PRM 6200 16111604549 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/17/2016 |
Paid |
$103,122.88 |
PRM 6200 16111604551 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/17/2016 |
Paid |
$3,528.00 |
PRM 6200 16111604553 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/17/2016 |
Paid |
$2,175.04 |
PRM 6200 16111104142 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/14/2016 |
Paid |
$435.12 |
PRM 6200 16110803946 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/09/2016 |
Paid |
$1,100.40 |
PRM 6200 16110703836 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/08/2016 |
Paid |
$61,684.00 |
PRM 6200 16110303612 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2016 |
Paid |
$20,621.44 |
PRM 6200 16110303613 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2016 |
Paid |
$12,734.96 |
PRM 6200 16110303614 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2016 |
Paid |
$13,134.80 |
PRM 6200 16110303616 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2016 |
Paid |
$1,000.72 |
PRM 6200 16110303618 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2016 |
Paid |
$5,899.04 |
PRM 6200 16110303620 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2016 |
Paid |
$2,419.26 |
PRM 6200 16110303621 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2016 |
Paid |
$41,777.68 |
PRM 6200 16110303622 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2016 |
Paid |
$14,518.80 |
PRM 6200 16110303623 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2016 |
Paid |
$23,898.17 |
PRM 6200 16110303624 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2016 |
Paid |
$3,234.32 |
PRM 6200 16110303625 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2016 |
Paid |
$20,258.27 |
PRM 6200 16110303626 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2016 |
Paid |
$402.64 |
PRM 6200 16110203445 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/03/2016 |
Paid |
$9,650.48 |
PRM 6200 16110103190 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2016 |
Paid |
$1,119.44 |
PRM 6200 16110103191 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2016 |
Paid |
$14,833.84 |
PRM 6200 16110103192 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2016 |
Paid |
$126.56 |
PRM 6200 16110103194 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2016 |
Paid |
$5,454.96 |
PRM 6200 16110103195 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2016 |
Paid |
$6,167.84 |
PRM 6200 16110103196 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2016 |
Paid |
$1,514.24 |
PRM 6200 16110103203 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2016 |
Paid |
$16,971.09 |
PRM 6200 16110103204 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2016 |
Paid |
$3,949.68 |
PRM 6200 16102602578 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/27/2016 |
Paid |
$483.28 |
PRM 6200 16102001935 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/21/2016 |
Paid |
$23,634.24 |
PRM 6200 16101401081 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/20/2016 |
Paid |
$20,957.07 |
PRM 6200 16101401083 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/20/2016 |
Paid |
$45,689.84 |
PRM 6200 16101701266 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/20/2016 |
Paid |
$1,631.28 |
PRM 6200 16101701268 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/20/2016 |
Paid |
$328.16 |
PRM 6200 16101701270 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/20/2016 |
Paid |
$538.72 |
PRM 6200 16101801480 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/20/2016 |
Paid |
$440.72 |
PRM 6200 16101901738 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/20/2016 |
Paid |
$1,550.08 |
PRM 6200 16101901740 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/20/2016 |
Paid |
$1,354.08 |
PRM 6200 16100400305 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/05/2016 |
Paid |
$85,637.57 |
PRM 6200 16092739077 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/28/2016 |
Paid |
$696.64 |
PRM 6200 16092138467 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/22/2016 |
Paid |
$15,331.48 |
PRM 6200 16091637863 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/19/2016 |
Paid |
$154,911.35 |
PRM 6200 16091437567 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/15/2016 |
Paid |
$1,233.12 |
PRM 6200 16091337408 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/14/2016 |
Paid |
$18,987.56 |
PRM 6200 16091337410 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/14/2016 |
Paid |
$27,123.63 |
PRM 6200 16091337412 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/14/2016 |
Paid |
$144,229.98 |
PRM 6200 16091337414 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/14/2016 |
Paid |
$86,258.48 |
PRM 6200 16091337416 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/14/2016 |
Paid |
$898.24 |
PRM 6200 16090236208 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/06/2016 |
Paid |
$81,350.64 |
PRM 6200 16082535362 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/26/2016 |
Paid |
$37,273.04 |
PRM 6200 16082535364 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/26/2016 |
Paid |
$61,793.76 |
PRM 6200 16082535366 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/26/2016 |
Paid |
$140.00 |
PRM 6200 16082535368 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/26/2016 |
Paid |
$43,904.00 |
PRM 6200 16082535370 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/26/2016 |
Paid |
$73,446.36 |
PRM 6200 16082234792 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/23/2016 |
Paid |
$107,528.40 |
PRM 6200 16081534011 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/16/2016 |
Paid |
$62,943.37 |
PRM 6200 16080933459 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/10/2016 |
Paid |
$193,610.01 |
PRM 6200 16080332767 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/04/2016 |
Paid |
$18,957.55 |
PRM 6200 16080332769 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/04/2016 |
Paid |
$302,487.06 |
PRM 6200 16080332771 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/04/2016 |
Paid |
$1,857.52 |
PRM 6200 16080332773 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/04/2016 |
Paid |
$649.60 |
PRM 6200 16080332775 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/04/2016 |
Paid |
$2,799.32 |
PRM 6200 16080232507 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/03/2016 |
Paid |
$5,843.60 |
PRM 6200 16072932144 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/01/2016 |
Paid |
$81,055.12 |
PRM 6200 16071931328 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/20/2016 |
Paid |
$20,601.28 |
PRM 6200 16071931329 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/20/2016 |
Paid |
$16,829.20 |
PRM 6200 16071931330 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/20/2016 |
Paid |
$9,622.18 |
PRM 6200 16070529905 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/06/2016 |
Paid |
$34,321.83 |
PRM 6200 16070529906 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/06/2016 |
Paid |
$18,962.72 |
PRM 6200 16070529907 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/06/2016 |
Paid |
$9,682.55 |
PRM 6200 16070529908 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/06/2016 |
Paid |
$27,886.32 |
PRM 6200 16070529909 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/06/2016 |
Paid |
$711.20 |
PRM 6200 16070229759 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/05/2016 |
Paid |
$108,244.64 |
PRM 6200 16062829058 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/29/2016 |
Paid |
$35,962.64 |
PRM 6200 16062829060 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/29/2016 |
Paid |
$18,253.76 |
PRM 6200 16062829061 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/29/2016 |
Paid |
$223.44 |
PRM 6200 16062428606 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/27/2016 |
Paid |
$11,618.32 |
PRM 6200 16062228287 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/23/2016 |
Paid |
$79,368.80 |
PRM 6200 16061627647 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/17/2016 |
Paid |
$4,090.24 |
PRM 6200 16061627648 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/17/2016 |
Paid |
$19,177.76 |
PRM 6200 16061627650 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/17/2016 |
Paid |
$42,147.28 |
PRM 6200 16061627652 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/17/2016 |
Paid |
$4,238.64 |
PRM 6200 16061627653 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/17/2016 |
Paid |
$36,896.16 |
PRM 6200 16061627654 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/17/2016 |
Paid |
$1,632.40 |
PRM 6200 16061627655 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/17/2016 |
Paid |
$20,385.42 |
PRM 6200 16061527446 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/16/2016 |
Paid |
$39,884.88 |
PRM 6200 16061026937 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/13/2016 |
Paid |
$55,143.87 |
PRM 6200 16060926779 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/10/2016 |
Paid |
$57,437.52 |
PRM 6200 16060326303 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/06/2016 |
Paid |
$39,416.72 |
PRM 6200 16060126145 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/02/2016 |
Paid |
$83,617.52 |
PRM 6200 16060126149 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/02/2016 |
Paid |
$17,640.00 |
PRM 6200 16060126150 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/02/2016 |
Paid |
$15,244.32 |
PRM 6200 16060126151 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/02/2016 |
Paid |
$6,468.56 |
PRM 6200 16053126014 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/01/2016 |
Paid |
$1,758.96 |
PRM 6200 16052025251 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/23/2016 |
Paid |
$851.76 |
PRM 6200 16051124403 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/12/2016 |
Paid |
$143,588.48 |
PRM 6200 16051024263 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/11/2016 |
Paid |
$126,646.80 |
PRM 6200 16050924101 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/10/2016 |
Paid |
$9,577.68 |
PRM 6200 16042723321 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/28/2016 |
Paid |
$5,232.08 |
PRM 6200 16042723322 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/28/2016 |
Paid |
$12,875.52 |
PRM 6200 16042723323 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/28/2016 |
Paid |
$338.24 |
PRM 6200 16042723324 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/28/2016 |
Paid |
$24,197.60 |
PRM 6200 16042723325 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/28/2016 |
Paid |
$16,773.68 |
PRM 6200 16042623034 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/27/2016 |
Paid |
$2,285.92 |
PRM 6200 16041922149 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/20/2016 |
Paid |
$140,721.28 |
PRM 6200 16041922151 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/20/2016 |
Paid |
$61,390.78 |
PRM 6200 16041922153 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/20/2016 |
Paid |
$19,635.28 |
PRM 6200 16041221337 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$13,871.59 |
PRM 6200 16041221341 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$505.12 |
PRM 6200 16041221342 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$35,544.88 |
PRM 6200 16041221343 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$4,338.88 |
PRM 6200 16041221344 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$22,205.68 |
PRM 6200 16041221345 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$2,768.64 |
PRM 6200 16041221346 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$43,446.46 |
PRM 6200 16041221347 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$2,549.68 |
PRM 6200 16041221348 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$6,399.68 |
PRM 6200 16041221349 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$1,746.08 |
PRM 6200 16041221350 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$17,515.12 |
PRM 6200 16041221351 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$1,764.00 |
PRM 6200 16041221352 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$20,924.96 |
PRM 6200 16041221353 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$6,464.20 |
PRM 6200 16041221354 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$33,900.16 |
PRM 6200 16041221355 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/13/2016 |
Paid |
$1,537.76 |
PRM 6200 16040520733 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/06/2016 |
Paid |
$1,077.44 |
PRM 6200 16040120419 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/04/2016 |
Paid |
$3,375.40 |
PRM 6200 16040120421 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/04/2016 |
Paid |
$2,408.00 |
PRM 6200 16040120423 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/04/2016 |
Paid |
$22,204.96 |
PRM 6200 16032819586 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/29/2016 |
Paid |
$78,324.04 |
PRM 6200 16032819587 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/29/2016 |
Paid |
$1,784.72 |
PRM 6200 16032819588 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/29/2016 |
Paid |
$22,809.92 |
PRM 6200 16032819589 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/29/2016 |
Paid |
$3,953.04 |
PRM 6200 16032118847 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/22/2016 |
Paid |
$31,516.77 |
PRM 6200 16031718623 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/18/2016 |
Paid |
$1,200.08 |
PRM 6200 16031718626 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/18/2016 |
Paid |
$4,382.42 |
PRM 6200 16031618435 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/17/2016 |
Paid |
$507.36 |
PRM 6200 16031618436 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/17/2016 |
Paid |
$840.56 |
PRM 6200 16031618437 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/17/2016 |
Paid |
$115,869.98 |
GAX 6200 16030108100 |
|
03/14/2016 |
Paid |
($753.72) |
GAX 6200 16030108103 |
|
03/14/2016 |
Paid |
($708.84) |
GAX 6200 16030108106 |
|
03/14/2016 |
Paid |
($684.42) |
PRM 6200 16031117888 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2016 |
Paid |
$25,737.60 |
PRM 6200 16031017710 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/11/2016 |
Paid |
$156,530.46 |
PRM 6200 16030917465 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/10/2016 |
Paid |
$37,000.20 |
PRM 6200 16030917467 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/10/2016 |
Paid |
$17,884.72 |
PRM 6200 16030716906 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/08/2016 |
Paid |
$50,317.96 |
PRM 6200 16030416758 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/07/2016 |
Paid |
$66,478.48 |
PRM 6200 16022615821 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/29/2016 |
Paid |
$55,151.04 |
PRM 6200 16022515685 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$10,209.17 |
PRM 6200 16022515686 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$14,104.72 |
PRM 6200 16022515687 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$868.00 |
PRM 6200 16022515688 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$12,150.88 |
PRM 6200 16022515689 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$758.24 |
PRM 6200 16022515690 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$20,902.56 |
PRM 6200 16022515691 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$1,013.04 |
PRM 6200 16022515693 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$3,494.40 |
PRM 6200 16022515694 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$10,975.44 |
PRM 6200 16022515695 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$561.12 |
PRM 6200 16022515696 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$14,730.24 |
PRM 6200 16022515697 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$5,586.17 |
PRM 6200 16022515699 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$1,503.66 |
PRM 6200 16022515700 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2016 |
Paid |
$129,199.74 |
PRM 6200 16021614355 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/17/2016 |
Paid |
$1,394.96 |
PRM 6200 16021214191 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/16/2016 |
Paid |
$22,535.50 |
PRM 6200 16021114138 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/12/2016 |
Paid |
$19,048.40 |
PRM 6200 16021114139 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/12/2016 |
Paid |
$1,263.36 |
PRM 6200 16021114140 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/12/2016 |
Paid |
$856.80 |
PRM 6200 16020913833 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/10/2016 |
Paid |
$199,595.06 |
PRM 6200 16020112923 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/02/2016 |
Paid |
$120,182.72 |
PRM 6200 16012812750 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/29/2016 |
Paid |
$57,985.20 |
PRM 6200 16012812752 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/29/2016 |
Paid |
$54,573.68 |
PRM 6200 16011511382 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/19/2016 |
Paid |
$52,263.68 |
PRM 6200 16011110501 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/12/2016 |
Paid |
$60,082.96 |
PRM 6200 16010710172 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/08/2016 |
Paid |
$2,784.32 |
PRM 6200 16010710173 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/08/2016 |
Paid |
$506.80 |
PRM 6200 16010609949 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2016 |
Paid |
$2,754.64 |
PRM 6200 16010609965 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2016 |
Paid |
$2,254.00 |
PRM 6200 16010609966 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2016 |
Paid |
$857.92 |
PRM 6200 16010609967 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2016 |
Paid |
$4,683.28 |
PRM 6200 16010609968 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2016 |
Paid |
$5,118.30 |
PRM 6200 16010609969 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2016 |
Paid |
$3,286.64 |
PRM 6200 16010609973 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2016 |
Paid |
$37,213.12 |
PRM 6200 16010509757 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/06/2016 |
Paid |
$30,273.60 |
PRM 6200 16010509760 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/06/2016 |
Paid |
$7,393.12 |
PRM 6200 15122208790 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/23/2015 |
Paid |
$4,632.64 |
PRM 6200 15121808430 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/21/2015 |
Paid |
$25,576.88 |
PRM 6200 15121808432 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/21/2015 |
Paid |
$8,432.70 |
PRM 6200 15121508041 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/16/2015 |
Paid |
$23,041.20 |
PRM 6200 15121508043 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/16/2015 |
Paid |
$47,317.76 |
PRM 6200 15121508045 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/16/2015 |
Paid |
$4,776.24 |
PRM 6200 15121107555 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/14/2015 |
Paid |
$36,781.00 |
PRM 6200 15120206443 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/03/2015 |
Paid |
$4,784.80 |
PRM 6200 15113006066 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/01/2015 |
Paid |
$108,934.24 |
PRM 6200 15113006070 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/01/2015 |
Paid |
$37,816.24 |
PRM 6200 15113006071 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/01/2015 |
Paid |
$4,968.64 |
PRM 6200 15113006072 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/01/2015 |
Paid |
$351.12 |
PRM 6200 15113006073 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/01/2015 |
Paid |
$14,469.76 |
PRM 6200 15112405752 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/25/2015 |
Paid |
$2,922.48 |
PRM 6200 15112405777 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/25/2015 |
Paid |
$14,131.20 |
PRM 6200 15111304784 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/16/2015 |
Paid |
$39,868.67 |
PRM 6200 15111304786 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/16/2015 |
Paid |
$10,512.32 |
PRM 6200 15110504103 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/06/2015 |
Paid |
$17,693.76 |
PRM 6200 15110504105 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/06/2015 |
Paid |
$1,553.44 |
PRM 6200 15110504106 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/06/2015 |
Paid |
$19,468.40 |
PRM 6200 15110504107 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/06/2015 |
Paid |
$2,780.40 |
PRM 6200 15110504108 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/06/2015 |
Paid |
$11,639.60 |
PRM 6200 15110504109 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/06/2015 |
Paid |
$33,790.40 |
PRM 6200 15110504110 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/06/2015 |
Paid |
$64,967.76 |
PRM 6200 15110504111 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/06/2015 |
Paid |
$7,712.88 |
PRM 6200 15110504112 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/06/2015 |
Paid |
$4,263.28 |
PRM 6200 15110504113 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/06/2015 |
Paid |
$25,504.64 |
PRM 6200 15110403999 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/05/2015 |
Paid |
$5,736.08 |
PRM 6200 15110404001 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/05/2015 |
Paid |
$1,099.28 |
PRM 6200 15102703065 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/28/2015 |
Paid |
$2,616.24 |
PRM 6200 15102703066 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/28/2015 |
Paid |
$27,378.12 |
PRM 6200 15102703067 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/28/2015 |
Paid |
$17,314.64 |
PRM 6200 15101301057 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/14/2015 |
Paid |
$2,162.16 |
PRM 6200 15101301059 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/14/2015 |
Paid |
$6,446.16 |
PRM 6200 15101301061 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/14/2015 |
Paid |
$57,160.86 |
PRM 6200 15101301063 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/14/2015 |
Paid |
$23,303.68 |
PRM 6200 15101301069 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/14/2015 |
Paid |
$2,002.00 |
PRM 6200 15101301071 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/14/2015 |
Paid |
$8,537.18 |
PRM 6200 15100900872 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/12/2015 |
Paid |
$10,897.92 |
PRM 6200 15100500358 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/06/2015 |
Paid |
$500.64 |
PRM 6200 15100500359 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/06/2015 |
Paid |
$500.08 |
PRM 6200 15100500360 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/06/2015 |
Paid |
$1,225.84 |
PRM 6200 15100500361 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/06/2015 |
Paid |
$25,337.40 |
PRM 6200 15100500362 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/06/2015 |
Paid |
$1,232.56 |
PRM 6200 15100500363 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/06/2015 |
Paid |
$216,633.50 |
PRM 6200 15093040510 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/02/2015 |
Paid |
$4,146.24 |
PRM 6200 15092940257 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/30/2015 |
Paid |
$225,186.76 |
PRM 6200 15091638839 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/17/2015 |
Paid |
$462.56 |
PRM 6200 15091638841 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/17/2015 |
Paid |
$342.72 |
PRM 6200 15091438404 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/15/2015 |
Paid |
$60,377.52 |
PRM 6200 15091438405 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/15/2015 |
Paid |
$61,860.48 |
PRM 6200 15091438406 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/15/2015 |
Paid |
$3,983.28 |
PRM 6200 15091138277 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/14/2015 |
Paid |
$174,658.70 |
PRM 6200 15090938042 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/10/2015 |
Paid |
$123,275.54 |
PRM 6200 15090938044 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/10/2015 |
Paid |
$49,854.56 |
PRM 6200 15090137127 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/02/2015 |
Paid |
$108,527.68 |
PRM 6200 15090137131 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/02/2015 |
Paid |
$16,484.16 |
PRM 6200 15090137133 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/02/2015 |
Paid |
$843.92 |
PRM 6200 15090137135 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/02/2015 |
Paid |
$24,995.60 |
PRM 6200 15082836820 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/31/2015 |
Paid |
$60,369.28 |
PRM 6200 15082736688 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/28/2015 |
Paid |
$3,872.60 |
PRM 6200 15082436087 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/25/2015 |
Paid |
$2,868.24 |
PRM 6200 15082436089 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/25/2015 |
Paid |
$67,288.54 |
PRM 6200 15082436090 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/25/2015 |
Paid |
$39,469.92 |
PRM 6200 15082436091 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/25/2015 |
Paid |
$4,796.96 |
PRM 6200 15082436092 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/25/2015 |
Paid |
$30,488.64 |
PRM 6200 15082436093 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/25/2015 |
Paid |
$34,486.48 |
PRM 6200 15082035737 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/21/2015 |
Paid |
$2,786.00 |
PRM 6200 15082035738 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/21/2015 |
Paid |
$1,834.00 |
PRM 6200 15082035739 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/21/2015 |
Paid |
$673.68 |
PRM 6200 15082035740 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/21/2015 |
Paid |
$5,467.28 |
PRM 6200 15082035741 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/21/2015 |
Paid |
$1,153.60 |
PRM 6200 15082035742 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/21/2015 |
Paid |
$8,439.76 |
PRM 6200 15082035743 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/21/2015 |
Paid |
$1,302.56 |
PRM 6200 15082035744 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/21/2015 |
Paid |
$684.88 |
PRM 6200 15082035745 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/21/2015 |
Paid |
$2,856.94 |
PRM 6200 15082035746 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/21/2015 |
Paid |
$10,378.92 |
PRM 6200 15081435013 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/17/2015 |
Paid |
$346,733.66 |
PRM 6200 15081334871 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/14/2015 |
Paid |
$19,921.44 |
PRM 6200 15080734256 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/10/2015 |
Paid |
$43,907.85 |
PRM 6200 15080533980 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/06/2015 |
Paid |
$8,005.76 |
PRM 6200 15080533981 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/06/2015 |
Paid |
$49,372.78 |
PRM 6200 15080533982 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/06/2015 |
Paid |
$39,208.00 |
PRM 6200 15080533983 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/06/2015 |
Paid |
$2,849.84 |
PRM 6200 15080533984 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/06/2015 |
Paid |
$2,010.96 |
PRM 6200 15080533985 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/06/2015 |
Paid |
$9,002.00 |
PRM 6200 15080533986 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/06/2015 |
Paid |
$10,531.92 |
PRM 6200 15080333571 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/04/2015 |
Paid |
$1,642.48 |
PRM 6200 15073033275 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/31/2015 |
Paid |
$2,113.44 |
PRM 6200 15072933156 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/30/2015 |
Paid |
$61,028.80 |
PRM 6200 15072933158 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/30/2015 |
Paid |
$8,963.36 |
PRM 6200 15072933160 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/30/2015 |
Paid |
$1,932.56 |
PRM 6200 15072933162 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/30/2015 |
Paid |
$47,138.00 |
PRM 6200 15072332599 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/24/2015 |
Paid |
$7,568.40 |
PRM 6200 15072232424 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/23/2015 |
Paid |
$8,305.36 |
PRM 6200 15072232425 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/23/2015 |
Paid |
$33,519.36 |
PRM 6200 15072232426 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/23/2015 |
Paid |
$3,688.16 |
PRM 6200 15072132184 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/22/2015 |
Paid |
$33,445.57 |
PRM 6200 15072132185 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/22/2015 |
Paid |
$25,398.24 |
PRM 6200 15072132186 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/22/2015 |
Paid |
$40,711.44 |
PRM 6200 15072132187 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/22/2015 |
Paid |
$15,971.76 |
PRM 6200 15072132188 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/22/2015 |
Paid |
$14,148.40 |
PRM 6200 15072132192 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/22/2015 |
Paid |
$1,901.20 |
PRM 6200 15070730356 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/08/2015 |
Paid |
$52,059.84 |
PRM 6200 15070730368 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/08/2015 |
Paid |
$11,280.08 |
PRM 6200 15070730372 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/08/2015 |
Paid |
$1,355.20 |
PRM 6200 15070630176 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/07/2015 |
Paid |
$205.92 |
PRM 6200 15070630178 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/07/2015 |
Paid |
$45,614.76 |
PRM 6200 15062328827 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/24/2015 |
Paid |
$99,935.12 |
PRM 6200 15062228583 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/23/2015 |
Paid |
$56,455.74 |
PRM 6200 15061928484 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/22/2015 |
Paid |
$23,290.40 |
PRM 6200 15061527898 |
Asphaltic Concrete, Cold Laid |
06/16/2015 |
Paid |
$239.94 |
PRM 6200 15061527900 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/16/2015 |
Paid |
$595.84 |
PRM 6200 15061527902 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/16/2015 |
Paid |
$20,415.36 |
PRM 6200 15061527905 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/16/2015 |
Paid |
$5,401.76 |
PRM 6200 15061527907 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/16/2015 |
Paid |
$6,891.82 |
PRM 6200 15060226550 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/03/2015 |
Paid |
$23,124.08 |
PRM 6200 15052726081 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/28/2015 |
Paid |
$70,602.49 |
PRM 6200 15052726083 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/28/2015 |
Paid |
$73,979.92 |
PRM 6200 15052726085 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/28/2015 |
Paid |
$4,623.36 |
PRM 6200 15052726087 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/28/2015 |
Paid |
$558.32 |
PRM 6200 15052625937 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/27/2015 |
Paid |
$67,785.76 |
PRM 6200 15051224572 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/13/2015 |
Paid |
$4,206.77 |
PRM 6200 15050523705 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/06/2015 |
Paid |
$317,374.10 |
PRM 6200 15050523707 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/06/2015 |
Paid |
$10,410.96 |
PRM 6200 15042822870 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/29/2015 |
Paid |
$35,310.77 |
PRM 6200 15042822872 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/29/2015 |
Paid |
$77,561.97 |
PRM 6200 15042422527 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/27/2015 |
Paid |
$1,818.32 |
PRM 6200 15042222217 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/23/2015 |
Paid |
$100,358.30 |
PRM 6200 15042122049 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/22/2015 |
Paid |
$265,708.09 |
PRM 6200 15041321000 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/14/2015 |
Paid |
$96,574.58 |
PRM 6200 15040820582 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/09/2015 |
Paid |
$22,191.68 |
PRM 6200 15040320067 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/06/2015 |
Paid |
$59,967.68 |
PRM 6200 15032719384 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/30/2015 |
Paid |
$3,413.76 |
PRM 6200 15032619193 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/27/2015 |
Paid |
$94,248.30 |
PRM 6200 15031918134 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/20/2015 |
Paid |
$43,957.76 |
PRM 6200 15031317487 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/16/2015 |
Paid |
$80,203.80 |
PRM 6200 15031217398 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/13/2015 |
Paid |
$75,837.84 |
PRM 6200 15030916784 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/10/2015 |
Paid |
$708.96 |
PRM 6200 15030416347 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/05/2015 |
Paid |
$115,819.76 |
PRM 6200 15030416348 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/05/2015 |
Paid |
$1,029.84 |
PRM 6200 15022515585 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/26/2015 |
Paid |
$112,728.56 |
PRM 6200 15021114067 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/12/2015 |
Paid |
$135,102.10 |
PRM 6200 15020312928 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/04/2015 |
Paid |
$6,252.96 |
PRM 6200 15012211812 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/23/2015 |
Paid |
$11,945.36 |
PRM 6200 15011511063 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/16/2015 |
Paid |
$158,325.91 |
PRM 6200 15011511066 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/16/2015 |
Paid |
$418.32 |
PRM 6200 15010209699 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/05/2015 |
Paid |
$85,225.28 |
PRM 6200 14123009313 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/31/2014 |
Paid |
$4,497.36 |
PRM 6200 14122308718 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/26/2014 |
Paid |
$6,510.00 |
PRM 6200 14121808082 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/19/2014 |
Paid |
$70,189.28 |
PRM 6200 14121808084 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/19/2014 |
Paid |
$238,448.41 |
PRM 6200 14112105769 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/24/2014 |
Paid |
$70,574.56 |
PRM 6200 14112105771 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/24/2014 |
Paid |
$88,822.16 |
PRM 6200 14112105773 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/24/2014 |
Paid |
$1,546.16 |
PRM 6200 14112105775 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/24/2014 |
Paid |
$1,065.68 |
PRM 6200 14110304034 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2014 |
Paid |
$16,463.87 |
PRM 6200 14110304036 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2014 |
Paid |
$21,643.29 |
PRM 6200 14110304038 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2014 |
Paid |
$76,926.64 |
PRM 6200 14110304040 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/04/2014 |
Paid |
$166,283.69 |
PRM 6200 14101401636 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/15/2014 |
Paid |
$30,750.70 |
PRM 6200 14101401640 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/15/2014 |
Paid |
$8,303.68 |
PRM 6200 14100800913 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/09/2014 |
Paid |
$4,108.54 |
PRM 6200 14100800914 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/09/2014 |
Paid |
$2,935.52 |
PRM 6200 14100800915 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/09/2014 |
Paid |
$29,433.37 |
PRM 6200 14100800916 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/09/2014 |
Paid |
$15,783.24 |
PRM 6200 14100800917 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/09/2014 |
Paid |
$278.88 |
PRM 6200 14100800918 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/09/2014 |
Paid |
$48,895.85 |
PRM 6200 14100800919 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/09/2014 |
Paid |
$29,656.24 |
PRM 6200 14100800920 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/09/2014 |
Paid |
$523.04 |
PRM 6200 14100800921 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/09/2014 |
Paid |
$16,656.77 |
PRM 6200 14100800922 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/09/2014 |
Paid |
$711.76 |
PRM 6200 14100700683 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/08/2014 |
Paid |
$2,123.52 |
PRM 6200 14100700684 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/08/2014 |
Paid |
$35,035.21 |
PRM 6200 14100700686 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/08/2014 |
Paid |
$33,977.04 |
PRM 6200 14100700687 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/08/2014 |
Paid |
$460.32 |
PRM 6200 14100700688 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/08/2014 |
Paid |
$5,754.48 |
PRM 6200 14100100081 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/02/2014 |
Paid |
$27,999.09 |
PRM 6200 14092938472 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/01/2014 |
Paid |
$2,371.04 |
PRM 6200 14092938474 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/01/2014 |
Paid |
$558.32 |
PRM 6200 14092938480 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/01/2014 |
Paid |
$29,806.56 |
PRM 6200 14092938483 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/01/2014 |
Paid |
$1,921.92 |
PRM 6200 14092938487 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/01/2014 |
Paid |
$400,519.39 |
PRM 6200 14093038662 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/01/2014 |
Paid |
$87,129.28 |
PRM 6200 14093038663 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/01/2014 |
Paid |
$3,887.52 |
PRM 6200 14092237494 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/23/2014 |
Paid |
$130,004.05 |
PRM 6200 14090936295 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/10/2014 |
Paid |
$1,032.08 |
PRM 6200 14090936297 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/10/2014 |
Paid |
$10,970.63 |
PRM 6200 14090936304 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/10/2014 |
Paid |
$40,803.84 |
PRM 6200 14090936306 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/10/2014 |
Paid |
$71,528.80 |
PRM 6200 14090936308 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/10/2014 |
Paid |
$103.04 |
PRM 6200 14090235506 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/03/2014 |
Paid |
$43,634.08 |
PRM 6200 14090235508 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/03/2014 |
Paid |
$4,331.60 |
PRM 6200 14090235510 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/03/2014 |
Paid |
$70,326.83 |
PRM 6200 14090235513 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/03/2014 |
Paid |
$71,312.64 |
PRM 6200 14090235515 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/03/2014 |
Paid |
$1,374.80 |
PRM 6200 14082634740 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/27/2014 |
Paid |
$2,722.16 |
PRM 6200 14082634743 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/27/2014 |
Paid |
$5,622.96 |
PRM 6200 14082634745 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/27/2014 |
Paid |
$1,719.20 |
PRM 6200 14082634747 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/27/2014 |
Paid |
$746.66 |
PRM 6200 14082634751 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/27/2014 |
Paid |
$18,618.10 |
PRM 6200 14082634753 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/27/2014 |
Paid |
$481.14 |
PRM 6200 14082634755 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/27/2014 |
Paid |
$413.16 |
PRM 6200 14082634757 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/27/2014 |
Paid |
$122,935.63 |
PRM 6200 14082634758 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/27/2014 |
Paid |
$105,323.54 |
PRM 6200 14080832952 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/11/2014 |
Paid |
$80,706.98 |
PRM 6200 14073132085 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/01/2014 |
Paid |
$620.48 |
PRM 6200 14073132091 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/01/2014 |
Paid |
$1,515.92 |
PRM 6200 14073132093 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/01/2014 |
Paid |
$1,405.04 |
PRM 6200 14073132096 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/01/2014 |
Paid |
$2,411.36 |
PRM 6200 14073132100 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/01/2014 |
Paid |
$24,117.52 |
PRM 6200 14073132103 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/01/2014 |
Paid |
$137,250.21 |
PRM 6200 14073031890 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/31/2014 |
Paid |
$1,847.44 |
PRM 6200 14073031891 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/31/2014 |
Paid |
$5,582.24 |
PRM 6200 14072431181 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/25/2014 |
Paid |
$62,808.00 |
PRM 6200 14072431183 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/25/2014 |
Paid |
$128,663.35 |
PRM 2200 14071629827 |
ASPHALTIC CONCRETE PAVEMENT, HOT MIX-COLD LAID, IN |
07/17/2014 |
Paid |
$2,981.50 |
PRM 6200 14071629923 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/17/2014 |
Paid |
$33,386.08 |
PRM 6200 14071629925 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/17/2014 |
Paid |
$125,906.41 |
PRM 6200 14071529641 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2014 |
Paid |
$1,327.20 |
PRM 6200 14071529642 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2014 |
Paid |
$1,379.84 |
PRM 6200 14071529643 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2014 |
Paid |
$1,169.84 |
PRM 6200 14071429326 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/15/2014 |
Paid |
$112,290.64 |
PRM 6200 14071429328 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/15/2014 |
Paid |
$2,934.96 |
PRM 6200 14070928866 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$26,700.80 |
PRM 6200 14070928867 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$1,024.24 |
PRM 6200 14070928868 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$1,279.60 |
PRM 6200 14070928869 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$1,844.08 |
PRM 6200 14070928870 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$6,707.12 |
PRM 6200 14070928872 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$1,954.96 |
PRM 6200 14070928873 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$3,134.88 |
PRM 6200 14070928874 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$337.68 |
PRM 6200 14070928875 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$2,019.92 |
PRM 6200 14070928876 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$1,402.24 |
PRM 6200 14070928877 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$21,154.56 |
PRM 6200 14070928878 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$8,070.18 |
PRM 6200 14070928879 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$27,367.76 |
PRM 6200 14070928880 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/10/2014 |
Paid |
$2,507.68 |
PRM 6200 14070728577 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/09/2014 |
Paid |
$230,190.10 |
PRM 6200 14062627681 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/27/2014 |
Paid |
$1,173.20 |
PRM 6200 14062427379 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/26/2014 |
Paid |
$24,719.52 |
PRM 6200 14062527561 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/26/2014 |
Paid |
$3,590.16 |
PRM 6200 14062527579 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/26/2014 |
Paid |
$283.92 |
PRM 6200 14062427376 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/25/2014 |
Paid |
$2,805.04 |
PRM 6200 14062427377 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/25/2014 |
Paid |
$30,369.92 |
PRM 6200 14062427378 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/25/2014 |
Paid |
$2,790.48 |
PRM 6200 14062427380 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/25/2014 |
Paid |
$23,658.88 |
PRM 6200 14062427382 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/25/2014 |
Paid |
$11,064.48 |
PRM 6200 14062427383 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/25/2014 |
Paid |
$37,917.60 |
PRM 6200 14062427384 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/25/2014 |
Paid |
$43,179.92 |
PRM 6200 14062427388 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/25/2014 |
Paid |
$3,831.52 |
PRM 6200 14060625484 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/09/2014 |
Paid |
$3,783.36 |
PRM 6200 14060625486 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/09/2014 |
Paid |
$139,673.52 |
PRM 6200 14053024862 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/02/2014 |
Paid |
$159,688.28 |
PRM 6200 14053024864 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/02/2014 |
Paid |
$93,821.88 |
PRM 6200 14052824510 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/29/2014 |
Paid |
$20,870.64 |
PRM 6200 14051323133 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/14/2014 |
Paid |
$21,828.46 |
PRM 6200 14051323135 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/14/2014 |
Paid |
$71,980.16 |
PRM 6200 14051222953 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/13/2014 |
Paid |
$121,021.60 |
PRM 6200 14051222958 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/13/2014 |
Paid |
$5,470.71 |
PRM 6200 14051222960 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/13/2014 |
Paid |
$1,738.80 |
PRM 6200 14051222963 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/13/2014 |
Paid |
$68,583.84 |
PRM 6200 14051222964 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/13/2014 |
Paid |
$2,816.24 |
PRM 6200 14051222965 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/13/2014 |
Paid |
$18,194.12 |
PRM 6200 14051222967 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/13/2014 |
Paid |
$4,901.23 |
PRM 6200 14050922781 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/12/2014 |
Paid |
$17,528.00 |
PRM 6200 14050622251 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/07/2014 |
Paid |
$14,724.08 |
PRM 6200 14050221849 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/05/2014 |
Paid |
$67,195.36 |
PRM 6200 14050221851 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/05/2014 |
Paid |
$67,048.90 |
PRM 6200 14042421062 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/25/2014 |
Paid |
$47,008.03 |
PRM 6200 14042320956 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/24/2014 |
Paid |
$6,876.16 |
PRM 6200 14042320958 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/24/2014 |
Paid |
$16,747.76 |
PRM 6200 14041620321 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/17/2014 |
Paid |
$390,369.75 |
PRM 6200 14041419936 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/15/2014 |
Paid |
$703.92 |
PRM 6200 14040919617 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/10/2014 |
Paid |
$53,555.60 |
PRM 6200 14040519056 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/07/2014 |
Paid |
$2,199.12 |
PRM 6200 14040519058 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/07/2014 |
Paid |
$1,939.28 |
PRM 6200 14040519060 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/07/2014 |
Paid |
$1,550.08 |
PRM 6200 14040519062 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/07/2014 |
Paid |
$23,159.92 |
PRM 6200 14033118213 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/01/2014 |
Paid |
$26,560.80 |
PRM 6200 14032617745 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/27/2014 |
Paid |
$2,780.40 |
PRM 6200 14032617747 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/27/2014 |
Paid |
$1,387.12 |
PRM 6200 14032617749 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/27/2014 |
Paid |
$10,622.08 |
PRM 6200 14032617751 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/27/2014 |
Paid |
$33,264.00 |
PRM 6200 14031216262 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/13/2014 |
Paid |
$27,611.05 |
PRM 6200 14031216264 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/13/2014 |
Paid |
$2,575.44 |
PRM 6200 14031015874 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/11/2014 |
Paid |
$36,484.00 |
PRM 6200 14030715586 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/10/2014 |
Paid |
$100,640.56 |
PRM 6200 14022114315 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/24/2014 |
Paid |
$106,717.89 |
PRM 6200 14021813923 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/19/2014 |
Paid |
$34,077.58 |
PRM 6200 14021113175 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/12/2014 |
Paid |
$7,953.68 |
PRM 6200 14021113179 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/12/2014 |
Paid |
$1,030.96 |
PRM 6200 14021113181 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/12/2014 |
Paid |
$173,424.76 |
PRM 6200 14021113183 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/12/2014 |
Paid |
$38,264.80 |
PRM 6200 14012711724 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/28/2014 |
Paid |
$81,513.04 |
PRM 6200 14010810202 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/09/2014 |
Paid |
$43,120.56 |
PRM 6200 13121007380 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/11/2013 |
Paid |
$43,166.48 |
PRM 6200 13121007382 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/11/2013 |
Paid |
$6,830.88 |
PRM 6200 13121007384 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/11/2013 |
Paid |
$118,851.08 |
PRM 6200 13121007386 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/11/2013 |
Paid |
$4,560.08 |
PRM 6200 13121007389 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/11/2013 |
Paid |
$10,052.56 |
PRM 6200 13121007391 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/11/2013 |
Paid |
$27,091.12 |
PRM 6200 13120607072 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/09/2013 |
Paid |
$28,567.98 |
PRM 6200 13112606288 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/27/2013 |
Paid |
$7,512.40 |
PRM 6200 13112506062 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/26/2013 |
Paid |
$19,921.62 |
PRM 6200 13111305186 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/14/2013 |
Paid |
$253,990.80 |
PRM 6200 13111205004 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/13/2013 |
Paid |
$32,089.12 |
PRM 6200 13110404164 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/05/2013 |
Paid |
$6,562.08 |
PRM 6200 13110404166 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/05/2013 |
Paid |
$6,823.04 |
PRM 6200 13110404168 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/05/2013 |
Paid |
$290.64 |
PRM 6200 13110404170 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/05/2013 |
Paid |
$124.88 |
PRM 6200 13102202470 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/23/2013 |
Paid |
$8,589.84 |
PRM 6200 13102102222 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/22/2013 |
Paid |
$2,819.48 |
PRM 6200 13102102225 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/22/2013 |
Paid |
$122,359.15 |
PRM 6200 13101501484 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/16/2013 |
Paid |
$8,130.64 |
PRM 6200 13100400541 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/07/2013 |
Paid |
$30,436.56 |
PRM 6200 13100400544 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/07/2013 |
Paid |
$143,275.61 |
PRM 6200 13091835576 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/19/2013 |
Paid |
$121,984.70 |
PRM 6200 13091835578 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/19/2013 |
Paid |
$50,939.84 |
PRM 6200 13091635301 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/17/2013 |
Paid |
$261,226.97 |
PRM 6200 13091134676 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/12/2013 |
Paid |
$167,664.44 |
PRM 6200 13091034469 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/11/2013 |
Paid |
$12,824.00 |
PRM 6200 13091034471 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/11/2013 |
Paid |
$20,928.88 |
PRM 6200 13091034473 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/11/2013 |
Paid |
$22,588.16 |
PRM 6200 13091034475 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/11/2013 |
Paid |
$18,004.56 |
PRM 6200 13091034477 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/11/2013 |
Paid |
$58,718.24 |
PRM 6200 13091034479 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/11/2013 |
Paid |
$1,182.16 |
PRM 6200 13091034481 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/11/2013 |
Paid |
$36,279.04 |
PRM 6200 13090533998 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/06/2013 |
Paid |
$181,808.83 |
PRM 6200 13090333771 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/04/2013 |
Paid |
$4,709.60 |
PRM 6200 13082232979 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/23/2013 |
Paid |
$88,738.04 |
PRM 6200 13081332136 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/14/2013 |
Paid |
$56,685.60 |
PRM 6200 13080131038 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/02/2013 |
Paid |
$153,945.52 |
PRM 6200 13072430064 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/25/2013 |
Paid |
$249,440.11 |
PRM 6200 13072329896 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/24/2013 |
Paid |
$1,920.24 |
PRM 6200 13072329900 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/24/2013 |
Paid |
$41,558.81 |
PRM 6200 13071628545 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/17/2013 |
Paid |
$36,702.96 |
PRM 6200 13071528306 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$1,690.08 |
PRM 6200 13071528308 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$2,434.32 |
PRM 6200 13071528311 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$6,316.24 |
PRM 6200 13071528313 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$1,872.08 |
PRM 6200 13071528315 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$51,462.88 |
PRM 6200 13071528318 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$15,980.72 |
PRM 6200 13071528319 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$3,900.96 |
PRM 6200 13071528321 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$53,566.20 |
PRM 6200 13071528323 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$32,524.35 |
PRM 6200 13071528326 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2013 |
Paid |
$46,318.06 |
PRM 6200 13062827028 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/01/2013 |
Paid |
$280,290.93 |
PRM 6200 13062426574 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/25/2013 |
Paid |
$51,868.10 |
PRM 6200 13062426576 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/25/2013 |
Paid |
$56,146.72 |
PRM 6200 13061425806 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/17/2013 |
Paid |
$34,049.09 |
PRM 6200 13061125432 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/12/2013 |
Paid |
$143,032.95 |
PRM 6200 13061125434 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/12/2013 |
Paid |
$239.68 |
PRM 6200 13061125436 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/12/2013 |
Paid |
$31,076.08 |
PRM 6200 13061125438 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/12/2013 |
Paid |
$32,961.00 |
PRM 6200 13061125440 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/12/2013 |
Paid |
$1,662.08 |
PRM 6200 13061125442 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/12/2013 |
Paid |
$38,937.92 |
PRM 6200 13061125444 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/12/2013 |
Paid |
$5,925.36 |
PRM 6200 13061125446 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/12/2013 |
Paid |
$36,031.83 |
PRM 6200 13060524995 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/06/2013 |
Paid |
$23,186.63 |
PRM 6200 13060524999 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/06/2013 |
Paid |
$50,846.88 |
PRM 6200 13060424830 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/05/2013 |
Paid |
$26,433.51 |
PRM 6200 13051723143 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/20/2013 |
Paid |
$19,707.16 |
PRM 6200 13051723145 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/20/2013 |
Paid |
$329,199.55 |
PRM 6200 13050121645 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/02/2013 |
Paid |
$85,287.54 |
PRM 6200 13042621192 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/29/2013 |
Paid |
$122,926.98 |
PRM 6200 13041720023 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/18/2013 |
Paid |
$11,656.26 |
PRM 6200 13041720024 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/18/2013 |
Paid |
$288,006.06 |
PRM 6200 13041720026 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/18/2013 |
Paid |
$1,195.92 |
PRM 6200 13040418885 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/05/2013 |
Paid |
$21,296.22 |
PRM 6200 13032617957 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/27/2013 |
Paid |
$43,202.94 |
PRM 6200 13032617959 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/27/2013 |
Paid |
$1,665.84 |
PRM 6200 13032617961 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/27/2013 |
Paid |
$2,722.50 |
PRM 6200 13032617963 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/27/2013 |
Paid |
$136,566.54 |
PRM 6200 13031316825 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2013 |
Paid |
$25,530.78 |
PRM 6200 13031316826 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2013 |
Paid |
$5,495.16 |
PRM 6200 13031316827 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2013 |
Paid |
$4,467.54 |
PRM 6200 13031316829 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2013 |
Paid |
$2,407.02 |
PRM 6200 13031316831 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2013 |
Paid |
$62,623.44 |
PRM 6200 13031316833 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2013 |
Paid |
$23,135.64 |
PRM 6200 13022615039 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$23,827.32 |
PRM 6200 13022615042 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$3,833.94 |
PRM 6200 13022615044 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$4,975.08 |
PRM 6200 13022615046 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$2,770.68 |
PRM 6200 13022615048 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$7,458.66 |
PRM 6200 13022615050 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$57,996.80 |
PRM 6200 13022615052 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$2,282.28 |
PRM 6200 13022615055 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$4,654.32 |
PRM 6200 13022615058 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$4,356.00 |
PRM 6200 13022615060 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$2,581.26 |
PRM 6200 13022615062 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$331.98 |
PRM 6200 13022615065 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$3,802.26 |
PRM 6200 13022615070 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$2,956.80 |
PRM 6200 13022615073 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$2,057.22 |
PRM 6200 13022615077 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$5,261.52 |
PRM 6200 13022615079 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$29,419.30 |
PRM 6200 13022615083 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$28,076.80 |
PRM 6200 13022615086 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$25,630.08 |
PRM 6200 13022615088 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$6,022.50 |
PRM 6200 13022615096 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2013 |
Paid |
$88,039.38 |
PRM 6200 13022014450 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/21/2013 |
Paid |
$11,452.32 |
PRM 6200 13022014452 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/21/2013 |
Paid |
$69,655.74 |
PRM 6200 13020413061 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/05/2013 |
Paid |
$70,105.86 |
PRM 6200 13013112807 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/01/2013 |
Paid |
$21,320.64 |
PRM 6200 13013012680 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/31/2013 |
Paid |
$81,467.10 |
PRM 6200 13012812312 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/29/2013 |
Paid |
$30,992.94 |
PRM 6200 13012812314 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/29/2013 |
Paid |
$47,605.14 |
PRM 6200 13012812316 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/29/2013 |
Paid |
$3,843.18 |
PRM 6200 13012412030 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/25/2013 |
Paid |
$27,873.78 |
PRM 6200 13010409483 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$11,538.12 |
PRM 6200 13010409485 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$6,285.84 |
PRM 6200 13010409487 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$15,145.68 |
PRM 6200 13010409489 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$35,777.28 |
PRM 6200 13010409491 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$23,856.36 |
PRM 6200 13010409493 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$2,412.96 |
PRM 6200 13010409495 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$5,352.60 |
PRM 6200 13010409497 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$59,192.10 |
PRM 6200 13010409499 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/07/2013 |
Paid |
$57,283.38 |
PRM 6200 12122608506 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/27/2012 |
Paid |
$61,626.18 |
PRM 6200 12121908208 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/20/2012 |
Paid |
$134,573.34 |
PRM 6200 12121808065 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/19/2012 |
Paid |
$4,948.68 |
PRM 6200 12121707940 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/18/2012 |
Paid |
$22,407.66 |
PRM 6200 12121707942 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/18/2012 |
Paid |
$130,112.40 |
PRM 6200 12112906274 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/30/2012 |
Paid |
$100,722.62 |
PRM 6200 12112705901 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/28/2012 |
Paid |
$2,040.72 |
PRM 6200 12112705903 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/28/2012 |
Paid |
$13,327.38 |
PRM 6200 12112705905 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/28/2012 |
Paid |
$2,348.94 |
PRM 6200 12112705907 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/28/2012 |
Paid |
$12,737.34 |
PRM 6200 12111405049 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/15/2012 |
Paid |
$137,957.06 |
PRM 6200 12110103814 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2012 |
Paid |
$19,443.60 |
PRM 6200 12110103816 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2012 |
Paid |
$44,486.64 |
PRM 6200 12103003606 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/31/2012 |
Paid |
$2,313.96 |
PRM 6200 12103003608 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/31/2012 |
Paid |
$1,551.00 |
PRM 6200 12103003610 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/31/2012 |
Paid |
$33,784.74 |
PRM 6200 12101701966 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/18/2012 |
Paid |
$91,375.40 |
PRM 6200 12101601687 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/17/2012 |
Paid |
$189,926.26 |
PRM 6200 12100400690 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/05/2012 |
Paid |
$11,413.38 |
PRM 6200 12100200277 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/03/2012 |
Paid |
$26,504.52 |
PRM 6200 12100200280 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/03/2012 |
Paid |
$56,874.18 |
PRM 6200 12100200282 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/03/2012 |
Paid |
$4,101.90 |
PRM 6200 12100200284 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/03/2012 |
Paid |
$27,263.28 |
PRM 6200 12100200286 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/03/2012 |
Paid |
$76,015.16 |
PRM 6200 12100200288 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/03/2012 |
Paid |
$26,949.78 |
PRM 6200 12092134671 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/24/2012 |
Paid |
$93,209.04 |
PRM 6200 12092034568 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/21/2012 |
Paid |
$266,351.70 |
PRM 6200 12090633080 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/07/2012 |
Paid |
$231,430.27 |
PRM 6200 12082331507 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/24/2012 |
Paid |
$31,148.70 |
PRM 6200 12082331509 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/24/2012 |
Paid |
$43,827.96 |
PRM 6200 12082331511 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/24/2012 |
Paid |
$40,186.74 |
PRM 6200 12082331513 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/24/2012 |
Paid |
$19,398.72 |
PRM 6200 12080930077 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/10/2012 |
Paid |
$139,134.46 |
PRM 6200 12080930078 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/10/2012 |
Paid |
$17,329.62 |
PRM 6200 12080329423 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/06/2012 |
Paid |
$17,171.88 |
PRM 6200 12080229322 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/03/2012 |
Paid |
$94,904.96 |
PRM 6200 12080229323 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/03/2012 |
Paid |
$2,094.18 |
PRM 6200 12080229324 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/03/2012 |
Paid |
$1,669.14 |
PRM 6200 12080129208 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/02/2012 |
Paid |
$171,019.37 |
PRM 6200 12072628632 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/27/2012 |
Paid |
$137,884.89 |
PRM 6200 12072328173 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/24/2012 |
Paid |
$21,341.59 |
PRM 6200 12071727734 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/18/2012 |
Paid |
$28,842.79 |
PRM 6200 12070526619 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/06/2012 |
Paid |
$68,056.99 |
PRM 6200 12070526621 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/06/2012 |
Paid |
$17,730.36 |
PRM 6200 12070526623 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/06/2012 |
Paid |
$26,652.81 |
PRM 6200 12070526625 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/06/2012 |
Paid |
$7,060.01 |
PRM 6200 12062625534 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/27/2012 |
Paid |
$37,378.34 |
PRM 6200 12061324243 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/14/2012 |
Paid |
$34,578.12 |
PRM 6200 12061324245 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/14/2012 |
Paid |
$7,406.31 |
PRM 6200 12061324247 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/14/2012 |
Paid |
$593,505.65 |
PRM 6200 12061224088 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/13/2012 |
Paid |
$171,325.63 |
PRM 6200 12060823838 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/11/2012 |
Paid |
$160,322.63 |
PRM 6200 12060623647 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/07/2012 |
Paid |
$18,515.80 |
PRM 6200 12053123103 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/01/2012 |
Paid |
$728.41 |
PRM 6200 12053022832 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/31/2012 |
Paid |
$6,911.22 |
PRM 6200 12052922670 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/30/2012 |
Paid |
$88,821.67 |
PRM 6200 12052922672 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/30/2012 |
Paid |
$37,309.08 |
PRM 6200 12052922675 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/30/2012 |
Paid |
$83,125.90 |
PRM 6200 12052522541 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/29/2012 |
Paid |
$31,352.03 |
PRM 6200 12051021230 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/11/2012 |
Paid |
$7,072.37 |
PRM 6200 12051021235 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/11/2012 |
Paid |
$74,124.24 |
PRM 6200 12050320711 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/04/2012 |
Paid |
$56,518.52 |
PRM 6200 12042619862 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/27/2012 |
Paid |
$33,784.58 |
PRM 6200 12042619863 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/27/2012 |
Paid |
$38,742.64 |
PRM 6200 12042519696 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/26/2012 |
Paid |
$6,754.12 |
PRM 6200 12041118167 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/12/2012 |
Paid |
$131,339.62 |
PRM 6200 12040517748 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/06/2012 |
Paid |
$75,630.47 |
PRM 6200 12032917097 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/30/2012 |
Paid |
$112,252.54 |
PRM 6200 12032316517 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/26/2012 |
Paid |
$20,310.63 |
PRM 6200 12032116284 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/22/2012 |
Paid |
$126,715.46 |
PRM 6200 12031415553 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/15/2012 |
Paid |
$105,567.00 |
PRM 6200 12031315374 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/14/2012 |
Paid |
$64,538.50 |
PRM 6200 12030915103 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/12/2012 |
Paid |
$21,746.52 |
PRM 6200 12030814945 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/09/2012 |
Paid |
$77,702.43 |
PRM 6200 12030714777 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/08/2012 |
Paid |
$7,566.33 |
PRM 6200 12022813818 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/29/2012 |
Paid |
$77,459.46 |
PRM 6200 12022413576 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/27/2012 |
Paid |
$16,620.94 |
PRM 6200 12021512542 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/16/2012 |
Paid |
$284,383.74 |
PRM 6200 12021412445 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/15/2012 |
Paid |
$13,122.49 |
PRM 6200 12013111151 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/01/2012 |
Paid |
$10,736.54 |
PRM 6200 12012410516 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/25/2012 |
Paid |
$304,317.51 |
PRM 6200 12012310301 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/24/2012 |
Paid |
$5,249.86 |
PRM 6200 12011009280 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/11/2012 |
Paid |
$45,480.49 |
PRM 6200 11123008424 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/03/2012 |
Paid |
$21,387.71 |
PRM 6200 11122808162 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/29/2011 |
Paid |
$65,027.20 |
PRM 6200 11122808163 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/29/2011 |
Paid |
$28,697.87 |
PRM 6200 11121907541 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/20/2011 |
Paid |
$10,210.02 |
PRM 6200 11120806590 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/09/2011 |
Paid |
$195,497.05 |
PRM 6200 11120606372 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/07/2011 |
Paid |
$102,325.25 |
PRM 6200 11111805014 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/21/2011 |
Paid |
$75,348.95 |
PRM 6200 11111704913 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/18/2011 |
Paid |
$18,138.80 |
PRM 6200 11111704914 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/18/2011 |
Paid |
$30,962.82 |
PRM 6200 11110904235 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/10/2011 |
Paid |
$125,811.36 |
PRM 6200 11110103292 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2011 |
Paid |
$7,458.21 |
PRM 6200 11110103293 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/02/2011 |
Paid |
$29,576.96 |
PRM 6200 11102502497 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/26/2011 |
Paid |
$50,467.67 |
PRM 6200 11102402276 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/25/2011 |
Paid |
$68,581.06 |
PRM 6200 11101701687 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/18/2011 |
Paid |
$206,670.48 |
PRM 6200 11100700785 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/10/2011 |
Paid |
$4,009.75 |
PRM 6200 11100600640 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/07/2011 |
Paid |
$60,793.04 |
PRM 6200 11092735592 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/28/2011 |
Paid |
$27,767.03 |
PRM 6200 11092635456 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/27/2011 |
Paid |
$163,592.85 |
PRM 6200 11092135033 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/22/2011 |
Paid |
$118,670.29 |
PRM 6200 11091634664 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/19/2011 |
Paid |
$51,706.07 |
PRM 6200 11090934024 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/12/2011 |
Paid |
$131,245.60 |
PRM 6200 11090934025 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/12/2011 |
Paid |
$4,148.66 |
PRM 6200 11083133268 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/01/2011 |
Paid |
$130,398.90 |
PRM 6200 11082932914 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/30/2011 |
Paid |
$46,541.68 |
PRM 6200 11082932915 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/30/2011 |
Paid |
$126,902.03 |
PRM 6200 11081731724 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/18/2011 |
Paid |
$31,440.86 |
PRM 6200 11081731725 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/18/2011 |
Paid |
$85,044.90 |
PRM 6200 11081031035 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/11/2011 |
Paid |
$117,370.54 |
PRM 6200 11080930777 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/10/2011 |
Paid |
$3,664.67 |
PRM 6200 11080930778 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/10/2011 |
Paid |
$15,039.90 |
PRM 6200 11080830571 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/09/2011 |
Paid |
$189,890.05 |
PRM 6200 11071928637 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/20/2011 |
Paid |
$38,002.93 |
PRM 6200 11071828520 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/19/2011 |
Paid |
$4,129.07 |
PRM 6200 11071828521 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/19/2011 |
Paid |
$97,280.36 |
PRM 6200 11070727580 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/08/2011 |
Paid |
$122,434.66 |
PRM 6200 11070127258 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/05/2011 |
Paid |
$8,484.91 |
PRM 6200 11070127259 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/05/2011 |
Paid |
$3,618.99 |
PRM 6200 11063027138 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/01/2011 |
Paid |
$43,611.72 |
PRM 6200 11061325337 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/14/2011 |
Paid |
$123,151.14 |
PRM 6200 11060824922 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/09/2011 |
Paid |
$99,942.31 |
PRM 6200 11060824923 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/09/2011 |
Paid |
$713.46 |
PRM 6200 11052523792 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/26/2011 |
Paid |
$79,206.66 |
PRM 6200 11052523793 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/26/2011 |
Paid |
$22,924.45 |
PRM 6200 11051823123 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/19/2011 |
Paid |
$2,634.16 |
PRM 6200 11051823124 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/19/2011 |
Paid |
$139,889.12 |
PRM 6200 11051122525 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/12/2011 |
Paid |
$60,107.32 |
PRM 6200 11051122526 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/12/2011 |
Paid |
$1,419.32 |
PRM 6200 11050922225 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/10/2011 |
Paid |
$34,641.68 |
PRM 6200 11042821119 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/29/2011 |
Paid |
$48,251.38 |
PRM 6200 11042620845 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/27/2011 |
Paid |
$72,284.61 |
PRM 6200 11041519980 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/18/2011 |
Paid |
$53,031.91 |
PRM 6200 11040719192 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/08/2011 |
Paid |
$30,713.27 |
PRM 6200 11040719193 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/08/2011 |
Paid |
$3,282.37 |
PRM 6200 11040719194 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/08/2011 |
Paid |
$2,812.55 |
PRM 6200 11040518906 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/06/2011 |
Paid |
$5,741.99 |
PRM 6200 11040518907 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
04/06/2011 |
Paid |
$14,069.75 |
PRM 6200 11032817820 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/29/2011 |
Paid |
$48,493.88 |
PRM 6200 11032417534 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/25/2011 |
Paid |
$32,890.60 |
PRM 6200 11032217276 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/23/2011 |
Paid |
$997.33 |
PRM 6200 11032217277 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/23/2011 |
Paid |
$210,908.95 |
PRM 6200 11032117173 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/22/2011 |
Paid |
$727.60 |
PRM 6200 11031616784 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/17/2011 |
Paid |
$129,724.39 |
PRM 6200 11030916091 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
03/10/2011 |
Paid |
$38,046.00 |
PRM 6200 11022514730 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/28/2011 |
Paid |
$48,996.40 |
PRM 6200 11022414512 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/25/2011 |
Paid |
$35,116.99 |
PRM 6200 11022214044 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/23/2011 |
Paid |
$16,708.78 |
PRM 6200 11020913108 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/10/2011 |
Paid |
$7,797.56 |
PRM 6200 11020812995 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/09/2011 |
Paid |
$10,516.54 |
PRM 6200 11020112535 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
02/02/2011 |
Paid |
$6,158.01 |
PRM 6200 11012511677 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/26/2011 |
Paid |
$35,836.42 |
PRM 6200 11011310481 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/14/2011 |
Paid |
$2,777.72 |
PRM 6200 11011110235 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
01/12/2011 |
Paid |
$23,942.43 |
PRM 6200 10122908836 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/30/2010 |
Paid |
$13,313.29 |
PRM 6200 10122108382 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/22/2010 |
Paid |
$102,256.70 |
PRM 6200 10113006315 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
12/01/2010 |
Paid |
$95,529.50 |
PRM 6200 10111905660 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/22/2010 |
Paid |
$76,993.28 |
PRM 6200 10111605186 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/17/2010 |
Paid |
$42,733.39 |
PRM 6200 10111004716 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/12/2010 |
Paid |
$10,383.87 |
PRM 6200 10110804393 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
11/09/2010 |
Paid |
$2,901.18 |
PRM 6200 10101902178 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/20/2010 |
Paid |
$193,745.04 |
PRM 6200 10101201384 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/13/2010 |
Paid |
$197,122.14 |
PRM 6200 10101101210 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/12/2010 |
Paid |
$87,795.99 |
PRM 6200 10100500496 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/06/2010 |
Paid |
$1,913.09 |
PRM 6200 10100500497 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/06/2010 |
Paid |
$164,834.46 |
PRM 6200 10100500498 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/06/2010 |
Paid |
$2,113.75 |
PRM 6200 10100400259 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
10/05/2010 |
Paid |
$99,189.65 |
PRM 6200 10092938955 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/30/2010 |
Paid |
$2,652.12 |
PRM 6200 10092037916 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/21/2010 |
Paid |
$58,756.52 |
PRM 6200 10091737748 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/20/2010 |
Paid |
$26,459.10 |
PRM 6200 10091537379 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/16/2010 |
Paid |
$7,109.09 |
PRM 6200 10091537380 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/16/2010 |
Paid |
$66,380.58 |
PRM 6200 10091036819 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/13/2010 |
Paid |
$82,222.04 |
PRM 6200 10090135761 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/02/2010 |
Paid |
$73,102.51 |
PRM 6200 10083135612 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
09/01/2010 |
Paid |
$19,333.16 |
PRM 6200 10081734118 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/18/2010 |
Paid |
$34,777.64 |
PRM 6200 10081333775 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/16/2010 |
Paid |
$255,743.88 |
PRM 6200 10080633024 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/09/2010 |
Paid |
$31,805.32 |
PRM 6200 10080232517 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
08/03/2010 |
Paid |
$294,003.57 |
PRM 6200 10072731869 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/28/2010 |
Paid |
$109,991.72 |
PRM 6200 10072231404 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/23/2010 |
Paid |
$108,602.89 |
PRM 6200 10072031021 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/21/2010 |
Paid |
$7,678.45 |
PRM 6200 10071530598 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/16/2010 |
Paid |
$55,944.50 |
PRM 6200 10070829763 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/09/2010 |
Paid |
$72,441.62 |
PRM 6200 10070729584 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
07/08/2010 |
Paid |
$72,136.69 |
PRM 6200 10062928871 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/30/2010 |
Paid |
$250,856.36 |
PRM 6200 10062227930 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/23/2010 |
Paid |
$112,306.38 |
PRM 6200 10061827696 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/21/2010 |
Paid |
$60,955.23 |
PRM 6200 10061827697 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/21/2010 |
Paid |
$705.85 |
PRM 6200 10061827698 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/21/2010 |
Paid |
$5,669.11 |
PRM 6200 10061527171 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/16/2010 |
Paid |
$25,108.31 |
PRM 6200 10061026794 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/11/2010 |
Paid |
$33,207.13 |
PRM 6200 10061026795 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/11/2010 |
Paid |
$1,412.79 |
PRM 6200 10060326090 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
06/04/2010 |
Paid |
$70,735.32 |
PRM 6200 10052625252 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/27/2010 |
Paid |
$82,366.71 |
PRM 6200 10052224706 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/24/2010 |
Paid |
$1,332.85 |
PRM 6200 10052224707 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/24/2010 |
Paid |
$19,453.36 |
PRM 6200 10052024598 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/21/2010 |
Paid |
$11,803.74 |
PRM 6200 10052024599 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/21/2010 |
Paid |
$19,250.75 |
PRM 6200 10051924511 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/20/2010 |
Paid |
$6,263.50 |
PRM 6200 10051424121 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/17/2010 |
Paid |
$29,651.84 |
PRM 6200 10051424122 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/17/2010 |
Paid |
$53,984.83 |
PRM 6200 10051123657 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/12/2010 |
Paid |
$41,861.73 |
PRM 6200 10050623253 |
ASPHALTIC CONCRETE, HOT MIX, IN ACCORDANCE WITH IT |
05/07/2010 |
Paid |
$31,391.51 |