PRM 6100 24032920739 |
Construction, Pipeline |
04/02/2024 |
Paid |
$218,891.47 |
PRM 6100 24032820487 |
Construction, Pipeline |
04/01/2024 |
Paid |
$13,096.44 |
PRM 6100 24032619955 |
Construction, Pipeline |
03/28/2024 |
Paid |
$309,409.53 |
PRM 6100 24032619960 |
Construction, Pipeline |
03/28/2024 |
Paid |
$65,552.85 |
PRM 6100 24032019201 |
Construction, Pipeline |
03/22/2024 |
Paid |
$7,324.31 |
PRM 6100 24031919057 |
MANAGEMENT, CONSTRUCTION |
03/21/2024 |
Paid |
$153,507.23 |
PRM 6100 24031919065 |
Site Work |
03/21/2024 |
Paid |
$3,722.10 |
PRM 6100 24031518615 |
Site Work |
03/19/2024 |
Paid |
$3,185.50 |
PRM 6100 24031418472 |
Site Work |
03/18/2024 |
Paid |
$13,636.69 |
PRM 6100 24030817925 |
Site Work |
03/12/2024 |
Paid |
$109,443.93 |
PRM 6100 24022716504 |
Construction, Water System, Main and Service Line |
02/29/2024 |
Paid |
$734,390.30 |
PRM 6100 24022616368 |
Site Work |
02/28/2024 |
Paid |
$59,264.80 |
PRM 6100 24022115817 |
MANAGEMENT, CONSTRUCTION |
02/23/2024 |
Paid |
$125,282.01 |
PRM 6100 24022015687 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
02/22/2024 |
Paid |
$73,385.71 |
PRM 6100 24022015690 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
02/22/2024 |
Paid |
$110,524.84 |
PRM 6100 24013013180 |
Construction, Pipeline |
02/01/2024 |
Paid |
$145,567.29 |
PRM 6100 24013013207 |
Site Work |
02/01/2024 |
Paid |
$27,165.21 |
PRM 6100 24012612958 |
Construction, Pipeline |
01/30/2024 |
Paid |
$45,966.77 |
PRM 6100 24012612965 |
Site Work |
01/30/2024 |
Paid |
$108,968.11 |
PRM 6100 24012512742 |
Site Work |
01/29/2024 |
Paid |
$171,698.01 |
PRM 6100 24012512760 |
Site Work |
01/29/2024 |
Paid |
$67,731.20 |
PRM 6100 24012412532 |
Construction, Pipeline |
01/26/2024 |
Paid |
$11,847.81 |
PRM 6100 24012412535 |
Site Work |
01/26/2024 |
Paid |
$38,134.50 |
PRM 6100 24011711710 |
Construction, Pipeline |
01/19/2024 |
Paid |
$12,173.88 |
PRM 6100 24011611552 |
Site Work |
01/18/2024 |
Paid |
$42,332.00 |
PRM 6100 24011611574 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/18/2024 |
Paid |
$55,367.79 |
PRM 6100 24010310150 |
Construction, Pipeline |
01/05/2024 |
Paid |
$24,937.50 |
PRM 6100 23122209422 |
Construction, Pipeline |
12/28/2023 |
Paid |
$536,199.84 |
PRM 6100 23122109282 |
Construction, Pipeline |
12/27/2023 |
Paid |
$2,565.00 |
PRM 6100 23121808582 |
MANAGEMENT, CONSTRUCTION |
12/20/2023 |
Paid |
$217,082.31 |
PRM 6100 23121808720 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
12/20/2023 |
Paid |
$79,945.35 |
PRM 6100 23120506935 |
Site Work |
12/07/2023 |
Paid |
$85,224.66 |
PRM 6100 23112906377 |
Construction, Water System, Main and Service Line |
12/01/2023 |
Paid |
$258,906.64 |
PRM 6100 23112205795 |
Construction, Communication Equipment (Incl Antenna Towers) |
11/29/2023 |
Paid |
$19,950.00 |
PRM 6100 23112705934 |
Site Work |
11/29/2023 |
Paid |
$55,728.75 |
PRM 6100 23112105648 |
Site Work |
11/27/2023 |
Paid |
$12,112.33 |
PRM 6100 23112105728 |
Construction, Pipeline |
11/27/2023 |
Paid |
$268,704.84 |
PRM 6100 23111705278 |
Site Work |
11/21/2023 |
Paid |
$30,453.41 |
PRM 6100 23111705353 |
Site Work |
11/21/2023 |
Paid |
$4,322.50 |
PRM 6100 23111304574 |
Construction, Pipeline |
11/15/2023 |
Paid |
$4,955.87 |
PRM 6100 23111304635 |
MANAGEMENT, CONSTRUCTION |
11/15/2023 |
Paid |
$167,931.13 |
PRM 6100 23110604102 |
Construction, Pipeline |
11/08/2023 |
Paid |
$3,523.04 |
PRM 6100 23110604107 |
Construction, Pipeline |
11/08/2023 |
Paid |
$665.60 |
PRM 6100 23110604162 |
Construction, Pipeline |
11/08/2023 |
Paid |
$1,158.12 |
PRM 6100 23110303940 |
Construction, Pipeline |
11/07/2023 |
Paid |
$4,171.13 |
PRM 6100 23102703207 |
MANAGEMENT, CONSTRUCTION |
10/31/2023 |
Paid |
$97,816.75 |
PRM 6100 23102502907 |
Site Work |
10/30/2023 |
Paid |
$7,556.06 |
PRM 6100 23102302614 |
Heating, Ventilating and Air Conditioning (HVAC) |
10/25/2023 |
Paid |
$131,118.81 |
PRM 6100 23101802114 |
Construction, Pipeline |
10/20/2023 |
Paid |
$7,185.22 |
PRM 6100 23101802123 |
Site Work |
10/20/2023 |
Paid |
$46,363.03 |
PRM 6100 23101601806 |
Site Work |
10/18/2023 |
Paid |
$23,658.26 |
PRM 6100 23101201433 |
Site Work |
10/16/2023 |
Paid |
$14,148.35 |
PRM 6100 23101101135 |
Site Work |
10/13/2023 |
Paid |
$20,962.70 |
PRM 6100 23101101280 |
Site Work |
10/13/2023 |
Paid |
$178,233.89 |
PRM 6100 23100600798 |
Site Work |
10/10/2023 |
Paid |
$33,744.00 |
PRM 6100 23092937057 |
MANAGEMENT, CONSTRUCTION |
10/03/2023 |
Paid |
$293,160.50 |
PRM 6100 23092937057 |
Site Work |
10/03/2023 |
Paid |
$12,468.74 |
PRM 6100 23090834453 |
Construction, Pipeline |
09/12/2023 |
Paid |
$11,718.63 |
PRM 6100 23090734231 |
Construction, Pipeline |
09/11/2023 |
Paid |
$5,457.35 |
PRM 6100 23090734241 |
Site Work |
09/11/2023 |
Paid |
$54,411.89 |
PRM 6100 23090533781 |
MANAGEMENT, CONSTRUCTION |
09/07/2023 |
Paid |
$113,466.55 |
PRM 6100 23090133585 |
Construction, Pipeline |
09/06/2023 |
Paid |
$5,275.61 |
PRM 6100 23090133592 |
Construction, Pipeline |
09/06/2023 |
Paid |
$792.76 |
PRM 6100 23090133595 |
Construction, Pipeline |
09/06/2023 |
Paid |
$4,143.42 |
PRM 6100 23083033265 |
Construction, Pipeline |
09/01/2023 |
Paid |
$2,036.09 |
PRM 6100 23082832936 |
MANAGEMENT, CONSTRUCTION |
08/30/2023 |
Paid |
$438,929.16 |
PRM 6100 23082432572 |
Construction, Pipeline |
08/28/2023 |
Paid |
$343,083.00 |
PRM 6100 23082332413 |
Construction, Water System, Main and Service Line |
08/25/2023 |
Paid |
$45,342.45 |
PRM 6100 23082332423 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
08/25/2023 |
Paid |
$10,094.70 |
PRM 6100 23082132149 |
Site Work |
08/23/2023 |
Paid |
$6,444.04 |
PRM 6100 23080830697 |
Site Work |
08/10/2023 |
Paid |
$10,040.59 |
PRM 6100 23080330273 |
Site Work |
08/07/2023 |
Paid |
$645,783.85 |
PRM 6100 23080330282 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
08/07/2023 |
Paid |
$111,450.97 |
PRM 6100 23080330297 |
Site Work |
08/07/2023 |
Paid |
$27,008.24 |
PRM 6100 23072729570 |
Site Work |
07/31/2023 |
Paid |
$35,147.35 |
PRM 6100 23072128901 |
Construction, Pipeline |
07/25/2023 |
Paid |
$10,149.56 |
PRM 6100 23072128909 |
Site Work |
07/25/2023 |
Paid |
$5,825.65 |
PRM 6100 23071828532 |
Construction, Pipeline |
07/20/2023 |
Paid |
$2,873.74 |
PRM 6100 23071428224 |
Construction, Water System, Main and Service Line |
07/18/2023 |
Paid |
$79,671.46 |
PRM 6100 23070727286 |
Construction, Pipeline |
07/11/2023 |
Paid |
$3,490.80 |
PRM 6100 23070627122 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
07/10/2023 |
Paid |
$219,088.24 |
PRM 6100 23070627156 |
Construction, Pipeline |
07/10/2023 |
Paid |
$476.02 |
PRM 6100 23070627156 |
Site Work |
07/10/2023 |
Paid |
$44,283.34 |
PRM 6100 23070627158 |
Construction, Pipeline |
07/10/2023 |
Paid |
$10,866.35 |
PRM 6100 23070526944 |
Construction, Pipeline |
07/07/2023 |
Paid |
$6,271.45 |
PRM 6100 23070326817 |
Construction, Pipeline |
07/06/2023 |
Paid |
$14,147.53 |
PRM 6100 23062325819 |
Construction, Pipeline |
06/27/2023 |
Paid |
$89,858.02 |
PRM 6100 23062225656 |
Construction, Pipeline |
06/26/2023 |
Paid |
$2,432.24 |
PRM 6100 23062225658 |
Construction, Pipeline |
06/26/2023 |
Paid |
$235,374.56 |
PRM 6100 23062225689 |
Site Work |
06/26/2023 |
Paid |
$156,529.70 |
PRM 6100 23061525021 |
Construction, Pipeline |
06/20/2023 |
Paid |
$4,792.94 |
PRM 6100 23061525023 |
Construction, Pipeline |
06/20/2023 |
Paid |
$5,960.82 |
PRM 6100 23061424922 |
Construction, Pipeline |
06/16/2023 |
Paid |
$223.66 |
PRM 6100 23061224801 |
MANAGEMENT, CONSTRUCTION |
06/14/2023 |
Paid |
$570,107.30 |
PRM 6100 23060824487 |
Paving/Resurfacing, Street (Major and Residential) |
06/12/2023 |
Paid |
$219,307.93 |
PRM 6100 23060824487 |
Site Work |
06/12/2023 |
Paid |
$17,572.80 |
PRM 6100 23060724356 |
MANAGEMENT, CONSTRUCTION |
06/09/2023 |
Paid |
$362,670.85 |
PRM 6100 23060524043 |
Site Work |
06/07/2023 |
Paid |
$54,555.31 |
PRM 6100 23052623343 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
05/31/2023 |
Paid |
$668,472.24 |
PRM 6100 23052222732 |
Site Work |
05/24/2023 |
Paid |
$115,178.64 |
PRM 6100 23052222737 |
Construction, Pipeline |
05/24/2023 |
Paid |
$206,268.62 |
PRM 6100 23051221929 |
Site Work |
05/16/2023 |
Paid |
$34,835.85 |
PRM 6100 23050921506 |
Site Work |
05/11/2023 |
Paid |
$35,188.95 |
PRM 6100 23050921541 |
Site Work |
05/11/2023 |
Paid |
$124,865.10 |
PRM 6100 23050821317 |
Construction, Pipeline |
05/10/2023 |
Paid |
$43,538.38 |
PRM 6100 23050821319 |
Construction, Pipeline |
05/10/2023 |
Paid |
$1,083.32 |
PRM 6100 23050821321 |
Construction, Pipeline |
05/10/2023 |
Paid |
$17,134.91 |
PRM 6100 23050821324 |
Construction, Pipeline |
05/10/2023 |
Paid |
$40,444.48 |
PRM 6100 23050821326 |
Construction, Pipeline |
05/10/2023 |
Paid |
$78,725.04 |
PRM 6100 23050821338 |
Site Work |
05/10/2023 |
Paid |
$79,715.46 |
PRM 6100 23050821340 |
Site Work |
05/10/2023 |
Paid |
$156,510.43 |
PRM 6100 23050821349 |
Site Work |
05/10/2023 |
Paid |
$130,957.77 |
PRM 6100 23050821352 |
Site Work |
05/10/2023 |
Paid |
$489,844.70 |
PRM 6100 23050220831 |
MANAGEMENT, CONSTRUCTION |
05/04/2023 |
Paid |
$387,623.49 |
PRM 6100 23042620235 |
Site Work |
04/28/2023 |
Paid |
$814,794.84 |
PRM 6100 23042620238 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
04/28/2023 |
Paid |
$255,325.42 |
PRM 6100 23042520110 |
MANAGEMENT, CONSTRUCTION |
04/27/2023 |
Paid |
$524,736.87 |
PRM 6100 23041819458 |
Construction, Pipeline |
04/20/2023 |
Paid |
$182,229.19 |
PRM 6100 23041719317 |
Paving/Resurfacing, Street (Major and Residential) |
04/19/2023 |
Paid |
$2,454,105.95 |
PRM 6100 23041018551 |
Construction, Pipeline |
04/12/2023 |
Paid |
$265,935.53 |
PRM 6100 23032417004 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
03/28/2023 |
Paid |
$244,902.69 |
PRM 6100 23032216693 |
Construction, Water System, Main and Service Line |
03/24/2023 |
Paid |
$63,283.85 |
PRM 6100 23032016290 |
Construction, Pipeline |
03/22/2023 |
Paid |
$283,426.62 |
PRM 6100 23032016292 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
03/22/2023 |
Paid |
$94,715.95 |
PRM 6100 23030714986 |
Heating, Ventilating and Air Conditioning (HVAC) |
03/09/2023 |
Paid |
$202,929.23 |
PRM 6100 23030714992 |
Construction, Pipeline |
03/09/2023 |
Paid |
$231,513.88 |
PRM 6100 23030614796 |
Construction, Pipeline |
03/08/2023 |
Paid |
$16,699.02 |
PRM 6100 23030614798 |
Construction, Pipeline |
03/08/2023 |
Paid |
$118,328.88 |
PRM 6100 23030314595 |
Site Work |
03/07/2023 |
Paid |
$735,613.15 |
PRM 6100 23030114330 |
Site Work |
03/03/2023 |
Paid |
$191,972.95 |
PRM 6100 23022113482 |
Construction, Pipeline |
02/23/2023 |
Paid |
$8,646.22 |
PRM 6100 23021312739 |
Construction, Communication Equipment (Incl Antenna Towers) |
02/15/2023 |
Paid |
$12,957.05 |
PRM 6100 23021412964 |
MANAGEMENT, CONSTRUCTION |
02/15/2023 |
Paid |
$348,049.22 |
PRM 6100 23021412964 |
Paving/Resurfacing, Street (Major and Residential) |
02/15/2023 |
Paid |
$266,154.49 |
PRM 6100 23020611990 |
Construction, Street (Major and Residential)(Incl Reconstruc |
02/08/2023 |
Paid |
$136,910.80 |
PRM 6100 23013111712 |
MANAGEMENT, CONSTRUCTION |
02/02/2023 |
Paid |
$118,792.94 |
PRM 6100 23012611332 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/30/2023 |
Paid |
$70,156.55 |
PRM 6100 23012611349 |
Site Work |
01/30/2023 |
Paid |
$5,587.47 |
PRM 6100 23011810179 |
Construction, Pipeline |
01/20/2023 |
Paid |
$102,444.51 |
PRM 6100 23011810183 |
Construction, Water System, Main and Service Line |
01/20/2023 |
Paid |
$45,640.14 |
PRM 6100 23011309911 |
Site Work |
01/18/2023 |
Paid |
$174,867.92 |
PRM 6100 23011209763 |
Site Work |
01/17/2023 |
Paid |
$774,542.33 |
PRM 6100 23010609119 |
Construction, Pipeline |
01/10/2023 |
Paid |
$1,193.34 |
PRM 6100 23010508995 |
Construction, Pipeline |
01/09/2023 |
Paid |
$3,826.49 |
PRM 6100 23010508997 |
Construction, Pipeline |
01/09/2023 |
Paid |
$39,600.00 |
PRM 6100 23010508999 |
Construction, Pipeline |
01/09/2023 |
Paid |
$35,626.28 |
PRM 6100 23010509005 |
Construction, Pipeline |
01/09/2023 |
Paid |
$3,633.29 |
PRM 6100 23010509007 |
Construction, Pipeline |
01/09/2023 |
Paid |
$72,015.01 |
PRM 6100 22123008730 |
Construction, Water System, Main and Service Line |
01/04/2023 |
Paid |
$6,739.79 |
PRM 6100 22122908639 |
Construction, Pipeline |
01/03/2023 |
Paid |
$124,396.95 |
PRM 6100 22121507500 |
Construction, Pipeline |
12/19/2022 |
Paid |
$496,474.73 |
PRM 6100 22121507502 |
Construction, Pipeline |
12/19/2022 |
Paid |
$75,703.40 |
PRM 6100 22121407330 |
MANAGEMENT, CONSTRUCTION |
12/16/2022 |
Paid |
$438,139.43 |
PRM 6100 22121407334 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
12/16/2022 |
Paid |
$258,024.34 |
PRM 6100 22121407336 |
Construction, Water System, Main and Service Line |
12/16/2022 |
Paid |
$42,466.08 |
PRM 6100 22121207021 |
Site Work |
12/14/2022 |
Paid |
$813,108.39 |
PRM 6100 22120606486 |
Site Work |
12/08/2022 |
Paid |
$263,623.00 |
PRM 6100 22120506341 |
Paving/Resurfacing, Street (Major and Residential) |
12/07/2022 |
Paid |
$309,449.32 |
PRM 6100 22120106141 |
Construction, Communication Equipment (Incl Antenna Towers) |
12/05/2022 |
Paid |
$210,994.05 |
PRM 6100 22120106141 |
Site Work |
12/05/2022 |
Paid |
$10,801.86 |
PRM 6100 22112305416 |
Construction, Pipeline |
11/29/2022 |
Paid |
$131,480.67 |
PRM 6100 22112305419 |
Site Work |
11/29/2022 |
Paid |
$341,901.22 |
PRM 6100 22112505512 |
MANAGEMENT, CONSTRUCTION |
11/29/2022 |
Paid |
$570,327.95 |
PRM 6100 22112205332 |
Site Work |
11/28/2022 |
Paid |
$437,334.66 |
PRM 6100 22112205336 |
Site Work |
11/28/2022 |
Paid |
$152,395.72 |
PRM 6100 22111604733 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
11/18/2022 |
Paid |
$353,009.71 |
PRM 6100 22111604733 |
Site Work |
11/18/2022 |
Paid |
$35,391.52 |
PRM 6100 22110303661 |
Heating, Ventilating and Air Conditioning (HVAC) |
11/07/2022 |
Paid |
$273,159.61 |
PRM 6100 22102502873 |
Construction, Pipeline |
10/27/2022 |
Paid |
$166,223.33 |
PRM 6100 22102402725 |
Construction, Pipeline |
10/26/2022 |
Paid |
$116,573.03 |
PRM 6100 22102102597 |
Construction, Pipeline |
10/25/2022 |
Paid |
$169,356.29 |
PRM 6100 22101802240 |
MANAGEMENT, CONSTRUCTION |
10/20/2022 |
Paid |
$16,767.50 |
PRM 6100 22101802242 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
10/20/2022 |
Paid |
$563,002.00 |
PRM 6100 22101802245 |
Site Work |
10/20/2022 |
Paid |
$2,647.09 |
PRM 6100 22101401838 |
Site Work |
10/18/2022 |
Paid |
$418,130.34 |
PRM 6100 22101101321 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
10/13/2022 |
Paid |
$472,113.90 |
PRM 6100 22092933168 |
Site Work |
10/03/2022 |
Paid |
$12,976.44 |
PRM 6100 22092833038 |
Construction, Water System, Main and Service Line |
09/30/2022 |
Paid |
$56,739.51 |
PRM 6100 22092833040 |
Construction, Water System, Main and Service Line |
09/30/2022 |
Paid |
$5,300.74 |
PRM 6100 22092632819 |
Heating, Ventilating and Air Conditioning (HVAC) |
09/28/2022 |
Paid |
$191,057.21 |
PRM 6100 22092032306 |
Construction, Pipeline |
09/22/2022 |
Paid |
$60,908.66 |
PRM 6100 22092032306 |
Paving/Resurfacing, Street (Major and Residential) |
09/22/2022 |
Paid |
$52,408.84 |
PRM 6100 22091531875 |
Construction, Water System, Main and Service Line |
09/19/2022 |
Paid |
$25,332.68 |
PRM 6100 22091231518 |
Paving/Resurfacing, Street (Major and Residential) |
09/14/2022 |
Paid |
$101,445.94 |
PRM 6100 22090130678 |
Site Work |
09/06/2022 |
Paid |
$135,041.18 |
PRM 6100 22083130480 |
Construction, Pipeline |
09/02/2022 |
Paid |
$8,778.00 |
PRM 6100 22083130482 |
Construction, Pipeline |
09/02/2022 |
Paid |
$291.94 |
PRM 6100 22083130558 |
Site Work |
09/02/2022 |
Paid |
$20,900.03 |
PRM 6100 22082930055 |
Construction, Pipeline |
08/31/2022 |
Paid |
$53,164.67 |
PRM 6100 22082930057 |
Construction, Pipeline |
08/31/2022 |
Paid |
$200.00 |
PRM 6100 22082229474 |
Construction, Pipeline |
08/24/2022 |
Paid |
$228,948.39 |
PRM 6100 22081629004 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
08/18/2022 |
Paid |
$372,262.18 |
PRM 6100 22080528206 |
Construction, Utility/Underground Projects |
08/09/2022 |
Paid |
$11,817.00 |
PRM 6100 22072627112 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
07/28/2022 |
Paid |
$224,900.09 |
PRM 6100 22072026522 |
Construction, Communication Equipment (Incl Antenna Towers) |
07/22/2022 |
Paid |
$64,077.50 |
PRM 6100 22072026610 |
Construction, Water System, Main and Service Line |
07/22/2022 |
Paid |
$244.00 |
PRM 6100 22072026618 |
Paving/Resurfacing, Street (Major and Residential) |
07/22/2022 |
Paid |
$136,195.21 |
PRM 6100 22072026620 |
Construction, Pipeline |
07/22/2022 |
Paid |
$231,585.65 |
PRM 6100 22071225814 |
Site Work |
07/14/2022 |
Paid |
$14,416.36 |
PRM 6100 22070725393 |
Construction, Pipeline |
07/11/2022 |
Paid |
$175,493.76 |
PRM 6100 22062924788 |
Site Work |
07/01/2022 |
Paid |
$148,892.41 |
PRM 6100 22062824602 |
Construction, Water System, Main and Service Line |
06/30/2022 |
Paid |
$89,175.00 |
PRM 6100 22062824609 |
Construction, Water System, Main and Service Line |
06/30/2022 |
Paid |
$50,223.88 |
PRM 6100 22062424254 |
Paving/Resurfacing, Street (Major and Residential) |
06/28/2022 |
Paid |
$125,638.15 |
PRM 6100 22062424336 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
06/28/2022 |
Paid |
$604,549.70 |
PRM 6100 22062324055 |
Construction, Utility/Underground Projects |
06/27/2022 |
Paid |
$110,873.39 |
PRM 6100 22062324060 |
Site Work |
06/27/2022 |
Paid |
$157,843.94 |
PRM 6100 22061623497 |
Construction, Pipeline |
06/21/2022 |
Paid |
$31,781.06 |
PRM 6100 22061623499 |
Construction, Pipeline |
06/21/2022 |
Paid |
$199,992.98 |
PRM 6100 22061523374 |
Construction, Pipeline |
06/17/2022 |
Paid |
$2,075.75 |
PRM 6100 22060622581 |
Site Work |
06/08/2022 |
Paid |
$657.48 |
PRM 6100 22060222308 |
Construction, Pipeline |
06/06/2022 |
Paid |
$85,191.79 |
PRM 6100 22060222313 |
Construction, Water System, Main and Service Line |
06/06/2022 |
Paid |
$100,470.03 |
PRM 6100 22053122034 |
Construction, Pipeline |
06/02/2022 |
Paid |
$24,005.47 |
PRM 6100 22060122205 |
Paving/Resurfacing, Street (Major and Residential) |
06/02/2022 |
Paid |
$146,994.11 |
PRM 6100 22052721900 |
Site Work |
06/01/2022 |
Paid |
$39,536.29 |
PRM 6100 22053021953 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
06/01/2022 |
Paid |
$635,270.18 |
PRM 6100 22050620020 |
Construction, Water System, Main and Service Line |
05/10/2022 |
Paid |
$40,187.94 |
PRM 6100 22050620022 |
Site Work |
05/10/2022 |
Paid |
$259,151.83 |
PRM 6100 22050519874 |
Construction, Water System, Main and Service Line |
05/09/2022 |
Paid |
$2,405.57 |
PRM 6100 22050319670 |
Construction, Utility/Underground Projects |
05/05/2022 |
Paid |
$160,119.11 |
PRM 6100 22042919364 |
Construction, Water System, Main and Service Line |
05/03/2022 |
Paid |
$78,085.15 |
PRM 6100 22042919424 |
Construction, Pipeline |
05/03/2022 |
Paid |
$694,320.52 |
PRM 6100 22042719204 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
05/02/2022 |
Paid |
$548,052.24 |
PRM 6100 22042819299 |
Site Work |
05/02/2022 |
Paid |
$1,390.99 |
PRM 6100 22042618993 |
Construction, Street (Major and Residential)(Incl Reconstruc |
04/28/2022 |
Paid |
$77,883.91 |
PRM 6100 22042518863 |
Construction, Water System, Main and Service Line |
04/27/2022 |
Paid |
$15,148.46 |
PRM 6100 22042218752 |
Construction, Water System, Main and Service Line |
04/26/2022 |
Paid |
$6,311.57 |
PRM 6100 22041918430 |
Paving/Resurfacing, Street (Major and Residential) |
04/21/2022 |
Paid |
$202,500.25 |
PRM 6100 22041317934 |
Heating, Ventilating and Air Conditioning (HVAC) |
04/15/2022 |
Paid |
$58,662.50 |
PRM 6100 22041117770 |
Site Work |
04/14/2022 |
Paid |
$12,492.09 |
PRM 6100 22041217842 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
04/14/2022 |
Paid |
$200,220.92 |
PRM 6100 22041217842 |
Site Work |
04/14/2022 |
Paid |
$60,844.42 |
PRM 6100 22040517146 |
Construction, Water System, Main and Service Line |
04/07/2022 |
Paid |
$5,518.45 |
PRM 6100 22040417092 |
Construction, Water System, Main and Service Line |
04/06/2022 |
Paid |
$1,225.23 |
PRM 6100 22040116938 |
Construction, Pipeline |
04/05/2022 |
Paid |
$73,237.35 |
PRM 6100 22040116940 |
Construction, Pipeline |
04/05/2022 |
Paid |
$1,315.01 |
PRM 6100 22033116838 |
Construction, Pipeline |
04/04/2022 |
Paid |
$20,091.46 |
PRM 6100 22031615301 |
Paving/Resurfacing, Street (Major and Residential) |
03/18/2022 |
Paid |
$156,604.78 |
PRM 6100 22031415022 |
Site Work |
03/15/2022 |
Paid |
$50,294.65 |
PRM 6100 22031014808 |
Construction, Utility/Underground Projects |
03/14/2022 |
Paid |
$36,070.31 |
PRM 6100 22030414144 |
Heating, Ventilating and Air Conditioning (HVAC) |
03/08/2022 |
Paid |
$42,750.00 |
PRM 6100 22022813524 |
Construction, Communication Equipment (Incl Antenna Towers) |
03/02/2022 |
Paid |
$44,013.50 |
PRM 6100 22022212951 |
Construction, Pipeline |
02/24/2022 |
Paid |
$50,354.40 |
PRM 6100 22022212953 |
Construction, Pipeline |
02/24/2022 |
Paid |
$15,106.00 |
PRM 6100 22022212960 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
02/24/2022 |
Paid |
$731,671.19 |
PRM 6100 22022213024 |
Paving/Resurfacing, Street (Major and Residential) |
02/24/2022 |
Paid |
$83,048.22 |
PRM 6100 22021812807 |
Construction, Water System, Main and Service Line |
02/23/2022 |
Paid |
$25,458.10 |
PRM 6100 22021011962 |
Construction, Utility/Underground Projects |
02/14/2022 |
Paid |
$68,218.94 |
PRM 6100 22013111062 |
Construction, Water System, Main and Service Line |
02/02/2022 |
Paid |
$327,382.69 |
PRM 6100 22012810949 |
Construction, Pipeline |
02/01/2022 |
Paid |
$10,726.38 |
PRM 6100 22012710782 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/31/2022 |
Paid |
$653,723.45 |
PRM 6100 22012710804 |
Construction, Pipeline |
01/31/2022 |
Paid |
$198,295.87 |
PRM 6100 22012710815 |
Construction, Water System, Main and Service Line |
01/31/2022 |
Paid |
$3,983.36 |
PRM 6100 22011909927 |
Paving/Resurfacing, Street (Major and Residential) |
01/21/2022 |
Paid |
$100,302.80 |
PRM 6100 22011809713 |
Construction, Water System, Main and Service Line |
01/20/2022 |
Paid |
$62,911.14 |
PRM 6100 22011809806 |
Construction, Water System, Main and Service Line |
01/20/2022 |
Paid |
$2,817.21 |
PRM 6100 22011009209 |
Construction, Water System, Main and Service Line |
01/12/2022 |
Paid |
$4,818.24 |
PRM 6100 22011009144 |
Site Work |
01/11/2022 |
Paid |
$32,251.17 |
PRM 6100 21123108429 |
Construction, Pipeline |
01/04/2022 |
Paid |
$18,877.81 |
PRM 6100 21122707976 |
Construction, Pipeline |
12/29/2021 |
Paid |
$91,234.26 |
PRM 6100 21122708036 |
Construction, Pipeline |
12/29/2021 |
Paid |
$111,603.62 |
PRM 6100 21122107673 |
Construction, Street (Major and Residential)(Incl Reconstruc |
12/28/2021 |
Paid |
$79,990.05 |
PRM 6100 21122107673 |
Construction, Water System, Main and Service Line |
12/28/2021 |
Paid |
$169,870.63 |
PRM 6100 21122107679 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
12/28/2021 |
Paid |
$940,032.26 |
PRM 6100 21122107679 |
Construction, Water System, Main and Service Line |
12/28/2021 |
Paid |
$10,220.90 |
PRM 6100 21122107686 |
Construction, Water System, Main and Service Line |
12/28/2021 |
Paid |
$6,556.46 |
PRM 6100 21122107686 |
Paving/Resurfacing, Street (Major and Residential) |
12/28/2021 |
Paid |
$57,243.65 |
PRM 6100 21121607344 |
Construction, Utility/Underground Projects |
12/20/2021 |
Paid |
$105,960.10 |
PRM 6100 21113005657 |
Construction, Pipeline |
12/02/2021 |
Paid |
$1,850.00 |
PRM 6100 21112905552 |
Construction, Pipeline |
12/01/2021 |
Paid |
$19,868.01 |
PRM 6100 21111804692 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
11/22/2021 |
Paid |
$1,122,093.27 |
PRM 6100 21111604401 |
Construction, Water System, Main and Service Line |
11/18/2021 |
Paid |
$6,450.79 |
PRM 6100 21111604419 |
Paving/Resurfacing, Street (Major and Residential) |
11/18/2021 |
Paid |
$174,045.46 |
PRM 6100 21111504311 |
Construction, Water System, Main and Service Line |
11/17/2021 |
Paid |
$16,635.66 |
PRM 6100 21111504315 |
Construction, Utility/Underground Projects |
11/17/2021 |
Paid |
$148,788.25 |
PRM 6100 21111504319 |
Construction, Water System, Main and Service Line |
11/17/2021 |
Paid |
$4,823.78 |
PRM 6100 21110803836 |
Construction, Pipeline |
11/10/2021 |
Paid |
$63,155.03 |
PRM 6100 21110803838 |
Construction, Pipeline |
11/10/2021 |
Paid |
$58,950.90 |
PRM 6100 21110403452 |
Construction, Water System, Main and Service Line |
11/08/2021 |
Paid |
$273,200.00 |
PRM 6100 21102802794 |
Construction, Water System, Main and Service Line |
11/01/2021 |
Paid |
$63,514.03 |
PRM 6100 21102502361 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
10/27/2021 |
Paid |
$610,591.04 |
PRM 6100 21101901791 |
Construction, Water System, Main and Service Line |
10/21/2021 |
Paid |
$44,457.85 |
PRM 6100 21101901808 |
Paving/Resurfacing, Street (Major and Residential) |
10/21/2021 |
Paid |
$81,824.52 |
PRM 6100 21101801614 |
Construction, Water System, Main and Service Line |
10/20/2021 |
Paid |
$931.48 |
PRM 6100 21101801713 |
Construction, Water System, Main and Service Line |
10/20/2021 |
Paid |
$71,129.56 |
PRM 6100 21101301266 |
Construction, Utility/Underground Projects |
10/15/2021 |
Paid |
$101,713.13 |
PRM 6100 21100600482 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
10/08/2021 |
Paid |
$1,001,355.31 |
PRM 6100 21100100080 |
Construction, Water System, Main and Service Line |
10/05/2021 |
Paid |
$8,616.14 |
PRM 6100 21092933753 |
Construction, Water System, Main and Service Line |
10/01/2021 |
Paid |
$1,478.84 |
PRM 6100 21092733369 |
Construction, Pipeline |
09/29/2021 |
Paid |
$158,005.81 |
PRM 6100 21092032672 |
Construction, Water System, Main and Service Line |
09/28/2021 |
Paid |
$313,035.13 |
PRM 6100 21092032679 |
Construction, Water System, Main and Service Line |
09/28/2021 |
Paid |
$10,775.35 |
PRM 6100 21092433219 |
Construction, Utility/Underground Projects |
09/28/2021 |
Paid |
$654,996.94 |
PRM 6100 21092433219 |
Paving/Resurfacing, Street (Major and Residential) |
09/28/2021 |
Paid |
$639,864.22 |
PRM 6100 21091532127 |
Construction, Water System, Main and Service Line |
09/17/2021 |
Paid |
$486.00 |
PRM 6100 21091331799 |
Construction, Water System, Main and Service Line |
09/15/2021 |
Paid |
$673.44 |
PRM 6100 21090831305 |
Construction, Water System, Main and Service Line |
09/10/2021 |
Paid |
$12,320.95 |
PRM 6100 21090331051 |
Construction, Street (Major and Residential)(Incl Reconstruc |
09/08/2021 |
Paid |
$88,271.72 |
PRM 2200 21090230853 |
Pipe Fittings, Misc. (Not Otherwise Classified) |
09/07/2021 |
Paid |
$1,897.62 |
PRM 6100 21082530085 |
Construction, Utility/Underground Projects |
08/27/2021 |
Paid |
$197,469.37 |
PRM 6100 21082429990 |
Construction, Water System, Main and Service Line |
08/26/2021 |
Paid |
$83,967.99 |
PRM 6100 21081729442 |
Construction, Pipeline |
08/19/2021 |
Paid |
$3,933.00 |
PRM 6100 21081629240 |
Construction, Water System, Main and Service Line |
08/18/2021 |
Paid |
$52,620.89 |
PRM 6100 21081629266 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
08/18/2021 |
Paid |
$1,318,557.90 |
PRM 6100 21081028805 |
Construction, Water System, Main and Service Line |
08/12/2021 |
Paid |
$2,157.27 |
PRM 6100 21080528362 |
Construction, Pipeline |
08/09/2021 |
Paid |
$665.00 |
PRM 6100 21080428236 |
Construction, Pipeline |
08/06/2021 |
Paid |
$53,243.07 |
PRM 6100 21072827527 |
Construction, Utility/Underground Projects |
07/30/2021 |
Paid |
$253,634.68 |
PRM 6100 21072727349 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
07/29/2021 |
Paid |
$1,543,373.14 |
PRM 6100 21072327095 |
Construction, Water System, Main and Service Line |
07/27/2021 |
Paid |
$21,193.72 |
PRM 6100 21072226945 |
Paving/Resurfacing, Street (Major and Residential) |
07/26/2021 |
Paid |
$184,463.40 |
PRM 6100 21071325922 |
Construction, Water System, Main and Service Line |
07/15/2021 |
Paid |
$1,439.89 |
PRM 6100 21071325965 |
Construction, Water System, Main and Service Line |
07/15/2021 |
Paid |
$23,755.07 |
PRM 6100 21070825507 |
Construction, Street (Major and Residential)(Incl Reconstruc |
07/12/2021 |
Paid |
$199,297.20 |
PRM 6100 21070725416 |
Construction, Utility/Underground Projects |
07/09/2021 |
Paid |
$68,524.60 |
PRM 6100 21070625221 |
Construction, Water System, Main and Service Line |
07/08/2021 |
Paid |
$85,244.59 |
PRM 6100 21070625234 |
Construction, Water System, Main and Service Line |
07/08/2021 |
Paid |
$68,344.88 |
PRM 6100 21062324104 |
Construction, Street (Major and Residential)(Incl Reconstruc |
06/25/2021 |
Paid |
$142,236.39 |
PRM 6100 21062123455 |
Construction, Water System, Main and Service Line |
06/23/2021 |
Paid |
$88,942.36 |
PRM 6100 21062123531 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
06/23/2021 |
Paid |
$420,574.15 |
PRM 6100 21062123531 |
Construction, Water System, Main and Service Line |
06/23/2021 |
Paid |
$93,796.97 |
PRM 6100 21061623269 |
Construction, Pipeline |
06/21/2021 |
Paid |
$21,528.19 |
PRM 6100 21061623273 |
Construction, Pipeline |
06/21/2021 |
Paid |
$12,525.34 |
PRM 6100 21061623275 |
Construction, Pipeline |
06/21/2021 |
Paid |
$596,716.56 |
PRM 6100 21060922414 |
Construction, Street (Major and Residential)(Incl Reconstruc |
06/11/2021 |
Paid |
$270,178.54 |
PRM 6100 21060922419 |
Construction, Pipeline |
06/11/2021 |
Paid |
$94,431.12 |
PRM 6100 21060922419 |
Construction, Water System, Main and Service Line |
06/11/2021 |
Paid |
$1,615.77 |
PRM 6100 21060922421 |
Construction, Pipeline |
06/11/2021 |
Paid |
$280,677.75 |
PRM 6100 21052121008 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
05/25/2021 |
Paid |
$931,720.54 |
PRM 6100 21051820593 |
Construction, Utility/Underground Projects |
05/20/2021 |
Paid |
$297,361.47 |
PRM 6100 21051820595 |
Construction, Pipeline |
05/20/2021 |
Paid |
$705,129.04 |
PRM 6100 21051820598 |
Construction, Water System, Main and Service Line |
05/20/2021 |
Paid |
$103,683.57 |
PRM 6100 21051320166 |
Construction, Water System, Main and Service Line |
05/17/2021 |
Paid |
$197,998.20 |
PRM 6100 21051320168 |
Construction, Water System, Main and Service Line |
05/17/2021 |
Paid |
$56,158.45 |
PRM 6100 21051220030 |
Construction, Water System, Main and Service Line |
05/14/2021 |
Paid |
$86,263.15 |
PRM 6100 21051019778 |
Construction, Water System, Main and Service Line |
05/12/2021 |
Paid |
$17,383.16 |
PRM 6100 21050519416 |
Construction, Water System, Main and Service Line |
05/07/2021 |
Paid |
$90,036.05 |
PRM 6100 21042618437 |
Construction, Street (Major and Residential)(Incl Reconstruc |
04/28/2021 |
Paid |
$268,813.82 |
PRM 6100 21042017826 |
Construction, Water System, Main and Service Line |
04/22/2021 |
Paid |
$22,327.82 |
PRM 6100 21040916844 |
Construction, Water System, Main and Service Line |
04/13/2021 |
Paid |
$244,626.85 |
PRM 6100 21040716576 |
Construction, Water System, Main and Service Line |
04/09/2021 |
Paid |
$114,949.73 |
PRM 6100 21040216260 |
Construction, Utility/Underground Projects |
04/06/2021 |
Paid |
$238,260.45 |
PRM 6100 21032315233 |
Construction, Water System, Main and Service Line |
03/25/2021 |
Paid |
$65,704.38 |
PRM 6100 21032215023 |
Construction, Pipeline |
03/24/2021 |
Paid |
$66,299.22 |
PRM 6100 21031514281 |
Construction, Street (Major and Residential)(Incl Reconstruc |
03/17/2021 |
Paid |
$100,297.47 |
PRM 6100 21031514283 |
Construction, Water System, Main and Service Line |
03/17/2021 |
Paid |
$80,007.86 |
PRM 6100 21031114044 |
Construction, Water System, Main and Service Line |
03/15/2021 |
Paid |
$10,497.50 |
PRM 6100 21030913658 |
Construction, Water System, Main and Service Line |
03/11/2021 |
Paid |
$12,285.27 |
PRM 6100 21030913690 |
Construction, Water System, Main and Service Line |
03/11/2021 |
Paid |
$55,081.55 |
PRM 6100 21022312347 |
Construction, Water System, Main and Service Line |
02/25/2021 |
Paid |
$54,340.00 |
PRM 6100 21021111952 |
Construction, Water System, Main and Service Line |
02/16/2021 |
Paid |
$23,141.89 |
PRM 6100 21021011802 |
Construction, Street (Major and Residential)(Incl Reconstruc |
02/12/2021 |
Paid |
$210,245.72 |
PRM 6100 21012710340 |
Construction, Water System, Main and Service Line |
01/29/2021 |
Paid |
$16,786.49 |
PRM 6100 21012710342 |
Construction, Water System, Main and Service Line |
01/29/2021 |
Paid |
$14,473.80 |
PRM 6100 21012610150 |
Construction, Street (Major and Residential)(Incl Reconstruc |
01/28/2021 |
Paid |
$681,213.24 |
PRM 6100 21011108850 |
Construction, Water System, Main and Service Line |
01/13/2021 |
Paid |
$440,562.50 |
PRM 6100 21011108903 |
Construction, Water System, Main and Service Line |
01/13/2021 |
Paid |
$4,372.17 |
PRM 6100 21010408195 |
Construction, Water System, Main and Service Line |
01/06/2021 |
Paid |
$65,418.94 |
PRM 6100 20121707054 |
Construction, Water System, Main and Service Line |
12/21/2020 |
Paid |
$266,575.41 |
PRM 6100 20121606837 |
Construction, Water System, Main and Service Line |
12/18/2020 |
Paid |
$190,551.05 |
PRM 6100 20121506700 |
Construction, Water System, Main and Service Line |
12/17/2020 |
Paid |
$493,002.50 |
PRM 6100 20120806070 |
Construction, Water System, Main and Service Line |
12/10/2020 |
Paid |
$51,654.84 |
PRM 6100 20120806081 |
Construction, Water System, Main and Service Line |
12/10/2020 |
Paid |
$37,156.41 |
PRM 6100 20120705866 |
Construction, Water System, Main and Service Line |
12/09/2020 |
Paid |
$6,901.14 |
PRM 6100 20120705868 |
Construction, Water System, Main and Service Line |
12/09/2020 |
Paid |
$198,587.28 |
PRM 6100 20120305555 |
Construction, Water System, Main and Service Line |
12/07/2020 |
Paid |
$12,825.00 |
PRM 6100 20113005122 |
Construction, Water System, Main and Service Line |
12/01/2020 |
Paid |
$17,104.30 |
PRM 6100 20113005138 |
Construction, Water System, Main and Service Line |
12/01/2020 |
Paid |
$713.50 |
PRM 6100 20112404924 |
Construction, Street (Major and Residential)(Incl Reconstruc |
11/30/2020 |
Paid |
$280,487.03 |
PRM 6100 20111304015 |
Construction, Water System, Main and Service Line |
11/17/2020 |
Paid |
$21,442.15 |
PRM 6100 20111604078 |
Construction, Water System, Main and Service Line |
11/17/2020 |
Paid |
$12,362.15 |
PRM 6100 20110903551 |
Construction, Water System, Main and Service Line |
11/12/2020 |
Paid |
$228,488.57 |
PRM 6100 20110903646 |
Construction, Water System, Main and Service Line |
11/12/2020 |
Paid |
$547,485.00 |
PRM 6100 20110403282 |
Construction, Water System, Main and Service Line |
11/06/2020 |
Paid |
$206,849.77 |
PRM 6100 20110303107 |
Construction, Water System, Main and Service Line |
11/05/2020 |
Paid |
$271,735.84 |
PRM 6100 20110303110 |
Construction, Water System, Main and Service Line |
11/05/2020 |
Paid |
$82,605.61 |
PRM 6100 20103002910 |
Construction, Water System, Main and Service Line |
11/03/2020 |
Paid |
$6,256.32 |
PRM 6100 20102702484 |
Construction, Water System, Main and Service Line |
10/29/2020 |
Paid |
$174,040.00 |
PRM 6100 20101501508 |
Construction, Water System, Main and Service Line |
10/19/2020 |
Paid |
$17,287.95 |
PRM 6100 20101501514 |
Construction, Water System, Main and Service Line |
10/19/2020 |
Paid |
$18,463.69 |
PRM 6100 20101501517 |
Construction, Water System, Main and Service Line |
10/19/2020 |
Paid |
$11,919.90 |
PRM 6100 20100900966 |
Construction, Water System, Main and Service Line |
10/13/2020 |
Paid |
$31,343.02 |
PRM 6100 20100700613 |
Construction, Street (Major and Residential)(Incl Reconstruc |
10/09/2020 |
Paid |
$70,914.36 |
PRM 6100 20100600493 |
Construction, Water System, Main and Service Line |
10/08/2020 |
Paid |
$85,856.82 |
PRM 6100 20100600500 |
Construction, Water System, Main and Service Line |
10/08/2020 |
Paid |
$20,138.29 |
PRM 6100 20100600505 |
Construction, Water System, Main and Service Line |
10/08/2020 |
Paid |
$11,925.50 |
PRM 6100 20092535046 |
Construction, Water System, Main and Service Line |
09/29/2020 |
Paid |
$3,011.19 |
PRM 6100 20092535049 |
Construction, Water System, Main and Service Line |
09/29/2020 |
Paid |
$13,556.43 |
PRM 6100 20092434885 |
Construction, Water System, Main and Service Line |
09/28/2020 |
Paid |
$9,922.96 |
PRM 6100 20091133635 |
Construction, Water System, Main and Service Line |
09/15/2020 |
Paid |
$88,127.16 |
PRM 6100 20090933359 |
Construction, Water System, Main and Service Line |
09/11/2020 |
Paid |
$36,342.25 |
PRM 6100 20090933423 |
Construction, Water System, Main and Service Line |
09/11/2020 |
Paid |
$18,406.25 |
PRM 6100 20090933433 |
Construction, Water System, Main and Service Line |
09/11/2020 |
Paid |
$1,763.50 |
PRM 6100 20090433150 |
Construction, Street (Major and Residential)(Incl Reconstruc |
09/09/2020 |
Paid |
$114,953.86 |
PRM 6100 20083132525 |
Construction, Water System, Main and Service Line |
09/02/2020 |
Paid |
$18,739.57 |
PRM 6100 20081831412 |
Construction, Water System, Main and Service Line |
08/20/2020 |
Paid |
$1,042.85 |
PRM 6100 20081431162 |
Construction, Water System, Main and Service Line |
08/18/2020 |
Paid |
$148,023.65 |
PRM 6100 20081230885 |
Construction, Water System, Main and Service Line |
08/14/2020 |
Paid |
$159,221.29 |
PRM 6100 20081030606 |
Construction, Water System, Main and Service Line |
08/12/2020 |
Paid |
$151,940.25 |
PRM 6100 20081030620 |
Construction, Water System, Main and Service Line |
08/12/2020 |
Paid |
$86.26 |
PRM 6100 20080730438 |
Construction, Water System, Main and Service Line |
08/11/2020 |
Paid |
$25,740.52 |
PRM 6100 20080730443 |
Construction, Street (Major and Residential)(Incl Reconstruc |
08/11/2020 |
Paid |
$158,361.77 |
PRM 6100 20080530207 |
Construction, Street (Major and Residential)(Incl Reconstruc |
08/10/2020 |
Paid |
$114,033.01 |
PRM 6100 20080530208 |
Construction, Water System, Main and Service Line |
08/07/2020 |
Paid |
$1,750.03 |
PRM 6100 20080329972 |
Construction, Water System, Main and Service Line |
08/05/2020 |
Paid |
$17,170.97 |
PRM 6100 20072729304 |
Construction, Water System, Main and Service Line |
07/29/2020 |
Paid |
$21,300.67 |
PRM 6100 20072729306 |
Construction, Water System, Main and Service Line |
07/29/2020 |
Paid |
$1,327.44 |
PRM 6100 20072729308 |
Construction, Water System, Main and Service Line |
07/29/2020 |
Paid |
$1,778.37 |
PRM 6100 20072729310 |
Construction, Water System, Main and Service Line |
07/29/2020 |
Paid |
$95,542.26 |
PRM 6100 20072729313 |
Construction, Water System, Main and Service Line |
07/29/2020 |
Paid |
$420,727.41 |
PRM 6100 20072028362 |
Construction, Water System, Main and Service Line |
07/22/2020 |
Paid |
$5,329.85 |
PRM 6100 20072028364 |
Construction, Water System, Main and Service Line |
07/22/2020 |
Paid |
$2,003.61 |
PRM 6100 20071728242 |
Construction, Water System, Main and Service Line |
07/21/2020 |
Paid |
$33,250.55 |
PRM 6100 20071427755 |
Construction, Water System, Main and Service Line |
07/17/2020 |
Paid |
$19,814.24 |
PRM 6100 20071027506 |
Construction, Water System, Main and Service Line |
07/15/2020 |
Paid |
$593,330.60 |
PRM 6100 20071027478 |
Construction, Water System, Main and Service Line |
07/14/2020 |
Paid |
$1,638.89 |
PRM 6100 20070126827 |
Construction, Water System, Main and Service Line |
07/08/2020 |
Paid |
$3,003.16 |
PRM 6100 20063026624 |
Construction, Water System, Main and Service Line |
07/06/2020 |
Paid |
$4,025.65 |
PRM 6100 20062926455 |
Construction, Water System, Main and Service Line |
07/01/2020 |
Paid |
$25,122.22 |
PRM 6100 20062526300 |
Construction, Water System, Main and Service Line |
06/30/2020 |
Paid |
$10,280.59 |
PRM 6100 20061725709 |
Construction, Water System, Main and Service Line |
06/23/2020 |
Paid |
$98,395.19 |
PRM 6100 20061625512 |
Construction, Water System, Main and Service Line |
06/19/2020 |
Paid |
$101,241.60 |
PRM 6100 20061125234 |
Construction, Water System, Main and Service Line |
06/16/2020 |
Paid |
$50,367.58 |
PRM 6100 20061125241 |
Construction, Water System, Main and Service Line |
06/16/2020 |
Paid |
$909.81 |
PRM 6100 20060224372 |
Construction, Water System, Main and Service Line |
06/05/2020 |
Paid |
$7,308.03 |
PRM 6100 20052924153 |
Construction, Water System, Main and Service Line |
06/02/2020 |
Paid |
$171,363.00 |
PRM 6100 20052924158 |
Construction, Water System, Main and Service Line |
06/02/2020 |
Paid |
$223,164.43 |
PRM 6100 20052223692 |
Construction, Water System, Main and Service Line |
05/29/2020 |
Paid |
$279,905.20 |
PRM 6100 20052123562 |
Construction, Water System, Main and Service Line |
05/27/2020 |
Paid |
$10,280.59 |
PRM 6100 20051122503 |
Construction, Water System, Main and Service Line |
05/15/2020 |
Paid |
$3,706.84 |
PRM 6100 20051122505 |
Construction, Water System, Main and Service Line |
05/15/2020 |
Paid |
$19,453.53 |
PRM 6100 20051222585 |
Construction, Water System, Main and Service Line |
05/15/2020 |
Paid |
$8,339.47 |
PRM 6100 20050822402 |
Construction, Water System, Main and Service Line |
05/13/2020 |
Paid |
$5,218.18 |
PRM 6100 20050822408 |
Construction, Water System, Main and Service Line |
05/13/2020 |
Paid |
$40,334.48 |
PRM 6100 20050822411 |
Construction, Water System, Main and Service Line |
05/13/2020 |
Paid |
$43,923.25 |
PRM 6100 20050722233 |
Construction, Water System, Main and Service Line |
05/12/2020 |
Paid |
$35,815.00 |
PRM 6100 20050822339 |
Construction, Water System, Main and Service Line |
05/12/2020 |
Paid |
$245,297.39 |
PRM 6100 20050622082 |
Construction, Water System, Main and Service Line |
05/08/2020 |
Paid |
$68,424.32 |
PRM 6100 20042821308 |
Construction, Water System, Main and Service Line |
05/01/2020 |
Paid |
$2,673.31 |
PRM 6100 20042821313 |
Construction, Water System, Main and Service Line |
05/01/2020 |
Paid |
$10,280.59 |
PRM 6100 20042220725 |
Construction, Water System, Main and Service Line |
04/24/2020 |
Paid |
$43,772.42 |
PRM 6100 20041520176 |
Construction, Water System, Main and Service Line |
04/20/2020 |
Paid |
$4,484.11 |
PRM 6100 20040719423 |
Construction, Water System, Main and Service Line |
04/10/2020 |
Paid |
$425,962.12 |
PRM 6100 20040619239 |
Construction, Water System, Main and Service Line |
04/08/2020 |
Paid |
$49,260.17 |
PRM 6100 20033118650 |
Construction, Water System, Main and Service Line |
04/02/2020 |
Paid |
$761.48 |
PRM 6100 20032618191 |
Construction, Water System, Main and Service Line |
03/31/2020 |
Paid |
$2,458.77 |
PRM 6100 20032618194 |
Construction, Water System, Main and Service Line |
03/31/2020 |
Paid |
$1,171.36 |
PRM 6100 20032417811 |
Construction, Water System, Main and Service Line |
03/27/2020 |
Paid |
$10,280.59 |
PRM 6100 20031116564 |
Construction, Water System, Main and Service Line |
03/13/2020 |
Paid |
$96,346.29 |
PRM 6100 20030916174 |
Construction, Water System, Main and Service Line |
03/11/2020 |
Paid |
$25,401.70 |
PRM 6100 20030616052 |
Construction, Water System, Main and Service Line |
03/10/2020 |
Paid |
$31,577.17 |
PRM 6100 20030415821 |
Construction, Water System, Main and Service Line |
03/09/2020 |
Paid |
$7,080.83 |
PRM 6100 20030315567 |
Construction, Water System, Main and Service Line |
03/05/2020 |
Paid |
$28,759.21 |
PRM 6100 20030215383 |
Construction, Water System, Main and Service Line |
03/04/2020 |
Paid |
$10,490.96 |
PRM 6100 20022514816 |
Construction, Water System, Main and Service Line |
02/28/2020 |
Paid |
$7,442.78 |
PRM 6100 20022514821 |
Construction, Water System, Main and Service Line |
02/28/2020 |
Paid |
$6,656.23 |
PRM 6100 20022414513 |
Construction, Water System, Main and Service Line |
02/26/2020 |
Paid |
$14,242.62 |
PRM 6100 20022414516 |
Construction, Water System, Main and Service Line |
02/26/2020 |
Paid |
$14,540.64 |
PRM 6100 20021813934 |
Construction, Water System, Main and Service Line |
02/20/2020 |
Paid |
$7,634.18 |
PRM 6100 20021413735 |
Construction, Water System, Main and Service Line |
02/19/2020 |
Paid |
$77,061.37 |
PRM 6100 20021413739 |
Construction, Water System, Main and Service Line |
02/19/2020 |
Paid |
$5,145.42 |
PRM 6100 20021313543 |
Construction, Water System, Main and Service Line |
02/18/2020 |
Paid |
$103,557.29 |
PRM 6100 20021012849 |
Construction, Water System, Main and Service Line |
02/12/2020 |
Paid |
$48,735.06 |
PRM 6100 20021012856 |
Construction, Water System, Main and Service Line |
02/12/2020 |
Paid |
$48,334.19 |
PRM 6100 20020512299 |
Construction, Water System, Main and Service Line |
02/07/2020 |
Paid |
$64,052.71 |
PRM 6100 20020311990 |
Construction, Water System, Main and Service Line |
02/06/2020 |
Paid |
$59,128.76 |
PRM 6100 20012911401 |
Construction, Water System, Main and Service Line |
02/05/2020 |
Paid |
$9,828.83 |
PRM 6100 20012811234 |
Construction, Water System, Main and Service Line |
01/31/2020 |
Paid |
$7,506.23 |
PRM 6100 20012711025 |
Construction, Water System, Main and Service Line |
01/29/2020 |
Paid |
$10,280.59 |
PRM 6100 20012310801 |
Construction, Water System, Main and Service Line |
01/28/2020 |
Paid |
$37,307.03 |
PRM 6100 20010809295 |
Construction, Water System, Main and Service Line |
01/10/2020 |
Paid |
$38,611.45 |
PRM 6100 20010208743 |
Construction, Water System, Main and Service Line |
01/07/2020 |
Paid |
$2,850.60 |
PRM 6100 20010208640 |
Construction, Water System, Main and Service Line |
01/06/2020 |
Paid |
$160,330.05 |
PRM 6100 19123008295 |
Construction, Water System, Main and Service Line |
01/03/2020 |
Paid |
$16,902.81 |
PRM 6100 19122607916 |
Construction, Water System, Main and Service Line |
12/30/2019 |
Paid |
$317,558.04 |
PRM 6100 19121607166 |
Construction, Water System, Main and Service Line |
12/18/2019 |
Paid |
$10,280.58 |
PRM 6100 19121006733 |
Construction, Water System, Main and Service Line |
12/13/2019 |
Paid |
$148,784.00 |
PRM 6100 19121106841 |
Construction, Water System, Main and Service Line |
12/13/2019 |
Paid |
$10,280.59 |
PRM 6100 19121106844 |
Construction, Water System, Main and Service Line |
12/13/2019 |
Paid |
$9,808.81 |
PRM 6100 19120506244 |
Construction, Water System, Main and Service Line |
12/09/2019 |
Paid |
$35,751.23 |
PRM 6100 19112605686 |
Construction, Water System, Main and Service Line |
12/02/2019 |
Paid |
$113,007.40 |
PRM 6100 19112505614 |
Construction, Water System, Main and Service Line |
11/27/2019 |
Paid |
$131,517.78 |
PRM 6100 19112205489 |
Construction, Water System, Main and Service Line |
11/26/2019 |
Paid |
$34,704.92 |
PRM 6100 19112105356 |
Construction, Water System, Main and Service Line |
11/25/2019 |
Paid |
$181,913.86 |
PRM 6100 19112005218 |
Construction, Water System, Main and Service Line |
11/22/2019 |
Paid |
$95,855.00 |
PRM 6100 19111504716 |
Construction, Water System, Main and Service Line |
11/20/2019 |
Paid |
$38,197.09 |
PRM 6100 19111204324 |
Construction, Water System, Main and Service Line |
11/14/2019 |
Paid |
$101,267.23 |
PRM 6100 19110704072 |
Construction, Water System, Main and Service Line |
11/12/2019 |
Paid |
$48,430.51 |
PRM 6100 19110704115 |
Construction, Water System, Main and Service Line |
11/12/2019 |
Paid |
$9,347.09 |
PRM 6100 19110403527 |
Construction, Water System, Main and Service Line |
11/07/2019 |
Paid |
$261,655.77 |
PRM 6100 19110403482 |
Construction, Water System, Main and Service Line |
11/06/2019 |
Paid |
$25,251.98 |
PRM 6100 19103003217 |
Construction, Water System, Main and Service Line |
11/01/2019 |
Paid |
$34,385.25 |
PRM 6100 19102502801 |
Construction, Water System, Main and Service Line |
10/29/2019 |
Paid |
$10,280.59 |
PRM 6100 19102302517 |
Construction, Water System, Main and Service Line |
10/25/2019 |
Paid |
$66,678.80 |
PRM 6100 19101701686 |
Construction, Water System, Main and Service Line |
10/21/2019 |
Paid |
$27,973.50 |
PRM 6100 19101701688 |
Construction, Water System, Main and Service Line |
10/21/2019 |
Paid |
$30,514.17 |
PRM 6100 19100900673 |
Construction, Water System, Main and Service Line |
10/11/2019 |
Paid |
$51,172.79 |
PRM 6100 19100900678 |
Construction, Water System, Main and Service Line |
10/11/2019 |
Paid |
$13,810.89 |
PRM 6100 19100900681 |
Construction, Water System, Main and Service Line |
10/11/2019 |
Paid |
$27,358.01 |
PRM 6100 19100100069 |
Construction, Water System, Main and Service Line |
10/03/2019 |
Paid |
$56,874.47 |
PRM 6100 19092533752 |
Construction, Water System, Main and Service Line |
09/27/2019 |
Paid |
$25,669.54 |
PRM 6100 19092433546 |
Construction, Water System, Main and Service Line |
09/26/2019 |
Paid |
$10,280.59 |
PRM 6100 19092433566 |
Construction, Water System, Main and Service Line |
09/26/2019 |
Paid |
$1,548.31 |
PRM 6100 19091632878 |
Construction, Water System, Main and Service Line |
09/19/2019 |
Paid |
$49,707.69 |
PRM 6100 19091232532 |
Construction, Water System, Main and Service Line |
09/17/2019 |
Paid |
$17,894.55 |
PRM 6100 19091332575 |
Construction, Water System, Main and Service Line |
09/17/2019 |
Paid |
$2,382.56 |
PRM 6100 19091332597 |
Construction, Water System, Main and Service Line |
09/17/2019 |
Paid |
$131,697.55 |
PRM 6100 19091232472 |
Construction, Water System, Main and Service Line |
09/16/2019 |
Paid |
$309,296.41 |
PRM 6100 19090431559 |
Construction, Water System, Main and Service Line |
09/06/2019 |
Paid |
$5,623.64 |
PRM 6100 19082931208 |
Construction, Water System, Main and Service Line |
09/04/2019 |
Paid |
$8,928.57 |
PRM 6100 19082931221 |
Construction, Water System, Main and Service Line |
09/04/2019 |
Paid |
$6,159.65 |
PRM 6100 19082931146 |
Construction, Water System, Main and Service Line |
09/03/2019 |
Paid |
$10,280.59 |
PRM 6100 19082630699 |
Construction, Water System, Main and Service Line |
08/27/2019 |
Paid |
$2,076.96 |
PRM 6100 19081630076 |
Construction, Water System, Main and Service Line |
08/20/2019 |
Paid |
$99,892.42 |
PRM 6100 19080829155 |
Construction, Water System, Main and Service Line |
08/12/2019 |
Paid |
$137.36 |
PRM 6100 19080528730 |
Construction, Water System, Main and Service Line |
08/08/2019 |
Paid |
$220,197.23 |
PRM 6100 19080528732 |
Construction, Water System, Main and Service Line |
08/08/2019 |
Paid |
$95,882.82 |
PRM 6100 19080528734 |
Construction, Water System, Main and Service Line |
08/08/2019 |
Paid |
$61,178.05 |
PRM 6100 19080528736 |
Construction, Water System, Main and Service Line |
08/08/2019 |
Paid |
$18,824.12 |
PRM 6100 19080528738 |
Construction, Water System, Main and Service Line |
08/08/2019 |
Paid |
$20,319.75 |
PRM 6100 19080528663 |
Construction, Water System, Main and Service Line |
08/07/2019 |
Paid |
$99,266.52 |
PRM 6100 19071827078 |
Construction, Water System, Main and Service Line |
07/23/2019 |
Paid |
$24,896.40 |
PRM 6100 19071026303 |
Construction, Water System, Main and Service Line |
07/15/2019 |
Paid |
$106,149.34 |
PRM 6100 19071126392 |
Construction, Water System, Main and Service Line |
07/15/2019 |
Paid |
$10,280.58 |
PRM 6100 19070926031 |
Construction, Water System, Main and Service Line |
07/11/2019 |
Paid |
$10,532.10 |
PRM 6100 19061323766 |
Construction, Water System, Main and Service Line |
06/14/2019 |
Paid |
$10,241.00 |
PRM 6100 19061023397 |
Construction, Water System, Main and Service Line |
06/13/2019 |
Paid |
$97,512.91 |
PRM 6100 19061123460 |
Construction, Water System, Main and Service Line |
06/13/2019 |
Paid |
$215,601.84 |
PRM 6100 19060623172 |
Construction, Water System, Main and Service Line |
06/11/2019 |
Paid |
$63,595.59 |
PRM 6100 19060322777 |
Construction, Water System, Main and Service Line |
06/05/2019 |
Paid |
$10,241.00 |
PRM 6100 19052421955 |
Construction, Water System, Main and Service Line |
05/29/2019 |
Paid |
$2,852.92 |
PRM 6100 19052121564 |
Construction, Water System, Main and Service Line |
05/23/2019 |
Paid |
$98,638.75 |
PRM 6100 19052021458 |
Construction, Water System, Main and Service Line |
05/22/2019 |
Paid |
$311,989.34 |
PRM 6100 19051320886 |
Construction, Water System, Main and Service Line |
05/15/2019 |
Paid |
$39,462.27 |
PRM 6100 19050620169 |
Construction, Water System, Main and Service Line |
05/08/2019 |
Paid |
$121,437.39 |
PRM 6100 19050620174 |
Construction, Water System, Main and Service Line |
05/08/2019 |
Paid |
$16,302.00 |
PRM 6100 19043019470 |
Construction, Water System, Main and Service Line |
05/02/2019 |
Paid |
$10,241.00 |
PRM 6100 19042318760 |
Construction, Water System, Main and Service Line |
04/25/2019 |
Paid |
$116,856.80 |
PRM 6100 19041818341 |
Construction, Water System, Main and Service Line |
04/22/2019 |
Paid |
$31,993.05 |
PRM 6100 19040216526 |
Construction, Water System, Main and Service Line |
04/04/2019 |
Paid |
$46,308.77 |
PRM 6100 19032816131 |
Construction, Water System, Main and Service Line |
04/01/2019 |
Paid |
$10,241.00 |
PRM 6100 19032816160 |
Construction, Water System, Main and Service Line |
04/01/2019 |
Paid |
$21,232.07 |
PRM 6100 19032716029 |
Construction, Water System, Main and Service Line |
03/29/2019 |
Paid |
$8,568.46 |
PRM 6100 19032615823 |
Construction, Water System, Main and Service Line |
03/28/2019 |
Paid |
$19,546.41 |
PRM 6100 19031915188 |
Construction, Water System, Main and Service Line |
03/21/2019 |
Paid |
$4,602.30 |
PRM 6100 19031915192 |
Construction, Water System, Main and Service Line |
03/21/2019 |
Paid |
$85,040.32 |
PRM 6100 19022813315 |
Construction, Water System, Main and Service Line |
03/04/2019 |
Paid |
$31,778.38 |
PRM 6100 19022713114 |
Construction, Water System, Main and Service Line |
02/28/2019 |
Paid |
$37,315.77 |
PRM 6100 19022012543 |
Construction, Water System, Main and Service Line |
02/22/2019 |
Paid |
$54,205.55 |
PRM 6100 19021912309 |
Construction, Water System, Main and Service Line |
02/21/2019 |
Paid |
$4,977.62 |
PRM 6100 19021512152 |
Construction, Water System, Main and Service Line |
02/20/2019 |
Paid |
$10,241.00 |
PRM 6100 19021512171 |
Construction, Water System, Main and Service Line |
02/20/2019 |
Paid |
$1,823,540.07 |
PRM 6100 19021412045 |
Construction, Water System, Main and Service Line |
02/19/2019 |
Paid |
$23,507.56 |
PRM 6100 19021111435 |
Construction, Water System, Main and Service Line |
02/13/2019 |
Paid |
$1,883.13 |
PRM 6100 19020811261 |
Construction, Water System, Main and Service Line |
02/12/2019 |
Paid |
$26,251.14 |
PRM 6100 19020711103 |
Construction, Water System, Main and Service Line |
02/11/2019 |
Paid |
$76,000.00 |
PRM 6100 19020610896 |
Construction, Water System, Main and Service Line |
02/07/2019 |
Paid |
$10,620.24 |
PRM 6100 19012409420 |
Construction, Water System, Main and Service Line |
01/28/2019 |
Paid |
$79,308.69 |
PRM 6100 19012209173 |
Construction, Water System, Main and Service Line |
01/24/2019 |
Paid |
$169,642.81 |
PRM 6100 19011108516 |
Construction, Water System, Main and Service Line |
01/15/2019 |
Paid |
$87,679.48 |
PRM 6100 18121806859 |
Construction, Water System, Main and Service Line |
12/19/2018 |
Paid |
$58,274.82 |
PRM 6100 18121806861 |
Construction, Water System, Main and Service Line |
12/19/2018 |
Paid |
$127,948.77 |