PRM 2200 24031318264 |
Flexible Base |
03/14/2024 |
Outstanding |
$6,376.24 |
PRM 2200 24030417124 |
Flexible Base |
03/05/2024 |
Outstanding |
$6,150.88 |
PRM 2200 24022616406 |
Flexible Base |
02/29/2024 |
Outstanding |
$2,106.58 |
PRM 2200 24022215957 |
Flexible Base |
02/26/2024 |
Outstanding |
$15,019.68 |
PRC 1100 MAX125117 |
Flexible Base |
02/22/2024 |
Outstanding |
$8,325.29 |
PRC 1100 MAX125157 |
Flexible Base |
02/22/2024 |
Outstanding |
$5,711.10 |
PRM 2200 24021214826 |
Flexible Base |
02/15/2024 |
Outstanding |
$6,243.07 |
PRM 2200 24021314859 |
Flexible Base |
02/15/2024 |
Outstanding |
$5,763.90 |
PRM 2200 24021314861 |
Flexible Base |
02/15/2024 |
Outstanding |
$6,037.25 |
PRM 2200 24021415005 |
Flexible Base |
02/15/2024 |
Outstanding |
$16,321.46 |
PRC 1100 MAX124813 |
Flexible Base |
02/13/2024 |
Outstanding |
$5,081.32 |
PRM 2200 24012312307 |
Flexible Base |
01/25/2024 |
Paid |
$6,717.38 |
PRM 2200 24012412476 |
Flexible Base |
01/25/2024 |
Paid |
$1,730.70 |
PRM 2200 24012212154 |
Flexible Base |
01/23/2024 |
Paid |
$5,772.61 |
PRC 1100 MAX123964 |
Flexible Base |
01/22/2024 |
Paid |
$1,849.87 |
PRM 8600 24011611612 |
Flexible Base |
01/17/2024 |
Paid |
$6,428.81 |
PRM 2200 24010410301 |
Flexible Base |
01/08/2024 |
Paid |
$6,344.18 |
PRM 2200 24010510539 |
Flexible Base |
01/08/2024 |
Paid |
$2,024.59 |
PRM 2200 24010510544 |
Flexible Base |
01/08/2024 |
Paid |
$3,246.93 |
PRM 2200 24010310063 |
Flexible Base |
01/04/2024 |
Paid |
$7,425.93 |
PRM 2200 24010209913 |
Flexible Base |
01/03/2024 |
Paid |
$39,822.70 |
PRC 1100 MAX122976 |
Flexible Base |
12/28/2023 |
Paid |
$461.66 |
PRC 1100 MAX122805 |
Flexible Base |
12/27/2023 |
Paid |
$3,209.79 |
PRM 2200 23122109185 |
Flexible Base |
12/27/2023 |
Paid |
$6,872.43 |
PRM 2200 23122009014 |
Flexible Base |
12/21/2023 |
Paid |
$5,807.88 |
PRM 8600 23121808669 |
Flexible Base |
12/19/2023 |
Paid |
$509.86 |
PRM 2200 23121408215 |
Flexible Base |
12/18/2023 |
Paid |
$2,123.57 |
PRC 1100 MAX122334 |
Flexible Base |
12/14/2023 |
Paid |
$2,674.26 |
PRM 2200 23121307953 |
Flexible Base |
12/14/2023 |
Paid |
$7,400.65 |
PRM 2200 23120807552 |
Flexible Base |
12/12/2023 |
Paid |
$6,304.04 |
PRM 2200 23120406771 |
Flexible Base |
12/07/2023 |
Paid |
$1,759.92 |
PRM 2200 23120406601 |
Flexible Base |
12/05/2023 |
Paid |
$6,245.00 |
PRC 1100 MAX121848 |
Flexible Base |
12/04/2023 |
Paid |
$453.94 |
PRC 1100 MAX121849 |
Flexible Base |
12/04/2023 |
Paid |
$3,002.34 |
PRC 1100 MAX121850 |
Flexible Base |
12/04/2023 |
Paid |
$16,829.93 |
PRM 2200 23110804393 |
Flexible Base |
11/13/2023 |
Paid |
$4,176.42 |
PRM 2200 23110804271 |
Flexible Base |
11/09/2023 |
Paid |
$10,299.71 |
PRM 2200 23110804306 |
Flexible Base |
11/09/2023 |
Paid |
$1,719.63 |
PRM 2200 23110203744 |
Flexible Base |
11/06/2023 |
Paid |
$10,840.69 |
PRM 2200 23103103459 |
Flexible Base |
11/02/2023 |
Paid |
$2,223.41 |
PRM 2200 23110103609 |
Flexible Base |
11/02/2023 |
Paid |
$6,274.50 |
PRM 2200 23110103616 |
Flexible Base |
11/02/2023 |
Paid |
$6,441.01 |
PRM 8600 23103003361 |
Flexible Base |
10/31/2023 |
Paid |
$38,806.75 |
PRM 2200 23102002432 |
Flexible Base |
10/23/2023 |
Paid |
$4,197.45 |
PRM 2200 23101802087 |
Flexible Base |
10/19/2023 |
Paid |
$4,387.29 |
PRM 2200 23101000898 |
Flexible Base |
10/12/2023 |
Paid |
$1,708.16 |
PRC 1100 MAX120331 |
Flexible Base |
10/10/2023 |
Paid |
$8,920.43 |
PRC 1100 MAX120332 |
Flexible Base |
10/10/2023 |
Paid |
$15,324.23 |
PRM 2200 23100500568 |
Flexible Base |
10/09/2023 |
Paid |
$4,151.35 |
PRM 2200 23100600737 |
Flexible Base |
10/09/2023 |
Paid |
$1,642.82 |
PRM 2200 23092736778 |
Flexible Base |
10/02/2023 |
Paid |
$12,541.78 |
PRM 2200 23092836847 |
Flexible Base |
10/02/2023 |
Paid |
$2,521.52 |
PRM 2200 23092937028 |
Flexible Base |
10/02/2023 |
Paid |
$2,114.79 |
PRM 2200 23092536355 |
Flexible Base |
09/28/2023 |
Paid |
$8,130.88 |
PRC 1100 MAX119370 |
Flexible Base |
09/21/2023 |
Paid |
$8,906.79 |
PRM 2200 23091535214 |
Flexible Base |
09/19/2023 |
Paid |
$4,644.53 |
PRM 2200 23091535137 |
Flexible Base |
09/18/2023 |
Paid |
$2,280.70 |
PRM 2200 23091134585 |
Flexible Base |
09/14/2023 |
Paid |
$6,315.29 |
PRM 2200 23091334837 |
Flexible Base |
09/14/2023 |
Paid |
$16,451.44 |
PRM 2200 23090634120 |
Flexible Base |
09/11/2023 |
Paid |
$4,096.99 |
PRM 2200 23090734135 |
Flexible Base |
09/11/2023 |
Paid |
$31,200.28 |
PRC 1100 MAX118686 |
Flexible Base |
09/07/2023 |
Paid |
$6,306.52 |
PRM 2200 23082832923 |
Flexible Base |
08/31/2023 |
Paid |
$2,081.38 |
PRM 8100 23082832887 |
Flexible Base |
08/29/2023 |
Paid |
$12,802.01 |
PRM 2200 23082432518 |
Flexible Base |
08/28/2023 |
Paid |
$2,533.37 |
PRM 2200 23081832064 |
Flexible Base |
08/22/2023 |
Paid |
$32,718.23 |
PRM 2200 23081731793 |
Flexible Base |
08/21/2023 |
Paid |
$9,937.55 |
PRM 2200 23081731814 |
Flexible Base |
08/21/2023 |
Paid |
$2,095.12 |
PRM 2200 23081531408 |
Flexible Base |
08/17/2023 |
Paid |
$10,899.09 |
PRM 2200 23080930747 |
Flexible Base |
08/10/2023 |
Paid |
$2,245.36 |
PRM 2200 23080230185 |
Flexible Base |
08/07/2023 |
Paid |
$4,062.15 |
PRM 2200 23080230126 |
Flexible Base |
08/03/2023 |
Paid |
$2,281.82 |
PRM 2200 23072129005 |
Flexible Base |
07/25/2023 |
Paid |
$3,114.69 |
PRM 2200 23072028763 |
Flexible Base |
07/24/2023 |
Paid |
$1,829.21 |
PRM 2200 23071328045 |
Flexible Base |
07/17/2023 |
Paid |
$2,689.48 |
PRM 2200 23071027407 |
Flexible Base |
07/11/2023 |
Paid |
$4,246.72 |
PRM 6300 23071027519 |
STONE RIP RAP |
07/11/2023 |
Paid |
$2,958.94 |
PRM 2200 23063026668 |
Flexible Base |
07/05/2023 |
Paid |
$2,730.25 |
PRM 2200 23062826206 |
Flexible Base |
06/29/2023 |
Paid |
$2,588.04 |
PRM 2200 23062826209 |
Flexible Base |
06/29/2023 |
Paid |
$2,553.87 |
PRM 2200 23062125524 |
Flexible Base |
06/26/2023 |
Paid |
$4,400.28 |
PRM 2200 23061925204 |
Flexible Base |
06/21/2023 |
Paid |
$1,830.34 |
PRM 2200 23061625119 |
Flexible Base |
06/20/2023 |
Paid |
$2,243.84 |
PRM 2200 23061424890 |
Flexible Base |
06/15/2023 |
Paid |
$5,108.44 |
PRM 2200 23061424901 |
Flexible Base |
06/15/2023 |
Paid |
$1,918.92 |
PRC 1100 MAX115661 |
Flexible Base |
06/13/2023 |
Paid |
$2,018.20 |
PRM 2200 23060924532 |
Flexible Base |
06/12/2023 |
Paid |
$2,050.07 |
PRM 2200 23053123670 |
Flexible Base |
06/05/2023 |
Paid |
$1,284.28 |
PRM 2200 23060123699 |
Flexible Base |
06/05/2023 |
Paid |
$1,563.44 |
PRM 2200 23053023446 |
Flexible Base |
05/31/2023 |
Paid |
$1,723.64 |
PRM 2200 23052523155 |
Flexible Base |
05/30/2023 |
Paid |
$1,336.43 |
PRM 6300 23052523242 |
STONE RIP RAP |
05/30/2023 |
Paid |
$2,904.21 |
PRM 2200 23051922613 |
Flexible Base |
05/22/2023 |
Paid |
$2,106.92 |
PRM 6300 23051522168 |
STONE RIP RAP |
05/18/2023 |
Paid |
$15,829.93 |
PRM 2200 23051121732 |
Flexible Base |
05/15/2023 |
Paid |
$4,514.13 |
PRM 2200 23050421023 |
Flexible Base |
05/08/2023 |
Paid |
$2,501.91 |
PRM 2200 23050421041 |
Flexible Base |
05/08/2023 |
Paid |
$3,423.98 |
PRM 2200 23042820534 |
Flexible Base |
05/02/2023 |
Paid |
$1,968.84 |
PRM 2200 23042019676 |
Flexible Base |
04/24/2023 |
Paid |
$6,346.73 |
PRM 2200 23041419179 |
Flexible Base |
04/19/2023 |
Paid |
$4,630.80 |
PRM 2200 23041719260 |
Flexible Base |
04/19/2023 |
Paid |
$1,676.34 |
PRM 2200 23040618227 |
Flexible Base |
04/10/2023 |
Paid |
$1,950.89 |
PRM 2200 23033017442 |
Flexible Base |
04/03/2023 |
Paid |
$1,872.85 |
PRM 2200 23033117571 |
Flexible Base |
04/03/2023 |
Paid |
$1,665.18 |
PRM 2200 23032416933 |
Flexible Base |
03/27/2023 |
Paid |
$5,119.94 |
PRM 2200 23031615933 |
Flexible Base |
03/20/2023 |
Paid |
$6,849.00 |
PRM 6300 23031415726 |
STONE RIP RAP |
03/16/2023 |
Paid |
$14,808.69 |
PRM 2200 23031015482 |
Flexible Base |
03/14/2023 |
Paid |
$9,284.01 |
PRC 1100 MAX112363 |
Flexible Base |
03/13/2023 |
Paid |
$13,287.89 |
PRM 2200 23030614871 |
Flexible Base |
03/09/2023 |
Paid |
$1,915.97 |
PRM 2200 23030815090 |
Flexible Base |
03/09/2023 |
Paid |
$5,751.78 |
PRM 2200 23030614730 |
Flexible Base |
03/07/2023 |
Paid |
$5,568.47 |
PRM 2200 23030614738 |
Flexible Base |
03/07/2023 |
Paid |
$1,769.03 |
PRM 8100 23030614845 |
Flexible Base |
03/07/2023 |
Paid |
$3,507.00 |
PRM 2200 23030214391 |
Flexible Base |
03/06/2023 |
Paid |
$1,241.34 |
PRM 2200 23022713956 |
Flexible Base |
02/28/2023 |
Paid |
$3,084.37 |
PRC 1100 MAX111669 |
Flexible Base |
02/23/2023 |
Paid |
$19,866.76 |
PRM 6300 23021613201 |
LIMESTONE, CRUSHED |
02/21/2023 |
Paid |
$2,432.14 |
PRM 6300 23021613201 |
STONE RIP RAP |
02/21/2023 |
Paid |
$7,797.02 |
PRC 1100 MAX111118 |
Flexible Base |
02/13/2023 |
Paid |
$3,008.48 |
PRM 2200 23020912381 |
Flexible Base |
02/13/2023 |
Paid |
$8,923.99 |
PRM 2200 23020611933 |
Flexible Base |
02/07/2023 |
Paid |
$2,028.68 |
PRM 2200 23020611951 |
Flexible Base |
02/07/2023 |
Paid |
$5,377.70 |
PRM 2200 23012711513 |
Flexible Base |
01/31/2023 |
Paid |
$5,457.71 |
PRM 2200 23012511158 |
Flexible Base |
01/30/2023 |
Paid |
$1,872.28 |
PRM 2200 23012511174 |
Flexible Base |
01/30/2023 |
Paid |
$5,317.38 |
PRM 6300 23012511217 |
LIMESTONE, CRUSHED |
01/30/2023 |
Paid |
$34,046.02 |
PRM 2200 23012511055 |
Flexible Base |
01/26/2023 |
Paid |
$1,961.78 |
PRM 6300 23012410993 |
STONE RIP RAP |
01/26/2023 |
Paid |
$50,725.57 |
PRM 2200 23012310704 |
Flexible Base |
01/24/2023 |
Paid |
$1,377.35 |
PRC 1100 MAX110432 |
Flexible Base |
01/23/2023 |
Paid |
$11,072.79 |
PRM 2200 23012010534 |
Flexible Base |
01/23/2023 |
Paid |
$10,256.87 |
PRM 2200 23011109497 |
Flexible Base |
01/12/2023 |
Paid |
$1,263.13 |
PRM 2200 23010308782 |
Flexible Base |
01/04/2023 |
Paid |
$2,628.35 |
PRM 2200 22122808534 |
Flexible Base |
01/03/2023 |
Paid |
$3,173.23 |
PRM 2200 22121907775 |
Flexible Base |
12/22/2022 |
Paid |
$5,171.93 |
PRM 2200 22121507418 |
Flexible Base |
12/19/2022 |
Paid |
$8,331.22 |
PRM 2200 22121507420 |
Flexible Base |
12/19/2022 |
Paid |
$8,287.72 |
PRM 2200 22121607570 |
Flexible Base |
12/19/2022 |
Paid |
$1,748.42 |
PRC 1100 MAX109501 |
Flexible Base |
12/15/2022 |
Paid |
$5,214.74 |
PRM 2200 22121207088 |
Flexible Base |
12/15/2022 |
Paid |
$7,249.29 |
PRM 2200 22120906893 |
Flexible Base |
12/12/2022 |
Paid |
$1,747.96 |
PRM 6300 22120806800 |
STONE RIP RAP |
12/12/2022 |
Paid |
$37,541.70 |
PRC 1100 MAX109279 |
Flexible Base |
12/08/2022 |
Paid |
$1,294.41 |
PRM 2200 22120706572 |
Flexible Base |
12/08/2022 |
Paid |
$2,662.15 |
PRM 2200 22120206265 |
Flexible Base |
12/06/2022 |
Paid |
$8,374.38 |
PRM 2200 22120106060 |
Flexible Base |
12/05/2022 |
Paid |
$7,512.82 |
PRC 1100 MAX108774 |
Flexible Base |
11/22/2022 |
Paid |
$7,110.68 |
PRM 2200 22111504528 |
Flexible Base |
11/17/2022 |
Paid |
$1,763.73 |
PRC 1100 MAX108544 |
Flexible Base |
11/15/2022 |
Paid |
$21,265.61 |
PRC 1100 MAX108190 |
Flexible Base |
11/07/2022 |
Paid |
$6,720.68 |
PRM 2200 22102803196 |
Flexible Base |
10/31/2022 |
Paid |
$3,911.41 |
PRM 2200 22102502802 |
Flexible Base |
10/27/2022 |
Paid |
$2,777.23 |
PRM 2200 22101201480 |
Flexible Base |
10/13/2022 |
Paid |
$1,562.18 |
PRM 8600 22101001222 |
STONE RIP RAP |
10/13/2022 |
Paid |
$21,499.64 |
PRM 2200 22101001000 |
Flexible Base |
10/11/2022 |
Paid |
$6,916.29 |
PRM 8600 22100700867 |
Flexible Base |
10/10/2022 |
Paid |
$49,532.76 |
PRM 8600 22100700867 |
LIMESTONE, CRUSHED |
10/10/2022 |
Paid |
$24,235.03 |
PRM 2200 22100400261 |
Flexible Base |
10/06/2022 |
Paid |
$2,028.79 |
PRM 2200 22100500468 |
Flexible Base |
10/06/2022 |
Paid |
$1,013.31 |
PRM 2200 22100300019 |
Flexible Base |
10/04/2022 |
Paid |
$3,244.59 |
PRM 2200 22092132449 |
Flexible Base |
09/26/2022 |
Paid |
$1,620.44 |
PRM 2200 22092232540 |
Flexible Base |
09/26/2022 |
Paid |
$1,183.70 |
PRM 2200 22092132372 |
Flexible Base |
09/22/2022 |
Paid |
$2,158.76 |
PRM 2200 22092132374 |
Flexible Base |
09/22/2022 |
Paid |
$1,299.06 |
PRM 2200 22091531825 |
Flexible Base |
09/19/2022 |
Paid |
$3,492.97 |
PRM 2200 22091531828 |
Flexible Base |
09/19/2022 |
Paid |
$2,177.81 |
PRM 2200 22090831249 |
Flexible Base |
09/12/2022 |
Paid |
$1,383.00 |
PRM 2200 22090130619 |
Flexible Base |
09/06/2022 |
Paid |
$10,872.61 |
PRM 8600 22083130587 |
STONE RIP RAP |
09/06/2022 |
Paid |
$51,716.87 |
PRM 8600 22090130753 |
Flexible Base |
09/06/2022 |
Paid |
$19,938.15 |
PRM 2200 22082929993 |
Flexible Base |
08/30/2022 |
Paid |
$1,372.01 |
PRM 2200 22082529772 |
Flexible Base |
08/29/2022 |
Paid |
$7,480.02 |
PRM 2200 22082629860 |
Flexible Base |
08/29/2022 |
Paid |
$2,019.19 |
PRM 2200 22082229441 |
Flexible Base |
08/25/2022 |
Paid |
$1,830.27 |
PRM 2200 22081628939 |
Flexible Base |
08/18/2022 |
Paid |
$2,009.01 |
PRM 2200 22081628963 |
Flexible Base |
08/18/2022 |
Paid |
$3,787.07 |
PRM 2200 22080528156 |
Flexible Base |
08/08/2022 |
Paid |
$2,864.91 |
PRM 2200 22080227764 |
Flexible Base |
08/04/2022 |
Paid |
$1,956.98 |
PRM 2200 22080227771 |
Flexible Base |
08/04/2022 |
Paid |
$3,092.02 |
PRM 2200 22080327904 |
Flexible Base |
08/04/2022 |
Paid |
$6,904.39 |
PRM 2200 22080127565 |
Flexible Base |
08/02/2022 |
Paid |
$1,753.45 |
PRM 2200 22072526986 |
Flexible Base |
07/28/2022 |
Paid |
$12,756.11 |
PRM 6300 22071526116 |
STONE RIP RAP |
07/18/2022 |
Paid |
$2,302.89 |
PRM 2200 22071325919 |
Flexible Base |
07/14/2022 |
Paid |
$2,123.45 |
PRM 2200 22070825567 |
Flexible Base |
07/12/2022 |
Paid |
$7,548.35 |
PRM 2200 22070825570 |
Flexible Base |
07/12/2022 |
Paid |
$3,791.32 |
PRM 2200 22071125599 |
Flexible Base |
07/12/2022 |
Paid |
$1,272.32 |
PRM 6300 22070825503 |
LIMESTONE, CRUSHED |
07/11/2022 |
Paid |
$8,409.16 |
PRM 2200 22070525118 |
Flexible Base |
07/06/2022 |
Paid |
$5,239.21 |
PRC 1100 MAX103896 |
Flexible Base |
07/05/2022 |
Paid |
$1,754.03 |
PRC 1100 MAX103897 |
Flexible Base |
07/05/2022 |
Paid |
$3,655.25 |
PRM 6300 22062724423 |
LIMESTONE, CRUSHED |
06/28/2022 |
Paid |
$32,388.14 |
PRM 2200 22062424223 |
Flexible Base |
06/27/2022 |
Paid |
$6,611.00 |
PRM 2200 22060722655 |
Flexible Base |
06/09/2022 |
Paid |
$3,286.05 |
PRM 2200 22060322431 |
Flexible Base |
06/06/2022 |
Paid |
$7,913.59 |
PRC 1100 MAX102841 |
Flexible Base |
06/02/2022 |
Paid |
$41,775.46 |
PRC 1100 MAX102976 |
Flexible Base |
06/02/2022 |
Paid |
$83,185.07 |
PRC 1100 MAX102977 |
Flexible Base |
06/02/2022 |
Paid |
$7,930.41 |
PRM 2200 22060122144 |
Flexible Base |
06/02/2022 |
Paid |
$2,186.32 |
PRC 1100 MAX102840 |
Flexible Base |
05/31/2022 |
Paid |
$35,861.42 |
PRM 2200 22052621716 |
Flexible Base |
05/31/2022 |
Paid |
$5,689.35 |
PRC 1100 MAX102465 |
Flexible Base |
05/23/2022 |
Paid |
$1,336.08 |
PRM 2200 22051620734 |
Flexible Base |
05/17/2022 |
Paid |
$1,731.42 |
PRC 1100 MAX102323 |
Flexible Base |
05/12/2022 |
Paid |
$12,965.94 |
PRC 1100 MAX102324 |
Flexible Base |
05/12/2022 |
Paid |
$6,092.18 |
PRC 1100 MAX102325 |
Flexible Base |
05/12/2022 |
Paid |
$11,627.21 |
PRM 2200 22050619960 |
Flexible Base |
05/09/2022 |
Paid |
$4,690.66 |
PRM 2200 22042518845 |
Flexible Base |
04/26/2022 |
Paid |
$7,390.98 |
PRM 2200 22042018583 |
Flexible Base |
04/25/2022 |
Paid |
$1,170.40 |
PRM 2200 22042218708 |
Flexible Base |
04/25/2022 |
Paid |
$4,776.49 |
PRM 2200 22041217790 |
Flexible Base |
04/14/2022 |
Paid |
$1,842.72 |
PRM 2200 22040617262 |
Flexible Base |
04/07/2022 |
Paid |
$6,983.36 |
PRM 6300 22040417096 |
Flexible Base |
04/07/2022 |
Paid |
$4,899.55 |
PRM 2200 22032916535 |
Flexible Base |
03/31/2022 |
Paid |
$1,499.31 |
PRM 2200 22033016668 |
Flexible Base |
03/31/2022 |
Paid |
$4,636.21 |
PRM 2200 22032816384 |
Flexible Base |
03/29/2022 |
Paid |
$5,468.45 |
PRC 1100 MAX100427 |
Flexible Base |
03/24/2022 |
Paid |
$33,337.90 |
PRC 1100 MAX100428 |
Flexible Base |
03/24/2022 |
Paid |
$7,026.63 |
PRM 2200 22032215834 |
Flexible Base |
03/24/2022 |
Paid |
$4,683.49 |
PRM 2200 22030914727 |
Flexible Base |
03/14/2022 |
Paid |
$4,844.85 |
PRM 2200 22030914605 |
Flexible Base |
03/10/2022 |
Paid |
$1,704.14 |
PRM 2200 22022413235 |
Flexible Base |
02/28/2022 |
Paid |
$4,420.79 |
PRM 2200 22022213012 |
Flexible Base |
02/24/2022 |
Paid |
$5,848.77 |
PRM 2200 22022313081 |
Flexible Base |
02/24/2022 |
Paid |
$1,945.11 |
PRM 2200 22021712667 |
Flexible Base |
02/22/2022 |
Paid |
$3,287.47 |
PRM 8600 22020111243 |
Crushed Stone (Includes Riprap) |
02/03/2022 |
Paid |
$23,933.11 |
PRM 2200 22012710708 |
Flexible Base |
01/31/2022 |
Paid |
$1,796.65 |
PRM 2200 22012710734 |
Flexible Base |
01/31/2022 |
Paid |
$3,402.28 |
PRM 2200 22012510479 |
Flexible Base |
01/27/2022 |
Paid |
$1,260.13 |
PRM 2200 22012010075 |
Flexible Base |
01/21/2022 |
Paid |
$4,846.27 |
PRM 2200 22011409567 |
Flexible Base |
01/18/2022 |
Paid |
$864.96 |
PRM 2200 22010508817 |
Flexible Base |
01/10/2022 |
Paid |
$1,944.86 |
PRM 6200 21122808139 |
Crushed Stone (Includes Riprap) |
12/29/2021 |
Paid |
$4,665.28 |
PRM 2200 21122207813 |
Flexible Base |
12/27/2021 |
Paid |
$633.02 |
PRM 2200 21121407026 |
Flexible Base |
12/16/2021 |
Paid |
$630.31 |
PRM 2200 21121507127 |
Flexible Base |
12/16/2021 |
Paid |
$1,892.71 |
PRM 2200 21121006761 |
Flexible Base |
12/13/2021 |
Paid |
$2,118.52 |
PRM 2200 21120105743 |
Flexible Base |
12/02/2021 |
Paid |
$5,382.24 |
PRM 2200 21112305137 |
Flexible Base |
11/24/2021 |
Paid |
$5,060.69 |
PRM 2200 21111504227 |
Flexible Base |
11/16/2021 |
Paid |
$6,170.26 |
PRM 2200 21110903883 |
Flexible Base |
11/12/2021 |
Paid |
$1,843.22 |
PRM 2200 21110503519 |
Flexible Base |
11/08/2021 |
Paid |
$6,381.43 |
PRM 2200 21110303302 |
Flexible Base |
11/04/2021 |
Paid |
$311.95 |
PRM 2200 21102802737 |
Soil Mixtures (Special) |
11/01/2021 |
Paid |
$965.59 |
PRM 2200 21102102071 |
Soil Mixtures (Special) |
10/25/2021 |
Paid |
$727.68 |
PRM 2200 21101501423 |
Flexible Base |
10/18/2021 |
Paid |
$1,822.92 |
PRM 8100 21101501485 |
Crushed Stone (Includes Riprap) |
10/18/2021 |
Paid |
$6,070.87 |
PRM 2200 21100400159 |
Flexible Base |
10/05/2021 |
Paid |
$1,794.37 |
PRM 2200 21100400179 |
Flexible Base |
10/05/2021 |
Paid |
$6,935.39 |
PRM 8600 21093033879 |
Flexible Base |
10/04/2021 |
Paid |
$1,231.82 |
PRM 2200 21092933561 |
Soil Mixtures (Special) |
09/30/2021 |
Paid |
$721.41 |
PRM 2200 21092933563 |
Soil Mixtures (Special) |
09/30/2021 |
Paid |
$968.20 |
PRM 2200 21092933580 |
Flexible Base |
09/30/2021 |
Paid |
$1,853.10 |
PRM 8600 21092833526 |
Crushed Stone (Includes Riprap) |
09/30/2021 |
Paid |
$20,846.16 |
PRM 2200 21092032650 |
Flexible Base |
09/23/2021 |
Paid |
$6,083.43 |
PRM 2200 21092232853 |
Flexible Base |
09/23/2021 |
Paid |
$2,052.23 |
PRM 2200 21092232876 |
Flexible Base |
09/23/2021 |
Paid |
$7,303.03 |
PRM 2200 21091632203 |
Soil Mixtures (Special) |
09/20/2021 |
Paid |
$733.82 |
PRM 2200 21083130502 |
Flexible Base |
09/02/2021 |
Paid |
$2,070.16 |
PRM 2200 21090130694 |
Flexible Base |
09/02/2021 |
Paid |
$5,527.69 |
PRM 8600 21083130660 |
Flexible Base |
09/02/2021 |
Paid |
$697.31 |
PRM 8600 21083130662 |
Flexible Base |
09/02/2021 |
Paid |
$1,396.45 |
PRM 2200 21082730329 |
Flexible Base |
08/30/2021 |
Paid |
$3,255.10 |
PRM 2200 21082730329 |
Soil Mixtures (Special) |
08/30/2021 |
Paid |
$960.49 |
PRM 2200 21082730333 |
Soil Mixtures (Special) |
08/30/2021 |
Paid |
$1,180.45 |
PRM 6200 21082530090 |
Crushed Stone (Includes Riprap) |
08/26/2021 |
Paid |
$998.92 |
PRM 2200 21082029734 |
Flexible Base |
08/23/2021 |
Paid |
$6,031.94 |
PRM 2200 21082029734 |
Soil Mixtures (Special) |
08/23/2021 |
Paid |
$686.16 |
PRM 2200 21081028758 |
Flexible Base |
08/12/2021 |
Paid |
$3,393.76 |
PRM 2200 21081028758 |
Soil Mixtures (Special) |
08/12/2021 |
Paid |
$1,159.26 |
PRM 2200 21080928584 |
Flexible Base |
08/10/2021 |
Paid |
$2,922.77 |
PRM 2200 21080428194 |
Flexible Base |
08/05/2021 |
Paid |
$8,706.67 |
PRM 2200 21080428194 |
Soil Mixtures (Special) |
08/05/2021 |
Paid |
$1,299.95 |
PRM 8600 21080328158 |
Flexible Base |
08/05/2021 |
Paid |
$1,241.26 |
PRM 2200 21072927570 |
Flexible Base |
08/02/2021 |
Paid |
$2,026.28 |
PRM 2200 21072026610 |
Soil Mixtures (Special) |
07/22/2021 |
Paid |
$967.47 |
PRM 2200 21071526151 |
Flexible Base |
07/19/2021 |
Paid |
$8,337.90 |
PRM 2200 21071526151 |
Soil Mixtures (Special) |
07/19/2021 |
Paid |
$959.74 |
PRM 2200 21070525081 |
Flexible Base |
07/07/2021 |
Paid |
$1,268.75 |
PRM 2200 21070525081 |
Soil Mixtures (Special) |
07/07/2021 |
Paid |
$929.47 |
PRM 2200 21063024755 |
Flexible Base |
07/01/2021 |
Paid |
$1,943.59 |
PRM 2200 21063024768 |
Flexible Base |
07/01/2021 |
Paid |
$9,144.38 |
PRM 2200 21062223581 |
Flexible Base |
06/24/2021 |
Paid |
$1,775.72 |
PRM 2200 21061623136 |
Flexible Base |
06/17/2021 |
Paid |
$1,743.77 |
PRM 2200 21061623138 |
Soil Mixtures (Special) |
06/17/2021 |
Paid |
$689.56 |
PRM 8600 21061422973 |
Flexible Base |
06/17/2021 |
Paid |
$1,430.64 |
PRM 2200 21061022560 |
Flexible Base |
06/14/2021 |
Paid |
$1,654.00 |
PRM 2200 21060722153 |
Flexible Base |
06/10/2021 |
Paid |
$6,244.86 |
PRM 2200 21060722153 |
Soil Mixtures (Special) |
06/10/2021 |
Paid |
$1,045.57 |
PRM 2200 21052621453 |
Flexible Base |
06/01/2021 |
Paid |
$5,059.44 |
PRM 2200 21052421197 |
Soil Mixtures (Special) |
05/27/2021 |
Paid |
$703.13 |
PRM 2200 21052421208 |
Flexible Base |
05/27/2021 |
Paid |
$6,346.42 |
PRM 2200 21052621363 |
Soil Mixtures (Special) |
05/27/2021 |
Paid |
$962.79 |
PRM 2200 21051019760 |
Soil Mixtures (Special) |
05/11/2021 |
Paid |
$969.24 |
PRM 2200 21050419178 |
Soil Mixtures (Special) |
05/06/2021 |
Paid |
$1,430.39 |
PRM 2200 21042318167 |
Flexible Base |
04/26/2021 |
Paid |
$1,292.47 |
PRM 2200 21042017770 |
Flexible Base |
04/22/2021 |
Paid |
$7,519.29 |
PRM 2200 21041617463 |
Flexible Base |
04/19/2021 |
Paid |
$1,925.07 |
PRM 2200 21041617476 |
Flexible Base |
04/19/2021 |
Paid |
$8,901.39 |
PRM 2200 21041617476 |
Soil Mixtures (Special) |
04/19/2021 |
Paid |
$2,912.33 |
PRM 8600 21041417297 |
Flexible Base |
04/15/2021 |
Paid |
$1,233.52 |
PRM 2200 21040916799 |
Flexible Base |
04/12/2021 |
Paid |
$1,621.91 |
PRM 8600 21040816766 |
Flexible Base |
04/12/2021 |
Paid |
$1,445.55 |
PRM 2200 21032615632 |
Flexible Base |
03/29/2021 |
Paid |
$6,730.74 |
PRM 2200 21032615632 |
Soil Mixtures (Special) |
03/29/2021 |
Paid |
$1,199.13 |
PRM 2200 21031714623 |
Soil Mixtures (Special) |
03/18/2021 |
Paid |
$639.00 |
PRM 8100 21031614544 |
SAND, CONCRETE |
03/18/2021 |
Paid |
$457.00 |
PRM 8100 21031514304 |
AGGREGATE LIMESTONE TYPE F |
03/16/2021 |
Paid |
$748.99 |
PRM 2200 21031214134 |
Flexible Base |
03/15/2021 |
Paid |
$4,567.50 |
PRM 2200 21031013818 |
Flexible Base |
03/11/2021 |
Paid |
$10,197.35 |
PRM 2200 21030312999 |
Flexible Base |
03/04/2021 |
Paid |
$3,121.63 |
PRM 2200 21030112800 |
Soil Mixtures (Special) |
03/02/2021 |
Paid |
$1,895.58 |
PRM 2200 21022312403 |
Soil Mixtures (Special) |
02/25/2021 |
Paid |
$1,644.61 |
PRM 2200 21020811409 |
Flexible Base |
02/09/2021 |
Paid |
$16,500.86 |
PRM 2200 21020110715 |
Flexible Base |
02/02/2021 |
Paid |
$3,639.98 |
PRM 2200 21012810455 |
Soil Mixtures (Special) |
02/01/2021 |
Paid |
$2,235.20 |
PRM 6200 21012910661 |
Crushed Stone (Includes Riprap) |
02/01/2021 |
Paid |
$20,280.13 |
PRM 2200 21012109651 |
Flexible Base |
01/22/2021 |
Paid |
$1,989.03 |
PRM 2200 21012109651 |
Soil Mixtures (Special) |
01/22/2021 |
Paid |
$1,932.32 |
PRM 2200 21011309077 |
Flexible Base |
01/14/2021 |
Paid |
$8,507.88 |
PRM 2200 21011309077 |
Soil Mixtures (Special) |
01/14/2021 |
Paid |
$1,162.51 |
PRM 8600 20122907762 |
Flexible Base |
12/31/2020 |
Paid |
$7,616.50 |
PRM 2200 20122307444 |
Flexible Base |
12/28/2020 |
Paid |
$8,283.15 |
PRM 2200 20122307444 |
Soil Mixtures (Special) |
12/28/2020 |
Paid |
$1,190.36 |
PRM 2200 20120705806 |
Flexible Base |
12/08/2020 |
Paid |
$8,853.58 |
PRM 2200 20120705806 |
Soil Mixtures (Special) |
12/08/2020 |
Paid |
$1,419.94 |
PRM 2200 20112304706 |
Flexible Base |
11/24/2020 |
Paid |
$5,941.75 |
PRM 2200 20111103761 |
Soil Mixtures (Special) |
11/16/2020 |
Paid |
$3,696.71 |
PRM 2200 20110903632 |
Flexible Base |
11/12/2020 |
Paid |
$6,217.34 |
PRM 2200 20110603409 |
Soil Mixtures (Special) |
11/09/2020 |
Paid |
$513.65 |
PRM 2200 20110603410 |
Flexible Base |
11/09/2020 |
Paid |
$7,476.81 |
PRM 2200 20102302173 |
Soil Mixtures (Special) |
10/26/2020 |
Paid |
$1,693.27 |
PRM 2200 20101901686 |
Flexible Base |
10/20/2020 |
Paid |
$5,291.76 |
PRM 2200 20101301238 |
Flexible Base |
10/15/2020 |
Paid |
$3,085.86 |
PRM 8600 20100600530 |
Flexible Base |
10/08/2020 |
Paid |
$19,958.36 |
PRM 2200 20100100011 |
Soil Mixtures (Special) |
10/05/2020 |
Paid |
$1,172.72 |
PRM 2200 20093035350 |
Flexible Base |
10/01/2020 |
Paid |
$4,745.69 |
PRM 2200 20093035377 |
Flexible Base |
10/01/2020 |
Paid |
$8,661.09 |
PRM 2200 20092234522 |
Soil Mixtures (Special) |
09/24/2020 |
Paid |
$1,483.83 |
PRM 8600 20091834356 |
Flexible Base |
09/21/2020 |
Paid |
$18,802.62 |
PRM 2200 20090933398 |
Flexible Base |
09/14/2020 |
Paid |
$2,348.42 |
PRM 2200 20090933410 |
Flexible Base |
09/14/2020 |
Paid |
$10,114.94 |
PRM 2200 20083132590 |
Soil Mixtures (Special) |
09/03/2020 |
Paid |
$2,552.68 |
PRM 2200 20081831367 |
Flexible Base |
08/20/2020 |
Paid |
$8,937.42 |
PRM 2200 20081831367 |
Soil Mixtures (Special) |
08/20/2020 |
Paid |
$1,178.26 |
PRM 8600 20081731282 |
Flexible Base |
08/18/2020 |
Paid |
$23,681.69 |
PRM 2200 20080630230 |
Flexible Base |
08/10/2020 |
Paid |
$2,810.33 |
PRM 2200 20080329849 |
Flexible Base |
08/04/2020 |
Paid |
$4,638.17 |
PRM 2200 20073029579 |
Flexible Base |
08/03/2020 |
Paid |
$5,558.22 |
PRM 2200 20073129704 |
Soil Mixtures (Special) |
08/03/2020 |
Paid |
$1,439.25 |
PRM 2200 20072328839 |
Flexible Base |
07/27/2020 |
Paid |
$8,174.06 |
PRM 6300 20072328931 |
STONE, CRUSHED (LIMESTONE). TO BE CRUSHED AND SCRE |
07/27/2020 |
Paid |
$6,387.54 |
PRM 2200 20072128451 |
Flexible Base |
07/23/2020 |
Paid |
$6,072.33 |
PRM 2200 20071628014 |
Flexible Base |
07/20/2020 |
Paid |
$2,256.93 |
PRM 2200 20071628038 |
Soil Mixtures (Special) |
07/20/2020 |
Paid |
$1,142.87 |
PRM 6300 20071527906 |
Crushed Stone (Includes Riprap) |
07/16/2020 |
Paid |
$20,997.39 |
PRM 2200 20070827214 |
Soil Mixtures (Special) |
07/09/2020 |
Paid |
$2,578.90 |
PRM 2200 20070827231 |
Flexible Base |
07/09/2020 |
Paid |
$9,323.75 |
PRM 2200 20070827233 |
Flexible Base |
07/09/2020 |
Paid |
$4,114.36 |
PRM 2200 20070827234 |
Flexible Base |
07/09/2020 |
Paid |
$4,702.04 |
PRM 2200 20070827236 |
Flexible Base |
07/09/2020 |
Paid |
$4,552.49 |
PRM 2200 20070827236 |
Soil Mixtures (Special) |
07/09/2020 |
Paid |
$1,206.23 |
PRM 6300 20062926508 |
Crushed Stone (Includes Riprap) |
06/30/2020 |
Paid |
$27,800.86 |
PRM 2200 20062526227 |
Flexible Base |
06/29/2020 |
Paid |
$2,750.68 |
PRM 2200 20062526227 |
Soil Mixtures (Special) |
06/29/2020 |
Paid |
$1,907.29 |
PRM 2200 20060424603 |
Flexible Base |
06/08/2020 |
Paid |
$2,807.15 |
PRM 2200 20052623731 |
Soil Mixtures (Special) |
05/28/2020 |
Paid |
$1,461.19 |
PRM 2200 20052023409 |
Flexible Base |
05/21/2020 |
Paid |
$5,542.75 |
PRM 2200 20051222542 |
Flexible Base |
05/14/2020 |
Paid |
$4,985.29 |
PRM 8600 20051222656 |
Sand and Gravel |
05/14/2020 |
Paid |
$4,938.22 |
PRC 1100 MAX77624 |
PATCHING MATERIAL, ASPHALT (LIMESTONE ROCK) POLYME |
04/20/2020 |
Paid |
$865.35 |
PRM 2200 20041520169 |
Flexible Base |
04/20/2020 |
Paid |
$2,534.31 |
PRM 2200 20040719355 |
Flexible Base |
04/09/2020 |
Paid |
$2,751.80 |
PRM 2200 20032517967 |
Flexible Base |
03/26/2020 |
Paid |
$7,200.87 |
PRM 2200 20032317609 |
Flexible Base |
03/24/2020 |
Paid |
$5,073.81 |
PRM 2200 20032017465 |
Flexible Base |
03/23/2020 |
Paid |
$1,140.20 |
PRM 6200 20031817214 |
Crushed Stone (Includes Riprap) |
03/19/2020 |
Paid |
$4,791.51 |
PRM 2200 20031216789 |
Soil Mixtures (Special) |
03/16/2020 |
Paid |
$1,295.92 |
PRM 2200 20031116506 |
Flexible Base |
03/12/2020 |
Paid |
$4,798.99 |
PRM 2200 20031116506 |
Soil Mixtures (Special) |
03/12/2020 |
Paid |
$2,162.45 |
PRM 8600 20030215471 |
Flexible Base |
03/04/2020 |
Paid |
$8,477.85 |
PRM 8600 20022815289 |
Flexible Base |
03/02/2020 |
Paid |
$2,336.47 |
PRM 2200 20022715042 |
Flexible Base |
02/28/2020 |
Paid |
$1,815.30 |
PRM 2200 20022614907 |
Flexible Base |
02/27/2020 |
Paid |
$7,928.86 |
PRM 2200 20022414477 |
Soil Mixtures (Special) |
02/25/2020 |
Paid |
$1,272.53 |
PRM 8100 20021213345 |
Crushed Stone (Includes Riprap) |
02/13/2020 |
Paid |
$2,734.48 |
PRM 2200 20020712605 |
Flexible Base |
02/10/2020 |
Paid |
$4,452.30 |
PRM 2200 20012811208 |
Flexible Base |
02/07/2020 |
Paid |
$8,180.08 |
PRM 2200 20020412072 |
Flexible Base |
02/07/2020 |
Paid |
$5,448.77 |
PRM 2200 20020412072 |
Soil Mixtures (Special) |
02/07/2020 |
Paid |
$1,037.43 |
PRM 2200 20020612449 |
Flexible Base |
02/07/2020 |
Paid |
$3,488.19 |
PRM 2200 20020412213 |
Soil Mixtures (Special) |
02/06/2020 |
Paid |
$1,776.36 |
PRM 2200 20011410201 |
Flexible Base |
01/16/2020 |
Paid |
$11,817.53 |
PRM 2200 20011410201 |
Soil Mixtures (Special) |
01/16/2020 |
Paid |
$1,551.49 |
PRM 2200 20011309945 |
Flexible Base |
01/15/2020 |
Paid |
$3,716.70 |
PRM 2200 20011309945 |
Soil Mixtures (Special) |
01/15/2020 |
Paid |
$759.61 |
PRM 8600 19122007818 |
Flexible Base |
12/26/2019 |
Paid |
$590.25 |
PRM 2200 19121807446 |
Flexible Base |
12/19/2019 |
Paid |
$7,292.07 |
PRM 2200 19121607141 |
Flexible Base |
12/17/2019 |
Paid |
$13,451.23 |
PRM 2200 19121607141 |
Soil Mixtures (Special) |
12/17/2019 |
Paid |
$1,276.60 |
PRM 2200 19120906479 |
Flexible Base |
12/10/2019 |
Paid |
$6,228.09 |
PRM 8600 19120406129 |
Flexible Base |
12/05/2019 |
Paid |
$9,580.39 |
PRM 2200 19112605638 |
Soil Mixtures (Special) |
11/27/2019 |
Paid |
$2,002.08 |
PRM 2200 19112005137 |
Flexible Base |
11/21/2019 |
Paid |
$7,380.68 |
PRM 2200 19111204403 |
Flexible Base |
11/14/2019 |
Paid |
$8,506.46 |
PRM 2200 19111204403 |
Soil Mixtures (Special) |
11/14/2019 |
Paid |
$1,268.89 |
PRM 6300 19111204328 |
Crushed Stone (Includes Riprap) |
11/13/2019 |
Paid |
$4,513.09 |
PRM 6300 19111204328 |
STONE, CRUSHED (LIMESTONE). TO BE CRUSHED AND SCRE |
11/13/2019 |
Paid |
$6,012.99 |
PRM 2200 19110403457 |
Soil Mixtures (Special) |
11/05/2019 |
Paid |
$2,301.95 |
PRM 8600 19102903170 |
Flexible Base |
10/31/2019 |
Paid |
$3,896.63 |
PRM 8600 19103003263 |
Flexible Base |
10/31/2019 |
Paid |
$20,077.88 |
PRM 2200 19102903035 |
Flexible Base |
10/30/2019 |
Paid |
$2,811.87 |
PRM 2200 19102903045 |
Flexible Base |
10/30/2019 |
Paid |
$5,936.84 |
PRM 2200 19102903045 |
Soil Mixtures (Special) |
10/30/2019 |
Paid |
$1,323.77 |
PRM 6200 19102903096 |
Crushed Stone (Includes Riprap) |
10/30/2019 |
Paid |
$1,562.40 |
PRM 2200 19102302448 |
Flexible Base |
10/24/2019 |
Paid |
$5,749.01 |
PRM 2200 19102101917 |
Flexible Base |
10/22/2019 |
Paid |
$3,005.76 |
PRM 2200 19102101917 |
Soil Mixtures (Special) |
10/22/2019 |
Paid |
$2,255.56 |
PRM 2200 19102101920 |
Flexible Base |
10/22/2019 |
Paid |
$4,819.27 |
PRM 2200 19102101920 |
Soil Mixtures (Special) |
10/22/2019 |
Paid |
$1,501.90 |
PRM 2200 19101401013 |
Flexible Base |
10/15/2019 |
Paid |
$3,019.98 |
PRM 2200 19093034254 |
Flexible Base |
10/01/2019 |
Paid |
$9,713.21 |
PRM 6300 19092734138 |
Crushed Stone (Includes Riprap) |
09/30/2019 |
Paid |
$9,630.32 |
PRM 8600 19092734170 |
Flexible Base |
09/30/2019 |
Paid |
$5,129.54 |
PRM 6200 19092433647 |
Crushed Stone (Includes Riprap) |
09/26/2019 |
Paid |
$1,623.28 |
PRM 2200 19091933127 |
Flexible Base |
09/20/2019 |
Paid |
$3,013.88 |
PRM 2200 19091632726 |
Flexible Base |
09/17/2019 |
Paid |
$2,399.67 |
PRM 2200 19091632743 |
Soil Mixtures (Special) |
09/17/2019 |
Paid |
$4,695.31 |
PRM 6200 19091632790 |
Crushed Stone (Includes Riprap) |
09/17/2019 |
Paid |
$1,150.10 |
PRM 8600 19091132383 |
Flexible Base |
09/12/2019 |
Paid |
$2,874.91 |
PRM 2200 19082730817 |
Soil Mixtures (Special) |
08/28/2019 |
Paid |
$946.27 |
PRM 2200 19082730823 |
Flexible Base |
08/28/2019 |
Paid |
$10,710.65 |
PRM 6300 19082330664 |
Crushed Stone (Includes Riprap) |
08/26/2019 |
Paid |
$15,855.95 |
PRM 8600 19081930251 |
Flexible Base |
08/20/2019 |
Paid |
$8,027.10 |
PRM 2200 19080929453 |
Soil Mixtures (Special) |
08/13/2019 |
Paid |
$1,205.61 |
PRM 2200 19081229480 |
Flexible Base |
08/13/2019 |
Paid |
$11,286.38 |
PRM 2200 19080829074 |
Flexible Base |
08/09/2019 |
Paid |
$2,496.02 |
PRM 6300 19080829193 |
Crushed Stone (Includes Riprap) |
08/09/2019 |
Paid |
$11,678.47 |
PRM 8600 19080228601 |
Flexible Base |
08/06/2019 |
Paid |
$3,139.16 |
PRM 2200 19073128156 |
Flexible Base |
08/01/2019 |
Paid |
$3,005.37 |
PRM 2200 19072927768 |
Flexible Base |
07/30/2019 |
Paid |
$2,269.72 |
PRM 2200 19072927768 |
Soil Mixtures (Special) |
07/30/2019 |
Paid |
$722.34 |
PRM 2200 19072627723 |
Flexible Base |
07/29/2019 |
Paid |
$6,051.65 |
PRM 2200 19072627723 |
Soil Mixtures (Special) |
07/29/2019 |
Paid |
$1,695.35 |
PRM 2200 19072327442 |
Flexible Base |
07/25/2019 |
Paid |
$7,212.43 |
PRM 8600 19072227255 |
Flexible Base |
07/23/2019 |
Paid |
$2,654.01 |
PRM 2200 19071526566 |
Soil Mixtures (Special) |
07/16/2019 |
Paid |
$1,748.81 |
PRM 8600 19071026329 |
Flexible Base |
07/12/2019 |
Paid |
$8,851.07 |
PRM 2200 19070926080 |
Flexible Base |
07/11/2019 |
Paid |
$4,526.32 |
PRM 2200 19070926082 |
Flexible Base |
07/11/2019 |
Paid |
$3,719.28 |
PRM 2200 19070926082 |
Soil Mixtures (Special) |
07/11/2019 |
Paid |
$1,578.02 |
PRM 2200 19070525777 |
Flexible Base |
07/08/2019 |
Paid |
$3,124.58 |
PRM 6300 19070225567 |
Crushed Stone (Includes Riprap) |
07/03/2019 |
Paid |
$9,478.84 |
PRM 2200 19062825349 |
Flexible Base |
07/02/2019 |
Paid |
$2,823.02 |
PRM 2200 19061724039 |
Flexible Base |
06/19/2019 |
Paid |
$5,158.06 |
PRM 2200 19061723949 |
Flexible Base |
06/18/2019 |
Paid |
$4,641.56 |
PRM 2200 19060723288 |
Soil Mixtures (Special) |
06/11/2019 |
Paid |
$1,187.34 |
PRM 2200 19060723292 |
Flexible Base |
06/11/2019 |
Paid |
$3,952.37 |
PRM 2200 19060422836 |
Flexible Base |
06/05/2019 |
Paid |
$2,998.77 |
PRM 2200 19053122501 |
Soil Mixtures (Special) |
06/03/2019 |
Paid |
$2,530.13 |
PRM 8600 19053122560 |
Flexible Base |
06/03/2019 |
Paid |
$4,277.40 |
PRM 2200 19052822096 |
Flexible Base |
05/29/2019 |
Paid |
$3,762.73 |
PRM 8600 19052422075 |
Flexible Base |
05/29/2019 |
Paid |
$5,242.86 |
PRM 2200 19051621207 |
Flexible Base |
05/17/2019 |
Paid |
$2,920.85 |
PRM 2200 19051621216 |
Flexible Base |
05/17/2019 |
Paid |
$9,563.68 |
PRM 6300 19050920616 |
Soil Mixtures (Special) |
05/10/2019 |
Paid |
$5,052.96 |
PRM 6300 19050720295 |
Crushed Stone (Includes Riprap) |
05/08/2019 |
Paid |
$2,023.08 |
PRM 2200 19050219830 |
Flexible Base |
05/03/2019 |
Paid |
$4,652.28 |
PRM 2200 19050219830 |
Soil Mixtures (Special) |
05/03/2019 |
Paid |
$1,378.08 |
PRM 2200 19050219835 |
Flexible Base |
05/03/2019 |
Paid |
$21,100.96 |
PRM 2200 19050219841 |
Flexible Base |
05/03/2019 |
Paid |
$3,074.42 |
PRM 8600 19043019564 |
Flexible Base |
05/01/2019 |
Paid |
$8,140.12 |
PRM 2200 19042619091 |
Flexible Base |
04/29/2019 |
Paid |
$9,196.28 |
PRM 2200 19042619091 |
Soil Mixtures (Special) |
04/29/2019 |
Paid |
$1,607.76 |
PRM 2200 19042318709 |
Flexible Base |
04/24/2019 |
Paid |
$2,904.47 |
PRM 2200 19041818303 |
Soil Mixtures (Special) |
04/19/2019 |
Paid |
$1,378.08 |
PRM 2200 19041818316 |
Flexible Base |
04/19/2019 |
Paid |
$4,898.49 |
PRM 8600 19040517163 |
Flexible Base |
04/08/2019 |
Paid |
$5,571.18 |
PRM 2200 19040416804 |
Flexible Base |
04/05/2019 |
Paid |
$4,807.17 |
PRM 2200 19040416804 |
Soil Mixtures (Special) |
04/05/2019 |
Paid |
$918.72 |
PRM 8600 19040116360 |
Flexible Base |
04/02/2019 |
Paid |
$5,579.61 |
PRM 6300 19032716043 |
Crushed Stone (Includes Riprap) |
03/28/2019 |
Paid |
$2,012.66 |
PRM 2200 19032015278 |
Soil Mixtures (Special) |
03/21/2019 |
Paid |
$1,837.44 |
PRM 2200 19032015282 |
Flexible Base |
03/21/2019 |
Paid |
$3,970.12 |
PRM 6300 19032015347 |
Crushed Stone (Includes Riprap) |
03/21/2019 |
Paid |
$13,641.60 |
PRM 2200 19031915103 |
Flexible Base |
03/20/2019 |
Paid |
$10,813.38 |
PRM 2200 19031915103 |
Soil Mixtures (Special) |
03/20/2019 |
Paid |
$1,002.24 |
PRM 6300 19030413577 |
STONE, CRUSHED (LIMESTONE). TO BE CRUSHED AND SCRE |
03/05/2019 |
Paid |
$7,684.03 |
PRM 6300 19022512880 |
Crushed Stone (Includes Riprap) |
02/26/2019 |
Paid |
$15,557.76 |
PRM 6200 19022112662 |
Flexible Base |
02/22/2019 |
Paid |
$5,051.02 |
PRM 2200 19022012485 |
Flexible Base |
02/21/2019 |
Paid |
$554.43 |
PRM 2200 19021311762 |
Flexible Base |
02/14/2019 |
Paid |
$4,276.16 |
PRM 2200 19021311779 |
Flexible Base |
02/14/2019 |
Paid |
$11,513.54 |
PRM 2200 19021311785 |
Flexible Base |
02/14/2019 |
Paid |
$12,962.11 |
PRM 2200 19021311785 |
Soil Mixtures (Special) |
02/14/2019 |
Paid |
$1,378.08 |
PRM 2200 19020711049 |
Flexible Base |
02/08/2019 |
Paid |
$8,829.49 |
PRM 2200 19020510484 |
Soil Mixtures (Special) |
02/06/2019 |
Paid |
$689.04 |
PRM 6300 19020510612 |
Soil Mixtures (Special) |
02/06/2019 |
Paid |
$3,212.44 |
PRM 2200 19013109985 |
Flexible Base |
02/01/2019 |
Paid |
$4,443.53 |
PRM 2200 19012209134 |
Soil Mixtures (Special) |
01/23/2019 |
Paid |
$1,252.80 |
PRM 2200 19010707907 |
Soil Mixtures (Special) |
01/08/2019 |
Paid |
$3,215.52 |
PRM 2200 19010307675 |
Flexible Base |
01/04/2019 |
Paid |
$1,384.22 |
PRM 2200 19010307675 |
Soil Mixtures (Special) |
01/04/2019 |
Paid |
$1,378.08 |
PRM 2200 18123107471 |
Flexible Base |
01/02/2019 |
Paid |
$1,369.86 |
PRM 6300 18123107506 |
Crushed Stone (Includes Riprap) |
01/02/2019 |
Paid |
$6,689.76 |
PRM 2200 18122007010 |
Soil Mixtures (Special) |
12/21/2018 |
Paid |
$918.72 |
PRM 2200 18121206419 |
Flexible Base |
12/13/2018 |
Paid |
$3,846.31 |
PRM 2200 18120605965 |
Flexible Base |
12/07/2018 |
Paid |
$11,184.18 |
PRM 2200 18120405709 |
Flexible Base |
12/05/2018 |
Paid |
$19,364.96 |
PRM 8600 18112805319 |
Flexible Base |
11/29/2018 |
Paid |
$21,761.89 |
PRM 2200 18112104754 |
Soil Mixtures (Special) |
11/26/2018 |
Paid |
$1,837.44 |
PRM 2200 18103002930 |
Soil Mixtures (Special) |
10/31/2018 |
Paid |
$229.68 |
PRM 6300 18101802133 |
Crushed Stone (Includes Riprap) |
10/19/2018 |
Paid |
$21,914.26 |
PRM 2200 18101601662 |
Flexible Base |
10/17/2018 |
Paid |
$7,453.79 |
PRM 2200 18101201236 |
Flexible Base |
10/15/2018 |
Paid |
$6,141.67 |
PRM 2200 18101201236 |
Soil Mixtures (Special) |
10/15/2018 |
Paid |
$2,902.32 |
PRM 2200 18101000869 |
Flexible Base |
10/11/2018 |
Paid |
$6,949.16 |
PRM 2200 18101000869 |
Soil Mixtures (Special) |
10/11/2018 |
Paid |
$1,378.08 |
PRM 2200 18100500665 |
Flexible Base |
10/08/2018 |
Paid |
$5,565.95 |
PRM 6300 18092532222 |
Crushed Stone (Includes Riprap) |
09/26/2018 |
Paid |
$518.33 |
PRM 2200 18092431975 |
Flexible Base |
09/25/2018 |
Paid |
$12,616.42 |
PRM 6300 18091931628 |
Crushed Stone (Includes Riprap) |
09/20/2018 |
Paid |
$4,183.15 |
PRM 2200 18091230912 |
Flexible Base |
09/13/2018 |
Paid |
$12,691.98 |
PRM 2200 18091230912 |
Soil Mixtures (Special) |
09/13/2018 |
Paid |
$1,378.08 |
PRM 2200 18091130590 |
Flexible Base |
09/12/2018 |
Paid |
$3,385.04 |
PRM 2200 18083029646 |
Soil Mixtures (Special) |
08/31/2018 |
Paid |
$1,378.08 |
PRM 2200 18082729213 |
Soil Mixtures (Special) |
08/28/2018 |
Paid |
$918.72 |
PRM 2200 18081728578 |
Flexible Base |
08/20/2018 |
Paid |
$1,659.48 |
PRM 2200 18081528344 |
Flexible Base |
08/16/2018 |
Paid |
$2,775.71 |
PRM 2200 18081528355 |
Flexible Base |
08/16/2018 |
Paid |
$3,345.72 |
PRM 2200 18080928043 |
Flexible Base |
08/10/2018 |
Paid |
$7,961.37 |
PRM 2200 18080928043 |
Soil Mixtures (Special) |
08/10/2018 |
Paid |
$689.04 |
PRM 2200 18080627643 |
Flexible Base |
08/07/2018 |
Paid |
$3,232.02 |
PRM 2200 18080627645 |
Flexible Base |
08/07/2018 |
Paid |
$7,389.56 |
PRM 2200 18080627645 |
Soil Mixtures (Special) |
08/07/2018 |
Paid |
$689.04 |
PRM 6200 18073127269 |
Crushed Stone (Includes Riprap) |
08/01/2018 |
Paid |
$5,438.28 |
PRM 6200 18073027085 |
Crushed Stone (Includes Riprap) |
07/31/2018 |
Paid |
$2,077.48 |
PRM 2200 18072426415 |
Flexible Base |
07/25/2018 |
Paid |
$4,139.62 |
PRM 6200 18072026275 |
Crushed Stone (Includes Riprap) |
07/23/2018 |
Paid |
$5,877.12 |
PRM 2200 18071225589 |
Flexible Base |
07/13/2018 |
Paid |
$1,736.12 |
PRM 2200 18071225589 |
Soil Mixtures (Special) |
07/13/2018 |
Paid |
$1,378.08 |
PRM 2200 18071225599 |
Flexible Base |
07/13/2018 |
Paid |
$3,555.77 |
PRM 2200 18070925047 |
Flexible Base |
07/10/2018 |
Paid |
$2,797.90 |
PRM 2200 18070925047 |
Soil Mixtures (Special) |
07/10/2018 |
Paid |
$1,378.08 |
PRM 2200 18070524880 |
Flexible Base |
07/06/2018 |
Paid |
$4,924.22 |
PRM 2200 18062724095 |
Flexible Base |
06/28/2018 |
Paid |
$2,777.56 |
PRM 2200 18061923344 |
Flexible Base |
06/20/2018 |
Paid |
$1,675.59 |
PRM 2200 18061823193 |
Flexible Base |
06/19/2018 |
Paid |
$3,574.69 |
PRM 2200 18061322845 |
Flexible Base |
06/14/2018 |
Paid |
$2,792.69 |
PRM 2200 18061322865 |
Flexible Base |
06/14/2018 |
Paid |
$11,245.45 |
PRM 2200 18061322865 |
Soil Mixtures (Special) |
06/14/2018 |
Paid |
$918.72 |
PRM 2200 18060622342 |
Flexible Base |
06/07/2018 |
Paid |
$2,840.52 |
PRM 2200 18052921573 |
Soil Mixtures (Special) |
05/30/2018 |
Paid |
$1,148.40 |
PRM 2200 18052321216 |
Flexible Base |
05/24/2018 |
Paid |
$5,324.65 |
PRM 2200 18052321216 |
Soil Mixtures (Special) |
05/24/2018 |
Paid |
$918.72 |
PRM 2200 18052221004 |
Flexible Base |
05/23/2018 |
Paid |
$2,805.88 |
PRM 6300 18052120920 |
Crushed Stone (Includes Riprap) |
05/22/2018 |
Paid |
$13,238.34 |
PRM 2200 18051020181 |
Flexible Base |
05/11/2018 |
Paid |
$7,477.47 |
PRM 2200 18050719663 |
Soil Mixtures (Special) |
05/08/2018 |
Paid |
$689.04 |
PRM 2200 18050219364 |
Flexible Base |
05/03/2018 |
Paid |
$4,078.33 |
PRM 2200 18050219364 |
Soil Mixtures (Special) |
05/03/2018 |
Paid |
$1,148.40 |
PRM 2200 18042718926 |
Flexible Base |
04/30/2018 |
Paid |
$2,762.36 |
PRM 2200 18042618830 |
Flexible Base |
04/27/2018 |
Paid |
$3,909.23 |
PRM 2200 18041217505 |
Flexible Base |
04/13/2018 |
Paid |
$2,810.76 |
PRM 2200 18032916460 |
Flexible Base |
03/30/2018 |
Paid |
$2,835.25 |
PRM 2200 18032916460 |
Soil Mixtures (Special) |
03/30/2018 |
Paid |
$918.72 |
PRM 2200 18032816326 |
Flexible Base |
03/29/2018 |
Paid |
$2,899.92 |
PRM 2200 18032615957 |
Flexible Base |
03/27/2018 |
Paid |
$9,409.00 |
PRM 2200 18032315835 |
Soil Mixtures (Special) |
03/26/2018 |
Paid |
$918.72 |
PRM 2200 18031715195 |
Flexible Base |
03/19/2018 |
Paid |
$10,262.66 |
PRM 2200 18031715195 |
Soil Mixtures (Special) |
03/19/2018 |
Paid |
$918.72 |
PRM 2200 18031014581 |
Soil Mixtures (Special) |
03/12/2018 |
Paid |
$2,296.80 |
PRM 2200 18030513779 |
Flexible Base |
03/06/2018 |
Paid |
$4,113.79 |
PRM 2200 18030513779 |
Soil Mixtures (Special) |
03/06/2018 |
Paid |
$918.72 |
PRM 2200 18030213676 |
Flexible Base |
03/05/2018 |
Paid |
$4,181.80 |
PRM 6300 18030213708 |
Crushed Stone (Includes Riprap) |
03/05/2018 |
Paid |
$6,569.02 |
PRM 2200 18021412112 |
Flexible Base |
02/15/2018 |
Paid |
$7,071.65 |
PRM 2200 18020911756 |
Flexible Base |
02/12/2018 |
Paid |
$4,108.30 |
PRM 2200 18020911756 |
Soil Mixtures (Special) |
02/12/2018 |
Paid |
$689.04 |
PRM 2200 18020111122 |
Flexible Base |
02/02/2018 |
Paid |
$5,549.35 |
PRM 2200 18012710502 |
Soil Mixtures (Special) |
01/29/2018 |
Paid |
$3,445.20 |
PRM 2200 18012710504 |
Flexible Base |
01/29/2018 |
Paid |
$11,322.27 |
PRM 6300 18012710518 |
Crushed Stone (Includes Riprap) |
01/29/2018 |
Paid |
$537.08 |
PRM 2200 18012310171 |
Soil Mixtures (Special) |
01/24/2018 |
Paid |
$918.72 |
PRM 2200 18012209999 |
Flexible Base |
01/23/2018 |
Paid |
$5,769.51 |
PRM 2200 18011209527 |
Flexible Base |
01/16/2018 |
Paid |
$3,634.50 |
PRM 2200 18010408496 |
Flexible Base |
01/05/2018 |
Paid |
$4,278.32 |
PRM 2200 18010408531 |
Flexible Base |
01/05/2018 |
Paid |
$2,820.33 |
PRM 2200 18010408531 |
Soil Mixtures (Special) |
01/05/2018 |
Paid |
$918.72 |
PRM 6300 18010408625 |
Flexible Base |
01/05/2018 |
Paid |
$5,387.90 |
PRM 2200 17122107487 |
Flexible Base |
12/22/2017 |
Paid |
$4,117.16 |
PRM 2200 17120605975 |
Flexible Base |
12/07/2017 |
Paid |
$4,056.24 |
PRM 2200 17120605975 |
Soil Mixtures (Special) |
12/07/2017 |
Paid |
$1,231.92 |
PRM 2200 17120405626 |
Flexible Base |
12/05/2017 |
Paid |
$4,244.05 |
PRM 2200 17120405626 |
Soil Mixtures (Special) |
12/05/2017 |
Paid |
$2,463.84 |
PRM 6300 17120405692 |
Crushed Stone (Includes Riprap) |
12/05/2017 |
Paid |
$921.15 |
PRM 2200 17112104676 |
Soil Mixtures (Special) |
11/22/2017 |
Paid |
$918.72 |
PRM 2200 17112104678 |
Flexible Base |
11/22/2017 |
Paid |
$6,569.42 |
PRM 2200 17112004534 |
Flexible Base |
11/21/2017 |
Paid |
$4,090.15 |
PRM 2200 17111804459 |
Soil Mixtures (Special) |
11/20/2017 |
Paid |
$1,148.40 |
PRM 2200 17111403985 |
Flexible Base |
11/15/2017 |
Paid |
$2,813.74 |
PRM 2200 17111003775 |
Flexible Base |
11/13/2017 |
Paid |
$3,886.40 |
PRM 8100 17110703543 |
STABILIZER, ROAD BASE |
11/08/2017 |
Paid |
$2,764.05 |
PRM 2200 17110203124 |
Soil Mixtures (Special) |
11/03/2017 |
Paid |
$2,296.80 |
PRM 6200 17102602727 |
STONE RIP RAP |
10/27/2017 |
Paid |
$7,542.73 |
PRM 2200 17102302224 |
Flexible Base |
10/24/2017 |
Paid |
$2,763.75 |
PRM 2200 17101100914 |
Soil Mixtures (Special) |
10/12/2017 |
Paid |
$2,296.80 |
PRM 2200 17101100928 |
Flexible Base |
10/12/2017 |
Paid |
$3,475.85 |
PRM 2200 17100900568 |
Flexible Base |
10/10/2017 |
Paid |
$3,226.92 |
PRM 6200 17100500415 |
Flexible Base |
10/06/2017 |
Paid |
$670.37 |
PRM 2200 17093035641 |
Flexible Base |
10/02/2017 |
Paid |
$4,201.67 |
PRM 6200 17092935559 |
Flexible Base |
10/02/2017 |
Paid |
$3,745.95 |
PRM 6200 17092935559 |
STONE RIP RAP |
10/02/2017 |
Paid |
$2,804.47 |
PRM 6300 17093035668 |
Crushed Stone (Includes Riprap) |
10/02/2017 |
Paid |
$8,705.01 |
PRM 2200 17092735181 |
Flexible Base |
09/28/2017 |
Paid |
$4,020.36 |
PRM 2200 17092735181 |
Soil Mixtures (Special) |
09/28/2017 |
Paid |
$1,378.08 |
PRM 2200 17091933943 |
Flexible Base |
09/20/2017 |
Paid |
$7,238.31 |
PRM 6300 17091934021 |
Crushed Stone (Includes Riprap) |
09/20/2017 |
Paid |
$14,301.45 |
PRM 6300 17091934021 |
STONE RIP RAP |
09/20/2017 |
Paid |
$9,372.84 |
PRM 6300 17091533753 |
Crushed Stone (Includes Riprap) |
09/18/2017 |
Paid |
$9,154.96 |
PRM 2200 17091433620 |
Soil Mixtures (Special) |
09/15/2017 |
Paid |
$1,250.48 |
PRM 6300 17091233332 |
Crushed Stone (Includes Riprap) |
09/13/2017 |
Paid |
$11,958.45 |
PRM 2200 17090832999 |
Flexible Base |
09/11/2017 |
Paid |
$5,672.81 |
PRM 2200 17090732871 |
Flexible Base |
09/08/2017 |
Paid |
$5,883.85 |
PRM 2200 17090732873 |
Flexible Base |
09/08/2017 |
Paid |
$6,932.99 |
PRM 2200 17090732873 |
Soil Mixtures (Special) |
09/08/2017 |
Paid |
$709.92 |
PRM 2200 17090732875 |
Soil Mixtures (Special) |
09/08/2017 |
Paid |
$918.72 |
PRM 6300 17090732920 |
Crushed Stone (Includes Riprap) |
09/08/2017 |
Paid |
$8,857.41 |
PRM 2200 17090632711 |
Flexible Base |
09/07/2017 |
Paid |
$3,846.73 |
PRM 2200 17083032099 |
Flexible Base |
08/31/2017 |
Paid |
$6,116.87 |
PRM 2200 17081730971 |
Flexible Base |
08/18/2017 |
Paid |
$4,099.15 |
PRM 2200 17081530552 |
Flexible Base |
08/16/2017 |
Paid |
$4,703.60 |
PRM 2200 17081130363 |
Flexible Base |
08/14/2017 |
Paid |
$4,000.38 |
PRM 6300 17081130376 |
Crushed Stone (Includes Riprap) |
08/14/2017 |
Paid |
$17,402.08 |
PRM 2200 17081030214 |
Soil Mixtures (Special) |
08/11/2017 |
Paid |
$3,441.90 |
PRM 2200 17080829935 |
Flexible Base |
08/09/2017 |
Paid |
$4,284.60 |
PRM 2200 17080829935 |
Soil Mixtures (Special) |
08/09/2017 |
Paid |
$1,147.30 |
PRM 6300 17080329638 |
Crushed Stone (Includes Riprap) |
08/04/2017 |
Paid |
$21,675.92 |
PRM 2200 17080229428 |
Flexible Base |
08/03/2017 |
Paid |
$5,843.08 |
PRM 2200 17072528468 |
Flexible Base |
07/26/2017 |
Paid |
$3,465.99 |
PRM 2200 17071827945 |
Flexible Base |
07/19/2017 |
Paid |
$3,343.82 |
PRM 6300 17071327652 |
Crushed Stone (Includes Riprap) |
07/14/2017 |
Paid |
$16,401.94 |
PRM 6300 17071327662 |
STONE RIP RAP |
07/14/2017 |
Paid |
$3,392.39 |
PRM 2200 17070626952 |
Flexible Base |
07/07/2017 |
Paid |
$7,465.19 |
PRM 2200 17070626952 |
Soil Mixtures (Special) |
07/07/2017 |
Paid |
$688.38 |
PRM 8600 17070526852 |
Flexible Base |
07/06/2017 |
Paid |
$9,681.43 |
PRM 2200 17062926377 |
Soil Mixtures (Special) |
06/30/2017 |
Paid |
$688.38 |
PRM 6300 17061625172 |
STONE RIP RAP |
06/19/2017 |
Paid |
$15,067.74 |
PRM 2200 17061525029 |
Flexible Base |
06/16/2017 |
Paid |
$2,782.48 |
PRM 2200 17061324787 |
Flexible Base |
06/14/2017 |
Paid |
$2,891.81 |
PRM 2200 17061324787 |
Soil Mixtures (Special) |
06/14/2017 |
Paid |
$917.84 |
PRM 2200 17060223757 |
Flexible Base |
06/05/2017 |
Paid |
$4,238.87 |
PRM 2200 17052623149 |
Flexible Base |
05/30/2017 |
Paid |
$1,404.02 |
PRM 2200 17052623157 |
Flexible Base |
05/30/2017 |
Paid |
$8,284.98 |
PRM 2200 17052422938 |
Flexible Base |
05/25/2017 |
Paid |
$6,601.21 |
PRM 2200 17052322783 |
Flexible Base |
05/24/2017 |
Paid |
$4,721.75 |
PRM 2200 17052322783 |
Soil Mixtures (Special) |
05/24/2017 |
Paid |
$917.84 |
PRM 2200 17050821299 |
Soil Mixtures (Special) |
05/09/2017 |
Paid |
$1,147.30 |
PRM 2200 17050821307 |
Flexible Base |
05/09/2017 |
Paid |
$4,504.68 |
PRM 2200 17050320944 |
Flexible Base |
05/04/2017 |
Paid |
$7,492.69 |
PRM 6300 17050321020 |
STONE RIP RAP |
05/04/2017 |
Paid |
$24,250.92 |
PRM 2200 17042520176 |
Flexible Base |
04/26/2017 |
Paid |
$578.48 |
PRM 2200 17041919674 |
Flexible Base |
04/20/2017 |
Paid |
$3,345.21 |
PRM 2200 17041919674 |
Soil Mixtures (Special) |
04/20/2017 |
Paid |
$2,753.52 |
PRM 2200 17041919686 |
Flexible Base |
04/20/2017 |
Paid |
$4,037.81 |
PRM 2200 17041919686 |
Soil Mixtures (Special) |
04/20/2017 |
Paid |
$917.84 |
PRM 2200 17041719311 |
Flexible Base |
04/18/2017 |
Paid |
$3,357.52 |
PRM 2200 17041218843 |
Soil Mixtures (Special) |
04/13/2017 |
Paid |
$1,147.30 |
PRM 2200 17033017790 |
Flexible Base |
03/31/2017 |
Paid |
$1,147.30 |
PRM 6300 17033017829 |
STONE RIP RAP |
03/31/2017 |
Paid |
$1,183.10 |
PRM 2200 17032817416 |
Flexible Base |
03/29/2017 |
Paid |
$3,815.10 |
PRM 6200 17032317139 |
Flexible Base |
03/24/2017 |
Paid |
$578.00 |
PRM 2200 17032216952 |
Soil Mixtures (Special) |
03/23/2017 |
Paid |
$1,835.68 |
PRM 2200 17032116801 |
Flexible Base |
03/22/2017 |
Paid |
$3,406.00 |
PRM 2200 17031616365 |
Flexible Base |
03/17/2017 |
Paid |
$3,348.51 |
PRM 2200 17030815545 |
Flexible Base |
03/09/2017 |
Paid |
$3,351.75 |
PRM 2200 17030715362 |
Flexible Base |
03/08/2017 |
Paid |
$8,557.86 |
PRM 2200 17030615117 |
Flexible Base |
03/07/2017 |
Paid |
$3,867.24 |
PRM 2200 17030615127 |
Soil Mixtures (Special) |
03/07/2017 |
Paid |
$917.84 |
PRM 6200 17030315050 |
STONE RIP RAP |
03/06/2017 |
Paid |
$7,546.47 |
PRM 2200 17022414281 |
Soil Mixtures (Special) |
02/27/2017 |
Paid |
$231.05 |
PRM 6200 17022314223 |
STONE RIP RAP |
02/24/2017 |
Paid |
$7,440.59 |
PRM 6300 17022214079 |
Crushed Stone (Includes Riprap) |
02/23/2017 |
Paid |
$1,887.34 |
PRM 2200 17022113757 |
Flexible Base |
02/22/2017 |
Paid |
$2,708.94 |
PRM 2200 17021012872 |
Flexible Base |
02/13/2017 |
Paid |
$3,968.53 |
PRM 6300 17020912805 |
Crushed Stone (Includes Riprap) |
02/10/2017 |
Paid |
$1,309.17 |
PRM 8100 17020712489 |
Crushed Stone (Includes Riprap) |
02/08/2017 |
Paid |
$442.53 |
PRM 2200 17020612223 |
Soil Mixtures (Special) |
02/07/2017 |
Paid |
$876.12 |
PRM 2200 17020312085 |
Flexible Base |
02/06/2017 |
Paid |
$2,516.56 |
PRM 2200 17020111762 |
Flexible Base |
02/02/2017 |
Paid |
$8,138.50 |
PRM 2200 17020111790 |
Flexible Base |
02/02/2017 |
Paid |
$1,744.87 |
PRM 2200 17020111790 |
Soil Mixtures (Special) |
02/02/2017 |
Paid |
$375.48 |
PRM 2200 17013111611 |
Soil Mixtures (Special) |
02/01/2017 |
Paid |
$1,835.68 |
PRM 6300 17012711314 |
Crushed Stone (Includes Riprap) |
01/30/2017 |
Paid |
$8,359.53 |
PRM 6300 17012711314 |
STONE RIP RAP |
01/30/2017 |
Paid |
$19,963.80 |
PRM 2200 17012010393 |
Flexible Base |
01/23/2017 |
Paid |
$7,008.45 |
PRM 2200 17011610081 |
Flexible Base |
01/18/2017 |
Paid |
$3,692.03 |
PRM 2200 17011109685 |
Flexible Base |
01/12/2017 |
Paid |
$4,925.98 |
PRM 2200 17011109685 |
Soil Mixtures (Special) |
01/12/2017 |
Paid |
$1,376.76 |
PRM 2200 16122708182 |
Flexible Base |
12/28/2016 |
Paid |
$5,876.09 |
PRM 6300 16122708260 |
Crushed Stone (Includes Riprap) |
12/28/2016 |
Paid |
$13,102.77 |
PRM 2200 16122007623 |
Soil Mixtures (Special) |
12/21/2016 |
Paid |
$1,835.68 |
PRM 2200 16122007646 |
Soil Mixtures (Special) |
12/21/2016 |
Paid |
$1,147.30 |
PRM 2200 16121406890 |
Borrow and Soil (See Class 790 for Top Soil) |
12/15/2016 |
Paid |
$4,585.43 |
PRM 2200 16121406897 |
Borrow and Soil (See Class 790 for Top Soil) |
12/15/2016 |
Paid |
$3,132.41 |
PRM 2200 16121306747 |
Flexible Base |
12/14/2016 |
Paid |
$4,118.25 |
PRM 2200 16121206565 |
Flexible Base |
12/13/2016 |
Paid |
$3,519.13 |
PRM 2200 16121206584 |
Flexible Base |
12/13/2016 |
Paid |
$2,737.21 |
PRM 2200 16121006446 |
Flexible Base |
12/12/2016 |
Paid |
$3,347.33 |
PRM 2200 16121006446 |
RIVER ROCK |
12/12/2016 |
Paid |
$285.38 |
PRM 2200 16121006446 |
Soil Mixtures (Special) |
12/12/2016 |
Paid |
$1,147.30 |
PRM 6300 16121006463 |
STONE RIP RAP |
12/12/2016 |
Paid |
$1,387.60 |
PRM 2200 16120806256 |
Soil Mixtures (Special) |
12/09/2016 |
Paid |
$1,147.30 |
PRM 2200 16101901649 |
Flexible Base |
12/08/2016 |
Paid |
$3,432.98 |
PRM 2200 16101901656 |
Flexible Base |
12/08/2016 |
Paid |
$6,463.65 |
PRM 2200 16101901656 |
Sand and Gravel |
12/08/2016 |
Paid |
$827.34 |
PRM 2200 16120706128 |
Flexible Base |
12/08/2016 |
Paid |
$3,994.73 |
PRM 6300 16120706187 |
Crushed Stone (Includes Riprap) |
12/08/2016 |
Paid |
$3,460.00 |
PRM 6300 16120706187 |
STONE RIP RAP |
12/08/2016 |
Paid |
$2,491.47 |
PRM 6200 16120505921 |
Crushed Stone (Includes Riprap) |
12/06/2016 |
Paid |
$5,107.95 |
PRM 2200 16113005520 |
Sand and Gravel |
12/01/2016 |
Paid |
$3,353.47 |
PRM 2200 16111504348 |
Sand and Gravel |
11/16/2016 |
Paid |
$1,314.90 |
PRM 2200 16110904016 |
Flexible Base |
11/10/2016 |
Paid |
$8,575.04 |
PRM 2200 16110904016 |
Soil Mixtures (Special) |
11/10/2016 |
Paid |
$1,606.22 |
PRM 2200 16110303595 |
Soil Mixtures (Special) |
11/04/2016 |
Paid |
$3,671.36 |
PRM 6300 16110303627 |
Crushed Stone (Includes Riprap) |
11/04/2016 |
Paid |
$4,458.57 |
PRM 2200 16110203390 |
Flexible Base |
11/03/2016 |
Paid |
$4,121.63 |
PRM 2200 16110103138 |
RIVER ROCK |
11/02/2016 |
Paid |
$2,673.39 |
PRM 2200 16103102907 |
Flexible Base |
11/01/2016 |
Paid |
$6,557.72 |
PRM 2200 16103102913 |
Flexible Base |
11/01/2016 |
Paid |
$3,783.98 |
PRM 2200 16101801411 |
Flexible Base |
10/19/2016 |
Paid |
$2,220.65 |
PRM 2200 16101801421 |
Flexible Base |
10/19/2016 |
Paid |
$1,199.17 |
PRM 6200 16101401086 |
Soil Mixtures (Special) |
10/17/2016 |
Paid |
$312.12 |
PRM 2200 16101300921 |
Soil Mixtures (Special) |
10/14/2016 |
Paid |
$1,147.30 |
PRM 6300 16101300974 |
Crushed Stone (Includes Riprap) |
10/14/2016 |
Paid |
$2,007.48 |
PRM 2200 16101200828 |
Flexible Base |
10/13/2016 |
Paid |
$4,848.92 |
PRM 2200 16100400238 |
Sand and Gravel |
10/05/2016 |
Paid |
$416.87 |
PRM 2200 16100400251 |
Flexible Base |
10/05/2016 |
Paid |
$3,983.92 |
PRM 2200 16100400254 |
Soil Mixtures (Special) |
10/05/2016 |
Paid |
$1,378.08 |
PRM 6300 16100300111 |
STONE RIP RAP |
10/04/2016 |
Paid |
$16,763.08 |
PRM 6300 16100300114 |
STONE RIP RAP |
10/04/2016 |
Paid |
$21,808.90 |
PRM 6200 16092939393 |
STONE RIP RAP |
09/30/2016 |
Paid |
$3,833.93 |
PRM 2200 16092739003 |
Flexible Base |
09/28/2016 |
Paid |
$5,559.66 |
PRM 2200 16092739009 |
Flexible Base |
09/28/2016 |
Paid |
$4,110.38 |
PRM 2200 16092739009 |
Soil Mixtures (Special) |
09/28/2016 |
Paid |
$500.64 |
PRM 2200 16092038124 |
Flexible Base |
09/21/2016 |
Paid |
$5,549.00 |
PRM 2200 16092038125 |
Flexible Base |
09/21/2016 |
Paid |
$3,832.13 |
PRM 2200 16090836869 |
Sand and Gravel |
09/09/2016 |
Paid |
$4,132.69 |
PRM 2200 16090836873 |
Flexible Base |
09/09/2016 |
Paid |
$11,134.30 |
PRM 2200 16090836873 |
Soil Mixtures (Special) |
09/09/2016 |
Paid |
$1,251.60 |
PRM 6300 16083136022 |
Crushed Stone (Includes Riprap) |
09/01/2016 |
Paid |
$14,891.51 |
PRM 2200 16082635463 |
Sand and Gravel |
08/29/2016 |
Paid |
$5,021.52 |
PRM 2200 16082635472 |
Flexible Base |
08/29/2016 |
Paid |
$6,232.42 |
PRM 2200 16082435137 |
Sand and Gravel |
08/25/2016 |
Paid |
$2,201.12 |
PRM 6200 16082234795 |
Flexible Base |
08/23/2016 |
Paid |
$1,350.12 |
PRM 2200 16081734362 |
Flexible Base |
08/18/2016 |
Paid |
$3,816.30 |
PRM 2200 16080332704 |
Soil Mixtures (Special) |
08/04/2016 |
Paid |
$3,643.13 |
PRM 2200 16072731904 |
Flexible Base |
07/28/2016 |
Paid |
$8,047.81 |
PRM 2200 16071931263 |
Sand and Gravel |
07/20/2016 |
Paid |
$8,591.61 |
PRM 2200 16071931275 |
Flexible Base |
07/20/2016 |
Paid |
$10,114.38 |
PRM 2200 16071931275 |
Soil Mixtures (Special) |
07/20/2016 |
Paid |
$7,134.12 |
PRM 6300 16071431029 |
Crushed Stone (Includes Riprap) |
07/15/2016 |
Paid |
$1,342.11 |
PRM 6200 16070630149 |
Crushed Stone (Includes Riprap) |
07/07/2016 |
Paid |
$5,394.03 |
PRM 6300 16070529919 |
Crushed Stone (Includes Riprap) |
07/06/2016 |
Paid |
$1,985.93 |
PRM 6200 16070129658 |
Soil Mixtures (Special) |
07/05/2016 |
Paid |
$102.60 |
PRM 2200 16062929231 |
Sand and Gravel |
06/30/2016 |
Paid |
$4,267.92 |
PRM 2200 16062829004 |
Flexible Base |
06/29/2016 |
Paid |
$7,872.11 |
PRM 6300 16062428612 |
Crushed Stone (Includes Riprap) |
06/27/2016 |
Paid |
$933.45 |
PRM 2200 16062128022 |
Flexible Base |
06/22/2016 |
Paid |
$6,779.06 |
PRM 2200 16062128024 |
Flexible Base |
06/22/2016 |
Paid |
$3,779.59 |
PRM 6300 16061527459 |
STONE RIP RAP |
06/16/2016 |
Paid |
$14,579.48 |
PRM 6300 16061327112 |
Crushed Stone (Includes Riprap) |
06/14/2016 |
Paid |
$2,669.38 |
PRM 2200 16060926725 |
Sand and Gravel |
06/10/2016 |
Paid |
$2,855.35 |
PRM 2200 16060926739 |
Flexible Base |
06/10/2016 |
Paid |
$8,296.87 |
PRM 2200 16060926739 |
Soil Mixtures (Special) |
06/10/2016 |
Paid |
$709.24 |
PRM 6300 16060926784 |
Crushed Stone (Includes Riprap) |
06/10/2016 |
Paid |
$9,248.16 |
PRM 2200 16060126120 |
Flexible Base |
06/02/2016 |
Paid |
$3,795.02 |
PRM 6300 16053126028 |
Crushed Stone (Includes Riprap) |
06/01/2016 |
Paid |
$820.48 |
PRM 6300 16052725857 |
Crushed Stone (Includes Riprap) |
05/31/2016 |
Paid |
$935.96 |
PRM 6300 16052725860 |
Crushed Stone (Includes Riprap) |
05/31/2016 |
Paid |
$4,535.50 |
PRM 2200 16051724858 |
Sand and Gravel |
05/18/2016 |
Paid |
$1,705.56 |
PRM 2200 16051724860 |
Sand and Gravel |
05/18/2016 |
Paid |
$2,490.45 |
PRM 2200 16051724865 |
Flexible Base |
05/18/2016 |
Paid |
$6,579.78 |
PRM 2200 16051724865 |
Sand and Gravel |
05/18/2016 |
Paid |
$1,970.32 |
PRM 2200 16051724865 |
Soil Mixtures (Special) |
05/18/2016 |
Paid |
$917.84 |
PRM 2200 16050223598 |
Flexible Base |
05/03/2016 |
Paid |
$3,198.92 |
PRM 2200 16042723186 |
Flexible Base |
04/28/2016 |
Paid |
$1,880.39 |
PRM 2200 16042723186 |
Sand and Gravel |
04/28/2016 |
Paid |
$1,307.34 |
PRM 6200 16042623035 |
Flexible Base |
04/27/2016 |
Paid |
$3,818.75 |
PRM 6200 16042022322 |
Soil Mixtures (Special) |
04/21/2016 |
Paid |
$410.40 |
PRM 2200 16041922040 |
Sand and Gravel |
04/20/2016 |
Paid |
$897.38 |
PRM 2200 16041821892 |
Flexible Base |
04/19/2016 |
Paid |
$6,112.02 |
PRM 2200 16041821892 |
Soil Mixtures (Special) |
04/19/2016 |
Paid |
$959.56 |
PRM 2200 16041521791 |
Flexible Base |
04/18/2016 |
Paid |
$2,313.80 |
PRM 6200 16041321540 |
STONE RIP RAP |
04/14/2016 |
Paid |
$8,071.04 |
PRM 2200 16040520656 |
Flexible Base |
04/06/2016 |
Paid |
$2,526.68 |
PRM 2200 16040520656 |
Sand and Gravel |
04/06/2016 |
Paid |
$6,517.76 |
PRM 6300 16040120424 |
STONE RIP RAP |
04/04/2016 |
Paid |
$8,609.76 |
PRM 2200 16033120182 |
Flexible Base |
04/01/2016 |
Paid |
$7,429.16 |
PRM 2200 16033120182 |
Sand and Gravel |
04/01/2016 |
Paid |
$1,624.37 |
PRM 2200 16033120182 |
Soil Mixtures (Special) |
04/01/2016 |
Paid |
$917.84 |
PRM 6200 16032219010 |
STONE RIP RAP |
03/23/2016 |
Paid |
$21,389.50 |
PRM 2200 16031818709 |
Flexible Base |
03/21/2016 |
Paid |
$5,335.47 |
PRM 2200 16031017600 |
Flexible Base |
03/11/2016 |
Paid |
$4,757.25 |
PRM 2200 16031017600 |
Sand and Gravel |
03/11/2016 |
Paid |
$2,979.38 |
PRM 2200 16030716843 |
Flexible Base |
03/08/2016 |
Paid |
$2,067.65 |
PRM 2200 16030416692 |
Sand and Gravel |
03/07/2016 |
Paid |
$1,266.61 |
PRM 2200 16030116041 |
Flexible Base |
03/02/2016 |
Paid |
$5,462.80 |
PRM 2200 16030116041 |
Soil Mixtures (Special) |
03/02/2016 |
Paid |
$924.00 |
PRM 2200 16030116043 |
Sand and Gravel |
03/02/2016 |
Paid |
$3,255.55 |
PRM 6300 16030116108 |
Crushed Stone (Includes Riprap) |
03/02/2016 |
Paid |
$11,294.36 |
PRM 2200 16022915888 |
Flexible Base |
03/01/2016 |
Paid |
$2,092.60 |
PRM 2200 16022915888 |
Sand and Gravel |
03/01/2016 |
Paid |
$1,641.29 |
PRM 2200 16022915888 |
Soil Mixtures (Special) |
03/01/2016 |
Paid |
$1,383.36 |
PRM 6200 16022515684 |
Flexible Base |
02/26/2016 |
Paid |
$3,837.37 |
PRM 2200 16021914848 |
Flexible Base |
02/22/2016 |
Paid |
$3,121.61 |
PRM 2200 16021914850 |
Soil Mixtures (Special) |
02/22/2016 |
Paid |
$2,217.60 |
PRM 2200 16021914852 |
Flexible Base |
02/22/2016 |
Paid |
$2,666.66 |
PRM 2200 16021914854 |
Flexible Base |
02/22/2016 |
Paid |
$5,249.90 |
PRM 2200 16021914854 |
Sand and Gravel |
02/22/2016 |
Paid |
$1,228.08 |
PRM 2200 16021914857 |
Soil Mixtures (Special) |
02/22/2016 |
Paid |
$679.36 |
PRM 2200 16021214177 |
Sand and Gravel |
02/16/2016 |
Paid |
$1,322.06 |
PRM 2200 16021214177 |
Soil Mixtures (Special) |
02/16/2016 |
Paid |
$679.36 |
PRM 2200 16021013940 |
Flexible Base |
02/11/2016 |
Paid |
$2,412.04 |
PRM 2200 16021013940 |
Sand and Gravel |
02/11/2016 |
Paid |
$1,580.89 |
PRM 2200 16020313102 |
Flexible Base |
02/04/2016 |
Paid |
$3,641.71 |
PRM 6300 16020313174 |
STONE RIP RAP |
02/04/2016 |
Paid |
$27,826.62 |
PRM 6200 16011511390 |
Flexible Base |
01/19/2016 |
Paid |
$2,146.24 |
PRM 2200 16011411203 |
Flexible Base |
01/15/2016 |
Paid |
$1,746.89 |
PRM 2200 16011411207 |
Sand and Gravel |
01/15/2016 |
Paid |
$1,556.26 |
PRM 2200 16010810293 |
Flexible Base |
01/11/2016 |
Paid |
$10,190.50 |
PRM 2200 16010810293 |
Sand and Gravel |
01/11/2016 |
Paid |
$1,906.04 |
PRM 2200 16010810293 |
Soil Mixtures (Special) |
01/11/2016 |
Paid |
$1,898.88 |
PRM 2200 16010509686 |
Flexible Base |
01/06/2016 |
Paid |
$2,073.46 |
PRM 2200 16010509686 |
Sand and Gravel |
01/06/2016 |
Paid |
$2,748.42 |
PRM 6300 15123109535 |
Crushed Stone (Includes Riprap) |
01/04/2016 |
Paid |
$2,680.68 |
PRM 2200 15122308875 |
Sand and Gravel |
12/28/2015 |
Paid |
$1,706.24 |
PRM 6200 15122208791 |
Flexible Base |
12/23/2015 |
Paid |
$2,364.17 |
PRM 6200 15121808429 |
Crushed Stone (Includes Riprap) |
12/21/2015 |
Paid |
$1,819.16 |
PRM 6200 15121808429 |
STONE RIP RAP |
12/21/2015 |
Paid |
$4,949.56 |
PRM 2200 15121407677 |
Flexible Base |
12/15/2015 |
Paid |
$1,943.27 |
PRM 2200 15121407677 |
Sand and Gravel |
12/15/2015 |
Paid |
$1,367.97 |
PRM 2200 15121007356 |
Flexible Base |
12/11/2015 |
Paid |
$14,374.66 |
PRM 2200 15121007356 |
Sand and Gravel |
12/11/2015 |
Paid |
$5,147.53 |
PRM 2200 15121007356 |
Top Soil and Fill Dirt (For Mulch See Class 335) |
12/11/2015 |
Paid |
$691.68 |
PRM 6200 15120907253 |
Crushed Stone (Includes Riprap) |
12/10/2015 |
Paid |
$3,202.14 |
PRM 6200 15120706859 |
STONE RIP RAP |
12/08/2015 |
Paid |
$6,224.04 |
PRM 6300 15120706875 |
Crushed Stone (Includes Riprap) |
12/08/2015 |
Paid |
$10,810.51 |
PRM 6300 15120206450 |
STONE, CRUSHED (LIMESTONE). TO BE CRUSHED AND SCRE |
12/03/2015 |
Paid |
$3,044.66 |
PRM 2200 15111805040 |
Flexible Base |
11/19/2015 |
Paid |
$2,698.34 |
PRM 6300 15111304793 |
Sand and Gravel |
11/16/2015 |
Paid |
$2,991.00 |
PRM 2200 15111004284 |
Flexible Base |
11/10/2015 |
Paid |
$3,922.91 |
PRM 2200 15111004284 |
Sand and Gravel |
11/10/2015 |
Paid |
$1,964.24 |
PRM 2200 15111004284 |
Top Soil and Fill Dirt (For Mulch See Class 335) |
11/10/2015 |
Paid |
$1,383.36 |
PRM 6200 15110403998 |
STONE RIP RAP |
11/05/2015 |
Paid |
$1,741.18 |
PRM 2200 15102702938 |
Top Soil and Fill Dirt (For Mulch See Class 335) |
10/28/2015 |
Paid |
$1,383.36 |
PRM 2200 15102702939 |
Flexible Base |
10/28/2015 |
Paid |
$3,037.77 |
PRM 2200 15102702960 |
Flexible Base |
10/28/2015 |
Paid |
$3,894.53 |
PRM 2200 15102702963 |
Flexible Base |
10/28/2015 |
Paid |
$5,854.08 |
PRM 2200 15102702963 |
Sand and Gravel |
10/28/2015 |
Paid |
$2,473.91 |
PRM 6200 15102703064 |
STONE RIP RAP |
10/28/2015 |
Paid |
$6,720.42 |
PRM 2200 15102002091 |
Flexible Base |
10/21/2015 |
Paid |
$5,249.90 |
PRM 2200 15101301000 |
Flexible Base |
10/14/2015 |
Paid |
$6,315.19 |
PRM 2200 15101301000 |
Sand and Gravel |
10/14/2015 |
Paid |
$2,847.36 |
PRM 2200 15101301004 |
Top Soil and Fill Dirt (For Mulch See Class 335) |
10/14/2015 |
Paid |
$1,383.36 |
PRM 2200 15101301006 |
Flexible Base |
10/14/2015 |
Paid |
$8,358.50 |
PRM 2200 15101301006 |
Sand and Gravel |
10/14/2015 |
Paid |
$1,574.14 |
PRM 6300 15101301079 |
STONE RIP RAP |
10/14/2015 |
Paid |
$1,865.04 |
PRM 2200 15100600537 |
Sand and Gravel |
10/07/2015 |
Paid |
$1,225.05 |
PRM 2200 15100600537 |
Top Soil and Fill Dirt (For Mulch See Class 335) |
10/07/2015 |
Paid |
$1,886.40 |
PRM 2200 15100500257 |
ASPHALTIC CONCRETE PAVEMENT, HOT MIX-COLD LAID, IN |
10/06/2015 |
Paid |
$2,217.60 |
PRM 6300 15093040536 |
Sand and Gravel |
10/02/2015 |
Paid |
$2,324.43 |
PRM 6300 15093040538 |
Sand and Gravel |
10/02/2015 |
Paid |
$2,767.73 |
PRM 2200 15092439799 |
Sand and Gravel |
09/25/2015 |
Paid |
$1,609.78 |
PRM 6300 15091738977 |
Sand and Gravel |
09/18/2015 |
Paid |
$2,270.28 |
PRM 2200 15091538586 |
Top Soil and Fill Dirt (For Mulch See Class 335) |
09/16/2015 |
Paid |
$1,037.52 |
PRM 2200 15091538588 |
ASPHALTIC CONCRETE PAVEMENT, HOT MIX-COLD LAID, IN |
09/16/2015 |
Paid |
$924.00 |
PRM 2200 15091538588 |
Flexible Base |
09/16/2015 |
Paid |
$17,433.50 |
PRM 2200 15091538588 |
Sand and Gravel |
09/16/2015 |
Paid |
$4,226.24 |
PRM 2200 15091538588 |
Top Soil and Fill Dirt (For Mulch See Class 335) |
09/16/2015 |
Paid |
$669.68 |
PRM 6300 15091438433 |
Sand and Gravel |
09/15/2015 |
Paid |
$2,373.91 |
PRM 6200 15090938041 |
STONE RIP RAP |
09/10/2015 |
Paid |
$2,410.34 |
PRM 2200 15090337483 |
Flexible Base |
09/04/2015 |
Paid |
$2,429.99 |
PRM 2200 15090337483 |
Sand and Gravel |
09/04/2015 |
Paid |
$1,291.78 |
PRM 2200 15090337496 |
Flexible Base |
09/04/2015 |
Paid |
$3,892.55 |
PRM 2200 15090337496 |
Sand and Gravel |
09/04/2015 |
Paid |
$1,271.56 |
PRM 6300 15090237362 |
STONE RIP RAP |
09/03/2015 |
Paid |
$2,354.49 |
PRM 6300 15082636484 |
STONE RIP RAP |
08/27/2015 |
Paid |
$15,610.80 |
PRM 6300 15082636484 |
Sand and Gravel |
08/27/2015 |
Paid |
$2,674.84 |
PRM 2200 15082435999 |
ASPHALTIC CONCRETE PAVEMENT, HOT MIX-COLD LAID, IN |
08/25/2015 |
Paid |
$679.36 |
PRM 2200 15082035699 |
Flexible Base |
08/21/2015 |
Paid |
$3,902.71 |
PRM 2200 15082035700 |
Flexible Base |
08/21/2015 |
Paid |
$3,548.81 |
PRM 2200 15081935542 |
Sand and Gravel |
08/20/2015 |
Paid |
$3,296.94 |
PRM 2200 15081935543 |
Flexible Base |
08/20/2015 |
Paid |
$5,210.77 |
PRM 2200 15081935544 |
Flexible Base |
08/20/2015 |
Paid |
$1,757.58 |
PRM 2200 15081935545 |
Sand and Gravel |
08/20/2015 |
Paid |
$2,629.39 |
PRM 2200 15081835315 |
ASPHALTIC CONCRETE PAVEMENT, HOT MIX-COLD LAID, IN |
08/19/2015 |
Paid |
$1,848.00 |
PRM 2200 15081835315 |
Flexible Base |
08/19/2015 |
Paid |
$6,601.17 |
PRM 2200 15081835315 |
Sand and Gravel |
08/19/2015 |
Paid |
$1,643.60 |
PRC 1100 MAX38109 |
Fencing, Concrete or Rock |
08/14/2015 |
Paid |
$2,988.34 |
PRM 2200 15081334819 |
ASPHALTIC CONCRETE PAVEMENT, HOT MIX-COLD LAID, IN |
08/14/2015 |
Paid |
$3,098.64 |
PRM 2200 15081334819 |
Flexible Base |
08/14/2015 |
Paid |
$4,576.49 |
PRM 2200 15081334819 |
Sand and Gravel |
08/14/2015 |
Paid |
$1,193.54 |
PRM 2200 15080333490 |
Flexible Base |
08/04/2015 |
Paid |
$11,040.01 |
PRM 2200 15080333490 |
Sand and Gravel |
08/04/2015 |
Paid |
$2,657.89 |
PRC 1100 MAX37859 |
Fencing, Concrete or Rock |
07/31/2015 |
Paid |
$344.54 |
PRM 2200 15072232315 |
Sand and Gravel |
07/23/2015 |
Paid |
$2,497.22 |
PRM 2200 15071330966 |
Flexible Base |
07/14/2015 |
Paid |
$5,256.73 |
PRM 2200 15071330966 |
Sand and Gravel |
07/14/2015 |
Paid |
$2,608.90 |
PRC 1100 MAX37451 |
Fencing, Concrete or Rock |
07/13/2015 |
Paid |
$1,515.88 |
PRM 2200 15071030813 |
ASPHALTIC CONCRETE PAVEMENT, HOT MIX-COLD LAID, IN |
07/13/2015 |
Paid |
$741.12 |
PRM 2200 15071030813 |
Flexible Base |
07/13/2015 |
Paid |
$2,695.53 |
PRM 2200 15071030821 |
Flexible Base |
07/13/2015 |
Paid |
$3,591.23 |
PRM 2200 15063029633 |
Sand and Gravel |
07/07/2015 |
Paid |
$1,304.97 |
PRM 2200 15061728170 |
Flexible Base |
06/18/2015 |
Paid |
$3,451.87 |
PRM 2200 15061728176 |
ASPHALTIC CONCRETE PAVEMENT, HOT MIX-COLD LAID, IN |
06/18/2015 |
Paid |
$1,574.88 |
PRM 2200 15061728178 |
Flexible Base |
06/18/2015 |
Paid |
$3,907.82 |
PRC 1100 MAX36663 |
Fencing, Concrete or Rock |
06/11/2015 |
Paid |
$1,515.98 |
PRC 1100 MAX36848 |
Fencing, Concrete or Rock |
06/10/2015 |
Paid |
$1,202.35 |
PRC 1100 MAX36849 |
Fencing, Concrete or Rock |
06/10/2015 |
Paid |
$5,445.39 |
PRC 1100 MAX36664 |
Fencing, Concrete or Rock |
06/05/2015 |
Paid |
$5,078.95 |
PRM 2200 15052926255 |
ASPHALTIC CONCRETE PAVEMENT, HOT MIX-COLD LAID, IN |
06/01/2015 |
Paid |
$739.20 |
PRM 2200 15052926255 |
Flexible Base |
06/01/2015 |
Paid |
$6,235.35 |
PRM 2200 15052826156 |
Flexible Base |
05/29/2015 |
Paid |
$3,367.93 |
PRM 2200 15052826165 |
ASPHALTIC CONCRETE PAVEMENT, HOT MIX-COLD LAID, IN |
05/29/2015 |
Paid |
$509.52 |
PRM 2200 15052826165 |
Sand and Gravel |
05/29/2015 |
Paid |
$1,084.43 |
PRM 2200 15052225672 |
Flexible Base |
05/26/2015 |
Paid |
$1,838.46 |
PRM 2200 15052225672 |
Sand and Gravel |
05/26/2015 |
Paid |
$2,561.77 |
PRM 2200 15052225672 |
Top Soil and Fill Dirt (For Mulch See Class 335) |
05/26/2015 |
Paid |
$705.60 |
PRM 2200 15051124334 |
Flexible Base |
05/12/2015 |
Paid |
$4,228.36 |
PRM 2200 15050824215 |
Flexible Base |
05/11/2015 |
Paid |
$3,106.15 |
PRM 2200 15050824217 |
Sand and Gravel |
05/11/2015 |
Paid |
$1,681.44 |
PRM 2200 15050824219 |
Flexible Base |
05/11/2015 |
Paid |
$2,485.40 |
PRM 2200 15050824221 |
Flexible Base |
05/11/2015 |
Paid |
$2,086.77 |
PRM 2200 15050824221 |
Top Soil and Fill Dirt (For Mulch See Class 335) |
05/11/2015 |
Paid |
$680.00 |
PRM 2200 15050824223 |
Sand and Gravel |
05/11/2015 |
Paid |
$1,275.53 |
PRM 2200 15050824225 |
Sand and Gravel |
05/11/2015 |
Paid |
$1,591.74 |
PRM 2200 15050824227 |
ASPHALTIC CONCRETE PAVEMENT, HOT MIX-COLD LAID, IN |
05/11/2015 |
Paid |
$509.52 |
PRM 2200 15050824227 |
Flexible Base |
05/11/2015 |
Paid |
$4,475.38 |
PRM 2200 15050523644 |
Flexible Base |
05/06/2015 |
Paid |
$1,574.94 |
PRM 2200 15042322360 |
Sand and Gravel |
04/24/2015 |
Paid |
$1,682.24 |
PRM 2200 15041721701 |
Flexible Base |
04/20/2015 |
Paid |
$6,711.72 |
PRM 2200 15041721701 |
Sand and Gravel |
04/20/2015 |
Paid |
$2,841.25 |
PRM 2200 15040820521 |
Top Soil and Fill Dirt (For Mulch See Class 335) |
04/09/2015 |
Paid |
$740.00 |
PRM 2200 15040219946 |
Flexible Base |
04/03/2015 |
Paid |
$5,810.96 |
PRM 2200 15040219946 |
Sand and Gravel |
04/03/2015 |
Paid |
$1,327.95 |
PRM 2200 15040219946 |
Top Soil and Fill Dirt (For Mulch See Class 335) |
04/03/2015 |
Paid |
$510.00 |
PRM 2200 15032018229 |
Top Soil and Fill Dirt (For Mulch See Class 335) |
03/23/2015 |
Paid |
$740.00 |
PRM 2200 15031016930 |
Sand and Gravel |
03/11/2015 |
Paid |
$2,656.33 |
PRM 2200 15031016930 |
Top Soil and Fill Dirt (For Mulch See Class 335) |
03/11/2015 |
Paid |
$1,360.00 |
PRM 2200 15030616550 |
Flexible Base |
03/09/2015 |
Paid |
$1,563.52 |
PRM 2200 15022715859 |
Flexible Base |
03/02/2015 |
Paid |
$4,097.86 |
PRM 2200 15022715861 |
Flexible Base |
03/02/2015 |
Paid |
$6,487.21 |
PRM 2200 15021914787 |
Flexible Base |
02/20/2015 |
Paid |
$1,754.39 |
PRM 2200 15021914787 |
Sand and Gravel |
02/20/2015 |
Paid |
$2,907.86 |
PRM 2200 15021914788 |
Flexible Base |
02/20/2015 |
Paid |
$3,501.61 |
PRM 2200 15021013713 |
Flexible Base |
02/11/2015 |
Paid |
$6,311.93 |
PRM 2200 15021013713 |
Sand and Gravel |
02/11/2015 |
Paid |
$3,560.71 |
PRM 2200 15012611999 |
Flexible Base |
01/27/2015 |
Paid |
$9,668.99 |
PRM 2200 15012611999 |
Sand and Gravel |
01/27/2015 |
Paid |
$5,138.66 |
PRM 2200 15011611140 |
Flexible Base |
01/20/2015 |
Paid |
$3,765.37 |
PRM 2200 15011611140 |
Sand and Gravel |
01/20/2015 |
Paid |
$2,105.40 |
PRM 2200 15010509810 |
Flexible Base |
01/06/2015 |
Paid |
$8,616.02 |
PRM 2200 14123009267 |
Sand and Gravel |
12/31/2014 |
Paid |
$1,001.87 |
PRM 2200 14122909025 |
Flexible Base |
12/30/2014 |
Paid |
$2,406.13 |
PRM 2200 14122308662 |
Sand and Gravel |
12/26/2014 |
Paid |
$1,155.24 |
PRM 2200 14121707898 |
Flexible Base |
12/18/2014 |
Paid |
$5,283.15 |
PRM 2200 14121707898 |
Sand and Gravel |
12/18/2014 |
Paid |
$1,412.94 |
PRM 2200 14120907104 |
Flexible Base |
12/10/2014 |
Paid |
$2,724.35 |
PRM 2200 14120907107 |
Sand and Gravel |
12/10/2014 |
Paid |
$1,424.33 |
PRM 2200 14120907115 |
Sand and Gravel |
12/10/2014 |
Paid |
$1,195.23 |
PRM 2200 14112005614 |
Flexible Base |
11/21/2014 |
Paid |
$2,579.87 |
PRM 2200 14111905492 |
Flexible Base |
11/20/2014 |
Paid |
$3,242.78 |
PRM 2200 14111905492 |
Sand and Gravel |
11/20/2014 |
Paid |
$1,157.45 |
PRM 6300 14111705283 |
Sand and Gravel |
11/18/2014 |
Paid |
$1,170.14 |
PRM 2200 14110504276 |
Flexible Base |
11/06/2014 |
Paid |
$6,294.99 |
PRM 2200 14110504276 |
Sand and Gravel |
11/06/2014 |
Paid |
$1,183.43 |
PRM 2200 14110404120 |
Flexible Base |
11/05/2014 |
Paid |
$3,048.50 |
PRM 2200 14110404120 |
Sand and Gravel |
11/05/2014 |
Paid |
$1,442.86 |
PRM 2200 14110404130 |
Flexible Base |
11/05/2014 |
Paid |
$2,198.79 |
PRM 2200 14110404130 |
Sand and Gravel |
11/05/2014 |
Paid |
$2,359.26 |
PRM 2200 14102703105 |
Flexible Base |
10/28/2014 |
Paid |
$3,639.86 |
PRM 2200 14101702216 |
Flexible Base |
10/20/2014 |
Paid |
$1,800.79 |
PRM 2200 14101702216 |
Sand and Gravel |
10/20/2014 |
Paid |
$858.80 |
PRM 2200 14100700611 |
Sand and Gravel |
10/08/2014 |
Paid |
$1,153.05 |
PRM 2200 14100700613 |
Flexible Base |
10/08/2014 |
Paid |
$1,743.56 |
PRM 2200 14100700615 |
Flexible Base |
10/08/2014 |
Paid |
$16,913.39 |
PRM 2200 14093038606 |
Flexible Base |
10/01/2014 |
Paid |
$7,268.45 |
PRM 2200 14093038606 |
Sand and Gravel |
10/01/2014 |
Paid |
$2,364.66 |
PRM 6300 14093038675 |
Sand and Gravel |
10/01/2014 |
Paid |
$859.77 |
PRM 2200 14092538089 |
Flexible Base |
09/26/2014 |
Paid |
$10,665.68 |
PRM 2200 14092437962 |
Sand and Gravel |
09/25/2014 |
Paid |
$1,422.28 |
PRM 2200 14092437963 |
Flexible Base |
09/25/2014 |
Paid |
$4,764.71 |
PRM 2200 14092437964 |
Sand and Gravel |
09/25/2014 |
Paid |
$1,468.63 |
PRM 2200 14091536784 |
Sand and Gravel |
09/16/2014 |
Paid |
$1,451.10 |
PRM 2200 14090836058 |
Flexible Base |
09/09/2014 |
Paid |
$5,802.27 |
PRM 2200 14090836060 |
Sand and Gravel |
09/09/2014 |
Paid |
$2,680.04 |
PRM 2200 14090335639 |
Sand and Gravel |
09/04/2014 |
Paid |
$1,448.65 |
PRM 2200 14090235373 |
Flexible Base |
09/03/2014 |
Paid |
$3,538.51 |
PRM 2200 14082134257 |
Flexible Base |
08/22/2014 |
Paid |
$2,848.47 |
PRM 2200 14082134257 |
Sand and Gravel |
08/22/2014 |
Paid |
$1,456.37 |
PRM 2200 14081933848 |
Flexible Base |
08/20/2014 |
Paid |
$3,837.55 |
PRM 2200 14081933848 |
Sand and Gravel |
08/20/2014 |
Paid |
$1,041.15 |
PRM 6300 14081533613 |
Sand and Gravel |
08/18/2014 |
Paid |
$16,393.91 |
PRM 2200 14080432308 |
Sand and Gravel |
08/05/2014 |
Paid |
$1,109.28 |
PRM 2200 14080432317 |
Flexible Base |
08/05/2014 |
Paid |
$9,222.90 |
PRM 2200 14080432317 |
Sand and Gravel |
08/05/2014 |
Paid |
$1,643.77 |
PRM 2200 14073132010 |
Flexible Base |
08/01/2014 |
Paid |
$1,536.02 |
PRM 2200 14073132013 |
Flexible Base |
08/01/2014 |
Paid |
$1,601.04 |
PRM 2200 14072831403 |
Flexible Base |
07/29/2014 |
Paid |
$3,133.58 |
PRM 2200 14072831403 |
Sand and Gravel |
07/29/2014 |
Paid |
$597.55 |
PRM 2200 14071730094 |
Sand and Gravel |
07/18/2014 |
Paid |
$1,442.15 |
PRM 2200 14071629817 |
Flexible Base |
07/17/2014 |
Paid |
$4,644.80 |
PRM 2200 14071629817 |
Sand and Gravel |
07/17/2014 |
Paid |
$1,104.26 |
PRM 2200 14071429237 |
Sand and Gravel |
07/15/2014 |
Paid |
$1,426.58 |
PRM 2200 14062427285 |
Flexible Base |
06/25/2014 |
Paid |
$3,815.89 |
PRM 2200 14062427286 |
Flexible Base |
06/25/2014 |
Paid |
$3,018.29 |
PRM 2200 14062427287 |
Sand and Gravel |
06/25/2014 |
Paid |
$2,231.46 |
PRM 2200 14062427288 |
Flexible Base |
06/25/2014 |
Paid |
$2,799.98 |
PRM 2200 14061125971 |
Flexible Base |
06/12/2014 |
Paid |
$6,847.01 |
PRM 2200 14061125971 |
Sand and Gravel |
06/12/2014 |
Paid |
$1,776.11 |
PRM 2200 14061025714 |
Flexible Base |
06/11/2014 |
Paid |
$1,527.43 |
PRM 2200 14061025714 |
Sand and Gravel |
06/11/2014 |
Paid |
$1,121.91 |
PRM 2200 14060925543 |
Flexible Base |
06/10/2014 |
Paid |
$1,529.23 |
PRM 2200 14053024826 |
Flexible Base |
06/02/2014 |
Paid |
$2,071.50 |
PRM 2200 14053024826 |
Sand and Gravel |
06/02/2014 |
Paid |
$1,152.20 |
PRM 2200 14052123933 |
Flexible Base |
05/22/2014 |
Paid |
$7,926.11 |
PRM 2200 14052123933 |
Sand and Gravel |
05/22/2014 |
Paid |
$861.63 |
PRM 2200 14051623500 |
Flexible Base |
05/19/2014 |
Paid |
$4,202.11 |
PRM 2200 14051523348 |
Flexible Base |
05/16/2014 |
Paid |
$1,870.07 |
PRM 2200 14051222889 |
Flexible Base |
05/13/2014 |
Paid |
$3,080.28 |
PRM 2200 14050722400 |
Flexible Base |
05/08/2014 |
Paid |
$1,545.24 |
PRM 2200 14050722401 |
Flexible Base |
05/08/2014 |
Paid |
$1,531.63 |
PRM 2200 14050722403 |
Sand and Gravel |
05/08/2014 |
Paid |
$1,125.11 |
PRM 2200 14050121676 |
Flexible Base |
05/02/2014 |
Paid |
$2,585.85 |
PRM 2200 14043021552 |
Flexible Base |
05/01/2014 |
Paid |
$2,995.13 |
PRM 2200 14043021552 |
Sand and Gravel |
05/01/2014 |
Paid |
$1,150.85 |
PRM 2200 14041820485 |
Flexible Base |
04/21/2014 |
Paid |
$3,731.82 |
PRM 2200 14041820485 |
Sand and Gravel |
04/21/2014 |
Paid |
$1,927.29 |
PRM 6300 14040819404 |
Sand and Gravel |
04/09/2014 |
Paid |
$1,189.70 |
PRM 2200 14040719207 |
Flexible Base |
04/08/2014 |
Paid |
$2,271.44 |
PRM 2200 14040719207 |
Sand and Gravel |
04/08/2014 |
Paid |
$3,191.95 |
PRM 2200 14040519002 |
Flexible Base |
04/07/2014 |
Paid |
$1,541.17 |
PRM 2200 14040218537 |
Flexible Base |
04/03/2014 |
Paid |
$3,212.31 |
PRM 2200 14040218537 |
Sand and Gravel |
04/03/2014 |
Paid |
$1,731.10 |
PRM 2200 14032918059 |
Flexible Base |
03/31/2014 |
Paid |
$3,535.89 |
PRM 2200 14032217221 |
Flexible Base |
03/24/2014 |
Paid |
$3,943.03 |
PRM 2200 14031716593 |
Flexible Base |
03/18/2014 |
Paid |
$2,019.10 |
PRM 2200 14031015838 |
Flexible Base |
03/11/2014 |
Paid |
$3,801.32 |
PRM 2200 14031015838 |
Sand and Gravel |
03/11/2014 |
Paid |
$2,327.32 |
PRM 2200 14030715535 |
Flexible Base |
03/10/2014 |
Paid |
$1,721.86 |
PRM 2200 14030715535 |
Sand and Gravel |
03/10/2014 |
Paid |
$1,394.70 |
PRM 2200 14022614778 |
Flexible Base |
02/27/2014 |
Paid |
$2,686.11 |
PRM 2200 14022614778 |
Sand and Gravel |
02/27/2014 |
Paid |
$1,436.88 |
PRM 2200 14021813845 |
Sand and Gravel |
02/19/2014 |
Paid |
$1,129.50 |
PRM 2200 14021513622 |
Flexible Base |
02/18/2014 |
Paid |
$3,170.94 |
PRM 2200 14021513625 |
Flexible Base |
02/18/2014 |
Paid |
$3,554.84 |
PRM 6300 14021513695 |
Sand and Gravel |
02/18/2014 |
Paid |
$837.89 |
PRM 6300 14021513697 |
Sand and Gravel |
02/18/2014 |
Paid |
$5,138.74 |
PRM 2200 14020412442 |
Flexible Base |
02/05/2014 |
Paid |
$4,521.36 |
PRM 2200 14020412442 |
Sand and Gravel |
02/05/2014 |
Paid |
$2,091.10 |
PRM 2200 14013112203 |
Flexible Base |
02/03/2014 |
Paid |
$4,028.31 |
PRM 2200 14013112203 |
Sand and Gravel |
02/03/2014 |
Paid |
$1,435.53 |
PRM 2200 14012911922 |
Flexible Base |
01/30/2014 |
Paid |
$7,979.53 |
PRM 2200 14012911922 |
Sand and Gravel |
01/30/2014 |
Paid |
$4,113.28 |
PRM 6300 14011310727 |
Sand and Gravel |
01/14/2014 |
Paid |
$7,293.46 |
PRM 2200 14010910330 |
Flexible Base |
01/10/2014 |
Paid |
$12,081.50 |
PRM 2200 14010910330 |
Sand and Gravel |
01/10/2014 |
Paid |
$2,641.55 |
PRM 2200 14010709781 |
Flexible Base |
01/08/2014 |
Paid |
$2,767.40 |
PRM 2200 14010709781 |
Sand and Gravel |
01/08/2014 |
Paid |
$1,981.45 |
PRM 2200 13123008988 |
Sand and Gravel |
12/31/2013 |
Paid |
$890.57 |
PRM 2200 13121708106 |
Flexible Base |
12/18/2013 |
Paid |
$1,532.94 |
PRM 2200 13121207656 |
Flexible Base |
12/13/2013 |
Paid |
$2,735.32 |
PRM 2200 13112606221 |
Sand and Gravel |
11/27/2013 |
Paid |
$834.05 |
PRM 2200 13112606229 |
Flexible Base |
11/27/2013 |
Paid |
$2,185.39 |
PRM 2200 13111505373 |
Flexible Base |
11/18/2013 |
Paid |
$2,970.41 |
PRM 2200 13111505373 |
Sand and Gravel |
11/18/2013 |
Paid |
$1,131.47 |
PRM 2200 13110804832 |
Flexible Base |
11/12/2013 |
Paid |
$1,281.07 |
PRM 2200 13110804834 |
Flexible Base |
11/12/2013 |
Paid |
$1,488.03 |
PRM 2200 13110804836 |
Sand and Gravel |
11/12/2013 |
Paid |
$820.03 |
PRM 2200 13110504317 |
Sand and Gravel |
11/06/2013 |
Paid |
$2,383.46 |
PRM 2200 13102903482 |
Flexible Base |
10/30/2013 |
Paid |
$3,153.54 |
PRM 2200 13102903482 |
Sand and Gravel |
10/30/2013 |
Paid |
$875.24 |
PRM 2200 13102903486 |
Flexible Base |
10/30/2013 |
Paid |
$4,832.51 |
PRM 2200 13102302615 |
Flexible Base |
10/24/2013 |
Paid |
$14,517.25 |
PRM 2200 13102302615 |
Sand and Gravel |
10/24/2013 |
Paid |
$776.93 |
PRM 2200 13102102116 |
Flexible Base |
10/22/2013 |
Paid |
$798.32 |
PRM 2200 13101501431 |
Flexible Base |
10/16/2013 |
Paid |
$15,522.87 |
PRM 2200 13091935685 |
Flexible Base |
09/20/2013 |
Paid |
$1,534.71 |
PRM 2200 13090634104 |
Sand and Gravel |
09/09/2013 |
Paid |
$1,266.67 |
PRM 2200 13090634110 |
Flexible Base |
09/09/2013 |
Paid |
$6,757.07 |
PRM 2200 13090634110 |
Sand and Gravel |
09/09/2013 |
Paid |
$813.49 |
PRM 2200 13090533943 |
Sand and Gravel |
09/06/2013 |
Paid |
$1,322.10 |
PRM 2200 13090433841 |
Flexible Base |
09/05/2013 |
Paid |
$8,746.18 |
PRM 2200 13090433841 |
Sand and Gravel |
09/05/2013 |
Paid |
$2,330.45 |
PRM 2200 13090333736 |
Flexible Base |
09/04/2013 |
Paid |
$6,236.79 |
PRM 2200 13090333736 |
Sand and Gravel |
09/04/2013 |
Paid |
$778.70 |
PRM 2200 13082333038 |
Flexible Base |
08/26/2013 |
Paid |
$2,078.28 |
PRM 2200 13080831805 |
Flexible Base |
08/09/2013 |
Paid |
$1,525.88 |
PRM 2200 13080831805 |
Sand and Gravel |
08/09/2013 |
Paid |
$1,787.75 |
PRM 2200 13080731641 |
Flexible Base |
08/08/2013 |
Paid |
$3,624.50 |
PRM 2200 13080531303 |
Flexible Base |
08/06/2013 |
Paid |
$1,548.31 |
PRM 2200 13072530198 |
Flexible Base |
07/26/2013 |
Paid |
$1,492.87 |
PRM 2200 13072530198 |
Sand and Gravel |
07/26/2013 |
Paid |
$1,820.56 |
PRM 2200 13072329820 |
Flexible Base |
07/24/2013 |
Paid |
$3,830.42 |
PRM 2200 13072329820 |
Sand and Gravel |
07/24/2013 |
Paid |
$578.93 |
PRM 2200 13071728720 |
Flexible Base |
07/18/2013 |
Paid |
$1,463.60 |
PRM 2200 13071728720 |
Sand and Gravel |
07/18/2013 |
Paid |
$982.69 |
PRM 2200 13071628457 |
Flexible Base |
07/17/2013 |
Paid |
$2,249.69 |
PRM 2200 13071027827 |
Flexible Base |
07/11/2013 |
Paid |
$2,990.45 |
PRM 2200 13071027827 |
Sand and Gravel |
07/11/2013 |
Paid |
$815.71 |
PRM 2200 13070927663 |
Sand and Gravel |
07/10/2013 |
Paid |
$1,350.66 |
PRM 2200 13061825972 |
Flexible Base |
06/19/2013 |
Paid |
$1,547.75 |
PRM 2200 13061825972 |
Sand and Gravel |
06/19/2013 |
Paid |
$852.27 |
PRM 2200 13061725844 |
Flexible Base |
06/18/2013 |
Paid |
$6,541.08 |
PRM 2200 13061725844 |
Sand and Gravel |
06/18/2013 |
Paid |
$1,072.76 |
PRM 6300 13061725905 |
Sand and Gravel |
06/18/2013 |
Paid |
$9,038.73 |
PRM 2200 13061125386 |
Flexible Base |
06/12/2013 |
Paid |
$3,638.15 |
PRM 2200 13060424766 |
Flexible Base |
06/05/2013 |
Paid |
$1,550.67 |
PRM 2200 13052823952 |
Flexible Base |
05/29/2013 |
Paid |
$7,640.29 |
PRM 2200 13052823952 |
Sand and Gravel |
05/29/2013 |
Paid |
$3,344.74 |
PRM 2200 13052123392 |
Flexible Base |
05/22/2013 |
Paid |
$2,603.03 |
PRM 2200 13050922431 |
Flexible Base |
05/10/2013 |
Paid |
$4,534.20 |
PRM 2200 13050922431 |
Sand and Gravel |
05/10/2013 |
Paid |
$1,539.12 |
PRM 2200 13050722106 |
Flexible Base |
05/08/2013 |
Paid |
$3,619.25 |
PRM 2200 13050621948 |
Sand and Gravel |
05/07/2013 |
Paid |
$518.65 |
PRM 2200 13042420770 |
Flexible Base |
04/25/2013 |
Paid |
$1,542.69 |
PRM 2200 13041920239 |
Flexible Base |
04/22/2013 |
Paid |
$2,480.82 |
PRM 2200 13041920239 |
Sand and Gravel |
04/22/2013 |
Paid |
$1,009.06 |
PRM 2200 13040519020 |
Flexible Base |
04/08/2013 |
Paid |
$2,455.22 |
PRM 2200 13040218526 |
Flexible Base |
04/03/2013 |
Paid |
$2,740.68 |
PRM 2200 13040218528 |
Sand and Gravel |
04/03/2013 |
Paid |
$768.51 |
PRM 2200 13040118332 |
Flexible Base |
04/02/2013 |
Paid |
$6,253.59 |
PRM 2200 13040118332 |
Sand and Gravel |
04/02/2013 |
Paid |
$3,080.06 |
PRM 2200 13031917287 |
Flexible Base |
03/20/2013 |
Paid |
$1,692.04 |
PRM 2200 13031917287 |
Sand and Gravel |
03/20/2013 |
Paid |
$929.39 |
PRM 2200 13030716132 |
Flexible Base |
03/08/2013 |
Paid |
$2,155.86 |
PRM 2200 13030716132 |
Sand and Gravel |
03/08/2013 |
Paid |
$1,030.44 |
PRM 2200 13030515804 |
Flexible Base |
03/06/2013 |
Paid |
$6,211.80 |
PRM 2200 13030515804 |
Sand and Gravel |
03/06/2013 |
Paid |
$2,558.49 |
PRM 2200 13022514748 |
Flexible Base |
02/26/2013 |
Paid |
$1,817.73 |
PRM 2200 13021414072 |
Flexible Base |
02/15/2013 |
Paid |
$6,634.28 |
PRM 2200 13021414072 |
Sand and Gravel |
02/15/2013 |
Paid |
$259.83 |
PRM 2200 13021213818 |
Flexible Base |
02/13/2013 |
Paid |
$3,297.57 |
PRM 2200 13021213818 |
Sand and Gravel |
02/13/2013 |
Paid |
$1,510.43 |
PRM 2200 13020813526 |
Flexible Base |
02/11/2013 |
Paid |
$2,768.12 |
PRM 2200 13020813526 |
Sand and Gravel |
02/11/2013 |
Paid |
$2,825.22 |
PRM 2200 13013012641 |
Flexible Base |
01/31/2013 |
Paid |
$6,119.89 |
PRM 2200 13013012641 |
Sand and Gravel |
01/31/2013 |
Paid |
$1,011.39 |
PRM 2200 13012912502 |
Flexible Base |
01/30/2013 |
Paid |
$1,557.29 |
PRM 2200 13012211456 |
Sand and Gravel |
01/23/2013 |
Paid |
$805.07 |
PRM 2200 13011610937 |
Sand and Gravel |
01/17/2013 |
Paid |
$1,109.99 |
PRM 2200 13011510801 |
Flexible Base |
01/16/2013 |
Paid |
$2,810.46 |
PRM 2200 13010809832 |
Flexible Base |
01/09/2013 |
Paid |
$2,243.95 |
PRM 2200 13010709622 |
Sand and Gravel |
01/08/2013 |
Paid |
$561.76 |
PRM 2200 13010209169 |
Flexible Base |
01/03/2013 |
Paid |
$11,400.60 |
PRM 2200 13010209169 |
Sand and Gravel |
01/03/2013 |
Paid |
$1,838.95 |
PRM 2200 12121307482 |
Flexible Base |
12/14/2012 |
Paid |
$3,141.71 |
PRM 2200 12121307482 |
Sand and Gravel |
12/14/2012 |
Paid |
$4,307.36 |
PRM 2200 12120606730 |
Sand and Gravel |
12/07/2012 |
Paid |
$2,085.37 |
PRM 6300 12112806130 |
Sand and Gravel |
11/29/2012 |
Paid |
$2,004.11 |
PRM 6300 12110203929 |
Sand and Gravel |
11/05/2012 |
Paid |
$7,323.16 |
PRM 2200 12102302819 |
Sand and Gravel |
10/24/2012 |
Paid |
$1,044.84 |
PRM 6300 12101802236 |
Sand and Gravel |
10/19/2012 |
Paid |
$5,786.03 |
PRM 2200 12101601601 |
Sand and Gravel |
10/17/2012 |
Paid |
$1,081.85 |
PRM 2200 12101101180 |
Sand and Gravel |
10/12/2012 |
Paid |
$2,634.49 |
PRM 6300 12092735411 |
Sand and Gravel |
09/28/2012 |
Paid |
$3,003.02 |
PRM 2200 12092534901 |
Sand and Gravel |
09/26/2012 |
Paid |
$2,675.56 |
PRM 2200 12092534909 |
Sand and Gravel |
09/26/2012 |
Paid |
$808.95 |
PRM 2200 12090432647 |
Sand and Gravel |
09/05/2012 |
Paid |
$1,808.59 |
PRM 2200 12083032388 |
Sand and Gravel |
08/31/2012 |
Paid |
$771.39 |
PRM 2200 12082131185 |
Sand and Gravel |
08/22/2012 |
Paid |
$529.51 |
PRM 2200 12080930010 |
Sand and Gravel |
08/10/2012 |
Paid |
$2,329.90 |
PRM 2200 12080229301 |
Sand and Gravel |
08/03/2012 |
Paid |
$2,740.34 |
PRM 2200 12071026965 |
Sand and Gravel |
07/11/2012 |
Paid |
$1,089.50 |
PRM 2200 12071026967 |
Sand and Gravel |
07/11/2012 |
Paid |
$527.08 |
PRM 2200 12070226227 |
Sand and Gravel |
07/03/2012 |
Paid |
$3,146.05 |
PRM 2200 12062825944 |
Sand and Gravel |
06/29/2012 |
Paid |
$786.68 |
PRM 2200 12062225095 |
Sand and Gravel |
06/25/2012 |
Paid |
$508.13 |
PRM 2200 12061824610 |
Sand and Gravel |
06/19/2012 |
Paid |
$2,093.83 |
PRM 2200 12061424354 |
Sand and Gravel |
06/15/2012 |
Paid |
$1,959.68 |
PRM 2200 12061424356 |
Sand and Gravel |
06/15/2012 |
Paid |
$664.19 |
PRM 2200 12060823799 |
Sand and Gravel |
06/11/2012 |
Paid |
$636.44 |
PRM 6300 12052522544 |
Sand and Gravel |
05/29/2012 |
Paid |
$7,133.99 |
PRM 2200 12050820890 |
Sand and Gravel |
05/09/2012 |
Paid |
$1,058.58 |
PRM 2200 12050320634 |
Sand and Gravel |
05/04/2012 |
Paid |
$1,957.60 |
PRM 2200 12050220336 |
Sand and Gravel |
05/03/2012 |
Paid |
$476.00 |
PRM 6300 12050220448 |
Sand and Gravel |
05/03/2012 |
Paid |
$3,101.67 |
PRM 2200 12050120155 |
Sand and Gravel |
05/02/2012 |
Paid |
$517.99 |
PRM 2200 12042619794 |
Sand and Gravel |
04/27/2012 |
Paid |
$1,309.55 |
PRM 2200 12041818870 |
Sand and Gravel |
04/19/2012 |
Paid |
$1,360.07 |
PRM 6300 12041818908 |
Sand and Gravel |
04/19/2012 |
Paid |
$267.19 |
PRM 2200 12032716715 |
Sand and Gravel |
03/28/2012 |
Paid |
$2,414.33 |
PRM 6300 12032716766 |
Sand and Gravel |
03/28/2012 |
Paid |
$5,721.34 |
PRM 2200 12032116244 |
Sand and Gravel |
03/22/2012 |
Paid |
$1,248.56 |
PRM 2200 12031515639 |
Sand and Gravel |
03/16/2012 |
Paid |
$1,937.43 |
PRM 6300 12031415564 |
Sand and Gravel |
03/15/2012 |
Paid |
$1,008.20 |
PRM 2200 12030814921 |
Sand and Gravel |
03/09/2012 |
Paid |
$3,045.28 |
PRM 2200 12030514393 |
Sand and Gravel |
03/06/2012 |
Paid |
$6,955.04 |
PRM 2200 12022313380 |
Sand and Gravel |
02/24/2012 |
Paid |
$3,221.72 |
PRM 2200 12022112915 |
Sand and Gravel |
02/22/2012 |
Paid |
$528.18 |
PRM 2200 12021412402 |
Sand and Gravel |
02/15/2012 |
Paid |
$1,136.17 |
PRM 2200 12021012208 |
Sand and Gravel |
02/13/2012 |
Paid |
$12,571.40 |
PRM 2200 12020111222 |
Sand and Gravel |
02/02/2012 |
Paid |
$165.92 |
PRM 2200 12020111241 |
Sand and Gravel |
02/02/2012 |
Paid |
$1,868.62 |
PRM 2200 12011809990 |
Sand and Gravel |
01/19/2012 |
Paid |
$690.07 |
PRM 2200 12011109415 |
Sand and Gravel |
01/12/2012 |
Paid |
$485.93 |
PRM 2200 12010909044 |
Sand and Gravel |
01/10/2012 |
Paid |
$6,153.66 |
PRM 2200 11122908260 |
Sand and Gravel |
12/30/2011 |
Paid |
$946.44 |
PRM 2200 11122808129 |
Sand and Gravel |
12/29/2011 |
Paid |
$3,018.27 |
PRM 2200 11121907450 |
Sand and Gravel |
12/20/2011 |
Paid |
$8,526.03 |
PRM 2200 11121607319 |
Sand and Gravel |
12/19/2011 |
Paid |
$1,068.33 |
PRM 2200 11120906695 |
Sand and Gravel |
12/12/2011 |
Paid |
$2,839.57 |
PRM 2200 11113005794 |
Sand and Gravel |
12/01/2011 |
Paid |
$807.07 |
PRM 2200 11112105097 |
Sand and Gravel |
11/22/2011 |
Paid |
$2,132.36 |
PRM 2200 11111004309 |
Sand and Gravel |
11/14/2011 |
Paid |
$8,191.13 |
PRM 2200 11110403700 |
Sand and Gravel |
11/07/2011 |
Paid |
$807.35 |
PRM 2200 11110103246 |
Sand and Gravel |
11/02/2011 |
Paid |
$581.37 |
PRM 2200 11102702829 |
Sand and Gravel |
10/28/2011 |
Paid |
$8,637.74 |
PRM 2200 11102102119 |
Sand and Gravel |
10/24/2011 |
Paid |
$819.82 |
PRM 2200 11101701629 |
Sand and Gravel |
10/18/2011 |
Paid |
$1,117.57 |
PRM 2200 11100600597 |
Sand and Gravel |
10/07/2011 |
Paid |
$6,879.68 |
PRM 2200 11100500398 |
Sand and Gravel |
10/06/2011 |
Paid |
$264.37 |
PRM 2200 11100300039 |
Sand and Gravel |
10/04/2011 |
Paid |
$3,884.44 |
PRM 2200 11100300040 |
Sand and Gravel |
10/04/2011 |
Paid |
$231.23 |
PRM 2200 11092835804 |
Sand and Gravel |
09/29/2011 |
Paid |
$116.78 |
PRM 2200 11091934698 |
Sand and Gravel |
09/20/2011 |
Paid |
$6,218.91 |
PRM 2200 11091434440 |
Sand and Gravel |
09/15/2011 |
Paid |
$2,304.03 |
PRM 2200 11090133345 |
Sand and Gravel |
09/02/2011 |
Paid |
$589.57 |
PRM 2200 11082932866 |
Sand and Gravel |
08/30/2011 |
Paid |
$1,898.36 |
PRM 2200 11082532597 |
Sand and Gravel |
08/26/2011 |
Paid |
$8,707.53 |
PRM 2200 11082332297 |
Sand and Gravel |
08/24/2011 |
Paid |
$1,208.92 |
PRM 2200 11081531301 |
Sand and Gravel |
08/16/2011 |
Paid |
$839.98 |
PRM 2200 11080930701 |
Sand and Gravel |
08/10/2011 |
Paid |
$7,438.17 |
PRM 2200 11080430212 |
Sand and Gravel |
08/05/2011 |
Paid |
$2,161.36 |
PRM 2200 11080129754 |
Sand and Gravel |
08/02/2011 |
Paid |
$230.54 |
PRM 2200 11072529123 |
Sand and Gravel |
07/26/2011 |
Paid |
$689.00 |
PRM 2200 11071528351 |
Sand and Gravel |
07/18/2011 |
Paid |
$5,770.69 |
PRM 2200 11071227931 |
Sand and Gravel |
07/13/2011 |
Paid |
$1,093.71 |
PRM 2200 11070727540 |
Sand and Gravel |
07/08/2011 |
Paid |
$1,364.87 |
PRM 2200 11070527348 |
Sand and Gravel |
07/06/2011 |
Paid |
$2,723.36 |
PRM 2200 11062126172 |
Sand and Gravel |
06/22/2011 |
Paid |
$1,920.31 |
PRM 2200 11061625722 |
Sand and Gravel |
06/17/2011 |
Paid |
$685.69 |
PRM 2200 11060724696 |
Sand and Gravel |
06/08/2011 |
Paid |
$1,285.95 |
PRM 2200 11060724697 |
Sand and Gravel |
06/08/2011 |
Paid |
$2,157.36 |
PRM 2200 11052523763 |
Sand and Gravel |
05/26/2011 |
Paid |
$127.30 |
PRM 2200 11052023341 |
Sand and Gravel |
05/23/2011 |
Paid |
$484.57 |
PRM 2200 11050922155 |
Sand and Gravel |
05/10/2011 |
Paid |
$7,425.10 |
PRM 2200 11041920237 |
Sand and Gravel |
04/20/2011 |
Paid |
$1,896.99 |
PRM 2200 11041319656 |
Sand and Gravel |
04/14/2011 |
Paid |
$1,613.74 |
PRM 2200 11040619024 |
Sand and Gravel |
04/07/2011 |
Paid |
$3,387.98 |
PRM 2200 11033118262 |
Sand and Gravel |
04/01/2011 |
Paid |
$2,499.23 |
PRM 2200 11031016186 |
Sand and Gravel |
03/11/2011 |
Paid |
$5,827.50 |
PRM 2200 11030815840 |
Sand and Gravel |
03/09/2011 |
Paid |
$2,953.56 |
PRM 2200 11022314192 |
Sand and Gravel |
02/24/2011 |
Paid |
$8,270.73 |
PRM 2200 11021813916 |
Sand and Gravel |
02/22/2011 |
Paid |
$238.34 |
PRM 2200 11020812949 |
Sand and Gravel |
02/09/2011 |
Paid |
$5,826.71 |
PRM 2200 11012611868 |
Sand and Gravel |
01/27/2011 |
Paid |
$5,090.73 |
PRM 2200 11012411371 |
Sand and Gravel |
01/25/2011 |
Paid |
$248.18 |
PRM 2200 11011010021 |
Sand and Gravel |
01/11/2011 |
Paid |
$1,291.20 |
PRM 2200 11010509496 |
Sand and Gravel |
01/06/2011 |
Paid |
$5,220.28 |
PRM 2200 11010309197 |
Sand and Gravel |
01/04/2011 |
Paid |
$4,110.22 |
PRM 2200 10121307684 |
Sand and Gravel |
12/14/2010 |
Paid |
$1,965.20 |
PRM 2200 10120807329 |
Sand and Gravel |
12/09/2010 |
Paid |
$271.06 |
PRM 2200 10120306819 |
Sand and Gravel |
12/06/2010 |
Paid |
$403.04 |
PRM 2200 10120306820 |
Sand and Gravel |
12/06/2010 |
Paid |
$101.39 |
PRM 2200 10120306821 |
Sand and Gravel |
12/06/2010 |
Paid |
$112.40 |
PRM 2200 10120306822 |
Sand and Gravel |
12/06/2010 |
Paid |
$115.32 |
PRM 2200 10120306823 |
Sand and Gravel |
12/06/2010 |
Paid |
$217.69 |
PRM 2200 10120306824 |
Sand and Gravel |
12/06/2010 |
Paid |
$221.29 |
PRM 2200 10120306825 |
Sand and Gravel |
12/06/2010 |
Paid |
$405.48 |
PRM 2200 10120306826 |
Sand and Gravel |
12/06/2010 |
Paid |
$319.57 |
PRM 2200 10120306827 |
Sand and Gravel |
12/06/2010 |
Paid |
$110.84 |
PRM 2200 10120306828 |
Sand and Gravel |
12/06/2010 |
Paid |
$448.14 |
PRM 2200 10113006265 |
Sand and Gravel |
12/01/2010 |
Paid |
$1,918.95 |
PRM 2200 10112205754 |
Sand and Gravel |
11/23/2010 |
Paid |
$1,964.89 |
PRM 2200 10110904502 |
Sand and Gravel |
11/10/2010 |
Paid |
$1,114.65 |
PRM 2200 10102703251 |
Sand and Gravel |
10/28/2010 |
Paid |
$1,088.06 |
PRM 2200 10102202602 |
Sand and Gravel |
10/25/2010 |
Paid |
$7,503.07 |
PRM 2200 10102002281 |
Sand and Gravel |
10/21/2010 |
Paid |
$3,207.44 |
PRM 2200 10101401749 |
Sand and Gravel |
10/15/2010 |
Paid |
$657.25 |
PRM 2200 10100400177 |
Sand and Gravel |
10/05/2010 |
Paid |
$1,896.46 |
PRM 2200 10092438481 |
Sand and Gravel |
09/27/2010 |
Paid |
$1,954.01 |
PRM 8600 10092138186 |
Sand and Gravel |
09/22/2010 |
Paid |
$1,899.36 |
PRM 2200 10091737686 |
Sand and Gravel |
09/20/2010 |
Paid |
$1,204.93 |
PRM 2200 10091537298 |
Sand and Gravel |
09/16/2010 |
Paid |
$112.69 |
PRM 2200 10091036783 |
Sand and Gravel |
09/13/2010 |
Paid |
$98.96 |
PRM 2200 10090736211 |
Sand and Gravel |
09/08/2010 |
Paid |
$1,897.54 |
PRM 2200 10090235882 |
Sand and Gravel |
09/03/2010 |
Paid |
$3,265.67 |
PRM 2200 10082534986 |
Sand and Gravel |
08/26/2010 |
Paid |
$3,104.10 |
PRM 2200 10082434833 |
Sand and Gravel |
08/25/2010 |
Paid |
$3,439.39 |
PRM 2200 10081133446 |
Sand and Gravel |
08/12/2010 |
Paid |
$992.02 |
PRM 2200 10080633002 |
Sand and Gravel |
08/09/2010 |
Paid |
$2,844.43 |
PRM 2200 10080432764 |
Sand and Gravel |
08/05/2010 |
Paid |
$1,862.58 |
PRM 2200 10080332622 |
Sand and Gravel |
08/04/2010 |
Paid |
$2,353.22 |
PRM 2200 10072731808 |
Sand and Gravel |
07/28/2010 |
Paid |
$1,320.78 |
PRM 2200 10072030955 |
Sand and Gravel |
07/21/2010 |
Paid |
$910.59 |
PRM 2200 10071430331 |
Sand and Gravel |
07/15/2010 |
Paid |
$1,005.85 |
PRM 2200 10070929878 |
Sand and Gravel |
07/12/2010 |
Paid |
$328.43 |
PRM 2200 10070229285 |
Sand and Gravel |
07/06/2010 |
Paid |
$3,722.83 |
PRM 2200 10061527127 |
Sand and Gravel |
06/16/2010 |
Paid |
$4,813.51 |
PRM 2200 10061026719 |
Sand and Gravel |
06/11/2010 |
Paid |
$784.56 |
PRM 2200 10060426197 |
Sand and Gravel |
06/07/2010 |
Paid |
$5,607.10 |
PRM 2200 10052725363 |
Sand and Gravel |
05/28/2010 |
Paid |
$2,130.82 |
PRM 2200 10052625231 |
Sand and Gravel |
05/27/2010 |
Paid |
$4,865.74 |
PRM 2200 10052424828 |
Sand and Gravel |
05/25/2010 |
Paid |
$244.96 |
PRM 2200 10051724211 |
Sand and Gravel |
05/18/2010 |
Paid |
$1,920.58 |
PRM 2200 10051023449 |
Sand and Gravel |
05/11/2010 |
Paid |
$541.54 |
PRM 2200 10050523057 |
Sand and Gravel |
05/06/2010 |
Paid |
$1,898.36 |
PRM 2200 10042822388 |
Sand and Gravel |
04/29/2010 |
Paid |
$4,507.44 |
PRM 2200 10041621497 |
Sand and Gravel |
04/19/2010 |
Paid |
$1,535.81 |
PRM 2200 10041321030 |
Sand and Gravel |
04/14/2010 |
Paid |
$5,068.92 |
PRM 2200 10040920675 |
Sand and Gravel |
04/12/2010 |
Paid |
$693.39 |
PRM 2200 10040720322 |
Sand and Gravel |
04/08/2010 |
Paid |
$1,406.07 |
PRM 2200 10032418951 |
Sand and Gravel |
03/25/2010 |
Paid |
$928.03 |
PRM 2200 10031718106 |
Sand and Gravel |
03/18/2010 |
Paid |
$1,900.52 |
PRM 2200 10031617936 |
Sand and Gravel |
03/17/2010 |
Paid |
$1,876.60 |
PRM 2200 10030316220 |
Sand and Gravel |
03/04/2010 |
Paid |
$5,200.49 |
PRM 2200 10030115701 |
Sand and Gravel |
03/02/2010 |
Paid |
$845.92 |
PRM 2200 10022515384 |
Sand and Gravel |
02/26/2010 |
Paid |
$5,484.33 |
PRM 2200 10021914737 |
Sand and Gravel |
02/22/2010 |
Paid |
$7,517.81 |
PRM 2200 10021114136 |
Sand and Gravel |
02/12/2010 |
Paid |
$2,021.80 |
PRM 2200 10021013909 |
Sand and Gravel |
02/11/2010 |
Paid |
$6,582.73 |
PRM 2200 10020212883 |
Sand and Gravel |
02/03/2010 |
Paid |
$824.89 |
PRM 2200 10020112679 |
Sand and Gravel |
02/02/2010 |
Paid |
$2,777.96 |
PRM 2200 10012712141 |
Sand and Gravel |
01/28/2010 |
Paid |
$4,054.43 |
PRM 2200 10012611974 |
Sand and Gravel |
01/27/2010 |
Paid |
$950.42 |
PRM 2200 10011210601 |
Sand and Gravel |
01/13/2010 |
Paid |
$2,265.90 |
PRM 2200 10010509823 |
Sand and Gravel |
01/06/2010 |
Paid |
$2,083.37 |
PRM 2200 09123009199 |
Sand and Gravel |
12/31/2009 |
Paid |
$358.82 |
PRM 2200 09122908964 |
Sand and Gravel |
12/30/2009 |
Paid |
$578.07 |
PRM 2200 09121708202 |
Sand and Gravel |
12/18/2009 |
Paid |
$2,037.11 |
PRM 2200 09121107602 |
Sand and Gravel |
12/14/2009 |
Paid |
$587.91 |
PRM 2200 09120306896 |
Sand and Gravel |
12/04/2009 |
Paid |
$4,138.42 |
PRM 2200 09112005698 |
Sand and Gravel |
11/23/2009 |
Paid |
$842.61 |
PRM 2200 09111805462 |
Sand and Gravel |
11/19/2009 |
Paid |
$3,198.10 |
PRM 2200 09111305020 |
Sand and Gravel |
11/16/2009 |
Paid |
$365.55 |
PRM 2200 09111305021 |
Sand and Gravel |
11/16/2009 |
Paid |
$1,053.77 |
PRM 2200 09110403935 |
Sand and Gravel |
11/05/2009 |
Paid |
$969.91 |
PRM 2200 09102702928 |
Sand and Gravel |
10/28/2009 |
Paid |
$3,381.81 |
PRM 2200 09102602713 |
Sand and Gravel |
10/27/2009 |
Paid |
$363.99 |
PRM 2200 09102102323 |
Sand and Gravel |
10/22/2009 |
Paid |
$5,045.05 |
PRM 2200 09101401598 |
Sand and Gravel |
10/15/2009 |
Paid |
$372.94 |
PRM 2200 09100600458 |
Sand and Gravel |
10/07/2009 |
Paid |
$701.96 |
PRM 2200 09100100042 |
Sand and Gravel |
10/02/2009 |
Paid |
$2,024.23 |
PRM 2200 09092845305 |
Sand and Gravel |
09/29/2009 |
Paid |
$841.44 |
PRM 2200 09092344704 |
Sand and Gravel |
09/24/2009 |
Paid |
$2,710.37 |
PRM 2200 09091744035 |
Sand and Gravel |
09/18/2009 |
Paid |
$2,033.18 |
PRM 2200 09091443581 |
Sand and Gravel |
09/15/2009 |
Paid |
$3,011.42 |
PRM 2200 09090943161 |
Sand and Gravel |
09/10/2009 |
Paid |
$4,946.70 |
PRM 2200 09090843023 |
Sand and Gravel |
09/09/2009 |
Paid |
$180.25 |
PRM 2200 09090142342 |
Sand and Gravel |
09/02/2009 |
Paid |
$964.93 |
PRM 2200 09082842009 |
Sand and Gravel |
08/31/2009 |
Paid |
$1,407.29 |
PRM 2200 09082040978 |
Sand and Gravel |
08/21/2009 |
Paid |
$1,371.36 |
PRM 2200 09081440283 |
Sand and Gravel |
08/17/2009 |
Paid |
$2,031.28 |
PRM 2200 09081440284 |
Sand and Gravel |
08/17/2009 |
Paid |
$2,045.37 |
PRM 2200 09081340128 |
Sand and Gravel |
08/14/2009 |
Paid |
$1,393.89 |
PRM 2200 09081139751 |
Sand and Gravel |
08/12/2009 |
Paid |
$1,023.87 |
PRM 2200 09073138702 |
Sand and Gravel |
08/03/2009 |
Paid |
$2,546.89 |
PRM 2200 09072938371 |
Sand and Gravel |
07/30/2009 |
Paid |
$123.70 |
PRM 2200 09072437665 |
Sand and Gravel |
07/27/2009 |
Paid |
$2,423.30 |
PRM 2200 09072337448 |
Sand and Gravel |
07/24/2009 |
Paid |
$1,367.21 |
PRM 2200 09072137055 |
Sand and Gravel |
07/22/2009 |
Paid |
$3,020.55 |
PRM 2200 09071636613 |
Sand and Gravel |
07/17/2009 |
Paid |
$603.59 |
PRM 2200 09071335944 |
Sand and Gravel |
07/14/2009 |
Paid |
$854.98 |
PRM 2200 09070134992 |
Sand and Gravel |
07/02/2009 |
Paid |
$2,048.35 |
PRM 2200 09062534472 |
Sand and Gravel |
06/26/2009 |
Paid |
$1,215.65 |
PRM 2200 09061633206 |
Sand and Gravel |
06/17/2009 |
Paid |
$4,109.87 |
PRM 2200 09061232906 |
Sand and Gravel |
06/15/2009 |
Paid |
$242.04 |
PRM 2200 09060832249 |
Sand and Gravel |
06/09/2009 |
Paid |
$2,699.28 |
PRM 2200 09060431904 |
Sand and Gravel |
06/05/2009 |
Paid |
$1,174.94 |
PRM 2200 09052931229 |
Sand and Gravel |
06/01/2009 |
Paid |
$1,373.98 |
PRM 2200 09052831059 |
Sand and Gravel |
05/29/2009 |
Paid |
$2,576.49 |
PRM 2200 09052730903 |
Sand and Gravel |
05/28/2009 |
Paid |
$504.53 |
PRM 2200 09051529690 |
Sand and Gravel |
05/18/2009 |
Paid |
$2,730.70 |
PRM 2200 09051129066 |
Sand and Gravel |
05/12/2009 |
Paid |
$4,052.54 |
PRM 2200 09043027908 |
Sand and Gravel |
05/01/2009 |
Paid |
$495.18 |
PRM 2200 09042226895 |
Sand and Gravel |
04/23/2009 |
Paid |
$442.20 |
PRM 2200 09042126737 |
Sand and Gravel |
04/22/2009 |
Paid |
$2,020.17 |
PRM 2200 09042026482 |
Sand and Gravel |
04/21/2009 |
Paid |
$238.92 |
PRM 2200 09041425768 |
Sand and Gravel |
04/15/2009 |
Paid |
$1,076.76 |
PRM 2200 09040825015 |
Sand and Gravel |
04/09/2009 |
Paid |
$1,095.46 |
PRM 2200 09040724787 |
Sand and Gravel |
04/08/2009 |
Paid |
$867.64 |
PRM 2200 09040624584 |
Sand and Gravel |
04/07/2009 |
Paid |
$2,097.88 |
PRM 2200 09040224090 |
Sand and Gravel |
04/03/2009 |
Paid |
$2,033.99 |
PRM 2200 09032422676 |
Sand and Gravel |
03/25/2009 |
Paid |
$3,880.75 |
PRM 2200 09032022353 |
Sand and Gravel |
03/23/2009 |
Paid |
$2,507.89 |
PRM 2200 09031221363 |
Sand and Gravel |
03/13/2009 |
Paid |
$2,027.08 |
PRM 2200 09030920721 |
Sand and Gravel |
03/10/2009 |
Paid |
$2,025.18 |
PRM 2200 09030420145 |
Sand and Gravel |
03/05/2009 |
Paid |
$3,158.51 |
PRM 2200 09030319885 |
Sand and Gravel |
03/04/2009 |
Paid |
$711.79 |
PRM 2200 09022519294 |
Sand and Gravel |
02/26/2009 |
Paid |
$1,836.01 |
PRM 2200 09022018748 |
Sand and Gravel |
02/23/2009 |
Paid |
$1,279.46 |
PRM 2200 09022018781 |
Sand and Gravel |
02/23/2009 |
Paid |
$1,896.46 |
PRM 2200 09021918530 |
Sand and Gravel |
02/20/2009 |
Paid |
$1,829.61 |
PRM 2200 09021718126 |
Sand and Gravel |
02/18/2009 |
Paid |
$1,386.37 |
PRM 2200 09021217767 |
Sand and Gravel |
02/13/2009 |
Paid |
$363.40 |
PRM 2200 09012715238 |
Sand and Gravel |
01/28/2009 |
Paid |
$4,054.82 |
PRM 2200 09011614136 |
Sand and Gravel |
01/20/2009 |
Paid |
$1,433.86 |
PRM 2200 09011413696 |
Sand and Gravel |
01/15/2009 |
Paid |
$1,241.96 |
PRM 2200 09010712630 |
Sand and Gravel |
01/08/2009 |
Paid |
$2,021.60 |
PRM 2200 09010612355 |
Sand and Gravel |
01/07/2009 |
Paid |
$10,181.05 |
PRM 2200 08122211213 |
Sand and Gravel |
12/23/2008 |
Paid |
$935.37 |
PRM 2200 08121510576 |
Sand and Gravel |
12/16/2008 |
Paid |
$1,585.13 |
PRM 2200 08120509259 |
Sand and Gravel |
12/08/2008 |
Paid |
$1,870.46 |
PRM 2200 08120409028 |
Sand and Gravel |
12/05/2008 |
Paid |
$739.66 |
PRM 2200 08120308858 |
Sand and Gravel |
12/04/2008 |
Paid |
$946.37 |
PRM 2200 08120208603 |
Sand and Gravel |
12/03/2008 |
Paid |
$2,558.44 |
PRM 2200 08112508006 |
Sand and Gravel |
11/26/2008 |
Paid |
$1,831.18 |
PRM 2200 08111306070 |
Sand and Gravel |
11/14/2008 |
Paid |
$2,082.44 |
PRM 2200 08111306071 |
Sand and Gravel |
11/14/2008 |
Paid |
$1,043.19 |
PRM 2200 08110505156 |
Sand and Gravel |
11/06/2008 |
Paid |
$1,375.74 |
PRM 2200 08102804043 |
Sand and Gravel |
10/29/2008 |
Paid |
$313.14 |
PRM 2200 08102804044 |
Sand and Gravel |
10/29/2008 |
Paid |
$3,150.61 |
PRM 2200 08102102978 |
Sand and Gravel |
10/22/2008 |
Paid |
$1,950.37 |
PRM 2200 08102102979 |
Sand and Gravel |
10/22/2008 |
Paid |
$1,876.20 |
PRM 2200 08100600739 |
Sand and Gravel |
10/07/2008 |
Paid |
$556.62 |
PRM 2200 08093056107 |
Sand and Gravel |
10/01/2008 |
Paid |
$431.97 |