PAYMENT REQUEST
CATEGORY | COMMODITIES |
---|---|
EXPENSE CATEGORY | ASPHALT |
PAYEE | ERGON ASPHALT & EMULSIONS INC |
PAYMENT REQUEST | Select a payment request. |
PAYMENT REQUEST | DESCRIPTION | CHECK DATE | CHECK STATUS Checks cleared as of 01/31/2015 have been reflected as paid on the reports |
AMOUNT |
---|---|---|---|---|
PRM 6200 17100600522 | EMULSIONS, ASPHALT | 10/09/2017 | Paid | $3,346.38 |
PRM 6200 17100600524 | EMULSIONS, ASPHALT | 10/09/2017 | Paid | $13,503.18 |
PRM 6200 17100500409 | EMULSIONS, ASPHALT | 10/06/2017 | Paid | $632.44 |
PRM 6200 17100500412 | EMULSIONS, ASPHALT | 10/06/2017 | Paid | $54.45 |
PRM 6200 17092935550 | EMULSIONS, ASPHALT | 10/02/2017 | Paid | $33,743.22 |
PRM 6200 17091934012 | EMULSIONS, ASPHALT | 09/20/2017 | Paid | $2,153.85 |
PRM 6200 17091133146 | EMULSIONS, ASPHALT | 09/12/2017 | Paid | $100,940.10 |
PRM 6200 17090833032 | EMULSIONS, ASPHALT | 09/11/2017 | Paid | $142.14 |
PRM 6200 17090833034 | EMULSIONS, ASPHALT | 09/11/2017 | Paid | $39,000.58 |
PRM 6200 17090833036 | EMULSIONS, ASPHALT | 09/11/2017 | Paid | $3,916.08 |
PRM 6200 17090833038 | EMULSIONS, ASPHALT | 09/11/2017 | Paid | $10,965.03 |
PRM 6200 17090833040 | EMULSIONS, ASPHALT | 09/11/2017 | Paid | $4,617.72 |
PRM 6200 17081731034 | EMULSIONS, ASPHALT | 08/18/2017 | Paid | $50,341.37 |
PRM 6200 17080729826 | EMULSIONS, ASPHALT | 08/08/2017 | Paid | $105.02 |
PRM 6200 17080229492 | EMULSIONS, ASPHALT | 08/03/2017 | Paid | $162.97 |
PRM 6200 17080129287 | EMULSIONS, ASPHALT | 08/02/2017 | Paid | $2,453.74 |
PRM 6200 17073129132 | EMULSIONS, ASPHALT | 08/01/2017 | Paid | $5,690.38 |
PRM 6200 17073129134 | EMULSIONS, ASPHALT | 08/01/2017 | Paid | $33,463.83 |
PRM 6200 17072929017 | EMULSIONS, ASPHALT | 07/31/2017 | Paid | $33,102.61 |
PRM 6200 17072028227 | EMULSIONS, ASPHALT | 07/21/2017 | Paid | $114.82 |
PRM 6200 17072028231 | EMULSIONS, ASPHALT | 07/21/2017 | Paid | $54,230.70 |
PRM 6200 17072028233 | EMULSIONS, ASPHALT | 07/21/2017 | Paid | $11,276.39 |
PRM 6200 17072028235 | EMULSIONS, ASPHALT | 07/21/2017 | Paid | $4,753.86 |
PRM 6200 17072028238 | EMULSIONS, ASPHALT | 07/21/2017 | Paid | $17,310.18 |
PRM 6200 17072028246 | EMULSIONS, ASPHALT | 07/21/2017 | Paid | $39.84 |
PRM 6200 17072028249 | EMULSIONS, ASPHALT | 07/21/2017 | Paid | $108.64 |
PRM 6200 17071127397 | EMULSIONS, ASPHALT | 07/12/2017 | Paid | $36,632.50 |
PRM 6200 17070526794 | EMULSIONS, ASPHALT | 07/07/2017 | Paid | $16,560.07 |
PRM 6200 17070627003 | EMULSIONS, ASPHALT | 07/07/2017 | Paid | $46,886.65 |
PRM 6200 17070627005 | EMULSIONS, ASPHALT | 07/07/2017 | Paid | $55.56 |
PRM 6200 17070526790 | EMULSIONS, ASPHALT | 07/06/2017 | Paid | $10,761.88 |
PRM 6200 17070526791 | EMULSIONS, ASPHALT | 07/06/2017 | Paid | $11,992.83 |
PRM 6200 17062926426 | EMULSIONS, ASPHALT | 06/30/2017 | Paid | $19,263.08 |
PRM 6200 17062926428 | EMULSIONS, ASPHALT | 06/30/2017 | Paid | $4,580.76 |
PRM 6200 17062926430 | EMULSIONS, ASPHALT | 06/30/2017 | Paid | $12,911.66 |
PRM 6200 17062926432 | EMULSIONS, ASPHALT | 06/30/2017 | Paid | $5,786.22 |
PRM 6200 17062625892 | EMULSIONS, ASPHALT | 06/27/2017 | Paid | $53,320.42 |
PRM 6200 17062325788 | EMULSIONS, ASPHALT | 06/26/2017 | Paid | $8,650.24 |
PRM 6200 17062325790 | EMULSIONS, ASPHALT | 06/26/2017 | Paid | $5,232.41 |
PRM 6200 17062325792 | EMULSIONS, ASPHALT | 06/26/2017 | Paid | $34,639.28 |
PRM 6200 17061324843 | EMULSIONS, ASPHALT | 06/14/2017 | Paid | $5,545.13 |
PRM 6200 17061324844 | EMULSIONS, ASPHALT | 06/14/2017 | Paid | $5,678.15 |
PRM 6200 17060624098 | EMULSIONS, ASPHALT | 06/07/2017 | Paid | $39,403.20 |
PRM 6200 17060223791 | EMULSIONS, ASPHALT | 06/05/2017 | Paid | $40,349.76 |
PRM 6200 17060223794 | EMULSIONS, ASPHALT | 06/05/2017 | Paid | $3,267.77 |
PRM 6200 17053123542 | EMULSIONS, ASPHALT | 06/01/2017 | Paid | $5,383.02 |
PRM 6200 17053123543 | EMULSIONS, ASPHALT | 06/01/2017 | Paid | $5,694.77 |
PRM 6200 17053123544 | EMULSIONS, ASPHALT | 06/01/2017 | Paid | $3,928.15 |
PRM 6200 17053123547 | EMULSIONS, ASPHALT | 06/01/2017 | Paid | $65.49 |
PRM 6200 17052422995 | EMULSIONS, ASPHALT | 05/25/2017 | Paid | $80.05 |
PRM 6200 17051822489 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $2,605.87 |
PRM 6200 17051822490 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,669.83 |
PRM 6200 17051822491 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $1,995.25 |
PRM 6200 17051822492 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $4,323.04 |
PRM 6200 17051822493 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,644.89 |
PRM 6200 17051822494 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $4,734.56 |
PRM 6200 17051822495 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $91.39 |
PRM 6200 17051822497 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,353.92 |
PRM 6200 17051822498 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $65.49 |
PRM 6200 17051822499 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,017.22 |
PRM 6200 17051822500 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,657.36 |
PRM 6200 17051822501 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,473.93 |
PRM 6200 17051822502 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $4,535.04 |
PRM 6200 17051822503 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $15,248.22 |
PRM 6200 17051822504 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,719.72 |
PRM 6200 17051822505 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $5,008.91 |
PRM 6200 17051822507 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $22,367.58 |
PRM 6200 17051822510 | EMULSIONS, ASPHALT | 05/19/2017 | Paid | $280.82 |
GAX 6200 17042812337 | 05/16/2017 | Paid | ($3,174.40) | |
GAX 6200 17051012980 | 05/16/2017 | Paid | ($3,386.60) | |
PRM 6200 17051522052 | EMULSIONS, ASPHALT | 05/16/2017 | Paid | $6,893.05 |
PRM 6200 17051522055 | EMULSIONS, ASPHALT | 05/16/2017 | Paid | $5,519.55 |
PRM 6200 17050921587 | EMULSIONS, ASPHALT | 05/10/2017 | Paid | $12,887.09 |
PRM 6200 17050921588 | EMULSIONS, ASPHALT | 05/10/2017 | Paid | $5,125.30 |
PRM 6200 17050321004 | EMULSIONS, ASPHALT | 05/04/2017 | Paid | $22,903.54 |
PRM 6200 17050321006 | EMULSIONS, ASPHALT | 05/04/2017 | Paid | $4,956.81 |
PRM 6200 17050220825 | EMULSIONS, ASPHALT | 05/03/2017 | Paid | $519.39 |
PRM 6200 17050120699 | EMULSIONS, ASPHALT | 05/02/2017 | Paid | $464.27 |
PRM 6200 17041218903 | EMULSIONS, ASPHALT | 04/13/2017 | Paid | $197.17 |
PRM 6200 17041218905 | EMULSIONS, ASPHALT | 04/13/2017 | Paid | $135.10 |
PRM 6200 17041218907 | EMULSIONS, ASPHALT | 04/13/2017 | Paid | $1,143.90 |
PRM 6200 17032417228 | EMULSIONS, ASPHALT | 03/27/2017 | Paid | $1,259.72 |
PRM 6200 17032317130 | EMULSIONS, ASPHALT | 03/24/2017 | Paid | $1,493.41 |
PRM 6200 17032317133 | EMULSIONS, ASPHALT | 03/24/2017 | Paid | $1,285.28 |
PRM 6200 17031416050 | EMULSIONS, ASPHALT | 03/15/2017 | Paid | $2,203.65 |
PRM 6200 17030214898 | EMULSIONS, ASPHALT | 03/03/2017 | Paid | $2,104.22 |
PRM 6200 17022714436 | EMULSIONS, ASPHALT | 02/28/2017 | Paid | $795.46 |
PRM 6200 17021313026 | EMULSIONS, ASPHALT | 02/14/2017 | Paid | $480.65 |
PRM 6200 17020812636 | EMULSIONS, ASPHALT | 02/09/2017 | Paid | $88.47 |
PRM 6200 17020812638 | EMULSIONS, ASPHALT | 02/09/2017 | Paid | $2,643.06 |
PRM 6200 17020812640 | EMULSIONS, ASPHALT | 02/09/2017 | Paid | $88.47 |
PRM 6200 17020212033 | EMULSIONS, ASPHALT | 02/03/2017 | Paid | $2,173.06 |
PRM 6200 17013011466 | EMULSIONS, ASPHALT | 01/31/2017 | Paid | $116.12 |
PRM 6200 17012410739 | EMULSIONS, ASPHALT | 01/25/2017 | Paid | $387.06 |
PRM 6200 17012310525 | EMULSIONS, ASPHALT | 01/24/2017 | Paid | $613.42 |
PRM 6200 17011009578 | EMULSIONS, ASPHALT | 01/11/2017 | Paid | $9,427.55 |
PRM 6200 16122808403 | EMULSIONS, ASPHALT | 12/29/2016 | Paid | $458.95 |
PRM 6200 16122007717 | EMULSIONS, ASPHALT | 12/21/2016 | Paid | $347.42 |
PRM 6200 16121206636 | EMULSIONS, ASPHALT | 12/13/2016 | Paid | $6,404.76 |
PRM 6200 16112205064 | EMULSIONS, ASPHALT | 11/23/2016 | Paid | $15,136.29 |
PRM 6200 16112205068 | EMULSIONS, ASPHALT | 11/23/2016 | Paid | $150.18 |
PRM 6200 16112104876 | EMULSIONS, ASPHALT | 11/22/2016 | Paid | $71.71 |
PRM 6200 16112104878 | EMULSIONS, ASPHALT | 11/22/2016 | Paid | $121.36 |
PRM 6200 16112104880 | EMULSIONS, ASPHALT | 11/22/2016 | Paid | $19,576.14 |
PRM 6200 16103102985 | EMULSIONS, ASPHALT | 11/01/2016 | Paid | $20,145.67 |
PRM 6200 16102602564 | EMULSIONS, ASPHALT | 10/27/2016 | Paid | $325.47 |
PRM 6200 16102602565 | EMULSIONS, ASPHALT | 10/27/2016 | Paid | $8,113.36 |
PRM 6200 16102602566 | EMULSIONS, ASPHALT | 10/27/2016 | Paid | $171.01 |
PRM 6200 16102602567 | EMULSIONS, ASPHALT | 10/27/2016 | Paid | $6,460.26 |
PRM 6200 16102602568 | EMULSIONS, ASPHALT | 10/27/2016 | Paid | $6,730.01 |
PRM 6200 16102602569 | EMULSIONS, ASPHALT | 10/27/2016 | Paid | $9,475.97 |
PRM 6200 16102602573 | EMULSIONS, ASPHALT | 10/27/2016 | Paid | $279.37 |
PRM 6200 16101401079 | EMULSIONS, ASPHALT | 10/17/2016 | Paid | $28,095.38 |
GAX 6200 16100600338 | 10/12/2016 | Paid | ($4,082.80) | |
PRM 6200 16101100671 | EMULSIONS, ASPHALT | 10/12/2016 | Paid | $8,083.14 |
PRM 6200 16100300097 | EMULSIONS, ASPHALT | 10/04/2016 | Paid | $7,848.24 |
PRM 6200 16092739081 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $18,142.15 |
PRM 6200 16092739082 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $19,047.19 |
PRM 6200 16092739083 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $5,561.48 |
PRM 6200 16092739089 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $9,692.86 |
PRM 6200 16092739090 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $9,368.15 |
PRM 6200 16092739091 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $8,442.39 |
PRM 6200 16092739092 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $16,435.72 |
PRM 6200 16092739093 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $115.03 |
PRM 6200 16092739094 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $9,216.16 |
PRM 6200 16092739095 | EMULSIONS, ASPHALT | 09/28/2016 | Paid | $14,093.68 |
PRM 6200 16092438758 | EMULSIONS, ASPHALT | 09/26/2016 | Paid | $8,995.08 |
PRM 6200 16092038211 | EMULSIONS, ASPHALT | 09/21/2016 | Paid | $9,152.74 |
PRM 6200 16091938000 | EMULSIONS, ASPHALT | 09/20/2016 | Paid | $82.17 |
PRM 6200 16091437563 | EMULSIONS, ASPHALT | 09/15/2016 | Paid | $36,815.16 |
PRM 6200 16091437566 | EMULSIONS, ASPHALT | 09/15/2016 | Paid | $4,189.14 |
PRM 6200 16090937033 | EMULSIONS, ASPHALT | 09/12/2016 | Paid | $3,133.33 |
PRM 6200 16090736716 | EMULSIONS, ASPHALT | 09/08/2016 | Paid | $143,632.42 |
PRM 6200 16083035803 | EMULSIONS, ASPHALT | 08/31/2016 | Paid | $144.96 |
PRM 6200 16082935623 | EMULSIONS, ASPHALT | 08/30/2016 | Paid | $46,221.36 |
PRM 6200 16082535371 | EMULSIONS, ASPHALT | 08/26/2016 | Paid | $4,386.28 |
PRM 6200 16082435212 | EMULSIONS, ASPHALT | 08/25/2016 | Paid | $119,107.89 |
PRM 6200 16082234793 | EMULSIONS, ASPHALT | 08/23/2016 | Paid | $27,103.56 |
PRM 6200 16081534009 | EMULSIONS, ASPHALT | 08/16/2016 | Paid | $18,547.86 |
PRM 6200 16081233925 | EMULSIONS, ASPHALT | 08/15/2016 | Paid | $94,200.73 |
PRM 6200 16081133848 | EMULSIONS, ASPHALT | 08/12/2016 | Paid | $21,816.69 |
PRM 6200 16080633154 | EMULSIONS, ASPHALT | 08/08/2016 | Paid | $18,905.42 |
PRM 6200 16080332772 | EMULSIONS, ASPHALT | 08/04/2016 | Paid | $8,541.69 |
PRM 6200 16080332774 | EMULSIONS, ASPHALT | 08/04/2016 | Paid | $49,846.81 |
PRM 6200 16080332776 | EMULSIONS, ASPHALT | 08/04/2016 | Paid | $34,243.37 |
PRM 6200 16080332778 | EMULSIONS, ASPHALT | 08/04/2016 | Paid | $43,724.46 |
PRM 6200 16080332780 | EMULSIONS, ASPHALT | 08/04/2016 | Paid | $22,892.28 |
PRM 6200 16080232509 | EMULSIONS, ASPHALT | 08/03/2016 | Paid | $78.52 |
PRM 6200 16072932142 | EMULSIONS, ASPHALT | 08/01/2016 | Paid | $261.39 |
PRM 6200 16071931327 | EMULSIONS, ASPHALT | 07/20/2016 | Paid | $132,840.63 |
PRM 6200 16070730265 | EMULSIONS, ASPHALT | 07/08/2016 | Paid | $7,657.90 |
PRM 6200 16070630155 | EMULSIONS, ASPHALT | 07/07/2016 | Paid | $183.77 |
PRM 6200 16070630156 | EMULSIONS, ASPHALT | 07/07/2016 | Paid | $69,783.02 |
PRM 6200 16063029494 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $8,983.45 |
PRM 6200 16063029495 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $9,425.95 |
PRM 6200 16063029496 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $9,545.36 |
PRM 6200 16063029497 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $9,341.67 |
PRM 6200 16063029498 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $7,972.02 |
PRM 6200 16063029499 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $2,746.31 |
PRM 6200 16063029500 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $7,157.26 |
PRM 6200 16063029501 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $15,691.19 |
PRM 6200 16063029502 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $7,956.82 |
PRM 6200 16063029503 | EMULSIONS, ASPHALT | 07/01/2016 | Paid | $2,989.14 |
PRM 6200 16062829052 | EMULSIONS, ASPHALT | 06/29/2016 | Paid | $175,546.07 |
PRM 6200 16062128091 | EMULSIONS, ASPHALT | 06/22/2016 | Paid | $8,428.57 |
PRM 6200 16062128092 | EMULSIONS, ASPHALT | 06/22/2016 | Paid | $5,183.57 |
PRM 6200 16062128093 | EMULSIONS, ASPHALT | 06/22/2016 | Paid | $7,431.19 |
PRM 6200 16061727838 | EMULSIONS, ASPHALT | 06/20/2016 | Paid | $6,216.07 |
PRM 6200 16061627649 | EMULSIONS, ASPHALT | 06/17/2016 | Paid | $6,770.95 |
PRM 6200 16061627651 | EMULSIONS, ASPHALT | 06/17/2016 | Paid | $17,545.48 |
PRM 6200 16061427283 | EMULSIONS, ASPHALT | 06/15/2016 | Paid | $139,710.89 |
PRM 6200 16060326304 | EMULSIONS, ASPHALT | 06/06/2016 | Paid | $26,062.77 |
PRM 6200 16060226254 | EMULSIONS, ASPHALT | 06/03/2016 | Paid | $11,497.98 |
PRM 6200 16060126148 | EMULSIONS, ASPHALT | 06/02/2016 | Paid | $172.63 |
PRM 6200 16052625726 | EMULSIONS, ASPHALT | 05/27/2016 | Paid | $39,723.16 |
PRM 6200 16052625728 | EMULSIONS, ASPHALT | 05/27/2016 | Paid | $8,665.74 |
PRM 6200 16051825124 | EMULSIONS, ASPHALT | 05/19/2016 | Paid | $362.68 |
PRM 6200 16051324663 | EMULSIONS, ASPHALT | 05/16/2016 | Paid | $105.81 |
PRM 6200 16051124398 | EMULSIONS, ASPHALT | 05/12/2016 | Paid | $295.14 |
PRM 6200 16051124399 | EMULSIONS, ASPHALT | 05/12/2016 | Paid | $6,257.99 |
PRM 6200 16050223645 | EMULSIONS, ASPHALT | 05/03/2016 | Paid | $167.06 |
PRM 6200 16042723319 | EMULSIONS, ASPHALT | 04/28/2016 | Paid | $111.37 |
PRM 6200 16042522678 | EMULSIONS, ASPHALT | 04/26/2016 | Paid | $817.55 |
PRM 6200 16041421715 | EMULSIONS, ASPHALT | 04/15/2016 | Paid | $432.46 |
PRM 6200 16041321543 | EMULSIONS, ASPHALT | 04/14/2016 | Paid | $300.71 |
PRM 6200 16040420568 | EMULSIONS, ASPHALT | 04/05/2016 | Paid | $276.79 |
PRM 6200 16032919806 | EMULSIONS, ASPHALT | 03/30/2016 | Paid | $94.11 |
PRM 6200 16032819593 | EMULSIONS, ASPHALT | 03/29/2016 | Paid | $4,817.04 |
PRM 6200 16032219009 | EMULSIONS, ASPHALT | 03/23/2016 | Paid | $110.72 |
PRM 6200 16031618432 | EMULSIONS, ASPHALT | 03/17/2016 | Paid | $3,255.12 |
PRM 6200 16031618433 | EMULSIONS, ASPHALT | 03/17/2016 | Paid | $188.22 |
PRM 6200 16031017723 | EMULSIONS, ASPHALT | 03/11/2016 | Paid | $404.12 |
PRM 6200 16030917466 | EMULSIONS, ASPHALT | 03/10/2016 | Paid | $71.97 |
PRM 6200 16030716905 | EMULSIONS, ASPHALT | 03/08/2016 | Paid | $813.78 |
PRM 6200 16022515692 | EMULSIONS, ASPHALT | 02/26/2016 | Paid | $457.47 |
PRM 6200 16021714521 | EMULSIONS, ASPHALT | 02/18/2016 | Paid | $2,515.11 |
PRM 6200 16020313165 | EMULSIONS, ASPHALT | 02/04/2016 | Paid | $2,217.91 |
PRM 6200 16012512296 | EMULSIONS, ASPHALT | 01/26/2016 | Paid | $258.67 |
GAX 6200 16011105397 | 01/19/2016 | Paid | ($2,363.35) | |
PRM 6200 16011511384 | EMULSIONS, ASPHALT | 01/19/2016 | Paid | $8,864.02 |
PRM 6200 16011411268 | Asphalt, Emulsified | 01/15/2016 | Paid | $1,040.51 |
PRM 6200 16011311023 | EMULSIONS, ASPHALT | 01/14/2016 | Paid | $129.00 |
PRM 6200 16010609956 | EMULSIONS, ASPHALT | 01/07/2016 | Paid | $44.87 |
PRM 6200 16010609958 | EMULSIONS, ASPHALT | 01/07/2016 | Paid | $409.43 |
PRM 6200 15121808428 | EMULSIONS, ASPHALT | 12/21/2015 | Paid | $436.35 |
PRM 6200 15121608189 | EMULSIONS, ASPHALT | 12/17/2015 | Paid | $357.27 |
PRM 6200 15121407756 | EMULSIONS, ASPHALT | 12/15/2015 | Paid | $88.06 |
PRM 6200 15121407758 | EMULSIONS, ASPHALT | 12/15/2015 | Paid | $104.57 |
PRM 6200 15120907251 | EMULSIONS, ASPHALT | 12/10/2015 | Paid | $247.65 |
PRM 6200 15112405759 | EMULSIONS, ASPHALT | 11/25/2015 | Paid | $144.10 |
PRM 6200 15112405760 | EMULSIONS, ASPHALT | 11/25/2015 | Paid | $116.39 |
PRM 6200 15112305480 | EMULSIONS, ASPHALT | 11/24/2015 | Paid | $71.97 |
PRM 6200 15111905206 | EMULSIONS, ASPHALT | 11/20/2015 | Paid | $3,211.17 |
PRM 6200 15111004348 | EMULSIONS, ASPHALT | 11/10/2015 | Paid | $177.36 |
PRM 6200 15111004349 | EMULSIONS, ASPHALT | 11/10/2015 | Paid | $8,002.14 |
PRM 6200 15111004350 | EMULSIONS, ASPHALT | 11/10/2015 | Paid | $5,633.73 |
PRM 6200 15110403988 | EMULSIONS, ASPHALT | 11/05/2015 | Paid | $18,225.53 |
PRM 6200 15110403990 | EMULSIONS, ASPHALT | 11/05/2015 | Paid | $9,824.90 |
PRM 6200 15102102492 | EMULSIONS, ASPHALT | 10/22/2015 | Paid | $293.75 |
PRM 6200 15101301077 | Asphalt, Emulsified | 10/14/2015 | Paid | $3,021.00 |
PRM 6200 15101301077 | EMULSIONS, ASPHALT | 10/14/2015 | Paid | $29,575.59 |
PRM 6200 15100600562 | Asphalt, Emulsified | 10/07/2015 | Paid | $9,908.50 |
PRM 6200 15100600563 | Asphalt, Emulsified | 10/07/2015 | Paid | $2,808.66 |
PRM 6200 15100200140 | EMULSIONS, ASPHALT | 10/05/2015 | Paid | $120,610.92 |
PRM 6200 15091638834 | EMULSIONS, ASPHALT | 09/17/2015 | Paid | $41,185.40 |
PRM 6200 15091438401 | Asphalt, Emulsified | 09/15/2015 | Paid | $2,451.47 |
PRM 6200 15091038176 | EMULSIONS, ASPHALT | 09/11/2015 | Paid | $8,639.04 |
PRM 6200 15090938047 | EMULSIONS, ASPHALT | 09/10/2015 | Paid | $16,842.32 |
PRM 6200 15090837827 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $171.82 |
PRM 6200 15090837829 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $110.72 |
PRM 6200 15090837830 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $7,241.85 |
PRM 6200 15090837831 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $9,012.55 |
PRM 6200 15090837832 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $19,851.11 |
PRM 6200 15090837833 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $7,041.27 |
PRM 6200 15090837836 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $18,246.43 |
PRM 6200 15090837837 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $9,621.22 |
PRM 6200 15090837838 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $7,525.44 |
PRM 6200 15090837839 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $18,834.35 |
PRM 6200 15090837840 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $5,616.41 |
PRM 6200 15090837842 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $14,462.95 |
PRM 6200 15090837843 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $13,536.11 |
PRM 6200 15090837844 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $10,160.73 |
PRM 6200 15090837845 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $9,526.48 |
PRM 6200 15090837846 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $8,756.62 |
PRM 6200 15090837847 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $8,728.96 |
PRM 6200 15090837848 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $7,670.69 |
PRM 6200 15090837849 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $7,449.35 |
PRM 6200 15090837850 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $18,301.76 |
PRM 6200 15090837851 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $13,446.19 |
PRM 6200 15090837852 | EMULSIONS, ASPHALT | 09/09/2015 | Paid | $9,351.46 |
PRM 6200 15090237354 | Asphalt, Emulsified | 09/03/2015 | Paid | $3,564.01 |
PRM 6200 15082736682 | EMULSIONS, ASPHALT | 08/28/2015 | Paid | $76,824.96 |
PRM 6200 15082736684 | EMULSIONS, ASPHALT | 08/28/2015 | Paid | $13,003.52 |
PRM 6200 15082736686 | EMULSIONS, ASPHALT | 08/28/2015 | Paid | $42,506.44 |
PRM 6200 15082135890 | EMULSIONS, ASPHALT | 08/24/2015 | Paid | $170,123.67 |
PRM 6200 15081835379 | Asphalt, Emulsified | 08/19/2015 | Paid | $3,072.85 |
PRM 6200 15081435007 | Asphalt, Emulsified | 08/17/2015 | Paid | $3,787.02 |
PRM 6200 15081334867 | EMULSIONS, ASPHALT | 08/14/2015 | Paid | $664.31 |
PRM 6200 15081234725 | EMULSIONS, ASPHALT | 08/13/2015 | Paid | $146.70 |
PRM 6200 15080734255 | EMULSIONS, ASPHALT | 08/10/2015 | Paid | $33,857.24 |
PRM 6200 15080734257 | EMULSIONS, ASPHALT | 08/10/2015 | Paid | $40,056.06 |
PRM 6200 15080634140 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $1,966.67 |
PRM 6200 15080634141 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $6,768.67 |
PRM 6200 15080634142 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $8,575.50 |
PRM 6200 15080634143 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $9,770.79 |
PRM 6200 15080634144 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $16,928.62 |
PRM 6200 15080634145 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $8,749.23 |
PRM 6200 15080634146 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $7,206.48 |
PRM 6200 15080634147 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $9,729.09 |
PRM 6200 15080634148 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $18,096.11 |
PRM 6200 15080634149 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $7,039.69 |
PRM 6200 15080634150 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $10,069.61 |
PRM 6200 15080634151 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $9,332.98 |
PRM 6200 15080634152 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $8,373.97 |
PRM 6200 15080634153 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $6,768.67 |
PRM 6200 15080634154 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $19,777.86 |
PRM 6200 15080634155 | EMULSIONS, ASPHALT | 08/07/2015 | Paid | $13,585.98 |
PRM 6200 15072933157 | EMULSIONS, ASPHALT | 07/30/2015 | Paid | $9,868.08 |
PRM 6200 15072933159 | EMULSIONS, ASPHALT | 07/30/2015 | Paid | $8,589.40 |
PRM 6200 15072933161 | EMULSIONS, ASPHALT | 07/30/2015 | Paid | $9,875.03 |
PRM 6200 15072432707 | EMULSIONS, ASPHALT | 07/27/2015 | Paid | $89,481.31 |
PRM 6200 15072432709 | EMULSIONS, ASPHALT | 07/27/2015 | Paid | $13,314.96 |
PRM 6200 15072232427 | EMULSIONS, ASPHALT | 07/23/2015 | Paid | $134,542.31 |
PRM 6200 15072132199 | EMULSIONS, ASPHALT | 07/22/2015 | Paid | $49,774.46 |
PRM 6200 15072132201 | EMULSIONS, ASPHALT | 07/22/2015 | Paid | $9,219.62 |
PRM 6200 15070730357 | EMULSIONS, ASPHALT | 07/08/2015 | Paid | $127,903.09 |
PRM 6200 15070730359 | EMULSIONS, ASPHALT | 07/08/2015 | Paid | $6,639.24 |
PRM 6200 15070730361 | EMULSIONS, ASPHALT | 07/08/2015 | Paid | $13,787.59 |
PRM 6200 15070730363 | EMULSIONS, ASPHALT | 07/08/2015 | Paid | $7,204.14 |
PRM 6200 15070730365 | EMULSIONS, ASPHALT | 07/08/2015 | Paid | $60,965.44 |
PRM 6200 15070730373 | EMULSIONS, ASPHALT | 07/08/2015 | Paid | $14,101.42 |
PRM 6200 15062529132 | EMULSIONS, ASPHALT | 06/26/2015 | Paid | $8,005.65 |
PRM 6200 15062428982 | EMULSIONS, ASPHALT | 06/25/2015 | Paid | $15,516.79 |
PRM 6200 15061527891 | EMULSIONS, ASPHALT | 06/16/2015 | Paid | $34,230.67 |
PRM 6200 15060326707 | EMULSIONS, ASPHALT | 06/04/2015 | Paid | $222.75 |
PRM 6200 15060326709 | EMULSIONS, ASPHALT | 06/04/2015 | Paid | $8,828.98 |
GAX 6200 15051413455 | 05/28/2015 | Paid | ($8,929.65) | |
GAX 6200 15051513471 | 05/28/2015 | Paid | ($2,966.35) | |
PRM 6200 15052726089 | EMULSIONS, ASPHALT | 05/28/2015 | Paid | $23,578.98 |
PRM 6200 15052625935 | EMULSIONS, ASPHALT | 05/27/2015 | Paid | $16,309.03 |
PRM 6200 15052025423 | EMULSIONS, ASPHALT | 05/21/2015 | Paid | $1,035.79 |
PRM 6200 15052025424 | EMULSIONS, ASPHALT | 05/21/2015 | Paid | $2,383.41 |
PRM 6200 15052025425 | EMULSIONS, ASPHALT | 05/21/2015 | Paid | $16,922.21 |
PRM 6200 15051424889 | EMULSIONS, ASPHALT | 05/15/2015 | Paid | $306.28 |
PRM 6200 15050423527 | EMULSIONS, ASPHALT | 05/05/2015 | Paid | $2,966.35 |
PRM 6200 15043023246 | EMULSIONS, ASPHALT | 05/01/2015 | Paid | $961.79 |
PRM 6200 15042422529 | EMULSIONS, ASPHALT | 04/27/2015 | Paid | $267.30 |
PRM 6200 15042322398 | EMULSIONS, ASPHALT | 04/24/2015 | Paid | $1,092.38 |
PRM 6200 15042122048 | EMULSIONS, ASPHALT | 04/22/2015 | Paid | $1,986.95 |
PRM 6200 15042122050 | EMULSIONS, ASPHALT | 04/22/2015 | Paid | $144.79 |
PRM 6200 15041521400 | EMULSIONS, ASPHALT | 04/16/2015 | Paid | $118.20 |
PRM 6200 15041521403 | EMULSIONS, ASPHALT | 04/16/2015 | Paid | $410.89 |
PRM 6200 15040320058 | EMULSIONS, ASPHALT | 04/06/2015 | Paid | $460.99 |
PRM 6200 15032519008 | EMULSIONS, ASPHALT | 03/26/2015 | Paid | $3,659.78 |
PRM 6200 15031217393 | EMULSIONS, ASPHALT | 03/13/2015 | Paid | $717.16 |
PRM 6200 15030916788 | EMULSIONS, ASPHALT | 03/10/2015 | Paid | $116.39 |
PRM 6200 15020613411 | EMULSIONS, ASPHALT | 02/09/2015 | Paid | $833.33 |
PRM 6200 15012812265 | EMULSIONS, ASPHALT | 01/29/2015 | Paid | $144.45 |
PRM 6200 15011210602 | EMULSIONS, ASPHALT | 01/13/2015 | Paid | $277.13 |
PRM 6200 15010509884 | EMULSIONS, ASPHALT | 01/06/2015 | Paid | $2,510.73 |
PRM 6200 15010509886 | EMULSIONS, ASPHALT | 01/06/2015 | Paid | $72.05 |
PRM 6200 15010509888 | EMULSIONS, ASPHALT | 01/06/2015 | Paid | $266.04 |
PRM 6200 15010509890 | EMULSIONS, ASPHALT | 01/06/2015 | Paid | $55.42 |
PRM 6200 14121808080 | EMULSIONS, ASPHALT | 12/19/2014 | Paid | $2,782.94 |
PRM 6200 14112005676 | EMULSIONS, ASPHALT | 11/21/2014 | Paid | $188.00 |
PRM 6200 14111905539 | EMULSIONS, ASPHALT | 11/20/2014 | Paid | $237.76 |
PRM 6200 14111305071 | EMULSIONS, ASPHALT | 11/14/2014 | Paid | $132.71 |
PRM 6200 14111204962 | EMULSIONS, ASPHALT | 11/13/2014 | Paid | $32,423.99 |
PRM 6200 14110304041 | EMULSIONS, ASPHALT | 11/04/2014 | Paid | $110.59 |
PRM 6200 14101401615 | EMULSIONS, ASPHALT | 10/15/2014 | Paid | $344.04 |
PRM 6200 14101401625 | EMULSIONS, ASPHALT | 10/15/2014 | Paid | $266.35 |
PRM 6200 14101301354 | EMULSIONS, ASPHALT | 10/14/2014 | Paid | $64,059.16 |
PRM 6200 14100700704 | EMULSIONS, ASPHALT | 10/08/2014 | Paid | $25,596.56 |
PRM 6200 14100700708 | EMULSIONS, ASPHALT | 10/08/2014 | Paid | $1,564.82 |
PRM 6200 14092237487 | EMULSIONS, ASPHALT | 09/23/2014 | Paid | $61,299.71 |
PRM 6200 14092237489 | EMULSIONS, ASPHALT | 09/23/2014 | Paid | $78,909.04 |
PRM 6200 14091636993 | EMULSIONS, ASPHALT | 09/17/2014 | Paid | $34,125.27 |
PRM 6200 14091136563 | EMULSIONS, ASPHALT | 09/12/2014 | Paid | $104,565.71 |
PRM 6200 14090936269 | EMULSIONS, ASPHALT | 09/10/2014 | Paid | $14,509.18 |
PRM 6200 14090936271 | EMULSIONS, ASPHALT | 09/10/2014 | Paid | $8,201.31 |
PRM 6200 14090936273 | EMULSIONS, ASPHALT | 09/10/2014 | Paid | $17,742.34 |
PRM 6200 14090936275 | EMULSIONS, ASPHALT | 09/10/2014 | Paid | $13,162.08 |
PRM 6200 14090936277 | EMULSIONS, ASPHALT | 09/10/2014 | Paid | $1,787.32 |
PRM 6200 14090936279 | EMULSIONS, ASPHALT | 09/10/2014 | Paid | $1,594.25 |
PRM 6200 14090936281 | EMULSIONS, ASPHALT | 09/10/2014 | Paid | $15,201.67 |
PRM 6200 14090936283 | EMULSIONS, ASPHALT | 09/10/2014 | Paid | $16,274.49 |
PRM 6200 14090936285 | EMULSIONS, ASPHALT | 09/10/2014 | Paid | $303.40 |
PRM 6200 14090936287 | EMULSIONS, ASPHALT | 09/10/2014 | Paid | $9,379.31 |
PRM 6200 14090936289 | EMULSIONS, ASPHALT | 09/10/2014 | Paid | $18,257.54 |
PRM 6200 14090936291 | EMULSIONS, ASPHALT | 09/10/2014 | Paid | $13,394.98 |
PRM 6200 14090936293 | EMULSIONS, ASPHALT | 09/10/2014 | Paid | $4,100.36 |
PRM 6200 14082634738 | EMULSIONS, ASPHALT | 08/27/2014 | Paid | $95,938.54 |
PRM 6200 14082634741 | EMULSIONS, ASPHALT | 08/27/2014 | Paid | $16,189.71 |
PRM 6200 14082634744 | EMULSIONS, ASPHALT | 08/27/2014 | Paid | $20,925.24 |
PRM 6200 14082634748 | EMULSIONS, ASPHALT | 08/27/2014 | Paid | $13,387.92 |
PRM 6200 14082634750 | EMULSIONS, ASPHALT | 08/27/2014 | Paid | $11,680.02 |
GAX 6200 14081819329 | 08/19/2014 | Paid | ($4,324.70) | |
PRM 6200 14081833736 | EMULSIONS, ASPHALT | 08/19/2014 | Paid | $18,597.02 |
PRM 6200 14081433522 | EMULSIONS, ASPHALT | 08/15/2014 | Paid | $44,778.12 |
PRM 6200 14081433524 | EMULSIONS, ASPHALT | 08/15/2014 | Paid | $53,517.94 |
PRM 6200 14081233232 | EMULSIONS, ASPHALT | 08/13/2014 | Paid | $19,866.35 |
PRM 6200 14073132087 | EMULSIONS, ASPHALT | 08/01/2014 | Paid | $32,925.71 |
PRM 6200 14072931659 | EMULSIONS, ASPHALT | 07/30/2014 | Paid | $89,479.04 |
PRM 6200 14072130560 | EMULSIONS, ASPHALT | 07/22/2014 | Paid | $7,449.28 |
PRM 6200 14071629917 | EMULSIONS, ASPHALT | 07/17/2014 | Paid | $28,891.60 |
PRM 6200 14071629935 | EMULSIONS, ASPHALT | 07/17/2014 | Paid | $15,259.35 |
PRM 6200 14071629937 | EMULSIONS, ASPHALT | 07/17/2014 | Paid | $5,631.18 |
PRM 6200 14071629941 | EMULSIONS, ASPHALT | 07/17/2014 | Paid | $96.95 |
PRM 6200 14071529630 | EMULSIONS, ASPHALT | 07/16/2014 | Paid | $54,199.74 |
PRM 6200 14071529632 | EMULSIONS, ASPHALT | 07/16/2014 | Paid | $2,385.90 |
PRM 6200 14070928883 | EMULSIONS, ASPHALT | 07/10/2014 | Paid | $154,776.26 |
PRM 6200 14070728575 | EMULSIONS, ASPHALT | 07/09/2014 | Paid | $98,978.22 |
PRM 6200 14062527565 | EMULSIONS, ASPHALT | 06/26/2014 | Paid | $360.47 |
PRM 6200 14062527567 | EMULSIONS, ASPHALT | 06/26/2014 | Paid | $13,513.58 |
PRM 6200 14062527569 | EMULSIONS, ASPHALT | 06/26/2014 | Paid | $18,556.79 |
PRM 6200 14062527571 | EMULSIONS, ASPHALT | 06/26/2014 | Paid | $20,729.63 |
PRM 6200 14062527573 | EMULSIONS, ASPHALT | 06/26/2014 | Paid | $19,058.27 |
PRM 6200 14062527575 | EMULSIONS, ASPHALT | 06/26/2014 | Paid | $4,180.58 |
PRM 6200 14062527577 | EMULSIONS, ASPHALT | 06/26/2014 | Paid | $53,392.57 |
PRM 6200 14062327169 | EMULSIONS, ASPHALT | 06/24/2014 | Paid | $44,625.45 |
PRM 6200 14061926841 | EMULSIONS, ASPHALT | 06/20/2014 | Paid | $5,377.57 |
PRM 6200 14060925610 | EMULSIONS, ASPHALT | 06/10/2014 | Paid | $92,449.60 |
PRM 6200 14052724289 | EMULSIONS, ASPHALT | 05/28/2014 | Paid | $53,962.78 |
PRM 6200 14052023801 | EMULSIONS, ASPHALT | 05/21/2014 | Paid | $20,048.88 |
PRM 6200 14052023812 | EMULSIONS, ASPHALT | 05/21/2014 | Paid | $4,287.75 |
PRM 6200 14052023814 | EMULSIONS, ASPHALT | 05/21/2014 | Paid | $2,397.53 |
PRM 6200 14052023816 | EMULSIONS, ASPHALT | 05/21/2014 | Paid | $35,554.94 |
PRM 6200 14051222950 | EMULSIONS, ASPHALT | 05/13/2014 | Paid | $2,164.98 |
PRM 6200 14050722499 | EMULSIONS, ASPHALT | 05/08/2014 | Paid | $3,068.79 |
PRM 6200 14050221842 | EMULSIONS, ASPHALT | 05/05/2014 | Paid | $160.16 |
PRM 6200 14050221843 | EMULSIONS, ASPHALT | 05/05/2014 | Paid | $9,610.96 |
PRM 6200 14050221844 | EMULSIONS, ASPHALT | 05/05/2014 | Paid | $17,074.56 |
PRM 6200 14050121723 | EMULSIONS, ASPHALT | 05/02/2014 | Paid | $375.56 |
PRM 6200 14042921470 | EMULSIONS, ASPHALT | 04/30/2014 | Paid | $77.50 |
PRM 6200 14042320951 | EMULSIONS, ASPHALT | 04/24/2014 | Paid | $846.99 |
PRM 6200 14041720405 | EMULSIONS, ASPHALT | 04/18/2014 | Paid | $365.38 |
PRM 6200 14040719244 | EMULSIONS, ASPHALT | 04/08/2014 | Paid | $4,769.20 |
PRM 6200 14031716620 | EMULSIONS, ASPHALT | 03/18/2014 | Paid | $2,691.22 |
PRM 6200 14031216246 | EMULSIONS, ASPHALT | 03/13/2014 | Paid | $182.69 |
PRM 6200 14030815713 | EMULSIONS, ASPHALT | 03/10/2014 | Paid | $2,280.80 |
PRM 6200 14021313446 | EMULSIONS, ASPHALT | 02/14/2014 | Paid | $326.62 |
PRM 6200 14020612829 | EMULSIONS, ASPHALT | 02/07/2014 | Paid | $143.94 |
PRM 6200 14012311593 | EMULSIONS, ASPHALT | 01/24/2014 | Paid | $175.91 |
PRM 6200 14010810196 | EMULSIONS, ASPHALT | 01/09/2014 | Paid | $146.71 |
PRM 6200 14010810198 | EMULSIONS, ASPHALT | 01/09/2014 | Paid | $174.70 |
PRM 6200 13121708203 | EMULSIONS, ASPHALT | 12/18/2013 | Paid | $304.28 |
PRM 6200 13121007388 | EMULSIONS, ASPHALT | 12/11/2013 | Paid | $1,814.80 |
PRM 6200 13121007390 | EMULSIONS, ASPHALT | 12/11/2013 | Paid | $228.21 |
PRM 6200 13112706378 | EMULSIONS, ASPHALT | 12/02/2013 | Paid | $93.67 |
PRM 6200 13112706380 | EMULSIONS, ASPHALT | 12/02/2013 | Paid | $1,852.57 |
PRM 6200 13111204998 | EMULSIONS, ASPHALT | 11/13/2013 | Paid | $99.18 |
PRM 6200 13111205000 | EMULSIONS, ASPHALT | 11/13/2013 | Paid | $104.69 |
PRM 6200 13111205002 | EMULSIONS, ASPHALT | 11/13/2013 | Paid | $154.28 |
PRM 6200 13101801864 | EMULSIONS, ASPHALT | 10/21/2013 | Paid | $25,108.98 |
PRM 6200 13101801867 | EMULSIONS, ASPHALT | 10/21/2013 | Paid | $48,151.64 |
GAX 6200 13101000797 | 10/16/2013 | Paid | ($3,522.30) | |
PRM 6200 13101501487 | EMULSIONS, ASPHALT | 10/16/2013 | Paid | $5,343.13 |
PRM 6200 13092436191 | EMULSIONS, ASPHALT | 09/25/2013 | Paid | $9,760.56 |
PRM 6200 13091735445 | EMULSIONS, ASPHALT | 09/18/2013 | Paid | $167,756.55 |
PRM 6200 13091735453 | EMULSIONS, ASPHALT | 09/18/2013 | Paid | $92,994.53 |
PRM 6200 13091335128 | EMULSIONS, ASPHALT | 09/16/2013 | Paid | $72,148.06 |
PRM 6200 13091234914 | EMULSIONS, ASPHALT | 09/13/2013 | Paid | $253.60 |
PRM 6200 13080831852 | EMULSIONS, ASPHALT | 08/09/2013 | Paid | $42,082.90 |
PRM 6200 13080231209 | EMULSIONS, ASPHALT | 08/05/2013 | Paid | $56,458.35 |
PRM 6200 13080231211 | EMULSIONS, ASPHALT | 08/05/2013 | Paid | $17,798.57 |
PRM 6200 13080231213 | EMULSIONS, ASPHALT | 08/05/2013 | Paid | $52,107.28 |
PRM 6200 13080231215 | EMULSIONS, ASPHALT | 08/05/2013 | Paid | $20,283.89 |
PRM 6200 13071929282 | EMULSIONS, ASPHALT | 07/22/2013 | Paid | $13,363.60 |
PRM 6200 13071929284 | EMULSIONS, ASPHALT | 07/22/2013 | Paid | $15,410.19 |
PRM 6200 13071829042 | EMULSIONS, ASPHALT | 07/19/2013 | Paid | $32,196.36 |
PRM 6200 13071728773 | EMULSIONS, ASPHALT | 07/18/2013 | Paid | $170,274.59 |
PRM 6200 13071628547 | EMULSIONS, ASPHALT | 07/17/2013 | Paid | $7,609.54 |
PRM 6200 13071628549 | EMULSIONS, ASPHALT | 07/17/2013 | Paid | $197,784.30 |
PRM 6200 13062526701 | EMULSIONS, ASPHALT | 06/26/2013 | Paid | $105,115.63 |
PRM 6200 13062426578 | EMULSIONS, ASPHALT | 06/25/2013 | Paid | $31,664.87 |
PRM 6200 13062426580 | EMULSIONS, ASPHALT | 06/25/2013 | Paid | $43,108.43 |
PRM 6200 13062426582 | EMULSIONS, ASPHALT | 06/25/2013 | Paid | $80.99 |
PRM 6200 13062426584 | EMULSIONS, ASPHALT | 06/25/2013 | Paid | $15,259.93 |
PRM 6200 13062426586 | EMULSIONS, ASPHALT | 06/25/2013 | Paid | $9,221.39 |
GAX 6200 13061415131 | 06/24/2013 | Paid | ($2,424.20) | |
PRM 6200 13062126489 | EMULSIONS, ASPHALT | 06/24/2013 | Paid | $3,066.67 |
PRM 6200 13061926231 | EMULSIONS, ASPHALT | 06/20/2013 | Paid | $18,015.36 |
PRM 6200 13060725246 | EMULSIONS, ASPHALT | 06/10/2013 | Paid | $7,224.32 |
GAX 6200 13052813717 | 06/05/2013 | Paid | ($1,764.59) | |
GAX 6200 13052913827 | 06/05/2013 | Paid | ($7,337.00) | |
GAX 6200 13052913832 | 06/05/2013 | Paid | ($6,520.71) | |
PRM 6200 13060424813 | EMULSIONS, ASPHALT | 06/05/2013 | Paid | $317,321.90 |
PRM 6200 13060424832 | EMULSIONS, ASPHALT | 06/05/2013 | Paid | $15,626.45 |
PRM 6200 13060424836 | EMULSIONS, ASPHALT | 06/05/2013 | Paid | $17,016.53 |
PRM 6200 13060424839 | EMULSIONS, ASPHALT | 06/05/2013 | Paid | $6,135.54 |
PRM 6200 13042520996 | EMULSIONS, ASPHALT | 04/26/2013 | Paid | $98.22 |
PRM 6200 13042521008 | EMULSIONS, ASPHALT | 04/26/2013 | Paid | $125.50 |
PRM 6200 13042521010 | EMULSIONS, ASPHALT | 04/26/2013 | Paid | $124.03 |
PRM 6200 13042521012 | EMULSIONS, ASPHALT | 04/26/2013 | Paid | $107.85 |
PRM 6200 13041219634 | EMULSIONS, ASPHALT | 04/15/2013 | Paid | $3,170.34 |
PRM 6200 13040819132 | EMULSIONS, ASPHALT | 04/09/2013 | Paid | $632.97 |
PRM 6200 13040819134 | EMULSIONS, ASPHALT | 04/09/2013 | Paid | $2,706.53 |
PRM 6200 13032517773 | EMULSIONS, ASPHALT | 03/26/2013 | Paid | $1,566.32 |
PRM 6200 13032017518 | EMULSIONS, ASPHALT | 03/21/2013 | Paid | $615.54 |
PRM 6200 13030515856 | EMULSIONS, ASPHALT | 03/06/2013 | Paid | $219.83 |
PRM 6200 13022615034 | EMULSIONS, ASPHALT | 02/27/2013 | Paid | $496.64 |
PRM 6200 13022615061 | EMULSIONS, ASPHALT | 02/27/2013 | Paid | $133.17 |
PRM 6200 13022615063 | EMULSIONS, ASPHALT | 02/27/2013 | Paid | $255.25 |
PRM 6200 13022615068 | EMULSIONS, ASPHALT | 02/27/2013 | Paid | $604.54 |
PRM 6200 13022615074 | EMULSIONS, ASPHALT | 02/27/2013 | Paid | $142.89 |
PRM 6200 13022615076 | EMULSIONS, ASPHALT | 02/27/2013 | Paid | $76.94 |
PRM 6200 13022615078 | EMULSIONS, ASPHALT | 02/27/2013 | Paid | $236.32 |
PRM 6200 13022615085 | EMULSIONS, ASPHALT | 02/27/2013 | Paid | $142.89 |
PRM 6200 13022014454 | EMULSIONS, ASPHALT | 02/21/2013 | Paid | $743.53 |
PRM 6200 13013112799 | EMULSIONS, ASPHALT | 02/01/2013 | Paid | $123.45 |
PRM 6200 13010309361 | EMULSIONS, ASPHALT | 01/04/2013 | Paid | $7,794.83 |
PRM 6200 12122708645 | EMULSIONS, ASPHALT | 12/28/2012 | Paid | $97.07 |
PRM 6200 12121908207 | EMULSIONS, ASPHALT | 12/20/2012 | Paid | $3,246.41 |
PRM 6200 12112605729 | EMULSIONS, ASPHALT | 11/27/2012 | Paid | $232.43 |
PRM 6200 12112605731 | EMULSIONS, ASPHALT | 11/27/2012 | Paid | $453.63 |
PRM 6200 12112605733 | EMULSIONS, ASPHALT | 11/27/2012 | Paid | $2,643.24 |
PRM 6200 12111905444 | EMULSIONS, ASPHALT | 11/20/2012 | Paid | $4,268.02 |
PRM 6200 12103003602 | EMULSIONS, ASPHALT | 10/31/2012 | Paid | $135.13 |
PRM 6200 12101701970 | EMULSIONS, ASPHALT | 10/18/2012 | Paid | $160.84 |
PRM 6200 12101101226 | EMULSIONS, ASPHALT | 10/12/2012 | Paid | $214.45 |
PRM 6200 12100800920 | EMULSIONS, ASPHALT | 10/09/2012 | Paid | $40,449.81 |
PRM 6200 12100800922 | EMULSIONS, ASPHALT | 10/09/2012 | Paid | $9,169.19 |
PRM 6200 12100800930 | EMULSIONS, ASPHALT | 10/09/2012 | Paid | $273.42 |
PRM 6200 12092835541 | EMULSIONS, ASPHALT | 10/01/2012 | Paid | $268,713.37 |
PRM 6200 12090432717 | EMULSIONS, ASPHALT | 09/05/2012 | Paid | $1,962.95 |
PRM 6200 12082331506 | EMULSIONS, ASPHALT | 08/24/2012 | Paid | $59,443.62 |
PRM 6200 12082331508 | EMULSIONS, ASPHALT | 08/24/2012 | Paid | $5,578.52 |
PRM 6200 12082331510 | EMULSIONS, ASPHALT | 08/24/2012 | Paid | $17,171.60 |
PRM 6200 12082331512 | EMULSIONS, ASPHALT | 08/24/2012 | Paid | $16,666.35 |
PRM 6200 12082331514 | EMULSIONS, ASPHALT | 08/24/2012 | Paid | $54,283.61 |
PRM 6200 12082331516 | EMULSIONS, ASPHALT | 08/24/2012 | Paid | $28,096.54 |
PRM 6200 12082331518 | EMULSIONS, ASPHALT | 08/24/2012 | Paid | $169,883.23 |
PRM 6200 12082231348 | EMULSIONS, ASPHALT | 08/23/2012 | Paid | $104,786.79 |
PRM 6200 12082231350 | EMULSIONS, ASPHALT | 08/23/2012 | Paid | $27,706.07 |
PRM 6200 12072528430 | EMULSIONS, ASPHALT | 07/26/2012 | Paid | $92,354.01 |
PRM 6200 12071627543 | EMULSIONS, ASPHALT | 07/17/2012 | Paid | $17,482.08 |
PRM 6200 12071627545 | EMULSIONS, ASPHALT | 07/17/2012 | Paid | $36,878.58 |
PRM 6200 12071627551 | EMULSIONS, ASPHALT | 07/17/2012 | Paid | $107,649.16 |
PRM 6200 12071627554 | EMULSIONS, ASPHALT | 07/17/2012 | Paid | $79,290.91 |
PRM 6200 12071327444 | EMULSIONS, ASPHALT | 07/16/2012 | Paid | $51,935.15 |
PRM 6200 12071327451 | EMULSIONS, ASPHALT | 07/16/2012 | Paid | $23,738.31 |
PRM 6200 12070326467 | EMULSIONS, ASPHALT | 07/05/2012 | Paid | $18,036.99 |
PRM 6200 12062625515 | EMULSIONS, ASPHALT | 06/27/2012 | Paid | $13,176.23 |
PRM 6200 12062625517 | EMULSIONS, ASPHALT | 06/27/2012 | Paid | $18,430.35 |
PRM 6200 12062625519 | EMULSIONS, ASPHALT | 06/27/2012 | Paid | $33,935.14 |
PRM 6200 12062625521 | EMULSIONS, ASPHALT | 06/27/2012 | Paid | $18,594.12 |
PRM 6200 12062625523 | EMULSIONS, ASPHALT | 06/27/2012 | Paid | $9,866.82 |
PRM 6200 12062625525 | EMULSIONS, ASPHALT | 06/27/2012 | Paid | $17,052.00 |
PRM 6200 12062625527 | EMULSIONS, ASPHALT | 06/27/2012 | Paid | $196,502.66 |
PRM 6200 12062525307 | EMULSIONS, ASPHALT | 06/26/2012 | Paid | $35,154.82 |
PRM 6200 12060523530 | EMULSIONS, ASPHALT | 06/06/2012 | Paid | $40,637.52 |
PRM 6200 12060523532 | EMULSIONS, ASPHALT | 06/06/2012 | Paid | $7,451.29 |
PRM 6200 12060523535 | EMULSIONS, ASPHALT | 06/06/2012 | Paid | $74,114.62 |
PRM 6200 12050820927 | EMULSIONS, ASPHALT | 05/09/2012 | Paid | $251.01 |
PRM 6200 12050820930 | EMULSIONS, ASPHALT | 05/09/2012 | Paid | $87.31 |
PRM 6200 12050820932 | EMULSIONS, ASPHALT | 05/09/2012 | Paid | $3,295.84 |
PRM 6200 12050820935 | EMULSIONS, ASPHALT | 05/09/2012 | Paid | $130.96 |
PRM 6200 12050820937 | EMULSIONS, ASPHALT | 05/09/2012 | Paid | $92.76 |
PRM 6200 12050820939 | EMULSIONS, ASPHALT | 05/09/2012 | Paid | $305.58 |
PRM 6200 12050820941 | EMULSIONS, ASPHALT | 05/09/2012 | Paid | $136.42 |
PRM 6200 12050820943 | EMULSIONS, ASPHALT | 05/09/2012 | Paid | $141.87 |
PRM 6200 12050820946 | EMULSIONS, ASPHALT | 05/09/2012 | Paid | $8,496.55 |
PRM 6200 12050820948 | EMULSIONS, ASPHALT | 05/09/2012 | Paid | $8,910.35 |
PRM 6200 12041618561 | EMULSIONS, ASPHALT | 04/17/2012 | Paid | $3,052.89 |
PRM 6200 12032917094 | EMULSIONS, ASPHALT | 03/30/2012 | Paid | $3,643.48 |
PRM 6200 12030614604 | EMULSIONS, ASPHALT | 03/07/2012 | Paid | $6,045.57 |
PRM 6200 12030614605 | EMULSIONS, ASPHALT | 03/07/2012 | Paid | $1,284.35 |
PRM 6200 12020912116 | EMULSIONS, ASPHALT | 02/10/2012 | Paid | $4,616.17 |
PRM 6200 12011709886 | EMULSIONS, ASPHALT | 01/18/2012 | Paid | $207.85 |
PRM 6200 11121907533 | EMULSIONS, ASPHALT | 12/20/2011 | Paid | $3,662.98 |
PRM 6200 11112805464 | EMULSIONS, ASPHALT | 11/29/2011 | Paid | $69.70 |
PRM 6200 11112305398 | EMULSIONS, ASPHALT | 11/28/2011 | Paid | $4,819.81 |
PRM 6200 11112305399 | EMULSIONS, ASPHALT | 11/28/2011 | Paid | $5,945.94 |
PRM 6200 11102502486 | EMULSIONS, ASPHALT | 10/26/2011 | Paid | $593.20 |
PRM 6200 11101401486 | EMULSIONS, ASPHALT | 10/17/2011 | Paid | $323.56 |
PRM 6200 11092235177 | EMULSIONS, ASPHALT | 09/23/2011 | Paid | $334.35 |
PRM 6200 11092135029 | EMULSIONS, ASPHALT | 09/22/2011 | Paid | $8,692.35 |
PRM 6200 11091934757 | EMULSIONS, ASPHALT | 09/20/2011 | Paid | $86.59 |
PRM 6200 11091334309 | EMULSIONS, ASPHALT | 09/14/2011 | Paid | $4,923.50 |
PRM 6200 11090934019 | EMULSIONS, ASPHALT | 09/12/2011 | Paid | $242,782.92 |
PRM 6200 11081831856 | EMULSIONS, ASPHALT | 08/19/2011 | Paid | $7,411.49 |
PRM 6200 11081731721 | EMULSIONS, ASPHALT | 08/18/2011 | Paid | $387,308.35 |
PRM 6200 11081631492 | EMULSIONS, ASPHALT | 08/17/2011 | Paid | $40,595.65 |
PRM 6200 11072729470 | EMULSIONS, ASPHALT | 07/28/2011 | Paid | $77,113.35 |
PRM 6200 11072028785 | EMULSIONS, ASPHALT | 07/21/2011 | Paid | $32,941.29 |
PRM 6200 11071328124 | EMULSIONS, ASPHALT | 07/14/2011 | Paid | $328,700.39 |
PRM 6200 11071227961 | EMULSIONS, ASPHALT | 07/13/2011 | Paid | $156,069.29 |
PRM 6200 11062026084 | EMULSIONS, ASPHALT | 06/21/2011 | Paid | $38,659.55 |
PRM 6200 11061625778 | EMULSIONS, ASPHALT | 06/17/2011 | Paid | $132,842.73 |
PRM 6200 11052523790 | EMULSIONS, ASPHALT | 05/26/2011 | Paid | $88,021.56 |
PRM 6200 11052423647 | EMULSIONS, ASPHALT | 05/25/2011 | Paid | $4,197.92 |
PRM 6200 11051122522 | EMULSIONS, ASPHALT | 05/12/2011 | Paid | $84,090.99 |
PRM 6200 11042620840 | EMULSIONS, ASPHALT | 04/27/2011 | Paid | $3,825.96 |
PRM 6200 11040619060 | EMULSIONS, ASPHALT | 04/07/2011 | Paid | $1,178.21 |
PRM 6200 11040418744 | EMULSIONS, ASPHALT | 04/05/2011 | Paid | $556.26 |
PRM 6200 11033118314 | EMULSIONS, ASPHALT | 04/01/2011 | Paid | $129.47 |
PRM 6200 11032817819 | EMULSIONS, ASPHALT | 03/29/2011 | Paid | $450.77 |
PRM 6200 11032517659 | EMULSIONS, ASPHALT | 03/28/2011 | Paid | $763.34 |
PRM 6200 11030916081 | EMULSIONS, ASPHALT | 03/10/2011 | Paid | $705.74 |
PRM 6200 11022414507 | EMULSIONS, ASPHALT | 02/25/2011 | Paid | $1,035.79 |
PRM 6200 11012411447 | EMULSIONS, ASPHALT | 01/25/2011 | Paid | $2,517.56 |
PRM 6200 11011410627 | EMULSIONS, ASPHALT | 01/18/2011 | Paid | $244.56 |
PRM 6200 10122908825 | EMULSIONS, ASPHALT | 12/30/2010 | Paid | $699.68 |
PRM 6200 10121007615 | EMULSIONS, ASPHALT | 12/13/2010 | Paid | $333.21 |
PRM 6200 10111705400 | EMULSIONS, ASPHALT | 11/18/2010 | Paid | $909.15 |
PRM 6200 10110103742 | EMULSIONS, ASPHALT | 11/02/2010 | Paid | $3,292.50 |
PRM 6200 10102703328 | EMULSIONS, ASPHALT | 10/28/2010 | Paid | $519.10 |
PRM 6200 10102002325 | EMULSIONS, ASPHALT | 10/21/2010 | Paid | $3,269.81 |
PRM 6200 10101101209 | EMULSIONS, ASPHALT | 10/12/2010 | Paid | $30,954.00 |
PRM 6200 10092037906 | EMULSIONS, ASPHALT | 09/21/2010 | Paid | $173,858.94 |
PRM 6200 10091737740 | EMULSIONS, ASPHALT | 09/20/2010 | Paid | $44,193.59 |
PRM 6200 10083035478 | EMULSIONS, ASPHALT | 08/31/2010 | Paid | $204,107.98 |
PRM 6200 10081834202 | EMULSIONS, ASPHALT | 08/19/2010 | Paid | $72,413.37 |
PRM 6200 10081133472 | EMULSIONS, ASPHALT | 08/12/2010 | Paid | $57,436.64 |
PRM 6200 10081033329 | EMULSIONS, ASPHALT | 08/11/2010 | Paid | $88,850.04 |
PRM 6200 10080933155 | EMULSIONS, ASPHALT | 08/10/2010 | Paid | $193,319.78 |
PRM 6200 10072832044 | EMULSIONS, ASPHALT | 07/29/2010 | Paid | $32,686.38 |
PRM 6200 10072231401 | EMULSIONS, ASPHALT | 07/23/2010 | Paid | $49.30 |
PRM 6200 10072031018 | EMULSIONS, ASPHALT | 07/21/2010 | Paid | $12,434.71 |
PRM 6200 10071530596 | EMULSIONS, ASPHALT | 07/16/2010 | Paid | $119,232.58 |
PRM 6200 10070929915 | EMULSIONS, ASPHALT | 07/12/2010 | Paid | $55,541.11 |
PRM 6200 10070929916 | EMULSIONS, ASPHALT | 07/12/2010 | Paid | $51,961.11 |
PRM 6200 10070629475 | EMULSIONS, ASPHALT | 07/07/2010 | Paid | $131,206.99 |
PRM 6200 10070129140 | EMULSIONS, ASPHALT | 07/02/2010 | Paid | $3,295.35 |
PRM 6200 10062227929 | EMULSIONS, ASPHALT | 06/23/2010 | Paid | $56,584.21 |
PRM 6200 10061827693 | EMULSIONS, ASPHALT | 06/21/2010 | Paid | $71,344.24 |
PRM 6200 10060426271 | EMULSIONS, ASPHALT | 06/07/2010 | Paid | $11,509.46 |
PRM 6200 10052725394 | EMULSIONS, ASPHALT | 05/28/2010 | Paid | $21,880.59 |
PRM 6200 10052625249 | EMULSIONS, ASPHALT | 05/27/2010 | Paid | $245.33 |
PRM 6200 10051123656 | EMULSIONS, ASPHALT | 05/12/2010 | Paid | $556.06 |
PRM 6200 10050623248 | EMULSIONS, ASPHALT | 05/07/2010 | Paid | $61.33 |
PRM 6200 10050623249 | EMULSIONS, ASPHALT | 05/07/2010 | Paid | $110.40 |
PRM 6200 10050623250 | EMULSIONS, ASPHALT | 05/07/2010 | Paid | $106.31 |
PRM 6200 10050623251 | EMULSIONS, ASPHALT | 05/07/2010 | Paid | $44.98 |
PRM 6200 10050523121 | EMULSIONS, ASPHALT | 05/06/2010 | Paid | $878.98 |
PRM 6200 10041621528 | EMULSIONS, ASPHALT | 04/19/2010 | Paid | $143.11 |
PRM 6200 10041321085 | EMULSIONS, ASPHALT | 04/14/2010 | Paid | $89.85 |
PRM 6200 10041321086 | EMULSIONS, ASPHALT | 04/14/2010 | Paid | $85.76 |
PRM 6200 10041321087 | EMULSIONS, ASPHALT | 04/14/2010 | Paid | $3,079.35 |
PRM 6200 10041321088 | EMULSIONS, ASPHALT | 04/14/2010 | Paid | $191.95 |
PRM 6200 10041321089 | EMULSIONS, ASPHALT | 04/14/2010 | Paid | $110.27 |
PRM 6200 10041321090 | EMULSIONS, ASPHALT | 04/14/2010 | Paid | $69.43 |
PRM 6200 10041321091 | EMULSIONS, ASPHALT | 04/14/2010 | Paid | $114.35 |
PRM 6200 10041321092 | EMULSIONS, ASPHALT | 04/14/2010 | Paid | $147.02 |
PRM 6200 10040820570 | EMULSIONS, ASPHALT | 04/09/2010 | Paid | $106.18 |
PRM 6200 10040119951 | EMULSIONS, ASPHALT | 04/02/2010 | Paid | $98.02 |
PRM 6200 10032919479 | EMULSIONS, ASPHALT | 03/30/2010 | Paid | $2,250.29 |
PRM 6200 10022315095 | EMULSIONS, ASPHALT | 02/24/2010 | Paid | $81.68 |
PRM 6200 10022315096 | EMULSIONS, ASPHALT | 02/24/2010 | Paid | $49.01 |
PRM 6200 10022315097 | EMULSIONS, ASPHALT | 02/24/2010 | Paid | $64.75 |
PRM 6200 10022315098 | EMULSIONS, ASPHALT | 02/24/2010 | Paid | $147.02 |
PRM 6200 10022315099 | EMULSIONS, ASPHALT | 02/24/2010 | Paid | $73.51 |
PRM 6200 10022315100 | EMULSIONS, ASPHALT | 02/24/2010 | Paid | $65.35 |
PRM 6200 10020913679 | EMULSIONS, ASPHALT | 02/10/2010 | Paid | $294.06 |
PRM 6200 10012211695 | EMULSIONS, ASPHALT | 01/25/2010 | Paid | $1,435.83 |
PRM 6200 10010509851 | EMULSIONS, ASPHALT | 01/06/2010 | Paid | $98.94 |
PRM 6200 10010409655 | EMULSIONS, ASPHALT | 01/05/2010 | Paid | $2,612.62 |
PRM 6200 09121407793 | EMULSIONS, ASPHALT | 12/15/2009 | Paid | $421.49 |
PRM 6200 09120807296 | EMULSIONS, ASPHALT | 12/09/2009 | Paid | $127.75 |
PRM 6200 09112506198 | EMULSIONS, ASPHALT | 11/30/2009 | Paid | $2,233.00 |
PRM 6200 09112506199 | EMULSIONS, ASPHALT | 11/30/2009 | Paid | $70.00 |
PRM 6200 09110504233 | EMULSIONS, ASPHALT | 11/06/2009 | Paid | $204.75 |
PRM 6200 09103003374 | EMULSIONS, ASPHALT | 11/02/2009 | Paid | $122.50 |
PRM 6200 09102702988 | EMULSIONS, ASPHALT | 10/28/2009 | Paid | $248.50 |
PRM 6200 09101401632 | EMULSIONS, ASPHALT | 10/15/2009 | Paid | $45,353.45 |
PRM 6200 09100600498 | EMULSIONS, ASPHALT | 10/07/2009 | Paid | $26,243.85 |
PRM 6200 09092344781 | EMULSIONS, ASPHALT | 09/24/2009 | Paid | $34,853.06 |
PRM 6200 09091143503 | EMULSIONS, ASPHALT | 09/14/2009 | Paid | $75,122.57 |
PRM 6200 09091143504 | EMULSIONS, ASPHALT | 09/14/2009 | Paid | $194,310.69 |
PRM 6200 09090943212 | EMULSIONS, ASPHALT | 09/10/2009 | Paid | $2,810.50 |
PRM 6200 09090242529 | EMULSIONS, ASPHALT | 09/03/2009 | Paid | $3,680.25 |
PRM 6200 09082641788 | EMULSIONS, ASPHALT | 08/27/2009 | Paid | $152,157.80 |
PRM 6200 09082541596 | EMULSIONS, ASPHALT | 08/26/2009 | Paid | $13,731.05 |
PRM 6200 09073038606 | EMULSIONS, ASPHALT | 07/31/2009 | Paid | $87,629.35 |
PRM 6200 09072838144 | EMULSIONS, ASPHALT | 07/29/2009 | Paid | $126,906.81 |
PRM 6200 09070935714 | EMULSIONS, ASPHALT | 07/10/2009 | Paid | $149,287.13 |
PRM 6200 09062033763 | Asphalt, Emulsified | 06/22/2009 | Paid | $27,225.34 |
PRM 6200 09061533117 | Asphalt, Emulsified | 06/16/2009 | Paid | $111,978.36 |
PRM 6200 09060832296 | Asphalt, Emulsified | 06/09/2009 | Paid | $14,906.84 |
PRM 6200 09060532116 | Asphalt, Emulsified | 06/08/2009 | Paid | $28,879.98 |
PRM 6200 09060532117 | Asphalt, Emulsified | 06/08/2009 | Paid | $28,493.63 |
PRM 6200 09060331772 | Asphalt, Emulsified | 06/04/2009 | Paid | $42,479.16 |
PRM 6200 09052730953 | Asphalt, Emulsified | 05/28/2009 | Paid | $109,848.47 |
PRM 6200 09052230522 | Asphalt, Emulsified | 05/26/2009 | Paid | $28,709.09 |
PRM 6200 09052130285 | Asphalt, Emulsified | 05/22/2009 | Paid | $41,926.86 |
PRM 6200 09052030085 | Asphalt, Emulsified | 05/21/2009 | Paid | $41,235.90 |
PRM 6200 08101602507 | Asphalt, Emulsified | 10/17/2008 | Paid | $36,045.89 |
PRM 6200 08101301782 | Asphalt, Emulsified | 10/14/2008 | Paid | $17,454.19 |
PRM 6200 08101001466 | Asphalt, Emulsified | 10/13/2008 | Paid | $56,433.99 |
PRM 6200 08100901268 | Asphalt, Emulsified | 10/10/2008 | Paid | $17,994.97 |