PRC 1100 MAX121793 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/04/2023 |
Paid |
$5,100.00 |
PRC 1100 MAX93656 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2022 |
Paid |
$7,416.00 |
PRC 1100 MAX93682 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/12/2022 |
Paid |
$8,478.00 |
PRC 1100 MAX105937 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/30/2022 |
Paid |
$9,380.00 |
PRC 1100 MAX103718 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/06/2022 |
Paid |
$3,950.00 |
PRC 1100 MAX103652 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/05/2022 |
Paid |
$15,830.00 |
PRC 1100 MAX103848 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/05/2022 |
Paid |
$4,038.00 |
PRC 1100 MAX103408 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2022 |
Paid |
$12,114.00 |
PRC 1100 MAX103230 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/14/2022 |
Paid |
$2,970.00 |
PRC 1100 MAX103023 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/09/2022 |
Paid |
$8,910.00 |
PRC 1100 MAX102676 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/26/2022 |
Paid |
$25,230.00 |
PRC 1100 MAX102214 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2022 |
Paid |
$2,780.00 |
PRC 1100 MAX102025 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/05/2022 |
Paid |
$11,980.00 |
PRC 1100 MAX101681 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/02/2022 |
Paid |
$4,870.00 |
PRC 1100 MAX101030 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2022 |
Paid |
$2,780.00 |
PRC 1100 MAX101110 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2022 |
Paid |
$7,540.00 |
PRC 1100 MAX100820 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/04/2022 |
Paid |
$2,990.00 |
PRC 1100 MAX100429 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/24/2022 |
Paid |
$2,016.00 |
PRC 1100 MAX100448 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/24/2022 |
Paid |
$9,919.00 |
PRC 1100 MAX100450 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/24/2022 |
Paid |
$7,492.00 |
PRC 1100 MAX99639 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/01/2022 |
Paid |
$3,746.00 |
PRC 1100 MAX99643 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/01/2022 |
Paid |
$2,300.00 |
PRC 1100 MAX99310 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/22/2022 |
Paid |
$5,619.00 |
PRC 1100 MAX99360 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/22/2022 |
Paid |
$9,573.00 |
PRC 1100 MAX99382 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/22/2022 |
Paid |
$1,873.00 |
PRC 1100 MAX99228 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2022 |
Paid |
$13,111.00 |
PRC 1100 MAX98832 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/08/2022 |
Paid |
$28,511.00 |
PRC 1100 MAX98885 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/03/2022 |
Paid |
$39,850.00 |
PRC 1100 MAX98888 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/03/2022 |
Paid |
$12,228.00 |
PRC 1100 MAX98652 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/27/2022 |
Paid |
$5,685.00 |
PRC 1100 MAX98727 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/27/2022 |
Paid |
$25,355.00 |
PRC 1100 MAX98736 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/27/2022 |
Paid |
$5,776.00 |
PRC 1100 MAX98166 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/18/2022 |
Paid |
$9,822.00 |
PRC 1100 MAX98307 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/18/2022 |
Paid |
$1,873.00 |
PRC 1100 MAX98065 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/10/2022 |
Paid |
$1,600.00 |
PRC 1100 MAX98053 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/06/2022 |
Paid |
$9,800.00 |
PRC 1100 MAX92102 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/30/2021 |
Paid |
$1,788.00 |
PRC 1100 MAX97880 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/30/2021 |
Paid |
$10,080.00 |
PRC 1100 MAX97469 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2021 |
Paid |
$5,407.00 |
PRC 1100 21120900395 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/13/2021 |
Paid |
$16,956.00 |
PRC 1100 MAX97146 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/13/2021 |
Paid |
$1,900.00 |
PRC 1100 MAX97361 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/13/2021 |
Paid |
$2,150.00 |
PRC 1100 MAX96896 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/24/2021 |
Paid |
$29,500.00 |
PRC 1100 MAX96177 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/12/2021 |
Paid |
$27,434.00 |
PRC 1100 MAX96180 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/12/2021 |
Paid |
$1,382.00 |
PRC 1100 MAX95853 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$5,187.00 |
PRC 1100 MAX95894 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$5,914.00 |
PRC 1100 MAX95933 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$5,040.00 |
PRC 1100 MAX95969 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$3,380.00 |
PRC 1100 MAX95972 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2021 |
Paid |
$17,060.00 |
PRC 1100 MAX95786 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/26/2021 |
Paid |
$8,321.00 |
PRC 1100 MAX95534 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/25/2021 |
Paid |
$8,298.00 |
PRC 1100 MAX95644 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/25/2021 |
Paid |
$2,520.00 |
PRC 1100 MAX95676 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/25/2021 |
Paid |
$29,500.00 |
PRC 1100 MAX95706 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/25/2021 |
Paid |
$22,981.00 |
PRC 1100 MAX95370 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/18/2021 |
Paid |
$59,000.00 |
PRC 1100 MAX95372 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/18/2021 |
Paid |
$4,041.00 |
PRC 1100 MAX95401 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/18/2021 |
Paid |
$11,062.00 |
PRC 1100 MAX95465 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/18/2021 |
Paid |
$34,530.00 |
PRC 1100 MAX95474 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/18/2021 |
Paid |
$3,445.00 |
PRC 1100 MAX91667 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/14/2021 |
Paid |
$1,405.00 |
PRC 1100 MAX91672 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/14/2021 |
Paid |
$29,500.00 |
PRC 1100 MAX95094 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2021 |
Paid |
$4,056.00 |
PRC 1100 MAX95101 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2021 |
Paid |
$2,520.00 |
PRC 1100 MAX95051 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2021 |
Paid |
$56,524.00 |
PRC 1100 MAX95149 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/04/2021 |
Paid |
$14,131.00 |
PRC 1100 MAX94698 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/30/2021 |
Paid |
$5,202.00 |
PRC 1100 MAX94847 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/30/2021 |
Paid |
$4,863.00 |
PRC 1100 MAX94670 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2021 |
Paid |
$6,559.00 |
PRC 1100 MAX94689 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2021 |
Paid |
$3,468.00 |
PRC 1100 MAX94480 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2021 |
Paid |
$41,532.00 |
PRC 1100 MAX94574 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2021 |
Paid |
$3,061.00 |
PRC 1100 MAX94587 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2021 |
Paid |
$2,778.00 |
PRC 1100 MAX94589 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2021 |
Paid |
$6,556.00 |
PRC 1100 MAX94661 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2021 |
Paid |
$62,298.00 |
PRC 1100 MAX94762 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2021 |
Paid |
$32,119.00 |
PRC 1100 MAX94877 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2021 |
Paid |
$1,389.00 |
PRC 1100 MAX93909 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/20/2021 |
Paid |
$1,453.00 |
PRC 1100 MAX93685 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/02/2021 |
Paid |
$1,782.00 |
PRC 1100 MAX93586 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/01/2021 |
Paid |
$17,677.00 |
PRC 1100 MAX93561 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/26/2021 |
Paid |
$4,903.00 |
PRC 1100 MAX93592 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/26/2021 |
Paid |
$12,655.00 |
PRC 1100 MAX93658 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/26/2021 |
Paid |
$3,065.00 |
PRC 1100 MAX93662 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/26/2021 |
Paid |
$5,995.00 |
PRC 1100 MAX93677 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/26/2021 |
Paid |
$6,135.00 |
PRC 1100 MAX93679 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/26/2021 |
Paid |
$1,740.00 |
PRC 1100 MAX93464 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/20/2021 |
Paid |
$4,863.00 |
PRC 1100 MAX93291 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2021 |
Paid |
$1,736.00 |
PRC 1100 MAX91669 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/18/2021 |
Paid |
$4,239.00 |
PRC 1100 MAX93189 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/17/2021 |
Paid |
$17,677.00 |
PRC 1100 MAX87572 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2021 |
Paid |
$4,377.00 |
PRC 1100 MAX93197 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2021 |
Paid |
$12,717.00 |
PRC 1100 MAX92896 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/05/2021 |
Paid |
$57,602.00 |
PRC 1100 MAX92903 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/05/2021 |
Paid |
$9,296.00 |
PRC 1100 MAX92813 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/04/2021 |
Paid |
$3,478.00 |
PRC 1100 MAX90265 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/19/2021 |
Paid |
$9,352.00 |
PRC 1100 MAX91091 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/15/2021 |
Paid |
$1,852.00 |
PRC 1100 MAX91987 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/15/2021 |
Paid |
$3,480.00 |
PRC 1100 MAX92091 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/15/2021 |
Paid |
$5,247.00 |
PRC 1100 MAX92094 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/15/2021 |
Paid |
$7,614.00 |
PRC 1100 MAX92097 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/15/2021 |
Paid |
$4,972.00 |
PRC 1100 MAX91662 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/07/2021 |
Paid |
$3,193.00 |
PRC 1100 MAX91668 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/07/2021 |
Paid |
$2,906.00 |
PRC 1100 MAX91671 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/07/2021 |
Paid |
$6,710.00 |
PRC 1100 MAX91657 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/06/2021 |
Paid |
$4,970.00 |
PRC 1100 MAX91421 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/17/2021 |
Paid |
$3,595.00 |
PRC 1100 MAX91422 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/17/2021 |
Paid |
$3,257.00 |
PRC 1100 MAX91427 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/17/2021 |
Paid |
$2,810.00 |
PRC 1100 MAX91444 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/17/2021 |
Paid |
$10,520.00 |
PRC 1100 MAX91095 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/09/2021 |
Paid |
$9,357.00 |
PRC 1100 MAX91157 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/09/2021 |
Paid |
$11,115.00 |
PRC 1100 MAX91087 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/07/2021 |
Paid |
$2,810.00 |
PRC 1100 MAX91092 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/07/2021 |
Paid |
$1,405.00 |
PRC 1100 MAX91156 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/07/2021 |
Paid |
$3,486.00 |
PRC 1100 MAX90541 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2021 |
Paid |
$2,336.00 |
PRC 1100 MAX90539 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/21/2021 |
Paid |
$13,468.00 |
PRC 1100 MAX90545 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/21/2021 |
Paid |
$17,592.00 |
PRC 1100 MAX90261 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/17/2021 |
Paid |
$42,968.00 |
PRC 1100 MAX90257 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2021 |
Paid |
$1,788.00 |
PRC 1100 MAX90258 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2021 |
Paid |
$2,614.00 |
PRC 1100 MAX90264 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/12/2021 |
Paid |
$6,136.00 |
PRC 1100 MAX89949 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/05/2021 |
Paid |
$3,807.00 |
PRC 1100 MAX89950 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/05/2021 |
Paid |
$1,410.00 |
PRC 1100 MAX89951 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/05/2021 |
Paid |
$2,520.00 |
PRC 1100 MAX89953 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/05/2021 |
Paid |
$21,379.00 |
PRC 1100 MAX89901 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/04/2021 |
Paid |
$7,560.00 |
PRC 1100 MAX89903 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/04/2021 |
Paid |
$1,749.00 |
PRC 1100 MAX87463 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/28/2021 |
Paid |
$1,419.00 |
PRC 1100 MAX89701 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/28/2021 |
Paid |
$3,504.00 |
PRC 1100 MAX89707 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/28/2021 |
Paid |
$12,717.00 |
PRC 1100 MAX89867 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/28/2021 |
Paid |
$3,450.00 |
PRC 1100 MAX89370 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/20/2021 |
Paid |
$4,230.00 |
PRC 1100 MAX89367 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/14/2021 |
Paid |
$4,979.00 |
PRC 1100 MAX89369 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/14/2021 |
Paid |
$1,859.00 |
PRC 1100 MAX89455 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/14/2021 |
Paid |
$23,540.00 |
PRC 1100 MAX88773 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/05/2021 |
Paid |
$20,229.00 |
PRC 1100 MAX88775 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/05/2021 |
Paid |
$16,366.00 |
PRC 1100 MAX88772 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2021 |
Paid |
$3,504.00 |
PRC 1100 MAX88776 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/29/2021 |
Paid |
$3,504.00 |
PRC 1100 MAX88419 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/16/2021 |
Paid |
$7,025.00 |
PRC 1100 MAX88423 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/15/2021 |
Paid |
$38,466.00 |
PRC 1100 MAX88430 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/15/2021 |
Paid |
$25,572.00 |
PRC 1100 MAX87778 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/01/2021 |
Paid |
$3,400.00 |
PRC 1100 MAX87781 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/01/2021 |
Paid |
$7,028.00 |
PRC 1100 MAX87792 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/01/2021 |
Paid |
$1,859.00 |
PRC 1100 MAX87863 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/01/2021 |
Paid |
$12,786.00 |
PRC 1100 MAX87562 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2021 |
Paid |
$7,590.00 |
PRC 1100 MAX87555 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2021 |
Paid |
$6,180.00 |
PRC 1100 MAX87561 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2021 |
Paid |
$32,266.00 |
PRC 1100 MAX87564 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2021 |
Paid |
$62,298.00 |
PRC 1100 MAX87456 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/10/2021 |
Paid |
$12,720.00 |
PRC 1100 MAX87460 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/10/2021 |
Paid |
$6,017.00 |
PRC 1100 MAX87156 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/08/2021 |
Paid |
$1,419.00 |
PRC 1100 MAX87163 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/08/2021 |
Paid |
$1,419.00 |
PRC 1100 MAX87153 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/03/2021 |
Paid |
$1,760.00 |
PRC 1100 MAX87160 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/03/2021 |
Paid |
$10,849.00 |
PRC 1100 MAX87161 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/03/2021 |
Paid |
$3,520.00 |
PRC 1100 MAX87162 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/03/2021 |
Paid |
$3,072.00 |
PRC 1100 MAX86811 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/29/2021 |
Paid |
$4,491.00 |
PRC 1100 MAX86802 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/26/2021 |
Paid |
$4,275.00 |
PRC 1100 MAX86805 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2021 |
Paid |
$2,530.00 |
PRC 1100 MAX86806 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2021 |
Paid |
$20,766.00 |
PRC 1100 MAX86813 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2021 |
Paid |
$20,766.00 |
PRC 1100 MAX86814 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/21/2021 |
Paid |
$2,344.00 |
PRC 1100 MAX86364 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/11/2021 |
Paid |
$3,528.00 |
PRC 1100 MAX86365 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/11/2021 |
Paid |
$5,292.00 |
PRC 1100 MAX86367 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/11/2021 |
Paid |
$2,850.00 |
PRC 1100 MAX86373 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/11/2021 |
Paid |
$7,170.00 |
PRC 1100 MAX86374 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/11/2021 |
Paid |
$10,352.00 |
PRC 1100 MAX86050 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/05/2021 |
Paid |
$17,677.00 |
PRC 1100 MAX85051 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2021 |
Paid |
$4,297.00 |
PRC 1100 MAX85855 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2021 |
Paid |
$17,677.00 |
PRC 1100 MAX85867 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2021 |
Paid |
$41,532.00 |
PRC 1100 MAX85874 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2021 |
Paid |
$84,382.00 |
PRC 1100 MAX85877 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2021 |
Paid |
$3,080.00 |
PRC 1100 MAX85906 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/04/2021 |
Paid |
$2,850.00 |
PRC 1100 MAX85873 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2020 |
Paid |
$41,532.00 |
PRC 1100 MAX85875 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2020 |
Paid |
$1,425.00 |
PRC 1100 MAX85878 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2020 |
Paid |
$20,766.00 |
PRC 1100 MAX85879 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2020 |
Paid |
$7,056.00 |
PRC 1100 MAX85880 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2020 |
Paid |
$16,457.00 |
PRC 1100 MAX85858 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/28/2020 |
Paid |
$76,886.00 |
PRC 1100 MAX85868 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/28/2020 |
Paid |
$20,766.00 |
PRC 1100 MAX85048 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/04/2020 |
Paid |
$14,131.00 |
PRC 1100 MAX85004 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/24/2020 |
Paid |
$1,500.00 |
PRC 1100 MAX85007 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/24/2020 |
Paid |
$85,487.00 |
PRC 1100 MAX85041 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/24/2020 |
Paid |
$2,355.00 |
PRC 1100 MAX84798 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/17/2020 |
Paid |
$12,900.00 |
PRC 1100 MAX84801 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/17/2020 |
Paid |
$35,354.00 |
PRC 1100 MAX84803 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/17/2020 |
Paid |
$17,677.00 |
PRC 1100 MAX84804 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/17/2020 |
Paid |
$5,078.00 |
PRC 1100 MAX84559 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/09/2020 |
Paid |
$2,350.00 |
PRC 1100 MAX84558 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/06/2020 |
Paid |
$26,572.00 |
PRC 1100 MAX84562 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/06/2020 |
Paid |
$11,750.00 |
PRC 1100 MAX84563 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/06/2020 |
Paid |
$21,275.00 |
PRC 1100 MAX84605 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/06/2020 |
Paid |
$28,262.00 |
PRC 1100 MAX84368 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/02/2020 |
Paid |
$14,100.00 |
PRC 1100 MAX84369 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/02/2020 |
Paid |
$4,305.00 |
PRC 1100 MAX83962 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/26/2020 |
Paid |
$7,175.00 |
PRC 1100 MAX83958 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2020 |
Paid |
$1,774.00 |
PRC 1100 MAX83964 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2020 |
Paid |
$4,564.00 |
PRC 1100 MAX83674 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/13/2020 |
Paid |
$41,532.00 |
PRC 1100 MAX83675 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/13/2020 |
Paid |
$59,209.00 |
PRC 1100 MAX83676 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/13/2020 |
Paid |
$1,789.00 |
PRC 1100 20092302644 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/06/2020 |
Paid |
$4,880.00 |
PRC 1100 MAX83577 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/06/2020 |
Paid |
$53,031.00 |
PRC 1100 MAX83412 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2020 |
Paid |
$7,320.00 |
PRC 1100 MAX83414 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2020 |
Paid |
$5,060.00 |
PRC 1100 MAX83417 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2020 |
Paid |
$20,766.00 |
PRC 1100 MAX83419 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2020 |
Paid |
$3,400.00 |
PRC 1100 MAX83420 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/05/2020 |
Paid |
$4,305.00 |
PRC 1100 20092302643 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2020 |
Paid |
$8,728.00 |
PRC 1100 MAX82391 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/29/2020 |
Paid |
$11,664.00 |
PRC 1100 MAX82379 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2020 |
Paid |
$17,840.00 |
PRC 1100 MAX82775 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2020 |
Paid |
$56,524.00 |
PRC 1100 MAX82776 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2020 |
Paid |
$70,708.00 |
PRC 1100 MAX82777 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2020 |
Paid |
$28,262.00 |
PRC 1100 MAX82778 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2020 |
Paid |
$41,532.00 |
PRC 1100 MAX82779 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2020 |
Paid |
$55,663.00 |
PRC 1100 MAX82780 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2020 |
Paid |
$28,262.00 |
PRC 1100 MAX82784 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2020 |
Paid |
$12,620.00 |
PRC 1100 MAX82786 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2020 |
Paid |
$7,647.00 |
PRC 1100 MAX82788 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2020 |
Paid |
$3,578.00 |
PRC 1100 MAX82789 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2020 |
Paid |
$1,789.00 |
PRC 1100 MAX83124 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2020 |
Paid |
$4,305.00 |
PRC 1100 MAX82860 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2020 |
Paid |
$6,338.00 |
PRC 1100 MAX82861 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2020 |
Paid |
$3,123.00 |
PRC 1100 MAX82863 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2020 |
Paid |
$6,816.00 |
PRC 1100 MAX82865 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2020 |
Paid |
$7,798.00 |
PRC 1100 MAX82858 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/24/2020 |
Paid |
$13,092.00 |
PRC 1100 MAX82859 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/24/2020 |
Paid |
$7,156.00 |
PRC 1100 MAX82388 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/16/2020 |
Paid |
$6,378.00 |
PRC 1100 MAX82384 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/10/2020 |
Paid |
$1,521.00 |
PRC 1100 MAX82381 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2020 |
Paid |
$6,039.00 |
PRC 1100 MAX81611 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/03/2020 |
Paid |
$12,960.00 |
PRC 1100 MAX82239 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/03/2020 |
Paid |
$13,217.00 |
PRC 1100 MAX82244 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/03/2020 |
Paid |
$2,440.00 |
PRC 1100 MAX81610 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2020 |
Paid |
$20,766.00 |
PRC 1100 MAX81614 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2020 |
Paid |
$2,918.00 |
PRC 1100 MAX81728 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2020 |
Paid |
$8,930.00 |
PRC 1100 MAX81730 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2020 |
Paid |
$3,480.00 |
PRC 1100 MAX81733 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2020 |
Paid |
$4,880.00 |
PRC 1100 MAX81607 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/13/2020 |
Paid |
$12,550.00 |
PRC 1100 MAX81608 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/13/2020 |
Paid |
$20,766.00 |
PRC 1100 MAX81372 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/06/2020 |
Paid |
$13,156.00 |
PRC 1100 MAX81088 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/30/2020 |
Paid |
$39,526.00 |
PRC 1100 MAX81144 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/30/2020 |
Paid |
$14,640.00 |
PRC 1100 MAX81145 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/30/2020 |
Paid |
$2,705.00 |
PRC 1100 MAX80747 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2020 |
Paid |
$1,484.00 |
PRC 1100 MAX80750 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2020 |
Paid |
$35,000.00 |
PRC 1100 MAX80751 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2020 |
Paid |
$7,416.00 |
PRC 1100 MAX80752 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2020 |
Paid |
$62,298.00 |
PRC 1100 MAX80755 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2020 |
Paid |
$5,391.00 |
PRC 1100 MAX80757 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2020 |
Paid |
$10,218.00 |
PRC 1100 MAX80758 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/16/2020 |
Paid |
$1,470.00 |
PRC 1100 MAX80500 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2020 |
Paid |
$1,479.00 |
PRC 1100 MAX80503 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2020 |
Paid |
$62,298.00 |
PRC 1100 MAX80504 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2020 |
Paid |
$7,188.00 |
PRC 1100 MAX80505 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2020 |
Paid |
$22,248.00 |
PRC 1100 MAX80508 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2020 |
Paid |
$2,634.00 |
PRC 1100 MAX80509 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2020 |
Paid |
$14,562.00 |
PRC 1100 MAX80512 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2020 |
Paid |
$25,838.00 |
PRC 1100 MAX80513 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2020 |
Paid |
$7,007.00 |
PRC 1100 MAX80233 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/25/2020 |
Paid |
$7,908.00 |
PRC 1100 MAX80234 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/25/2020 |
Paid |
$1,470.00 |
PRC 1100 MAX80236 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/25/2020 |
Paid |
$4,516.00 |
PRC 1100 MAX80237 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/25/2020 |
Paid |
$6,534.00 |
PRC 1100 MAX80238 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/25/2020 |
Paid |
$1,470.00 |
PRC 1100 MAX80240 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/25/2020 |
Paid |
$3,502.00 |
PRC 1100 MAX80242 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/25/2020 |
Paid |
$1,797.00 |
PRC 1100 MAX79850 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2020 |
Paid |
$19,770.00 |
PRC 1100 MAX79851 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/16/2020 |
Paid |
$3,796.00 |
PRC 1100 MAX79405 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2020 |
Paid |
$7,200.00 |
PRC 1100 MAX79407 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2020 |
Paid |
$6,234.00 |
PRC 1100 MAX79554 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2020 |
Paid |
$3,150.00 |
PRC 1100 MAX79555 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2020 |
Paid |
$3,510.00 |
PRC 1100 MAX79556 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2020 |
Paid |
$5,132.00 |
PRC 1100 MAX79557 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2020 |
Paid |
$1,960.00 |
PRC 1100 MAX79558 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2020 |
Paid |
$1,810.00 |
PRC 1100 MAX79559 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2020 |
Paid |
$5,630.00 |
PRC 1100 MAX79560 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2020 |
Paid |
$1,484.00 |
PRC 1100 MAX79561 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/11/2020 |
Paid |
$5,134.00 |
PRC 1100 MAX79037 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2020 |
Paid |
$1,532.00 |
PRC 1100 MAX79038 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2020 |
Paid |
$1,532.00 |
PRC 1100 MAX79040 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2020 |
Paid |
$102,516.00 |
PRC 1100 MAX79045 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2020 |
Paid |
$1,473.00 |
PRC 1100 MAX79046 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2020 |
Paid |
$1,800.00 |
PRC 1100 MAX78724 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2020 |
Paid |
$2,740.00 |
PRC 1100 MAX78726 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2020 |
Paid |
$2,958.00 |
PRC 1100 MAX78732 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2020 |
Paid |
$6,130.00 |
PRC 1100 MAX78733 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/19/2020 |
Paid |
$1,800.00 |
PRC 1100 MAX78236 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/07/2020 |
Paid |
$59,000.00 |
PRC 1100 MAX78244 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/07/2020 |
Paid |
$39,375.00 |
PRC 1100 MAX78247 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/07/2020 |
Paid |
$5,300.00 |
PRC 1100 MAX78249 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/07/2020 |
Paid |
$13,125.00 |
PRC 1100 MAX77761 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/20/2020 |
Paid |
$17,677.00 |
PRC 1100 MAX77767 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/20/2020 |
Paid |
$3,510.00 |
PRC 1100 MAX77628 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/16/2020 |
Paid |
$3,519.00 |
PRC 1100 MAX77630 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/16/2020 |
Paid |
$3,150.00 |
PRC 1100 MAX77357 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2020 |
Paid |
$5,939.00 |
PRC 1100 MAX77398 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2020 |
Paid |
$2,968.00 |
PRC 1100 MAX77399 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/09/2020 |
Paid |
$70,708.00 |
PRC 1100 MAX77104 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/30/2020 |
Paid |
$53,031.00 |
PRC 1100 MAX76867 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/19/2020 |
Paid |
$7,134.00 |
PRC 1100 MAX76871 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/19/2020 |
Paid |
$9,960.00 |
PRC 1100 MAX76872 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/19/2020 |
Paid |
$8,463.00 |
PRC 1100 MAX76875 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/19/2020 |
Paid |
$2,976.00 |
PRC 1100 MAX76879 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/19/2020 |
Paid |
$4,629.00 |
PRC 1100 MAX76614 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/13/2020 |
Paid |
$1,810.00 |
PRC 1100 MAX76617 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/13/2020 |
Paid |
$7,500.00 |
PRC 1100 MAX76212 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2020 |
Paid |
$7,019.00 |
PRC 1100 MAX76214 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2020 |
Paid |
$30,000.00 |
PRC 1100 MAX76216 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2020 |
Paid |
$1,549.00 |
PRC 1100 MAX76217 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2020 |
Paid |
$3,529.00 |
PRC 1100 MAX76219 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2020 |
Paid |
$17,500.00 |
PRC 1100 MAX76220 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2020 |
Paid |
$12,747.00 |
PRC 1100 MAX76222 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/06/2020 |
Paid |
$1,814.00 |
PRC 1100 MAX75848 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2020 |
Paid |
$29,500.00 |
PRC 1100 MAX75849 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2020 |
Paid |
$14,131.00 |
PRC 1100 MAX75859 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2020 |
Paid |
$43,631.00 |
PRC 1100 MAX75863 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2020 |
Paid |
$1,814.00 |
PRC 1100 MAX75865 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/25/2020 |
Paid |
$2,021.00 |
PRC 1100 MAX75532 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2020 |
Paid |
$6,960.00 |
PRC 1100 MAX75533 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2020 |
Paid |
$6,876.00 |
PRC 1100 MAX75536 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2020 |
Paid |
$1,499.00 |
PRC 1100 MAX75540 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2020 |
Paid |
$15,402.00 |
PRC 1100 MAX75543 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2020 |
Paid |
$5,141.00 |
PRC 1100 MAX75545 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/14/2020 |
Paid |
$2,027.00 |
PRC 1100 MAX75279 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2020 |
Paid |
$56,524.00 |
PRC 1100 MAX75280 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2020 |
Paid |
$2,998.00 |
PRC 1100 MAX75289 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2020 |
Paid |
$14,444.00 |
PRC 1100 MAX75293 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2020 |
Paid |
$1,499.00 |
PRC 1100 MAX75305 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2020 |
Paid |
$2,500.00 |
PRC 1100 MAX75306 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2020 |
Paid |
$17,677.00 |
PRC 1100 MAX75307 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/12/2020 |
Paid |
$4,383.00 |
PRC 1100 MAX74849 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/29/2020 |
Paid |
$6,499.00 |
PRC 1100 MAX74850 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/29/2020 |
Paid |
$21,554.00 |
PRC 1100 MAX74839 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2020 |
Paid |
$5,463.00 |
PRC 1100 MAX74846 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2020 |
Paid |
$3,982.00 |
PRC 1100 MAX74847 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2020 |
Paid |
$15,928.00 |
PRC 1100 MAX74848 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/28/2020 |
Paid |
$1,499.00 |
PRC 1100 MAX74394 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/16/2020 |
Paid |
$25,453.00 |
PRC 1100 MAX74386 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/14/2020 |
Paid |
$5,463.00 |
PRC 1100 MAX74387 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/14/2020 |
Paid |
$42,052.00 |
PRC 1100 MAX74393 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/13/2020 |
Paid |
$21,945.00 |
PRC 1100 MAX74395 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/13/2020 |
Paid |
$2,500.00 |
PRC 1100 MAX74396 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/13/2020 |
Paid |
$6,876.00 |
PRC 1100 MAX74397 |
Transformers, Power Distribution (Incl. Fluid Fill |
01/13/2020 |
Paid |
$30,000.00 |
PRC 1100 MAX73974 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/30/2019 |
Paid |
$14,527.00 |
PRC 1100 MAX73977 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/30/2019 |
Paid |
$11,992.00 |
PRC 1100 MAX73982 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/30/2019 |
Paid |
$10,926.00 |
PRC 1100 MAX73983 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/30/2019 |
Paid |
$35,354.00 |
PRC 1100 MAX73984 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/30/2019 |
Paid |
$2,500.00 |
PRC 1100 MAX73334 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/19/2019 |
Paid |
$25,964.00 |
PRC 1100 MAX73655 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2019 |
Paid |
$35,354.00 |
PRC 1100 MAX73660 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2019 |
Paid |
$2,671.00 |
PRC 1100 MAX73661 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2019 |
Paid |
$13,813.00 |
PRC 1100 MAX73662 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2019 |
Paid |
$56,524.00 |
PRC 1100 MAX73664 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2019 |
Paid |
$5,463.00 |
PRC 1100 MAX73665 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2019 |
Paid |
$14,799.00 |
PRC 1100 MAX73666 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2019 |
Paid |
$59,000.00 |
PRC 1100 MAX73667 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2019 |
Paid |
$29,500.00 |
PRC 1100 MAX73668 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/16/2019 |
Paid |
$8,013.00 |
PRC 1100 MAX73320 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2019 |
Paid |
$29,500.00 |
PRC 1100 MAX73322 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2019 |
Paid |
$10,028.00 |
PRC 1100 MAX73323 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2019 |
Paid |
$1,505.00 |
PRC 1100 MAX73332 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2019 |
Paid |
$1,826.00 |
PRC 1100 MAX73333 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2019 |
Paid |
$14,543.00 |
PRC 1100 MAX73335 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2019 |
Paid |
$3,652.00 |
PRC 1100 MAX72997 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/26/2019 |
Paid |
$2,765.00 |
PRC 1100 MAX72998 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/26/2019 |
Paid |
$7,304.00 |
PRC 1100 MAX72808 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2019 |
Paid |
$5,034.00 |
PRC 1100 MAX72365 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/14/2019 |
Paid |
$30,429.00 |
PRC 1100 MAX72680 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/14/2019 |
Paid |
$4,530.00 |
PRC 1100 MAX72684 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/14/2019 |
Paid |
$13,374.00 |
PRC 1100 MAX72554 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/04/2019 |
Paid |
$14,832.00 |
PRC 1100 MAX72466 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/29/2019 |
Paid |
$12,585.00 |
PRC 1100 MAX72468 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/29/2019 |
Paid |
$34,565.00 |
PRC 1100 MAX72362 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/25/2019 |
Paid |
$22,075.00 |
PRC 1100 MAX72366 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/25/2019 |
Paid |
$10,068.00 |
PRC 1100 MAX72368 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/25/2019 |
Paid |
$5,034.00 |
PRC 1100 19101600234 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2019 |
Paid |
$13,395.00 |
PRC 1100 MAX72028 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2019 |
Paid |
$7,988.00 |
PRC 1100 MAX72190 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/22/2019 |
Paid |
$35,453.00 |
PRC 1100 MAX72191 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/22/2019 |
Paid |
$2,517.00 |
PRC 1100 MAX72030 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/21/2019 |
Paid |
$4,068.00 |
PRC 1100 MAX72029 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/18/2019 |
Paid |
$30,204.00 |
PRC 1100 MAX72085 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/18/2019 |
Paid |
$7,687.00 |
PRC 1100 MAX71770 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2019 |
Paid |
$15,778.00 |
PRC 1100 MAX71729 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/02/2019 |
Paid |
$4,560.00 |
PRC 1100 MAX71731 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/02/2019 |
Paid |
$22,248.00 |
PRC 1100 MAX71520 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/01/2019 |
Paid |
$17,677.00 |
PRC 1100 MAX71623 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/01/2019 |
Paid |
$5,184.00 |
PRC 1100 MAX71421 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/23/2019 |
Paid |
$13,719.00 |
PRC 1100 MAX71422 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/23/2019 |
Paid |
$8,078.00 |
PRC 1100 MAX71424 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/23/2019 |
Paid |
$53,031.00 |
PRC 1100 MAX71426 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/23/2019 |
Paid |
$10,366.00 |
PRC 1100 MAX71278 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2019 |
Paid |
$31,392.00 |
PRC 1100 MAX71280 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2019 |
Paid |
$1,520.00 |
PRC 1100 MAX71281 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2019 |
Paid |
$1,520.00 |
PRC 1100 MAX71283 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2019 |
Paid |
$5,066.00 |
PRC 1100 MAX71284 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2019 |
Paid |
$88,332.00 |
PRC 1100 MAX71070 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/12/2019 |
Paid |
$9,570.00 |
PRC 1100 MAX70955 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2019 |
Paid |
$12,745.00 |
PRC 1100 MAX70957 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2019 |
Paid |
$12,745.00 |
PRC 1100 MAX70958 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2019 |
Paid |
$1,526.00 |
PRC 1100 MAX70961 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2019 |
Paid |
$4,578.00 |
PRC 1100 MAX70962 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2019 |
Paid |
$7,647.00 |
PRC 1100 MAX70963 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2019 |
Paid |
$4,020.00 |
PRC 1100 MAX70964 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/09/2019 |
Paid |
$3,595.00 |
PRC 1100 19082602508 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2019 |
Paid |
$3,108.00 |
PRC 1100 MAX70700 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/29/2019 |
Paid |
$11,004.00 |
PRC 1100 MAX70588 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2019 |
Paid |
$14,004.00 |
PRC 1100 MAX70590 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2019 |
Paid |
$5,502.00 |
PRC 1100 MAX70592 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/26/2019 |
Paid |
$1,526.00 |
PRC 1100 MAX70595 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/26/2019 |
Paid |
$4,020.00 |
PRC 1100 MAX70492 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2019 |
Paid |
$50,266.00 |
PRC 1100 MAX70494 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2019 |
Paid |
$2,549.00 |
PRC 1100 MAX70497 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/19/2019 |
Paid |
$1,834.00 |
PRC 1100 MAX70436 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/14/2019 |
Paid |
$20,766.00 |
PRC 1100 MAX70437 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/14/2019 |
Paid |
$20,766.00 |
PRC 1100 MAX70332 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2019 |
Paid |
$2,795.00 |
PRC 1100 MAX70334 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2019 |
Paid |
$4,578.00 |
PRC 1100 MAX70338 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/09/2019 |
Paid |
$3,668.00 |
PRC 1100 MAX70183 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/07/2019 |
Paid |
$2,579.00 |
PRC 1100 MAX70186 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/07/2019 |
Paid |
$5,158.00 |
PRC 1100 MAX70187 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/07/2019 |
Paid |
$3,052.00 |
PRC 1100 MAX70188 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/07/2019 |
Paid |
$1,579.00 |
PRC 1100 MAX70192 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/07/2019 |
Paid |
$3,052.00 |
PRC 1100 MAX70193 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/07/2019 |
Paid |
$17,946.00 |
PRC 1100 MAX69956 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2019 |
Paid |
$8,078.00 |
PRC 1100 MAX69957 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2019 |
Paid |
$6,618.00 |
PRC 1100 MAX69959 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2019 |
Paid |
$2,579.00 |
PRC 1100 MAX69960 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2019 |
Paid |
$1,834.00 |
PRC 1100 MAX69967 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/31/2019 |
Paid |
$3,360.00 |
PRC 1100 MAX69793 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/24/2019 |
Paid |
$4,574.00 |
PRC 1100 MAX69795 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/24/2019 |
Paid |
$83,064.00 |
PRC 1100 MAX69798 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/24/2019 |
Paid |
$42,393.00 |
PRC 1100 MAX69799 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/24/2019 |
Paid |
$5,230.00 |
PRC 1100 MAX69800 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/24/2019 |
Paid |
$7,336.00 |
PRC 1100 MAX69803 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/24/2019 |
Paid |
$3,158.00 |
PRC 1100 MAX69657 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/18/2019 |
Paid |
$3,595.00 |
PRC 1100 MAX69658 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/18/2019 |
Paid |
$3,100.00 |
PRC 1100 MAX69659 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/18/2019 |
Paid |
$3,595.00 |
PRC 1100 MAX69352 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$5,990.00 |
PRC 1100 MAX69353 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$10,640.00 |
PRC 1100 MAX69354 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$3,680.00 |
PRC 1100 MAX69356 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$5,195.00 |
PRC 1100 MAX69357 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$5,195.00 |
PRC 1100 MAX69359 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2019 |
Paid |
$8,955.00 |
PRC 1100 MAX69097 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/24/2019 |
Paid |
$17,775.00 |
PRC 1100 MAX67773 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/19/2019 |
Paid |
$7,380.00 |
PRC 1100 MAX68901 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/19/2019 |
Paid |
$8,900.00 |
PRC 1100 MAX68902 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/19/2019 |
Paid |
$15,975.00 |
PRC 1100 MAX68903 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/19/2019 |
Paid |
$8,720.00 |
PRC 1100 MAX68842 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/17/2019 |
Paid |
$1,845.00 |
PRC 1100 MAX68843 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/17/2019 |
Paid |
$4,026.00 |
PRC 1100 MAX68844 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/17/2019 |
Paid |
$3,100.00 |
PRC 1100 MAX68845 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/17/2019 |
Paid |
$3,395.00 |
PRC 1100 MAX68570 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/14/2019 |
Paid |
$5,240.00 |
PRC 1100 MAX68567 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/06/2019 |
Paid |
$5,620.00 |
PRC 1100 MAX68573 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/06/2019 |
Paid |
$1,845.00 |
PRC 1100 MAX68574 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/06/2019 |
Paid |
$2,709.00 |
PRC 1100 MAX68577 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/06/2019 |
Paid |
$2,709.00 |
PRC 1100 MAX68218 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2019 |
Paid |
$2,709.00 |
PRC 1100 MAX68220 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2019 |
Paid |
$9,680.00 |
PRC 1100 MAX68226 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2019 |
Paid |
$10,836.00 |
PRC 1100 MAX68227 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/28/2019 |
Paid |
$13,350.00 |
PRC 1100 MAX67973 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/17/2019 |
Paid |
$1,845.00 |
PRC 1100 MAX67974 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/17/2019 |
Paid |
$4,650.00 |
PRC 1100 MAX67778 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/09/2019 |
Paid |
$2,620.00 |
PRC 1100 MAX67782 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/09/2019 |
Paid |
$15,720.00 |
PRC 1100 MAX67784 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/09/2019 |
Paid |
$18,340.00 |
PRC 1100 MAX67785 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/09/2019 |
Paid |
$8,340.00 |
PRC 1100 MAX67697 |
Transformers, Power Distribution (Incl. Fluid Fill |
05/07/2019 |
Paid |
$11,930.00 |
PRC 1100 MAX67359 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2019 |
Paid |
$11,070.00 |
PRC 1100 MAX67360 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2019 |
Paid |
$1,554.00 |
PRC 1100 MAX67361 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2019 |
Paid |
$11,070.00 |
PRC 1100 MAX67362 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2019 |
Paid |
$8,996.00 |
PRC 1100 MAX67363 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2019 |
Paid |
$6,790.00 |
PRC 1100 MAX67366 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2019 |
Paid |
$20,960.00 |
PRC 1100 MAX67367 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2019 |
Paid |
$2,620.00 |
PRC 1100 MAX67368 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2019 |
Paid |
$7,750.00 |
PRC 1100 MAX67369 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/22/2019 |
Paid |
$8,635.00 |
PRC 1100 19041101046 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/16/2019 |
Paid |
$3,698.00 |
PRC 1100 MAX67131 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2019 |
Paid |
$38,816.00 |
PRC 1100 MAX67133 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2019 |
Paid |
$12,915.00 |
PRC 1100 MAX67134 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2019 |
Paid |
$28,820.00 |
PRC 1100 MAX67136 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2019 |
Paid |
$15,762.00 |
PRC 1100 MAX67139 |
Transformers, Power Distribution (Incl. Fluid Fill |
04/11/2019 |
Paid |
$1,554.00 |
PRC 1100 MAX66695 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/27/2019 |
Paid |
$68,056.00 |
PRC 1100 MAX66696 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/27/2019 |
Paid |
$68,120.00 |
PRC 1100 MAX66427 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2019 |
Paid |
$1,554.00 |
PRC 1100 MAX66429 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2019 |
Paid |
$8,248.00 |
PRC 1100 MAX66433 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2019 |
Paid |
$15,647.00 |
PRC 1100 MAX66434 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2019 |
Paid |
$68,056.00 |
PRC 1100 MAX66437 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/14/2019 |
Paid |
$3,698.00 |
PRC 1100 MAX66128 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2019 |
Paid |
$2,740.00 |
PRC 1100 MAX66129 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2019 |
Paid |
$2,729.00 |
PRC 1100 MAX66131 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2019 |
Paid |
$6,876.00 |
PRC 1100 MAX66134 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2019 |
Paid |
$31,294.00 |
PRC 1100 MAX66135 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2019 |
Paid |
$31,294.00 |
PRC 1100 MAX66136 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2019 |
Paid |
$37,524.00 |
PRC 1100 MAX66139 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2019 |
Paid |
$25,016.00 |
PRC 1100 MAX66144 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2019 |
Paid |
$3,698.00 |
PRC 1100 MAX66145 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2019 |
Paid |
$5,254.00 |
PRC 1100 MAX66148 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2019 |
Paid |
$3,108.00 |
PRC 1100 MAX66150 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2019 |
Paid |
$46,941.00 |
PRC 1100 MAX66151 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2019 |
Paid |
$7,396.00 |
PRC 1100 MAX66152 |
Transformers, Power Distribution (Incl. Fluid Fill |
03/07/2019 |
Paid |
$7,770.00 |
PRC 1100 MAX65714 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2019 |
Paid |
$13,128.00 |
PRC 1100 MAX65716 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2019 |
Paid |
$5,737.00 |
PRC 1100 MAX65717 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2019 |
Paid |
$4,115.00 |
PRC 1100 MAX65718 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2019 |
Paid |
$1,860.00 |
PRC 1100 MAX65719 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/20/2019 |
Paid |
$5,280.00 |
PRC 1100 MAX65713 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/19/2019 |
Paid |
$6,564.00 |
PRC 1100 MAX65378 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/11/2019 |
Paid |
$63,790.00 |
PRC 1100 MAX65383 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/11/2019 |
Paid |
$1,860.00 |
PRC 1100 MAX65384 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/11/2019 |
Paid |
$3,280.00 |
PRC 1100 MAX65385 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/11/2019 |
Paid |
$4,980.00 |
PRC 1100 MAX65387 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/11/2019 |
Paid |
$4,680.00 |
PRC 1100 MAX65018 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/04/2019 |
Paid |
$62,155.00 |
PRC 1100 MAX65019 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/04/2019 |
Paid |
$6,560.00 |
PRC 1100 MAX65024 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/04/2019 |
Paid |
$6,840.00 |
PRC 1100 MAX65025 |
Transformers, Power Distribution (Incl. Fluid Fill |
02/04/2019 |
Paid |
$5,340.00 |
PRC 1100 MAX64255 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2018 |
Paid |
$31,294.00 |
PRC 1100 MAX64257 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2018 |
Paid |
$3,120.00 |
PRC 1100 MAX64258 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2018 |
Paid |
$14,790.00 |
PRC 1100 MAX64262 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2018 |
Paid |
$7,340.00 |
PRC 1100 MAX64263 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/31/2018 |
Paid |
$2,670.00 |
PRC 1100 MAX64009 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/12/2018 |
Paid |
$5,280.00 |
PRC 1100 MAX64010 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/12/2018 |
Paid |
$18,690.00 |
PRC 1100 MAX64011 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/12/2018 |
Paid |
$17,896.00 |
PRC 1100 MAX64012 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/12/2018 |
Paid |
$3,148.00 |
PRC 1100 MAX63857 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2018 |
Paid |
$36,762.00 |
PRC 1100 MAX63860 |
Transformers, Power Distribution (Incl. Fluid Fill |
12/10/2018 |
Paid |
$1,865.00 |
PRC 1100 MAX63592 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/28/2018 |
Paid |
$50,032.00 |
PRC 1100 MAX63593 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/28/2018 |
Paid |
$3,148.00 |
PRC 1100 MAX63594 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/28/2018 |
Paid |
$2,749.00 |
PRC 1100 MAX63600 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/28/2018 |
Paid |
$8,452.00 |
PRC 1100 MAX63379 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2018 |
Paid |
$2,785.00 |
PRC 1100 MAX63380 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/15/2018 |
Paid |
$59,449.00 |
PRC 1100 MAX63009 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2018 |
Paid |
$6,808.00 |
PRC 1100 MAX63010 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2018 |
Paid |
$37,436.00 |
PRC 1100 MAX63011 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2018 |
Paid |
$3,180.00 |
PRC 1100 MAX63015 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2018 |
Paid |
$16,044.00 |
PRC 1100 MAX63017 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2018 |
Paid |
$3,740.00 |
PRC 1100 MAX63018 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2018 |
Paid |
$24,066.00 |
PRC 1100 MAX63019 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2018 |
Paid |
$42,104.00 |
PRC 1100 MAX63020 |
Transformers, Power Distribution (Incl. Fluid Fill |
11/01/2018 |
Paid |
$1,590.00 |
PRC 1100 MAX62797 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/24/2018 |
Paid |
$1,870.00 |
PRC 1100 MAX62786 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2018 |
Paid |
$8,355.00 |
PRC 1100 MAX62789 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2018 |
Paid |
$3,460.00 |
PRC 1100 MAX62790 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2018 |
Paid |
$10,696.00 |
PRC 1100 MAX62799 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2018 |
Paid |
$6,245.00 |
PRC 1100 MAX62800 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2018 |
Paid |
$4,770.00 |
PRC 1100 MAX62802 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2018 |
Paid |
$10,696.00 |
PRC 1100 MAX62803 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/23/2018 |
Paid |
$3,300.00 |
PRC 1100 MAX62355 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2018 |
Paid |
$28,155.00 |
PRC 1100 MAX62356 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2018 |
Paid |
$32,200.00 |
PRC 1100 MAX62357 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2018 |
Paid |
$15,647.00 |
PRC 1100 MAX62358 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2018 |
Paid |
$83,298.00 |
PRC 1100 MAX62359 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2018 |
Paid |
$31,580.00 |
PRC 1100 MAX62405 |
Transformers, Power Distribution (Incl. Fluid Fill |
10/03/2018 |
Paid |
$11,328.00 |
PRC 1100 MAX62236 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2018 |
Paid |
$20,815.00 |
PRC 1100 MAX62237 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/28/2018 |
Paid |
$2,808.00 |
PRC 1100 MAX61776 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2018 |
Paid |
$4,163.00 |
PRC 1100 MAX62174 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2018 |
Paid |
$5,664.00 |
PRC 1100 MAX62177 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/27/2018 |
Paid |
$11,328.00 |
PRC 1100 MAX61862 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/25/2018 |
Paid |
$5,664.00 |
PRC 1100 MAX61866 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2018 |
Paid |
$10,560.00 |
PRC 1100 MAX61868 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2018 |
Paid |
$27,000.00 |
PRC 1100 MAX61871 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/18/2018 |
Paid |
$13,500.00 |
PRC 1100 MAX61779 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/14/2018 |
Paid |
$5,670.00 |
PRC 1100 MAX61465 |
Transformers, Power Distribution (Incl. Fluid Fill |
09/05/2018 |
Paid |
$22,500.00 |
PRC 1100 MAX61363 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/30/2018 |
Paid |
$15,120.00 |
PRC 1100 MAX61365 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/30/2018 |
Paid |
$4,520.00 |
PRC 1100 MAX61366 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/30/2018 |
Paid |
$4,165.00 |
PRC 1100 MAX61370 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/30/2018 |
Paid |
$5,670.00 |
PRC 1100 MAX61151 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2018 |
Paid |
$3,200.00 |
PRC 1100 MAX61153 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2018 |
Paid |
$20,815.00 |
PRC 1100 MAX61159 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/27/2018 |
Paid |
$1,890.00 |
PRC 1100 MAX61128 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/23/2018 |
Paid |
$7,560.00 |
PRC 1100 MAX60939 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2018 |
Paid |
$5,650.00 |
PRC 1100 MAX61056 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2018 |
Paid |
$13,370.00 |
PRC 1100 MAX61057 |
Transformers, Power Distribution (Incl. Fluid Fill |
08/16/2018 |
Paid |
$3,360.00 |
PRC 1100 MAX60618 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/26/2018 |
Paid |
$3,200.00 |
PRC 1100 MAX60619 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/26/2018 |
Paid |
$5,280.00 |
PRC 1100 MAX60620 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/26/2018 |
Paid |
$21,510.00 |
PRC 1100 MAX60512 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2018 |
Paid |
$4,165.00 |
PRC 1100 MAX60514 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2018 |
Paid |
$7,600.00 |
PRC 1100 MAX60516 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2018 |
Paid |
$25,801.00 |
PRC 1100 MAX60521 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2018 |
Paid |
$12,390.00 |
PRC 1100 MAX60522 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/25/2018 |
Paid |
$11,340.00 |
PRC 1100 MAX60281 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2018 |
Paid |
$1,600.00 |
PRC 1100 MAX60282 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2018 |
Paid |
$44,744.66 |
PRC 1100 MAX60283 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2018 |
Paid |
$21,512.00 |
PRC 1100 MAX60289 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2018 |
Paid |
$13,300.00 |
PRC 1100 MAX60290 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2018 |
Paid |
$5,700.00 |
PRC 1100 MAX60291 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2018 |
Paid |
$10,896.00 |
PRC 1100 MAX60292 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/12/2018 |
Paid |
$5,889.00 |
PRC 1100 MAX60137 |
Transformers, Power Distribution (Incl. Fluid Fill |
07/09/2018 |
Paid |
$17,203.36 |
PRC 1100 MAX59904 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2018 |
Paid |
$18,823.00 |
PRC 1100 MAX59905 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2018 |
Paid |
$26,890.00 |
PRC 1100 MAX59906 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2018 |
Paid |
$3,500.00 |
PRC 1100 MAX59907 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/28/2018 |
Paid |
$4,800.00 |
PRC 1100 MAX59690 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/20/2018 |
Paid |
$2,844.00 |
PRC 1100 MAX59691 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/20/2018 |
Paid |
$13,285.00 |
PRC 1100 MAX59695 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/20/2018 |
Paid |
$1,900.00 |
PRC 1100 MAX59698 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/20/2018 |
Paid |
$5,400.00 |
PRC 1100 MAX59601 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2018 |
Paid |
$18,080.00 |
PRC 1100 MAX59604 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2018 |
Paid |
$4,800.00 |
PRC 1100 MAX59607 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/18/2018 |
Paid |
$3,800.00 |
PRC 1100 MAX59428 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/14/2018 |
Paid |
$4,440.00 |
PRC 1100 MAX59438 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/14/2018 |
Paid |
$24,570.00 |
PRC 1100 MAX59435 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/13/2018 |
Paid |
$8,000.00 |
PRC 1100 MAX59437 |
Transformers, Power Distribution (Incl. Fluid Fill |
06/13/2018 |
Paid |
$6,885.00 |