PRC 1100 MAX126991 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2024 |
Outstanding |
$62,119.77 |
PRC 1100 MAX126992 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2024 |
Outstanding |
$19,821.00 |
PRC 1100 MAX126993 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2024 |
Outstanding |
$55,392.22 |
PRC 1100 MAX126996 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2024 |
Outstanding |
$31,800.00 |
PRC 1100 MAX126999 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2024 |
Outstanding |
$20,706.59 |
PRC 1100 MAX127001 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2024 |
Outstanding |
$21,854.00 |
PRC 1100 MAX127002 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2024 |
Outstanding |
$16,234.00 |
PRC 1100 MAX126837 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/04/2024 |
Outstanding |
$55,392.22 |
PRC 1100 MAX126082 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/18/2024 |
Paid |
$27,696.11 |
PRC 1100 MAX126084 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/18/2024 |
Paid |
$3,950.00 |
PRC 1100 MAX126119 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/18/2024 |
Paid |
$21,854.00 |
PRC 1100 MAX126120 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/18/2024 |
Paid |
$41,413.18 |
PRC 1100 24030700698 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/13/2024 |
Paid |
$21,123.48 |
PRC 1100 24030700699 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/13/2024 |
Paid |
$41,413.18 |
PRC 1100 24030700700 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/12/2024 |
Paid |
$27,696.11 |
PRC 1100 MAX125850 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2024 |
Paid |
$226,646.00 |
PRC 1100 MAX125856 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2024 |
Paid |
$110,784.44 |
PRC 1100 MAX125857 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2024 |
Paid |
$27,696.11 |
PRC 1100 MAX125858 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2024 |
Paid |
$5,810.00 |
PRC 1100 MAX125859 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2024 |
Paid |
$29,500.00 |
PRC 1100 MAX125860 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2024 |
Paid |
$27,696.11 |
PRC 1100 MAX125863 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2024 |
Paid |
$27,696.11 |
PRC 1100 MAX125864 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2024 |
Paid |
$19,329.85 |
PRC 1100 MAX125568 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2024 |
Paid |
$26,150.00 |
PRC 1100 MAX125794 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2024 |
Paid |
$39,642.00 |
PRC 1100 MAX125578 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/05/2024 |
Paid |
$84,410.00 |
PRC 1100 MAX125579 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/05/2024 |
Paid |
$57,989.55 |
PRC 1100 MAX125581 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/05/2024 |
Paid |
$27,696.11 |
PRC 1100 MAX125494 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/04/2024 |
Paid |
$55,811.00 |
PRC 1100 MAX125496 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/04/2024 |
Paid |
$23,543.00 |
PRC 1100 MAX125499 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/04/2024 |
Paid |
$226,646.00 |
PRC 1100 MAX125562 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/04/2024 |
Paid |
$12,000.00 |
PRC 1100 MAX125565 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/04/2024 |
Paid |
$27,696.11 |
PRC 1100 MAX123002 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/27/2024 |
Paid |
$14,921.83 |
PRC 1100 MAX125213 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/27/2024 |
Paid |
$122,150.00 |
PRC 1100 MAX125280 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/27/2024 |
Paid |
$19,329.85 |
PRC 1100 MAX125139 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/26/2024 |
Paid |
$19,329.85 |
PRC 1100 MAX125145 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/26/2024 |
Paid |
$110,784.44 |
PRC 1100 MAX125146 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/26/2024 |
Paid |
$21,123.48 |
PRC 1100 MAX125148 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/26/2024 |
Paid |
$32,468.00 |
PRC 1100 MAX124870 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2024 |
Paid |
$55,392.22 |
PRC 1100 MAX124871 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2024 |
Paid |
$19,329.85 |
PRC 1100 MAX124882 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2024 |
Paid |
$6,000.00 |
PRC 1100 MAX124940 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2024 |
Paid |
$19,329.85 |
PRC 1100 MAX124941 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2024 |
Paid |
$27,696.11 |
PRC 1100 MAX124942 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2024 |
Paid |
$27,696.11 |
PRC 1100 MAX124943 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2024 |
Paid |
$19,406.00 |
PRC 1100 MAX124944 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2024 |
Paid |
$96,649.25 |
PRC 1100 MAX124945 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2024 |
Paid |
$108,000.00 |
PRC 1100 MAX124946 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2024 |
Paid |
$38,659.70 |
PRC 1100 MAX124948 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2024 |
Paid |
$113,000.00 |
PRC 1100 MAX124951 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2024 |
Paid |
$361,617.20 |
PRC 1100 MAX124953 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2024 |
Paid |
$62,474.00 |
PRC 1100 MAX124524 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/15/2024 |
Paid |
$27,696.11 |
PRC 1100 MAX124526 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/15/2024 |
Paid |
$16,234.00 |
PRC 1100 MAX124527 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/15/2024 |
Paid |
$110,784.44 |
PRC 1100 MAX124835 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/15/2024 |
Paid |
$361,617.20 |
PRC 1100 MAX124838 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/15/2024 |
Paid |
$361,617.20 |
PRC 1100 MAX124841 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/15/2024 |
Paid |
$55,392.22 |
PRC 1100 MAX124842 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/15/2024 |
Paid |
$38,659.70 |
PRC 1100 MAX124350 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/05/2024 |
Paid |
$16,234.00 |
PRC 1100 MAX124351 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/05/2024 |
Paid |
$31,900.00 |
PRC 1100 MAX124352 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/05/2024 |
Paid |
$26,400.00 |
PRC 1100 MAX124475 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/05/2024 |
Paid |
$11,921.41 |
PRC 1100 MAX124478 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/05/2024 |
Paid |
$76,978.00 |
PRC 1100 MAX124025 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$32,200.00 |
PRC 1100 MAX124032 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$66,000.00 |
PRC 1100 MAX124034 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$23,848.00 |
PRC 1100 MAX124038 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$6,170.00 |
PRC 1100 MAX124055 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$32,734.33 |
PRC 1100 MAX124056 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$29,843.66 |
PRC 1100 MAX124105 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$20,000.00 |
PRC 1100 MAX124124 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$131,972.40 |
PRC 1100 MAX124125 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$178,586.80 |
PRC 1100 MAX124126 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$121,699.20 |
PRC 1100 MAX124127 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$105,600.00 |
PRC 1100 MAX124130 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$42,246.96 |
PRC 1100 MAX124132 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$21,123.48 |
PRC 1100 MAX124133 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2024 |
Paid |
$42,246.96 |
PRC 1100 MAX124242 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2024 |
Paid |
$48,702.00 |
PRC 1100 24011900554 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/25/2024 |
Paid |
$21,123.48 |
PRC 1100 MAX123674 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/22/2024 |
Paid |
$131,972.40 |
PRC 1100 MAX123675 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/22/2024 |
Paid |
$145,118.40 |
PRC 1100 MAX123676 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/22/2024 |
Paid |
$121,699.20 |
PRC 1100 MAX123678 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/22/2024 |
Paid |
$145,118.40 |
PRC 1100 MAX123682 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/22/2024 |
Paid |
$178,586.80 |
PRC 1100 MAX123766 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/22/2024 |
Paid |
$15,900.00 |
PRC 1100 MAX123831 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/22/2024 |
Paid |
$10,600.00 |
PRC 1100 MAX123656 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/18/2024 |
Paid |
$121,699.20 |
PRC 1100 MAX123456 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/16/2024 |
Paid |
$84,493.92 |
PRC 1100 MAX123459 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/16/2024 |
Paid |
$16,234.00 |
PRC 1100 MAX123460 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/16/2024 |
Paid |
$42,246.96 |
PRC 1100 MAX123461 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/16/2024 |
Paid |
$21,123.48 |
PRC 1100 MAX123464 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/16/2024 |
Paid |
$55,392.22 |
PRC 1100 MAX123466 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/16/2024 |
Paid |
$32,600.00 |
PRC 1100 MAX123570 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/16/2024 |
Paid |
$21,123.48 |
PRC 1100 MAX123259 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$62,900.00 |
PRC 1100 MAX123265 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$42,246.96 |
PRC 1100 MAX123266 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$31,662.84 |
PRC 1100 MAX123267 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$42,246.96 |
PRC 1100 MAX123333 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$63,370.44 |
PRC 1100 MAX123342 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$15,831.42 |
PRC 1100 MAX123355 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$32,734.33 |
PRC 1100 MAX123358 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$31,662.84 |
PRC 1100 MAX123363 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$31,662.84 |
PRC 1100 MAX123383 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$51,000.00 |
PRC 1100 MAX123386 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$16,234.00 |
PRC 1100 MAX123387 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$27,696.11 |
PRC 1100 MAX123388 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$42,246.96 |
PRC 1100 MAX123390 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$55,392.22 |
PRC 1100 MAX123391 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$16,234.00 |
PRC 1100 MAX123392 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2024 |
Paid |
$27,696.11 |
PRC 1100 MAX123089 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/08/2024 |
Paid |
$42,246.96 |
PRC 1100 MAX123129 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/08/2024 |
Paid |
$15,831.42 |
PRC 1100 MAX123130 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/08/2024 |
Paid |
$15,831.42 |
PRC 1100 MAX123131 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/08/2024 |
Paid |
$8,500.00 |
PRC 1100 MAX123148 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/08/2024 |
Paid |
$202,622.00 |
PRC 1100 MAX123151 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/08/2024 |
Paid |
$16,234.00 |
PRC 1100 MAX123155 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/08/2024 |
Paid |
$47,494.26 |
PRC 1100 MAX123156 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/08/2024 |
Paid |
$21,123.48 |
PRC 1100 MAX122866 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$230,500.00 |
PRC 1100 MAX122867 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$42,246.96 |
PRC 1100 MAX122868 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$32,734.33 |
PRC 1100 MAX122869 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$48,702.00 |
PRC 1100 MAX122872 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$21,123.48 |
PRC 1100 MAX122875 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$42,246.96 |
PRC 1100 MAX122876 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$15,831.42 |
PRC 1100 MAX123001 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$15,831.42 |
PRC 1100 MAX123003 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$15,831.42 |
PRC 1100 MAX123004 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$47,494.26 |
PRC 1100 MAX123005 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$21,123.48 |
PRC 1100 MAX123091 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$14,921.83 |
PRC 1100 MAX123093 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$42,246.96 |
PRC 1100 MAX123096 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2024 |
Paid |
$41,000.00 |
PRC 1100 MAX122612 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/21/2023 |
Paid |
$11,000.00 |
PRC 1100 MAX122617 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/21/2023 |
Paid |
$112,511.00 |
PRC 1100 MAX122618 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/21/2023 |
Paid |
$225,022.00 |
PRC 1100 MAX122743 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/21/2023 |
Paid |
$55,392.22 |
PRC 1100 MAX122744 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/21/2023 |
Paid |
$42,246.96 |
PRC 1100 MAX122745 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/21/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX122746 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/21/2023 |
Paid |
$27,696.11 |
PRC 1100 MAX122747 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/21/2023 |
Paid |
$42,246.96 |
PRC 1100 MAX122752 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/21/2023 |
Paid |
$32,450.00 |
PRC 1100 MAX122392 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/18/2023 |
Paid |
$19,200.00 |
PRC 1100 MAX122092 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/14/2023 |
Paid |
$16,234.00 |
PRC 1100 MAX122095 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/14/2023 |
Paid |
$25,900.00 |
PRC 1100 MAX121825 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/07/2023 |
Paid |
$435,904.00 |
PRC 1100 MAX121826 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/07/2023 |
Paid |
$16,234.00 |
PRC 1100 MAX121827 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/07/2023 |
Paid |
$44,554.00 |
PRC 1100 MAX121828 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/07/2023 |
Paid |
$64,936.00 |
PRC 1100 MAX121829 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/07/2023 |
Paid |
$27,696.11 |
PRC 1100 MAX121830 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/07/2023 |
Paid |
$48,702.00 |
PRC 1100 MAX121832 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/07/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX121833 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/07/2023 |
Paid |
$22,277.00 |
PRC 1100 MAX121834 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/07/2023 |
Paid |
$217,952.00 |
PRC 1100 MAX121835 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/07/2023 |
Paid |
$357,173.60 |
PRC 1100 MAX121363 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/13/2023 |
Paid |
$15,831.42 |
PRC 1100 MAX121364 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/13/2023 |
Paid |
$15,831.42 |
PRC 1100 MAX121097 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/02/2023 |
Paid |
$12,754.86 |
PRC 1100 MAX119854 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$36,597.68 |
PRC 1100 MAX119859 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$5,025.00 |
PRC 1100 MAX119860 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$29,880.00 |
PRC 1100 MAX120133 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$9,500.00 |
PRC 1100 MAX120141 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$16,149.66 |
PRC 1100 MAX120274 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX120275 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$98,202.99 |
PRC 1100 MAX120286 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$65,468.66 |
PRC 1100 MAX120293 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$22,277.00 |
PRC 1100 MAX120294 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$12,754.86 |
PRC 1100 MAX120295 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$11,921.41 |
PRC 1100 MAX120296 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$12,754.86 |
PRC 1100 MAX120297 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$12,754.86 |
PRC 1100 MAX120385 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$61,200.00 |
PRC 1100 MAX120388 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$60,200.00 |
PRC 1100 MAX120425 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2023 |
Paid |
$16,149.66 |
PRC 1100 MAX119768 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$26,910.00 |
PRC 1100 MAX120048 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$32,734.33 |
PRC 1100 MAX120049 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$22,277.00 |
PRC 1100 MAX120135 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$22,277.00 |
PRC 1100 MAX120138 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$32,734.33 |
PRC 1100 MAX120142 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$32,734.33 |
PRC 1100 MAX120143 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$14,921.83 |
PRC 1100 MAX120144 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$35,400.00 |
PRC 1100 MAX120273 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX120276 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX120277 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX120280 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX120282 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$32,734.33 |
PRC 1100 MAX120283 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX120284 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$42,246.96 |
PRC 1100 MAX120292 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2023 |
Paid |
$44,554.00 |
PRC 1100 MAX119763 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/09/2023 |
Paid |
$29,843.66 |
PRC 1100 MAX119871 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/09/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX119758 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2023 |
Paid |
$92,700.00 |
PRC 1100 MAX119759 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2023 |
Paid |
$112,200.00 |
PRC 1100 MAX119580 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2023 |
Paid |
$92,700.00 |
PRC 1100 MAX119581 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2023 |
Paid |
$35,700.00 |
PRC 1100 MAX119584 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX119585 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2023 |
Paid |
$11,921.41 |
PRC 1100 MAX119586 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2023 |
Paid |
$22,277.00 |
PRC 1100 MAX119351 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2023 |
Paid |
$32,734.33 |
PRC 1100 MAX119356 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2023 |
Paid |
$20,200.00 |
PRC 1100 MAX119441 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2023 |
Paid |
$22,277.00 |
PRC 1100 MAX119449 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX119450 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2023 |
Paid |
$98,202.99 |
PRC 1100 MAX119235 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/19/2023 |
Paid |
$98,202.99 |
PRC 1100 MAX119240 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/19/2023 |
Paid |
$32,734.33 |
PRC 1100 MAX119241 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/19/2023 |
Paid |
$25,100.00 |
PRC 1100 MAX119246 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/19/2023 |
Paid |
$59,000.00 |
PRC 1100 MAX119248 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/19/2023 |
Paid |
$123,580.00 |
PRC 1100 MAX119252 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/19/2023 |
Paid |
$65,468.66 |
PRC 1100 MAX119255 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/19/2023 |
Paid |
$4,990.00 |
PRC 1100 MAX119073 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$24,900.00 |
PRC 1100 MAX119123 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$93,700.00 |
PRC 1100 MAX119124 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$42,246.96 |
PRC 1100 MAX119125 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$9,781.00 |
PRC 1100 MAX119126 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$179,280.00 |
PRC 1100 MAX119127 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$9,781.00 |
PRC 1100 MAX119130 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$32,734.33 |
PRC 1100 MAX119131 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$19,920.00 |
PRC 1100 MAX119132 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$84,493.92 |
PRC 1100 MAX119133 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$3,700.00 |
PRC 1100 MAX119134 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$9,781.00 |
PRC 1100 MAX119135 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$120,110.00 |
PRC 1100 MAX119136 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$11,750.00 |
PRC 1100 MAX119140 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$65,468.66 |
PRC 1100 MAX119142 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2023 |
Paid |
$42,246.96 |
PRC 1100 MAX119051 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2023 |
Paid |
$18,160.00 |
PRC 1100 MAX119061 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2023 |
Paid |
$12,800.00 |
PRC 1100 MAX119066 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2023 |
Paid |
$39,700.00 |
PRC 1100 MAX119070 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2023 |
Paid |
$79,600.00 |
PRC 1100 MAX119077 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2023 |
Paid |
$28,500.00 |
PRC 1100 MAX118326 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$42,246.96 |
PRC 1100 MAX118445 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$42,246.96 |
PRC 1100 MAX118448 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$60,640.00 |
PRC 1100 MAX118451 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$88,840.00 |
PRC 1100 MAX118452 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$23,703.00 |
PRC 1100 MAX118504 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$16,530.00 |
PRC 1100 MAX118507 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX118508 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX118509 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$16,149.66 |
PRC 1100 MAX118516 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$22,277.00 |
PRC 1100 MAX118521 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$96,180.00 |
PRC 1100 MAX118526 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$10,552.00 |
PRC 1100 MAX118528 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$55,392.22 |
PRC 1100 MAX118532 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$60,140.00 |
PRC 1100 MAX118574 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$16,149.66 |
PRC 1100 MAX118576 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$33,978.00 |
PRC 1100 MAX118590 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2023 |
Paid |
$7,600.00 |
PRC 1100 MAX112510 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/05/2023 |
Paid |
$14,970.00 |
PRC 1100 MAX118320 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/31/2023 |
Paid |
$127,500.00 |
PRC 1100 MAX118321 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/31/2023 |
Paid |
$64,570.00 |
PRC 1100 MAX118322 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/31/2023 |
Paid |
$19,800.00 |
PRC 1100 MAX118325 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/31/2023 |
Paid |
$28,000.00 |
PRC 1100 MAX118003 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/22/2023 |
Paid |
$19,800.00 |
PRC 1100 MAX118006 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/22/2023 |
Paid |
$24,860.00 |
PRC 1100 MAX118008 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/22/2023 |
Paid |
$21,123.48 |
PRC 1100 MAX118012 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/21/2023 |
Paid |
$29,880.00 |
PRC 1100 MAX117342 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2023 |
Paid |
$9,980.00 |
PRC 1100 MAX117343 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2023 |
Paid |
$34,930.00 |
PRC 1100 MAX117349 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2023 |
Paid |
$52,590.00 |
PRC 1100 MAX117362 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2023 |
Paid |
$22,277.00 |
PRC 1100 MAX117368 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2023 |
Paid |
$90,800.00 |
PRC 1100 MAX117402 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2023 |
Paid |
$45,150.00 |
PRC 1100 MAX117404 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2023 |
Paid |
$18,160.00 |
PRC 1100 MAX117420 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2023 |
Paid |
$33,978.00 |
PRC 1100 MAX117445 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2023 |
Paid |
$33,978.00 |
PRC 1100 MAX117447 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2023 |
Paid |
$16,989.00 |
PRC 1100 MAX117216 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/27/2023 |
Paid |
$127,120.00 |
PRC 1100 MAX117096 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/24/2023 |
Paid |
$22,277.00 |
PRC 1100 MAX117097 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/24/2023 |
Paid |
$16,149.66 |
PRC 1100 MAX117099 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/24/2023 |
Paid |
$16,989.00 |
PRC 1100 MAX116977 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/20/2023 |
Paid |
$75,200.00 |
PRC 1100 MAX117063 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/20/2023 |
Paid |
$9,080.00 |
PRC 1100 MAX116684 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/13/2023 |
Paid |
$16,149.66 |
PRC 1100 MAX116570 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/11/2023 |
Paid |
$15,222.01 |
PRC 1100 MAX116607 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/11/2023 |
Paid |
$44,554.00 |
PRC 1100 MAX116694 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/11/2023 |
Paid |
$45,600.00 |
PRC 1100 MAX116398 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$27,150.00 |
PRC 1100 MAX116520 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$49,910.00 |
PRC 1100 MAX116521 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$33,978.00 |
PRC 1100 MAX116524 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$22,277.00 |
PRC 1100 MAX116537 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$16,149.66 |
PRC 1100 MAX116542 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$35,090.00 |
PRC 1100 MAX116544 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$48,560.00 |
PRC 1100 MAX116569 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$48,448.98 |
PRC 1100 MAX116573 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$16,989.00 |
PRC 1100 MAX116574 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$16,989.00 |
PRC 1100 MAX116576 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$22,277.00 |
PRC 1100 MAX116577 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$22,277.00 |
PRC 1100 MAX116579 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$30,100.00 |
PRC 1100 MAX116580 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$26,328.00 |
PRC 1100 MAX116583 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2023 |
Paid |
$19,719.01 |
PRC 1100 MAX116384 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/05/2023 |
Paid |
$60,800.00 |
PRC 1100 MAX116393 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/05/2023 |
Paid |
$16,989.00 |
PRC 1100 MAX116030 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2023 |
Paid |
$3,400.00 |
PRC 1100 MAX116031 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2023 |
Paid |
$16,149.66 |
PRC 1100 MAX116032 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2023 |
Paid |
$44,554.00 |
PRC 1100 MAX116033 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2023 |
Paid |
$26,328.00 |
PRC 1100 MAX116034 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2023 |
Paid |
$38,050.00 |
PRC 1100 MAX116038 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2023 |
Paid |
$107,870.00 |
PRC 1100 MAX116047 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2023 |
Paid |
$16,989.00 |
PRC 1100 MAX116050 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2023 |
Paid |
$52,656.00 |
PRC 1100 MAX116051 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2023 |
Paid |
$16,989.00 |
PRC 1100 MAX116055 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2023 |
Paid |
$52,280.00 |
PRC 1100 MAX115793 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/20/2023 |
Paid |
$46,920.00 |
PRC 1100 MAX115796 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/20/2023 |
Paid |
$34,030.00 |
PRC 1100 MAX115240 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/31/2023 |
Paid |
$29,800.00 |
PRC 1100 MAX115241 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/31/2023 |
Paid |
$8,420.00 |
PRC 1100 MAX115242 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/31/2023 |
Paid |
$39,438.02 |
PRC 1100 MAX115243 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/31/2023 |
Paid |
$19,719.01 |
PRC 1100 MAX115244 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/31/2023 |
Paid |
$19,719.01 |
PRC 1100 MAX115245 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/31/2023 |
Paid |
$33,978.00 |
PRC 1100 MAX115246 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/31/2023 |
Paid |
$33,978.00 |
PRC 1100 MAX115012 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/25/2023 |
Paid |
$33,060.00 |
PRC 1100 MAX115014 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/25/2023 |
Paid |
$19,719.01 |
PRC 1100 MAX115017 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/25/2023 |
Paid |
$27,240.00 |
PRC 1100 MAX115019 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/25/2023 |
Paid |
$77,630.00 |
PRC 1100 MAX114792 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/22/2023 |
Paid |
$48,448.98 |
PRC 1100 MAX114616 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/16/2023 |
Paid |
$14,505.00 |
PRC 1100 MAX114138 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/15/2023 |
Paid |
$169,560.00 |
PRC 1100 MAX114524 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/15/2023 |
Paid |
$14,900.00 |
PRC 1100 MAX114529 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/15/2023 |
Paid |
$12,161.11 |
PRC 1100 MAX114531 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/15/2023 |
Paid |
$16,149.66 |
PRC 1100 MAX114532 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/15/2023 |
Paid |
$59,157.03 |
PRC 1100 MAX114533 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/15/2023 |
Paid |
$16,149.66 |
PRC 1100 MAX114624 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/15/2023 |
Paid |
$43,708.00 |
PRC 1100 MAX114534 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/11/2023 |
Paid |
$19,719.01 |
PRC 1100 MAX114537 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/11/2023 |
Paid |
$32,299.32 |
PRC 1100 MAX114334 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/08/2023 |
Paid |
$16,149.66 |
PRC 1100 MAX114355 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/08/2023 |
Paid |
$16,989.00 |
PRC 1100 MAX114360 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/08/2023 |
Paid |
$10,200.00 |
PRC 1100 MAX114361 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/08/2023 |
Paid |
$18,060.00 |
PRC 1100 MAX114406 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/08/2023 |
Paid |
$14,900.00 |
PRC 1100 MAX114411 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/04/2023 |
Paid |
$34,930.00 |
PRC 1100 MAX114413 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/04/2023 |
Paid |
$59,600.00 |
PRC 1100 MAX114414 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/04/2023 |
Paid |
$25,500.00 |
PRC 1100 MAX113953 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2023 |
Paid |
$22,350.00 |
PRC 1100 MAX113964 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2023 |
Paid |
$39,438.02 |
PRC 1100 MAX114020 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2023 |
Paid |
$19,719.01 |
PRC 1100 MAX114022 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2023 |
Paid |
$32,299.32 |
PRC 1100 MAX113761 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2023 |
Paid |
$84,660.00 |
PRC 1100 MAX113762 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2023 |
Paid |
$9,080.00 |
PRC 1100 MAX113790 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2023 |
Paid |
$16,149.66 |
PRC 1100 MAX113791 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2023 |
Paid |
$74,500.00 |
PRC 1100 MAX113793 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2023 |
Paid |
$15,100.00 |
PRC 1100 MAX113801 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2023 |
Paid |
$16,149.66 |
PRC 1100 MAX113802 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2023 |
Paid |
$19,719.01 |
PRC 1100 MAX113861 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2023 |
Paid |
$22,350.00 |
PRC 1100 MAX113718 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/20/2023 |
Paid |
$5,100.00 |
PRC 1100 MAX113721 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/20/2023 |
Paid |
$9,080.00 |
PRC 1100 MAX113723 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/20/2023 |
Paid |
$72,640.00 |
PRC 1100 MAX113769 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/20/2023 |
Paid |
$32,299.32 |
PRC 1100 MAX113615 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/19/2023 |
Paid |
$21,045.00 |
PRC 1100 MAX113685 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/19/2023 |
Paid |
$59,157.03 |
PRC 1100 MAX113687 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/19/2023 |
Paid |
$93,840.00 |
PRC 1100 MAX113717 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/19/2023 |
Paid |
$39,438.02 |
PRC 1100 MAX113357 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/13/2023 |
Paid |
$103,680.00 |
PRC 1100 MAX113365 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/13/2023 |
Paid |
$13,011.93 |
PRC 1100 MAX113498 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/13/2023 |
Paid |
$3,400.00 |
PRC 1100 MAX113538 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/13/2023 |
Paid |
$24,950.00 |
PRC 1100 MAX113539 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/13/2023 |
Paid |
$15,300.00 |
PRC 1100 MAX113540 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/13/2023 |
Paid |
$38,967.00 |
PRC 1100 MAX113387 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2023 |
Paid |
$84,830.00 |
PRC 1100 MAX113396 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2023 |
Paid |
$114,000.00 |
PRC 1100 MAX113398 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2023 |
Paid |
$15,050.00 |
PRC 1100 MAX113356 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/10/2023 |
Paid |
$12,989.00 |
PRC 1100 MAX113359 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/10/2023 |
Paid |
$32,299.32 |
PRC 1100 MAX113360 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/10/2023 |
Paid |
$32,299.32 |
PRC 1100 MAX113361 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/10/2023 |
Paid |
$48,448.98 |
PRC 1100 MAX113364 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/10/2023 |
Paid |
$15,222.01 |
PRC 1100 MAX113180 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/06/2023 |
Paid |
$7,450.00 |
PRC 1100 MAX113183 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/06/2023 |
Paid |
$19,719.01 |
PRC 1100 MAX113315 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/06/2023 |
Paid |
$13,011.93 |
PRC 1100 MAX113318 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/06/2023 |
Paid |
$13,011.93 |
PRC 1100 MAX113325 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/06/2023 |
Paid |
$39,544.23 |
PRC 1100 MAX113018 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/30/2023 |
Paid |
$49,900.00 |
PRC 1100 MAX113022 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/30/2023 |
Paid |
$19,960.00 |
PRC 1100 MAX112821 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/28/2023 |
Paid |
$26,023.86 |
PRC 1100 MAX112822 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/28/2023 |
Paid |
$6,020.00 |
PRC 1100 MAX112826 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/27/2023 |
Paid |
$65,562.00 |
PRC 1100 MAX112830 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/27/2023 |
Paid |
$12,989.00 |
PRC 1100 MAX112836 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/27/2023 |
Paid |
$25,500.00 |
PRC 1100 MAX112383 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2023 |
Paid |
$19,480.00 |
PRC 1100 MAX112418 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2023 |
Paid |
$28,820.00 |
PRC 1100 MAX112422 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2023 |
Paid |
$21,045.00 |
PRC 1100 MAX112451 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2023 |
Paid |
$15,859.00 |
PRC 1100 MAX112477 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2023 |
Paid |
$6,600.00 |
PRC 1100 MAX112500 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2023 |
Paid |
$21,045.00 |
PRC 1100 MAX112501 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2023 |
Paid |
$10,040.00 |
PRC 1100 MAX112505 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2023 |
Paid |
$90,050.00 |
PRC 1100 MAX112584 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2023 |
Paid |
$6,600.00 |
PRC 1100 MAX112590 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2023 |
Paid |
$13,011.93 |
PRC 1100 MAX112591 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2023 |
Paid |
$26,023.86 |
PRC 1100 MAX112434 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/16/2023 |
Paid |
$12,989.00 |
PRC 1100 MAX112481 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/16/2023 |
Paid |
$26,600.00 |
PRC 1100 MAX112204 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2023 |
Paid |
$62,080.00 |
PRC 1100 MAX112205 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2023 |
Paid |
$44,910.00 |
PRC 1100 MAX111712 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/27/2023 |
Paid |
$70,780.00 |
PRC 1100 MAX111716 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/27/2023 |
Paid |
$19,960.00 |
PRC 1100 MAX111443 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/16/2023 |
Paid |
$57,000.00 |
PRC 1100 MAX111447 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/16/2023 |
Paid |
$39,920.00 |
PRC 1100 MAX111449 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/16/2023 |
Paid |
$30,400.00 |
PRC 1100 MAX111450 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/16/2023 |
Paid |
$38,000.00 |
PRC 1100 MAX111451 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/16/2023 |
Paid |
$25,978.00 |
PRC 1100 MAX110736 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/06/2023 |
Paid |
$4,968.00 |
PRC 1100 MAX110807 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/06/2023 |
Paid |
$34,930.00 |
PRC 1100 MAX110814 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/06/2023 |
Paid |
$15,859.00 |
PRC 1100 MAX110821 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/06/2023 |
Paid |
$13,288.23 |
PRC 1100 MAX110945 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/06/2023 |
Paid |
$10,465.00 |
PRC 1100 MAX110925 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/03/2023 |
Paid |
$34,930.00 |
PRC 1100 MAX107453 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2023 |
Paid |
$12,989.00 |
PRC 1100 MAX107455 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2023 |
Paid |
$29,343.00 |
PRC 1100 MAX110718 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2023 |
Paid |
$21,045.00 |
PRC 1100 MAX110725 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2023 |
Paid |
$25,978.00 |
PRC 1100 MAX110734 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2023 |
Paid |
$19,151.00 |
PRC 1100 MAX110745 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2023 |
Paid |
$19,700.00 |
PRC 1100 MAX109965 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/12/2023 |
Paid |
$3,770.00 |
PRC 1100 MAX109966 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/12/2023 |
Paid |
$3,308.00 |
PRC 1100 MAX109968 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/12/2023 |
Paid |
$13,932.00 |
PRC 1100 MAX110137 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/12/2023 |
Paid |
$11,310.00 |
PRC 1100 MAX110207 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/12/2023 |
Paid |
$15,859.00 |
PRC 1100 MAX106558 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/19/2022 |
Paid |
$65,450.00 |
PRC 1100 MAX109304 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/19/2022 |
Paid |
$41,744.67 |
PRC 1100 MAX109305 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/19/2022 |
Paid |
$27,458.82 |
PRC 1100 MAX109306 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/19/2022 |
Paid |
$33,137.62 |
PRC 1100 MAX109308 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/19/2022 |
Paid |
$17,611.77 |
PRC 1100 MAX109317 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/19/2022 |
Paid |
$20,930.00 |
PRC 1100 MAX108913 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/06/2022 |
Paid |
$49,736.00 |
PRC 1100 MAX108921 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/05/2022 |
Paid |
$48,961.12 |
PRC 1100 MAX108925 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/05/2022 |
Paid |
$50,421.14 |
PRC 1100 MAX108626 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2022 |
Paid |
$17,465.00 |
PRC 1100 MAX108466 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/14/2022 |
Paid |
$12,989.00 |
PRC 1100 MAX108468 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/14/2022 |
Paid |
$10,465.00 |
PRC 1100 MAX108484 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/14/2022 |
Paid |
$31,718.00 |
PRC 1100 MAX107837 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/24/2022 |
Paid |
$9,781.00 |
PRC 1100 MAX107838 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/24/2022 |
Paid |
$23,454.00 |
PRC 1100 MAX107848 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/24/2022 |
Paid |
$62,011.74 |
PRC 1100 MAX107452 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/17/2022 |
Paid |
$15,859.00 |
PRC 1100 MAX107456 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/11/2022 |
Paid |
$21,045.00 |
PRC 1100 MAX107459 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/11/2022 |
Paid |
$10,465.00 |
PRC 1100 MAX107463 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/11/2022 |
Paid |
$35,611.36 |
PRC 1100 MAX107098 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2022 |
Paid |
$8,676.47 |
PRC 1100 MAX107102 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2022 |
Paid |
$10,465.00 |
PRC 1100 MAX107103 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2022 |
Paid |
$12,989.00 |
PRC 1100 MAX107130 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2022 |
Paid |
$9,781.00 |
PRC 1100 MAX107132 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2022 |
Paid |
$66,828.19 |
PRC 1100 MAX107208 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2022 |
Paid |
$60,016.43 |
PRC 1100 MAX107278 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2022 |
Paid |
$3,158.82 |
PRC 1100 MAX107291 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2022 |
Paid |
$10,465.00 |
PRC 1100 MAX107292 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2022 |
Paid |
$12,989.00 |
PRC 1100 MAX107293 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2022 |
Paid |
$21,045.00 |
PRC 1100 MAX107295 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2022 |
Paid |
$10,465.00 |
PRC 1100 MAX107422 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2022 |
Paid |
$15,488.23 |
PRC 1100 MAX106504 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2022 |
Paid |
$14,970.00 |
PRC 1100 MAX106550 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2022 |
Paid |
$48,945.00 |
PRC 1100 MAX106561 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2022 |
Paid |
$60,250.00 |
PRC 1100 MAX106565 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2022 |
Paid |
$52,710.00 |
PRC 1100 MAX106785 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2022 |
Paid |
$10,465.00 |
PRC 1100 MAX106786 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2022 |
Paid |
$15,859.00 |
PRC 1100 MAX106830 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2022 |
Paid |
$23,755.28 |
PRC 1100 MAX106861 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2022 |
Paid |
$4,429.41 |
PRC 1100 MAX106407 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/19/2022 |
Paid |
$43,899.00 |
PRC 1100 MAX106456 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/19/2022 |
Paid |
$2,395.00 |
PRC 1100 MAX106476 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/19/2022 |
Paid |
$90,930.00 |
PRC 1100 MAX106299 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/15/2022 |
Paid |
$40,964.00 |
PRC 1100 MAX106331 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/15/2022 |
Paid |
$35,611.36 |
PRC 1100 MAX105476 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2022 |
Paid |
$43,727.00 |
PRC 1100 MAX105714 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2022 |
Paid |
$89,028.40 |
PRC 1100 MAX105718 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2022 |
Paid |
$9,980.00 |
PRC 1100 MAX105739 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2022 |
Paid |
$13,580.68 |
PRC 1100 MAX105753 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2022 |
Paid |
$35,611.36 |
PRC 1100 MAX105755 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2022 |
Paid |
$46,800.00 |
PRC 1100 MAX105764 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2022 |
Paid |
$53,417.04 |
PRC 1100 MAX105767 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2022 |
Paid |
$2,880.00 |
PRC 1100 MAX105771 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2022 |
Paid |
$40,742.04 |
PRC 1100 MAX105772 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2022 |
Paid |
$17,805.68 |
PRC 1100 MAX105424 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/25/2022 |
Paid |
$7,995.00 |
PRC 1100 MAX105768 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/25/2022 |
Paid |
$13,580.68 |
PRC 1100 MAX105770 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/25/2022 |
Paid |
$17,805.68 |
PRC 1100 MAX105474 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/23/2022 |
Paid |
$30,048.00 |
PRC 1100 MAX105479 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/23/2022 |
Paid |
$36,055.00 |
PRC 1100 MAX104959 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/11/2022 |
Paid |
$38,164.00 |
PRC 1100 MAX105133 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/11/2022 |
Paid |
$11,890.00 |
PRC 1100 MAX105139 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/11/2022 |
Paid |
$22,420.00 |
PRC 1100 MAX105147 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/11/2022 |
Paid |
$35,872.00 |
PRC 1100 MAX105150 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/11/2022 |
Paid |
$9,824.00 |
PRC 1100 MAX104957 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2022 |
Paid |
$14,505.00 |
PRC 1100 MAX104961 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2022 |
Paid |
$35,922.00 |
PRC 1100 MAX104963 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2022 |
Paid |
$2,542.00 |
PRC 1100 MAX104881 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/02/2022 |
Paid |
$35,611.36 |
PRC 1100 MAX104886 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/02/2022 |
Paid |
$13,580.68 |
PRC 1100 MAX104891 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/02/2022 |
Paid |
$38,540.00 |
PRC 1100 MAX104913 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/02/2022 |
Paid |
$20,765.90 |
PRC 1100 MAX104521 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/28/2022 |
Paid |
$27,161.36 |
PRC 1100 MAX104523 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/28/2022 |
Paid |
$28,048.00 |
PRC 1100 MAX104526 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/28/2022 |
Paid |
$27,161.36 |
PRC 1100 MAX104527 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/28/2022 |
Paid |
$10,382.95 |
PRC 1100 MAX104530 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/28/2022 |
Paid |
$7,818.00 |
PRC 1100 MAX104532 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/28/2022 |
Paid |
$33,920.00 |
PRC 1100 MAX104534 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/28/2022 |
Paid |
$13,140.00 |
PRC 1100 MAX104556 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/28/2022 |
Paid |
$67,224.00 |
PRC 1100 MAX104559 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/28/2022 |
Paid |
$106,638.00 |
PRC 1100 MAX104642 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/28/2022 |
Paid |
$84,800.00 |
PRC 1100 MAX104697 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/28/2022 |
Paid |
$12,677.27 |
PRC 1100 MAX104698 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/28/2022 |
Paid |
$27,161.36 |
PRC 1100 MAX104702 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/28/2022 |
Paid |
$27,161.36 |
PRC 1100 MAX104029 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/26/2022 |
Paid |
$17,468.18 |
PRC 1100 MAX104562 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/26/2022 |
Paid |
$31,030.00 |
PRC 1100 MAX104563 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/26/2022 |
Paid |
$25,210.00 |
PRC 1100 MAX101767 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/21/2022 |
Paid |
$21,000.00 |
PRC 1100 MAX104030 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/21/2022 |
Paid |
$10,382.95 |
PRC 1100 MAX104033 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/21/2022 |
Paid |
$69,872.72 |
PRC 1100 MAX104035 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/21/2022 |
Paid |
$13,580.68 |
PRC 1100 MAX104036 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/21/2022 |
Paid |
$12,677.27 |
PRC 1100 MAX104160 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/21/2022 |
Paid |
$3,260.00 |
PRC 1100 MAX104161 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/21/2022 |
Paid |
$36,500.00 |
PRC 1100 MAX104027 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/14/2022 |
Paid |
$76,560.00 |
PRC 1100 MAX103651 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/07/2022 |
Paid |
$22,700.00 |
PRC 1100 MAX103645 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/06/2022 |
Paid |
$40,742.04 |
PRC 1100 MAX103647 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/06/2022 |
Paid |
$46,640.00 |
PRC 1100 MAX103649 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/06/2022 |
Paid |
$17,940.00 |
PRC 1100 MAX103772 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/06/2022 |
Paid |
$12,677.27 |
PRC 1100 MAX103831 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/06/2022 |
Paid |
$19,650.00 |
PRC 1100 MAX103833 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/06/2022 |
Paid |
$27,161.36 |
PRC 1100 MAX103834 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/06/2022 |
Paid |
$55,120.00 |
PRC 1100 MAX103908 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/06/2022 |
Paid |
$10,382.95 |
PRC 1100 MAX104024 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/06/2022 |
Paid |
$49,032.00 |
PRC 1100 MAX103110 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2022 |
Paid |
$29,900.00 |
PRC 1100 MAX103120 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2022 |
Paid |
$5,730.00 |
PRC 1100 MAX103122 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2022 |
Paid |
$26,900.00 |
PRC 1100 MAX103162 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2022 |
Paid |
$100,800.00 |
PRC 1100 MAX102789 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/01/2022 |
Paid |
$18,600.00 |
PRC 1100 MAX102797 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/01/2022 |
Paid |
$41,500.00 |
PRC 1100 MAX102801 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/01/2022 |
Paid |
$45,990.00 |
PRC 1100 MAX102773 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/31/2022 |
Paid |
$34,540.00 |
PRC 1100 MAX102779 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/31/2022 |
Paid |
$24,800.00 |
PRC 1100 MAX102448 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2022 |
Paid |
$47,295.00 |
PRC 1100 MAX102496 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2022 |
Paid |
$7,505.00 |
PRC 1100 MAX102595 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2022 |
Paid |
$13,200.00 |
PRC 1100 MAX102599 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2022 |
Paid |
$14,410.00 |
PRC 1100 MAX102622 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2022 |
Paid |
$12,006.00 |
PRC 1100 MAX102636 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2022 |
Paid |
$123,070.50 |
PRC 1100 MAX102396 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/24/2022 |
Paid |
$8,820.00 |
PRC 1100 MAX102411 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/24/2022 |
Paid |
$6,003.00 |
PRC 1100 MAX102443 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/24/2022 |
Paid |
$7,505.00 |
PRC 1100 MAX102145 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/23/2022 |
Paid |
$179,938.50 |
PRC 1100 MAX102352 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/23/2022 |
Paid |
$9,885.00 |
PRC 1100 MAX102447 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/23/2022 |
Paid |
$14,410.00 |
PRC 1100 MAX101768 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2022 |
Paid |
$114,492.00 |
PRC 1100 MAX102146 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2022 |
Paid |
$35,611.36 |
PRC 1100 MAX102149 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2022 |
Paid |
$73,710.00 |
PRC 1100 MAX102150 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2022 |
Paid |
$147,420.00 |
PRC 1100 MAX102151 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2022 |
Paid |
$123,070.50 |
PRC 1100 MAX102152 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2022 |
Paid |
$61,535.25 |
PRC 1100 MAX102153 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2022 |
Paid |
$89,969.25 |
PRC 1100 MAX102159 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2022 |
Paid |
$147,420.00 |
PRC 1100 MAX102164 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2022 |
Paid |
$73,710.00 |
PRC 1100 MAX101716 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/03/2022 |
Paid |
$15,540.00 |
PRC 1100 MAX101720 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/03/2022 |
Paid |
$33,500.00 |
PRC 1100 MAX101728 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/03/2022 |
Paid |
$4,038.00 |
PRC 1100 MAX101294 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/26/2022 |
Paid |
$2,935.00 |
PRC 1100 MAX101314 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/26/2022 |
Paid |
$1,325.00 |
PRC 1100 MAX101347 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/26/2022 |
Paid |
$14,675.00 |
PRC 1100 MAX101351 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/26/2022 |
Paid |
$4,038.00 |
PRC 1100 MAX101376 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/26/2022 |
Paid |
$19,425.00 |
PRC 1100 MAX101413 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/26/2022 |
Paid |
$45,000.00 |
PRC 1100 MAX101293 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2022 |
Paid |
$29,990.00 |
PRC 1100 MAX101195 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/18/2022 |
Paid |
$6,670.00 |
PRC 1100 MAX101199 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/18/2022 |
Paid |
$20,190.00 |
PRC 1100 MAX100489 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2022 |
Paid |
$6,375.00 |
PRC 1100 MAX100049 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2022 |
Paid |
$14,505.00 |
PRC 1100 MAX100479 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2022 |
Paid |
$2,650.00 |
PRC 1100 MAX100480 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2022 |
Paid |
$2,785.00 |
PRC 1100 MAX100483 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2022 |
Paid |
$99,600.00 |
PRC 1100 MAX96752 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2022 |
Paid |
$3,454.00 |
PRC 1100 MAX100054 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/17/2022 |
Paid |
$2,345.00 |
PRC 1100 MAX100033 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/15/2022 |
Paid |
$47,925.00 |
PRC 1100 MAX100035 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/15/2022 |
Paid |
$23,040.00 |
PRC 1100 MAX100046 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/15/2022 |
Paid |
$2,880.00 |
PRC 1100 MAX94271 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2022 |
Paid |
$9,934.00 |
PRC 1100 MAX99817 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2022 |
Paid |
$20,400.00 |
PRC 1100 MAX99820 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2022 |
Paid |
$38,850.00 |
PRC 1100 MAX99850 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2022 |
Paid |
$120,600.00 |
PRC 1100 MAX99539 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/01/2022 |
Paid |
$8,640.00 |
PRC 1100 MAX99093 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/22/2022 |
Paid |
$5,760.00 |
PRC 1100 MAX99389 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/22/2022 |
Paid |
$5,700.00 |
PRC 1100 MAX99077 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/17/2022 |
Paid |
$48,305.00 |
PRC 1100 MAX99088 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/17/2022 |
Paid |
$22,041.00 |
PRC 1100 MAX99152 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/17/2022 |
Paid |
$11,655.00 |
PRC 1100 MAX99158 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/17/2022 |
Paid |
$18,362.00 |
PRC 1100 MAX99159 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/17/2022 |
Paid |
$2,345.00 |
PRC 1100 MAX98126 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/19/2022 |
Paid |
$27,920.00 |
PRC 1100 MAX98217 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/19/2022 |
Paid |
$29,010.00 |
PRC 1100 MAX98292 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/19/2022 |
Paid |
$2,880.00 |
PRC 1100 MAX98294 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/19/2022 |
Paid |
$7,489.00 |
PRC 1100 MAX98299 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/19/2022 |
Paid |
$15,496.00 |
PRC 1100 MAX97805 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/06/2022 |
Paid |
$8,424.00 |
PRC 1100 MAX97806 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/06/2022 |
Paid |
$51,896.25 |
PRC 1100 MAX97563 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/22/2021 |
Paid |
$61,710.00 |
PRC 1100 MAX97446 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2021 |
Paid |
$4,137.00 |
PRC 1100 MAX97450 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2021 |
Paid |
$62,160.00 |
PRC 1100 MAX97452 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2021 |
Paid |
$124,320.00 |
PRC 1100 MAX97459 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2021 |
Paid |
$124,320.00 |
PRC 1100 MAX97425 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/14/2021 |
Paid |
$2,339.00 |
PRC 1100 MAX97430 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/14/2021 |
Paid |
$4,704.00 |
PRC 1100 MAX97034 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/13/2021 |
Paid |
$23,080.00 |
PRC 1100 MAX96750 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/09/2021 |
Paid |
$87,475.50 |
PRC 1100 MAX97022 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/09/2021 |
Paid |
$124,320.00 |
PRC 1100 MAX97024 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/09/2021 |
Paid |
$124,320.00 |
PRC 1100 MAX97025 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/09/2021 |
Paid |
$124,320.00 |
PRC 1100 MAX97119 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/09/2021 |
Paid |
$4,137.00 |
PRC 1100 MAX97124 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/09/2021 |
Paid |
$20,223.00 |
PRC 1100 MAX97125 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/09/2021 |
Paid |
$49,670.00 |
PRC 1100 MAX97132 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/09/2021 |
Paid |
$36,551.00 |
PRC 1100 MAX97134 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/09/2021 |
Paid |
$47,498.00 |
PRC 1100 MAX96730 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/24/2021 |
Paid |
$2,758.00 |
PRC 1100 MAX96748 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/24/2021 |
Paid |
$16,956.00 |
PRC 1100 MAX96749 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/24/2021 |
Paid |
$124,320.00 |
PRC 1100 MAX96425 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/18/2021 |
Paid |
$15,530.00 |
PRC 1100 MAX96430 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/18/2021 |
Paid |
$12,717.00 |
PRC 1100 MAX95728 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2021 |
Paid |
$41,186.25 |
PRC 1100 MAX96351 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2021 |
Paid |
$42,390.00 |
PRC 1100 MAX96353 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2021 |
Paid |
$87,475.50 |
PRC 1100 MAX96356 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2021 |
Paid |
$6,780.00 |
PRC 1100 MAX96357 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2021 |
Paid |
$87,475.50 |
PRC 1100 MAX96358 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2021 |
Paid |
$103,792.50 |
PRC 1100 MAX96361 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2021 |
Paid |
$2,758.00 |
PRC 1100 MAX96365 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2021 |
Paid |
$16,500.00 |
PRC 1100 MAX96367 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2021 |
Paid |
$7,939.00 |
PRC 1100 MAX96048 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2021 |
Paid |
$12,176.00 |
PRC 1100 MAX96097 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2021 |
Paid |
$8,635.00 |
PRC 1100 MAX96100 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2021 |
Paid |
$87,475.50 |
PRC 1100 MAX96101 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2021 |
Paid |
$123,375.00 |
PRC 1100 MAX96102 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2021 |
Paid |
$103,792.50 |
PRC 1100 MAX96103 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2021 |
Paid |
$124,320.00 |
PRC 1100 MAX96081 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/02/2021 |
Paid |
$123,375.00 |
PRC 1100 MAX96088 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/02/2021 |
Paid |
$10,044.00 |
PRC 1100 MAX95905 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$9,550.00 |
PRC 1100 MAX95913 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$103,792.50 |
PRC 1100 MAX95916 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$14,499.00 |
PRC 1100 MAX95951 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$5,040.00 |
PRC 1100 MAX95954 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$52,727.00 |
PRC 1100 MAX95958 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$33,000.00 |
PRC 1100 MAX95962 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$12,105.00 |
PRC 1100 MAX96042 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$6,780.00 |
PRC 1100 MAX96043 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$6,880.00 |
PRC 1100 MAX96046 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$12,600.00 |
PRC 1100 MAX96047 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$19,221.00 |
PRC 1100 MAX95713 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/28/2021 |
Paid |
$42,357.00 |
PRC 1100 MAX95714 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/28/2021 |
Paid |
$61,687.50 |
PRC 1100 MAX95715 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/28/2021 |
Paid |
$3,740.00 |
PRC 1100 MAX95718 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/28/2021 |
Paid |
$17,257.00 |
PRC 1100 MAX91386 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2021 |
Paid |
$7,331.00 |
PRC 1100 MAX95071 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2021 |
Paid |
$9,934.00 |
PRC 1100 MAX95077 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2021 |
Paid |
$7,519.00 |
PRC 1100 MAX94640 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/30/2021 |
Paid |
$7,057.00 |
PRC 1100 MAX94776 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/30/2021 |
Paid |
$8,645.00 |
PRC 1100 MAX94871 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2021 |
Paid |
$42,504.00 |
PRC 1100 MAX94872 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2021 |
Paid |
$13,200.00 |
PRC 1100 MAX94897 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2021 |
Paid |
$2,764.00 |
PRC 1100 MAX94276 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/20/2021 |
Paid |
$15,029.00 |
PRC 1100 MAX94244 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/16/2021 |
Paid |
$6,118.00 |
PRC 1100 MAX94258 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/16/2021 |
Paid |
$9,674.00 |
PRC 1100 MAX94259 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/16/2021 |
Paid |
$5,040.00 |
PRC 1100 MAX93974 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/07/2021 |
Paid |
$4,967.00 |
PRC 1100 MAX93785 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/02/2021 |
Paid |
$11,190.00 |
PRC 1100 MAX93787 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/02/2021 |
Paid |
$32,928.00 |
PRC 1100 MAX93789 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/02/2021 |
Paid |
$2,845.00 |
PRC 1100 MAX93790 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/02/2021 |
Paid |
$4,863.00 |
PRC 1100 MAX93792 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/02/2021 |
Paid |
$9,934.00 |
PRC 1100 MAX93798 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/02/2021 |
Paid |
$8,800.00 |
PRC 1100 MAX93807 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/02/2021 |
Paid |
$3,558.00 |
PRC 1100 MAX93810 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/02/2021 |
Paid |
$6,126.00 |
PRC 1100 MAX93442 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/26/2021 |
Paid |
$10,402.00 |
PRC 1100 MAX93444 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/26/2021 |
Paid |
$2,788.00 |
PRC 1100 MAX93471 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/26/2021 |
Paid |
$4,182.00 |
PRC 1100 MAX93550 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/26/2021 |
Paid |
$4,239.00 |
PRC 1100 MAX93553 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/26/2021 |
Paid |
$5,202.00 |
PRC 1100 MAX93270 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2021 |
Paid |
$13,920.00 |
PRC 1100 MAX93272 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2021 |
Paid |
$5,208.00 |
PRC 1100 MAX93281 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2021 |
Paid |
$8,364.00 |
PRC 1100 MAX93284 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2021 |
Paid |
$4,863.00 |
PRC 1100 MAX92540 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/05/2021 |
Paid |
$5,217.00 |
PRC 1100 MAX92543 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/05/2021 |
Paid |
$43,605.00 |
PRC 1100 MAX92566 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/05/2021 |
Paid |
$10,779.00 |
PRC 1100 MAX90946 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/02/2021 |
Paid |
$3,564.00 |
PRC 1100 MAX92263 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2021 |
Paid |
$5,217.00 |
PRC 1100 MAX92268 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2021 |
Paid |
$6,990.00 |
PRC 1100 MAX92269 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2021 |
Paid |
$1,880.00 |
PRC 1100 MAX92278 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2021 |
Paid |
$25,434.00 |
PRC 1100 MAX92407 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2021 |
Paid |
$8,594.00 |
PRC 1100 MAX92430 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2021 |
Paid |
$2,796.00 |
PRC 1100 MAX92030 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/15/2021 |
Paid |
$4,967.00 |
PRC 1100 MAX92033 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/15/2021 |
Paid |
$12,173.00 |
PRC 1100 MAX92041 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/15/2021 |
Paid |
$12,717.00 |
PRC 1100 MAX92049 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/15/2021 |
Paid |
$4,967.00 |
PRC 1100 MAX91553 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/22/2021 |
Paid |
$4,206.00 |
PRC 1100 MAX91559 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/22/2021 |
Paid |
$4,970.00 |
PRC 1100 MAX91346 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/21/2021 |
Paid |
$13,968.00 |
PRC 1100 MAX91351 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/21/2021 |
Paid |
$14,143.00 |
PRC 1100 MAX91378 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/21/2021 |
Paid |
$5,335.00 |
PRC 1100 MAX91382 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/21/2021 |
Paid |
$8,412.00 |
PRC 1100 MAX91389 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/17/2021 |
Paid |
$4,653.00 |
PRC 1100 MAX90949 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/14/2021 |
Paid |
$6,984.00 |
PRC 1100 MAX90951 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/07/2021 |
Paid |
$2,820.00 |
PRC 1100 MAX90957 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/07/2021 |
Paid |
$3,698.00 |
PRC 1100 MAX90785 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/01/2021 |
Paid |
$18,624.00 |
PRC 1100 MAX90786 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/01/2021 |
Paid |
$7,010.00 |
PRC 1100 MAX90789 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/01/2021 |
Paid |
$6,972.00 |
PRC 1100 MAX90814 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/01/2021 |
Paid |
$62,302.00 |
PRC 1100 MAX90820 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/27/2021 |
Paid |
$4,206.00 |
PRC 1100 MAX90826 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/27/2021 |
Paid |
$39,183.00 |
PRC 1100 MAX90396 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2021 |
Paid |
$50,900.00 |
PRC 1100 MAX90398 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2021 |
Paid |
$12,225.00 |
PRC 1100 MAX90402 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2021 |
Paid |
$47,340.00 |
PRC 1100 MAX90391 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/17/2021 |
Paid |
$2,810.00 |
PRC 1100 MAX90191 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/10/2021 |
Paid |
$1,880.00 |
PRC 1100 MAX90182 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/06/2021 |
Paid |
$1,788.00 |
PRC 1100 MAX90184 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/06/2021 |
Paid |
$22,842.00 |
PRC 1100 MAX90186 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/06/2021 |
Paid |
$2,611.00 |
PRC 1100 MAX90188 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/06/2021 |
Paid |
$93,978.00 |
PRC 1100 MAX90213 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/06/2021 |
Paid |
$3,068.00 |
PRC 1100 MAX90216 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/06/2021 |
Paid |
$12,600.00 |
PRC 1100 MAX89888 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/04/2021 |
Paid |
$8,852.00 |
PRC 1100 MAX89900 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/04/2021 |
Paid |
$12,201.00 |
PRC 1100 MAX89716 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2021 |
Paid |
$21,195.00 |
PRC 1100 MAX89717 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2021 |
Paid |
$4,215.00 |
PRC 1100 MAX89721 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2021 |
Paid |
$6,896.00 |
PRC 1100 MAX89334 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/20/2021 |
Paid |
$7,050.00 |
PRC 1100 MAX89331 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2021 |
Paid |
$43,290.00 |
PRC 1100 MAX89336 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2021 |
Paid |
$33,951.00 |
PRC 1100 MAX89337 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2021 |
Paid |
$25,696.00 |
PRC 1100 MAX89231 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/12/2021 |
Paid |
$9,494.00 |
PRC 1100 MAX89232 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/12/2021 |
Paid |
$2,820.00 |
PRC 1100 MAX89299 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/12/2021 |
Paid |
$5,247.00 |
PRC 1100 MAX89309 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/12/2021 |
Paid |
$56,728.00 |
PRC 1100 MAX89234 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/08/2021 |
Paid |
$1,854.00 |
PRC 1100 MAX89253 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/08/2021 |
Paid |
$9,944.00 |
PRC 1100 21031701153 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2021 |
Paid |
$26,835.88 |
PRC 1100 MAX87986 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2021 |
Paid |
$4,262.00 |
PRC 1100 MAX88743 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2021 |
Paid |
$5,247.00 |
PRC 1100 MAX88751 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2021 |
Paid |
$5,247.00 |
PRC 1100 MAX85196 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2021 |
Paid |
$32,542.94 |
PRC 1100 MAX88385 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/15/2021 |
Paid |
$12,786.00 |
PRC 1100 MAX88390 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/15/2021 |
Paid |
$7,014.00 |
PRC 1100 MAX88097 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2021 |
Paid |
$84,714.00 |
PRC 1100 MAX88211 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2021 |
Paid |
$124,320.00 |
PRC 1100 MAX88215 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2021 |
Paid |
$103,792.50 |
PRC 1100 MAX88216 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2021 |
Paid |
$124,320.00 |
PRC 1100 MAX87759 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/04/2021 |
Paid |
$3,400.00 |
PRC 1100 MAX87982 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/01/2021 |
Paid |
$4,230.00 |
PRC 1100 MAX87984 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/01/2021 |
Paid |
$43,213.00 |
PRC 1100 MAX87760 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/26/2021 |
Paid |
$87,475.50 |
PRC 1100 MAX87769 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/26/2021 |
Paid |
$121,605.75 |
PRC 1100 MAX87771 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/26/2021 |
Paid |
$10,512.00 |
PRC 1100 MAX87623 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2021 |
Paid |
$1,859.00 |
PRC 1100 MAX87632 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2021 |
Paid |
$12,296.00 |
PRC 1100 MAX87631 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/24/2021 |
Paid |
$5,040.00 |
PRC 1100 MAX87409 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/16/2021 |
Paid |
$40,535.25 |
PRC 1100 MAX87410 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/16/2021 |
Paid |
$174,951.00 |
PRC 1100 MAX87412 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/16/2021 |
Paid |
$18,375.00 |
PRC 1100 MAX87413 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/16/2021 |
Paid |
$2,810.00 |
PRC 1100 MAX87118 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2021 |
Paid |
$5,271.00 |
PRC 1100 MAX87121 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2021 |
Paid |
$17,031.00 |
PRC 1100 MAX87122 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2021 |
Paid |
$3,514.00 |
PRC 1100 MAX87125 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2021 |
Paid |
$1,405.00 |
PRC 1100 MAX87126 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2021 |
Paid |
$6,140.00 |
PRC 1100 MAX87130 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2021 |
Paid |
$4,215.00 |
PRC 1100 MAX86670 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/22/2021 |
Paid |
$5,048.00 |
PRC 1100 MAX86671 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/22/2021 |
Paid |
$8,910.00 |
PRC 1100 MAX86652 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/19/2021 |
Paid |
$5,676.00 |
PRC 1100 MAX86660 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/19/2021 |
Paid |
$10,355.00 |
PRC 1100 MAX86435 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/15/2021 |
Paid |
$5,280.00 |
PRC 1100 MAX86480 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/15/2021 |
Paid |
$21,340.00 |
PRC 1100 MAX86498 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/15/2021 |
Paid |
$51,896.25 |
PRC 1100 MAX86502 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/15/2021 |
Paid |
$11,041.00 |
PRC 1100 MAX86430 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/14/2021 |
Paid |
$11,562.00 |
PRC 1100 MAX86433 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/14/2021 |
Paid |
$9,550.00 |
PRC 1100 MAX86440 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/14/2021 |
Paid |
$7,040.00 |
PRC 1100 MAX86467 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/14/2021 |
Paid |
$7,095.00 |
PRC 1100 MAX86476 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/14/2021 |
Paid |
$2,650.00 |
PRC 1100 MAX85950 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/05/2021 |
Paid |
$34,152.00 |
PRC 1100 MAX85913 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2020 |
Paid |
$6,144.00 |
PRC 1100 MAX85915 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2020 |
Paid |
$7,095.00 |
PRC 1100 MAX85919 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2020 |
Paid |
$61,687.50 |
PRC 1100 MAX85920 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2020 |
Paid |
$10,560.00 |
PRC 1100 MAX85923 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2020 |
Paid |
$8,818.00 |
PRC 1100 MAX85924 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2020 |
Paid |
$2,838.00 |
PRC 1100 MAX85567 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/17/2020 |
Paid |
$7,125.00 |
PRC 1100 MAX85572 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/17/2020 |
Paid |
$4,688.00 |
PRC 1100 MAX85573 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/17/2020 |
Paid |
$55,083.00 |
PRC 1100 MAX85574 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/17/2020 |
Paid |
$82,372.50 |
PRC 1100 MAX85576 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/17/2020 |
Paid |
$55,083.00 |
PRC 1100 MAX85558 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/14/2020 |
Paid |
$62,160.00 |
PRC 1100 MAX85559 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/14/2020 |
Paid |
$51,896.25 |
PRC 1100 MAX85386 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2020 |
Paid |
$9,264.00 |
PRC 1100 MAX85388 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2020 |
Paid |
$7,056.00 |
PRC 1100 MAX85321 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/07/2020 |
Paid |
$62,160.00 |
PRC 1100 MAX85264 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/03/2020 |
Paid |
$62,160.00 |
PRC 1100 MAX85265 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/03/2020 |
Paid |
$3,878.00 |
PRC 1100 MAX85266 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/03/2020 |
Paid |
$103,792.50 |
PRC 1100 MAX85319 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/03/2020 |
Paid |
$4,287.00 |
PRC 1100 MAX85320 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/03/2020 |
Paid |
$110,166.00 |
PRC 1100 MAX84997 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/23/2020 |
Paid |
$2,655.00 |
PRC 1100 MAX84988 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/19/2020 |
Paid |
$42,291.00 |
PRC 1100 MAX84656 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/16/2020 |
Paid |
$19,844.00 |
PRC 1100 MAX84849 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/16/2020 |
Paid |
$8,585.00 |
PRC 1100 MAX84859 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/16/2020 |
Paid |
$131,213.25 |
PRC 1100 MAX84539 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/05/2020 |
Paid |
$218,688.75 |
PRC 1100 MAX84550 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/05/2020 |
Paid |
$3,560.00 |
PRC 1100 MAX84655 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/05/2020 |
Paid |
$6,033.00 |
PRC 1100 MAX84347 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/02/2020 |
Paid |
$9,756.00 |
PRC 1100 MAX84358 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/02/2020 |
Paid |
$14,432.00 |
PRC 1100 MAX84360 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/02/2020 |
Paid |
$11,840.00 |
PRC 1100 MAX84131 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/26/2020 |
Paid |
$43,484.34 |
PRC 1100 20102000201 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/22/2020 |
Paid |
$6,288.00 |
PRC 1100 MAX83914 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/22/2020 |
Paid |
$43,737.75 |
PRC 1100 MAX83915 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/22/2020 |
Paid |
$110,166.00 |
PRC 1100 MAX83919 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/22/2020 |
Paid |
$20,081.00 |
PRC 1100 MAX83926 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/22/2020 |
Paid |
$3,560.00 |
PRC 1100 MAX83929 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/22/2020 |
Paid |
$16,855.00 |
PRC 1100 MAX84084 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/22/2020 |
Paid |
$123,558.75 |
PRC 1100 MAX79257 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/19/2020 |
Paid |
$172,178.04 |
PRC 1100 MAX83941 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/19/2020 |
Paid |
$103,792.50 |
PRC 1100 MAX83841 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/15/2020 |
Paid |
$47,743.50 |
PRC 1100 MAX83935 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/15/2020 |
Paid |
$103,792.50 |
PRC 1100 MAX83936 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/15/2020 |
Paid |
$70,119.00 |
PRC 1100 MAX83937 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/15/2020 |
Paid |
$87,475.50 |
PRC 1100 MAX78687 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/06/2020 |
Paid |
$6,126.00 |
PRC 1100 MAX81817 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2020 |
Paid |
$9,550.00 |
PRC 1100 MAX82764 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2020 |
Paid |
$6,779.00 |
PRC 1100 MAX83478 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2020 |
Paid |
$7,200.00 |
PRC 1100 MAX83479 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2020 |
Paid |
$30,725.00 |
PRC 1100 MAX83487 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2020 |
Paid |
$5,081.00 |
PRC 1100 MAX83569 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2020 |
Paid |
$5,322.00 |
PRC 1100 MAX83270 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/01/2020 |
Paid |
$3,620.00 |
PRC 1100 MAX83371 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/01/2020 |
Paid |
$7,200.00 |
PRC 1100 MAX83372 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/01/2020 |
Paid |
$16,320.00 |
PRC 1100 MAX83374 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/01/2020 |
Paid |
$14,400.00 |
PRC 1100 MAX83230 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2020 |
Paid |
$46,270.00 |
PRC 1100 MAX83233 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2020 |
Paid |
$1,440.00 |
PRC 1100 MAX83241 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2020 |
Paid |
$1,760.00 |
PRC 1100 MAX82954 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/24/2020 |
Paid |
$6,800.00 |
PRC 1100 MAX82961 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/24/2020 |
Paid |
$5,322.00 |
PRC 1100 20091602630 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/21/2020 |
Paid |
$57,392.68 |
PRC 1100 MAX82878 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/21/2020 |
Paid |
$10,644.00 |
PRC 1100 MAX82879 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/21/2020 |
Paid |
$2,640.00 |
PRC 1100 MAX82952 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/21/2020 |
Paid |
$35,140.00 |
PRC 1100 MAX82409 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/15/2020 |
Paid |
$3,119.00 |
PRC 1100 MAX82412 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/15/2020 |
Paid |
$17,182.00 |
PRC 1100 MAX82418 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/15/2020 |
Paid |
$7,679.00 |
PRC 1100 MAX82450 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/15/2020 |
Paid |
$3,119.00 |
PRC 1100 MAX81711 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/03/2020 |
Paid |
$57,392.68 |
PRC 1100 MAX81908 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/01/2020 |
Paid |
$14,880.00 |
PRC 1100 MAX81910 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/01/2020 |
Paid |
$10,930.00 |
PRC 1100 MAX81918 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/01/2020 |
Paid |
$2,640.00 |
PRC 1100 MAX81702 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2020 |
Paid |
$15,297.00 |
PRC 1100 MAX81756 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2020 |
Paid |
$5,065.00 |
PRC 1100 MAX81758 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2020 |
Paid |
$6,779.00 |
PRC 1100 MAX81770 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2020 |
Paid |
$22,528.00 |
PRC 1100 MAX81415 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/10/2020 |
Paid |
$4,894.00 |
PRC 1100 MAX81419 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/10/2020 |
Paid |
$6,648.00 |
PRC 1100 MAX81449 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/10/2020 |
Paid |
$5,371.00 |
PRC 1100 MAX81460 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/10/2020 |
Paid |
$1,462.00 |
PRC 1100 MAX81038 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/27/2020 |
Paid |
$13,541.00 |
PRC 1100 MAX80640 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2020 |
Paid |
$237,593.70 |
PRC 1100 MAX80673 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2020 |
Paid |
$19,575.00 |
PRC 1100 MAX80622 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/13/2020 |
Paid |
$2,930.00 |
PRC 1100 MAX80624 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/13/2020 |
Paid |
$5,240.00 |
PRC 1100 MAX80301 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/29/2020 |
Paid |
$9,867.00 |
PRC 1100 MAX80305 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/29/2020 |
Paid |
$12,380.00 |
PRC 1100 MAX80306 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/29/2020 |
Paid |
$1,760.00 |
PRC 1100 MAX80321 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/29/2020 |
Paid |
$1,795.00 |
PRC 1100 MAX80322 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/29/2020 |
Paid |
$2,930.00 |
PRC 1100 MAX80091 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/25/2020 |
Paid |
$7,886.00 |
PRC 1100 MAX80092 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/25/2020 |
Paid |
$2,930.00 |
PRC 1100 MAX80093 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/25/2020 |
Paid |
$3,485.00 |
PRC 1100 MAX80021 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/23/2020 |
Paid |
$29,844.00 |
PRC 1100 MAX80008 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/22/2020 |
Paid |
$21,900.00 |
PRC 1100 MAX80010 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/22/2020 |
Paid |
$9,500.00 |
PRC 1100 MAX80011 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/22/2020 |
Paid |
$34,587.69 |
PRC 1100 MAX80027 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/22/2020 |
Paid |
$5,610.00 |
PRC 1100 MAX79921 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2020 |
Paid |
$23,658.00 |
PRC 1100 MAX79925 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2020 |
Paid |
$2,930.00 |
PRC 1100 MAX79737 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2020 |
Paid |
$4,712.00 |
PRC 1100 MAX79740 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2020 |
Paid |
$15,950.00 |
PRC 1100 MAX79752 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2020 |
Paid |
$7,924.00 |
PRC 1100 MAX79777 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2020 |
Paid |
$7,350.00 |
PRC 1100 MAX79803 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2020 |
Paid |
$39,339.00 |
PRC 1100 MAX79808 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2020 |
Paid |
$47,316.00 |
PRC 1100 MAX79816 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2020 |
Paid |
$8,090.00 |
PRC 1100 MAX79817 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2020 |
Paid |
$7,552.00 |
PRC 1100 MAX79489 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/15/2020 |
Paid |
$5,579.00 |
PRC 1100 MAX79491 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/15/2020 |
Paid |
$16,173.00 |
PRC 1100 MAX79498 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/15/2020 |
Paid |
$28,083.00 |
PRC 1100 MAX79258 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/08/2020 |
Paid |
$34,780.57 |
PRC 1100 MAX79259 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/08/2020 |
Paid |
$31,475.09 |
PRC 1100 MAX79260 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/08/2020 |
Paid |
$114,687.94 |
PRC 1100 MAX79261 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/08/2020 |
Paid |
$57,343.97 |
PRC 1100 MAX79262 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/08/2020 |
Paid |
$83,257.54 |
PRC 1100 MAX78984 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2020 |
Paid |
$4,476.00 |
PRC 1100 MAX78986 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2020 |
Paid |
$9,684.00 |
PRC 1100 MAX78987 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2020 |
Paid |
$4,109.00 |
PRC 1100 MAX78988 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2020 |
Paid |
$1,760.00 |
PRC 1100 MAX78991 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2020 |
Paid |
$1,470.00 |
PRC 1100 MAX78993 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2020 |
Paid |
$5,880.00 |
PRC 1100 MAX78776 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2020 |
Paid |
$2,730.00 |
PRC 1100 MAX78782 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2020 |
Paid |
$7,365.00 |
PRC 1100 MAX78681 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2020 |
Paid |
$5,400.00 |
PRC 1100 MAX78694 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2020 |
Paid |
$11,379.00 |
PRC 1100 MAX78329 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/07/2020 |
Paid |
$34,587.69 |
PRC 1100 MAX78331 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/07/2020 |
Paid |
$5,130.00 |
PRC 1100 MAX78336 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/07/2020 |
Paid |
$1,955.00 |
PRC 1100 MAX78337 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/07/2020 |
Paid |
$15,217.00 |
PRC 1100 MAX78339 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/07/2020 |
Paid |
$5,130.00 |
PRC 1100 MAX78340 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/07/2020 |
Paid |
$15,860.00 |
PRC 1100 MAX78106 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/30/2020 |
Paid |
$11,895.00 |
PRC 1100 MAX78117 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/30/2020 |
Paid |
$7,930.00 |
PRC 1100 MAX78118 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/30/2020 |
Paid |
$8,792.00 |
PRC 1100 MAX77942 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2020 |
Paid |
$57,392.68 |
PRC 1100 MAX77943 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2020 |
Paid |
$6,288.00 |
PRC 1100 MAX77811 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/23/2020 |
Paid |
$19,704.00 |
PRC 1100 MAX77559 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/13/2020 |
Paid |
$2,652.00 |
PRC 1100 MAX77589 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/13/2020 |
Paid |
$7,395.00 |
PRC 1100 MAX77598 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/13/2020 |
Paid |
$3,517.00 |
PRC 1100 MAX77279 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/07/2020 |
Paid |
$1,766.00 |
PRC 1100 MAX77283 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/07/2020 |
Paid |
$5,412.00 |
PRC 1100 MAX77286 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/07/2020 |
Paid |
$11,878.00 |
PRC 1100 MAX77290 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/07/2020 |
Paid |
$13,675.00 |
PRC 1100 MAX77158 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/31/2020 |
Paid |
$10,264.00 |
PRC 1100 MAX76762 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/30/2020 |
Paid |
$31,751.00 |
PRC 1100 MAX76952 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2020 |
Paid |
$4,964.00 |
PRC 1100 MAX76752 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/18/2020 |
Paid |
$31,475.09 |
PRC 1100 MAX76758 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/18/2020 |
Paid |
$7,129.00 |
PRC 1100 MAX76765 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/18/2020 |
Paid |
$3,608.00 |
PRC 1100 MAX76541 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/12/2020 |
Paid |
$57,392.68 |
PRC 1100 MAX76543 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/12/2020 |
Paid |
$37,309.00 |
PRC 1100 MAX76362 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2020 |
Paid |
$7,420.00 |
PRC 1100 MAX76368 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2020 |
Paid |
$17,924.00 |
PRC 1100 MAX76372 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2020 |
Paid |
$1,547.00 |
PRC 1100 MAX76384 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2020 |
Paid |
$29,904.00 |
PRC 1100 MAX76182 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/03/2020 |
Paid |
$172,178.04 |
PRC 1100 MAX76191 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/03/2020 |
Paid |
$12,082.00 |
PRC 1100 MAX76202 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/03/2020 |
Paid |
$3,522.00 |
PRC 1100 MAX75990 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/02/2020 |
Paid |
$29,357.06 |
PRC 1100 MAX75991 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/02/2020 |
Paid |
$29,357.06 |
PRC 1100 MAX75992 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/02/2020 |
Paid |
$35,324.08 |
PRC 1100 MAX76001 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/02/2020 |
Paid |
$6,314.00 |
PRC 1100 MAX76007 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/02/2020 |
Paid |
$5,430.00 |
PRC 1100 MAX76015 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/02/2020 |
Paid |
$7,286.00 |
PRC 1100 MAX75783 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/24/2020 |
Paid |
$2,010.00 |
PRC 1100 MAX75732 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/21/2020 |
Paid |
$2,652.00 |
PRC 1100 MAX75627 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2020 |
Paid |
$8,418.00 |
PRC 1100 MAX75632 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2020 |
Paid |
$2,021.00 |
PRC 1100 MAX75635 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/18/2020 |
Paid |
$18,478.00 |
PRC 1100 MAX75636 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/18/2020 |
Paid |
$2,976.00 |
PRC 1100 MAX75487 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2020 |
Paid |
$5,952.00 |
PRC 1100 MAX75498 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2020 |
Paid |
$11,183.00 |
PRC 1100 MAX75225 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/13/2020 |
Paid |
$6,063.00 |
PRC 1100 MAX75210 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2020 |
Paid |
$40,204.00 |
PRC 1100 MAX75220 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2020 |
Paid |
$19,685.00 |
PRC 1100 MAX75224 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2020 |
Paid |
$57,392.68 |
PRC 1100 MAX74554 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/29/2020 |
Paid |
$6,081.00 |
PRC 1100 MAX74442 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/15/2020 |
Paid |
$34,587.69 |
PRC 1100 MAX74443 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/15/2020 |
Paid |
$34,587.69 |
PRC 1100 MAX74444 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/15/2020 |
Paid |
$57,392.68 |
PRC 1100 MAX74445 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/15/2020 |
Paid |
$57,392.68 |
PRC 1100 MAX74341 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/14/2020 |
Paid |
$4,054.00 |
PRC 1100 MAX74348 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/14/2020 |
Paid |
$4,383.00 |
PRC 1100 MAX73615 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/30/2019 |
Paid |
$18,931.00 |
PRC 1100 MAX73902 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/30/2019 |
Paid |
$6,499.00 |
PRC 1100 MAX73907 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/30/2019 |
Paid |
$1,821.00 |
PRC 1100 MAX73910 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/30/2019 |
Paid |
$5,342.00 |
PRC 1100 MAX73918 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/30/2019 |
Paid |
$2,998.00 |
PRC 1100 MAX73921 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/30/2019 |
Paid |
$2,027.00 |
PRC 1100 19121700845 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/26/2019 |
Paid |
$72,691.52 |
PRC 1100 MAX73614 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/26/2019 |
Paid |
$2,671.00 |
PRC 1100 MAX73618 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2019 |
Paid |
$1,821.00 |
PRC 1100 MAX73476 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/13/2019 |
Paid |
$7,495.00 |
PRC 1100 MAX73482 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/13/2019 |
Paid |
$33,677.00 |
PRC 1100 MAX73479 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/12/2019 |
Paid |
$1,821.00 |
PRC 1100 MAX73269 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2019 |
Paid |
$6,277.00 |
PRC 1100 MAX73271 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2019 |
Paid |
$57,620.44 |
PRC 1100 MAX73283 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2019 |
Paid |
$5,463.00 |
PRC 1100 MAX73286 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2019 |
Paid |
$2,757.00 |
PRC 1100 MAX73058 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/25/2019 |
Paid |
$10,926.00 |
PRC 1100 MAX72731 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/13/2019 |
Paid |
$3,764.00 |
PRC 1100 MAX72669 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/08/2019 |
Paid |
$157,147.20 |
PRC 1100 MAX72660 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/07/2019 |
Paid |
$2,670.00 |
PRC 1100 MAX72662 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/07/2019 |
Paid |
$7,525.00 |
PRC 1100 MAX72663 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/07/2019 |
Paid |
$8,021.00 |
PRC 1100 MAX72523 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2019 |
Paid |
$1,780.00 |
PRC 1100 MAX72525 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2019 |
Paid |
$19,884.00 |
PRC 1100 MAX72427 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/29/2019 |
Paid |
$35,256.00 |
PRC 1100 MAX72317 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/24/2019 |
Paid |
$1,826.00 |
PRC 1100 MAX72326 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/24/2019 |
Paid |
$12,535.00 |
PRC 1100 MAX72334 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/24/2019 |
Paid |
$7,968.00 |
PRC 1100 MAX72335 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/24/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX72069 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/21/2019 |
Paid |
$15,007.00 |
PRC 1100 MAX72157 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/21/2019 |
Paid |
$8,055.00 |
PRC 1100 MAX72161 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/21/2019 |
Paid |
$64,889.00 |
PRC 1100 MAX72163 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/21/2019 |
Paid |
$7,521.00 |
PRC 1100 MAX71980 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/15/2019 |
Paid |
$6,090.00 |
PRC 1100 MAX71991 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/15/2019 |
Paid |
$75,210.00 |
PRC 1100 MAX71998 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/15/2019 |
Paid |
$157,147.20 |
PRC 1100 MAX72000 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/15/2019 |
Paid |
$157,147.20 |
PRC 1100 MAX71737 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2019 |
Paid |
$7,550.00 |
PRC 1100 MAX71742 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2019 |
Paid |
$6,374.00 |
PRC 1100 MAX71807 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2019 |
Paid |
$11,966.00 |
PRC 1100 MAX71527 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2019 |
Paid |
$1,780.00 |
PRC 1100 MAX71619 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2019 |
Paid |
$8,510.00 |
PRC 1100 MAX71464 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2019 |
Paid |
$157,147.20 |
PRC 1100 MAX71471 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2019 |
Paid |
$34,780.57 |
PRC 1100 MAX71472 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2019 |
Paid |
$42,834.36 |
PRC 1100 MAX71473 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2019 |
Paid |
$32,542.94 |
PRC 1100 MAX71474 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2019 |
Paid |
$39,485.52 |
PRC 1100 MAX71475 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2019 |
Paid |
$32,542.94 |
PRC 1100 MAX71476 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2019 |
Paid |
$31,612.70 |
PRC 1100 MAX71295 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/23/2019 |
Paid |
$30,306.00 |
PRC 1100 MAX71301 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/23/2019 |
Paid |
$54,202.00 |
PRC 1100 MAX71310 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/23/2019 |
Paid |
$3,020.00 |
PRC 1100 MAX71322 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/23/2019 |
Paid |
$18,868.00 |
PRC 1100 MAX71211 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/17/2019 |
Paid |
$35,097.00 |
PRC 1100 MAX71215 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/17/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX71216 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/17/2019 |
Paid |
$43,484.34 |
PRC 1100 MAX71132 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/13/2019 |
Paid |
$20,320.00 |
PRC 1100 MAX71143 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/13/2019 |
Paid |
$3,040.00 |
PRC 1100 MAX71150 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/13/2019 |
Paid |
$3,020.00 |
PRC 1100 MAX71153 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/13/2019 |
Paid |
$37,140.00 |
PRC 1100 MAX71155 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/13/2019 |
Paid |
$57,620.44 |
PRC 1100 MAX71022 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/10/2019 |
Paid |
$7,600.00 |
PRC 1100 MAX70879 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2019 |
Paid |
$4,019.00 |
PRC 1100 MAX70887 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/06/2019 |
Paid |
$12,700.00 |
PRC 1100 MAX70573 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/04/2019 |
Paid |
$4,019.00 |
PRC 1100 MAX70579 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/04/2019 |
Paid |
$3,040.00 |
PRC 1100 MAX70627 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/04/2019 |
Paid |
$4,080.00 |
PRC 1100 MAX70628 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/04/2019 |
Paid |
$13,999.00 |
PRC 1100 MAX70447 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2019 |
Paid |
$29,357.06 |
PRC 1100 MAX70457 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2019 |
Paid |
$48,683.32 |
PRC 1100 MAX70458 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX70456 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/14/2019 |
Paid |
$2,540.00 |
PRC 1100 MAX70347 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/12/2019 |
Paid |
$10,992.00 |
PRC 1100 MAX70354 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/12/2019 |
Paid |
$7,647.00 |
PRC 1100 MAX70355 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/12/2019 |
Paid |
$1,526.00 |
PRC 1100 MAX70225 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/08/2019 |
Paid |
$32,542.94 |
PRC 1100 MAX70226 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/08/2019 |
Paid |
$32,542.94 |
PRC 1100 MAX70227 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/08/2019 |
Paid |
$29,520.52 |
PRC 1100 MAX70228 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/08/2019 |
Paid |
$2,775.00 |
PRC 1100 MAX70234 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/08/2019 |
Paid |
$22,150.00 |
PRC 1100 MAX70249 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/08/2019 |
Paid |
$12,745.00 |
PRC 1100 MAX70260 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/08/2019 |
Paid |
$18,346.00 |
PRC 1100 MAX70262 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/08/2019 |
Paid |
$1,526.00 |
PRC 1100 MAX70042 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2019 |
Paid |
$3,615.00 |
PRC 1100 MAX70046 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2019 |
Paid |
$1,526.00 |
PRC 1100 MAX69878 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/26/2019 |
Paid |
$6,527.00 |
PRC 1100 MAX69914 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/26/2019 |
Paid |
$3,668.00 |
PRC 1100 MAX69918 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/26/2019 |
Paid |
$2,549.00 |
PRC 1100 MAX69922 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/26/2019 |
Paid |
$5,194.00 |
PRC 1100 MAX69923 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/26/2019 |
Paid |
$22,256.00 |
PRC 1100 MAX69929 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/26/2019 |
Paid |
$24,120.00 |
PRC 1100 MAX69763 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX69764 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX69765 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX69766 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX69767 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX69770 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2019 |
Paid |
$11,004.00 |
PRC 1100 MAX69774 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2019 |
Paid |
$61,694.78 |
PRC 1100 MAX69571 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/18/2019 |
Paid |
$3,650.00 |
PRC 1100 MAX69326 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$57,620.44 |
PRC 1100 MAX69327 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$70,648.16 |
PRC 1100 MAX69330 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$10,562.00 |
PRC 1100 MAX69333 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$5,190.00 |
PRC 1100 MAX69338 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$5,190.00 |
PRC 1100 MAX69343 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$5,502.00 |
PRC 1100 MAX69345 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$21,691.00 |
PRC 1100 MAX69347 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$23,940.00 |
PRC 1100 MAX68066 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/02/2019 |
Paid |
$21,195.00 |
PRC 1100 MAX68704 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/02/2019 |
Paid |
$17,830.00 |
PRC 1100 MAX69190 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/26/2019 |
Paid |
$8,554.00 |
PRC 1100 MAX69193 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/26/2019 |
Paid |
$12,599.00 |
PRC 1100 MAX69197 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/26/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX69198 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/26/2019 |
Paid |
$57,620.44 |
PRC 1100 MAX69199 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/26/2019 |
Paid |
$26,719.26 |
PRC 1100 MAX68370 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/24/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX69043 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/24/2019 |
Paid |
$115,240.88 |
PRC 1100 MAX69044 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/24/2019 |
Paid |
$57,620.44 |
PRC 1100 MAX69060 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/24/2019 |
Paid |
$48,683.32 |
PRC 1100 MAX69062 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/24/2019 |
Paid |
$57,620.44 |
PRC 1100 MAX68916 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/20/2019 |
Paid |
$48,913.00 |
PRC 1100 MAX68923 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/20/2019 |
Paid |
$22,493.00 |
PRC 1100 MAX68926 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/20/2019 |
Paid |
$17,756.00 |
PRC 1100 MAX68623 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/17/2019 |
Paid |
$10,460.00 |
PRC 1100 MAX68774 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/17/2019 |
Paid |
$2,585.00 |
PRC 1100 MAX68785 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/17/2019 |
Paid |
$1,995.00 |
PRC 1100 MAX68786 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/17/2019 |
Paid |
$1,550.00 |
PRC 1100 MAX68611 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2019 |
Paid |
$6,390.00 |
PRC 1100 MAX68622 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2019 |
Paid |
$1,550.00 |
PRC 1100 MAX68625 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2019 |
Paid |
$7,170.00 |
PRC 1100 MAX68694 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2019 |
Paid |
$1,712.00 |
PRC 1100 MAX68696 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2019 |
Paid |
$19,360.00 |
PRC 1100 MAX68710 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2019 |
Paid |
$6,237.00 |
PRC 1100 MAX68712 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2019 |
Paid |
$11,430.00 |
PRC 1100 MAX68713 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2019 |
Paid |
$3,395.00 |
PRC 1100 MAX68354 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/06/2019 |
Paid |
$15,130.00 |
PRC 1100 MAX68360 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/06/2019 |
Paid |
$6,149.00 |
PRC 1100 MAX68363 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/06/2019 |
Paid |
$10,480.00 |
PRC 1100 MAX68364 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/06/2019 |
Paid |
$3,690.00 |
PRC 1100 MAX68365 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/06/2019 |
Paid |
$77,999.10 |
PRC 1100 MAX68366 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/06/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX68367 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/06/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX68368 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/06/2019 |
Paid |
$57,620.44 |
PRC 1100 MAX68369 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/06/2019 |
Paid |
$48,683.32 |
PRC 1100 MAX68161 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/23/2019 |
Paid |
$5,390.00 |
PRC 1100 MAX68163 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/23/2019 |
Paid |
$3,575.00 |
PRC 1100 MAX68174 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/23/2019 |
Paid |
$10,780.00 |
PRC 1100 MAX68061 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/17/2019 |
Paid |
$3,564.00 |
PRC 1100 MAX67872 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/14/2019 |
Paid |
$2,620.00 |
PRC 1100 MAX67884 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/14/2019 |
Paid |
$8,930.00 |
PRC 1100 MAX67886 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/14/2019 |
Paid |
$7,680.00 |
PRC 1100 MAX67890 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/14/2019 |
Paid |
$1,845.00 |
PRC 1100 MAX67742 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/08/2019 |
Paid |
$7,380.00 |
PRC 1100 MAX67745 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/08/2019 |
Paid |
$29,520.52 |
PRC 1100 MAX67746 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/08/2019 |
Paid |
$36,896.59 |
PRC 1100 MAX67749 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/08/2019 |
Paid |
$31,440.00 |
PRC 1100 MAX67753 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/08/2019 |
Paid |
$3,395.00 |
PRC 1100 MAX67762 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/08/2019 |
Paid |
$48,642.04 |
PRC 1100 MAX67763 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/08/2019 |
Paid |
$48,642.04 |
PRC 1100 MAX67432 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2019 |
Paid |
$34,116.64 |
PRC 1100 MAX67433 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2019 |
Paid |
$97,284.08 |
PRC 1100 MAX67440 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2019 |
Paid |
$10,480.00 |
PRC 1100 MAX67449 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2019 |
Paid |
$7,656.00 |
PRC 1100 MAX67312 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/19/2019 |
Paid |
$14,100.00 |
PRC 1100 MAX67313 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/19/2019 |
Paid |
$4,650.00 |
PRC 1100 MAX67323 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/19/2019 |
Paid |
$17,260.00 |
PRC 1100 MAX67331 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/19/2019 |
Paid |
$5,240.00 |
PRC 1100 MAX67265 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/17/2019 |
Paid |
$3,100.00 |
PRC 1100 MAX67274 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/17/2019 |
Paid |
$70,648.16 |
PRC 1100 MAX67039 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2019 |
Paid |
$20,455.00 |
PRC 1100 MAX67053 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2019 |
Paid |
$5,535.00 |
PRC 1100 MAX67056 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2019 |
Paid |
$48,642.04 |
PRC 1100 MAX67058 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2019 |
Paid |
$57,620.44 |
PRC 1100 MAX66948 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/05/2019 |
Paid |
$44,500.00 |
PRC 1100 MAX66950 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/05/2019 |
Paid |
$7,750.00 |
PRC 1100 MAX66953 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/05/2019 |
Paid |
$7,380.00 |
PRC 1100 MAX66956 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/05/2019 |
Paid |
$3,100.00 |
PRC 1100 MAX66961 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/05/2019 |
Paid |
$21,008.00 |
PRC 1100 MAX66673 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/27/2019 |
Paid |
$50,320.00 |
PRC 1100 MAX66476 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/19/2019 |
Paid |
$3,100.00 |
PRC 1100 MAX66502 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/19/2019 |
Paid |
$9,110.00 |
PRC 1100 MAX66511 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/19/2019 |
Paid |
$2,625.00 |
PRC 1100 MAX66303 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/12/2019 |
Paid |
$48,683.32 |
PRC 1100 MAX66308 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/12/2019 |
Paid |
$4,861.00 |
PRC 1100 MAX66315 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/12/2019 |
Paid |
$11,070.00 |
PRC 1100 MAX66323 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/12/2019 |
Paid |
$5,535.00 |
PRC 1100 MAX66325 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/12/2019 |
Paid |
$4,662.00 |
PRC 1100 MAX66364 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/12/2019 |
Paid |
$5,535.00 |
PRC 1100 MAX66107 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2019 |
Paid |
$1,750.00 |
PRC 1100 MAX66108 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2019 |
Paid |
$73,793.18 |
PRC 1100 MAX66109 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2019 |
Paid |
$36,896.59 |
PRC 1100 MAX66110 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2019 |
Paid |
$27,624.22 |
PRC 1100 MAX66114 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2019 |
Paid |
$2,727.00 |
PRC 1100 MAX66117 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2019 |
Paid |
$48,683.32 |
PRC 1100 MAX65855 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2019 |
Paid |
$1,554.00 |
PRC 1100 MAX65859 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2019 |
Paid |
$5,535.00 |
PRC 1100 MAX65864 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2019 |
Paid |
$8,150.00 |
PRC 1100 MAX65753 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2019 |
Paid |
$6,804.00 |
PRC 1100 MAX65760 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2019 |
Paid |
$5,254.00 |
PRC 1100 MAX65762 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX65763 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2019 |
Paid |
$35,324.08 |
PRC 1100 MAX65766 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2019 |
Paid |
$26,719.26 |
PRC 1100 MAX65768 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2019 |
Paid |
$57,620.44 |
PRC 1100 MAX65769 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2019 |
Paid |
$57,620.44 |
PRC 1100 MAX65620 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/15/2019 |
Paid |
$10,806.00 |
PRC 1100 MAX65625 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/15/2019 |
Paid |
$4,180.00 |
PRC 1100 MAX65628 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/15/2019 |
Paid |
$12,985.00 |
PRC 1100 MAX65636 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/15/2019 |
Paid |
$3,714.00 |
PRC 1100 MAX65400 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$26,719.26 |
PRC 1100 MAX65402 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$6,363.00 |
PRC 1100 MAX65406 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$6,519.00 |
PRC 1100 MAX65408 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$38,194.00 |
PRC 1100 MAX65409 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$29,520.52 |
PRC 1100 MAX65410 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$36,896.59 |
PRC 1100 MAX65411 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$27,624.22 |
PRC 1100 MAX65412 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$27,624.22 |
PRC 1100 MAX65413 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$27,624.22 |
PRC 1100 MAX65528 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$26,719.26 |
PRC 1100 MAX65534 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$2,738.00 |
PRC 1100 MAX65536 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$5,254.00 |
PRC 1100 MAX65543 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$6,560.00 |
PRC 1100 MAX65587 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2019 |
Paid |
$7,770.00 |
PRC 1100 MAX65122 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/05/2019 |
Paid |
$4,112.00 |
PRC 1100 MAX64922 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2019 |
Paid |
$29,104.22 |
PRC 1100 MAX64923 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2019 |
Paid |
$10,596.00 |
PRC 1100 MAX64924 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2019 |
Paid |
$9,840.00 |
PRC 1100 MAX64926 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2019 |
Paid |
$26,719.26 |
PRC 1100 MAX64927 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2019 |
Paid |
$25,408.00 |
PRC 1100 MAX64738 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/25/2019 |
Paid |
$3,433.00 |
PRC 1100 MAX64743 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/25/2019 |
Paid |
$3,620.00 |
PRC 1100 MAX64576 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/15/2019 |
Paid |
$40,242.00 |
PRC 1100 MAX64247 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/28/2018 |
Paid |
$1,570.00 |
PRC 1100 MAX64249 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/28/2018 |
Paid |
$1,750.00 |
PRC 1100 MAX64250 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/28/2018 |
Paid |
$11,018.00 |
PRC 1100 MAX64147 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/24/2018 |
Paid |
$4,608.00 |
PRC 1100 MAX64156 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/24/2018 |
Paid |
$2,649.00 |
PRC 1100 MAX64160 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/24/2018 |
Paid |
$97,366.64 |
PRC 1100 MAX64161 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/24/2018 |
Paid |
$34,116.64 |
PRC 1100 MAX64162 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/24/2018 |
Paid |
$34,116.64 |
PRC 1100 MAX63942 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/12/2018 |
Paid |
$29,139.00 |
PRC 1100 MAX63945 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/12/2018 |
Paid |
$5,589.00 |
PRC 1100 MAX63958 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/12/2018 |
Paid |
$20,598.00 |
PRC 1100 MAX63806 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/06/2018 |
Paid |
$1,863.00 |
PRC 1100 MAX63641 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/29/2018 |
Paid |
$4,689.00 |
PRC 1100 MAX63645 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/29/2018 |
Paid |
$4,935.00 |
PRC 1100 MAX63483 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/27/2018 |
Paid |
$29,104.22 |
PRC 1100 MAX63503 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/27/2018 |
Paid |
$5,490.00 |
PRC 1100 MAX63399 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/20/2018 |
Paid |
$2,805.00 |
PRC 1100 MAX63401 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/20/2018 |
Paid |
$3,656.00 |
PRC 1100 MAX63442 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/20/2018 |
Paid |
$4,036.00 |
PRC 1100 MAX63444 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/20/2018 |
Paid |
$26,719.26 |
PRC 1100 MAX63328 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/14/2018 |
Paid |
$26,719.26 |
PRC 1100 MAX63335 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/14/2018 |
Paid |
$3,656.00 |
PRC 1100 MAX62932 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/29/2018 |
Paid |
$42,165.00 |
PRC 1100 MAX62936 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/29/2018 |
Paid |
$9,470.00 |
PRC 1100 MAX62940 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/29/2018 |
Paid |
$16,020.00 |
PRC 1100 MAX62879 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/26/2018 |
Paid |
$7,860.00 |
PRC 1100 MAX62884 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/26/2018 |
Paid |
$25,035.00 |
PRC 1100 MAX62885 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/26/2018 |
Paid |
$20,380.00 |
PRC 1100 MAX62886 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/26/2018 |
Paid |
$8,002.00 |
PRC 1100 MAX62887 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/26/2018 |
Paid |
$3,160.00 |
PRC 1100 MAX62893 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/26/2018 |
Paid |
$5,595.00 |
PRC 1100 MAX62895 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/26/2018 |
Paid |
$2,035.00 |
PRC 1100 MAX62764 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2018 |
Paid |
$5,610.00 |
PRC 1100 MAX62769 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2018 |
Paid |
$9,040.00 |
PRC 1100 MAX62773 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2018 |
Paid |
$2,854.00 |
PRC 1100 MAX62413 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2018 |
Paid |
$18,682.00 |
PRC 1100 MAX62414 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2018 |
Paid |
$895.00 |
PRC 1100 MAX62475 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2018 |
Paid |
$1,888.00 |
PRC 1100 MAX62261 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/02/2018 |
Paid |
$1,890.00 |
PRC 1100 MAX62226 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2018 |
Paid |
$2,808.00 |
PRC 1100 MAX62292 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2018 |
Paid |
$21,512.00 |
PRC 1100 18092402229 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2018 |
Paid |
$11,328.00 |
PRC 1100 MAX62194 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2018 |
Paid |
$115,240.88 |
PRC 1100 MAX62202 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2018 |
Paid |
$7,950.00 |
PRC 1100 MAX62033 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/24/2018 |
Paid |
$3,776.00 |
PRC 1100 MAX62034 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/24/2018 |
Paid |
$7,552.00 |
PRC 1100 MAX61961 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/21/2018 |
Paid |
$13,200.00 |
PRC 1100 MAX61971 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/21/2018 |
Paid |
$10,560.00 |
PRC 1100 MAX61972 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/21/2018 |
Paid |
$4,519.00 |
PRC 1100 MAX61975 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/21/2018 |
Paid |
$3,776.00 |
PRC 1100 MAX61657 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2018 |
Paid |
$2,689.00 |
PRC 1100 MAX61667 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2018 |
Paid |
$13,557.00 |
PRC 1100 MAX61668 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2018 |
Paid |
$1,888.00 |
PRC 1100 MAX61793 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2018 |
Paid |
$6,238.00 |
PRC 1100 MAX61799 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2018 |
Paid |
$28,614.40 |
PRC 1100 MAX61800 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2018 |
Paid |
$28,614.40 |
PRC 1100 MAX61801 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2018 |
Paid |
$28,614.40 |
PRC 1100 MAX61804 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2018 |
Paid |
$8,067.00 |
PRC 1100 MAX61808 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2018 |
Paid |
$1,600.00 |
PRC 1100 MAX61811 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2018 |
Paid |
$26,890.00 |
PRC 1100 MAX61391 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/04/2018 |
Paid |
$4,479.00 |
PRC 1100 MAX61392 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/04/2018 |
Paid |
$2,122.00 |
PRC 1100 MAX61327 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/30/2018 |
Paid |
$8,176.00 |
PRC 1100 MAX61339 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/30/2018 |
Paid |
$11,980.00 |
PRC 1100 MAX61342 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/30/2018 |
Paid |
$6,366.00 |
PRC 1100 MAX61294 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2018 |
Paid |
$2,689.00 |
PRC 1100 MAX61295 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2018 |
Paid |
$8,326.00 |
PRC 1100 MAX61110 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/23/2018 |
Paid |
$5,664.00 |
PRC 1100 MAX61112 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/23/2018 |
Paid |
$3,200.00 |
PRC 1100 MAX61117 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/23/2018 |
Paid |
$57,620.44 |
PRC 1100 MAX61121 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/23/2018 |
Paid |
$10,896.00 |
PRC 1100 MAX61122 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/23/2018 |
Paid |
$18,823.00 |
PRC 1100 MAX61037 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2018 |
Paid |
$13,560.00 |
PRC 1100 MAX61038 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2018 |
Paid |
$27,649.00 |
PRC 1100 MAX61044 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2018 |
Paid |
$11,151.00 |
PRC 1100 MAX61032 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/15/2018 |
Paid |
$4,800.00 |
PRC 1100 MAX61034 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/15/2018 |
Paid |
$8,067.00 |
PRC 1100 MAX60922 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/10/2018 |
Paid |
$39,552.00 |
PRC 1100 MAX60670 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/27/2018 |
Paid |
$12,489.00 |
PRC 1100 MAX60672 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/27/2018 |
Paid |
$57,620.44 |
PRC 1100 MAX60676 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/27/2018 |
Paid |
$2,854.00 |
PRC 1100 MAX60677 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/27/2018 |
Paid |
$12,450.00 |
PRC 1100 MAX60681 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/27/2018 |
Paid |
$5,280.00 |
PRC 1100 MAX60460 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/20/2018 |
Paid |
$3,780.00 |
PRC 1100 MAX60361 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2018 |
Paid |
$31,249.00 |
PRC 1100 MAX60366 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2018 |
Paid |
$3,200.00 |
PRC 1100 MAX60369 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2018 |
Paid |
$1,600.00 |
PRC 1100 MAX60236 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2018 |
Paid |
$13,445.00 |
PRC 1100 MAX60242 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2018 |
Paid |
$1,600.00 |
PRC 1100 MAX60250 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2018 |
Paid |
$5,518.00 |
PRC 1100 MAX60157 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2018 |
Paid |
$4,289.00 |
PRC 1100 MAX60168 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2018 |
Paid |
$10,570.00 |
PRC 1100 MAX59843 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2018 |
Paid |
$5,670.00 |
PRC 1100 MAX59845 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2018 |
Paid |
$3,200.00 |
PRC 1100 MAX59848 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2018 |
Paid |
$8,000.00 |
PRC 1100 MAX59854 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2018 |
Paid |
$3,200.00 |
PRC 1100 MAX59857 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2018 |
Paid |
$22,554.00 |
PRC 1100 MAX59858 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2018 |
Paid |
$10,756.00 |
PRC 1100 MAX59867 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2018 |
Paid |
$2,140.00 |
PRC 1100 MAX59868 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2018 |
Paid |
$920.00 |
PRC 1100 MAX59532 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/15/2018 |
Paid |
$5,680.00 |
PRC 1100 MAX59538 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/15/2018 |
Paid |
$18,080.00 |
PRC 1100 MAX59545 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/14/2018 |
Paid |
$16,470.00 |
PRC 1100 MAX59375 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2018 |
Paid |
$5,700.00 |
PRC 1100 MAX59388 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/08/2018 |
Paid |
$7,600.00 |
PRC 1100 MAX59234 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/30/2018 |
Paid |
$6,800.00 |
PRC 1100 MAX59238 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/30/2018 |
Paid |
$17,310.00 |
PRC 1100 MAX59243 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/30/2018 |
Paid |
$2,700.00 |
PRC 1100 MAX59248 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/29/2018 |
Paid |
$47,143.00 |
PRC 1100 MAX58998 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2018 |
Paid |
$1,900.00 |
PRC 1100 MAX58999 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2018 |
Paid |
$25,000.00 |
PRC 1100 MAX59010 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2018 |
Paid |
$47,143.00 |
PRC 1100 MAX59011 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2018 |
Paid |
$1,900.00 |
PRC 1100 MAX58808 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/16/2018 |
Paid |
$12,285.00 |
PRC 1100 MAX58821 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/16/2018 |
Paid |
$4,185.00 |
PRC 1100 MAX58825 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/16/2018 |
Paid |
$2,855.00 |
PRC 1100 MAX58695 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/10/2018 |
Paid |
$5,700.00 |
PRC 1100 MAX58741 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/10/2018 |
Paid |
$10,170.00 |
PRC 1100 MAX58742 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/10/2018 |
Paid |
$16,200.00 |
PRC 1100 MAX58748 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/10/2018 |
Paid |
$25,110.00 |
PRC 1100 MAX58759 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/10/2018 |
Paid |
$2,700.00 |
PRC 1100 MAX58688 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/09/2018 |
Paid |
$10,600.00 |
PRC 1100 MAX58692 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/09/2018 |
Paid |
$27,000.00 |
PRC 1100 MAX58696 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/09/2018 |
Paid |
$18,650.00 |
PRC 1100 MAX58391 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/26/2018 |
Paid |
$9,040.00 |
PRC 1100 MAX58394 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/26/2018 |
Paid |
$2,840.00 |
PRC 1100 MAX58396 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/26/2018 |
Paid |
$1,690.00 |
PRC 1100 MAX58406 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/26/2018 |
Paid |
$5,688.00 |
PRC 1100 MAX58412 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/26/2018 |
Paid |
$9,500.00 |
PRC 1100 MAX58248 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/19/2018 |
Paid |
$3,386.00 |
PRC 1100 MAX58250 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/19/2018 |
Paid |
$4,800.00 |
PRC 1100 MAX58240 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/18/2018 |
Paid |
$27,407.00 |
PRC 1100 MAX58255 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/18/2018 |
Paid |
$2,855.00 |
PRC 1100 MAX58140 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/16/2018 |
Paid |
$1,909.00 |
PRC 1100 MAX58146 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/16/2018 |
Paid |
$1,909.00 |
PRC 1100 MAX58154 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/16/2018 |
Paid |
$1,909.00 |
PRC 1100 MAX58058 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/12/2018 |
Paid |
$3,818.00 |
PRC 1100 MAX58067 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/12/2018 |
Paid |
$9,638.00 |
PRC 1100 MAX57619 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/21/2018 |
Paid |
$9,600.00 |
PRC 1100 MAX57448 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2018 |
Paid |
$26,795.00 |
PRC 1100 MAX57452 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2018 |
Paid |
$7,519.00 |
PRC 1100 MAX57456 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2018 |
Paid |
$1,909.00 |
PRC 1100 MAX57548 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2018 |
Paid |
$13,595.00 |
PRC 1100 MAX57549 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2018 |
Paid |
$26,650.00 |
PRC 1100 MAX57392 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2018 |
Paid |
$3,818.00 |
PRC 1100 MAX57406 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2018 |
Paid |
$3,818.00 |
PRC 1100 MAX57436 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2018 |
Paid |
$8,532.00 |
PRC 1100 MAX57441 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2018 |
Paid |
$10,307.00 |
PRC 1100 MAX57444 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2018 |
Paid |
$900.00 |
PRC 1100 MAX57212 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/23/2018 |
Paid |
$5,680.00 |
PRC 1100 MAX57000 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2018 |
Paid |
$12,000.00 |
PRC 1100 MAX56875 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/13/2018 |
Paid |
$2,719.00 |
PRC 1100 MAX56877 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/13/2018 |
Paid |
$5,335.00 |
PRC 1100 MAX56663 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/31/2018 |
Paid |
$3,659.00 |
PRC 1100 MAX56669 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/31/2018 |
Paid |
$15,840.00 |
PRC 1100 MAX56558 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/29/2018 |
Paid |
$12,350.00 |
PRC 1100 MAX56559 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/29/2018 |
Paid |
$3,818.00 |
PRC 1100 MAX56506 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/25/2018 |
Paid |
$22,238.00 |
PRC 1100 MAX56507 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/25/2018 |
Paid |
$2,844.00 |
PRC 1100 MAX56512 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/25/2018 |
Paid |
$4,319.00 |
PRC 1100 MAX56521 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/25/2018 |
Paid |
$3,818.00 |
PRC 1100 MAX56522 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/25/2018 |
Paid |
$5,688.00 |
PRC 1100 MAX56523 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/25/2018 |
Paid |
$17,914.00 |
PRC 1100 MAX56320 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/16/2018 |
Paid |
$15,710.00 |
PRC 1100 MAX56324 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/16/2018 |
Paid |
$2,150.00 |
PRC 1100 MAX56327 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/16/2018 |
Paid |
$1,909.00 |
PRC 1100 MAX56331 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/16/2018 |
Paid |
$19,033.00 |
PRC 1100 MAX56340 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/16/2018 |
Paid |
$7,300.00 |
PRC 1100 MAX56390 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/12/2018 |
Paid |
$7,259.00 |
PRC 1100 MAX55997 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/27/2017 |
Paid |
$1,600.00 |
PRC 1100 MAX56000 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/27/2017 |
Paid |
$6,588.00 |
PRC 1100 MAX55842 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/21/2017 |
Paid |
$15,318.00 |
PRC 1100 MAX55856 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/18/2017 |
Paid |
$3,400.00 |
PRC 1100 MAX55615 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/11/2017 |
Paid |
$5,727.00 |
PRC 1100 MAX55463 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/06/2017 |
Paid |
$10,876.00 |
PRC 1100 MAX55475 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/06/2017 |
Paid |
$36,144.00 |
PRC 1100 MAX55329 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/01/2017 |
Paid |
$13,363.00 |
PRC 1100 MAX55335 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/01/2017 |
Paid |
$29,130.00 |
PRC 1100 MAX55221 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2017 |
Paid |
$4,754.00 |
PRC 1100 MAX55228 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2017 |
Paid |
$12,501.00 |
PRC 1100 MAX55229 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2017 |
Paid |
$11,454.00 |
PRC 1100 MAX55079 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/17/2017 |
Paid |
$26,013.00 |
PRC 1100 MAX55100 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/17/2017 |
Paid |
$5,350.00 |
PRC 1100 MAX54945 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/06/2017 |
Paid |
$4,300.00 |
PRC 1100 MAX54949 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/06/2017 |
Paid |
$900.00 |
PRC 1100 MAX54950 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/06/2017 |
Paid |
$3,400.00 |
PRC 1100 MAX54958 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/06/2017 |
Paid |
$6,879.00 |
PRC 1100 MAX54793 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/31/2017 |
Paid |
$15,917.00 |
PRC 1100 MAX54794 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/31/2017 |
Paid |
$3,659.00 |
PRC 1100 MAX54814 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/31/2017 |
Paid |
$1,610.00 |
PRC 1100 MAX54817 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/31/2017 |
Paid |
$5,180.00 |
PRC 1100 MAX54818 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/31/2017 |
Paid |
$19,033.00 |
PRC 1100 MAX54790 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2017 |
Paid |
$7,500.00 |
PRC 1100 MAX54792 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2017 |
Paid |
$26,013.00 |
PRC 1100 MAX54804 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2017 |
Paid |
$8,157.00 |
PRC 1100 MAX54805 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2017 |
Paid |
$1,610.00 |
PRC 1100 MAX54532 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/24/2017 |
Paid |
$27,145.00 |
PRC 1100 MAX54536 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/24/2017 |
Paid |
$10,666.00 |
PRC 1100 MAX54718 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/24/2017 |
Paid |
$4,788.00 |
PRC 1100 MAX54483 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2017 |
Paid |
$2,150.00 |
PRC 1100 MAX54425 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/09/2017 |
Paid |
$4,830.00 |
PRC 1100 MAX54086 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2017 |
Paid |
$1,610.00 |
PRC 1100 MAX54087 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2017 |
Paid |
$2,840.00 |
PRC 1100 MAX54088 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2017 |
Paid |
$2,719.00 |
PRC 1100 MAX54089 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2017 |
Paid |
$16,314.00 |
PRC 1100 MAX54168 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2017 |
Paid |
$16,087.00 |
PRC 1100 MAX53887 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2017 |
Paid |
$17,977.00 |
PRC 1100 MAX53960 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2017 |
Paid |
$10,419.00 |
PRC 1100 MAX53975 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2017 |
Paid |
$22,714.00 |
PRC 1100 MAX53765 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/15/2017 |
Paid |
$33,068.00 |
PRC 1100 MAX53753 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2017 |
Paid |
$47,183.00 |
PRC 1100 MAX53771 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2017 |
Paid |
$1,940.00 |
PRC 1100 MAX53665 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/12/2017 |
Paid |
$6,020.00 |
PRC 1100 MAX53672 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/12/2017 |
Paid |
$1,944.00 |
PRC 1100 MAX53461 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/01/2017 |
Paid |
$33,068.00 |
PRC 1100 MAX53462 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/01/2017 |
Paid |
$13,692.00 |
PRC 1100 MAX53463 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/01/2017 |
Paid |
$2,844.00 |
PRC 1100 MAX53321 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2017 |
Paid |
$18,358.00 |
PRC 1100 MAX53322 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2017 |
Paid |
$9,242.00 |
PRC 1100 MAX53324 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2017 |
Paid |
$3,888.00 |
PRC 1100 MAX53108 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/21/2017 |
Paid |
$3,400.00 |
PRC 1100 MAX53111 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/21/2017 |
Paid |
$2,900.00 |
PRC 1100 MAX53115 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/21/2017 |
Paid |
$8,488.00 |
PRC 1100 MAX53116 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/21/2017 |
Paid |
$2,510.00 |
PRC 1100 MAX52991 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2017 |
Paid |
$53,680.00 |
PRC 1100 MAX52993 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2017 |
Paid |
$4,830.00 |
PRC 1100 MAX52998 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2017 |
Paid |
$2,069.00 |
PRC 1100 MAX52772 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2017 |
Paid |
$1,610.00 |
PRC 1100 MAX52780 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2017 |
Paid |
$38,520.00 |
PRC 1100 MAX52835 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2017 |
Paid |
$3,400.00 |
PRC 1100 MAX52844 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2017 |
Paid |
$14,000.00 |
PRC 1100 MAX52846 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2017 |
Paid |
$111,686.00 |
PRC 1100 MAX52847 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2017 |
Paid |
$55,843.00 |
PRC 1100 MAX52848 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2017 |
Paid |
$94,366.00 |
PRC 1100 MAX52849 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2017 |
Paid |
$105,684.00 |
PRC 1100 MAX52850 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2017 |
Paid |
$34,238.00 |
PRC 1100 MAX52695 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/02/2017 |
Paid |
$23,684.00 |
PRC 1100 MAX52700 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/02/2017 |
Paid |
$3,300.00 |
PRC 1100 MAX52581 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2017 |
Paid |
$17,112.00 |
PRC 1100 MAX52289 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/13/2017 |
Paid |
$4,830.00 |
PRC 1100 MAX52365 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/13/2017 |
Paid |
$22,720.00 |
PRC 1100 MAX52379 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/13/2017 |
Paid |
$2,549.00 |
PRC 1100 MAX52383 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/13/2017 |
Paid |
$1,610.00 |
PRC 1100 MAX52388 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/13/2017 |
Paid |
$3,888.00 |
PRC 1100 MAX52194 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2017 |
Paid |
$22,058.00 |
PRC 1100 MAX52197 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2017 |
Paid |
$4,280.00 |
PRC 1100 MAX52202 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/10/2017 |
Paid |
$1,944.00 |
PRC 1100 MAX52105 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/03/2017 |
Paid |
$21,560.00 |
PRC 1100 MAX52068 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/30/2017 |
Paid |
$9,660.00 |
PRC 1100 MAX51938 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/26/2017 |
Paid |
$23,400.00 |
PRC 1100 MAX51943 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/26/2017 |
Paid |
$900.00 |
PRC 1100 MAX51947 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/26/2017 |
Paid |
$7,776.00 |
PRC 1100 MAX51815 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/21/2017 |
Paid |
$12,000.00 |
PRC 1100 MAX51697 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/15/2017 |
Paid |
$3,888.00 |
PRC 1100 MAX51704 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/15/2017 |
Paid |
$6,800.00 |
PRC 1100 MAX51604 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/13/2017 |
Paid |
$9,128.00 |
PRC 1100 MAX51605 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/13/2017 |
Paid |
$1,610.00 |
PRC 1100 MAX51492 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/08/2017 |
Paid |
$22,820.00 |
PRC 1100 MAX51494 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/08/2017 |
Paid |
$8,318.00 |
PRC 1100 MAX51499 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/08/2017 |
Paid |
$9,352.00 |
PRC 1100 MAX51293 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/01/2017 |
Paid |
$20,213.00 |
PRC 1100 MAX51217 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2017 |
Paid |
$5,098.00 |
PRC 1100 MAX51218 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2017 |
Paid |
$7,647.00 |
PRC 1100 MAX51223 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2017 |
Paid |
$22,820.00 |
PRC 1100 MAX51227 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2017 |
Paid |
$18,000.00 |
PRC 1100 MAX51230 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2017 |
Paid |
$2,700.00 |
PRC 1100 MAX51231 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2017 |
Paid |
$15,826.00 |
PRC 1100 MAX51122 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/24/2017 |
Paid |
$3,888.00 |
PRC 1100 MAX51124 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/24/2017 |
Paid |
$28,039.00 |
PRC 1100 MAX51133 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/24/2017 |
Paid |
$33,137.00 |
PRC 1100 MAX51016 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2017 |
Paid |
$66,514.00 |
PRC 1100 MAX51108 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2017 |
Paid |
$4,830.00 |
PRC 1100 MAX51110 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2017 |
Paid |
$1,957.00 |
PRC 1100 MAX51007 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/15/2017 |
Paid |
$19,200.00 |
PRC 1100 MAX51008 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/15/2017 |
Paid |
$4,830.00 |
PRC 1100 MAX51009 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/15/2017 |
Paid |
$5,370.00 |
PRC 1100 MAX50938 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/09/2017 |
Paid |
$5,098.00 |
PRC 1100 MAX50939 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/09/2017 |
Paid |
$11,664.00 |
PRC 1100 MAX50945 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/09/2017 |
Paid |
$3,888.00 |
PRC 1100 MAX50949 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/09/2017 |
Paid |
$15,294.00 |
PRC 1100 MAX50801 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/05/2017 |
Paid |
$2,549.00 |
PRC 1100 MAX50802 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/05/2017 |
Paid |
$9,128.00 |
PRC 1100 MAX50805 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/05/2017 |
Paid |
$1,800.00 |
PRC 1100 MAX50811 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/05/2017 |
Paid |
$12,809.00 |
PRC 1100 MAX50821 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/05/2017 |
Paid |
$10,826.00 |
PRC 1100 MAX50713 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/02/2017 |
Paid |
$3,914.00 |
PRC 1100 MAX50715 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/02/2017 |
Paid |
$45,904.00 |
PRC 1100 MAX50725 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/02/2017 |
Paid |
$15,389.00 |
PRC 1100 MAX50497 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/20/2017 |
Paid |
$7,442.00 |
PRC 1100 MAX50502 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/20/2017 |
Paid |
$17,120.00 |
PRC 1100 MAX50347 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/19/2017 |
Paid |
$3,447.00 |
PRC 1100 MAX50342 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/18/2017 |
Paid |
$2,864.00 |
PRC 1100 MAX50354 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/18/2017 |
Paid |
$8,592.00 |
PRC 1100 MAX50144 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2017 |
Paid |
$11,664.00 |
PRC 1100 MAX50162 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2017 |
Paid |
$17,843.00 |
PRC 1100 MAX50169 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2017 |
Paid |
$17,235.00 |
PRC 1100 MAX50172 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2017 |
Paid |
$2,549.00 |
PRC 1100 MAX50210 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2017 |
Paid |
$23,690.00 |
PRC 1100 MAX50213 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2017 |
Paid |
$7,647.00 |
PRC 1100 MAX50215 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2017 |
Paid |
$3,567.00 |
PRC 1100 MAX50225 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2017 |
Paid |
$7,442.00 |
PRC 1100 MAX50226 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2017 |
Paid |
$11,010.00 |
PRC 1100 MAX49976 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/30/2017 |
Paid |
$1,690.00 |
PRC 1100 MAX49843 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/24/2017 |
Paid |
$8,052.00 |
PRC 1100 MAX49845 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/24/2017 |
Paid |
$4,830.00 |
PRC 1100 MAX49854 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/24/2017 |
Paid |
$8,560.00 |
PRC 1100 MAX49754 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2017 |
Paid |
$10,196.00 |
PRC 1100 MAX49755 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2017 |
Paid |
$14,110.00 |
PRC 1100 MAX49759 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2017 |
Paid |
$56,268.00 |
PRC 1100 MAX49285 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/21/2017 |
Paid |
$5,760.00 |
PRC 1100 MAX49777 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/21/2017 |
Paid |
$5,832.00 |
PRC 1100 MAX49775 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/17/2017 |
Paid |
$2,549.00 |
PRC 1100 MAX49621 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2017 |
Paid |
$2,549.00 |
PRC 1100 MAX49622 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2017 |
Paid |
$2,700.00 |
PRC 1100 MAX49623 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2017 |
Paid |
$3,888.00 |
PRC 1100 MAX49624 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2017 |
Paid |
$1,610.00 |
PRC 1100 MAX49380 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2017 |
Paid |
$9,660.00 |
PRC 1100 MAX49430 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2017 |
Paid |
$9,517.00 |
PRC 1100 MAX49432 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2017 |
Paid |
$22,300.00 |
PRC 1100 MAX49434 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2017 |
Paid |
$10,969.00 |
PRC 1100 MAX49435 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/08/2017 |
Paid |
$3,670.00 |
PRC 1100 MAX49263 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/28/2017 |
Paid |
$26,152.00 |
PRC 1100 MAX49286 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/28/2017 |
Paid |
$11,664.00 |
PRC 1100 MAX49373 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/28/2017 |
Paid |
$5,832.00 |
PRC 1100 MAX49172 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/24/2017 |
Paid |
$18,000.00 |
PRC 1100 MAX49176 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/24/2017 |
Paid |
$15,294.00 |
PRC 1100 MAX49177 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/24/2017 |
Paid |
$2,700.00 |
PRC 1100 MAX49179 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/24/2017 |
Paid |
$9,660.00 |
PRC 1100 MAX49183 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/24/2017 |
Paid |
$4,844.00 |
PRC 1100 MAX49188 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/24/2017 |
Paid |
$4,830.00 |
PRC 1100 MAX49191 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/24/2017 |
Paid |
$1,800.00 |
PRC 1100 MAX49195 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/24/2017 |
Paid |
$2,700.00 |
PRC 1100 MAX49189 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/23/2017 |
Paid |
$8,560.00 |
PRC 1100 MAX49010 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/21/2017 |
Paid |
$3,888.00 |
PRC 1100 MAX48722 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/07/2017 |
Paid |
$2,069.00 |
PRC 1100 MAX48725 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/07/2017 |
Paid |
$7,647.00 |
PRC 1100 MAX48814 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/07/2017 |
Paid |
$3,480.00 |
PRC 1100 MAX48817 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/07/2017 |
Paid |
$17,280.00 |
PRC 1100 MAX48640 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2017 |
Paid |
$32,615.00 |
PRC 1100 MAX48653 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/01/2017 |
Paid |
$13,608.00 |
PRC 1100 MAX48534 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/27/2017 |
Paid |
$14,628.00 |
PRC 1100 MAX48535 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/27/2017 |
Paid |
$7,919.00 |
PRC 1100 MAX48540 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/27/2017 |
Paid |
$3,220.00 |
PRC 1100 MAX48473 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/26/2017 |
Paid |
$17,000.00 |
PRC 1100 MAX48472 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/25/2017 |
Paid |
$2,549.00 |
PRC 1100 MAX48474 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/25/2017 |
Paid |
$15,294.00 |
PRC 1100 MAX48480 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/25/2017 |
Paid |
$3,300.00 |
PRC 1100 MAX48217 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2017 |
Paid |
$18,380.00 |
PRC 1100 MAX48221 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2017 |
Paid |
$3,888.00 |
PRC 1100 MAX48222 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2017 |
Paid |
$9,052.00 |
PRC 1100 MAX48227 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2017 |
Paid |
$9,600.00 |
PRC 1100 MAX48185 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/06/2017 |
Paid |
$3,220.00 |
PRC 1100 MAX48187 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/06/2017 |
Paid |
$3,670.00 |
PRC 1100 MAX48189 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/06/2017 |
Paid |
$3,220.00 |
PRC 1100 MAX48191 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/06/2017 |
Paid |
$3,901.00 |
PRC 1100 MAX48011 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2017 |
Paid |
$13,608.00 |
PRC 1100 MAX48052 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2017 |
Paid |
$5,460.00 |
PRC 1100 MAX48053 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2017 |
Paid |
$2,700.00 |
PRC 1100 MAX48055 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2017 |
Paid |
$8,050.00 |
PRC 1100 MAX48059 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2017 |
Paid |
$12,957.00 |
PRC 1100 MAX47828 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/19/2016 |
Paid |
$20,872.00 |
PRC 1100 MAX47835 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/19/2016 |
Paid |
$3,888.00 |
PRC 1100 MAX47745 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/14/2016 |
Paid |
$3,220.00 |
PRC 1100 MAX47746 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/14/2016 |
Paid |
$9,190.00 |
PRC 1100 MAX47747 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/14/2016 |
Paid |
$5,871.00 |
PRC 1100 MAX47674 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/08/2016 |
Paid |
$18,380.00 |
PRC 1100 MAX47676 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/08/2016 |
Paid |
$27,672.00 |
PRC 1100 MAX47677 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/08/2016 |
Paid |
$15,654.00 |
PRC 1100 MAX47679 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/08/2016 |
Paid |
$7,040.00 |
PRC 1100 MAX47550 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/06/2016 |
Paid |
$8,050.00 |
PRC 1100 MAX47555 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/06/2016 |
Paid |
$6,440.00 |
PRC 1100 MAX47557 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/06/2016 |
Paid |
$9,212.00 |
PRC 1100 MAX47558 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/06/2016 |
Paid |
$30,000.00 |
PRC 1100 MAX47563 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/06/2016 |
Paid |
$23,268.00 |
PRC 1100 MAX47587 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/06/2016 |
Paid |
$2,609.00 |
PRC 1100 MAX47397 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/23/2016 |
Paid |
$19,390.00 |
PRC 1100 MAX47407 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/22/2016 |
Paid |
$1,957.00 |
PRC 1100 MAX47408 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/22/2016 |
Paid |
$4,323.00 |
PRC 1100 MAX47145 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2016 |
Paid |
$18,195.00 |
PRC 1100 MAX47315 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/17/2016 |
Paid |
$7,827.00 |
PRC 1100 MAX47317 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/17/2016 |
Paid |
$29,130.00 |
PRC 1100 MAX47319 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/17/2016 |
Paid |
$2,700.00 |
PRC 1100 MAX47320 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/17/2016 |
Paid |
$5,900.00 |
PRC 1100 MAX47303 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2016 |
Paid |
$42,214.00 |
PRC 1100 MAX47146 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/08/2016 |
Paid |
$8,718.00 |
PRC 1100 MAX47153 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/08/2016 |
Paid |
$2,609.00 |
PRC 1100 MAX46892 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/31/2016 |
Paid |
$1,690.00 |
PRC 1100 MAX46904 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/31/2016 |
Paid |
$12,779.00 |
PRC 1100 MAX46899 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/26/2016 |
Paid |
$3,898.00 |
PRC 1100 MAX46902 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/26/2016 |
Paid |
$4,830.00 |
PRC 1100 MAX46753 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/21/2016 |
Paid |
$4,830.00 |
PRC 1100 MAX46758 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/21/2016 |
Paid |
$11,694.00 |
PRC 1100 MAX46632 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2016 |
Paid |
$1,610.00 |
PRC 1100 MAX46633 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2016 |
Paid |
$1,800.00 |
PRC 1100 MAX46469 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/30/2016 |
Paid |
$26,154.00 |
PRC 1100 MAX46543 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/30/2016 |
Paid |
$17,660.00 |
PRC 1100 MAX46545 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/30/2016 |
Paid |
$9,920.00 |
PRC 1100 MAX46546 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/30/2016 |
Paid |
$8,718.00 |
PRC 1100 MAX46350 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2016 |
Paid |
$14,634.00 |
PRC 1100 MAX46354 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2016 |
Paid |
$30,816.00 |
PRC 1100 MAX46370 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2016 |
Paid |
$3,968.00 |
PRC 1100 MAX46372 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2016 |
Paid |
$12,492.00 |
PRC 1100 MAX46377 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2016 |
Paid |
$23,500.00 |
PRC 1100 MAX46228 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/22/2016 |
Paid |
$1,800.00 |
PRC 1100 MAX46233 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/22/2016 |
Paid |
$11,298.00 |
PRC 1100 MAX46121 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/16/2016 |
Paid |
$13,120.00 |
PRC 1100 MAX46122 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/16/2016 |
Paid |
$3,968.00 |
PRC 1100 MAX46125 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/16/2016 |
Paid |
$13,120.00 |
PRC 1100 MAX46070 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2016 |
Paid |
$6,440.00 |
PRC 1100 MAX46071 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2016 |
Paid |
$15,077.00 |
PRC 1100 MAX46073 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2016 |
Paid |
$3,968.00 |
PRC 1100 MAX45976 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/12/2016 |
Paid |
$1,610.00 |
PRC 1100 MAX45977 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/12/2016 |
Paid |
$2,700.00 |
PRC 1100 MAX45986 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/12/2016 |
Paid |
$5,539.00 |
PRC 1100 MAX45880 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2016 |
Paid |
$4,389.00 |
PRC 1100 MAX45888 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2016 |
Paid |
$9,920.00 |
PRC 1100 MAX45895 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2016 |
Paid |
$32,536.00 |
PRC 1100 MAX45920 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2016 |
Paid |
$19,958.00 |
PRC 1100 MAX45921 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2016 |
Paid |
$4,830.00 |
PRC 1100 MAX45399 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/07/2016 |
Paid |
$15,872.00 |
PRC 1100 MAX45784 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/31/2016 |
Paid |
$28,864.00 |
PRC 1100 MAX45694 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2016 |
Paid |
$5,020.00 |
PRC 1100 MAX45699 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2016 |
Paid |
$1,984.00 |
PRC 1100 MAX45597 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/23/2016 |
Paid |
$4,389.00 |
PRC 1100 MAX45498 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/18/2016 |
Paid |
$10,560.00 |
PRC 1100 MAX45500 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/18/2016 |
Paid |
$3,400.00 |
PRC 1100 MAX45504 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/18/2016 |
Paid |
$18,664.00 |
PRC 1100 MAX45508 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/18/2016 |
Paid |
$11,998.00 |
PRC 1100 MAX45410 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/17/2016 |
Paid |
$9,660.00 |
PRC 1100 MAX45392 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/12/2016 |
Paid |
$13,944.00 |
PRC 1100 MAX45393 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/12/2016 |
Paid |
$26,334.00 |
PRC 1100 MAX45394 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/12/2016 |
Paid |
$11,092.00 |
PRC 1100 MAX45407 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/12/2016 |
Paid |
$4,830.00 |
PRC 1100 MAX45271 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/10/2016 |
Paid |
$15,744.00 |
PRC 1100 MAX45277 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/10/2016 |
Paid |
$17,164.00 |
PRC 1100 MAX45280 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/10/2016 |
Paid |
$9,162.00 |
PRC 1100 MAX45113 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2016 |
Paid |
$8,972.00 |
PRC 1100 MAX45117 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2016 |
Paid |
$2,700.00 |
PRC 1100 MAX45123 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2016 |
Paid |
$9,829.00 |
PRC 1100 MAX45126 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2016 |
Paid |
$7,138.00 |
PRC 1100 MAX45127 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2016 |
Paid |
$14,730.00 |
PRC 1100 MAX45083 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/01/2016 |
Paid |
$5,248.00 |
PRC 1100 MAX45084 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/01/2016 |
Paid |
$13,167.00 |
PRC 1100 MAX45093 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/01/2016 |
Paid |
$10,544.00 |
PRC 1100 MAX45097 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/01/2016 |
Paid |
$15,872.00 |
PRC 1100 MAX45101 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/01/2016 |
Paid |
$9,172.00 |
PRC 1100 MAX44864 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/27/2016 |
Paid |
$13,888.00 |
PRC 1100 MAX44993 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/27/2016 |
Paid |
$5,985.00 |
PRC 1100 MAX44842 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/20/2016 |
Paid |
$5,856.00 |
PRC 1100 MAX44698 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2016 |
Paid |
$7,176.00 |
PRC 1100 MAX44699 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2016 |
Paid |
$13,921.00 |
PRC 1100 MAX44703 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2016 |
Paid |
$5,470.00 |
PRC 1100 MAX44585 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/30/2016 |
Paid |
$3,220.00 |
PRC 1100 MAX44586 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/30/2016 |
Paid |
$7,908.00 |
PRC 1100 MAX44589 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/30/2016 |
Paid |
$12,008.00 |
PRC 1100 MAX44496 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2016 |
Paid |
$2,636.00 |
PRC 1100 MAX44497 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2016 |
Paid |
$7,936.00 |
PRC 1100 MAX44498 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2016 |
Paid |
$1,984.00 |
PRC 1100 MAX44414 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/24/2016 |
Paid |
$5,289.00 |
PRC 1100 MAX44415 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/24/2016 |
Paid |
$12,898.00 |
PRC 1100 MAX44426 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/24/2016 |
Paid |
$17,773.00 |
PRC 1100 MAX44427 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/24/2016 |
Paid |
$2,636.00 |
PRC 1100 MAX44291 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/20/2016 |
Paid |
$3,240.00 |
PRC 1100 MAX44298 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/20/2016 |
Paid |
$1,620.00 |
PRC 1100 MAX44171 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2016 |
Paid |
$25,749.00 |
PRC 1100 MAX44176 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2016 |
Paid |
$5,985.00 |
PRC 1100 MAX44180 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2016 |
Paid |
$7,196.00 |
PRC 1100 MAX43879 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/27/2016 |
Paid |
$9,356.00 |
PRC 1100 MAX43883 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/27/2016 |
Paid |
$1,800.00 |
PRC 1100 MAX43884 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/27/2016 |
Paid |
$7,605.00 |
PRC 1100 MAX43887 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/27/2016 |
Paid |
$4,860.00 |
PRC 1100 MAX43890 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/27/2016 |
Paid |
$7,980.00 |
PRC 1100 MAX43687 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2016 |
Paid |
$2,069.00 |
PRC 1100 MAX43688 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2016 |
Paid |
$6,800.00 |
PRC 1100 MAX43694 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2016 |
Paid |
$8,850.00 |
PRC 1100 MAX43696 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2016 |
Paid |
$10,544.00 |
PRC 1100 MAX43701 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2016 |
Paid |
$2,636.00 |
PRC 1100 MAX43500 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/11/2016 |
Paid |
$14,034.00 |
PRC 1100 MAX43514 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/11/2016 |
Paid |
$40,698.00 |
PRC 1100 MAX43516 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/11/2016 |
Paid |
$18,457.00 |
PRC 1100 MAX43379 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/06/2016 |
Paid |
$1,995.00 |
PRC 1100 MAX43380 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/06/2016 |
Paid |
$3,670.00 |
PRC 1100 MAX43384 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/06/2016 |
Paid |
$3,380.00 |
PRC 1100 MAX43385 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/06/2016 |
Paid |
$7,980.00 |
PRC 1100 MAX43388 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/06/2016 |
Paid |
$6,098.00 |
PRC 1100 MAX43331 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2016 |
Paid |
$8,850.00 |
PRC 1100 MAX43346 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2016 |
Paid |
$3,049.00 |
PRC 1100 MAX43198 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2016 |
Paid |
$1,620.00 |
PRC 1100 MAX43200 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2016 |
Paid |
$1,995.00 |
PRC 1100 MAX43202 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2016 |
Paid |
$2,069.00 |
PRC 1100 MAX43205 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2016 |
Paid |
$1,620.00 |
PRC 1100 MAX43207 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2016 |
Paid |
$4,390.00 |
PRC 1100 MAX42992 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2016 |
Paid |
$13,143.00 |
PRC 1100 MAX42993 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2016 |
Paid |
$18,190.00 |
PRC 1100 MAX42994 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2016 |
Paid |
$8,100.00 |
PRC 1100 MAX42996 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2016 |
Paid |
$1,690.00 |
PRC 1100 MAX43011 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2016 |
Paid |
$27,303.00 |
PRC 1100 MAX43014 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2016 |
Paid |
$7,276.00 |
PRC 1100 MAX43052 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2016 |
Paid |
$19,051.00 |
PRC 1100 MAX43059 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2016 |
Paid |
$5,871.00 |
PRC 1100 MAX42861 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/07/2016 |
Paid |
$1,690.00 |
PRC 1100 MAX42862 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/07/2016 |
Paid |
$5,612.00 |
PRC 1100 MAX42687 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/30/2016 |
Paid |
$8,100.00 |
PRC 1100 MAX42694 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/30/2016 |
Paid |
$6,289.00 |
PRC 1100 MAX42518 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/22/2016 |
Paid |
$4,860.00 |
PRC 1100 MAX42520 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/22/2016 |
Paid |
$13,269.00 |
PRC 1100 MAX42521 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/22/2016 |
Paid |
$23,724.00 |
PRC 1100 MAX42538 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/22/2016 |
Paid |
$21,177.00 |
PRC 1100 MAX42345 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/21/2016 |
Paid |
$48,304.00 |
PRC 1100 MAX42348 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/18/2016 |
Paid |
$6,158.00 |
PRC 1100 MAX42354 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/18/2016 |
Paid |
$74,202.00 |
PRC 1100 MAX42357 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/18/2016 |
Paid |
$32,151.00 |
PRC 1100 MAX42273 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/17/2016 |
Paid |
$23,495.00 |
PRC 1100 MAX42163 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2016 |
Paid |
$3,670.00 |
PRC 1100 MAX42164 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2016 |
Paid |
$3,380.00 |
PRC 1100 MAX42175 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2016 |
Paid |
$2,700.00 |
PRC 1100 MAX42177 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2016 |
Paid |
$48,909.00 |
PRC 1100 MAX41991 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/02/2016 |
Paid |
$6,480.00 |
PRC 1100 MAX41995 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/02/2016 |
Paid |
$7,980.00 |
PRC 1100 MAX41996 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/02/2016 |
Paid |
$6,800.00 |
PRC 1100 MAX41842 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2016 |
Paid |
$13,960.00 |
PRC 1100 MAX41855 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2016 |
Paid |
$5,985.00 |
PRC 1100 MAX41615 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/18/2016 |
Paid |
$13,965.00 |
PRC 1100 MAX41621 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/18/2016 |
Paid |
$1,958.00 |
PRC 1100 MAX41623 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/18/2016 |
Paid |
$9,225.00 |
PRC 1100 MAX41399 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2016 |
Paid |
$4,860.00 |
PRC 1100 MAX41238 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2016 |
Paid |
$16,230.00 |
PRC 1100 MAX41241 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2016 |
Paid |
$4,500.00 |
PRC 1100 MAX41250 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2016 |
Paid |
$24,345.00 |
PRC 1100 MAX41251 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2016 |
Paid |
$18,630.00 |
PRC 1100 MAX41254 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2016 |
Paid |
$3,240.00 |
PRC 1100 MAX41256 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2016 |
Paid |
$17,850.00 |
PRC 1100 MAX41260 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2016 |
Paid |
$1,620.00 |
PRC 1100 MAX41054 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2016 |
Paid |
$4,490.00 |
PRC 1100 MAX41085 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2016 |
Paid |
$1,995.00 |
PRC 1100 MAX41097 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2016 |
Paid |
$5,690.00 |
PRC 1100 MAX40956 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/11/2016 |
Paid |
$4,490.00 |
PRC 1100 MAX40957 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/11/2016 |
Paid |
$35,177.00 |
PRC 1100 MAX40960 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/11/2016 |
Paid |
$2,700.00 |
PRC 1100 MAX40465 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2015 |
Paid |
$40,410.00 |
PRC 1100 MAX40466 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2015 |
Paid |
$2,700.00 |
PRC 1100 MAX40471 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2015 |
Paid |
$3,400.00 |
PRC 1100 MAX40358 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/09/2015 |
Paid |
$4,860.00 |
PRC 1100 MAX40361 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/09/2015 |
Paid |
$3,490.00 |
PRC 1100 MAX40149 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/01/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX40152 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/01/2015 |
Paid |
$43,245.00 |
PRC 1100 MAX40153 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/01/2015 |
Paid |
$35,920.00 |
PRC 1100 MAX40154 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/01/2015 |
Paid |
$4,860.00 |
PRC 1100 MAX40155 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/01/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX40158 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/01/2015 |
Paid |
$2,069.00 |
PRC 1100 MAX40013 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/20/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX40014 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/20/2015 |
Paid |
$22,600.00 |
PRC 1100 MAX40018 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/20/2015 |
Paid |
$1,620.00 |
PRC 1100 MAX39892 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/12/2015 |
Paid |
$3,876.00 |
PRC 1100 MAX39893 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/12/2015 |
Paid |
$5,985.00 |
PRC 1100 MAX39896 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/12/2015 |
Paid |
$58,525.00 |
PRC 1100 MAX39897 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/12/2015 |
Paid |
$8,100.00 |
PRC 1100 MAX39769 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2015 |
Paid |
$7,980.00 |
PRC 1100 MAX39773 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2015 |
Paid |
$12,840.00 |
PRC 1100 MAX39671 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/29/2015 |
Paid |
$15,015.00 |
PRC 1100 MAX39723 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/29/2015 |
Paid |
$5,985.00 |
PRC 1100 MAX39728 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/29/2015 |
Paid |
$10,172.00 |
PRC 1100 MAX39473 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/27/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX39474 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/27/2015 |
Paid |
$1,620.00 |
PRC 1100 MAX39478 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/27/2015 |
Paid |
$12,364.00 |
PRC 1100 MAX39479 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/27/2015 |
Paid |
$5,695.00 |
PRC 1100 MAX39573 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/27/2015 |
Paid |
$13,204.00 |
PRC 1100 MAX39579 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/27/2015 |
Paid |
$1,800.00 |
PRC 1100 MAX39251 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/06/2015 |
Paid |
$1,995.00 |
PRC 1100 MAX39254 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/06/2015 |
Paid |
$17,140.00 |
PRC 1100 MAX39257 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/06/2015 |
Paid |
$12,850.00 |
PRC 1100 MAX39258 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/06/2015 |
Paid |
$27,250.00 |
PRC 1100 MAX39195 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/02/2015 |
Paid |
$900.00 |
PRC 1100 MAX39198 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/02/2015 |
Paid |
$17,090.00 |
PRC 1100 MAX39199 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/02/2015 |
Paid |
$1,995.00 |
PRC 1100 MAX39037 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2015 |
Paid |
$9,975.00 |
PRC 1100 MAX39038 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX39041 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2015 |
Paid |
$3,240.00 |
PRC 1100 MAX39043 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2015 |
Paid |
$14,370.00 |
PRC 1100 MAX39059 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2015 |
Paid |
$2,090.00 |
PRC 1100 MAX38882 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2015 |
Paid |
$23,875.00 |
PRC 1100 MAX38883 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2015 |
Paid |
$2,725.00 |
PRC 1100 MAX38886 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2015 |
Paid |
$21,800.00 |
PRC 1100 MAX38813 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/15/2015 |
Paid |
$11,970.00 |
PRC 1100 MAX38815 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/15/2015 |
Paid |
$2,700.00 |
PRC 1100 MAX38816 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/15/2015 |
Paid |
$15,465.00 |
PRC 1100 MAX38819 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/15/2015 |
Paid |
$19,160.00 |
PRC 1100 MAX38821 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/15/2015 |
Paid |
$16,200.00 |
PRC 1100 MAX38597 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2015 |
Paid |
$38,320.00 |
PRC 1100 MAX38599 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2015 |
Paid |
$21,800.00 |
PRC 1100 MAX38604 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2015 |
Paid |
$14,655.00 |
PRC 1100 MAX38608 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2015 |
Paid |
$15,960.00 |
PRC 1100 MAX38508 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/02/2015 |
Paid |
$32,700.00 |
PRC 1100 MAX38250 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/21/2015 |
Paid |
$10,095.00 |
PRC 1100 MAX38270 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/21/2015 |
Paid |
$36,075.00 |
PRC 1100 MAX38271 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/21/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX38274 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/21/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX38147 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2015 |
Paid |
$1,800.00 |
PRC 1100 MAX38150 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2015 |
Paid |
$21,800.00 |
PRC 1100 MAX38155 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2015 |
Paid |
$2,700.00 |
PRC 1100 MAX38159 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2015 |
Paid |
$3,400.00 |
PRC 1100 MAX38066 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/12/2015 |
Paid |
$5,985.00 |
PRC 1100 MAX38069 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/12/2015 |
Paid |
$3,240.00 |
PRC 1100 MAX38070 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/12/2015 |
Paid |
$16,350.00 |
PRC 1100 MAX37957 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/05/2015 |
Paid |
$28,740.00 |
PRC 1100 MAX37958 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/05/2015 |
Paid |
$3,130.00 |
PRC 1100 MAX37874 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2015 |
Paid |
$5,074.00 |
PRC 1100 MAX37787 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/29/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX37791 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/29/2015 |
Paid |
$2,082.00 |
PRC 1100 MAX37797 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/29/2015 |
Paid |
$13,470.00 |
PRC 1100 MAX37825 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/29/2015 |
Paid |
$54,680.00 |
PRC 1100 MAX37662 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/23/2015 |
Paid |
$1,620.00 |
PRC 1100 MAX37668 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/23/2015 |
Paid |
$8,175.00 |
PRC 1100 MAX37678 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/23/2015 |
Paid |
$9,950.00 |
PRC 1100 MAX37679 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/23/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX37686 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/23/2015 |
Paid |
$3,400.00 |
PRC 1100 MAX37380 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/13/2015 |
Paid |
$1,990.00 |
PRC 1100 MAX37381 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/13/2015 |
Paid |
$3,240.00 |
PRC 1100 MAX37383 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/13/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX37279 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/01/2015 |
Paid |
$27,250.00 |
PRC 1100 MAX37280 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/01/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX37286 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/01/2015 |
Paid |
$1,620.00 |
PRC 1100 MAX37287 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/01/2015 |
Paid |
$28,740.00 |
PRC 1100 MAX37290 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/01/2015 |
Paid |
$20,850.00 |
PRC 1100 MAX37008 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/23/2015 |
Paid |
$8,880.00 |
PRC 1100 MAX37009 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/23/2015 |
Paid |
$1,960.00 |
PRC 1100 MAX37010 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/23/2015 |
Paid |
$53,880.00 |
PRC 1100 MAX37011 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/23/2015 |
Paid |
$36,015.00 |
PRC 1100 MAX37057 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/23/2015 |
Paid |
$3,240.00 |
PRC 1100 MAX37059 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/23/2015 |
Paid |
$26,440.00 |
PRC 1100 MAX37060 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/23/2015 |
Paid |
$2,700.00 |
PRC 1100 MAX37063 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/23/2015 |
Paid |
$9,990.00 |
PRC 1100 MAX37065 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/23/2015 |
Paid |
$7,980.00 |
PRC 1100 MAX36915 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2015 |
Paid |
$17,820.00 |
PRC 1100 MAX36916 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2015 |
Paid |
$34,170.00 |
PRC 1100 MAX36697 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/10/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX36698 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/10/2015 |
Paid |
$5,985.00 |
PRC 1100 MAX36704 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/10/2015 |
Paid |
$20,270.00 |
PRC 1100 MAX36712 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/10/2015 |
Paid |
$5,450.00 |
PRC 1100 MAX36615 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/02/2015 |
Paid |
$1,620.00 |
PRC 1100 MAX36623 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/02/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX36624 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/02/2015 |
Paid |
$900.00 |
PRC 1100 MAX36518 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/27/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX36520 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/27/2015 |
Paid |
$6,000.00 |
PRC 1100 MAX36527 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/27/2015 |
Paid |
$3,150.00 |
PRC 1100 MAX36528 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/27/2015 |
Paid |
$5,985.00 |
PRC 1100 MAX36361 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2015 |
Paid |
$6,730.00 |
PRC 1100 MAX36362 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2015 |
Paid |
$6,480.00 |
PRC 1100 MAX36369 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2015 |
Paid |
$1,960.00 |
PRC 1100 MAX36379 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2015 |
Paid |
$24,660.00 |
PRC 1100 MAX36248 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/11/2015 |
Paid |
$12,000.00 |
PRC 1100 MAX36249 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/11/2015 |
Paid |
$5,985.00 |
PRC 1100 MAX36251 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/11/2015 |
Paid |
$39,280.00 |
PRC 1100 MAX36252 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/11/2015 |
Paid |
$6,690.00 |
PRC 1100 MAX36260 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/11/2015 |
Paid |
$5,610.00 |
PRC 1100 MAX36263 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/11/2015 |
Paid |
$13,050.00 |
PRC 1100 MAX36084 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/04/2015 |
Paid |
$6,855.00 |
PRC 1100 MAX36087 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/04/2015 |
Paid |
$3,240.00 |
PRC 1100 MAX35970 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/29/2015 |
Paid |
$8,220.00 |
PRC 1100 MAX35976 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/29/2015 |
Paid |
$17,050.00 |
PRC 1100 MAX35982 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/29/2015 |
Paid |
$1,995.00 |
PRC 1100 MAX35843 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/21/2015 |
Paid |
$1,995.00 |
PRC 1100 MAX35781 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/20/2015 |
Paid |
$1,960.00 |
PRC 1100 MAX35782 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/20/2015 |
Paid |
$8,220.00 |
PRC 1100 MAX35730 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2015 |
Paid |
$900.00 |
PRC 1100 MAX35554 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/08/2015 |
Paid |
$1,620.00 |
PRC 1100 MAX35555 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/08/2015 |
Paid |
$26,940.00 |
PRC 1100 MAX35475 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/03/2015 |
Paid |
$4,950.00 |
PRC 1100 MAX35476 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/03/2015 |
Paid |
$1,620.00 |
PRC 1100 MAX35478 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/03/2015 |
Paid |
$3,400.00 |
PRC 1100 MAX35483 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/03/2015 |
Paid |
$5,695.00 |
PRC 1100 MAX35494 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/03/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX35231 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/27/2015 |
Paid |
$115,220.00 |
PRC 1100 MAX35326 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/27/2015 |
Paid |
$10,036.62 |
PRC 1100 MAX35331 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/27/2015 |
Paid |
$1,995.00 |
PRC 1100 MAX35232 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2015 |
Paid |
$58,370.00 |
PRC 1100 MAX35234 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2015 |
Paid |
$5,480.00 |
PRC 1100 MAX35237 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2015 |
Paid |
$17,085.00 |
PRC 1100 MAX35240 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2015 |
Paid |
$1,690.00 |
PRC 1100 MAX35243 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2015 |
Paid |
$12,225.00 |
PRC 1100 MAX35245 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2015 |
Paid |
$1,620.00 |
PRC 1100 MAX35248 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2015 |
Paid |
$6,485.00 |
PRC 1100 MAX35097 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2015 |
Paid |
$7,765.00 |
PRC 1100 MAX35098 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2015 |
Paid |
$3,670.00 |
PRC 1100 MAX35102 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2015 |
Paid |
$28,475.00 |
PRC 1100 MAX35025 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/17/2015 |
Paid |
$11,970.00 |
PRC 1100 MAX35030 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/17/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX34849 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/04/2015 |
Paid |
$1,620.00 |
PRC 1100 MAX34851 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/04/2015 |
Paid |
$10,036.62 |
PRC 1100 MAX34854 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/04/2015 |
Paid |
$28,475.00 |
PRC 1100 MAX34773 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/26/2015 |
Paid |
$2,090.00 |
PRC 1100 MAX34521 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2015 |
Paid |
$3,775.00 |
PRC 1100 MAX34605 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2015 |
Paid |
$3,240.00 |
PRC 1100 MAX34610 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2015 |
Paid |
$35,720.00 |
PRC 1100 MAX34611 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2015 |
Paid |
$1,620.00 |
PRC 1100 MAX34614 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2015 |
Paid |
$1,620.00 |
PRC 1100 MAX34621 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2015 |
Paid |
$3,240.00 |
PRC 1100 MAX34518 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/19/2015 |
Paid |
$5,985.00 |
PRC 1100 MAX34520 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/19/2015 |
Paid |
$5,985.00 |
PRC 1100 MAX34359 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/10/2015 |
Paid |
$11,720.00 |
PRC 1100 MAX34275 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/04/2015 |
Paid |
$1,620.00 |
PRC 1100 MAX34276 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/04/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX34285 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/04/2015 |
Paid |
$21,600.00 |
PRC 1100 MAX34153 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2015 |
Paid |
$50,200.00 |
PRC 1100 MAX34157 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2015 |
Paid |
$19,880.00 |
PRC 1100 MAX34092 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/27/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX33968 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2015 |
Paid |
$3,990.00 |
PRC 1100 MAX33971 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2015 |
Paid |
$15,720.00 |
PRC 1100 MAX33972 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2015 |
Paid |
$17,960.00 |
PRC 1100 MAX33974 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2015 |
Paid |
$6,800.00 |
PRC 1100 MAX33987 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2015 |
Paid |
$3,960.00 |
PRC 1100 MAX33988 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2015 |
Paid |
$60,770.00 |
PRC 1100 MAX33992 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2015 |
Paid |
$5,988.00 |
PRC 1100 MAX33918 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/15/2015 |
Paid |
$15,200.00 |
PRC 1100 MAX33930 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/15/2015 |
Paid |
$10,310.00 |
PRC 1100 MAX33932 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/15/2015 |
Paid |
$4,700.00 |
PRC 1100 MAX33758 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2015 |
Paid |
$20,073.24 |
PRC 1100 MAX33763 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2015 |
Paid |
$9,190.00 |
PRC 1100 MAX33768 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2015 |
Paid |
$3,775.00 |
PRC 1100 MAX33771 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2015 |
Paid |
$2,000.00 |
PRC 1100 MAX33774 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2015 |
Paid |
$16,062.60 |
PRC 1100 MAX33777 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2015 |
Paid |
$28,800.00 |
PRC 1100 MAX33494 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/26/2014 |
Paid |
$37,220.00 |
PRC 1100 MAX33463 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/23/2014 |
Paid |
$102,560.00 |
PRC 1100 MAX33465 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/23/2014 |
Paid |
$6,240.00 |
PRC 1100 MAX33467 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/23/2014 |
Paid |
$15,760.00 |
PRC 1100 MAX33470 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/23/2014 |
Paid |
$5,700.00 |
PRC 1100 MAX33472 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/23/2014 |
Paid |
$8,290.00 |
PRC 1100 MAX33480 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/23/2014 |
Paid |
$6,345.00 |
PRC 1100 MAX33490 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/23/2014 |
Paid |
$900.00 |
PRC 1100 MAX33159 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2014 |
Paid |
$1,640.00 |
PRC 1100 MAX33161 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2014 |
Paid |
$14,540.00 |
PRC 1100 MAX33028 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/26/2014 |
Paid |
$1,640.00 |
PRC 1100 MAX33047 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/26/2014 |
Paid |
$2,850.00 |
PRC 1100 MAX32737 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/19/2014 |
Paid |
$22,600.00 |
PRC 1100 MAX32887 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/19/2014 |
Paid |
$11,740.00 |
PRC 1100 MAX32892 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/19/2014 |
Paid |
$7,740.00 |
PRC 1100 MAX32893 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/19/2014 |
Paid |
$15,200.00 |
PRC 1100 MAX32894 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/19/2014 |
Paid |
$1,640.00 |
PRC 1100 MAX32731 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/06/2014 |
Paid |
$1,640.00 |
PRC 1100 MAX32590 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/05/2014 |
Paid |
$2,200.00 |
PRC 1100 MAX32591 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/05/2014 |
Paid |
$13,560.00 |
PRC 1100 MAX32440 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/29/2014 |
Paid |
$3,840.00 |
PRC 1100 MAX32445 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/29/2014 |
Paid |
$2,700.00 |
PRC 1100 MAX32429 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/27/2014 |
Paid |
$2,700.00 |
PRC 1100 MAX32435 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/27/2014 |
Paid |
$9,520.00 |
PRC 1100 MAX32262 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/21/2014 |
Paid |
$13,745.00 |
PRC 1100 MAX32263 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/21/2014 |
Paid |
$2,200.00 |
PRC 1100 MAX32271 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/21/2014 |
Paid |
$47,525.00 |
PRC 1100 MAX31998 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/09/2014 |
Paid |
$16,790.00 |
PRC 1100 MAX32064 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/09/2014 |
Paid |
$3,280.00 |
PRC 1100 MAX31989 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2014 |
Paid |
$33,520.00 |
PRC 1100 MAX31993 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2014 |
Paid |
$33,080.00 |
PRC 1100 MAX31994 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2014 |
Paid |
$8,540.00 |
PRC 1100 MAX31999 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2014 |
Paid |
$1,640.00 |
PRC 1100 MAX32002 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2014 |
Paid |
$2,770.00 |
PRC 1100 MAX31782 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2014 |
Paid |
$3,280.00 |
PRC 1100 MAX31784 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2014 |
Paid |
$4,400.00 |
PRC 1100 MAX31790 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2014 |
Paid |
$1,640.00 |
PRC 1100 MAX31795 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2014 |
Paid |
$22,600.00 |
PRC 1100 MAX31695 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/23/2014 |
Paid |
$7,290.00 |
PRC 1100 MAX31700 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/23/2014 |
Paid |
$8,800.00 |
PRC 1100 MAX31703 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/23/2014 |
Paid |
$2,770.00 |
PRC 1100 MAX31623 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/22/2014 |
Paid |
$13,200.00 |
PRC 1100 MAX31420 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/16/2014 |
Paid |
$12,610.00 |
PRC 1100 MAX31518 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/16/2014 |
Paid |
$21,717.00 |
PRC 1100 MAX31520 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/16/2014 |
Paid |
$8,310.00 |
PRC 1100 MAX31521 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/16/2014 |
Paid |
$2,770.00 |
PRC 1100 MAX31526 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/16/2014 |
Paid |
$23,380.00 |
PRC 1100 MAX31528 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/16/2014 |
Paid |
$27,880.00 |
PRC 1100 MAX31414 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/12/2014 |
Paid |
$28,104.54 |
PRC 1100 MAX31418 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/12/2014 |
Paid |
$3,280.00 |
PRC 1100 MAX31423 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/12/2014 |
Paid |
$8,800.00 |
PRC 1100 MAX31427 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/12/2014 |
Paid |
$5,480.00 |
PRC 1100 MAX31439 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/12/2014 |
Paid |
$3,280.00 |
PRC 1100 MAX31212 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/03/2014 |
Paid |
$22,880.00 |
PRC 1100 MAX31214 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/03/2014 |
Paid |
$2,610.00 |
PRC 1100 MAX31215 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/03/2014 |
Paid |
$8,800.00 |
PRC 1100 MAX31220 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/03/2014 |
Paid |
$28,956.00 |
PRC 1100 MAX31227 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/03/2014 |
Paid |
$11,000.00 |
PRC 1100 MAX30912 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/20/2014 |
Paid |
$22,993.00 |
PRC 1100 MAX30913 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/20/2014 |
Paid |
$8,421.40 |
PRC 1100 MAX30914 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/20/2014 |
Paid |
$10,440.00 |
PRC 1100 MAX30923 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/20/2014 |
Paid |
$8,421.40 |
PRC 1100 MAX30796 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/15/2014 |
Paid |
$22,535.00 |
PRC 1100 MAX30767 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/14/2014 |
Paid |
$2,180.00 |
PRC 1100 MAX30771 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/14/2014 |
Paid |
$10,036.62 |
PRC 1100 MAX30789 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/14/2014 |
Paid |
$22,729.10 |
PRC 1100 MAX30790 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/14/2014 |
Paid |
$8,031.30 |
PRC 1100 MAX30792 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/14/2014 |
Paid |
$8,250.00 |
PRC 1100 MAX30638 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/08/2014 |
Paid |
$17,600.00 |
PRC 1100 MAX30639 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/08/2014 |
Paid |
$15,400.00 |
PRC 1100 MAX30645 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/08/2014 |
Paid |
$1,800.00 |
PRC 1100 MAX30651 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/08/2014 |
Paid |
$4,400.00 |
PRC 1100 MAX30408 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2014 |
Paid |
$5,580.00 |
PRC 1100 MAX30409 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2014 |
Paid |
$9,600.00 |
PRC 1100 MAX30410 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2014 |
Paid |
$4,400.00 |
PRC 1100 MAX30421 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2014 |
Paid |
$8,370.00 |
PRC 1100 MAX30284 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2014 |
Paid |
$2,610.00 |
PRC 1100 MAX30285 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2014 |
Paid |
$1,960.00 |
PRC 1100 MAX30286 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2014 |
Paid |
$3,000.00 |
PRC 1100 MAX30300 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2014 |
Paid |
$4,400.00 |
PRC 1100 MAX30206 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/21/2014 |
Paid |
$5,350.00 |
PRC 1100 MAX30209 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/21/2014 |
Paid |
$15,180.00 |
PRC 1100 MAX30088 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2014 |
Paid |
$3,750.00 |
PRC 1100 MAX30090 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2014 |
Paid |
$16,062.60 |
PRC 1100 MAX30091 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2014 |
Paid |
$8,370.00 |
PRC 1100 MAX30096 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2014 |
Paid |
$4,540.00 |
PRC 1100 MAX29711 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/03/2014 |
Paid |
$3,280.00 |
PRC 1100 MAX29717 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/03/2014 |
Paid |
$4,860.00 |
PRC 1100 MAX29719 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/03/2014 |
Paid |
$90,916.40 |
PRC 1100 MAX29721 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/03/2014 |
Paid |
$4,920.00 |
PRC 1100 MAX29722 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/03/2014 |
Paid |
$2,700.00 |
PRC 1100 MAX29723 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/03/2014 |
Paid |
$113,645.50 |
PRC 1100 MAX29681 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/30/2014 |
Paid |
$8,421.40 |
PRC 1100 MAX29682 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/30/2014 |
Paid |
$16,842.80 |
PRC 1100 MAX29684 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/30/2014 |
Paid |
$3,280.00 |
PRC 1100 MAX29529 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/23/2014 |
Paid |
$12,750.00 |
PRC 1100 MAX29542 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/23/2014 |
Paid |
$2,700.00 |
PRC 1100 MAX29543 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/23/2014 |
Paid |
$13,940.00 |
PRC 1100 MAX29455 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/19/2014 |
Paid |
$22,729.10 |
PRC 1100 MAX29464 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/19/2014 |
Paid |
$14,580.00 |
PRC 1100 MAX29466 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/19/2014 |
Paid |
$43,510.00 |
PRC 1100 MAX29468 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/19/2014 |
Paid |
$26,390.00 |
PRC 1100 MAX29407 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2014 |
Paid |
$26,530.00 |
PRC 1100 MAX29408 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2014 |
Paid |
$22,729.10 |
PRC 1100 MAX29417 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2014 |
Paid |
$3,900.00 |
PRC 1100 MAX29419 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2014 |
Paid |
$6,000.00 |
PRC 1100 MAX29420 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2014 |
Paid |
$46,300.00 |
PRC 1100 MAX29155 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/04/2014 |
Paid |
$6,560.00 |
PRC 1100 MAX29162 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/04/2014 |
Paid |
$1,800.00 |
PRC 1100 MAX29169 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/04/2014 |
Paid |
$1,930.00 |
PRC 1100 MAX29178 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/04/2014 |
Paid |
$17,820.00 |
PRC 1100 MAX29184 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/04/2014 |
Paid |
$10,000.00 |
PRC 1100 MAX29185 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/04/2014 |
Paid |
$52,500.00 |
PRC 1100 MAX29017 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/29/2014 |
Paid |
$900.00 |
PRC 1100 MAX29033 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/29/2014 |
Paid |
$24,780.00 |
PRC 1100 MAX29037 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/29/2014 |
Paid |
$21,400.00 |
PRC 1100 MAX29039 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/29/2014 |
Paid |
$22,530.00 |
PRC 1100 MAX28734 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2014 |
Paid |
$23,020.00 |
PRC 1100 MAX28735 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2014 |
Paid |
$10,000.00 |
PRC 1100 MAX28743 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2014 |
Paid |
$4,920.00 |
PRC 1100 MAX28574 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/07/2014 |
Paid |
$16,062.60 |
PRC 1100 MAX28583 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/07/2014 |
Paid |
$31,780.00 |
PRC 1100 MAX28371 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/30/2014 |
Paid |
$32,125.20 |
PRC 1100 MAX28375 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/30/2014 |
Paid |
$9,080.00 |
PRC 1100 MAX28376 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/30/2014 |
Paid |
$29,580.00 |
PRC 1100 MAX28379 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/30/2014 |
Paid |
$16,740.00 |
PRC 1100 MAX28453 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/30/2014 |
Paid |
$1,745.00 |
PRC 1100 MAX28454 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/30/2014 |
Paid |
$8,200.00 |
PRC 1100 MAX28455 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/30/2014 |
Paid |
$4,920.00 |
PRC 1100 MAX28190 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2014 |
Paid |
$14,300.00 |
PRC 1100 MAX28191 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2014 |
Paid |
$8,690.00 |
PRC 1100 MAX28192 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2014 |
Paid |
$4,000.00 |
PRC 1100 MAX28079 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2014 |
Paid |
$31,650.00 |
PRC 1100 MAX28082 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2014 |
Paid |
$19,700.00 |
PRC 1100 MAX28087 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2014 |
Paid |
$5,400.00 |
PRC 1100 MAX27858 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/08/2014 |
Paid |
$13,800.00 |
PRC 1100 MAX27859 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/08/2014 |
Paid |
$4,260.00 |
PRC 1100 MAX27867 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/08/2014 |
Paid |
$4,600.00 |
PRC 1100 MAX27869 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/08/2014 |
Paid |
$7,725.00 |
PRC 1100 MAX27872 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/08/2014 |
Paid |
$6,800.00 |
PRC 1100 MAX27778 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/02/2014 |
Paid |
$6,000.00 |
PRC 1100 MAX27467 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/26/2014 |
Paid |
$3,400.00 |
PRC 1100 MAX27470 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/26/2014 |
Paid |
$1,745.00 |
PRC 1100 MAX27552 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/26/2014 |
Paid |
$5,400.00 |
PRC 1100 MAX27556 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/26/2014 |
Paid |
$22,729.10 |
PRC 1100 MAX27559 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/26/2014 |
Paid |
$3,860.00 |
PRC 1100 MAX27560 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/26/2014 |
Paid |
$3,280.00 |
PRC 1100 MAX27460 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2014 |
Paid |
$24,400.00 |
PRC 1100 MAX27463 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2014 |
Paid |
$43,790.00 |
PRC 1100 MAX27469 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/20/2014 |
Paid |
$1,800.00 |
PRC 1100 MAX27231 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/12/2014 |
Paid |
$8,421.40 |
PRC 1100 MAX27233 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/12/2014 |
Paid |
$25,500.00 |
PRC 1100 MAX27131 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2014 |
Paid |
$18,836.00 |
PRC 1100 MAX27070 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/03/2014 |
Paid |
$6,000.00 |
PRC 1100 MAX27075 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/03/2014 |
Paid |
$6,560.00 |
PRC 1100 MAX27080 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/03/2014 |
Paid |
$4,000.00 |
PRC 1100 MAX27086 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/03/2014 |
Paid |
$43,360.00 |
PRC 1100 MAX26869 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/21/2014 |
Paid |
$20,073.24 |
PRC 1100 MAX26873 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/21/2014 |
Paid |
$1,800.00 |
PRC 1100 MAX26874 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/21/2014 |
Paid |
$14,960.00 |
PRC 1100 MAX26878 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/21/2014 |
Paid |
$40,146.48 |
PRC 1100 MAX26548 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/07/2014 |
Paid |
$10,000.00 |
PRC 1100 MAX26551 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/07/2014 |
Paid |
$8,031.30 |
PRC 1100 MAX26652 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/07/2014 |
Paid |
$6,700.00 |
PRC 1100 MAX26654 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/07/2014 |
Paid |
$20,073.24 |
PRC 1100 MAX26661 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/07/2014 |
Paid |
$18,870.00 |
PRC 1100 MAX26396 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2014 |
Paid |
$8,031.30 |
PRC 1100 MAX26399 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2014 |
Paid |
$3,064.00 |
PRC 1100 MAX26411 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2014 |
Paid |
$1,800.00 |
PRC 1100 MAX26412 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2014 |
Paid |
$2,150.00 |
PRC 1100 MAX26413 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2014 |
Paid |
$8,520.00 |
PRC 1100 MAX26199 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/14/2014 |
Paid |
$64,240.38 |
PRC 1100 MAX26166 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2014 |
Paid |
$6,021.00 |
PRC 1100 MAX26170 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2014 |
Paid |
$14,302.00 |
PRC 1100 MAX26173 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2014 |
Paid |
$7,630.00 |
PRC 1100 MAX26175 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2014 |
Paid |
$3,106.00 |
PRC 1100 MAX26190 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2014 |
Paid |
$15,039.00 |
PRC 1100 MAX26135 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/08/2014 |
Paid |
$8,031.30 |
PRC 1100 MAX26139 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/08/2014 |
Paid |
$10,036.62 |
PRC 1100 MAX26022 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/02/2014 |
Paid |
$6,959.00 |
PRC 1100 MAX26025 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/02/2014 |
Paid |
$15,555.00 |
PRC 1100 MAX25825 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/11/2013 |
Paid |
$4,046.00 |
PRC 1100 MAX25518 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/18/2013 |
Paid |
$3,064.00 |
PRC 1100 MAX25524 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/18/2013 |
Paid |
$5,070.00 |
PRC 1100 MAX25327 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/13/2013 |
Paid |
$1,975.00 |
PRC 1100 MAX25328 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/13/2013 |
Paid |
$10,036.62 |
PRC 1100 MAX25332 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/13/2013 |
Paid |
$6,800.00 |
PRC 1100 MAX25150 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2013 |
Paid |
$10,036.62 |
PRC 1100 MAX25152 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2013 |
Paid |
$8,031.30 |
PRC 1100 MAX25154 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2013 |
Paid |
$20,073.24 |
PRC 1100 MAX25160 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2013 |
Paid |
$5,070.00 |
PRC 1100 MAX25165 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2013 |
Paid |
$3,815.00 |
PRC 1100 MAX25170 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2013 |
Paid |
$16,320.00 |
PRC 1100 MAX25208 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2013 |
Paid |
$43,200.00 |
PRC 1100 MAX25211 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2013 |
Paid |
$8,160.00 |
PRC 1100 MAX25212 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2013 |
Paid |
$1,975.00 |
PRC 1100 MAX25215 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2013 |
Paid |
$946.00 |
PRC 1100 MAX25216 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2013 |
Paid |
$10,036.62 |
PRC 1100 MAX25217 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2013 |
Paid |
$15,500.00 |
PRC 1100 MAX24995 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2013 |
Paid |
$24,093.90 |
PRC 1100 MAX24996 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2013 |
Paid |
$9,123.00 |
PRC 1100 MAX24999 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2013 |
Paid |
$30,913.62 |
PRC 1100 MAX25000 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2013 |
Paid |
$30,913.62 |
PRC 1100 MAX25004 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2013 |
Paid |
$51,285.00 |
PRC 1100 MAX25005 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2013 |
Paid |
$22,729.10 |
PRC 1100 MAX25007 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2013 |
Paid |
$4,370.00 |
PRC 1100 MAX25008 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2013 |
Paid |
$946.00 |
PRC 1100 MAX25012 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2013 |
Paid |
$1,770.00 |
PRC 1100 MAX25014 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/30/2013 |
Paid |
$7,775.00 |
PRC 1100 MAX24779 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/11/2013 |
Paid |
$26,280.00 |
PRC 1100 MAX24689 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/08/2013 |
Paid |
$11,680.00 |
PRC 1100 MAX24739 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/08/2013 |
Paid |
$946.00 |
PRC 1100 MAX24577 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/02/2013 |
Paid |
$16,184.00 |
PRC 1100 MAX24581 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/02/2013 |
Paid |
$7,630.00 |
PRC 1100 MAX24587 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/02/2013 |
Paid |
$26,000.00 |
PRC 1100 MAX24414 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2013 |
Paid |
$12,102.00 |
PRC 1100 MAX24417 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2013 |
Paid |
$17,020.00 |
PRC 1100 MAX24419 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2013 |
Paid |
$5,166.00 |
PRC 1100 MAX24422 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2013 |
Paid |
$5,166.00 |
PRC 1100 MAX24395 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/23/2013 |
Paid |
$22,729.10 |
PRC 1100 MAX24396 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/23/2013 |
Paid |
$946.00 |
PRC 1100 MAX24224 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/17/2013 |
Paid |
$14,208.00 |
PRC 1100 MAX24051 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2013 |
Paid |
$11,222.00 |
PRC 1100 MAX24052 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2013 |
Paid |
$12,279.00 |
PRC 1100 MAX24054 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2013 |
Paid |
$19,796.00 |
PRC 1100 MAX24059 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2013 |
Paid |
$19,339.00 |
PRC 1100 MAX23936 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/28/2013 |
Paid |
$11,176.00 |
PRC 1100 MAX23940 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/28/2013 |
Paid |
$14,266.00 |
PRC 1100 MAX23942 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/28/2013 |
Paid |
$6,141.00 |
PRC 1100 MAX23945 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/28/2013 |
Paid |
$7,355.00 |
PRC 1100 MAX23946 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/28/2013 |
Paid |
$10,162.00 |
PRC 1100 MAX23714 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/20/2013 |
Paid |
$14,208.00 |
PRC 1100 MAX23688 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2013 |
Paid |
$8,838.00 |
PRC 1100 MAX23685 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2013 |
Paid |
$8,031.30 |
PRC 1100 MAX23622 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2013 |
Paid |
$24,093.90 |
PRC 1100 MAX23625 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2013 |
Paid |
$11,176.00 |
PRC 1100 MAX23443 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2013 |
Paid |
$1,908.00 |
PRC 1100 MAX23444 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2013 |
Paid |
$11,784.00 |
PRC 1100 MAX23305 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/29/2013 |
Paid |
$6,800.00 |
PRC 1100 MAX23308 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/29/2013 |
Paid |
$23,720.00 |
PRC 1100 MAX23285 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/26/2013 |
Paid |
$10,304.54 |
PRC 1100 MAX23226 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2013 |
Paid |
$51,522.70 |
PRC 1100 MAX23231 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2013 |
Paid |
$26,514.00 |
PRC 1100 MAX23235 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2013 |
Paid |
$70,007.52 |
PRC 1100 MAX23278 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2013 |
Paid |
$30,196.00 |
PRC 1100 MAX23280 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2013 |
Paid |
$20,609.08 |
PRC 1100 MAX23115 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2013 |
Paid |
$116,679.20 |
PRC 1100 MAX23127 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2013 |
Paid |
$10,304.54 |
PRC 1100 MAX23128 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2013 |
Paid |
$46,671.68 |
PRC 1100 MAX23130 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2013 |
Paid |
$14,596.00 |
PRC 1100 MAX23134 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/22/2013 |
Paid |
$18,452.00 |
PRC 1100 MAX22868 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2013 |
Paid |
$46,671.68 |
PRC 1100 MAX22863 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/05/2013 |
Paid |
$3,835.00 |
PRC 1100 MAX22864 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/05/2013 |
Paid |
$11,136.00 |
PRC 1100 MAX22867 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/05/2013 |
Paid |
$2,220.00 |
PRC 1100 MAX22869 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/05/2013 |
Paid |
$5,568.00 |
PRC 1100 MAX22780 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/02/2013 |
Paid |
$3,508.00 |
PRC 1100 MAX22782 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/02/2013 |
Paid |
$10,304.54 |
PRC 1100 MAX22783 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/02/2013 |
Paid |
$51,522.70 |
PRC 1100 MAX22784 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/02/2013 |
Paid |
$17,292.42 |
PRC 1100 MAX22749 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2013 |
Paid |
$14,765.00 |
PRC 1100 MAX22752 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2013 |
Paid |
$25,949.00 |
PRC 1100 MAX22755 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2013 |
Paid |
$14,738.00 |
PRC 1100 MAX22761 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2013 |
Paid |
$2,220.00 |
PRC 1100 MAX22542 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2013 |
Paid |
$9,606.00 |
PRC 1100 MAX22549 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2013 |
Paid |
$17,292.42 |
PRC 1100 MAX22551 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2013 |
Paid |
$4,118.00 |
PRC 1100 MAX22552 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2013 |
Paid |
$5,484.00 |
PRC 1100 MAX22560 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2013 |
Paid |
$36,981.00 |
PRC 1100 MAX22390 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/13/2013 |
Paid |
$10,304.54 |
PRC 1100 MAX22393 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/13/2013 |
Paid |
$3,835.00 |
PRC 1100 MAX22418 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/13/2013 |
Paid |
$30,552.00 |
PRC 1100 MAX22428 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/13/2013 |
Paid |
$1,918.00 |
PRC 1100 MAX22345 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/04/2013 |
Paid |
$10,304.54 |
PRC 1100 MAX22352 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/04/2013 |
Paid |
$8,352.00 |
PRC 1100 MAX22353 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/04/2013 |
Paid |
$3,835.00 |
PRM 1100 13052823905 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/29/2013 |
Paid |
$2,910.00 |
PRC 1100 MAX22164 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2013 |
Paid |
$12,339.00 |
PRC 1100 MAX22167 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2013 |
Paid |
$39,981.00 |
PRC 1100 MAX22176 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2013 |
Paid |
$10,295.00 |
PRC 1100 MAX21975 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/21/2013 |
Paid |
$8,934.00 |
PRC 1100 MAX22026 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/21/2013 |
Paid |
$11,143.00 |
PRC 1100 MAX22028 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/21/2013 |
Paid |
$61,104.00 |
PRC 1100 MAX22034 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/21/2013 |
Paid |
$6,177.00 |
PRC 1100 MAX22040 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/21/2013 |
Paid |
$15,276.00 |
PRC 1100 MAX21905 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/16/2013 |
Paid |
$3,590.00 |
PRC 1100 MAX21813 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/13/2013 |
Paid |
$5,385.00 |
PRC 1100 MAX21682 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/26/2013 |
Paid |
$10,295.00 |
PRC 1100 MAX21541 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2013 |
Paid |
$1,918.00 |
PRC 1100 MAX21542 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2013 |
Paid |
$18,479.00 |
PRC 1100 MAX21546 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2013 |
Paid |
$13,222.00 |
PRC 1100 MAX21549 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/24/2013 |
Paid |
$10,974.00 |
PRC 1100 MAX21522 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/23/2013 |
Paid |
$3,400.00 |
PRC 1100 MAX21451 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/18/2013 |
Paid |
$11,912.00 |
PRC 1100 MAX21452 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/18/2013 |
Paid |
$8,236.00 |
PRC 1100 MAX21455 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/18/2013 |
Paid |
$20,609.08 |
PRC 1100 MAX21412 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/16/2013 |
Paid |
$3,600.00 |
PRC 1100 MAX21420 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/16/2013 |
Paid |
$2,877.00 |
PRC 1100 MAX21423 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/16/2013 |
Paid |
$9,600.00 |
PRC 1100 MAX21324 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/10/2013 |
Paid |
$5,966.00 |
PRC 1100 MAX21334 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/10/2013 |
Paid |
$12,000.00 |
PRC 1100 MAX21146 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/04/2013 |
Paid |
$2,240.00 |
PRC 1100 MAX21151 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/04/2013 |
Paid |
$3,600.00 |
PRC 1100 MAX21043 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2013 |
Paid |
$3,600.00 |
PRC 1100 MAX20915 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/22/2013 |
Paid |
$2,240.00 |
PRC 1100 MAX20923 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/22/2013 |
Paid |
$6,192.00 |
PRC 1100 MAX20843 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2013 |
Paid |
$3,600.00 |
PRC 1100 MAX20741 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2013 |
Paid |
$5,153.00 |
PRC 1100 MAX20646 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/05/2013 |
Paid |
$18,702.00 |
PRC 1100 MAX20577 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/04/2013 |
Paid |
$6,192.00 |
PRC 1100 MAX20545 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/27/2013 |
Paid |
$5,400.00 |
PRC 1100 MAX20492 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/22/2013 |
Paid |
$22,800.00 |
PRC 1100 MAX20398 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2013 |
Paid |
$970.00 |
PRC 1100 MAX20405 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2013 |
Paid |
$5,630.00 |
PRC 1100 MAX20391 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/19/2013 |
Paid |
$5,400.00 |
PRC 1100 MAX20188 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2013 |
Paid |
$23,335.84 |
PRC 1100 MAX20189 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2013 |
Paid |
$20,609.08 |
PRC 1100 MAX20195 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2013 |
Paid |
$65,955.23 |
PRC 1100 MAX20197 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2013 |
Paid |
$24,737.07 |
PRC 1100 MAX20204 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2013 |
Paid |
$9,060.00 |
PRC 1100 MAX20160 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/08/2013 |
Paid |
$23,335.84 |
PRC 1100 MAX20161 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/08/2013 |
Paid |
$23,335.84 |
PRC 1100 MAX20162 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/08/2013 |
Paid |
$23,335.84 |
PRC 1100 MAX20163 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/08/2013 |
Paid |
$23,335.84 |
PRC 1100 MAX20167 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/08/2013 |
Paid |
$8,256.00 |
PRC 1100 MAX19908 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2013 |
Paid |
$5,400.00 |
PRC 1100 MAX19850 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/24/2013 |
Paid |
$70,007.52 |
PRC 1100 MAX19858 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/24/2013 |
Paid |
$15,100.00 |
PRC 1100 MAX19870 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/24/2013 |
Paid |
$10,320.00 |
PRC 1100 13011100077 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/22/2013 |
Paid |
$34,118.00 |
PRC 1100 MAX19746 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/22/2013 |
Paid |
$63,219.00 |
PRC 1100 MAX19705 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/14/2013 |
Paid |
$6,094.00 |
PRC 1100 MAX19646 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/10/2013 |
Paid |
$24,370.00 |
PRC 1100 MAX19578 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2013 |
Paid |
$5,400.00 |
PRC 1100 MAX19579 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2013 |
Paid |
$45,737.00 |
PRC 1100 MAX19580 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2013 |
Paid |
$4,146.00 |
PRC 1100 MAX19581 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2013 |
Paid |
$12,361.00 |
PRC 1100 MAX19584 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2013 |
Paid |
$9,141.00 |
PRC 1100 MAX19450 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2012 |
Paid |
$15,489.00 |
PRC 1100 MAX19284 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/27/2012 |
Paid |
$9,141.00 |
PRC 1100 MAX19323 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/27/2012 |
Paid |
$970.00 |
PRC 1100 MAX19324 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/27/2012 |
Paid |
$5,705.00 |
PRC 1100 MAX19328 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/27/2012 |
Paid |
$10,365.00 |
PRC 1100 MAX19212 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/17/2012 |
Paid |
$15,510.00 |
PRC 1100 MAX19004 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/05/2012 |
Paid |
$2,037.00 |
PRC 1100 MAX19006 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/05/2012 |
Paid |
$11,400.00 |
PRC 1100 MAX19007 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/05/2012 |
Paid |
$2,983.00 |
PRC 1100 MAX18854 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2012 |
Paid |
$2,983.00 |
PRC 1100 MAX18857 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2012 |
Paid |
$1,978.00 |
PRC 1100 MAX18863 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2012 |
Paid |
$15,380.00 |
PRC 1100 MAX18864 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2012 |
Paid |
$9,920.00 |
PRC 1100 MAX18873 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2012 |
Paid |
$6,360.00 |
PRC 1100 MAX18900 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2012 |
Paid |
$35,506.00 |
PRC 1100 MAX18905 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2012 |
Paid |
$14,075.00 |
PRC 1100 MAX18906 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2012 |
Paid |
$2,983.00 |
PRC 1100 MAX18729 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2012 |
Paid |
$4,240.00 |
PRC 1100 MAX18498 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/31/2012 |
Paid |
$15,640.00 |
PRC 1100 MAX18500 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/31/2012 |
Paid |
$1,820.00 |
PRC 1100 MAX18536 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/31/2012 |
Paid |
$4,240.00 |
PRC 1100 MAX18214 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/08/2012 |
Paid |
$2,069.00 |
PRC 1100 MAX18164 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2012 |
Paid |
$7,910.00 |
PRC 1100 MAX18063 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2012 |
Paid |
$24,737.07 |
PRC 1100 MAX18062 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2012 |
Paid |
$8,245.69 |
PRC 1100 MAX18076 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2012 |
Paid |
$12,017.00 |
PRC 1100 MAX17933 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/26/2012 |
Paid |
$2,867.00 |
PRC 1100 MAX17938 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/26/2012 |
Paid |
$2,967.00 |
PRC 1100 MAX17941 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/26/2012 |
Paid |
$3,928.00 |
PRC 1100 MAX17942 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/26/2012 |
Paid |
$8,601.00 |
PRC 1100 MAX17945 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/26/2012 |
Paid |
$14,720.00 |
PRC 1100 MAX17721 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/17/2012 |
Paid |
$10,920.00 |
PRC 1100 MAX17724 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/17/2012 |
Paid |
$22,675.00 |
PRC 1100 MAX17731 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/17/2012 |
Paid |
$2,867.00 |
PRC 1100 MAX17737 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/17/2012 |
Paid |
$8,540.00 |
PRC 1100 MAX17749 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/17/2012 |
Paid |
$5,575.00 |
PRC 1100 MAX17750 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/17/2012 |
Paid |
$30,913.62 |
PRC 1100 MAX17751 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/17/2012 |
Paid |
$20,609.08 |
PRC 1100 MAX17610 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/10/2012 |
Paid |
$30,780.00 |
PRC 1100 MAX17611 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/10/2012 |
Paid |
$9,234.00 |
PRC 1100 MAX17615 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/10/2012 |
Paid |
$27,702.00 |
PRC 1100 MAX17479 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2012 |
Paid |
$29,844.00 |
PRC 1100 MAX17457 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/23/2012 |
Paid |
$15,741.00 |
PRC 1100 MAX17373 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/15/2012 |
Paid |
$7,185.00 |
PRC 1100 MAX17376 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/15/2012 |
Paid |
$54,725.00 |
PRC 1100 MAX17377 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/15/2012 |
Paid |
$19,200.00 |
PRC 1100 MAX17206 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/07/2012 |
Paid |
$34,210.00 |
PRC 1100 MAX17211 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/07/2012 |
Paid |
$10,715.00 |
PRC 1100 MAX17099 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/06/2012 |
Paid |
$31,100.00 |
PRC 1100 MAX17103 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/06/2012 |
Paid |
$5,520.00 |
PRC 1100 MAX17168 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/06/2012 |
Paid |
$12,870.00 |
PRC 1100 MAX17169 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/06/2012 |
Paid |
$10,715.00 |
PRC 1100 MAX17016 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/01/2012 |
Paid |
$20,609.08 |
PRC 1100 MAX17017 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/01/2012 |
Paid |
$10,304.54 |
PRC 1100 MAX17022 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/01/2012 |
Paid |
$9,330.00 |
PRC 1100 MAX17040 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/01/2012 |
Paid |
$10,715.00 |
PRC 1100 MAX16926 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2012 |
Paid |
$2,264.00 |
PRC 1100 MAX16931 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2012 |
Paid |
$26,500.00 |
PRC 1100 MAX16935 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2012 |
Paid |
$34,930.00 |
PRC 1100 MAX16939 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2012 |
Paid |
$11,400.00 |
PRC 1100 MAX16727 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2012 |
Paid |
$7,360.00 |
PRC 1100 MAX16730 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2012 |
Paid |
$10,304.54 |
PRC 1100 MAX16737 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2012 |
Paid |
$7,450.00 |
PRC 1100 MAX16741 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2012 |
Paid |
$15,900.00 |
PRC 1100 MAX16576 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2012 |
Paid |
$10,750.00 |
PRC 1100 MAX16582 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2012 |
Paid |
$11,200.00 |
PRC 1100 MAX16584 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2012 |
Paid |
$3,400.00 |
PRC 1100 MAX16490 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/27/2012 |
Paid |
$19,900.00 |
PRC 1100 MAX16456 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/26/2012 |
Paid |
$24,875.00 |
PRC 1100 MAX16459 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/26/2012 |
Paid |
$6,320.00 |
PRC 1100 MAX16258 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/22/2012 |
Paid |
$1,860.00 |
PRC 1100 MAX16237 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2012 |
Paid |
$7,360.00 |
PRC 1100 MAX16244 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2012 |
Paid |
$3,680.00 |
PRC 1100 MAX16247 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2012 |
Paid |
$17,060.00 |
PRC 1100 MAX16249 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2012 |
Paid |
$19,700.00 |
PRC 1100 MAX16089 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/14/2012 |
Paid |
$16,080.00 |
PRC 1100 MAX16093 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/13/2012 |
Paid |
$11,200.00 |
PRC 1100 MAX16112 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/13/2012 |
Paid |
$6,320.00 |
PRC 1100 MAX16122 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/13/2012 |
Paid |
$6,600.00 |
PRC 1100 MAX15951 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/31/2012 |
Paid |
$2,000.00 |
PRC 1100 MAX15768 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/21/2012 |
Paid |
$13,180.00 |
PRC 1100 MAX15769 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/21/2012 |
Paid |
$11,000.00 |
PRC 1100 MAX15770 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/21/2012 |
Paid |
$56,550.00 |
PRC 1100 MAX15690 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2012 |
Paid |
$6,320.00 |
PRC 1100 MAX15694 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2012 |
Paid |
$93,460.00 |
PRC 1100 MAX15695 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2012 |
Paid |
$46,671.68 |
PRC 1100 MAX15699 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2012 |
Paid |
$17,175.00 |
PRC 1100 MAX15700 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2012 |
Paid |
$11,000.00 |
PRC 1100 MAX15749 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/18/2012 |
Paid |
$5,575.00 |
PRC 1100 MAX15470 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2012 |
Paid |
$5,535.00 |
PRC 1100 MAX15472 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2012 |
Paid |
$9,480.00 |
PRC 1100 MAX15475 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2012 |
Paid |
$23,335.84 |
PRC 1100 MAX15518 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2012 |
Paid |
$48,080.00 |
PRC 1100 MAX15519 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2012 |
Paid |
$15,090.00 |
PRC 1100 MAX15521 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2012 |
Paid |
$6,260.00 |
PRC 1100 MAX15522 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/27/2012 |
Paid |
$42,960.00 |
PRC 1100 MAX15263 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/23/2012 |
Paid |
$116,679.20 |
PRC 1100 MAX15319 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/23/2012 |
Paid |
$2,000.00 |
PRC 1100 MAX15333 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/23/2012 |
Paid |
$3,730.00 |
PRC 1100 MAX15335 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/23/2012 |
Paid |
$2,920.00 |
PRC 1100 MAX15350 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/23/2012 |
Paid |
$5,575.00 |
PRC 1100 MAX15371 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/23/2012 |
Paid |
$9,480.00 |
PRC 1100 MAX15378 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/23/2012 |
Paid |
$11,000.00 |
PRC 1100 MAX15064 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/10/2012 |
Paid |
$44,375.00 |
PRC 1100 MAX14953 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/03/2012 |
Paid |
$5,575.00 |
PRC 1100 MAX14883 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2012 |
Paid |
$12,000.00 |
PRC 1100 MAX14895 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2012 |
Paid |
$9,325.00 |
PRC 1100 MAX14897 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2012 |
Paid |
$22,995.00 |
PRC 1100 MAX14904 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2012 |
Paid |
$8,888.00 |
PRC 1100 MAX14819 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2012 |
Paid |
$6,666.00 |
PRC 1100 MAX14832 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2012 |
Paid |
$12,996.00 |
PRC 1100 MAX14834 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2012 |
Paid |
$16,650.00 |
PRC 1100 MAX14840 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2012 |
Paid |
$6,380.00 |
PRC 1100 MAX14843 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2012 |
Paid |
$4,320.00 |
PRC 1100 MAX14845 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2012 |
Paid |
$13,050.00 |
PRC 1100 MAX14846 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/23/2012 |
Paid |
$5,840.00 |
PRC 1100 MAX14641 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2012 |
Paid |
$23,335.84 |
PRC 1100 MAX14470 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2012 |
Paid |
$23,335.84 |
PRC 1100 MAX14539 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2012 |
Paid |
$3,249.00 |
PRC 1100 MAX14549 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2012 |
Paid |
$35,200.00 |
PRC 1100 MAX14467 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/01/2012 |
Paid |
$3,200.00 |
PRC 1100 MAX14369 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/28/2012 |
Paid |
$6,498.00 |
PRC 1100 MAX14379 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/28/2012 |
Paid |
$23,335.84 |
PRC 1100 MAX14234 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/23/2012 |
Paid |
$6,666.00 |
PRC 1100 MAX14237 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/23/2012 |
Paid |
$23,335.84 |
PRC 1100 MAX14155 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/16/2012 |
Paid |
$6,498.00 |
PRC 1100 MAX14156 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/16/2012 |
Paid |
$15,600.00 |
PRC 1100 MAX14086 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/09/2012 |
Paid |
$3,375.00 |
PRC 1100 MAX14092 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/09/2012 |
Paid |
$2,000.00 |
PRC 1100 MAX13957 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/07/2012 |
Paid |
$6,498.00 |
PRC 1100 MAX13961 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/07/2012 |
Paid |
$21,800.00 |
PRC 1100 MAX13975 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/07/2012 |
Paid |
$1,000.00 |
PRC 1100 MAX13895 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/02/2012 |
Paid |
$22,098.00 |
PRC 1100 MAX13898 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/02/2012 |
Paid |
$6,000.00 |
PRC 1100 MAX13902 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/02/2012 |
Paid |
$2,000.00 |
PRC 1100 MAX13904 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/02/2012 |
Paid |
$6,000.00 |
PRC 1100 MAX13905 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/02/2012 |
Paid |
$4,150.00 |
PRC 1100 MAX13907 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/02/2012 |
Paid |
$10,400.00 |
PRC 1100 MAX13751 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2012 |
Paid |
$20,437.00 |
PRC 1100 MAX13827 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2012 |
Paid |
$8,774.00 |
PRC 1100 MAX13837 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2012 |
Paid |
$2,215.00 |
PRC 1100 MAX13838 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/30/2012 |
Paid |
$3,000.00 |
PRC 1100 MAX13626 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/12/2012 |
Paid |
$5,850.00 |
PRC 1100 MAX13633 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/12/2012 |
Paid |
$1,000.00 |
PRC 1100 MAX13635 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/12/2012 |
Paid |
$39,850.00 |
PRC 1100 MAX13568 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/09/2012 |
Paid |
$10,008.33 |
PRC 1100 MAX13428 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2012 |
Paid |
$11,520.00 |
PRC 1100 MAX13316 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/22/2011 |
Paid |
$7,080.00 |
PRC 1100 MAX13321 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/22/2011 |
Paid |
$3,000.00 |
PRC 1100 MAX13324 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/22/2011 |
Paid |
$1,000.00 |
PRC 1100 MAX13177 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/20/2011 |
Paid |
$9,600.00 |
PRC 1100 MAX13268 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/20/2011 |
Paid |
$20,000.00 |
PRC 1100 MAX13270 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/20/2011 |
Paid |
$7,680.00 |
PRC 1100 MAX13271 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/20/2011 |
Paid |
$3,840.00 |
PRC 1100 MAX13272 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/20/2011 |
Paid |
$8,950.00 |
PRC 1100 MAX13173 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/19/2011 |
Paid |
$5,760.00 |
PRC 1100 MAX13191 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/19/2011 |
Paid |
$9,810.00 |
PRC 1100 MAX13194 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/19/2011 |
Paid |
$4,455.00 |
PRC 1100 MAX13195 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/19/2011 |
Paid |
$23,750.00 |
PRC 1100 MAX12765 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2011 |
Paid |
$3,270.00 |
PRC 1100 MAX12770 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/21/2011 |
Paid |
$10,008.33 |
PRC 1100 MAX12564 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/16/2011 |
Paid |
$17,525.00 |
PRC 1100 MAX12709 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/16/2011 |
Paid |
$20,016.66 |
PRC 1100 MAX12710 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/16/2011 |
Paid |
$4,465.00 |
PRC 1100 MAX12492 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2011 |
Paid |
$2,240.00 |
PRC 1100 MAX12514 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2011 |
Paid |
$2,000.00 |
PRC 1100 MAX12453 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2011 |
Paid |
$3,275.00 |
PRC 1100 MAX12462 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2011 |
Paid |
$3,200.00 |
PRC 1100 MAX12103 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/11/2011 |
Paid |
$19,080.00 |
PRC 1100 MAX12106 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/11/2011 |
Paid |
$25,975.00 |
PRC 1100 MAX12071 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/10/2011 |
Paid |
$19,080.00 |
PRC 1100 MAX11834 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2011 |
Paid |
$6,574.00 |
PRC 1100 MAX11838 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2011 |
Paid |
$8,930.00 |
PRC 1100 MAX11941 |
Electrical Equipment (Except Cable and Wires, and |
10/04/2011 |
Paid |
$91,800.00 |
PRC 1100 MAX11942 |
Electrical Equipment (Except Cable and Wires, and |
10/04/2011 |
Paid |
$58,905.00 |
PRC 1100 MAX11943 |
Electrical Equipment (Except Cable and Wires, and |
10/04/2011 |
Paid |
$38,452.00 |
PRC 1100 MAX12006 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2011 |
Paid |
$6,574.00 |
PRC 1100 MAX12014 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2011 |
Paid |
$19,080.00 |
PRC 1100 MAX12020 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2011 |
Paid |
$3,000.00 |
PRC 1100 MAX12027 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2011 |
Paid |
$3,150.00 |
PRC 1100 MAX11771 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2011 |
Paid |
$9,861.00 |
PRC 1100 MAX11772 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2011 |
Paid |
$6,574.00 |
PRC 1100 MAX11596 |
Electrical Equipment (Except Cable and Wires, and |
09/21/2011 |
Paid |
$30,600.00 |
PRC 1100 MAX11597 |
Electrical Equipment (Except Cable and Wires, and |
09/21/2011 |
Paid |
$30,600.00 |
PRC 1100 MAX11598 |
Electrical Equipment (Except Cable and Wires, and |
09/21/2011 |
Paid |
$57,678.00 |
PRC 1100 MAX11442 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2011 |
Paid |
$3,000.00 |
PRC 1100 MAX11538 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2011 |
Paid |
$13,455.00 |
PRC 1100 MAX11549 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2011 |
Paid |
$2,285.00 |
PRC 1100 MAX11552 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2011 |
Paid |
$2,400.00 |
PRC 1100 MAX11562 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2011 |
Paid |
$10,650.00 |
PRC 1100 MAX11431 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/07/2011 |
Paid |
$26,890.00 |
PRC 1100 MAX11433 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/07/2011 |
Paid |
$8,970.00 |
PRC 1100 MAX11436 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/07/2011 |
Paid |
$14,815.00 |
PRC 1100 MAX11439 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/07/2011 |
Paid |
$5,770.00 |
PRC 1100 MAX11445 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/07/2011 |
Paid |
$27,900.00 |
PRC 1100 MAX11342 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/01/2011 |
Paid |
$10,650.00 |
PRC 1100 MAX11350 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/01/2011 |
Paid |
$6,600.00 |
PRC 1100 MAX11251 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/22/2011 |
Paid |
$3,000.00 |
PRC 1100 MAX11253 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/22/2011 |
Paid |
$6,600.00 |
PRC 1100 MAX11256 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/22/2011 |
Paid |
$27,990.00 |
PRC 1100 MAX11262 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/22/2011 |
Paid |
$4,485.00 |
PRC 1100 MAX11181 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2011 |
Paid |
$3,600.00 |
PRC 1100 MAX10955 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/18/2011 |
Paid |
$33,801.12 |
PRC 1100 MAX10957 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/18/2011 |
Paid |
$12,430.00 |
PRC 1100 MAX10958 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/18/2011 |
Paid |
$9,945.00 |
PRC 1100 MAX10960 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/18/2011 |
Paid |
$4,500.00 |
PRC 1100 MAX11113 |
Electrical Equipment (Except Cable and Wires, and |
08/18/2011 |
Paid |
$58,905.00 |
PRC 1100 MAX10961 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/17/2011 |
Paid |
$2,400.00 |
PRC 1100 11080900204 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2011 |
Paid |
$9,200.00 |
PRC 1100 MAX11057 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2011 |
Paid |
$9,945.00 |
PRC 1100 MAX10668 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2011 |
Paid |
$5,980.00 |
PRC 1100 MAX10672 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2011 |
Paid |
$2,000.00 |
PRC 1100 MAX10680 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2011 |
Paid |
$7,200.00 |
PRC 1100 MAX10682 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2011 |
Paid |
$2,285.00 |
PRC 1100 MAX10476 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/19/2011 |
Paid |
$3,000.00 |
PRC 1100 MAX10477 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/19/2011 |
Paid |
$14,400.00 |
PRC 1100 MAX10196 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/15/2011 |
Paid |
$19,879.50 |
PRC 1100 MAX10390 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/13/2011 |
Paid |
$13,800.00 |
PRC 1100 MAX10262 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/11/2011 |
Paid |
$10,800.00 |
PRC 1100 MAX10195 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/05/2011 |
Paid |
$29,819.25 |
PRC 1100 MAX10208 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/05/2011 |
Paid |
$10,800.00 |
PRC 1100 MAX10211 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/05/2011 |
Paid |
$9,200.00 |
PRC 1100 MAX10132 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2011 |
Paid |
$9,200.00 |
PRC 1100 MAX10134 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2011 |
Paid |
$9,600.00 |
PRC 1100 MAX9998 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/22/2011 |
Paid |
$9,340.00 |
PRC 1100 MAX9946 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/20/2011 |
Paid |
$9,340.00 |
PRC 1100 MAX9964 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/20/2011 |
Paid |
$7,600.00 |
PRC 1100 MAX9768 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/03/2011 |
Paid |
$3,250.00 |
PRC 1100 MAX9771 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/03/2011 |
Paid |
$5,590.00 |
PRC 1100 MAX9772 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/03/2011 |
Paid |
$2,000.00 |
PRC 1100 MAX9779 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/03/2011 |
Paid |
$13,290.00 |
PRC 1100 MAX9604 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/27/2011 |
Paid |
$9,939.75 |
PRC 1100 MAX9601 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/23/2011 |
Paid |
$9,939.75 |
PRC 1100 MAX9603 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/23/2011 |
Paid |
$15,907.58 |
PRC 1100 MAX9623 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/23/2011 |
Paid |
$4,670.00 |
PRC 1100 MAX9456 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/20/2011 |
Paid |
$19,750.00 |
PRC 1100 MAX9366 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2011 |
Paid |
$32,550.00 |
PRC 1100 MAX9234 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/04/2011 |
Paid |
$19,400.00 |
PRC 1100 MAX8341 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/29/2011 |
Paid |
$3,000.00 |
PRC 1100 MAX8974 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/25/2011 |
Paid |
$20,340.00 |
PRC 1100 MAX8931 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/21/2011 |
Paid |
$23,861.37 |
PRC 1100 MAX8932 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/21/2011 |
Paid |
$9,939.75 |
PRC 1100 MAX8933 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/21/2011 |
Paid |
$9,939.75 |
PRC 1100 MAX8818 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2011 |
Paid |
$4,900.00 |
PRC 1100 MAX8819 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/15/2011 |
Paid |
$11,700.00 |
PRC 1100 MAX8268 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/14/2011 |
Paid |
$9,805.07 |
PRC 1100 MAX8764 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2011 |
Paid |
$31,280.00 |
PRC 1100 MAX8626 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/04/2011 |
Paid |
$17,375.00 |
PRC 1100 MAX8628 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/04/2011 |
Paid |
$10,170.00 |
PRC 1100 MAX8632 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/04/2011 |
Paid |
$17,580.00 |
PRC 1100 MAX8478 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/30/2011 |
Paid |
$9,480.00 |
PRC 1100 MAX8493 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/30/2011 |
Paid |
$9,480.00 |
PRC 1100 MAX8524 |
SWITCHGEARS AND PARTS, METAL CLAD |
03/30/2011 |
Paid |
$48,319.56 |
PRC 1100 MAX8525 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/30/2011 |
Paid |
$13,560.00 |
PRC 1100 MAX8528 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/30/2011 |
Paid |
$13,900.00 |
PRC 1100 MAX8530 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/30/2011 |
Paid |
$5,720.00 |
PRC 1100 MAX8536 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/30/2011 |
Paid |
$2,020.00 |
PRC 1100 MAX8343 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/28/2011 |
Paid |
$1,100.00 |
PRC 1100 MAX8157 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/11/2011 |
Paid |
$9,240.00 |
PRC 1100 MAX8060 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/03/2011 |
Paid |
$6,920.00 |
PRC 1100 MAX7982 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/02/2011 |
Paid |
$10,200.00 |
PRC 1100 MAX7986 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/02/2011 |
Paid |
$3,850.00 |
PRC 1100 MAX7948 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2011 |
Paid |
$18,480.00 |
PRC 1100 MAX7958 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2011 |
Paid |
$6,800.00 |
PRC 1100 MAX7901 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/23/2011 |
Paid |
$7,260.00 |
PRC 1100 MAX7656 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/11/2011 |
Paid |
$10,200.00 |
PRC 1100 MAX7717 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/08/2011 |
Paid |
$14,850.00 |
PRC 1100 MAX7617 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/31/2011 |
Paid |
$6,220.00 |
PRC 1100 MAX7618 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/31/2011 |
Paid |
$23,390.00 |
PRC 1100 MAX7621 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/31/2011 |
Paid |
$29,280.00 |
PRC 1100 MAX7512 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/25/2011 |
Paid |
$2,200.00 |
PRC 1100 MAX7447 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/24/2011 |
Paid |
$2,500.00 |
PRC 1100 MAX7278 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/20/2011 |
Paid |
$13,550.00 |
PRC 1100 MAX7330 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/11/2011 |
Paid |
$31,200.00 |
PRC 1100 MAX7366 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/11/2011 |
Paid |
$4,040.00 |
PRC 1100 MAX7379 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/11/2011 |
Paid |
$12,850.00 |
PRC 1100 MAX7294 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/10/2011 |
Paid |
$1,120.00 |
PRC 1100 MAX7298 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/10/2011 |
Paid |
$5,140.00 |
PRC 1100 MAX7182 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/05/2011 |
Paid |
$9,920.00 |
PRC 1100 MAX7276 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2011 |
Paid |
$4,040.00 |
PRC 1100 MAX7277 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2011 |
Paid |
$11,400.00 |
PRM 1100 09020416493 |
Oil Analysis and Diagnostic Equipment |
02/05/2009 |
Paid |
$4,395.00 |
PRM 1100 09011413671 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/15/2009 |
Paid |
$34,255.00 |