PRM 6100 23071828511 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
07/20/2023 |
Paid |
$224,659.80 |
PRM 6100 23071828536 |
Electrical |
07/20/2023 |
Paid |
$575,719.00 |
PRM 6100 23071828545 |
CONSTRUCTION SERVICES, HEAVY |
07/20/2023 |
Paid |
$749,960.40 |
PRM 6100 23070627133 |
Construction, Pipeline |
07/10/2023 |
Paid |
$214,210.75 |
PRM 6100 23062726111 |
Electrical |
06/29/2023 |
Paid |
$109,816.94 |
PRM 6100 23062225683 |
CONSTRUCTION SERVICES, HEAVY |
06/26/2023 |
Paid |
$923,039.00 |
PRM 6100 23062225683 |
CONSTRUCTION, W/W TREATMENT FA |
06/26/2023 |
Paid |
$275,862.94 |
PRM 6100 23062225683 |
Construction, Water System, Main and Service Line |
06/26/2023 |
Paid |
$250,170.81 |
PRM 6100 23060724355 |
CONSTRUCTION, W/W TREATMENT FA |
06/09/2023 |
Paid |
$323,568.62 |
PRM 6100 23051622258 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
05/18/2023 |
Paid |
$52,725.00 |
PRM 6100 23051622258 |
Electrical |
05/18/2023 |
Paid |
$145,967.50 |
PRM 6100 23051522080 |
CONSTRUCTION SERVICES, HEAVY |
05/17/2023 |
Paid |
$395,675.00 |
PRM 6100 23042620237 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
04/28/2023 |
Paid |
$870,295.00 |
PRM 6100 23042520107 |
CONSTRUCTION SERVICES, HEAVY |
04/27/2023 |
Paid |
$2,273,559.95 |
PRM 6100 23042520113 |
CONSTRUCTION, W/W TREATMENT FA |
04/27/2023 |
Paid |
$488,890.71 |
PRM 6100 23041819418 |
Construction, Pipeline |
04/20/2023 |
Paid |
$83,835.27 |
PRM 6100 23041719310 |
Electrical |
04/19/2023 |
Paid |
$320,376.48 |
PRM 6100 23040718486 |
Construction, Pipeline |
04/11/2023 |
Paid |
$156,846.57 |
PRM 6100 23032216691 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
03/24/2023 |
Paid |
$301,625.00 |
PRM 6100 23032216695 |
CONSTRUCTION, W/W TREATMENT FA |
03/24/2023 |
Paid |
$529,535.94 |
PRM 6100 23032016287 |
Electrical |
03/22/2023 |
Paid |
$65,000.52 |
PRM 6100 23031716177 |
CONSTRUCTION SERVICES, GENERAL |
03/21/2023 |
Paid |
$101,540.90 |
PRM 6100 23030614803 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
03/08/2023 |
Paid |
$354,680.60 |
PRM 6100 23022213688 |
CONSTRUCTION, W/W TREATMENT FA |
02/24/2023 |
Paid |
$592,820.67 |
PRM 6100 23012611335 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/30/2023 |
Paid |
$141,599.40 |
PRM 6100 23012310912 |
Construction, Water System, Main and Service Line |
01/25/2023 |
Paid |
$77,051.30 |
PRM 6100 23011710052 |
CONSTRUCTION, W/W TREATMENT FA |
01/19/2023 |
Paid |
$59,762.84 |
PRM 6100 22123008731 |
Construction, Water System, Main and Service Line |
01/04/2023 |
Paid |
$119,721.01 |
PRM 6100 22122208174 |
CONSTRUCTION, W/W TREATMENT FA |
12/28/2022 |
Paid |
$148,319.21 |
PRM 6100 22121907743 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
12/21/2022 |
Paid |
$121,822.30 |
PRM 6100 22121507499 |
Construction, Pipeline |
12/19/2022 |
Paid |
$108,963.76 |
PRM 6100 22121407335 |
CONSTRUCTION SERVICES, GENERAL |
12/16/2022 |
Paid |
$54,150.00 |
PRM 6100 22121407335 |
Construction, Water System, Main and Service Line |
12/16/2022 |
Paid |
$135,438.15 |
PRM 6100 22112305429 |
CONSTRUCTION, W/W TREATMENT FA |
11/29/2022 |
Paid |
$245,171.25 |
PRM 6100 22112305434 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
11/29/2022 |
Paid |
$231,642.30 |
PRM 6100 22112305434 |
Construction, Water System, Main and Service Line |
11/29/2022 |
Paid |
$389,251.75 |
PRM 6100 22112205337 |
CONSTRUCTION SERVICES, GENERAL |
11/28/2022 |
Paid |
$86,450.00 |
PRM 6100 22101802241 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
10/20/2022 |
Paid |
$239,922.50 |
PRM 6100 22101802241 |
CONSTRUCTION, W/W TREATMENT FA |
10/20/2022 |
Paid |
$279,276.72 |
PRM 6100 22101802241 |
Construction, Water System, Main and Service Line |
10/20/2022 |
Paid |
$346,749.26 |
PRM 6100 22092632732 |
CONSTRUCTION, W/W TREATMENT FA |
09/28/2022 |
Paid |
$646,151.90 |
PRM 6100 22092232569 |
Construction, Water System, Main and Service Line |
09/26/2022 |
Paid |
$108,648.65 |
PRM 6100 22092032301 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
09/22/2022 |
Paid |
$383,847.50 |
PRM 6100 22091531882 |
CONSTRUCTION SERVICES, GENERAL |
09/19/2022 |
Paid |
$366,289.60 |
PRM 6100 22083130484 |
Construction, Water System, Main and Service Line |
09/02/2022 |
Paid |
$143,431.00 |
PRM 6100 22082229389 |
CONSTRUCTION, W/W TREATMENT FA |
08/24/2022 |
Paid |
$23,512.50 |
PRM 6100 22082229468 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
08/24/2022 |
Paid |
$552,900.00 |
PRM 6100 22080928438 |
CONSTRUCTION SERVICES, GENERAL |
08/11/2022 |
Paid |
$1,068,987.50 |
PRM 6100 22080428069 |
Construction, Water System, Main and Service Line |
08/08/2022 |
Paid |
$107,443.10 |
PRM 6100 22080227831 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
08/04/2022 |
Paid |
$120,000.00 |
PRM 6100 22072627120 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
07/28/2022 |
Paid |
$378,897.05 |
PRM 6100 22071826322 |
CONSTRUCTION, W/W TREATMENT FA |
07/20/2022 |
Paid |
$192,638.15 |
PRM 6100 22062824601 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
06/30/2022 |
Paid |
$586,127.20 |
PRM 6100 22062324170 |
Construction, Water System, Main and Service Line |
06/27/2022 |
Paid |
$406,027.70 |
PRM 6100 22061523377 |
CONSTRUCTION SERVICES, GENERAL |
06/16/2022 |
Paid |
$171,950.00 |
PRM 6100 22053021952 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
06/01/2022 |
Paid |
$776,302.95 |
PRM 6100 22051720841 |
Construction, Water System, Main and Service Line |
05/19/2022 |
Paid |
$267,022.13 |
PRM 6100 22051320668 |
CONSTRUCTION SERVICES, GENERAL |
05/17/2022 |
Paid |
$108,110.00 |
PRM 6100 22041818335 |
Construction, Water System, Main and Service Line |
04/20/2022 |
Paid |
$682,202.04 |
PRM 6100 22040517157 |
Construction, Water System, Main and Service Line |
04/07/2022 |
Paid |
$75,623.92 |
PRM 6100 22031615307 |
Construction, Water System, Main and Service Line |
03/18/2022 |
Paid |
$344,328.45 |
PRM 6100 22022413278 |
Construction, Water System, Main and Service Line |
02/28/2022 |
Paid |
$422,545.20 |
PRM 6100 22012710783 |
Construction, Water System, Main and Service Line |
01/31/2022 |
Paid |
$146,880.68 |
PRM 6100 22011909929 |
CONSTRUCTION SERVICES, GENERAL |
01/21/2022 |
Paid |
$22,040.00 |
PRM 6100 22011809714 |
Construction, Water System, Main and Service Line |
01/20/2022 |
Paid |
$106,769.26 |
PRM 6100 21122407920 |
Construction, Water System, Main and Service Line |
12/28/2021 |
Paid |
$289,432.70 |
PRM 6100 21121607354 |
Construction, Water System, Main and Service Line |
12/20/2021 |
Paid |
$53,190.38 |
PRM 6100 21111104085 |
Construction, Water System, Main and Service Line |
11/16/2021 |
Paid |
$516,374.79 |
PRM 6100 21110903929 |
Construction, Water System, Main and Service Line |
11/12/2021 |
Paid |
$187,753.06 |
PRM 6100 21101901786 |
Construction, Water System, Main and Service Line |
10/21/2021 |
Paid |
$183,727.43 |
PRM 6100 21101301264 |
Construction, Water System, Main and Service Line |
10/15/2021 |
Paid |
$211,490.41 |
PRM 6100 21092232907 |
Construction, Water System, Main and Service Line |
09/24/2021 |
Paid |
$429,761.17 |
PRM 6100 21092032677 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
09/22/2021 |
Paid |
$128,826.00 |
PRM 6100 21091632316 |
Construction, Water System, Main and Service Line |
09/20/2021 |
Paid |
$33,250.00 |
PRM 6100 21081929672 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
08/23/2021 |
Paid |
$87,446.20 |
PRM 6100 21081629263 |
Construction, Water System, Main and Service Line |
08/18/2021 |
Paid |
$132,032.99 |
PRM 6100 21081028795 |
Construction, Water System, Main and Service Line |
08/12/2021 |
Paid |
$36,661.06 |
PRM 6100 21081028815 |
Construction, Water System, Main and Service Line |
08/12/2021 |
Paid |
$521,930.00 |
PRM 6100 21072226952 |
Construction, Water System, Main and Service Line |
07/26/2021 |
Paid |
$81,625.50 |
PRM 6100 21071626463 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
07/20/2021 |
Paid |
$79,514.97 |
PRM 6100 21071526205 |
Construction, Water System, Main and Service Line |
07/19/2021 |
Paid |
$435,613.42 |
PRM 6100 21071325962 |
Construction, Water System, Main and Service Line |
07/15/2021 |
Paid |
$104,500.00 |
PRM 6100 21062123453 |
Construction, Water System, Main and Service Line |
06/23/2021 |
Paid |
$697,878.36 |
PRM 6100 21062123532 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
06/23/2021 |
Paid |
$137,115.00 |
PRM 6100 21062123536 |
Construction, Water System, Main and Service Line |
06/23/2021 |
Paid |
$267,692.18 |
PRM 6100 21061523025 |
Construction, Water System, Main and Service Line |
06/17/2021 |
Paid |
$239,115.00 |
PRM 6100 21051820592 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
05/20/2021 |
Paid |
$888,811.83 |
PRM 6100 21051820596 |
Construction, Water System, Main and Service Line |
05/20/2021 |
Paid |
$634,510.25 |
PRM 6100 21051320176 |
Construction, Water System, Main and Service Line |
05/17/2021 |
Paid |
$710,811.44 |
PRM 6100 21051119952 |
Construction, Water System, Main and Service Line |
05/13/2021 |
Paid |
$502,155.01 |
PRM 6100 21050319061 |
Construction, Water System, Main and Service Line |
05/05/2021 |
Paid |
$441,195.77 |
PRM 6100 21042618436 |
Construction, Water System, Main and Service Line |
04/28/2021 |
Paid |
$174,911.64 |
PRM 6100 21042017822 |
Construction, Water System, Main and Service Line |
04/22/2021 |
Paid |
$328,675.20 |
PRM 6100 21041917642 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
04/21/2021 |
Paid |
$34,480.49 |
PRM 6100 21031714701 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
03/19/2021 |
Paid |
$190,827.28 |
PRM 6100 21031614484 |
Construction, Water System, Main and Service Line |
03/18/2021 |
Paid |
$205,239.41 |
PRM 6100 21031514355 |
Construction, Water System, Main and Service Line |
03/17/2021 |
Paid |
$241,847.26 |
PRM 6100 21031114054 |
Construction, Water System, Main and Service Line |
03/15/2021 |
Paid |
$556,664.42 |
PRM 6100 21030413217 |
Construction, Water System, Main and Service Line |
03/08/2021 |
Paid |
$355,414.26 |
PRM 6100 21022212211 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
02/24/2021 |
Paid |
$76,324.80 |
PRM 6100 21021512146 |
Construction, Water System, Main and Service Line |
02/17/2021 |
Paid |
$396,880.35 |
PRM 6100 21020911620 |
Construction, Water System, Main and Service Line |
02/11/2021 |
Paid |
$1,981,506.75 |
PRM 6100 21012710343 |
Construction, Water System, Main and Service Line |
01/29/2021 |
Paid |
$508,801.75 |
PRM 6100 21012109786 |
Construction, Water System, Main and Service Line |
01/25/2021 |
Paid |
$100,362.55 |
PRM 6100 21011909438 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/21/2021 |
Paid |
$192,920.89 |
PRM 6100 21011108901 |
Construction, Water System, Main and Service Line |
01/13/2021 |
Paid |
$452,882.51 |
PRM 6100 21010107984 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/05/2021 |
Paid |
$127,573.82 |
PRM 6100 20121807192 |
Construction, Water System, Main and Service Line |
12/22/2020 |
Paid |
$195,979.87 |
PRM 6100 20121707043 |
Construction, Water System, Main and Service Line |
12/21/2020 |
Paid |
$226,142.32 |
PRM 6100 20121606847 |
Construction, Water System, Main and Service Line |
12/18/2020 |
Paid |
$531,759.64 |
PRM 6100 20111604079 |
Construction, Water System, Main and Service Line |
11/18/2020 |
Paid |
$791,986.94 |
PRM 6100 20111604081 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
11/18/2020 |
Paid |
$58,725.49 |
PRM 6100 20111604084 |
Construction, Water System, Main and Service Line |
11/18/2020 |
Paid |
$202,274.00 |
PRM 6100 20111203849 |
Construction, Water System, Main and Service Line |
11/16/2020 |
Paid |
$134,725.53 |
PRM 6100 20101901834 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
10/21/2020 |
Paid |
$116,902.92 |
PRM 6100 20101601607 |
Construction, Water System, Main and Service Line |
10/20/2020 |
Paid |
$265,354.13 |
PRM 6100 20101601651 |
Construction, Water System, Main and Service Line |
10/20/2020 |
Paid |
$482,337.55 |
PRM 6100 20101301264 |
Construction, Water System, Main and Service Line |
10/15/2020 |
Paid |
$857,652.32 |
PRM 6100 20092935285 |
Construction, Water System, Main and Service Line |
10/01/2020 |
Paid |
$461,159.23 |
PRM 6100 20092535043 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
09/29/2020 |
Paid |
$173,829.86 |
PRM 6100 20091734181 |
Construction, Water System, Main and Service Line |
09/21/2020 |
Paid |
$420,762.65 |
PRM 6100 20091433765 |
Construction, Water System, Main and Service Line |
09/16/2020 |
Paid |
$1,488,845.58 |
PRM 6100 20082531986 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
08/27/2020 |
Paid |
$533,363.85 |
PRM 6100 20082431831 |
Construction, Water System, Main and Service Line |
08/26/2020 |
Paid |
$319,142.93 |
PRM 6100 20082431894 |
Construction, Water System, Main and Service Line |
08/26/2020 |
Paid |
$1,258,241.32 |
PRM 6100 20081431159 |
Construction, Water System, Main and Service Line |
08/18/2020 |
Paid |
$690,300.65 |
PRM 6100 20072128488 |
Construction, Water System, Main and Service Line |
07/23/2020 |
Paid |
$655,252.34 |
PRM 6100 20072128514 |
Construction, Water System, Main and Service Line |
07/23/2020 |
Paid |
$781,451.90 |
PRM 6100 20072028426 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
07/22/2020 |
Paid |
$630,185.09 |
PRM 6100 20072028426 |
Construction, Water System, Main and Service Line |
07/22/2020 |
Paid |
$976,058.57 |
PRM 6100 20061725706 |
Construction, Water System, Main and Service Line |
06/23/2020 |
Paid |
$740,693.57 |
PRM 6100 20061525469 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
06/19/2020 |
Paid |
$844,842.25 |
PRM 6100 20061525469 |
Construction, Water System, Main and Service Line |
06/19/2020 |
Paid |
$548,517.34 |
PRM 6100 20052924240 |
Construction, Water System, Main and Service Line |
06/03/2020 |
Paid |
$878,074.75 |
PRM 6100 20051923336 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
05/22/2020 |
Paid |
$302,409.70 |
PRM 6100 20042821316 |
Construction, Water System, Main and Service Line |
05/21/2020 |
Outstanding |
$86,051.38 |
PRM 6100 20051222588 |
Construction, Water System, Main and Service Line |
05/15/2020 |
Paid |
$1,737,833.63 |
PRM 6100 20042120625 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
04/24/2020 |
Paid |
$1,845,184.40 |
PRM 6100 20042220724 |
Construction, Water System, Main and Service Line |
04/24/2020 |
Paid |
$481,248.47 |
PRM 6100 20041319821 |
Construction, Water System, Main and Service Line |
04/15/2020 |
Paid |
$568,461.47 |
PRM 6100 20031817208 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
03/20/2020 |
Paid |
$990,645.48 |
PRM 6100 20031717090 |
Construction, Water System, Main and Service Line |
03/19/2020 |
Paid |
$702,856.98 |
PRM 6100 20031116570 |
Construction, Water System, Main and Service Line |
03/13/2020 |
Paid |
$920,613.16 |
PRM 6100 20021813929 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
02/20/2020 |
Paid |
$700,461.61 |
PRM 6100 20021813929 |
Construction, Water System, Main and Service Line |
02/20/2020 |
Paid |
$1,006,287.84 |
PRM 6100 20021813931 |
Construction, Water System, Main and Service Line |
02/20/2020 |
Paid |
$844,908.41 |
PRM 6100 20012110430 |
Construction, Water System, Main and Service Line |
01/23/2020 |
Paid |
$1,552,490.92 |
PRM 6100 20012110435 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/23/2020 |
Paid |
$288,615.01 |
PRM 6100 20012110435 |
Construction, Water System, Main and Service Line |
01/23/2020 |
Paid |
$257,185.41 |
PRM 6100 19122007760 |
Construction, Water System, Main and Service Line |
12/26/2019 |
Paid |
$186,519.34 |
PRM 6100 19121607235 |
Construction, Water System, Main and Service Line |
12/19/2019 |
Paid |
$995,826.05 |
PRM 6100 19121707306 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
12/19/2019 |
Paid |
$478,222.86 |
PRM 6100 19121707306 |
Construction, Water System, Main and Service Line |
12/19/2019 |
Paid |
$511,853.19 |
PRM 6100 19111804834 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
11/21/2019 |
Paid |
$606,423.22 |
PRM 6100 19111804834 |
Construction, Water System, Main and Service Line |
11/21/2019 |
Paid |
$880,166.29 |
PRM 6100 19111404563 |
Construction, Water System, Main and Service Line |
11/18/2019 |
Paid |
$1,196,063.51 |
PRM 6100 19110704073 |
Construction, Water System, Main and Service Line |
11/12/2019 |
Paid |
$212,856.71 |
PRM 6100 19102102105 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
10/24/2019 |
Paid |
$424,430.28 |
PRM 6100 19102102108 |
Construction, Water System, Main and Service Line |
10/24/2019 |
Paid |
$570,828.61 |
PRM 6100 19100900764 |
Construction, Water System, Main and Service Line |
10/14/2019 |
Paid |
$645,587.28 |
PRM 6100 19092333369 |
Construction, Water System, Main and Service Line |
09/25/2019 |
Paid |
$140,644.65 |
PRM 6100 19091732937 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
09/19/2019 |
Paid |
$227,509.83 |
PRM 6100 19091732937 |
Construction, Water System, Main and Service Line |
09/19/2019 |
Paid |
$1,294,978.97 |
PRM 6100 19090431682 |
Construction, Water System, Main and Service Line |
09/09/2019 |
Paid |
$27,110.15 |
PRM 6100 19081930225 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
08/21/2019 |
Paid |
$1,218,388.64 |
PRM 6100 19081930225 |
Construction, Water System, Main and Service Line |
08/21/2019 |
Paid |
$437,425.26 |
PRM 6100 19081529964 |
Construction, Water System, Main and Service Line |
08/19/2019 |
Paid |
$825,146.64 |
PRM 6100 19080128418 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
08/05/2019 |
Paid |
$259,525.94 |
PRM 6100 19071626791 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
07/19/2019 |
Paid |
$850,743.05 |
PRM 6100 19071626791 |
Construction, Water System, Main and Service Line |
07/19/2019 |
Paid |
$277,229.08 |
PRM 6100 19071226544 |
Construction, Water System, Main and Service Line |
07/17/2019 |
Paid |
$855,288.96 |
PRM 6100 19070926115 |
Construction, Water System, Main and Service Line |
07/12/2019 |
Paid |
$141,379.16 |
PRM 6100 19061924370 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
06/21/2019 |
Paid |
$1,105,729.70 |
PRM 6100 19061924370 |
Construction, Water System, Main and Service Line |
06/21/2019 |
Paid |
$356,374.03 |
PRM 6100 19061223689 |
Construction, Water System, Main and Service Line |
06/17/2019 |
Paid |
$599,869.96 |
PRM 6100 19060522973 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
06/07/2019 |
Paid |
$466,283.75 |
PRM 6100 19060522973 |
Construction, Water System, Main and Service Line |
06/07/2019 |
Paid |
$768,836.14 |
PRM 6100 19052121560 |
Construction, Water System, Main and Service Line |
05/23/2019 |
Paid |
$1,212,999.87 |
PRM 6100 19052021459 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
05/22/2019 |
Paid |
$21,155.75 |
PRM 6100 19052021459 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
05/22/2019 |
Paid |
$21,057.10 |
PRM 6100 19051521138 |
Construction, Water System, Main and Service Line |
05/17/2019 |
Paid |
$91,532.50 |
PRM 6100 19042919320 |
Construction, Water System, Main and Service Line |
05/01/2019 |
Paid |
$1,230,132.58 |
PRM 6100 19041517912 |
Construction, Water System, Main and Service Line |
04/17/2019 |
Paid |
$78,850.00 |
PRM 6100 19041517914 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
04/17/2019 |
Paid |
$739,569.30 |
PRM 6100 19041517916 |
Construction, Water System, Main and Service Line |
04/17/2019 |
Paid |
$969,110.63 |
PRM 6100 19041517916 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
04/17/2019 |
Paid |
$35,724.45 |
PRM 6100 19032715993 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
03/29/2019 |
Paid |
$491,446.40 |
PRM 6100 19031915189 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
03/21/2019 |
Paid |
$109,950.50 |
PRM 6100 19031915189 |
Construction, Water System, Main and Service Line |
03/21/2019 |
Paid |
$539,581.92 |
PRM 6100 19031915189 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
03/21/2019 |
Paid |
$14,958.39 |
PRM 6100 19021912322 |
Construction, Water System, Main and Service Line |
02/21/2019 |
Paid |
$459,072.83 |
PRM 6100 19021912333 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
02/21/2019 |
Paid |
$394,051.94 |
PRM 6100 19021912335 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
02/21/2019 |
Paid |
$1,137,842.29 |
PRM 6100 19021412044 |
Construction, Water System, Main and Service Line |
02/19/2019 |
Paid |
$256,973.55 |
PRM 6100 19012209171 |
Construction, Water System, Main and Service Line |
01/24/2019 |
Paid |
$203,646.69 |
PRM 6100 19012209174 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/24/2019 |
Paid |
$175,750.00 |
PRM 6100 19012209174 |
Construction, Water System, Main and Service Line |
01/24/2019 |
Paid |
$77,900.00 |
PRM 6100 19012209180 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/24/2019 |
Paid |
$610,587.30 |
PRM 6100 19012209180 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
01/24/2019 |
Paid |
$27,638.63 |
PRM 6100 18121806863 |
Construction, Water System, Main and Service Line |
12/20/2018 |
Paid |
$374,772.97 |
PRM 6100 18121806863 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
12/20/2018 |
Paid |
$84,212.22 |
PRM 6100 18121806865 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
12/20/2018 |
Paid |
$224,021.95 |
PRM 6100 18112004614 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
11/26/2018 |
Paid |
$37,664.25 |
PRM 6100 18111904454 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
11/21/2018 |
Paid |
$118,658.11 |
PRM 6100 18111904454 |
Construction, Water System, Main and Service Line |
11/21/2018 |
Paid |
$344,695.06 |
PRM 6100 18101501509 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
10/17/2018 |
Paid |
$243,055.14 |
PRM 6100 18101501509 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
10/17/2018 |
Paid |
$684,911.17 |
PRM 6100 18101000908 |
Construction, Water System, Main and Service Line |
10/12/2018 |
Paid |
$611,837.27 |
PRM 6100 18091831409 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
09/20/2018 |
Paid |
$676,349.33 |
PRM 6100 18091831409 |
Construction, Water System, Main and Service Line |
09/20/2018 |
Paid |
$169,770.25 |
PRM 6100 18091831411 |
Construction, Water System, Main and Service Line |
09/20/2018 |
Paid |
$484,583.66 |
PRM 6100 18091831411 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
09/20/2018 |
Paid |
$919,653.10 |
PRM 6100 18082028716 |
Construction, Water System, Main and Service Line |
08/22/2018 |
Paid |
$537,093.74 |
PRM 6100 18082028718 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
08/22/2018 |
Paid |
$231,675.55 |
PRM 6100 18082028718 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
08/22/2018 |
Paid |
$416,209.23 |
PRM 6100 18071725961 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
07/19/2018 |
Paid |
$144,031.40 |
PRM 6100 18071725961 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
07/19/2018 |
Paid |
$222,753.03 |
PRM 6100 18071625815 |
Construction, Water System, Main and Service Line |
07/18/2018 |
Paid |
$279,459.60 |
PRM 6100 18071625817 |
Construction, Water System, Main and Service Line |
07/18/2018 |
Paid |
$1,000,123.23 |
PRM 6100 18062123657 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
06/25/2018 |
Paid |
$580,378.72 |
PRM 6100 18062123657 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
06/25/2018 |
Paid |
$586,248.16 |
PRM 6100 18061923379 |
Construction, Water System, Main and Service Line |
06/21/2018 |
Paid |
$702,369.54 |
PRM 6100 18052120910 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
05/23/2018 |
Paid |
$1,001,966.46 |
PRM 6100 18052120910 |
Construction, Water System, Main and Service Line |
05/23/2018 |
Paid |
$456,874.75 |
PRM 6100 18052120910 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
05/23/2018 |
Paid |
$261,982.45 |
PRM 6100 18041617779 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
04/18/2018 |
Paid |
$728,957.01 |
PRM 6100 18041617779 |
Construction, Water System, Main and Service Line |
04/18/2018 |
Paid |
$1,320,116.73 |
PRM 6100 18041617779 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
04/18/2018 |
Paid |
$226,599.79 |
PRM 6100 18032315875 |
Construction, Water System, Main and Service Line |
03/27/2018 |
Paid |
$124,101.54 |
PRM 6100 18032215749 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
03/26/2018 |
Paid |
$364,461.42 |
PRM 6100 18032115560 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
03/23/2018 |
Paid |
$393,400.86 |
PRM 6100 18032015409 |
Construction, Water System, Main and Service Line |
03/22/2018 |
Paid |
$394,624.51 |
PRM 6100 18022112755 |
Construction, Water System, Main and Service Line |
02/23/2018 |
Paid |
$587,895.69 |
PRM 6100 18022112758 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
02/23/2018 |
Paid |
$219,396.94 |
PRM 6100 18022112758 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
02/23/2018 |
Paid |
$293,306.45 |
PRM 6100 18011909909 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/23/2018 |
Paid |
$516,983.13 |
PRM 6100 18011909909 |
Construction, Water System, Main and Service Line |
01/23/2018 |
Paid |
$141,641.44 |
PRM 6100 18011909909 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
01/23/2018 |
Paid |
$238,548.72 |
PRM 6100 18011209592 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/17/2018 |
Paid |
$374,926.41 |
PRM 6100 18011009249 |
Construction, Water System, Main and Service Line |
01/12/2018 |
Paid |
$381,580.85 |
PRM 6100 18010408613 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
01/08/2018 |
Paid |
$872,267.20 |
PRM 6100 17122707807 |
Construction, Water System, Main and Service Line |
12/29/2017 |
Paid |
$743,317.37 |
PRM 6100 17122007396 |
Construction, Water System, Main and Service Line |
12/22/2017 |
Paid |
$608,466.10 |
PRM 6100 17112204881 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
11/28/2017 |
Paid |
$608,598.13 |
PRM 6100 17112104755 |
Construction, Water System, Main and Service Line |
11/27/2017 |
Paid |
$504,212.50 |
PRM 6100 17112104758 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
11/27/2017 |
Paid |
$798,106.82 |
PRM 6100 17112104761 |
Construction, Water System, Main and Service Line |
11/27/2017 |
Paid |
$515,819.93 |
PRM 6100 17102302267 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
10/25/2017 |
Paid |
$495,763.55 |
PRM 6100 17102302267 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
10/25/2017 |
Paid |
$1,159,644.83 |
PRM 6100 17101701842 |
Construction, Water System, Main and Service Line |
10/19/2017 |
Paid |
$408,389.98 |
PRM 6100 17101601697 |
Construction, Water System, Main and Service Line |
10/18/2017 |
Paid |
$744,839.59 |
PRM 6100 17091934009 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
09/21/2017 |
Paid |
$796,953.53 |
PRM 6100 17091934009 |
Construction, Water System, Main and Service Line |
09/21/2017 |
Paid |
$807,578.30 |
PRM 6100 17091934009 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
09/21/2017 |
Paid |
$558,416.04 |
PRM 6100 17082131197 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
08/23/2017 |
Paid |
$2,229,905.08 |
PRM 6100 17082131197 |
Construction, Water System, Main and Service Line |
08/23/2017 |
Paid |
$629,961.89 |
PRM 6100 17082131197 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
08/23/2017 |
Paid |
$930,889.92 |
PRM 6100 17073129124 |
Construction, Water System, Main and Service Line |
08/02/2017 |
Paid |
$1,584,866.00 |
PRM 6100 17071928073 |
Construction, Water System, Main and Service Line |
07/21/2017 |
Paid |
$105,360.32 |
PRM 6100 17071727862 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
07/19/2017 |
Paid |
$944,921.63 |
PRM 6100 17071727862 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
07/19/2017 |
Paid |
$872,284.45 |
PRM 6100 17062325780 |
Construction, Water System, Main and Service Line |
06/27/2017 |
Paid |
$1,494,486.22 |
PRM 6100 17061925266 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
06/21/2017 |
Paid |
$1,415,989.28 |
PRM 6100 17061925266 |
Construction, Water System, Main and Service Line |
06/21/2017 |
Paid |
$118,039.30 |
PRM 6100 17061925266 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
06/21/2017 |
Paid |
$1,109,413.42 |
PRM 6100 17052422985 |
Construction, Water System, Main and Service Line |
05/26/2017 |
Paid |
$313,725.73 |
PRM 6100 17051622188 |
Construction, Water System, Main and Service Line |
05/18/2017 |
Paid |
$336,955.50 |
PRM 6100 17051622190 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
05/18/2017 |
Paid |
$1,357,010.17 |
PRM 6100 17051622190 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
05/18/2017 |
Paid |
$1,037,246.44 |
PRM 6100 17041819510 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
04/20/2017 |
Paid |
$1,063,701.90 |
PRM 6100 17041819510 |
Construction, Water System, Main and Service Line |
04/20/2017 |
Paid |
$594,972.39 |
PRM 6100 17041819510 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
04/20/2017 |
Paid |
$1,507,681.23 |
PRM 6100 17032016633 |
Construction, Water System, Main and Service Line |
03/22/2017 |
Paid |
$466,706.33 |
PRM 6100 17032016636 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
03/22/2017 |
Paid |
$2,056,057.85 |
PRM 6100 17031716498 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
03/21/2017 |
Paid |
$1,393,514.50 |
PRM 6100 17030214890 |
Construction, Water System, Main and Service Line |
03/06/2017 |
Paid |
$167,559.02 |
PRM 6100 17022113837 |
Construction, Water System, Main and Service Line |
02/23/2017 |
Paid |
$194,750.00 |
PRM 6100 17022113850 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
02/23/2017 |
Paid |
$2,341,583.98 |
PRM 6100 17022113850 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
02/23/2017 |
Paid |
$1,719,686.57 |
PRM 6100 17012711308 |
Construction, Water System, Main and Service Line |
01/30/2017 |
Paid |
$595,937.52 |
PRM 6100 17011810281 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/20/2017 |
Paid |
$576,802.59 |
PRM 6100 17011810281 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
01/20/2017 |
Paid |
$1,034,498.01 |
PRM 6100 16122908531 |
Construction, Water System, Main and Service Line |
01/03/2017 |
Paid |
$197,189.82 |
PRM 6100 16121907537 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
12/21/2016 |
Paid |
$808,935.47 |
PRM 6100 16121907537 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
12/21/2016 |
Paid |
$2,126,082.52 |
PRM 6100 16112104859 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
11/23/2016 |
Paid |
$1,139,416.69 |
PRM 6100 16112104859 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
11/23/2016 |
Paid |
$797,354.25 |
PRM 6100 16112205062 |
Construction, Water System, Main and Service Line |
11/23/2016 |
Paid |
$519,086.46 |
PRM 6100 16101901733 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
10/21/2016 |
Paid |
$689,004.30 |
PRM 6100 16101701256 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
10/19/2016 |
Paid |
$330,426.15 |
PRM 6100 16101701258 |
Construction, Water System, Main and Service Line |
10/19/2016 |
Paid |
$779,338.49 |
PRM 6100 16092338660 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
09/27/2016 |
Paid |
$907,463.75 |
PRM 6100 16092338662 |
Construction, Water System, Main and Service Line |
09/27/2016 |
Paid |
$162,925.00 |
PRM 6100 16092138458 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
09/23/2016 |
Paid |
$875,638.32 |
PRM 6100 16090336341 |
Construction, Water System, Main and Service Line |
09/06/2016 |
Paid |
$597,139.60 |
PRM 6100 16081634175 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
08/17/2016 |
Paid |
$428,450.00 |
PRM 6100 16081634175 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
08/17/2016 |
Paid |
$854,061.92 |
PRM 6100 16072631806 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
07/27/2016 |
Paid |
$383,708.65 |
PRM 6100 16062128079 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
06/22/2016 |
Paid |
$1,110,650.88 |
PRM 6100 16051624788 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
05/17/2016 |
Paid |
$332,377.73 |
PRM 6100 16041121205 |
EMBANKMENTS, CONSTRUCTION OF. THIS WORK SHALL CONS |
04/12/2016 |
Paid |
$227,525.00 |
PRM 6100 15072833022 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
07/29/2015 |
Paid |
$39,421.49 |
PRM 6100 15062328781 |
Construction, Water System, Main and Service Line |
06/24/2015 |
Paid |
$56,848.78 |
PRM 2200 15031217329 |
Mixing and Agitation Equipment |
03/13/2015 |
Paid |
$307,000.00 |
PRM 6100 15021814668 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
02/19/2015 |
Paid |
$206,120.79 |
PRM 6100 15012912404 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/30/2015 |
Paid |
$15,036.12 |
PRM 6100 14111705274 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
11/18/2014 |
Paid |
$14,347.38 |
PRM 6100 14100600489 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
10/07/2014 |
Paid |
$248,997.75 |
PRM 6100 14100600493 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
10/07/2014 |
Paid |
$91,357.62 |
PRM 6100 14090235503 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
09/03/2014 |
Paid |
$127,911.17 |
PRM 6100 14081333400 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
08/14/2014 |
Paid |
$147,379.83 |
PRM 6100 14080432371 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
08/05/2014 |
Paid |
$174,117.47 |
PRM 6100 14070728551 |
Construction, Water System, Main and Service Line |
07/09/2014 |
Paid |
$14,582.50 |
PRM 6100 14070728563 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
07/09/2014 |
Paid |
$1,021,203.84 |
PRM 6100 14061726580 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
06/18/2014 |
Paid |
$55,440.71 |
PRM 6100 14061726580 |
Construction, Water System, Main and Service Line |
06/18/2014 |
Paid |
$8,740.00 |
PRM 6100 14061326277 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
06/16/2014 |
Paid |
$409,572.65 |
PRM 6100 14051923655 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
05/20/2014 |
Paid |
$35,150.00 |
PRM 6100 14051923660 |
Construction, Water System, Main and Service Line |
05/20/2014 |
Paid |
$41,347.75 |
PRM 6100 14050221834 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
05/05/2014 |
Paid |
$95,162.03 |
PRM 6100 14042120638 |
Construction, Water System, Main and Service Line |
04/22/2014 |
Paid |
$69,252.44 |
PRM 6100 14042120640 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
04/22/2014 |
Paid |
$131,955.00 |
PRM 6100 14040318811 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
04/04/2014 |
Paid |
$65,601.41 |
PRM 6100 14031816720 |
Construction, Water System, Main and Service Line |
03/19/2014 |
Paid |
$172,543.75 |
PRM 6100 14021813899 |
Construction, Pipeline |
02/19/2014 |
Paid |
$48,000.00 |
PRM 6100 14021813908 |
Construction, Water System, Main and Service Line |
02/19/2014 |
Paid |
$89,323.75 |
PRM 6100 14021813917 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
02/19/2014 |
Paid |
$21,850.41 |
PRM 6100 14012111352 |
CONSTRUCTION AND UPGRADES, WASTEWATER TREATMENT PLANT |
01/22/2014 |
Paid |
$35,862.50 |
PRM 6100 14012111352 |
Construction, Water System, Main and Service Line |
01/22/2014 |
Paid |
$52,725.00 |
PRM 6100 14011611134 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
01/17/2014 |
Paid |
$160,875.00 |
PRM 6100 13121607981 |
Construction, Water System, Main and Service Line |
12/17/2013 |
Paid |
$122,374.25 |
PRM 6100 13121207730 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
12/13/2013 |
Paid |
$126,617.92 |
PRM 6100 13120406857 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
12/05/2013 |
Paid |
$412,589.64 |
PRM 6100 13111805483 |
Construction, Water System, Main and Service Line |
11/19/2013 |
Paid |
$68,789.50 |
PRM 6100 13110504391 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
11/06/2013 |
Paid |
$46,507.50 |
PRM 6100 13100300282 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
10/04/2013 |
Paid |
$112,838.71 |
PRM 6100 13100100067 |
Construction, Water System, Main and Service Line |
10/02/2013 |
Paid |
$45,600.00 |
PRM 6100 13091335116 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
09/16/2013 |
Paid |
$180,022.15 |
PRM 6100 13090333767 |
Construction, Water System, Main and Service Line |
09/04/2013 |
Paid |
$48,497.50 |
PRM 6100 13081632377 |
CONSTRUCTION, W/W TREATMENT FA |
08/19/2013 |
Paid |
$84,000.00 |
PRM 6100 13081232023 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
08/13/2013 |
Paid |
$150,461.00 |
PRM 2200 13072630351 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
07/29/2013 |
Paid |
$24,500.00 |
PRM 6100 13070227169 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
07/03/2013 |
Paid |
$92,939.89 |
PRM 6100 13060424808 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
06/05/2013 |
Paid |
$198,741.30 |
PRM 6100 13052123429 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
05/22/2013 |
Paid |
$165,197.13 |
PRM 6100 13041619916 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
04/17/2013 |
Paid |
$610,005.86 |
PRM 6100 13031917340 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
03/20/2013 |
Paid |
$683,312.97 |
PRM 6100 13021313995 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
02/14/2013 |
Paid |
$274,795.16 |
PRM 6100 13011711188 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
01/18/2013 |
Paid |
$386,495.02 |
PRM 6100 12120506646 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
12/06/2012 |
Paid |
$302,250.00 |
PRM 6100 12100800914 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
10/09/2012 |
Paid |
$344,175.00 |
PRM 6100 12091133585 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
09/12/2012 |
Paid |
$100,083.11 |
PRM 6100 12073028873 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
07/31/2012 |
Paid |
$255,486.98 |
PRM 6100 12062825988 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
06/29/2012 |
Paid |
$308,696.24 |
PRM 6100 12060623631 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
06/07/2012 |
Paid |
$374,541.81 |
PRM 6100 12050820901 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
05/09/2012 |
Paid |
$615,755.62 |
PRM 6100 12041018014 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
04/11/2012 |
Paid |
$262,005.05 |
PRM 6100 12031215224 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
03/13/2012 |
Paid |
$1,303,230.19 |
PRM 6100 12021312343 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
02/14/2012 |
Paid |
$199,699.99 |
PRM 6100 12011810040 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
01/19/2012 |
Paid |
$348,952.65 |
PRM 6100 11120906735 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
12/12/2011 |
Paid |
$681,653.07 |
PRM 6100 11110904225 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
11/10/2011 |
Paid |
$674,419.26 |
PRM 6100 11100500455 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
10/06/2011 |
Paid |
$1,062,109.36 |
PRM 6100 11092635409 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
09/27/2011 |
Paid |
$589,520.31 |
PRM 6100 11081531337 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
08/16/2011 |
Paid |
$351,901.25 |
PRM 6100 11071828504 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
07/19/2011 |
Paid |
$298,398.53 |
PRM 6100 11062026059 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
06/21/2011 |
Paid |
$645,908.41 |
PRM 6100 11050922201 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
05/10/2011 |
Paid |
$513,377.94 |
PRM 6100 11041920303 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
04/20/2011 |
Paid |
$609,902.86 |
PRM 6100 11032117151 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
03/22/2011 |
Paid |
$860,162.60 |
PRM 6100 11022214021 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
02/23/2011 |
Paid |
$866,711.75 |
PRM 6100 11011410612 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
01/18/2011 |
Paid |
$1,195,534.32 |
PRM 6100 10122008244 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
12/21/2010 |
Paid |
$1,879,307.58 |
PRM 6100 10111204849 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
11/18/2010 |
Paid |
$1,178,728.18 |
PRM 6100 10101501911 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
10/18/2010 |
Paid |
$928,550.63 |
PRM 6100 10090736265 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
09/08/2010 |
Paid |
$1,398,319.29 |
PRM 6100 10090336075 |
Construction, Utility/Underground Projects |
09/07/2010 |
Paid |
$52,663.30 |
PRM 6100 10073032350 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
08/02/2010 |
Paid |
$2,085,018.78 |
PRM 6100 10071630734 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
07/19/2010 |
Paid |
$598,892.00 |
PRM 6100 10062227922 |
Construction, Utility/Underground Projects |
06/23/2010 |
Paid |
$114,699.29 |
PRM 6100 10062127787 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
06/22/2010 |
Paid |
$1,318,164.81 |
PRM 6100 10050322806 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
05/04/2010 |
Paid |
$302,337.50 |
PRM 6100 10043022652 |
CONSTRUCTION, W/W TREATMENT FA |
05/03/2010 |
Paid |
$50,906.27 |
PRM 6100 10042021668 |
Construction, Utility/Underground Projects |
04/21/2010 |
Paid |
$38,000.00 |
PRM 6100 10041921608 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
04/20/2010 |
Paid |
$561,212.50 |
PRM 6100 10031517757 |
BUILDING CONSTRUCTION SVCS, NEW (INCL. MAINT AND RPR SVCS) |
03/16/2010 |
Paid |
$979,925.00 |
PRM 6100 10030115762 |
CONSTRUCTION, W/W TREATMENT FA |
03/02/2010 |
Paid |
$71,831.56 |
PRM 6100 10021814643 |
Construction, Utility/Underground Projects |
02/19/2010 |
Paid |
$46,645.00 |
PRM 6100 10021214342 |
Construction, Water System, Main and Service Line |
02/16/2010 |
Paid |
$94,172.68 |
PRM 6100 10010409637 |
Construction, Utility/Underground Projects |
01/05/2010 |
Paid |
$17,957.83 |
PRM 6100 09122108472 |
Construction, Pipeline |
12/22/2009 |
Paid |
$19,007.00 |
PRM 6100 09101902095 |
Construction, Utility/Underground Projects |
10/20/2009 |
Paid |
$86,730.59 |
PRM 6100 09092144422 |
Construction, Utility/Underground Projects |
09/22/2009 |
Paid |
$244,707.38 |
PRM 6100 09090843059 |
CONSTRUCTION, W/W TREATMENT FA |
09/09/2009 |
Paid |
$6,860.90 |
PRM 6100 09090843059 |
Construction, Water System, Main and Service Line |
09/09/2009 |
Paid |
$824,189.96 |
PRM 6100 09081239999 |
Construction, Water System, Main and Service Line |
08/13/2009 |
Paid |
$181,658.83 |
PRM 6100 09081039605 |
Construction, Utility/Underground Projects |
08/11/2009 |
Paid |
$137,961.64 |
PRM 6100 09072137117 |
CONSTRUCTION, W/W TREATMENT FA |
07/22/2009 |
Paid |
$17,156.95 |
PRM 6100 09072137117 |
Construction, Utility/Underground Projects |
07/22/2009 |
Paid |
$125,386.36 |
PRM 6100 09061633245 |
Construction, Water System, Main and Service Line |
06/17/2009 |
Paid |
$18,197.49 |
PRM 6100 09061232938 |
Construction, Utility/Underground Projects |
06/15/2009 |
Paid |
$114,795.04 |
PRM 6100 09060331767 |
CONSTRUCTION, W/W TREATMENT FA |
06/04/2009 |
Paid |
$31,026.10 |
PRM 6100 09052831084 |
Construction, Pipeline |
05/29/2009 |
Paid |
$13,316.00 |
PRM 6100 09051829817 |
CONSTRUCTION, W/W TREATMENT FA |
05/19/2009 |
Paid |
$23,986.55 |
PRM 6100 09051829817 |
Construction, Water System, Main and Service Line |
05/19/2009 |
Paid |
$113,023.78 |
PRM 6100 09050628662 |
CONSTRUCTION, W/W TREATMENT FA |
05/07/2009 |
Paid |
$32,795.90 |
PRM 6100 09042126758 |
Construction, Water System, Main and Service Line |
04/22/2009 |
Paid |
$945,989.05 |
PRM 6100 09042026532 |
Construction, Utility/Underground Projects |
04/21/2009 |
Paid |
$59,469.66 |
PRM 6100 09041525977 |
CONSTRUCTION, W/W TREATMENT FA |
04/16/2009 |
Paid |
$56,265.54 |
PRM 6100 09031621787 |
CONSTRUCTION, W/W TREATMENT FA |
03/17/2009 |
Paid |
$176,096.58 |
PRM 6100 09031621787 |
Construction, Utility/Underground Projects |
03/17/2009 |
Paid |
$14,250.00 |
PRM 6100 09031621787 |
Construction, Water System, Main and Service Line |
03/17/2009 |
Paid |
$1,254,330.54 |
PRM 6100 09030219732 |
Construction, Water System, Main and Service Line |
03/03/2009 |
Paid |
$1,088,630.84 |
PRM 6100 09021818392 |
CONSTRUCTION, W/W TREATMENT FA |
02/19/2009 |
Paid |
$18,810.00 |
PRM 6100 09021718179 |
CONSTRUCTION, W/W TREATMENT FA |
02/18/2009 |
Paid |
$263,314.65 |
PRM 6100 09013015944 |
Heating, Ventilating and Air Conditioning (HVAC) |
02/02/2009 |
Paid |
$40,741.31 |
PRM 6100 09012214672 |
CONSTRUCTION, W/W TREATMENT FA |
01/23/2009 |
Paid |
$123,994.61 |
PRM 6100 09012214672 |
Construction, Water System, Main and Service Line |
01/23/2009 |
Paid |
$1,678,645.58 |
PRM 6100 08123011665 |
Construction, Pipeline |
12/31/2008 |
Paid |
$234,192.43 |
PRM 6100 08121610753 |
CONSTRUCTION, W/W TREATMENT FA |
12/17/2008 |
Paid |
$435,737.71 |
PRM 6100 08121610754 |
Construction, Water System, Main and Service Line |
12/17/2008 |
Paid |
$1,411,566.99 |
PRM 6100 08120308900 |
Construction, Water System, Main and Service Line |
12/04/2008 |
Paid |
$1,202,556.08 |
PRM 6100 08112007235 |
Heating, Ventilating and Air Conditioning (HVAC) |
11/21/2008 |
Paid |
$12,802.20 |
PRM 6100 08111706645 |
CONSTRUCTION, W/W TREATMENT FA |
11/18/2008 |
Paid |
$72,008.69 |
PRM 6100 08111706646 |
CONSTRUCTION, W/W TREATMENT FA |
11/18/2008 |
Paid |
$53,399.50 |
PRM 6100 08110404957 |
Construction, Pipeline |
11/05/2008 |
Paid |
$129,458.40 |
PRM 6100 08110404958 |
CONSTRUCTION, W/W TREATMENT FA |
11/05/2008 |
Paid |
$61,585.48 |
PRM 6100 08102303522 |
CONSTRUCTION, W/W TREATMENT FA |
10/24/2008 |
Paid |
$89,746.50 |
PRM 6100 08102002839 |
Construction, Water System, Main and Service Line |
10/21/2008 |
Paid |
$761,297.74 |
PRM 6100 08100600793 |
CONSTRUCTION, W/W TREATMENT FA |
10/07/2008 |
Paid |
$13,528.00 |