC EQUIPMENT 03/31/2009 Paid $69.30
PRM 8100 09033023586 CHARGERS, BATTERY 03/31/2009 Paid $433.69
GAX 8100 09030911631 03/30/2009 Paid ($530.43)
PRM 8100 09032723459 BITS, DRILL, JOBBER'S LENGTH 03/30/2009 Paid $1,187.21
PRM 8100 09032723459 BLADES, KNIFE, SURGEONS, STAINLESS STEEL, INDIVIDU 03/30/2009 Paid $24.54
PRM 8100 09032723459 COUPLINGS, RIGID CONDUIT, MALLEABLE IRON 03/30/2009 Paid $85.38
PRM 8100 09032723459 HEADS, HAMMER OR MALLET 03/30/2009 Paid $47.36
PRM 8100 09032723459 LAMPS, MINIATURE, FLASHLIGHT AND HAND LANTERN 03/30/2009 Paid $498.86
PRM 8100 09032723459 PLIERS, WIRE STRIPPER AND CUTTER 03/30/2009 Paid $57.78
PRM 8100 09032723459 Pliers, All Kinds (Except Stock Tagging) 03/30/2009 Paid $61.00
PRM 8100 09032723459 Screwdrivers, All Kinds 03/30/2009 Paid $346.80
PRM 8100 09032723459 TAPS, HAND, NATIONAL COARSE AND NATIONAL FINE THRE 03/30/2009 Paid $408.16
PRM 8100 09032723459 WRENCH SET, HEX KEY 03/30/2009 Paid $87.78
PRM 8100 09032723459 WRENCHES, ADJUSTABLE, STANDARD, INDL. FINISH 03/30/2009 Paid $83.50
PRM 9600 09032723496 Storage Shelves, Aluminum, Chrome, and Stainless S 03/30/2009 Paid $2,774.40
PRM 1100 09032623109 Blowers: Industrial Types 03/27/2009 Paid $636.30
PRM 1100 09032623109 DUCT, FLEXIBLE 03/27/2009 Paid $998.47
PRM 1100 09032623109 Guard Rails and Accessories: Bolts, Posts, Termina 03/27/2009 Paid $206.33
PRM 1100 09032623109 Winches, (Not Otherwise Classified) 03/27/2009 Paid $500.40
PRM 7800 09032623238 Hand Tools, Special Automotive: Brake Tools, Body 03/27/2009 Paid $751.21
PRM 8100 09032623250 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES AND SUPPLI 03/27/2009 Paid $373.86
PRM 8100 09032623250 LAMPS, METAL HALIDE TYPE, BASE BURNING ANY POSITIO 03/27/2009 Paid $985.50
PRM 8100 09032623250 Pick-up Tools, Magnetic 03/27/2009 Paid $75.02
PRM 8100 09032623250 THIMBLES, WIRE ROPE 03/27/2009 Paid $177.75
PRM 8100 09032623250 Wire Rope 03/27/2009 Paid $142.22
PRM 2200 09032322515 Impact Tools, Air Powered (Not Road Building) 03/24/2009 Paid $67.07
PRM 2200 09032322516 Impact Tools, Air Powered (Not Road Building) 03/24/2009 Paid $285.02
PRM 2200 09032022359 Impact Tools, Air Powered (Not Road Building) 03/23/2009 Paid $579.53
PRM 2200 09032022359 SOCKET 12 POINT 1/2 IN DRIVE 7/16 IN 03/23/2009 Paid $18.76
PRM 2200 09032022360 Impact Tools, Air Powered (Not Road Building) 03/23/2009 Paid $146.99
PRM 6200 09032022394 BITS, ROTARY HAMMER, CONCRETE 03/23/2009 Paid $335.66
PRM 6200 09032022394 Drill Steel and Rock Bits 03/23/2009 Paid $168.52
PRM 6300 09032022399 Emergency Kits for Vehicles Including First Aid Ki 03/23/2009 Paid $139.06
GAX 8500 09031212084 03/20/2009 Paid $14.36
PRM 8600 09031822194 Impact Tools, Air Powered (Not Road Building) 03/19/2009 Paid $431.60
GAX 8500 09030311284 03/17/2009 Paid $53.76
PRM 8200 09031621876 LOCKERS, STORAGE, MULTIPLE TIER STYLE 03/17/2009 Paid $549.53
PRM 8200 09031621876 Meters, Hand Held: Voltage, Amperage, Multi-Hand H 03/17/2009 Paid $150.75
PRM 8200 09031621876 PADS, KNEE 03/17/2009 Paid $511.92
PRM 8200 09031621876 TAPE MEASURING 10 FT 03/17/2009 Paid $89.60
PRM 2200 09031321531 DRILL METAL 4 POINT STAR 12 INCH LONG 3/4 IN 03/16/2009 Paid $246.38
PRM 2200 09031321533 CLIPS, CABLE, TEST 03/16/2009 Paid $18.51
PRM 2200 09031321533 FLASHLIGHT 2 CELL 03/16/2009 Paid $50.45
PRM 2200 09031321538 Impact Tools, Air Powered (Not Road Building) 03/16/2009 Paid $82.40
PRM 2200 09031321540 Impact Tools, Air Powered (Not Road Building) 03/16/2009 Paid $64.70
PRM 2200 09031321541 Impact Tools, Air Powered (Not Road Building) 03/16/2009 Paid $586.35
PRM 2200 09031321543 Impact Tools, Air Powered (Not Road Building) 03/16/2009 Paid $756.75
PRM 2200 09031321545 Impact Tools, Air Powered (Not Road Building) 03/16/2009 Paid $39.60
PRM 2200 09031321546 Impact Tools, Air Powered (Not Road Building) 03/16/2009 Paid $634.05
PRM 2200 09031321548 Impact Tools, Air Powered (Not Road Building) 03/16/2009 Paid $30.82
PRM 2200 09031321549 Impact Tools, Air Powered (Not Road Building) 03/16/2009 Paid $109.35
PRM 2200 09031321550 Impact Tools, Air Powered (Not Road Building) 03/16/2009 Paid $180.68
PRM 2200 09031321551 Impact Tools, Air Powered (Not Road Building) 03/16/2009 Paid $64.41
PRM 2200 09031321552 Impact Tools, Air Powered (Not Road Building) 03/16/2009 Paid $141.21
PRM 2200 09031321553 Impact Tools, Air Powered (Not Road Building) 03/16/2009 Paid $158.22
PRM 2200 09031321554 Impact Tools, Air Powered (Not Road Building) 03/16/2009 Paid $619.16
PRM 8300 09031321649 LAMPS, FLUORESCENT, COMPACT 03/16/2009 Paid $142.50
PRM 6200 09031121199 NAILS, AIR GUN 03/12/2009 Paid $340.48
PRM 6200 09031121200 PUMP, GROUT, AIR POWERED 03/12/2009 Paid $176.85
PRM 8600 09031121280 Impact Tools, Air Powered (Not Road Building) 03/12/2009 Paid $192.67
PRM 2200 09031020940 Impact Tools, Air Powered (Not Road Building) 03/11/2009 Paid $157.43
GAX 2200 09022510828 03/10/2009 Paid $6.39
GAX 2200 09030311300 03/10/2009 Paid $19.17
PRM 6200 09030920800 KNIFES AND BLADES, UTILITY 03/10/2009 Paid $72.20
PRM 6400 09030920821 MOLDING, DOOR STOP O.G. AND RANCH 03/10/2009 Paid $58.41
PRM 8300 09030920877 BOX TOOL W/TOTE TRAY 20 X 8-1/2 X 9-1/2 03/10/2009 Paid $184.38
PRM 8300 09030920877 PLIERS LINEMANS SIDE CUTTING 8 IN 03/10/2009 Paid $83.04
PRM 8300 09030920877 PLIERS VISE GRIP STR JAW 7 IN 03/10/2009 Paid $86.82
PRM 8300 09030920877 SCREWDRIVER #2 PHILLIPS HEAD 4 IN 03/10/2009 Paid $77.64
PRM 7800 09030620624 Hand Tools, Special Automotive: Brake Tools, Body 03/09/2009 Paid $3,541.18
PRM 8600 09030620648 Impact Tools, Air Powered (Not Road Building) 03/09/2009 Paid $523.00
PRM 8600 09030620649 Impact Tools, Air Powered (Not Road Building) 03/09/2009 Paid $1,402.11
PRM 8600 09030620651 Impact Tools, Air Powered (Not Road Building) 03/09/2009 Paid $83.64
PRM 8600 09030620652 Impact Tools, Air Powered (Not Road Building) 03/09/2009 Paid $11.04
PRM 8100 09030520423 EXTENSION CORDS, ELECTRICAL, BY THE FOOT 03/06/2009 Paid $186.00
PRM 2200 09030420155 Impact Tools, Air Powered (Not Road Building) 03/05/2009 Paid $4.86
PRM 2200 09030420157 Impact Tools, Air Powered (Not Road Building) 03/05/2009 Paid $58.50
GAX 8300 09021310059 03/04/2009 Paid $82.95
PRM 2200 09030319887 Impact Tools, Air Powered (Not Road Building) 03/04/2009 Paid $58.27
PRM 2200 09030319889 Impact Tools, Air Powered (Not Road Building) 03/04/2009 Paid $242.73
PRM 8100 09030320022 BALLASTS, FLUORESCENT, CORE AND COIL 03/04/2009 Paid $474.60
PRM 8100 09030320022 BRACKETS 03/04/2009 Paid $53.10
PRM 8100 09030320022 COUPLINGS, COMPRESSION FOR EMT (THINWALL) 03/04/2009 Paid $203.00
PRM 8100 09030320022 CUTTER TUBING BRASS & COP 5/8 TO 2 IN 03/04/2009 Paid $109.72
PRM 8100 09030320022 FLASHLIGHTS, RECHARGEABLE AND NON-RECHARGEABLE, AN 03/04/2009 Paid $99.73
PRM 8100 09030320022 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES AND SUPPLI 03/04/2009 Paid $337.50
PRM 8100 09030320022 HOUSINGS, FILTER 03/04/2009 Paid $153.25
PRM 8100 09030320022 KNIFE PUTTY 3 IN 03/04/2009 Paid $50.30
PRM 8100 09030320022 LAMPS, HALOGEN, MINIATURE 03/04/2009 Paid $151.20
PRM 8100 09030320022 PLANES, ADJUSTABLE IRON 03/04/2009 Paid $22.40
PRM 8100 09030320022 PLUGS, CONDUIT, ALUMINUM 03/04/2009 Paid $225.00
PRM 8100 09030320022 WIRE, TYPE THHN OR THWN, SOLID OR STRANDED 03/04/2009 Paid $218.52
PRM 8500 09030320045 Library Furniture: Book Trucks, Card Cabinets, Car 03/04/2009 Paid $308.26
PRM 6400 09030219741 MOLDING, DOOR STOP O.G. AND RANCH 03/03/2009 Paid $8.38
PRM 7800 09030219770 Hand Tools, Special Automotive: Brake Tools, Body 03/03/2009 Paid $194.36
PRM 8600 09030219800 Impact Tools, Air Powered (Not Road Building) 03/03/2009 Paid $59.32
PRM 8600 09030219800 Ladders, Fiberglass, All Types (See Class 340 for 03/03/2009 Paid $399.60
GAX 8300 09021209988 03/02/2009 Paid $96.50
PRM 8300 09022619513 TOOLS, AUTOMOTIVE, MISCELLANEOUS 02/27/2009 Paid $484.59
PRM 8100 09022319076 ADAPTERS, CABLE 02/24/2009 Paid $12.78
PRM 8100 09022319076 BAGS, TOOL, CARPENTER 02/24/2009 Paid $93.92
PRM 8100 09022319076 BITS, DRILL, JOBBER'S LENGTH 02/24/2009 Paid $320.10
PRM 8100 09022319076 DRIVERS, DRILL, CORDLESS, INDUSTRIAL OR CONTRACTOR 02/24/2009 Paid $448.20
PRM 8100 09022319076 MONITORS, COLOR, FOR COMPUTERS 02/24/2009 Paid $376.65
PRM 8100 09022319076 SCREWDRIVER PARTS, ELECTRIC, PORTABLE 02/24/2009 Paid $290.48
PRM 8100 09022319076 Soldering Coppers, Guns, Irons, etc. 02/24/2009 Paid $56.64
PRM 8100 09022319076 VISES 02/24/2009 Paid $432.90
PRM 2200 09022018784 Impact Tools, Air Powered (Not Road Building) 02/23/2009 Paid $125.52
PRM 2200 09022018785 Impact Tools, Air Powered (Not Road Building) 02/23/2009 Paid $397.08
PRM 1500 09021818335 GAUGES, TIRE 02/19/2009 Paid $212.30
PRM 2200 09021818356 Impact Tools, Air Powered (Not Road Building) 02/19/2009 Paid $44.31
PRM 2200 09021818357 Impact Tools, Air Powered (Not Road Building) 02/19/2009 Paid $240.67
PRM 6200 09021718196 DRILLS, CORDLESS, REVERSIBLE, VARIABLE SPEED 02/18/2009 Paid $207.27
PRM 8100 09021718236 Sanders, Bench or Portable: Belt, Disc, and Finish 02/18/2009 Paid $318.58
PRM 8100 09021718238 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES AND SUPPLI 02/18/2009 Paid $3,732.81
PRM 2200 09021317947 Impact Tools, Air Powered (Not Road Building) 02/17/2009 Paid $60.76
PRM 2200 09021317950 Impact Tools, Air Powered (Not Road Building) 02/17/2009 Paid $478.76
PRM 2200 09021317952 Impact Tools, Air Powered (Not Road Building) 02/17/2009 Paid $699.18
PRM 8100 09021318015 Sharpeners: Lawn Mower, Saw, etc. 02/17/2009 Paid $440.44
PRM 1500 09021217746 GAUGES, TIRE 02/13/2009 Paid $752.70
PRM 7800 09021217880 Hand Tools, Special Automotive: Brake Tools, Body 02/13/2009 Paid $548.07
GAX 2200 09020509388 02/11/2009 Paid $18.06
GAX 2200 09020509389 02/11/2009 Paid $53.40
PRM 8300 09020917270 Pallet Storage Racks 02/10/2009 Paid $1,142.61
GAX 8500 09020209131 02/09/2009 Paid $26.99
PRM 2200 09020616932 PARTS, FROST PNEUMATIC HAMMER (FROST OR EQUAL) 02/09/2009 Paid $399.79
PRM 2200 09020616933 Impact Tools, Air Powered (Not Road Building) 02/09/2009 Paid $1,102.73
PRM 8200 09020617038 BITS, CHISEL 02/09/2009 Paid $38.80
PRM 8200 09020617038 Drills, Hand, Portable, (Powered), Automatic 02/09/2009 Paid $364.68
PRM 8200 09020617038 PLIERS, WIRE STRIPPER AND CUTTER 02/09/2009 Paid $118.14
PRM 6200 09020516774 Hand Tools, Non-Powered, All Kinds, Maintenance an 02/06/2009 Paid $194.80
PRM 6200 09020516775 Hand Tools, Non-Powered, All Kinds, Maintenance an 02/06/2009 Paid $402.80
PRM 7800 09020516834 Hand Tools, Special Automotive: Brake Tools, Body 02/06/2009 Paid $99.09
PRM 8100 09020416630 CONNECTORS, WIRE MOLDING 02/05/2009 Paid $141.94
PRM 8100 09020416630 GLOVES, LEATHER, WORK, SAFETY TYPE 02/05/2009 Paid $45.86
PRM 8100 09020416630 GLOVES, PVC 02/05/2009 Paid $2.38
PRM 8100 09020416630 Hand Tools, Automotive Air Conditioning (Including 02/05/2009 Paid $281.01
PRM 8200 09020416634 BITS, CHISEL 02/05/2009 Paid $16.25
PRM 2200 09020316343 Video Projectors, Accessories and Parts 02/04/2009 Paid $1,745.13
PRM 2200 09020316344 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES AND SUPPLI 02/04/2009 Paid $316.00
PRM 2200 09020316344 STOOLS, STEP 02/04/2009 Paid $26.96
PRM 2200 09020316347 Impact Tools, Air Powered (Not Road Building) 02/04/2009 Paid $269.00
PRM 2200 09020316348 Impact Tools, Air Powered (Not Road Building) 02/04/2009 Paid $335.49
PRM 6200 09020316390 Spreaders (Salt and Sand), Maintenance and Repair 02/04/2009 Paid $675.00
GAX 8300 09012308457 02/03/2009 Paid $92.64
PRM 2200 09020216081 Impact Tools, Air Powered (Not Road Building) 02/03/2009 Paid $170.10
PRM 7800 09020216188 Hand Tools, Special Automotive: Brake Tools, Body 02/03/2009 Paid $120.34
GAX 2200 09012308501 02/02/2009 Paid $61.70
GAX 2200 09012308506 02/02/2009 Paid $90.60
PRM 8300 09012915799 Pallet Storage Racks 02/02/2009 Paid $398.40
PRM 7800 09012915778 Hand Tools, Special Automotive: Brake Tools, Body 01/30/2009 Paid $158.10
PRM 7800 09012915779 Compressor, Base or Tank Mounted, Electric Motor o 01/30/2009 Paid $21.40
PRM 2200 09012815513 AIR COMPRESSORS AND ACCESSORIES 01/29/2009 Paid $296.55
PRM 2200 09012715249 Impact Tools, Air Powered (Not Road Building) 01/28/2009 Paid $444.10
PRM 6400 09012715360 SHELVING, STEEL, FIXED SHELF, LETTER SIZE, 36 IN. 01/28/2009 Paid $366.96
PRM 8300 09012715428 Fire Suppression Hand Tools: Fire Axe, Fire Rack, 01/28/2009 Paid $1,200.00
PRM 2200 09012314856 FILTERS, WATER, FRIGIDAIRE ICE MACHINE 01/26/2009 Paid $1,900.00
PRM 2200 09012114483 Leather and Canvas Aprons and Tool Pouches, Carpen 01/22/2009 Paid $70.98
PRM 7800 09012114569 Hand Tools, Special Automotive: Brake Tools, Body 01/22/2009 Paid $444.01
PRM 8600 09012114585 Impact Tools, Air Powered (Not Road Building) 01/22/2009 Paid $3,164.00
PRM 8600 09012014427 Impact Tools, Air Powered (Not Road Building) 01/21/2009 Paid $554.46
PRM 8600 09012014428 Impact Tools, Air Powered (Not Road Building) 01/21/2009 Paid $1,463.40
PRM 8600 09012014429 Impact Tools, Air Powered (Not Road Building) 01/21/2009 Paid $404.10
PRM 8300 09011614236 COUPLERS, AIR HOSE 01/20/2009 Paid $0.86
PRM 8300 09011614236 DRILLS, AIR, REVERSIBLE, VARIABLE SPEED 01/20/2009 Paid $183.16
GAX 8500 08091730761 01/15/2009 Paid $79.61
PRM 2200 09011413700 CONES, TRAFFIC, PLASTIC 01/15/2009 Paid $498.24
PRM 6200 09011413822 BLADES, DIAMOND 01/15/2009 Paid $5,433.60
PRM 6200 09011413823 THERMOMETERS, INFRARED 01/15/2009 Paid $291.30
PRM 8600 09011413853 Storage Cabinets, Metal 01/15/2009 Paid $605.70
PRM 8100 09011213387 CONNECTORS, WIRE MOLDING 01/13/2009 Paid $7.56
PRM 9300 09011213457 Pallet Storage Racks 01/13/2009 Paid $568.96
PRM 2200 09010913079 Bins, Cabinets, and Shelves, Metal (Not Office Typ 01/12/2009 Paid $490.14
PRM 2200 09010913080 Bins, Cabinets, and Shelves, Metal (Not Office Typ 01/12/2009 Paid $1,385.72
PRM 9100 09010913226 PERSONAL PROTECTIVE EQUIPMENT ENSEMBLE 01/12/2009 Paid $38,070.00
PRM 6400 09010812939 Key Storage Cabinets and Files 01/09/2009 Paid $448.43
GAX 8300 08121705875 01/08/2009 Paid $59.70
PRM 2200 09010712636 Bits, Dies, Drivers, Reamers, Taps, etc. (For Hand 01/08/2009 Paid $12.20
PRM 2200 09010712636 Bolts, Steel 01/08/2009 Paid $11.41
PRM 2200 09010712636 CLEANER, PARTS WASHER 01/08/2009 Paid $17.44
PRM 2200 09010712636 RESPIRATORS, MISCELLANEOUS 01/08/2009 Paid $31.14
PRM 2200 09010712636 TAPS, CONDUIT, COMPRESSION, ALUMINUM 01/08/2009 Paid $44.24
PRM 9100 09010712812 PERSONAL PROTECTIVE EQUIPMENT ENSEMBLE 01/08/2009 Paid $120,300.00
PRM 2200 09010612367 LIDS, TRASH CONTAINER, METAL 01/07/2009 Paid $235.14
PRM 2200 09010612370 Impact Tools, Air Powered (Not Road Building) 01/07/2009 Paid $82.21
PRM 6200 09010612451 GLOVES 01/07/2009 Paid $151.44
PRM 6200 09010612452 SPRAYER, HAND, COMPRESSION, INSECTICIDE 01/07/2009 Paid $344.88
GAX 6200 08120805019 01/06/2009 Paid $87.94
GAX 6200 08121605714 01/06/2009 Paid $24.27
GAX 6200 08121605722 01/06/2009 Paid $18.06
PRM 7800 09010512195 Hand Tools, Special Automotive: Brake Tools, Body 01/06/2009 Paid $713.19
PRM 8100 09010512218 ADAPTERS, SOCKET WRENCH 01/06/2009 Paid $140.65
GAX 6200 08121806014 12/31/2008 Paid $28.35
PRM 9100 08122311419 PERSONAL PROTECTIVE EQUIPMENT ENSEMBLE 12/29/2008 Paid $200,190.66
PRM 8100 08122211288 BATTERY CHARGERS/ENGINE STARTERS 12/23/2008 Paid $85.19
PRM 8100 08122211289 Wrenches, All Kinds (Including Sockets) 12/23/2008 Paid $386.66
PRM 8100 08122211290 Wrenches, All Kinds (Including Sockets) 12/23/2008 Paid $74.48
PRM 8100 08122211291 Wrenches, All Kinds (Including Sockets) 12/23/2008 Paid $34.58
PRM 6200 08121911111 TORCH SYSTEM, OXYGEN/ACETYLENE, SINGLE, PORTABLE, 12/22/2008 Paid $372.00
PRM 8300 08121911128 AIR COMPRESSORS AND ACCESSORIES 12/22/2008 Paid $478.18
PRM 8600 08121811055 Impact Tools, Air Powered (Not Road Building) 12/19/2008 Paid $205.73
GAX 2200 08120104538 12/17/2008 Paid $96.93
GAX 2200 08120304738 12/17/2008 Paid $12.40
GAX 2200 08120304739 12/17/2008 Paid $60.08
GAX 2200 08120304741 12/17/2008 Paid $62.00
PRM 8100 08121210445 BAGS, TOOL, CARPENTER 12/15/2008 Paid $288.48
PRM 9100 08121210497 PERSONAL PROTECTIVE EQUIPMENT ENSEMBLE 12/15/2008 Paid $1,665.00
PRM 7800 08121110303 Hand Tools, Special Automotive: Brake Tools, Body 12/12/2008 Paid $856.30
PRM 7800 08121110304 Hand Tools, Special Automotive: Brake Tools, Body 12/12/2008 Paid $614.50
PRM 8100 08121110320 ADAPTERS, SOCKET WRENCH 12/12/2008 Paid $19.41
PRM 8100 08121110320 ADHESIVE, INSTANT BONDING, FOR NON-POROUS MATERIAL 12/12/2008 Paid $85.60
PRM 8100 08121110320 Anatomical Braces and Supports: Arm Slings, Back S 12/12/2008 Paid $477.68
PRM 8100 08121110320 Bits, Dies, Drivers, Reamers, Taps, etc. (For Hand 12/12/2008 Paid $29.79
PRM 8100 08121110320 Flashlights and Lanterns, Battery Type 12/12/2008 Paid $344.56
PRM 8100 08121110320 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES AND SUPPLI 12/12/2008 Paid $475.00
PRM 8100 08121110320 LIGHTS, WORK, FLOOR 12/12/2008 Paid $137.03
PRM 8100 08121110320 Oilers, Hand 12/12/2008 Paid $261.00
PRM 8100 08121110320 PARTS AND ACCESSORIES, RIVET GUN 12/12/2008 Paid $122.49
PRM 8100 08121110320 SOCKETS, WRENCH 12/12/2008 Paid $40.83
PRM 8100 08121110320 SPRAYER, TRIGGER 12/12/2008 Paid $85.20
PRM 8100 08121110320 WIRE, EXTENSION CORD 12/12/2008 Paid $89.28
PRM 8100 08121110320 WRENCHES, HEX KEY SOCKET, HAND 12/12/2008 Paid $50.81
PRM 8100 08121110322 BAGS, TOOL, CARPENTER 12/12/2008 Paid $288.48
PRM 8100 08121110323 ADAPTERS, SOCKET WRENCH 12/12/2008 Paid $84.39
PRM 8100 08121110324 ADAPTERS, SOCKET WRENCH 12/12/2008 Paid $28.13
PRM 8100 08121110325 METERS, AMP - BRAND LISTED OR EQUAL 12/12/2008 Paid $838.15
PRM 8100 08120909855 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES AND SUPPLI 12/10/2008 Paid $107.46
PRM 8100 08120909856 GLOVES WORK LEATHER INSULATED EXTRA LARGE 12/10/2008 Paid $234.36
PRM 8100 08120909856 GLOVES WORK LEATHER INSULATED LARGE 12/10/2008 Paid $236.04
PRM 8100 08120909857 Trucks, Dolly 12/10/2008 Paid $332.10
PRM 8100 08120909858 LIGHTS, WARNING, STROBE TYPE, PERMANENT MOUNT 12/10/2008 Paid $426.73
PRM 2200 08120809507 BATTERIES, ALKALINE, RECHARGEABLE 12/09/2008 Paid $250.20
PRM 2200 08120809509 Impact Tools, Air Powered (Not Road Building) 12/09/2008 Paid $211.89
PRM 8600 08120809634 Impact Tools, Air Powered (Not Road Building) 12/09/2008 Paid $3,066.87
GAX 2200 08112404191 12/08/2008 Paid $87.62
GAX 2200 08112504344 12/08/2008 Paid $73.41
PRM 8100 08120409134 Oscilloscopes, Waveform Analyzers, and Accessories 12/05/2008 Paid $214.04
PRM 8100 08120409135 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES AND SUPPLI 12/05/2008 Paid $4,449.54
PRM 8300 08120409138 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 12/05/2008 Paid $438.52
PRM 8600 08120409188 Impact Tools, Air Powered (Not Road Building) 12/05/2008 Paid $329.86
PRM 9100 08120409211 PERSONAL PROTECTIVE EQUIPMENT ENSEMBLE 12/05/2008 Paid $2,565.00
GAX 2200 08112404225 12/04/2008 Paid $10.69
GAX 8300 08111803655 12/04/2008 Paid $44.50
PRM 2200 08120308866 Impact Tools, Air Powered (Not Road Building) 12/04/2008 Paid $742.66
PRM 2200 08120308867 Impact Tools, Air Powered (Not Road Building) 12/04/2008 Paid $150.98
PRM 2200 08120308868 Impact Tools, Air Powered (Not Road Building) 12/04/2008 Paid $490.37
PRM 2200 08120308869 Impact Tools, Air Powered (Not Road Building) 12/04/2008 Paid $357.94
PRM 8700 08120208765 BULBS (LABORATORY GLASSWARE) 12/03/2008 Paid $1,354.12
PRM 7800 08120108487 Hand Tools, Special Automotive: Brake Tools, Body 12/02/2008 Paid $387.10
PRM 2200 08112608280 PLIERS, ELECTRICIAN 12/01/2008 Paid $99.50
PRM 2200 08112608280 Screwdrivers, All Kinds 12/01/2008 Paid $254.20
PRM 2200 08112608281 Impact Tools, Air Powered (Not Road Building) 12/01/2008 Paid $230.79
PRM 8200 08112508174 CORDS, HEADSET, TELEPHONE 11/26/2008 Paid $199.80
PRM 8200 08112508174 TESTERS, ELECTRICAL EQUIPMENT, HIGH ANSI RATED 11/26/2008 Paid $207.90
PRM 6200 08112407728 HAMMERS, SLEDGE, CROSS PEIN AND DOUBLE FACE, WITH 11/25/2008 Paid $300.84
PRM 6200 08112407729 Chain Saw Parts 11/25/2008 Paid $421.80
PRM 6200 08112407729 HAMMERS, SLEDGE, CROSS PEIN AND DOUBLE FACE, WITH 11/25/2008 Paid $1,494.05
PRM 6200 08112407729 OILS, LUBRICATING, SPECIAL 11/25/2008 Paid $251.52
PRM 6200 08112407729 SHELVES, STEEL, EQUIPMENT, CANTILEVERED 11/25/2008 Paid $61.36
PRM 6200 08112407729 WELDING ACCESSORIES: CUTTING TIPS, HAMMERS, HOSE, INSPECTION 11/25/2008 Paid $676.11
PRM 9100 08112407919 PERSONAL PROTECTIVE EQUIPMENT ENSEMBLE 11/25/2008 Paid $3,337.50
PRM 9100 08112407920 PERSONAL PROTECTIVE EQUIPMENT ENSEMBLE 11/25/2008 Paid $14,234.40
PRM 9100 08112407921 PERSONAL PROTECTIVE EQUIPMENT ENSEMBLE 11/25/2008 Paid $13,189.89
GAX 2200 08111203135 11/21/2008 Paid $76.19
GAX 2200 08111203142 11/21/2008 Paid $128.79
GAX 2200 08111203145 11/21/2008 Paid $57.36
PRM 2200 08112007200 Impact Tools, Air Powered (Not Road Building) 11/21/2008 Paid $222.98
PRM 6200 08112007260 Threaded Rod and Studs 11/21/2008 Paid $1,452.36
PRM 6200 08112007262 BITS, WOOD BORING, ELECTRIC DRILL, HIGH SPEED STEE 11/21/2008 Paid $205.06
PRM 6200 08112007262 Chain Saw Parts 11/21/2008 Paid $3,432.00
PRM 8600 08112007383 Impact Tools, Air Powered (Not Road Building) 11/21/2008 Paid $1,346.25
PRM 8600 08112007384 Impact Tools, Air Powered (Not Road Building) 11/21/2008 Paid $1,157.22
PRM 2200 08111907029 WRENCH SETS, BOX 11/20/2008 Paid $111.97
PRM 6200 08111907085 Chain Saw Parts 11/20/2008 Paid $66.72
PRM 6200 08111907085 OIL, CHAIN SAW 11/20/2008 Paid $132.12
PRM 6200 08111907085 OILS, LUBRICATING, SPECIAL 11/20/2008 Paid $179.69
PRM 6200 08111907085 WELDING ACCESSORIES: CUTTING TIPS, HAMMERS, HOSE, INSPECTION 11/20/2008 Paid $168.72
GAX 7800 08111403461 11/19/2008 Paid $550.36
GAX 7800 08111403465 11/19/2008 Paid $1,953.90
PRM 6000 08111706619 GLASSES, SAFETY 11/18/2008 Paid $119.04
PRM 7800 08111706704 Hand Tools, Special Automotive: Brake Tools, Body 11/18/2008 Paid $531.28
PRM 8600 08111306258 Impact Tools, Air Powered (Not Road Building) 11/14/2008 Paid $809.10
GAX 6200 08102201840 11/13/2008 Paid $45.99
PRM 8500 08111205931 PARTS AND ACCESSORIES, HAND TRUCKS 11/13/2008 Paid $154.13
PRM 7800 08110705578 Hand Tools, Special Automotive: Brake Tools, Body 11/10/2008 Paid $392.95
PRM 8200 08110605446 CLAMPS, WELDING 11/07/2008 Paid $11.78
PRM 8200 08110605446 GAUGES, PRESSURE, WELDING 11/07/2008 Paid $187.65
GAX 6200 08100300241 11/06/2008 Paid $29.48
GAX 6200 08100700357 11/06/2008 Paid $114.17
GAX 6400 08102201787 11/06/2008 Paid $115.71
PRM 2200 08110505162 Bins, Cabinets, and Shelves, Metal (Not Office Typ 11/06/2008 Paid $241.40
PRM 2200 08110505163 Broom Manufacturing Machinery and Parts 11/06/2008 Paid $46.44
PRM 2200 08110505163 Cabinets, Safety (For Flammable Liquids, etc.) 11/06/2008 Paid $693.45
PRM 2200 08110505163 MATTING, RUBBER 11/06/2008 Paid $366.75
PRM 2200 08110505163 SQUEEGEES 11/06/2008 Paid $11.72
PRM 8200 08110505215 CLAMPS, WELDING 11/06/2008 Paid $58.90
PRM 8200 08110505215 GAUGES, PRESSURE, WELDING 11/06/2008 Paid $187.65
GAX 6200 08072325719 11/05/2008 Paid $55.64
GAX 6200 08101300937 11/05/2008 Paid $67.70
PRM 2200 08110404903 Hydraulic System Components and Parts 11/05/2008 Paid $211.50
PRM 2200 08110404907 Impact Tools, Air Powered (Not Road Building) 11/05/2008 Paid $90.00
PRM 2200 08103104593 Vacuum Cleaners, Manual (Including Parts and Acces 11/03/2008 Paid $356.80
PRM 2200 08103104595 Impact Tools, Air Powered (Not Road Building) 11/03/2008 Paid $35.89
PRM 2200 08102904301 Impact Tools, Air Powered (Not Road Building) 10/30/2008 Paid $765.00
PRM 6200 08102904345 OILS, LUBRICATING, SPECIAL 10/30/2008 Paid $1,689.07
PRM 2200 08102804055 Bins, Cabinets, and Shelves, Metal (Not Office Typ 10/29/2008 Paid $296.25
PRM 8100 08102804182 BITS, SOCKET, HEX HEAD 10/29/2008 Paid $147.38
PRM 8100 08102804182 DRIVERS, DRILL, CORDLESS, INDUSTRIAL OR CONTRACTOR 10/29/2008 Paid $72.62
PRM 8100 08102804182 Files and Rasps 10/29/2008 Paid $79.74
PRM 8100 08102804182 GUNS & IRONS, SOLDERING 10/29/2008 Paid $168.30
PRM 8100 08102804182 HACKSAWS 10/29/2008 Paid $69.76
PRM 8100 08102804182 Hammers, Mallets, Crow Bars, Pinch Bars, Pry Bars, 10/29/2008 Paid $113.90
PRM 8100 08102804182 KNIFE UTILITY 10/29/2008 Paid $26.34
PRM 8100 08102804182 PLIERS CHANNEL LOCK 9-1/2 IN 10/29/2008 Paid $19.90
PRM 8100 08102804182 PLIERS LINEMANS SIDE CUTTING 8 IN 10/29/2008 Paid $82.80
PRM 8100 08102804182 PLIERS, COMBINATION SLIP JOINT 10/29/2008 Paid $18.46
PRM 8100 08102804182 PLIERS, LONG NOSE 10/29/2008 Paid $14.10
PRM 8100 08102804182 PLIERS, WIRE STRIPPER AND CUTTER 10/29/2008 Paid $34.70
PRM 8100 08102804182 PUNCHES, PIN 10/29/2008 Paid $58.80
PRM 8100 08102804182 Rules, Squares, and Tapes (Carpenter, etc.) 10/29/2008 Paid $35.90
PRM 8100 08102804182 SCREWDRIVER SETS 10/29/2008 Paid $155.98
PRM 8100 08102804182 UNIVERSAL JOINT FOR SOCKETS 1/2 IN DRIVE 10/29/2008 Paid $297.14
PRM 8100 08102804182 VISES 10/29/2008 Paid $405.46
PRM 8100 08102804182 WRENCH SET, HEX KEY 10/29/2008 Paid $92.62
PRM 8100 08102804182 WRENCH SETS, COMBINATION 10/29/2008 Paid $488.30
PRM 8100 08102804182 WRENCH SETS, NUTDRIVER 10/29/2008 Paid $130.50
PRM 8100 08102804182 WRENCH SETS, SOCKET, HAND 10/29/2008 Paid $1,098.74
PRM 8100 08102804182 WRENCHES, ADJUSTABLE, STANDARD, INDL. FINISH 10/29/2008 Paid $101.52
PRM 8100 08102804182 WRENCHES, ALLEN HEX KEY 10/29/2008 Paid $32.62
PRM 8100 08102804182 WRENCHES, BOX, RATCHETING 10/29/2008 Paid $70.06
PRM 8100 08102804182 WRENCHES, SOCKET, HAND, REVERSIBLE RATCHET 10/29/2008 Paid $72.46
PRM 2200 08102303473 WIRE, EXTENSION CORD 10/24/2008 Paid $186.03
PRM 8100 08102203290 Anatomical Braces and Supports: Arm Slings, Back S 10/23/2008 Paid $491.40
PRM 8100 08102203293 Flashlights and Lanterns, Battery Type 10/23/2008 Paid $345.00
PRM 6200 08102002850 Chain Saws 10/21/2008 Paid $593.56
GAX 2200 08100200123 10/20/2008 Paid $139.43
GAX 2200 08100200133 10/20/2008 Paid $27.09
PRM 2200 08101602446 DRIVERS, DRILL, CORDLESS, INDUSTRIAL OR CONTRACTOR 10/17/2008 Paid $191.40
PRM 2200 08101602447 ADAPTERS, WIRE BRUSH, WHEEL 10/17/2008 Paid $79.05
PRM 2200 08101602447 BLADES, ABRASIVE GRINDING WHEEL 10/17/2008 Paid $45.81
PRM 2200 08101602448 Impact Tools, Air Powered (Not Road Building) 10/17/2008 Paid $247.50
PRM 2200 08101602449 Impact Tools, Air Powered (Not Road Building) 10/17/2008 Paid $995.82
PRM 2200 08101602451 WIRE, EXTENSION CORD 10/17/2008 Paid $87.75
PRM 2200 08101401963 Bins, Cabinets, and Shelves, Metal (Not Office Typ 10/15/2008 Paid $594.45
PRM 2200 08101301733 FANS, CIRCULATING 10/14/2008 Paid $99.32
PRM 6200 08101001476 Hand Tools, Non-Powered, All Kinds, Maintenance an 10/13/2008 Paid $1,004.40
PRM 8200 08101001555 Air Conditioning and Heating: Central Units, and P 10/13/2008 Paid $670.00
PRM 8600 08101001576 Impact Tools, Air Powered (Not Road Building) 10/13/2008 Paid $999.00
PRM 8200 08100700964 AIR CONDITIONERS, COMMERCIAL 10/08/2008 Paid $917.10
PRM 8300 08100700967 HAND TOOLS (POWERED AND NON-POWERED), ACCESSORIES 10/08/2008 Paid $448.36
PRM 9300 08100701030 Shelving, Metal (Not Library or Shop) 10/08/2008 Paid $303.68
GAX 8300 08091630643 10/07/2008 Paid $73.32
GAX 8500 08092531330 10/07/2008 Paid $88.17
PRM 6000 08100600782 GLASSES, SAFETY 10/07/2008 Paid $290.87
PRM 2200 08100300511 Bins, Cabinets, and Shelves, Metal (Not Office Typ 10/06/2008 Paid $138.38
PRM 6200 08100200350 Hand Tools, Non-Powered, All Kinds, Maintenance an 10/03/2008 Paid $973.28
PRM 6400 08100200363 Storage Cabinets, Metal 10/03/2008 Paid $1,909.80
PRM 2200 08100100017 Impact Tools, Air Powered (Not Road Building) 10/02/2008 Paid $48.78
PRM 2200 08100100026 Impact Tools, Air Powered (Not Road Building) 10/02/2008 Paid $359.38
PRM 9300 08100100241 Shelving, Metal (Not Library or Shop) 10/02/2008 Paid $2,165.04